HomeMy WebLinkAboutItem 2d: Accept work by CJ Construction, Inc. for the Windstorm Damage Sidewalk Repair Project1:71 rwd C °0�44ity °c0° STAFF REPORT Public Works Services Department DATE: July 17, 2012 TO: Honorable Mayor and City Council FROM: Tom Tait, Public Works Services Director ?P' By: Ken Herman, Deputy Public Works Services Director Jan Balanay, Engineering Assistant SUBJECT: ACCEPT ALL WORK PERFORMED BY CJ CONSTRUCTION, INC. FOR WINDSTORM DAMAGE SIDEWALK REPAIR PROJECT AND AUTHORIZE THE FINAL PAYMENT TO BE MADE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS Recommendation: Approve SUMMARY On February 21, 2012, the City Council awarded a contract to CJ Construction, Inc. in the amount of $103,620 for the construction of the Windstorm Damage Sidewalk Repair Project. The terms and conditions of this project have been complied with and the work has been performed to staff's satisfaction for a total project cost of $103,620. There were no change orders issued for this contract. It is recommended that the City Council accept all work performed by CJ Construction, Inc. as complete and authorize the final payment to be made in accordance with the contract documents, subject to retention of $5,181. DISCUSSION The 2011 December Windstorm caused extensive damage throughout the City. Much of the damage included trees in the public right -of -way that had been uprooted and blown over, damaging sidewalks, curbs, and gutters. In order to remove the large tree stumps and roots balls and address the damage to sidewalks, curbs, and gutters along major arterial and collector streets in a timely manner, these repairs were performed by a private contractor as a part of the Windstorm Damage Sidewalk Repair Project. This project was managed by the Public Works Services Department. The terms and conditions of the contract for this project have been complied with and the work has been completed in accordance to the project specifications. The locations of the sidewalk, curb and gutter repairs, and stump removals along arterial and collector roadways are shown on the attached location map (Exhibit "A "). This project includes Honorable Mayor and City Council June 17, 2012 Page 2 of 2 only the first phase of multiple projects that will make permanent repairs to the City's infrastructure damaged by the 2011 December Windstorm event. It is recommended that the City Council accept all work performed by CJ Construction, Inc. as complete and authorize the final payment to be made in accordance with the contract documents, subject to retention of $5,181. ENVIRONMENTAL ANALYSIS This project involves the repair and restoration of property and facilities damaged as a result of a disaster (2011 December Windstorm) and is therefore, considered to be statutorily exempt per Section 15269 (a) of the California Environmental Quality Act. FISCAL IMPACT $2,300,000 was appropriated to the Emergency Respond Fund for the cleanup and repair of damage caused by the 2011 December Windstorm. The total project cost of $103,620 was approved by the City Council on February 21, 2012. All terms and conditions of this contract have been satisfied. No change orders were issued in the execution of this contract. RECOMMENDATIONS It is recommended that the City Council approve the following: 1. Accept all work performed by CJI Construction, Inc. for the Wind Storm Damage Sidewalk Repair Project. 2. Authorize final payment to be made in accordance with the contract documents, subject to a retention of $5,181. APPROVED: is Lazz o City Manager Attachment: Location Map a, ' WIND STORM DAMAGE SIDEWALK REPAIRS PROJECT 4 PROJECT NO.: 80855312 a CONCRETE /ASPHALT REPAIR LOCATIONS g 4 u5 S 1 i tla Q p6 6P c ,v ,s LEGEND: d.. k " Y e o> „Q w • JL.i .. - • WORK TO BE DONE BY CONTRACTOR 1tl � a iiP Y :7F q yy ppRj, E �^o •�*„y�F � r t A F � w�b°ME° e,A.^ e � {{T hr"I" +.. � '�.rw qqr rrsnr i _ m.�uw m M1 11Q V L nv � IAR 1I • �^\ r„ v �, i- 'awl., N, a �\ e n Mt &.W„ yP a �;\. •• • of low ��..� 3. ea- -:�rw 8� 4• E� ����• � ""::+ a '4 „"'°""7oa.. i -� �1'i t ��w�.:.s, 0;..5 .mow. d,n.: • ,.�. � vu.e. .t, raw, • : a ,yam � ..v, ( a c w • ,v ti., c .,� "°" ..µxi • „�1 '• •• '""' \�•i^ � ... � R a `-'°" C.a .,.P uru •v 3 I y ww. ... i �n..F w• P Y}�•�„o�, *v, � c i €� �� °� w•w�.u. � _ qua � � n� S � x � ;�6p i ;� • a 0 a Tw a ^ f +wev a, '