Loading...
HomeMy WebLinkAbout5601 . " . RESOLUTION NO. 5601 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARCADIA, CALIFORNIA CHANGING THE FEES FOR BUILDING CODE VARIANCES, BUILDING PERMITS, PLAN REVIEW FEES, GRADING PLAN CF-lliCKING, GRADING PERMITS, PLUMBING PERMITS, PLUMBING PLAN CHECKING, ELECTRICAL PERMITS, MECHANICAL PERMITS, MECHANICAL PLAN CHECKING, MOVE EXAMINATION, RELOCATION PERMIT, REMOVAL PERMIT, DEMOLITION PERMIT, SIGN PERMIT AND SWIMMING POOL PERMIT, AND REPEALING RESOLUTION NO. 5545. THE CITY COUNCIL OF THE CITY OF ARCADIA DOES HEREBY RESOLVE AND DETERMINE AS FOLLOWS: SECTION 1. That City Council Resolution 5545 which sets forth current fees, is hereby repealed. SECTION 2. That the fees set forth in this resolution are necessary for the purpose of defraying the City of Arcadia's expenditures and costs for the purposes set forth in this resolution. SECTION l. Pursuant to Arcadia Municipal Code Section 8040, the fee for filing an application for a variance to the Codes shall be $290.40. SECTION 4, Pursuant to Arcadia Municipal Code Section 8130.6, there is hereby established the following fee schedule for filing an application for a building permit: BUILDING PERMIT FEES Total Valuation Fee Issuing Fee $33.15 $11.60 $33.50 Supplemental Issuing Fee $1.00 to $500.00 $501.00 to $2,000.00 $33.50 for the first $500.00 plus $3.45 for each additional $100.00 or fraction thereof, to and including $2,000.00 -1- 5601 ~ $2,001.00 to $25,000.00 $85.25 for the first $2,000.00 plus $13.75 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 $401.50 for the first $25,000.00 plus $10.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 $664.00 for the first $50,000.00 plus $6.85 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 $25,001.00 to $50,000.00 $50,001 to $100,000.00 $100,001 and up plus $1006.50 for the first $100,000.00 $5.70 for each additional $1,000.00 or fraction thereof. OTHER INSPECTIONS For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice. $43.00 For inspection for which no fees are herein prescribed and for emergency inspections: For the time consumed per hour, with a minimum charge of one hour $43.00 each PLAN REVIEW FEES When the valuation of proposed construction exceeds five hundred dollars ($500.00) and a plan is required to be submitted by Subsection (b) of Section 302, a plan review fee equal to 65% of the building permit fee shall be paid at the time of submitting plans and specifications for review. In addition, all commercial, industrial and multiple-family plans shall be charged a Fire Department plan review fee equal to 15% of the building plan check fee which shall be paid at the time of submitting the plans and specifications for review. In addition, when plans are required to be checked for compliance with the State Energy Conservation Regulations an energy plan review fee equal to 20% of the building permit fee shall be paid at the time of submitting the plans and specifications for review. -2- 5601 SECTION 5. Pursuant to Arcadia Municipal Code Sections 8130.30, there is hereby established the following fee schedule for the plan checking fee for filing an application for a grading permit; GRADING PLAN CHECKING FEE Volume Fee 50 cubic yards or less 51 to 100 cubic yards 101 to 1,000 cubic yards $33.15 $41.40 $49.70 1,001 to 10,000 cubic yards $58.05 10,001 to 100,000 cubic yards $58.05 for the first 10,000.00 cubic yards plus $23.20 for each additional 10,000 cubic yards or fraction thereof. 100,001 to 200,000 cubic yards $266.85 for the first 100,000.00 cubic yards plus $13.95 for each additional 10,000 cubic yards or fraction thereof. 200,001 cubic yards or more $406.35 for the first 200,000.00 cubic yards plus $7.00 for each additional 10,000 cubic yards or fraction thereof. Additional plan review required by changes, additions or revisions to approved plans (minimum charge - one hour): $43.00/hour SECTION 6. Pursuant to Arcadia Municipal Code Sections 8130.30, there is hereby established the following fee schedule for filing an application for a grading permit: -3- 5601 GRADING PERMIT FEE Volume Fee Issuing Fee $33.15 $11.60 Supplemental Issuing Fee 50 cubic yards or less $34.80 51 to 100 cubic yards 101 to 1,000 cubic yards $41.60 $41.60 for the first 100 cubic yards plus $16.40 for each additional 100 cubic yards or fraction thereof. 1,001 to 10,000 cubic yards $189.20 for the first 1,000 cubic yards plus $14.00 for each additional 1000 cubic yards or fraction thereof. 10,001 to 100,000 cubic yards $315.20 for the first 10,000.00 cubic yards plus $62.85 for each additional 10,000 cubic yards or fraction thereof. 100,001 cubic yards or more $880.85 for the first 100,000.00 cubic yards plus $35.00 for each additional 10,000 cubic yards or fraction thereof. OTHER INSPECTIONS For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice $43.00 For inspection for which no fees are herein prescribed and for emergency inspections: For the time consumed per hour with a minimum charge of one hour $43.00 SECTION 7. Pursuant to Arcadia Municipal Code Subsection 30.5 of Part III of Section 8230.1, there is hereby established the following fee schedule for filing an application for a plumbing permit: -4- 5601 PLUMBING PERMIT FEES PERMIT ISSUANCE 1. Permit issuance fee for each permit 2. Where additional fixtures, or equipment have not been included in the original permit, a supplemental permit fee is required. UNIT FEE SCHEDULE 1. For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping, and backflow protection therefor) . 2. For each building sewer and each trailer park sewer 3. Rainwater systems - per drain (inside building) 4. For each cesspool (where permitted) 5. For each private sewage disposal system 6. For each water heater and/ or vent 7. For each gas piping system of one to five outlets 8. For each gas piping system over five outlets, per outlet 9. For each industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture,traps 10. For installation, alteration, or repair of water piping and/ or water treating equipment each 11. For repair or alteration of drainage or vent piping, each fixture 12. For each lawn sprinkler system on anyone meter including backflow protection devices therefor 13. For atmospheric-type vacuum breakers not included in Item 1: -5- $ 33.15 $ 11.60 $ 9.35 $ 23.25 $ 9.35 $ 35.00 $ 69.85 $ 11.60 $ 11.60 $ 2.30 $ 18.65 ,$ 9.35 $ 9.35 $ 14.05 5601 1-5 Over 5, each $ 11.60 $ 2.30 14. For each backflow protective device other than atmospheric- type vacuum breaker: 2 inches and smaller over 2 inches $ 11.60 $ 23.25 $ 23.25 15. For each swimming pool piping (including spas and hot (tubs) 16. For each swimming pool "P" trap $ 9.35 17. For each swimming pool, spa and hot tub water heater (including gas piping) $ 35.00 18. For each sewer cap and/or cesspool fill $ 11.60 $ 23.25 19. For each sewer connection on property (including each dwelling unit in a multiple-family development) OTHER 1. For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior writtl~n notice $ 43.00 2. For inspection of plumbing facilities for which no fees are herein prescribed and for emergency inspections For the time consumed per hour, with a minimum charge of one hour $43.00 each PLUMBING PLAN CHECKING FEES For plumbing plans which require plan checking, a plan checking fee equal to 65% of the plumbing permit fee shall be paid to the Building Official at the time plans are submitted for plan check. SECTION 8. Pursuant to Arcadia Municipal Code Subsection 92-4 of Part III Sections 8330, there is hereby established the following fee schedule for filing an application for an electrical permit: -6- 5601 ELECTRICAL PERMIT FEE PERMIT ISSUANCE 1. For the issuance of each permit 2. For issuing each supplemental permit SERVICES 1. For residential service of 600 volts or less and not over 400 amps in rating, including one meter each 2. For one commercial service 200 amps or less, including one meter each 3. For each commercial service 200 amps to 1,000 amps, including one meter each 4. For commercial services over 600 volts or over 1,000 amps in rating, including one meter each 5. For each additional meter 6. For each distribution panel NEW RESIDENTIAL CONSTRUCTION In addition to the fees for permit issuance and services as outlined above: 1. For each new single, duplex and multiple family dwelling for each square foot of gross floor area 2. For buildings accessory to new residential buildings constructed in conjunction with those residential buildings for each square foot of gross floor area OTHER CONSTRUCTION 1. For receptacle, switch, lighting outlets First 20 each Additional each 2. For lighting fixtures, sockets or other lamp devices First 20 each -7- $ 33.15 $ 11.60 $ 11.60 $ 23.50 $ 46.45 $116.50 $ 11.60 $ 11.60 $ .03 $ .02 $ 1.15 $ .75 $ 1.15 5601 NOTE: Additional each $ .75 3. For pole or platform mounted lighting fixtures such as tennis courts, parking lot standards and walkway lighting fixtures First 6 each Additional each $ 4.65 $ 2.30 $ 4.65 4. For fixed residential appliances not exceeding 1 hp, kw or kva each 5. For fixed factory wired non-residential appliances not exceeding 1 hp, kw or kva each For residel\tial, commercial or industrial 220 or 240 volt receptacle each $ 4.65 $ 4.65 6. NOTE: For other types of air conditioners and other motor driven appliances having larger electrical rating, see POWER SCHEDULE. POWER SCHEDULE For motors, generators, transformers, rectifiers, converters, capacitors and other motor driven appliances such as heating, air conditioners, and cooling and baking equipment: Rating in hp, kw, kva or kvar: 1. Up to and including 1 each $ 5.70 2. Over 1 and not over 10 each $ 11.60 3. Over 10 and not over 50 each $ 29.15 4. Over 50 and not over 100 each $ 58.15 5. Over 100 each , $ 93.15 NOTE: For equipment having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. BUSW A YS For trolley and plug-in busways - each 100 feet or fraction thereof $ 6.90 -8- 5601 SIGNS Signs, outline lighting and marquees 1. For one sign and one branch circuit each 2. For additional branch circuits each CARNIVALS. CHRISTMAS TREE LOTS. SALES LOT. ETC. 1. For electric generators and electrically driven rides each 2. For mechanically driven rides and walk through attractions with lighting each 3. For arena and booth lighting each 4. For Christmas tree lots, sales booths, etc., each TEMPORARY POWER 1. For temporary service pole or pedestal installed in conjunction with temporary buildings each 2. For temporary service pole and one distribution system for construction sites each 3. For additional distribution panels installed in conjunction with remporary power poles each SWIMMING POOLS, SPAS. HOT TUBS, ETC. 1. For not more than one sub panel, three motors, integral lighting fixtures and all wiring and lighting for operation of same NOTE: For additional electrical outlets or equipment, see OTHER CONSTRUCTION or POWER SCHEDULE OTHER INSPECTION 1. For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice each -9- $ 46.45 $ 4.65 $ 11.60 $ 5.70 $ 5.70 $ 23.25 $ 46.45 $ 23.25 $ 11.60 $ 58.15 $ 43.00 5601 2. For inspection of electrical equipment for which no fees are herein prescribed and for emergency inspections for the time consumed For the time consumed per hour with a minimum charge of one hour $ 43.00 ELECTRICAL PLAN CHECKING FEES When service switch size exceeds 400 amps or 300 volts or when connected load exceeds 400 amps, a plan checking fee equal to 65% of the electrical permit fee shall be paid to the Building Official at the time plans are submitted for plan check. ANNUAL ELECTRICAL MAINTENANCE PERMIT $ 65.20 NOTE: Maintenance permits are only issued to manufacturing plants, commercial establishments, hospitals and similar occupancies having duly licensed journeymen electricians as permanent employees. This annual permit does not absolve the organization from any fees, inspections or other requirements of this Code as pertains to electrical installations. SECTION 9. Pursuant to Arcadia Municipal Code Sections 8432, there is hereby established the following fee schedule for filing an application for a mechanical permit; MECHANICAL PERMIT FEES PERMIT ISSUANCE 1. For the issuance of each permit $ 33.15 2. For issuing each supplemental permit $ 11.60 UNIT FEE SCHEDULE 1. For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h , $ 14.05 2. For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, over 100,000 Btu/h $ 17.55 3. For the installation or relocation of each floor furnace, including vents $ 14.05 -10- 5601 4. For the installation or relocation of each suspended heater, $ 14.05 recessed wall heater or floor mounted unit heater 5. For the installation, relocation or replacement of each appliance $ 7.00 vent installed and not included in an appliance permit 6. For the repair of, alteration of, or addition to each heating appliance $ 14.05 refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by this code. 7. For the installation or relocation of each boiler or compressor to $ 14.05 and including 3 horsepower, or each absorption system to and including 100,000 Btu/h and including 500,000 Btu/h 8. For the installation or relocation of each boiler or compressor $ 25.65 over 3 horsepower to and including 15 horsepower or each absorption system over 100,000 Btu/h and including 500,000 Btu/h 9. For the installation or relocation of each boiler or compressor $ 35.00 over 15 horsepower to and including 30 horsepower or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h 10. For the installation or relocation of each boiler or compressor $ 52.50 over 30 horsepower to and including 50 horsepower or each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h 11. For the installation or relocation of each boiler or compressor $ 87.45 over 50 horsepower or each absorption system over 1,750,000 Btu/h 12. For each air-handling unit to and including 10,000 cubic feet per $ 10.50 minute, including ducts attached thereto NOTE: This fee shall not apply to an air-handling unit which is a portion of a factory assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code. 13. For each air-handling unit over 10,000 dm $ 17.55 14. For each evaporative cooler other than portable type $ 10.50 15. For each ventilation fan connected to a single duct $ 7.00 -11- 5601 16. For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit 17. For the installation of each hood which is served by mechanical exhaust, including ducts for such hood 18. For the installation or relocation of each domestic-type incinerator 19. For the installation or relocation of each commercial or industrial- type incinerator 20. For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this Code. OTHER INSPECnONS For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice each $ 10.50 $ 10.50 $ 17.55 $ 69.85 $ 10.50 $ 43.00 For inspecting for which no fees are herein prescribed and for emergency inspection: For the time consumed per hour with a minimum charge of one hour MECHANICAL PLAN CHECKING FEES $ 43.00 For mechanical plan which require plan checking, a plan checking fee equal to 65% of the mechanical permit fee shall be paid to the Building Official at the time plans are submitted for plan check. SECTION 10. Pursuant to Arcadia Municipal Code Sections 8632.4 there is hereby established the fee for filing an application for a move examination shall be $11.60 for each one hundred (100) square feet or fraction thereof of floor space, whether usable or not, contained within the building proposed to be relocated. SECTION 11. Pursuant to Arcadia Municipal Code Sections 8633, there is hereby established the fee for filing an application for a relocation permit of $18.65 per one thousand dollars ($1,000.00) valuation, or fraction thereof, of the building to be relocated. For the purpose of computing such fee, valuation shall include the reasonable cost of moving such structure and the reasonable value of all new construction, alterations, additions, repairs, replacements and foundations in connection therewith. Permit Issuing Fee -12- $ 33.15 5601 Supplemental Issuing Fee $ 11.60 SECTION 12. Pursuant to Arcadia Municipal Code Sections 8642, there is hereby established the fee for filing an application for a removal permit of $244.50. Permit Issuing Fee Supplemental Issuing Fee $ 33.15 $ 11.60 SECTION 13. Pursuant to Arcadia Municipal Code Sections 8652, there is hereby established the following fee schedule for filing an application for a demolition permit: DEMOLmON PERMIT FEE Permit Issuing Fee Supplemental Issuing Fee $ 33.15 $ 11.60 Square foota~e of Building 500 sq. ft. or less 501 to 1,000 sq. ft. 1,001 to 3,000 sq. ft. 3,001 to 10,000 sq. ft. 10,001 sq. ft. or more Fee $ 18.65 $ 35.00 $ 58.15 $ 81.40 $186.30 SECTION 14. Pursuant to Arcadia Municipal Code Sections 8712 there is hereby established the fee for filing an application for a sign permit of the same as required for a building of equivalent valuation and shall also include a plan check fee which shall be 50% of the permit fee. SECTION 15. Pursuant to Arcadia Municipal Code Sections 8742 there is hereby established the fee for filing an application for a swimming pool permit shall be the same as required for a building of equivalent valuation. The valuation shall be calculated at the rate of $198.05 per perimeter foot of the swimming pool and/or spa. Permit Issuing Fee Supplemental Issuing Fee $ 33.15 $ 11.60 OTHER INSPECTIONS For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice. $ 43.00 For inspection for which no fees are herein prescribed and for emergency inspections: For the time consumed per hour with a minimum charge of one hour $ 43.00 -13- 5601 SECTION 16. This Resolution shall become effective August 1, 1991. SECTION 17. Neither the adoption of this resolution nor the repeal hereby of any resolution shall in any manner be construed as affecting any such fee, nor the effect the validity of any bond or cash deposit in lieu thereof, posted, filed or deposited therefore and all rights and obligations thereunder appertaining shall continue in full force and effect. SECTION 18. If any section, subsection, senrence, clause, phrase or portion of this resolution is, for any reason, held to be invalid or unconstitutional by the decision of any court or competent jurisdiction such decision shall not affect the validity of the remaining portions of this resolution. The City Council of the City of Arcadia hereby declares that it would have adopted this resolution and each section, subsection, sentence, clause, phrase or portion thereof irrespective of the fact that anyone or more sections, subsections, sentences, clauses, phrases or portions be declared invalid or unconstitutional. SECTION 19. The City Council hereby finds that the fees specified in this resolution will not produce an amount in excess of that estimated to fund the operation of the City of Arcadia Planning Division. Based on the foregoing, the City Council hereby finds this resolution is exempt from the requirements of the California Environmental Quality Act as specified in Title 14 Section 15079.1 of the California Administrative Code. SECTION 20. The City Clerk shall certify to the adoption of this resolution. Passed, approved and adopted this 2nd day of July, 1991. ~o/~ ATTEST: -14- 5601 STATE OF CALIFORNIA COUNTY OF LOS ANGELES SS: CITY OF ARCADIA I, JUNE D. ALFORD, city Clerk of the City of Arcadia, hereby certify that the foregoing Resolution No. 5601 was passed and adopted by the City Council of the City of Arcadia, signed by the Mayor and attested to by the city Clerk at a regular meeting of said Council held on the 2nd day of July, 1991 and that said Resolution was adopted by the following vote, to wit: AYES: Councilmember ciraulo, Fasching, Young and Harbicht NOES: None ABSENT: Councilmember Gilb J 5601