Loading...
HomeMy WebLinkAbout5323 RESOLUTION NO. 5323 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARCADIA CHANGING THE FEES FOR BUILDING CODE VARIANCES, BUILDING PERMITS, GRADING PLAN CHECKING, GRADING PERMITS, PLUMBING PERMITS, PLUMBING PLAN CHECKING, ELECTRICAL PERMITS, MECHANICAL PERMITS, MECHANICAL PLAN CHECKING, MOVE EXAMINATION, RELOCATION PERMIT, REMOVAL PERMIT, DEMOLITION PERMIT, SIGN PERMIT AND SWIMMING POOL PERMIT, AND REPEALING RESOLUTION NO. 5251. The City Council of the City of Arcadia does hereby resolve, find and determine as follows: SECTION 1. That the fees set forth in this resolution are necessary for the purpose of defraying the City of Arcadia's expenditures and costs for the purposes set forth in this resolution. SECTION 2. Pursuant to Section 8040 of the Arcadia Municipal Code, the fee for filing an application for a variance to the Codes shall be $230.00. SECTION 3. Pursuant to Section 8130.6 of the Arcadia Municipal Code, the fee for filing an application for a building permit shall be as set forth in the following schedule: BUILDING PERMIT FEES Total Valuation Fee $1.00 to $500.00 $501.00 to $2,0000.00 $26.25 $26.25 for the first $500.00 plus $2.75 for each additional $100.00 or fraction thereof, to and including $2,000.00. $2,001.00 to $25,000.00 $25,001.00 to $50,000.00 $67.50 for the first $2,000.00 plus $11.05 for each additional $1,000.00 or fraction thereof, to and including $25,000.00. $321.65 for the first $25,000.00 plus $8.35 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $530.40 for the first $50,000 plus $5.55 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $50,001.00 to $100,000.00 - 1 - 5323 $100,001.00 and up $807.90 for the first $100,000.00 plus $4.55 for each additional $1,000.00 or fraction thereof. OTHER INSPECTIONS For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice $36.80 For inspection for which no fees are herein inspections: For the time consumed per hour With a minimum charge of 1/2 hour prescribed and for emergency Each $36.80 $18.40 SECTION 4. Pursuant to Section 8130.30 of the Arcadia Municipal Code, the plan checking fee for filing an application for a grading permit shall be as set forth in the following schedule: GRADING PLAN CHECKING FEE Volume Fee 50 cubic yards or less $26.25 $32.85 $39.45 $46.00 51 to 100 cubic yards 101 to 1,000 cubic yards 1,001 to 10,000 cubic yards 10,001 to 100,000 cubic yards $46.00 for the first 10,000 cubic yards, plus $18.35 for each additional 10,000 cubic yards or fraction thereof. 100,001 to 200,00 cubic yards $211.15 for the first 100,000 cubic yards, plus $11.00 for each additional 10,000 cubic yards or fraction thereof. 200,001 cubic yards or more $321.15 for the first 200,000 cubic yards, plus $5.55 for each additional 10,000 cubic yards or fraction thereof. Additional plan review required by changes, additions or revisions to approved plans (minimum charge - 1/2 hour): $27.60/hour SECTION 5. Pursuant to Section 8130.30 of the Arcadia Municipal Code the fee for filing an application for a grading permit shall be as set forth in the following schedule: - 2 - 5323 GRADING PERMIT FEES Volume Fee 51 to 100 cubic yards 101 to 1,000 cubic yards $26.25 $32.90 50 cubic yards or less $32.90 for the first 100 cubic yards plus $12.95 for each additional 100 cubic yards or fraction thereof. 1,001 to 10,000 cubic yards $161.40 for the first 1,000 cubic yards, plus $11.05 for each additional 1,000 cubic yards or fraction thereof. 10,001 to 100,000 cubic yards $260.85 for the first 10,000 cubic yards plus $49.85 for each additional 10,000 cubic yards or fraction thereof. 100,001 cubic yards or more $709.50 for the first 100,000 cubic yards plus $27.70 for each additional 10,000 cubic yards or fraction thereof. OTHER INSPECTIONS For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice $36.80 For inspection for which no fees are herein prescribed and for emergency inspect ions: For the time consumed per hour With a minimum charge 1/2 hour $36.80 $18.40 SECTION 6. Pursuant to Subsection 30.5 of Part III of Section 8230.1 of the Arcadia Municipal Code the fee for filing an application for a plumbing permit shall be as set forth in the following schedule: PLUMBING PERMIT FEES PERMIT ISSUANCE 1. 2. Permi t issuance fee for each permit Where additional fixtures, or equipment have not been included in the original permit, a supplemental permit fee is required $26.25 $ 9.20 - 3 - 5323 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. OTHER 1. 2. UNIT FEE SCHEDULE For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping, and backflow protect ion therefor For each building sewer and each trailer park sewer Rainwater systems - per drain (inside building) For each cesspool (where permitted) For each private sewage disposal system For each water heater and/or vent For each gas piping system of one to five outlets For each gas piping system over five outlets, per outlet For each industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functionin9 as fixture traps For installation, alteration, or repair of water piping and/or water treating equipment each For repair or alteration of drainage or vent piping, each fi xture For each lawn sprinkler system on anyone meter including backflow protection devices therefor For atmospheric-type vacuum breakers not included in Item 1: 1-5 Over 5, each For each backflow protective device other than atmospheric-type vacuum breaker: 2 inches and smaller ove r 2 inches For each swimming pool piping (including spas and hot tubs) For each swimming pool "P" trap For each swimmi ng pool, spa and hot tub water heater (including gas piping) For each sewer cap and/or cesspool fill For each sewer connection on property (including each dwelling unit in a multiple family development) For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice For inspection of plumbing facilities for which no fees are herein prescribed and for emergency inspections For the time consumed per hour With a minimum charge 1/2 hour $ 7.40 $18.40 $ 7.40 $27.70 $55.40 $ 9.20 $ 9.20 $ 1. 80 $14.80 $ 7.40 $ 7.40 $11.10 $ 9.20 $ 1.80 $ 9.20 $18.40 $18.40 $ 7.40 $27.70 $ 9.20 $18.40 $36.80 $36.80 $17.40 PLUMBING PLAN CHECKING FEES For plumbing plans which require plan checking, a plan checking fee equal to 65% of the plumbing permit fee shall be paid to the Building Offici al at the time plans are submitted for plan check. - 4 - 5323 SECTION 7. Pursuant to Subsection 92-4 of Part III of Section 8330 of the Arcadia Municipal Code the fee for filing an application for an electrical permit shall be as set forth in the following schedule. ELECTRICAL PERMIT FEE PE RMIT IS SUANCE 1. 2. 1. 2. 3. 4. 5. 6. For the issuance of each permit For issui ng each supplemental permit SERVICES For residential service of 600 volts or less and not over 400 amps in rating, including one meter each For each commercial service 200 amps or less, including one meter each For each commercial service 200 amps to 1,000 amps, including one meter each For commercial services over 600 volts or over 1,000 amps in rating, including one meter each For each additional meter For each distribution panel NEW RESIDENTIAL CONSTRUCTION $26.25 $ 9.20 $ 9.20 $18.40 $36.80 $92.30 $ 9.20 $ 9.20 In addition to the fees for permit issuance and services as outlined above: 1. For each new single, duplex and multiple family dwelling - for each square foot of gross fl oor area $ .02 2. For buildings accessory to new residential buildings con- structed in conjunction with those residential buildings - for each square foot of gross floor area $.0125 OTHER CONSTRUCTION In addition to the fees for permit issuance and services as outlined above, fees for residential additions and alterations and other buildings shall be as follows: 1. 2. 3. For receptacle, switch, li9hting outlets Fi rst 20 each Addi t i ona 1 each For lighting fixtures, sockets or other lamp devices First 20 each Additional each For pole or platform mounted lighting fixtures such as tennis courts, parking lot standards and walkway lighting fi xtures First 6 each Addit ional each - 5 - $ .90 $ .55 $ .90 $ .55 $ 3.65 $ 1.80 5323 4. 5. 6. For fixed residential appliances not exceeding 1 hp, kw or k va each For fixed factory wired non-residential appliances not exceeding 1 hp, kw or kva each For residential, commercial or industrial 220 or 240 volt receptacle each $ 3.65 $ 3.65 $ 3.65 NOTE: For other types of air conditioners and other motor driven appliances having larger electrical ratings, see POWER SCHEDULE. POWER SCHEDULE For motors, generators, transfonners, rectifiers, converters, capacitors and other motor driven appliances such as heating, air conditioners, and cooking and baking equipment: Rating in hp, kw, kva or kvar: 1. 2. 3. 4. 5. Up to and including 1 each Over 1 and not over 10 each Over 10 and not over 50 each Over 50 and not over 100 each Over 100 each $ 4.60 $ 9.20 $23.10 $46.10 $73.80 Note: For equipment having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. Note: These fees include all switches, circuit breakers, contactors, thennostats, relays and other directly related control equipment. BUSWA YS For trolley and plug-in type busways - each 100 feet or fraction therof SIGNS $ 5.55 Signs, outline lighting and marquees 1. 2. For one sign and one branch circuit each For additional branch circuits each $36.80 $ 3.65 CARNIVALS, CHRISTMAS TREE LOTS, FOREWORKS STANDS, SALES LOTS, ETC. 1. 2. 3. 4. For electric generators and electrically driven rides each For mechanically driven rides and walk throu9h attractions with lighting each For arena and booth lighting each For Christmas tree lots, fireworks stands, sales booths, etc., each $ 9.20 $ 4.60 $ 4.60 $18.40 - 6 - 5323 TEMPORARY POWER 1. 2. 3. For temporary service pole or pedestal installed in conjunction with temporary buildings each For temporary service pole and one distribution system for construction sites each For additional distribution panels installed in conjunction with temporary power poles each SWIMMING POOLS, SPAS, HOT TUBS, ETC. 1. For not more than one sub panel, three motors,integral lighting fixtures and all wiring and lighting for operation of same $36.80 $18.40 $ 9.20 $46.10 NOTE: For additional electrical outlets or equipment, see OTHER CONSTRUCTION or POWER SCHEDULE OTHER INSPECTION 1. 2. For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice each For inspection of electrical equipment for which no fees are herein prescribed and for emergency inspections For the time consumed per hour With a minimum charge of 1/2 hour ELECTRICAL PLAN CHECKING FEES $36.80 , $36.80 $18.40 When service switch size exceeds 400 amps or 300 volts or when connected load exceeds 400 amps, a plan checking fee equal to 65% of the electrical permit fee shall be paid to the Building Official at the time plans are submitted for plan check. ANNUAL ELECTRICAL MAINTENANCE PERMIT $51.65 NOTE: Maintenance permits are only issued to manufacturing plans, commercial establishments, hospitals and similar occupancies having duly licensed journeymen electricians as permanent employees. This annual permit does not absolve the organization from any fees, inspections or other requirements of this Code as pertains to electrical installations. SECTION 8. Pursuant to Section 8432 of the Arcadia Municipal Code the fee for filing an application for a mechanical permit shall be as set forth in the following schedule. - 7 - 5323 MECHANICAL PERMIT FEES PERMIT ISSUANCE 1. 2. For the issuance of each permit For issuing each supplemental permit $26.25 $ 9.20 UNIT FEE SCHEDULE 1. For the installation or relocation of each forced-air $11.10 or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h 2. For the installation or relocation of each forced-air $13.85 or gravity-type furnace or burner, including ducts and vents attached to such appliance, over 100,000 Btu/h 3. For the installation or relocation of each floor furnace, $11.10 i nc 1 udi ng vent 4. For the installation or relocation of each suspended $11.10 heater, recessed wall heater or floor mounted unit heater 5. For the installation, relocation or replacement of each $ 5.55 appliance vent installed and not included in an appliance permit 6. For the repair of, alteration of, or addition to each $11.10 heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by this code 7. For the installation or relocation of each boiler or $11.10 compressor to and including 3 horsepower, or each absorption system to and including 100,000 Btu/h 8. For the installation or relocation of each boiler or $20.35 compressor over 3 horsepower to and including 15 horse- power or each absorption system over 100,000 Btu/h and including 500,000 Btu/h 9. For the installation or relocation of each boiler or $27.70 compressor over 15 horsepower to and including 30 horse- power or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h 10. For the installation or relocation of each boiler or $41.55 compressor over 30 horsepower to and including 50 horse- power, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h 11. For the installation or relocation of each boiler or $69.25 refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h 12. For each air-handling unit to and including 10,000 cubic $ 8.30 feet per minute, including ducts attached thereto NOTE: This fee shall not apply to an air-handling unit which is a portion of a factory assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code. - 8 - 5323 13. For each air-handling unit over 10,000 cfm $13.85 14. For each evaporative cooler other than portable type $ 8.30 15. For each ventilation fan connected to a single duct $ 5.55 16. For each ventilation system which is not a portion of $ 8.30 any heating or air conditioning system authorized by a permit 17. For the installation of each hood which is served by $ 8.30 mechanical exhaust, including ducts for such hood 18. For the installation or relocation of each domestic-type $13.85 incinerator 19. For the installation or relocation of each commercial $55.35 or industrial-type incinerator 20. For each appliance or piece of equipment regulated by $ 8.30 this code but not classed in other appliance categories, or for which no other fee is listed in this Code OTHER INSPECTIONS For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice each $36.80 For inspection for which no fees are herein prescribed and for emergency inspection: For the time consumer per hour With a minimum charge 1/2 hour $36.80 $18.40 MECHANICAL PLAN CHECKING FEES For mechanical plans which require plan checking, a plan checking fee equal to 65% of the mechanical permit fee shall be paid to the Building Official at the time plans are submitted for plan check. SECTION g. Pursuant to Section 8632.4 of the Arcadia Municipal Code the fee for filing an application for a move examination shall be nine dollars and twenty cents ($9.20) for each one hundred (100) square feet or fraction thereof of floor space, whether usable or not, contained within the building proposed to be relocated. SECTION 10. Pursuant to Section 8633 of the Arcadia Municipal Code the fee for filing an application for a relocation permit shall be fourteen dollars and eighty cents ($14.80) per one thousand dollars ($1,000.00) valuation, or fraction thereof, of the building to be relocated. For the purpose of computing such fee, valuation shall include the reasonable cost of moving such structure and the reasonable value of all new construction, alterations, additions, repairs, replacements and foundations in connection therewith. - g - 5323 SECTION 11. Pursuant to Section 8642 of the Arcadia Municipal Code the fee for filing an application for a removal permit shall be one hundred ninety three dollars and seventy cents ($193.70)). SECTION 12. Pursuant to Section 8652 of the Arcadia Municipal Code the fee for filing an application for a demolition permit shall be as set forth in the following schedule: DEMOLITION PERMIT FEE Square footage of Building 500 sq. ft. or less 501 to 1,000 sq. ft. 1,001 to 3,000 sq. ft. 3,001 to 10,000 sq.ft. 10,001 sq. ft. or more Fee $ 14.80 $ 27.70 $ 46.10 $ 64.65 $147.60 SECTION 13. Pursuant to Section 8712 of the Arcadia Municipal Code the fee for filing an application for a sign permit shall be the same as required for a building of equivalent valuation and shall also include a plan check fee which shall be 50 percent of the permit fee. SECTION 14. Pursuant to Section 8742 of the Arcadia Municipal Code the fee for filing an application for a swimming pool permit shall be the same as required for a building of equivalent valuation. The valuation shall be calculated at the rate of $156.90 per perimeter foot of the swimming pool and/or spa. OTHER INSPECTIONS For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice $36.80 For inspection for which no fees are herein inspections For the time consumed per hour each With a minimum charge of 1/2 hour prescribed and for emergency $36.80 $18.40 SECTION 15. That City Council Resolution 5251, which sets forth current fees is hereby repealed. - 10 - 5323 SECTION 16. This Resolution shall become effective November 1, 1986. SECTION 17. Neither the adoption of this resolution nor the repeal hereby of any resolution shall in any manner be construed as affecting any such fee, nor to affect the validity of any bond or cash deposit in lieu thereof, posted, filed or deposited therefor and all rights and obligations thereunder appertaining shall continue in full force and effect. SECTION 18. If any section, subsection, sentence, clause, phrase or portion of this resolution is, for any reason, held to be invalid or unconstitutional by the decision of any court or competent jurisdiction, such decision shall not affect the validity of the remaining portions of this resolution. The City Council of the City of Arcadia hereby declares that it would have adopted this resolution and each section, subsection, sentence, clause, phrase or portion thereof irrespective of the fact that anyone or more sections, subsections, sentences, clauses, phrases or portions be declared invalid or unconstitutional. SECTION 19. The City Council hereby finds that the fees specified in this resolution will not produce an amount in excess of that estimated to fund the operation of the City of Arcadia Building Division. Based on the foregoing, the City Council hereby finds this resolution is exempt from the requirements of the California Environmental Quality Act as specified in Title 14 Section 15079.1 of the California Administrative Code. SECTION 20. The City Clerk shall certify to the adoption of this reso 1 ut ion. Passed, approved and adopted thi s 7th day of October , 1986. ',f ::~~~ ~-, . ~ -,-- - , .'-~ i.3-::-~'- ~ , - '-. - , , - - 'o'~;~~-~:dt- -- - 11 - 5323 STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES) SS: CITY OF ARCADIA ) I, CHRISTINE VAN MAANEN, City Clerk of the City of Arcadia, hereby certify that the following Resolution No. 5323 was passed and adopted by the City Council of the City of Arcadia, signed by the Mayor and attested to by the City Clerk at a regular meeting of said Council on the 7th day of October, 1986, and that said Ordinance was adopted by the following vote, to-wit: AYES: NOES: ABSE NT: Councilman Chandler, Gilb, Harbicht, Lojeski and Young None None - 12 - 5323