HomeMy WebLinkAbout5323
RESOLUTION NO. 5323
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARCADIA
CHANGING THE FEES FOR BUILDING CODE VARIANCES, BUILDING
PERMITS, GRADING PLAN CHECKING, GRADING PERMITS,
PLUMBING PERMITS, PLUMBING PLAN CHECKING, ELECTRICAL
PERMITS, MECHANICAL PERMITS, MECHANICAL PLAN CHECKING,
MOVE EXAMINATION, RELOCATION PERMIT, REMOVAL PERMIT,
DEMOLITION PERMIT, SIGN PERMIT AND SWIMMING POOL
PERMIT, AND REPEALING RESOLUTION NO. 5251.
The City Council of the City of Arcadia does hereby resolve, find and
determine as follows:
SECTION 1. That the fees set forth in this resolution are necessary
for the purpose of defraying the City of Arcadia's expenditures and costs for
the purposes set forth in this resolution.
SECTION 2. Pursuant to Section 8040 of the Arcadia Municipal Code, the
fee for filing an application for a variance to the Codes shall be $230.00.
SECTION 3. Pursuant to Section 8130.6 of the Arcadia Municipal Code,
the fee for filing an application for a building permit shall be as set forth
in the following schedule:
BUILDING PERMIT FEES
Total Valuation
Fee
$1.00 to $500.00
$501.00 to $2,0000.00
$26.25
$26.25 for the first $500.00 plus $2.75
for each additional $100.00 or fraction
thereof, to and including $2,000.00.
$2,001.00 to $25,000.00
$25,001.00 to $50,000.00
$67.50 for the first $2,000.00 plus
$11.05 for each additional $1,000.00 or
fraction thereof, to and including
$25,000.00.
$321.65 for the first $25,000.00 plus
$8.35 for each additional $1,000.00 or
fraction thereof, to and including
$50,000.00.
$530.40 for the first $50,000 plus $5.55
for each additional $1,000.00 or fraction
thereof, to and including $100,000.00.
$50,001.00 to $100,000.00
- 1 -
5323
$100,001.00 and up
$807.90 for the first $100,000.00 plus
$4.55 for each additional $1,000.00 or
fraction thereof.
OTHER INSPECTIONS
For an extra inspection made necessary due to work not
being ready at the time specified or due to work not
corrected after prior written notice
$36.80
For inspection for which no fees are herein
inspections:
For the time consumed per hour
With a minimum charge of 1/2 hour
prescribed and for emergency
Each $36.80
$18.40
SECTION 4. Pursuant to Section 8130.30 of the Arcadia Municipal Code,
the plan checking fee for filing an application for a grading permit shall be
as set forth in the following schedule:
GRADING PLAN CHECKING FEE
Volume
Fee
50 cubic yards or less
$26.25
$32.85
$39.45
$46.00
51 to 100 cubic yards
101 to 1,000 cubic yards
1,001 to 10,000 cubic yards
10,001 to 100,000 cubic yards
$46.00 for the first 10,000 cubic yards,
plus $18.35 for each additional 10,000
cubic yards or fraction thereof.
100,001 to 200,00 cubic yards
$211.15 for the first 100,000 cubic
yards, plus $11.00 for each additional
10,000 cubic yards or fraction thereof.
200,001 cubic yards or more
$321.15 for the first 200,000 cubic
yards, plus $5.55 for each additional
10,000 cubic yards or fraction thereof.
Additional plan review required by changes, additions or revisions to approved
plans (minimum charge - 1/2 hour):
$27.60/hour
SECTION 5. Pursuant to Section 8130.30 of the Arcadia Municipal Code
the fee for filing an application for a grading permit shall be as set forth in
the following schedule:
- 2 -
5323
GRADING PERMIT FEES
Volume
Fee
51 to 100 cubic yards
101 to 1,000 cubic yards
$26.25
$32.90
50 cubic yards or less
$32.90 for the first 100 cubic yards
plus $12.95 for each additional 100 cubic
yards or fraction thereof.
1,001 to 10,000 cubic yards
$161.40 for the first 1,000 cubic yards,
plus $11.05 for each additional 1,000
cubic yards or fraction thereof.
10,001 to 100,000 cubic yards
$260.85 for the first 10,000 cubic yards
plus $49.85 for each additional 10,000
cubic yards or fraction thereof.
100,001 cubic yards or more
$709.50 for the first 100,000 cubic yards
plus $27.70 for each additional 10,000
cubic yards or fraction thereof.
OTHER INSPECTIONS
For an extra inspection made necessary due to work not being
ready at the time specified or due to work not corrected after
prior written notice
$36.80
For inspection for which no fees are herein prescribed and for emergency
inspect ions:
For the time consumed per hour
With a minimum charge 1/2 hour
$36.80
$18.40
SECTION 6. Pursuant to Subsection 30.5 of Part III of Section 8230.1
of the Arcadia Municipal Code the fee for filing an application for a plumbing
permit shall be as set forth in the following schedule:
PLUMBING PERMIT FEES
PERMIT ISSUANCE
1.
2.
Permi t issuance fee for each permit
Where additional fixtures, or equipment have not been
included in the original permit, a supplemental permit
fee is required
$26.25
$ 9.20
- 3 -
5323
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
OTHER
1.
2.
UNIT FEE SCHEDULE
For each plumbing fixture or trap or set of fixtures on
one trap (including water, drainage piping, and backflow
protect ion therefor
For each building sewer and each trailer park sewer
Rainwater systems - per drain (inside building)
For each cesspool (where permitted)
For each private sewage disposal system
For each water heater and/or vent
For each gas piping system of one to five outlets
For each gas piping system over five outlets, per outlet
For each industrial waste pretreatment interceptor,
including its trap and vent, excepting kitchen-type
grease interceptors functionin9 as fixture traps
For installation, alteration, or repair of water piping
and/or water treating equipment each
For repair or alteration of drainage or vent piping,
each fi xture
For each lawn sprinkler system on anyone meter
including backflow protection devices therefor
For atmospheric-type vacuum breakers not included in
Item 1:
1-5
Over 5, each
For each backflow protective device other than
atmospheric-type vacuum breaker:
2 inches and smaller
ove r 2 inches
For each swimming pool piping (including spas and
hot tubs)
For each swimming pool "P" trap
For each swimmi ng pool, spa and hot tub water heater
(including gas piping)
For each sewer cap and/or cesspool fill
For each sewer connection on property (including each
dwelling unit in a multiple family development)
For an extra inspection made necessary due to work not
being ready at the time specified or due to work not
corrected after prior written notice
For inspection of plumbing facilities for which no fees
are herein prescribed and for emergency inspections
For the time consumed per hour
With a minimum charge 1/2 hour
$ 7.40
$18.40
$ 7.40
$27.70
$55.40
$ 9.20
$ 9.20
$ 1. 80
$14.80
$ 7.40
$ 7.40
$11.10
$ 9.20
$ 1.80
$ 9.20
$18.40
$18.40
$ 7.40
$27.70
$ 9.20
$18.40
$36.80
$36.80
$17.40
PLUMBING PLAN CHECKING FEES
For plumbing plans which require plan checking, a plan checking fee
equal to 65% of the plumbing permit fee shall be paid to the Building
Offici al at the time plans are submitted for plan check.
- 4 -
5323
SECTION 7. Pursuant to Subsection 92-4 of Part III of Section 8330 of
the Arcadia Municipal Code the fee for filing an application for an electrical
permit shall be as set forth in the following schedule.
ELECTRICAL PERMIT FEE
PE RMIT IS SUANCE
1.
2.
1.
2.
3.
4.
5.
6.
For the issuance of each permit
For issui ng each supplemental permit
SERVICES
For residential service of 600 volts or less and not
over 400 amps in rating, including one meter each
For each commercial service 200 amps or less, including
one meter each
For each commercial service 200 amps to 1,000 amps,
including one meter each
For commercial services over 600 volts or over 1,000
amps in rating, including one meter each
For each additional meter
For each distribution panel
NEW RESIDENTIAL CONSTRUCTION
$26.25
$ 9.20
$ 9.20
$18.40
$36.80
$92.30
$ 9.20
$ 9.20
In addition to the fees for permit issuance and services as outlined above:
1. For each new single, duplex and multiple family dwelling -
for each square foot of gross fl oor area $ .02
2. For buildings accessory to new residential buildings con-
structed in conjunction with those residential buildings -
for each square foot of gross floor area $.0125
OTHER CONSTRUCTION
In addition to the fees for permit issuance and services as outlined above,
fees for residential additions and alterations and other buildings shall
be as follows:
1.
2.
3.
For receptacle, switch, li9hting outlets
Fi rst 20 each
Addi t i ona 1 each
For lighting fixtures, sockets or other lamp devices
First 20 each
Additional each
For pole or platform mounted lighting fixtures such as
tennis courts, parking lot standards and walkway lighting
fi xtures
First 6 each
Addit ional each
- 5 -
$ .90
$ .55
$ .90
$ .55
$ 3.65
$ 1.80
5323
4.
5.
6.
For fixed residential appliances not exceeding 1 hp,
kw or k va each
For fixed factory wired non-residential appliances
not exceeding 1 hp, kw or kva each
For residential, commercial or industrial 220 or 240
volt receptacle each
$ 3.65
$ 3.65
$ 3.65
NOTE: For other types of air conditioners and other motor driven appliances
having larger electrical ratings, see POWER SCHEDULE.
POWER SCHEDULE
For motors, generators, transfonners, rectifiers, converters, capacitors and
other motor driven appliances such as heating, air conditioners, and cooking
and baking equipment:
Rating in hp, kw, kva or kvar:
1.
2.
3.
4.
5.
Up to and including 1 each
Over 1 and not over 10 each
Over 10 and not over 50 each
Over 50 and not over 100 each
Over 100 each
$ 4.60
$ 9.20
$23.10
$46.10
$73.80
Note: For equipment having more than one motor, transformer, heater, etc., the
sum of the combined ratings may be used.
Note: These fees include all switches, circuit breakers, contactors,
thennostats, relays and other directly related control equipment.
BUSWA YS
For trolley and plug-in type busways - each 100 feet or fraction
therof
SIGNS
$ 5.55
Signs, outline lighting and marquees
1.
2.
For one sign and one branch circuit each
For additional branch circuits each
$36.80
$ 3.65
CARNIVALS, CHRISTMAS TREE LOTS, FOREWORKS STANDS, SALES LOTS, ETC.
1.
2.
3.
4.
For electric generators and electrically driven rides each
For mechanically driven rides and walk throu9h attractions
with lighting each
For arena and booth lighting each
For Christmas tree lots, fireworks stands, sales booths,
etc., each
$ 9.20
$ 4.60
$ 4.60
$18.40
- 6 -
5323
TEMPORARY POWER
1.
2.
3.
For temporary service pole or pedestal installed in
conjunction with temporary buildings each
For temporary service pole and one distribution system
for construction sites each
For additional distribution panels installed in
conjunction with temporary power poles each
SWIMMING POOLS, SPAS, HOT TUBS, ETC.
1.
For not more than one sub panel, three motors,integral
lighting fixtures and all wiring and lighting for
operation of same
$36.80
$18.40
$ 9.20
$46.10
NOTE: For additional electrical outlets or equipment, see OTHER CONSTRUCTION
or POWER SCHEDULE
OTHER INSPECTION
1.
2.
For an extra inspection made necessary due to work not
being ready at the time specified or due to work not
corrected after prior written notice each
For inspection of electrical equipment for which no fees
are herein prescribed and for emergency inspections
For the time consumed
per hour
With a minimum charge of 1/2 hour
ELECTRICAL PLAN CHECKING FEES
$36.80
, $36.80
$18.40
When service switch size exceeds 400 amps or 300 volts or when connected load
exceeds 400 amps, a plan checking fee equal to 65% of the electrical permit fee
shall be paid to the Building Official at the time plans are submitted for plan
check.
ANNUAL ELECTRICAL MAINTENANCE PERMIT
$51.65
NOTE: Maintenance permits are only issued to manufacturing plans, commercial
establishments, hospitals and similar occupancies having duly licensed
journeymen electricians as permanent employees.
This annual permit does not absolve the organization from any fees, inspections
or other requirements of this Code as pertains to electrical installations.
SECTION 8. Pursuant to Section 8432 of the Arcadia Municipal Code the
fee for filing an application for a mechanical permit shall be as set forth in
the following schedule.
- 7 -
5323
MECHANICAL PERMIT FEES
PERMIT ISSUANCE
1.
2.
For the issuance of each permit
For issuing each supplemental permit
$26.25
$ 9.20
UNIT FEE SCHEDULE
1. For the installation or relocation of each forced-air $11.10
or gravity-type furnace or burner, including ducts and
vents attached to such appliance, up to and including
100,000 Btu/h
2. For the installation or relocation of each forced-air $13.85
or gravity-type furnace or burner, including ducts and
vents attached to such appliance, over 100,000 Btu/h
3. For the installation or relocation of each floor furnace, $11.10
i nc 1 udi ng vent
4. For the installation or relocation of each suspended $11.10
heater, recessed wall heater or floor mounted unit heater
5. For the installation, relocation or replacement of each $ 5.55
appliance vent installed and not included in an appliance
permit
6. For the repair of, alteration of, or addition to each $11.10
heating appliance, refrigeration unit, cooling unit,
absorption unit, or each heating, cooling, absorption
or evaporative cooling system, including installation
of controls regulated by this code
7. For the installation or relocation of each boiler or $11.10
compressor to and including 3 horsepower, or each
absorption system to and including 100,000 Btu/h
8. For the installation or relocation of each boiler or $20.35
compressor over 3 horsepower to and including 15 horse-
power or each absorption system over 100,000 Btu/h and
including 500,000 Btu/h
9. For the installation or relocation of each boiler or $27.70
compressor over 15 horsepower to and including 30 horse-
power or each absorption system over 500,000 Btu/h to and
including 1,000,000 Btu/h
10. For the installation or relocation of each boiler or $41.55
compressor over 30 horsepower to and including 50 horse-
power, or for each absorption system over 1,000,000 Btu/h
to and including 1,750,000 Btu/h
11. For the installation or relocation of each boiler or $69.25
refrigeration compressor over 50 horsepower, or each
absorption system over 1,750,000 Btu/h
12. For each air-handling unit to and including 10,000 cubic $ 8.30
feet per minute, including ducts attached thereto
NOTE: This fee shall not apply to an air-handling unit
which is a portion of a factory assembled appliance,
cooling unit, evaporative cooler or absorption unit for
which a permit is required elsewhere in this code.
- 8 -
5323
13. For each air-handling unit over 10,000 cfm $13.85
14. For each evaporative cooler other than portable type $ 8.30
15. For each ventilation fan connected to a single duct $ 5.55
16. For each ventilation system which is not a portion of $ 8.30
any heating or air conditioning system authorized by a
permit
17. For the installation of each hood which is served by $ 8.30
mechanical exhaust, including ducts for such hood
18. For the installation or relocation of each domestic-type $13.85
incinerator
19. For the installation or relocation of each commercial $55.35
or industrial-type incinerator
20. For each appliance or piece of equipment regulated by $ 8.30
this code but not classed in other appliance categories,
or for which no other fee is listed in this Code
OTHER INSPECTIONS
For an extra inspection made necessary due to work not being
ready at the time specified or due to work not corrected after
prior written notice each
$36.80
For inspection for which no fees are herein prescribed and
for emergency inspection:
For the time consumer per hour
With a minimum charge 1/2 hour
$36.80
$18.40
MECHANICAL PLAN CHECKING FEES
For mechanical plans which require plan checking, a plan checking fee equal to
65% of the mechanical permit fee shall be paid to the Building Official at the
time plans are submitted for plan check.
SECTION g. Pursuant to Section 8632.4 of the Arcadia Municipal Code
the fee for filing an application for a move examination shall be nine dollars
and twenty cents ($9.20) for each one hundred (100) square feet or fraction
thereof of floor space, whether usable or not, contained within the building
proposed to be relocated.
SECTION 10. Pursuant to Section 8633 of the Arcadia Municipal Code the
fee for filing an application for a relocation permit shall be fourteen dollars
and eighty cents ($14.80) per one thousand dollars ($1,000.00) valuation, or
fraction thereof, of the building to be relocated. For the purpose of
computing such fee, valuation shall include the reasonable cost of moving such
structure and the reasonable value of all new construction, alterations,
additions, repairs, replacements and foundations in connection therewith.
- g -
5323
SECTION 11. Pursuant to Section 8642 of the Arcadia Municipal Code the
fee for filing an application for a removal permit shall be one hundred ninety
three dollars and seventy cents ($193.70)).
SECTION 12. Pursuant to Section 8652 of the Arcadia Municipal Code the
fee for filing an application for a demolition permit shall be as set forth in
the following schedule:
DEMOLITION PERMIT FEE
Square footage of Building
500 sq. ft. or less
501 to 1,000 sq. ft.
1,001 to 3,000 sq. ft.
3,001 to 10,000 sq.ft.
10,001 sq. ft. or more
Fee
$ 14.80
$ 27.70
$ 46.10
$ 64.65
$147.60
SECTION 13. Pursuant to Section 8712 of the Arcadia Municipal Code the
fee for filing an application for a sign permit shall be the same as required
for a building of equivalent valuation and shall also include a plan check fee
which shall be 50 percent of the permit fee.
SECTION 14. Pursuant to Section 8742 of the Arcadia Municipal Code the
fee for filing an application for a swimming pool permit shall be the same as
required for a building of equivalent valuation. The valuation shall be
calculated at the rate of $156.90 per perimeter foot of the swimming pool
and/or spa.
OTHER INSPECTIONS
For an extra inspection made necessary due to work not being
ready at the time specified or due to work not corrected after
prior written notice
$36.80
For inspection for which no fees are herein
inspections
For the time consumed per hour each
With a minimum charge of 1/2 hour
prescribed and for emergency
$36.80
$18.40
SECTION 15. That City Council Resolution 5251, which sets forth
current fees is hereby repealed.
- 10 -
5323
SECTION 16. This Resolution shall become effective November 1, 1986.
SECTION 17. Neither the adoption of this resolution nor the repeal
hereby of any resolution shall in any manner be construed as affecting any such
fee, nor to affect the validity of any bond or cash deposit in lieu thereof,
posted, filed or deposited therefor and all rights and obligations thereunder
appertaining shall continue in full force and effect.
SECTION 18. If any section, subsection, sentence, clause, phrase or
portion of this resolution is, for any reason, held to be invalid or
unconstitutional by the decision of any court or competent jurisdiction, such
decision shall not affect the validity of the remaining portions of this
resolution. The City Council of the City of Arcadia hereby declares that it
would have adopted this resolution and each section, subsection, sentence,
clause, phrase or portion thereof irrespective of the fact that anyone or more
sections, subsections, sentences, clauses, phrases or portions be declared
invalid or unconstitutional.
SECTION 19. The City Council hereby finds that the fees specified in
this resolution will not produce an amount in excess of that estimated to fund
the operation of the City of Arcadia Building Division. Based on the
foregoing, the City Council hereby finds this resolution is exempt from the
requirements of the California Environmental Quality Act as specified in Title
14 Section 15079.1 of the California Administrative Code.
SECTION 20. The City Clerk shall certify to the adoption of this
reso 1 ut ion.
Passed, approved and adopted thi s 7th day of October
, 1986.
',f
::~~~
~-, . ~
-,--
- ,
.'-~
i.3-::-~'-
~
, - '-. -
, , -
- 'o'~;~~-~:dt-
--
- 11 -
5323
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) SS:
CITY OF ARCADIA )
I, CHRISTINE VAN MAANEN, City Clerk of the City of Arcadia, hereby
certify that the following Resolution No. 5323 was passed and adopted by the
City Council of the City of Arcadia, signed by the Mayor and attested to by the
City Clerk at a regular meeting of said Council on the 7th day of October,
1986, and that said Ordinance was adopted by the following vote, to-wit:
AYES:
NOES:
ABSE NT:
Councilman Chandler, Gilb, Harbicht, Lojeski and Young
None
None
- 12 -
5323