Loading...
HomeMy WebLinkAbout5952 RESOLUTION NO. 5952 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARCADIA, CALIFORNIA, SETTING FORTH FEES RELATING TO BUILDING CODE APPEALS, FIRE CODE APPEALS, HANDICAP BOARD APPEALS, BUILDING PERMITS PLAN REVIEW FEES, GRADING PLAN REVIEW, GRADING PERMITS, PLUMBING PERMITS, PLUMBING PLAN REVIEWS, ELECTRICAL PERMITS, ELECTRICAL PLAN REVIEWS, MECHANICAL PERMITS, MECHANICAL PLAN REVIEWS, RELOCATION AND REMOVAL PERMITS, DEMOLITION PERMITS, REROOFING PERMITS, SIGN PERMITS, SWIMMING POOL PERMITS AND FIRE EXTINGUISHING PERMITS AND REPEALING RESOLUTION NO. 5683 IN ITS ENTIRETY. THE CITY COUNCIL OF THE CITY OF ARCADIA DOES HEREBY RESOLVE AND DETERMINE AS FOLLOWS: ~mCTION 1 That City Council Resolution No. 5683 which sets forth current fees, is hereby repealed in its entirety. The proposed fees (Resolution No. 5952) are subject of a noticed public hearing scheduled for October I, 1996. SECTION 2 That based on the cost allocation study prepared by the Administrative Services Department, the fees set forth in this resolution are necessary for the purposes set forth in this resolution and that said fees do not exceed the estimated costs for providing the service. SECTION 3 Pursuant to Arcadia Municipal Code Section 8040, the fee for filing an appeal of the Building Code shall be $500.00. SECTION 4 Pursuant to Arcadia Municipal Code Section 3116.2 the fee for filing an appeal of the current Uniform Fire Code shall be $500.00. SECTION 5 Pursuant to Arcadia MuniCipal Code Section 8130.6, there is hereby established the following fee schedule for filing an application for a building permit: . -1- 5952 , BIJILDING PERMIT FEES Total Valuation Fee Issuing Fee Supplemental Issuing Fee $40.25 $14.10 $1.00 to $500,00 $40,65 $501.00 to $2,000.00 $40.65 for the first $500.00 plus $4.20 for each additional $100,00 or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $103.65 for the first $2,000.00 plus $16.70 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $487.75 for the first $25,000.00 plus $12.75 for each additional $1,000.00 or fraction thereof, to and including $50,000,00 $50,001.00 to $100,000.00 $806.50 for the first $50,000,00 plus $8.35 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 $100,001.00 and up $1,224.00 for the first $100,000.00 plus $6.90 for each additional $1,000.00 or fraction thereof OTHER INSPEC:TIONS 1. For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice, $52.15 2. For an inspection for which no fees are herein prescribed and for emergency inspections (time consumed per hour with a minimum charge of 1 hour) $52.15 -2- 5952 PI,AN REVIEW FEES When plans are required to be submitted by subsection 106.3.2 of the 1994 Unifonn Building Code, a plan review fee equal to 65 percent of the building penn it fee shall be paid at the time of submitting plans and specifications for review. When plans are required to be submitted for compliance with the State Energy Conservation Regulations, an energy plan review fee equal to 20 percent of the building pennit fee shall be paid at the time of submitting the plans and specifications for review. When plans are required to be submitted for fire extinguishing systems a plan review fee equal to 9.75 percent of the building penn it fee shall be paid at the time of submitting the plans and specifications for review. SECTION 6 Pursuant to Arcadia Municipal Code Section 8130.30, there is hereby established the following fee schedule for the plan checking fee for filing an application for a grading plan: GRADING PLAN REVIEW FEE Volume Fee 50 cubic yards or less $40.25 51 to 100 cubic yards $50.25 10 1 to 1000 cubic yards $60.30 1,001 to 10,000 cubic yards $70.45 10,001 to 100,000 cubic yards $70.45 for the first 10,000 cubic yards plus $28.20 for each additional 10,000 cubic yards or fraction thereof. 100,001 to 200,000 cubic yards $324.25 for the first 100,000 cubic yards plus $16,90 for each additional 10,000 cubic yards or fraction thereof. 200,001 cubic yards or more $493.25 for the first 200,000 cubic yards plus $8.50 for each additional 10,000 cubic yards or fraction thereof, -3- 5952 Additional plan review required by changes, additions or revisions to approved plans (time consumed per hour with a minimum charge of 1 hour). $52.15 SECTION 7 Pursuant to Arcadia Municipal Code Section 8130,30 there is hereby established the following fee schedule for filing an application for a grading permit: GRADING PERMIT FEES Volume Fee Issuing Fee Supplemental Issuing Fee $40.25 $14.10 50 cubic yards or less $42.20 51 to 100 cubic yards $50.50 101 to 1,000 cubic yards $50.50 for the first 100 cubic yards plus $19.90 for each additional 100 cubic yards or fraction thereof 1,001 to 10,000 cubic yards $229.60 for the first 1,000 cubic yards plus $16.95 for each additional 1,000 cubic yards or fraction thereof 10,001 to 100,000 cubic yards $382.15 for the first 10,000 cubic yards plus $76.25 for each additional 10,000 cubic yards or fraction thereof 100,001 cubic yards or more $1,068.40 for the first 100,000 cubic yards plus $42.50 for each additional 10,000 cubic yards or fraction thereof, OTHER INSPECTIONS 1. For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice. $52.15 2. For inspection which no fees are herein prescribed and for emergency inspections (time consumed per hour with a minimum charge of 1 hour). $52,15 -4- 5952 3. Fee for filing an application for an appeal to the building or fire codes. $500.00 SECTION 8 Pursuant to Arcadia Municipal Code Subsection 30.5 of Part III of Section 8230.1, there is hereby established the following fee schedule for filing an application for a plumbing pennit: PLUMBING PERMIT FEES PERMIT ISSUANCE I. Pennit issuance fee for each pennit $40,25 2. Where additional fixtures, or equipment have not been included in the original penn it, a supplemental penn it fee is required. $14.10 UNIT FEE SCHEDULE I. For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping, and backflow protection therefor). $11.30 2. For each building sewer and each trailer park sewer $28.25 3. Rainwater systems. per drain (inside building) $11.30 4, For each cesspool (where pennitted) $42.50 5, For each private sewage disposal system $84.75 6. For each water heater and/or vent $14.10 7. For each gas piping system of one to five outlets $14.10 8. For each gas piping system over five outlets, per outlet $2.80 9. For each industrial waste pretreatment interceptor, including its trap $22.65 and vent, excepting kitchen-type grease interceptors functioning as fixture traps 10. For installation, alteration, or repair of water piping and/or water treating equipment each $11.30 -5- 5952 II. For repair or alteration of drainage or vent piping, each fixture $11.30 12. For each lawn sprinkler system on anyone meter including backflow protection devices therefor $17.00 13. For atmospheric-type vacuum breake~s not included in Item I: 1 to 5 Over 5, each $14.10 $2.80 14. For each backflow protective device other than atmospheric-type vacuum breaker: 2 inches and smaller Over 2 inches $14.10 $28.25 15. For each swimming pool piping (including spas and hot tubs) $24.55 16. For each swimming pool "P" trap $9.85 17. For each swimming pool, spa and hot tub water heater (including gas piping) $36.95 18. For each sewer cap and/or cesspool fill $14.10 19. For each sewer connection on property (including each dwelling unit in a multiple-family development) $28.25 OTHER INSPECTIONS L For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice $52.15 2. For inspection of plumbing facilities for which no fees are herein prescribed and for emergency inspections (time consumed per hour with a minimum charge of I hour) $52.15 PLUMBING PLAN REVIEW FEES For plumbing plans which require plan review, a plan review fee equal to 65 percent of the plumbing permit fee shall be paid to the Building Official at the time plans are submitted for review. -6- 5952 SECTION 9 Pursuant to Arcadia Municipal Code Subsection 92-4 of Part III Section 8330, there is hereby established the following fee schedule for filing an application for an electrical permit: ELECTRICAL PERMIT FEES PERMIT ISSIJANCE I. For the issuance of each permit $40.25 2. For issuing each supplemental permit $14.10 SERVICES 1. For residential service of 600 volts or less and not over 400 amps in rating, including one meter each $14.10 2. For one commercial service 200 amps or less, including one meter each $28.50 3. For each commercial service 200 amps to 1,000 amps, including one meter each $56.35 4. For commercial services over 600 volts or over 1,000 amps in rating, including one meter each . $141.35 5. For each additional meter $14.10 6. For each distribution panel $14.10 NEW RESIDENTIAl. CONSTRIJCTION In addition to the fees for permit issuance and services as outlined above: L For each new single, duplex and multiple-family dwelling for each square foot of gross floor area $0.05 2. For buildings accessory to new residential buildings constructed in conjunction with those residential buildings for each square foot of gross floor area $0.04 -7- 5952 OTHER CONSTRIJCTION I. For receptacle, switch, lighting outlets First 20 each Additional each $1.40 $0.90 2. For lighting fixtures, sockets or other lamp devices First 20 each Additional each $1.40 $0.90 3. For pole or platform mounted lighting fixtures such as tennis courts, parking lot standards and walkway lighting fixtures First 6 Additional each $5.65 $2,80 4. For fixed residential appliances not exceeding I hp, kw or kva each $5.65 5. For residential, commercial or industrial 220 or 240 volt receptacle each $5.65 NOTE: For other types of air conditioners and other motor driven appliance having larger electrical rating, see POWER SCHEDULE. POWER SCHEDl JLE For motors, generators, transformers, rectifiers, converters, capacitors and other motor driven appliances such as heating, air conditioners, and cooling and baking equipment: Rating in hp, kw, kva or kvar: 1. Up to and including I each $6.90 2. Over I and not over 10 each $14.10 3. Over 10 and not over 50 each $35,35 4. Over 50 and not over 100 each $70.55 5. Over 100 each $113.00 NOTE: For equipment having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. -8- 5952 NOTE: These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. RlJSWAYS For trolley and plug-in busways - each 100 feet or fraction thereof $8.40 SIGNS Signs, outline lighting and marquees: 1. For one sign and one branch circuit each $56.35 2, For additional branch circuits each $5.65 CARNIVALS, CHRISTMAS TREE LOTS, SALES LOT, ETC 1. For electric generators and electrically driven rides each $14.10 2. For mechanically driven rides and walk through attractions with lighting each $6.90 3. For arena and booth lighting each $6.90 4. For Christmas tree lots, sales booths, etc., each $28.25 TEMPORARY POWER 1. For temporary service pole or pedestal installed in conjunction with temporary buildings each $53.35 2. For temporary service pole and one distribution system for construction sites each $28.25 3. For additional distribution panels installed in conjunction with temporary power poles each $14.10 SWIMMING POOLS, SPAS, HOT TUBS, ETC 1. For not more than one sub-panel, three motors, integral lighting fixtures and all wiring and lighting for operation of same $61.35 -9- 5952 NOTE: For additional electrical outlets or equipment, see OTHER CONSTRUCTION or POWER SCHEDULE. OTHER INSPECTIONS 1. For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice, each $52.15 2. For inspection of electrical equipment for which no fees are herein prescribed and for emergency inspections (for the time consumed per hour with a minimum charge of 1 hour) $52.15 ELErTRICAL PLAN REVIEW FEES When service switch size exceeds 400 amps or 300 volts or when connected load exceeds 400 amps, a plan review fee equal to 65 percent of the electrical permit fee shall be paid to the Building Official at the time plans are submitted for plan review. Annual Electrical Maintenance Permit $79.10 NOTE: Maintenance permits are only issued to manufacturing plants, commercial establishments, hospitals and similar occupancies having duly licensed journeymen electricians as permanent employees. This annual permit does not absolve the organization from any fees, inspections or other requirements of this Code as pertains to electrical installations. SECTION 10 Pursuant to Arcadia Municipal Code Section 8432, there is hereby established the following fee schedule for filing an application for a mechanical permit: MECHANICAL PERMIT FEES PERMIT ISSlJANCE 1, For the issuance of each permit $40.25 2, For issuing each supplemental permit $14.10 -10- 5952 UNIT FEE SCHEDULE \, For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h $17.00 2, For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, over 100,000 Btu/h $21.30 3. For the installation or relocation of each floor furnace, including vents $\7.00 4. For the installation or relocation of each suspended heater, recessed wall heater or floor mounted unit heater $\7,00 5. For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit $8,50 6. For the regular repair of, alteration of, or addition to each heating appliance refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by this code $\7.00 7. For the installation or relocation of each boiler or compressor to and including 3 horsepower, or each absorption system to and including \00,000 Btu/h $\7,00 8, For the installation or relocation of each boiler or compressor over 3 horsepower to and including \5 horsepower or each absorption system over \00,000 Btu/h to and including 500,000 Btu/h $31.10 9. For the installation or relocation of each boiler or compressor over \5 horsepower to and including 30 horsepower or each absorption system over 500,000 Btu/h to and including \,000,000 Btu/h $42.50 \ o. For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower or each absorption system over \,000,000 Btu/h to and including \,750,000 Btu/h $63.70 \\, For the installation or relocation of each boiler or compressor over 50 horsepower or each absorption system over \,750,000 Btu/h $\06.10 -11- 5952 12. For each air-handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto $12.80 NOTE: This fee shall not apply to an air-handling unit which is a portion of a factory assembled appliance, cooling unit, evapo'rative cooler or absorption unit for which a permit is required elsewhere in this Code. 13. For each air-handling unit over 10,000 cubic feet per minute $21.30 14. For each evaporative cooler other than portable type $12.80 15. For each ventilation fan connected to a single duct $8.50 16. For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit $12.80 17, For the installation of each hood which is served by mechanical exhaust, including ducts for such hood $12.80 18. For the installation or relocation of each domestic-type incinerator $21.30 19. For the installation or relocation of each commercial or industrial-type incinerator $84.75 20, For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this Code $12.80 OTHER INSPECTIONS I. For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice each $52.15 2. For inspection of electrical equipment for which no fees are herein prescribed and for emergency inspections (for the time consumed per hour with a minimum charge of 1 hour) $52.15 MECHANICAL PLAN REVIEW FEES For mechanical plans which require plan review, a plan review fee equal to 65 percent of the mechanical permit fee shall be paid to the Building Official at the time plans are submitted for plan review. -12- 5952 SECTION 11 Pursuant to Arcadia Municipal Code Sections 8632.4, 8642 and 8633 there is hereby established relocation and removal fees as set forth below: RELOCATION AND REMOVAL FEES REI ,OCA TION EXAMTNA nON FEE Relocation examination fee shall be $14.10 for each one hundred (100) square feet or fraction thereof of floor space, whether usable or not, contained within the building proposed to be relocated. RELOCA TION PERMIT FEE Relocation permit fee shall be $22.65 per one thousand dollars ($1,000.00) valuation, or fraction thereof of the building to be relocated. For the purpose of computing such fee, valuation shall include the reasonable .cost of moving such structure and the reasonable value of all new construction, alterations, additions, repairs, replacements and foundations in connection therewith. I. For the issuance of each permit $40.25 2. For issuing each supplemental permit $14.\0 REMOVAl. PERMIT FEE (EXPORT) The fee for filing an application for a removal permit shall be $296.65 (route inspection fee and owner and mover bonds shall also be collected). 1. For the issuance of each permit $40.25 2. For issuing each supplemental permit $14.\0 SECTION 12 Pursuant to Arcadia Municipal Code Section 8652, there is hereby established the following fee schedule for filing an application for a demolition permit: -13- 5952 DEMOLITION PERMIT FEES Square Footage of Building Fee 500 square feet or less $22,65 501 to 1,000 square feet $42,50 1,001 to 3,000 square feet $70.55 3,001 to 10,000 square feet $98,80 10,001 square feet or more $226,05 1. For the issuance of each permit $40,25 2, For issuing each supplemental permit $14, io SECTION 13. Pursuant to Arcadia Municipal Code Section 8130,39 there is hereby established the following fee schedule for reroofmg permit: REROOFING PERMIT FEES REROOFING The fee for filing an application for a reroofing permit shall be the same as required for a building of equivalent valuation as determined by the following: Type of Reroofing Evaluation (cost per square) L Fiberglass Shingles (20 year warranty) $130.00 2. Laminated Fiberglass Shingles (25 to 30 year warranty) $150.00 3, Laminated Fiberglass Shingles (40 year warranty) $170.00 4. Heavy Concrete Tile $325.00 -14- 5952 5. Lite Weight Concrete Tile $375.00 6. Lite Weight Perlite Shakes (Cal-Shake, etc.) $325.00 7. Fiber Cement Shakes (Hardishake, etc.) $325.00 (Cemwood, etc.) $375.00 8. Pressure Treated Shakes (medium to heavy) $325.00 9. Steel Roofing Systems (Class "8") $350.00 (Class "A") $500.00 For plywoo~ installation add $50.00 a square to the above figures, SECTION 14 Pursuant 10 Arcadia Municipal Code Section 8712 the fee for filing an application for a sign permit shall be the same as required for a building of equivalent valuation and shall also include a plan check fee which shall be 50 percent of the permit fee. SECTION 15 Pursuant to Arcadia Municipal Code Section 8742 there is hereby established the fee for filing an application for a swimming pool permit as set forth below: SWIMMING POOl. PERMIT FEES The fee for filing an application for a swimming pool permit shall be the same as required for a building of equivalent valuation. The valuation shall be calculated at the rate of $208.95 per perimeter foot of the swimming pool and/or spa. I. For the issuance of each permit $40.25 2. For issuing each supplemental permit $14.10 OTHER INSPECTIONS I. For an extra inspection made necessary due to work not being ready at the time specified or due to work not corrected after prior written notice $52.15 2. For inspection of plumbing facilities for which no fees are herein prescribed and for emergency inspections (time consumed per hour with a minimum charge of I hour) $52.15 -15- 5952 SECTION ]6 Pursuant to Arcadia Municipal Code Section 3] 15.2 there is hereby established the following fee schedule for issuance of Fire Extinguishing Pennits: FIRE EXTINGlJISHING PERMIT FEES The fee for filing an application for the installation of fire extinguishing systems shall be the same as required for a building of equivalent evaluation. 1. For the issuance of each pennit $40.25 2. For issuing each supplemental pennit $14,10 SECTION] 7 This resolution shall become effective November 1, 1996. SECTION 18 Neither the adoption of this resolution nor the repeal hereby of any resolution shall in any manner be construed as affecting any such fee, nor effect the validity of any bond or cash deposit in lieu thereof, posted, filed or deposited therefore and all rights and obligations thereunder appertaining shall continue in full force and effect SRCTION 19 The City Council hereby finds that the fees specified in this resolution will not produce an amount in excess of that estimated to fund the operation of the City of Arcadia Community Development Division. - ]6- 5952 SECIION2..C!. The City Clerk shall certify to the adoption of this Resolution. Passed, approved and adopted this 1st day of October ,1996. ~o~~~/ 15. X~ ayor of the City of ArcadIa ATTEST: ,/ AD APPROVED AS TO FORM: ?!1di;J( c1!!!::: STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) SS: CITY OF ARCADIA ) I, JUNE D. ALFORD, City Clerk of the City of Arcadia, hereby certify that the foregoing Resolution No. 5952 was passed and adopted by the City Council of the City of Arcadia, signed by the Mayor and attested to by the City Clerk at a regular meeting of said Council on the lstdayof October , 1996, and that said Resolution was adopted by the following vote, to wit: A)1ES: Counci1member Chang, Harbicht, Kovacic, Young and Kuhn NOES: None ABSENT: None -17- 5952