HomeMy WebLinkAbout5545
.
.
,.
RESOLUTION NO, 5545
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARCADIA,
CALIFORNIA CHANGING THE FEES FOR BUILDING CODE
VARIANCES, BUILDING PERMITS, GRADING PLAN CHECKING,
GRADING PERMITS, PLUMBING PERMITS, PLUMBING PLAN
CHECKING, ELECTRICAL PERMITS, MECHANICAL PERMITS,
MECHANICAL PLAN CHECKING, MOVE EXAMINATION,
RELOCATION PERMIT, REMOVAL PERMIT, DEMOLmON PERMIT,
SIGN PERMIT AND SWIMMING POOL PERMIT, AND REPEALING
RESOLUTION NO. 5507,
THE CITY COUNCIL OF THE CITY OF ARCADIA DOES HEREBY RESOLVE
AND DETERMINE AS FOLLOWS:
SECTION 1, That the fees set forth in this resolution are necessary for the
purpose of defraying the City of Arcadia's expenditures and costs for the purposes set
forth in this resolution.
SECTION 2, Pursuant to Arcadia Municipal Code Section 8040, the fee for filing
an application for a variance to the Codes shall be $268,90,
SECTION 3, Pursuant to Arcadia Municipal Code Section 8130,6, there is hereby
established the following fee schedule for filing an application for a building permit:
BUILDING PERMIT FEES
Total Valuation
Fee
Issuing Fee
$30.70
$1.00 to $500,00
$501,00 to $2,000,00
$31.00
$31.00 for the first $500,00 plus $3,20
for each additional $100,00 or
fraction thereof, to and including
$2,000,00
$2,001.00 to $25,000,00
$79.00 for the first $2,000,00 plus
$12.75 for each additional $1,000,00
or fraction thereof, to and
including $25,000,00
-1-
5545
.
>
-
,.
-
$25,001.00 to $50,000.00
$372,25 for the first $25,000,00 plus
$9,70 for each additional $1,000,00
or fraction thereof, to and
including $50,000,00
$614,75 for the first $50,000.00 plus
$6.35 for each additional $1,000,00
or fraction thereof, to and
including $100,000,00
$50,001 to $100,000,00
$100,001 and up
$932,25 for the first $100,000,00 plus
$5.30 for each additional $1,000,00
or fraction thereof.
OTHER INSPECTIONS
For an extra inspection made necessary due
to work not being ready at the time specified
or due to work not corrected after prior
written notice,
$43,00
For inspection for which no fees are herein prescribed and for emergency inspections:
For the time consumed per hour
With a minimum charge of 1/2 hour
$43,00 each
$21.50
PLAN REVIEW FEES
When the valuation of proposed construction exceeds five hundred dollars ($500.00)
and a plan is required to be submitted by Subsection (b) of Section 302, a plan review fee
equal to 65% of the building permit fee shall be paid at the time of submitting plans and
specifications for review,
In addition, when plans are required to be checked for compliance with the State Energy
Conservation Regulations an energy plan review fee equal to 20% of the building
permit fee shall be paid at the time of submitting the plans and specifications for
review,
SECTION 4, Pursuant to Arcadia Municipal Code Sections 8130,30, there is
hereby established the following fee schedule for the plan checking fee for filing an
application for a grading permit:
-2-
5545
..
-
.
1
-
,
GRADING PLAN CHECKING FEE
Volume
Fee
50 cubic yards or less
$30.70
$38,35
51 to 100 cubic yards
101 to 1,000 cubic yards
$46,00
1,001 to 10,000 cubic yards
$53.75
10,001 to 100,000 cubic yards
$53,75 for the first 10,000,00 cubic
yards plus $21.50 for each
additional 10,000 cubic yards or
fraction thereof.
100,001 to 200,000 cubic yards
$247.25 for the first 100,000,00 cubic
yards plus $12,90 for each
additional 10,000 cubic yards or
fraction thereof,
200,001 cubic yards or more
$376,25 for the first 200,000.00 cubic
yards plus $6.50 for each
additional 10,000 cubic yards or
fraction thereof,
Additional plan review required by changes, additions or revisions to approved plans
(minimum charge - 1/2 hour):
$43,OO/hour
SECTION 5. Pursuant to Arcadia Municipal Code Sections 8130.30, there is
hereby established the following fee schedule for filing an application for a grading
permit:
GRADING PERMIT FEE
Volume
Fee
Issuing Fee
$30,70
$32,20
50 cubic yards or less
51 to 100 cubic yards
$38.50
-3-
5545
.-
L.
101 to 1,000 cubic yards
$38.50 for the first 100 cubic yards
plus $15,20 for each additional 100
cubic yards or fraction thereof,
1,001 to 10,000 cubic yards
$175,30 for the first 1,000 cubic yards
plus $12.95 for each additional 1000
cubic yards or fraction thereof,
10,001 to 100,000 cubic yards
$291.85 for the first 10,000,00 cubic
yards plus $58,25 for each
additional 10,000 cubic yards or
fraction thereof.
100,001 cubic yards or more
$829.05 for the first 100,000,00 cubic
yards plus $32.40 for each
additional 10,000 cubic yards or
fraction thereof.
OTHER INSPECTIONS
For an extra inspection made necessary due $43,00
to work not being ready at the time specified
or due to work not corrected after prior written notice
For inspection for which no fees are herein prescribed and for emergency inspections:
For the time consumed per hour
With a minimum charge 1/2 hour
$43,00
$21.50
SECTION 6, Pursuant to Arcadia Municipal Code Subsection 30.5 of Part III of
Section 8230,1, there is hereby established the following fee schedule for filing an
application for a plumbing permit:
PLUMBING PERMIT FEES
PERMIT ISSUANCE
1.
Permit issuance fee for each permit
$ 30,70
2,
Where additional fixtures, or equipment have not been
included in the original permit, a supplemental permit fee is
required.
$ 10,75
-4-
5545
..
~
,
UNIT FEE SCHEDULE
1.
For each plumbing fixture or trap or set of fixtures on one trap
(including water, drainage piping, and backflow protection
therefor) ,
2,
For each building sewer and each trailer park sewer
3.
Rainwater systems - per drain (inside building)
4,
For each cesspool (where permitted)
5.
For each private sewage disposal system
6.
For each water heater and/or vent
7,
For each gas piping system of one to five outlets
8,
For each gas piping system over five outlets, per outlet
9,
For each industrial waste pretreatment interceptor,
including its trap and vent, excepting kitchen-type grease
interceptors functioning as fixture traps
10,
For installation, alteration, or repair of water piping and/or
water treating equipment each
11.
For repair or alteration of drainage or vent piping, each fixture
12,
For each lawn sprinkler system on anyone meter including
backflow protection devices therefor
13, For atmospheric-type vacuum breakers not included in
Item 1:
1-5
Over 5, each
14, For each backflow protective device other than atmospheric-
type vacuum breaker:
2 inches and smaller
over 2 inches
15.
For each swimming pool piping (including spas and hot (tubs)
-5-
~
.
$ 8,65
$ 21.50
$ 8.65
$ 32,40
$ 64,65
$ 10,75
$ 10,75
$ 2.15
$ 17,25
$ 8,65
$ 8,65
$ 13,00
$ 10,75
$ 2,15
$ 10,75
$ 21.50
$ 21.50
5545
16,
17,
18,
19,
OTHER
For each swimming pool "P" trap
$ 8,65
For each swimming pool, spa and hot tub water heater
(including gas piping)
$ 32.40
For each sewer cap and/ or cesspool fill
$ 10,75
For each sewer connection on property (including each
dwelling unit in a multiple-family development)
$ 21.50
1.
For an extra inspection made necessary due to work not being
ready at the time specified or due to work not corrected after
prior written notice
$ 43,00
2, For inspection of plumbing facilities for which no fees are herein
prescribed and for emergency inspections
For the time consumed per hour
With a minimum charge 1/2 hour
$ 43,00
$ 21.50
PLUMBING PLAN CHECKING FEES
For plumbing plans which require plan checking, a plan checking fee equal to 65% of
the plumbing permit fee shall be paid to the Building Official at the time plans are
submitted for plan check.
SECTION 7, Pursuant to Arcadia Municipal Code Subsection 92-4 of Part III
Sections 8330, there is hereby established the following fee schedule for filing an
application for an electrical permit:
ELECTRICAL PERMIT FEE
PERMIT ISSUANCE
2,
1.
1.
For the issuance of each permit
$ 30.70
For issuing each supplemental permit
$ 10,75
SERVICES
For residential service of 600 volts or less and not over 400
amps in rating, including one meter each
$ 10,75
-6-
5545
,.
-
A.
2,
For one commercial service 200 amps or less, including
one meter each
3.
For each commercial service 200 amps to 1,000 amps,
including one meter each
4.
For commercial services over 600 volts or over 1,000 amps
in rating, including one meter each
5,
For each additional meter
6,
For each distribution panel
NEW RESIDENTIAL CONSTRUCTION
In addition to the fees for permit issuance and services as outlined above:
1,
For each new single, duplex and multiple family dwelling
for each square foot of gross floor area
2,
For buildings accessory to new residential buildings
constructed in conjunction with those residential buildings
for each square foot of gross floor area
OTHER CONSTRUCTION
1.
For receptacle, switch, lighting outlets
First 20 each
Additional each
2,
For lighting fixtures, sockets or other lamp devices
First 20 each
Additional each
3,
For pole or platform mounted lighting fixtures such as
tennis courts, parking lot standards and walkway lighting
fixtures
First 6 each
Additional each
4,
For fixed residential appliances not exceeding 1 hp, kw or
kva each
5.
For fixed factory wired non-residential appliances not
exceeding 1 hp, kw or kva each
-7-
$ 21.50
$ 43.00
$107,85
$ 10,75
$ 10,75
$ .03
$ ,02
$ 1.06
$ ,70
$ 1.06
$ ,70
$ 4,30
$ 2,15
$ 4,30
$ 4,30
5545
"
~,
6,
For residential, commercial or industrial 220 or 240 volt
receptacle each
$ 4,30
NOTE:
For other types of air conditioners and other motor driven appliances
having larger electrical rating, see POWER SCHEDULE,
POWER SCHEDULE
For motors, generators, transformers, rectifiers, converters, capacitors and other motor
driven appliances such as heating, air conditioners, and cooling and baking equipment:
Rating in hp, kw, kva or kvar:
1. Up to and including 1 each $ 5.40
2, Over 1 and not over 10 each $ 10.75
3, Over 10 and not over 50 each $ 27,00
4, Over 50 and not over 100 each $ 53,85
5, Over 100 each $ 86.25
NOTE:
For equipment having more than one motor, transformer, heater, etc" the
sum of the combined ratings may be used.
NOTE:
These fees include all switches, circuit breakers, contractors, thermostats,
relays and other directly related control equipment.
BUSW A YS
For trolley and plug-in busways - each 100 feet or fraction thereof
$ 6.50
SIGNS
Signs, outline lighting and marquees
1.
For one sign and one branch circuit each
$ 43,00
2,
For additional branch circuits each
$ 4.30
-8-
5545
.
...
'.
CARNIVALS. CHRISTMAS 1REE LOTS. SALES LOT. ETC.
1.
For electric generators and electrically driven rides each
2,
For mechanically driven rides and walk through attractions
with lighting each
3,
For arena and booth lighting each
4,
For Christmas tree lots, sales booths, etc" each
TEMPORARY POWER
1.
For temporary service pole or pedestal installed in conjunction
with temporary buildings each
2,
For temporary service pole and one distribution system for
construction sites each
3.
For additional distribution panels installed in conjunction
with temporary power poles each
SWIMMING POOLS. SPAS. HOT TUBS. ETC.
1.
For not more than one sub panel, three motors, integral
lighting fixtures and all wiring and lighting for operation of
same
NOTE:
For additional electrical outlets or equipment, see OTHER
CONS1RUCTIONor POWER SCHEDULE
OTHER INSPECTION
1.
For an extra inspection made necessary due to work not being
ready at the time specified or due to work not corrected after
prior written notice each
2,
For inspection of electrical equipment for which no fees are
herein prescribed and for emergency inspections for the time
consumed
Per hour
With a minimum charge of 1/2 hour
-9-
$ 10,75
$ 5.40
$ 5.40
$ 21.50
$ 43.00
$ 21.50
$ 10.75
$ 53,85
$ 43,00
$ 43,00
$ 21.50
5545
~-
ELECTRICAL PLAN CHECKING FEES
When service switch size exceeds 400 amps or 300 volts or when connected load exceeds
400 amps, a plan checking fee equal to 65% of the electrical permit fee shall be paid to
the Building Official at the time plans are submitted for plan check.
ANNUAL ELECTRICAL MAINTENANCE PERMIT
$ 60,35
NOTE:
Maintenance permits are only issued to manufacturing plants,
commercial establishments, hospitals and similar occupancies having
duly licensed journeymen electricians as permanent employees,
This annual permit does not absolve the organization from any fees, inspections or
other requirements of this Code as pertains to electrical installations.
SECTION 8. Pursuant to Arcadia Municipal Code Sections 8432, there is hereby
established the following fee schedule for filing an application for a mechanical permit:
MECHANICAL PERMIT FEES
PERMIT ISSUANCE
1.
For the issuance of each permit
$ 30,70
2,
For issuing each supplemental permit
$ 10,75
UNIT FEE SCHEDULE
1.
For the installation or relocation of each forced-air or gravity-type
furnace or burner, including ducts and vents attached to such
appliance, up to and including 100,000 Btu/h
$ 13,00
2,
For the installation or relocation of each forced-air or gravity-type
furnace or burner, including ducts and vents attached to such
appliance, over 100,000 Btu/h
$ 16,25
3,
For the installation or relocation of each floor furnace, including
vents
$ 13.00
-10-
5545
4,
5.
6,
7,
8,
9.
10,
11.
12,
13,
14,
.,~
'-
.... t
For the installation or relocation of each suspended heater,
recessed wall heater or floor mounted unit heater
For the installation, relocation or replacement of each appliance
vent installed and not included in an appliance permit
For the repair of, alteration of, or addition to each heating appliance
refrigeration unit, cooling unit, absorption unit, or each heating,
cooling, absorption or evaporative cooling system, including
installation of controls regulated by this code,
For the installation or relocation of each boiler or compressor to
and including 3 horsepower, or each absorption system to and
including 100,000 Btu/h and including 500,000 Btu/h
For the installation or relocation of each boiler or compressor
over 3 horsepower to and including 15 horsepower or each
absorption system over 100,000 Btu/h and including 500,000
Btu/h
For the installation or relocation of each boiler or compressor
over 15 horsepower to and including 30 horsepower or each
absorption system over 500,000 Btu/h to and including 1,000,000
Btu/h
For the installation or relocation of each boiler or compressor
over 30 horsepower to and including 50 horsepower or each
absorption system over 1,000,000 Btu/h to and including 1,750,000
Btu/h
For the installation or relocation of each boiler or compressor
over 50 horsepower or each absorption system over 1,750,000 Btu/h
For each air-handling unit to and including 10,000 cubic feet per
minute, including ducts attached thereto
NOTE:
lI' --,----- --------
$ 13,00
$ 6,50
$ 13,00
$ 13,00
$ 23.75
$ 32,40
$ 48,60
$ 80,95
$ 9,70
This fee shall not apply to an air-handling unit which is a portion of
a factory assembled appliance, cooling unit, evaporative cooler or
absorption unit for which a permit is required elsewhere in this
code,
For each air-handling unit over 10,000 dm
For each evaporative cooler other than portable type
-11-
$ 16,25
$ 9,70
5545
15,
16,
17.
18,
19,
20,
.
.
For each ventilation fan connected to a single duct
For each ventilation system which is not a portion of any heating
or air conditioning system authorized by a permit
For the installation of each hood which is served by mechanical
exhaust, including ducts for such hood
For the installation or relocation of each domestic-type incinerator
For the installation or relocation of each commercial or industrial-
type incinerator
For each appliance or piece of equipment regulated by this code but
not classed in other appliance categories, or for which no other fee
is listed in this Code,
OTHER INSPECTIONS
For an extra inspection made necessary due to work not being ready at the
time specified or due to work not corrected after prior written notice each
$ 6.50
$ 9,70
$ 9,70
$ 16,25
$ 64.65
$ 9,70
$ 43.00
For inspecting for which no fees are herein prescribed and for emergency inspection:
For the time consumer per hour
With a minimum charge 1/2 hour
MECHANICAL PLAN CHECKING FEES
$ 43,00
$ 21.50
For mechanical plan which require plan checking, a plan checking fee equal to 65% of
the mechanical permit fee shall be paid to the Building Official at the time plans are
submitted for plan check.
SECTION 9. Pursuant to Arcadia Municipal Code Sections 8632,4 there is hereby
established the fee for filing an application for a move examination shall be $10,75 for
each one hundred (l00) square feet or fraction thereof of floor space, whether usable or
not, contained within the building proposed to be relocated.
SECTION 10, Pursuant to Arcadia Municipal Code Sections 8633, there is hereby
established the fee for filing an application for a relocation permit of $17,25 per one
thousand dollars ($1,000,00) valuation, or fraction thereof, of the building to be
relocated, For the purpose of computing such fee, valuation shall include the
reasonable cost of moving such structure and the reasonable value of all new
construction, alterations, additions, repairs, replacements and foundations in
connection therewith,
-12-
5545
SECTION 11, Pursuant to Arcadia Municipal Code Sections 8642, there is hereby
established the fee for filing an application for a removal permit of $226,40,
SECTION 12, Pursuant to Arcadia Municipal Code Sections 8652, there is hereby
established the following fee schedule for filing an application for a demolition permit:
DEMOLmON PERMIT FEE
Square footage of Building
500 sq, ft. or less
501 to 1,000 sq. ft.
1,001 to 3,000 sq, ft.
3,001 to 10,000 sq, ft,
10,001 sq, ft. or more
Fee
$ 17,25
$ 32,40
$ 53,85
$ 75,35
$172.52
SECTION 13, Pursuant to Arcadia Municipal Code Sections 8712 there is hereby
established the fee for filing an application for a sign permit of the same as required for
a building of equivalent valuation and shall also include a plan check fee which shall
be 50% of the permit fee,
SECTION 14, Pursuant to Arcadia Municipal Code Sections 8742 there is hereby
established the fee for filing an application for a swimming pool permit shall be the
same as required for a building of equivalent valuation, The valuation shall be
calculated at the rate of $183.40 per perimeter foot of the swimming pool and/or spa,
OTHER INSPECTIONS
For an extra inspection made necessary due to work not being ready at the
time specified or due to work not corrected after prior written notice,
$ 43,00
For inspection for which no fees are herein prescribed and for emergency inspections:
For the time consumed per hour each $ 43.00
With a minimum charge of 1/2 hour $ 21.50
SECTION 15, That City Council Resolution 5507, which sets forth current fees is
hereby repealed,
SECTION 16, This Resolution shall become effective September 4, 1990,
SECTION 17. Neither the adoption of this resolution nor the repeal hereby of
any resolution shall in any manner be construed as affecting any such fee, nor the effect
the validity of any bond or cash deposit in lieu thereof, posted, filed or deposited
therefore and all rights and obligations thereunder appertaining shall continue in full
force and effect,
-13-
5545
.
" .
,
SECTION 18, If any section, subsection, sentence, clause, phrase or portion of this
resolution is, for any reason, held to be invalid or unconstitutional by the decision of
any court or competent jurisdiction such decision shall not affect the validity of the
remaining portions of this resolution, The City Council of the City of Arcadia hereby
declares that it would have adopted this resolution and each section, subsection,
sentence, clause, phrase or portion thereof irrespective of the fact that anyone or more
sections, subsections, sentences, clauses, phrases or portions be declared invalid or
unconstitutional.
SECTION 19, The City Council hereby finds that the fees specified in this
resolution will not produce an amount in excess of that estimated to fund the
operation of the City of Arcadia Planning Division, Based on the foregoing, the City
Council hereby finds this resolution is exempt from the requirements of the California
Environmental Quality Act as specified in Title 14 Section 15079.1 of the California
Administrative Code,
SECTION 20. The City Clerk shall certify to the adoption of this resolution,
Passed, approved and adopted this 7th day of August, 1990,
mrMtI:/~~~r-
Mayor of t City of adia
ATTEST:
Cit
-14-
5545
.
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS:
CITY OF ARCADIA )
I, JUNE D. ALFORD, City Clerk of the City of Arcadia, hereby
certify that the foregoing Ordinance No. 5545 was passed and
adopted by the City Council of the City of Arcadia, signed by the
Mayor and attested to by the City Clerk at a regular meeting of
said Council held on the 7th day of August, 1990 and that said
Resolution was adopted by the following vote, to wit:
AYES: Councilmember Ciraulo, Gilb, Harbicht and Young
NOES: Councilmernber Fasching
ABSENT: None
J
Arcadia
ci
lerk of