HomeMy WebLinkAbout3600
~
RESOLUTION NO. 3600
A RESOLUTION OF THE CITY COUNCIL OF
THE CITY OF ARCADIA, CALIFORNIA,
ADOPTING THE SCALE OF PREVAILING
RATE OF PER DIEM WAGES AND
RESCINDING RESOLUTION NO. 3550 AND
ALL OTHER RESOLUTIONS IN CONFLICT
HEREWITH.
~4
K. 3&1-7
THE CI~Y COUNCIL OF THE CITY OF ARCADIA, CALIFORNIA,
DOES DETERMINE AND RESOLVE AS FOLLOWS:
SECTION 1. That pursuant to Section 1773 of the Cali-
fornia Labor Code, the following wage scales for the basic trades
and sub trades hereinafter set forth are hereby ascertained and
determined to be the general prevailing rate of per diem wages in
the locality of the City of Arcadia and the general prevailing
rate for legal holiday and overtime work in said locality. That
the rates hereinafter specified shall be applicable as of the date
of the adoption hereof, except in such instances as rates or sched-
ules are hereinafter specified to be effective at a date later
than the date of the adoption hereof and in such cases the rates
shall be effective upon the respective dates hereinafter specified.
Per diem wages shall be deemed to include employer payments for
health and welfare, pension, vacation and similar purposes, when
the term "per diem wages" is used in any statute applicable to
public works. The basic trades and subtrades with respect to which
the general prevailing rate of per diem wages and the general pre-
vailing rate for legal holiday and overtime in the locality of the
City of Arcadia as thus determined are as follows:
-1-
3600
~
I
,
,,-.'"1:"^
, "
, ()'.
'^"~
..
#
.~
.
(}~~.
~\']
J., .
-2-
3600
/
,,/
SECTION 2. That Resolution No. 3550 entitled "A RESO-
LUTION OF THE CITY COUNCIL OF THE CITY OF ARCADIA, CALIFORNIA,
ADOPTING THE SCALE OF PREVAILING RATE OF PER DIEM WAGES AND RE-
SCINDING RESOLUTION NO. 3425 AND ALL OTHER RESOLUTIONS IN CONFLICT
HEREWITH" adopted January 15, 1963, and all other resolutions in
conflict herewith, are hereby rescinded.
SECTION 3. The City Clerk shall certify to the adoption
of this resolution and shall cause a certified'copy hereof to be
filed with the Director of Industrial Relations within ten (10)
days after the date of the adoption hereof and annually thereafter
shall cause a certified copy hereof to be flIed with the Director
of Industrial Relations; if during any annual period the City Coun-
cil determines that there has been a change in any prevailing rate
of per diem wages in the locality of the City of Arcadia, the City
Clerk shall notify the Director of Industrial Relations of such
determination within ten (10) days after such determination is made.
I HEREBY CERTIFY that the foregoing resolution was adopted
at a regular meeting of the City Council of the City of Arcadia held
on the 2nd
day of
July
, 1963, by the affirmative vote
of at,least three Councilmen, to wit:
AYES: Councilmen Balser, Reibold and Phillips
NOES: None
ABSENT: Councilmen Butterworth and Turner
vd - ~ Z2 L
~fflerk or'the ~ {~
SrGNED AND APPROVED this 2nd day of JUlf, 1963.
~~~:
ATTEST:
~~,ai
Ci y C er -
(SEAL)
-3-
3600
LINEMAN:
.t.i'
5,99
6.32
5,68
5,38
7,10
6,38
4,04
General Foreman ".n..................__.......___h........_uu......... 6.30
Foreman _.hu...__.__n_.__._._.'......................_..._...__.............. 5.72
Cable Splicer Foreman ................................__hh__________ 6.05
Cable Splicer ........n.__........__.....,.................__.____._......... 5.44
Lineman ._nnnn____.__._n__....._................._..............hh.hn. 5.14
Radio & TV Towennan Foreman ................__________m... 6.83
Radio &. TV Towerman ......h......h__..h...._____.__.,..___....... 0.14
Groundman ............h................_..'.._........_...n._.__n.h....... 3.86
(Pension Plan-l %)
ELEVATOR 9/15/62
Elevator Constructor Foreman ...................................._____.______....................__$5.37
Elevator Constructor ..........__h......._nnnu_n...____nn......................._....____.....___.. 4.77
Elevator Constructor Helper _..........................__mn_..._..._........................_....__ 3.34
Elevator Probationary Helper ............................n...mm...m______................... 2.385
(Health & Welf..e-71>,) (Pension Plan-1OI>" (Vacation Plan-2% up to
5 yrs.; 4% 5 yrs. or more)
GLAZIER 7/26/62 1/26/63 7/26/63 7/26/64
Glazier .mm____mm_____._.........__________.........__...,$4.14 $4.24 $4,31 $4,51
(Health & Welfare-l0,; 12,-7/26/64) (Pension Plan-1O,-7/26/63)
(Plus Vacation Plan)
6.45
5.85
6.19
5.56
5.26
6,97
6.26
3,95
GUNITE
Gunite Forcman-2S, per hour more than the highest classification over which
he has supervision.
6/1/fli2
Nozzle Man & Rod Man .._h....._.._____mm........_.............$4.125
Gun Man .....____...__.____......____.....____.__________.____.____.____...__. 3.795
Reboundman m____m_._._._____.._.".m_.___"...__....__.__.__.____"'_ 3,375
(Health & Welfare-12I'at)
HOUSEMOVER (,/22/62 7/1/63
Housemover Foreman ____.____..__.__$3,945 $4.065
Housemover Journeyman ..__._n.... 3.685 3.805
Yard Maintenance Man .............. 3.685 3.805
(Health & Welfare-12I>t) (Pension Plan-1O,)
. .
5/1/63 S/1/64
$4.275 $4.425 . .
3,935 4,075
3.475 3.615
7/1/64 1/1/65
$4,255 $4.365
3,995 4,105
3.995 4.105
111/64
$4.155
3,895
3.895
LATHER
NOTE: Upon 60 days' notice prior to May I, 1963, or May I, 1964, the Union
may elect t.~e fol!owh!g incre:lSc~ to be 4l.ppHcd to .....ages or fri.uge
benefits:
1 ^ : ~ hlNF a/Vti3
14t per honr-5/l/64 ...1-1-(, 'J
~ta~~:::~~;=~:--~.~...~-..-.-...-...-.......-.-----..--_..~ ~ ~~::.
Metal-Furring Lather __...hm._n_..___.._.....___..............___.. 4.345 ~ Note
(Health & Welfare-15%,) (Pension Plan-1O,) (Vacation Plan~ 3'"1l.
Los Angeles Area-Local No. 42A e:zFft 5/1/63 SIT /64
Nail-On Foreman ..............._._........___..___..m___.__......_....~ ...s.ae Q.'ii'-:1.-.,See
Nail.On Lather ____...__._.________,...____....__mm____m._...____.__. ~5 Nlrte.r,#""Note
(Health & Welfare-1St) ((Pension Plan-l0,) (Vacation Plan-25t)
~a;:~e~a ~7t~~~~e~:n8~.._.__.. . .............___m.mm_m~2 ~3stfJ. 5~W::4
Metal & Nail-On Lather .m.__mu____mu___mm______._..h.... ~ ~-e ~Note
(Health &: Welfare-IS,) (Pension Plan-IO<) (Vacation Plan-25~)
. .
....-- M
Long Be.ch Area-Local No. 172 ....
San Pedro Area-Local No. 366 ~ 5/1/63 5/1/64"""
Metal & Nail-On Foreman ...............................unm..... ~JI g;b ;';ee
Metal & Nail-On Lather ........................................_... . 5 Note tt.4:' Note
(Health & Welfare-IS,) (Pension Plan-l0~) (Vacation Plan-25t)
MARBLE 7/1/62
~:,~leG~~:.--:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~:gb5
Stock Man ...............'.mmn......'...,..................._....................n_,._n,. 3,805
Marble Setter Helper u.__....................................._..................._..... 3.555
Apprentice Helper-1st 3 mos. ........................__u.u___....__............ 3.045
Apprentice Helper-2nd 3 mos. .............................m_...._.............. 3.145
(Health &: Welf..e-12t)
711/63
$4,695
3.905
3,905
3.655
3,145
3,245
PAINTERSOO_Lo. Angeles Area
Painter Foreman-Not less than $2..00 per day additional.
1/1/63 7/1/63
Brush ,.........'.._..m_.nnmmn'_.m...'....'.,..."'..,.......,...........$4.15 $4,25
~~hl.:SB:rM~.g.~n::::::::::::::::::::::::::::::::::::::::::::::::::::: g~ g
Steel &: Bridge. Swing Stage _m..._....n......_................... 4.42 4,52
Spray Gun or Sandblaster .............,.......'..'.._.mmnnn._. 4.40 4,50
Spray Cun or Sandblaster. Swing Stage ...................... 4.52 4.62
Paint Burner ...........00.......................................0000.......... 4.27 4,37
Paperhanger ........h____u..____......................................u_.u 4.40 4.50
Taper _._..._00...'00....._.'.............00...'...'.._........_'_..00.............. 4,27 4,37
Steeplejack Worker m........................................_.._._.n.. 5,40 5,50
(Health & Welfare-12\2t) (Pension Plan-l0,) (Vacation Plan 7~)
..7~hoUf day fOf above
Sign & Pictorial Leaelman-lO% above Journeyman rate. .y-l~ 3
j~~:= ~!~~O~~nt::~:..:::::::::::::::::::::::::::::::::::::::::::::::::::::::i;::t.J~:::::::?
Sign &: Pictorial Helper .......................................u____..............J.\.S...._....... . ~
(Health &: Welfare-Sl'at) (Pension Plan-lOt) ~ )
"7~hour dAY for llbove N rJ W -/0 !/)...4- !l ~ f~' ~
PIPE TRADES
Plumber & Steamfitter General Foreman-20% above gross Journeyman ra.te.
Plumber & Steamfitter Foreman-l0% above gross Journeyman rate.
1/1/64
$4,34
4.46
4.46
4,61
4.59
4.71
4.46
4.59
4.46
5,59
7/1/62
~i~~~;:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::=::::::::::::::::::::::::Hi
(Health & Welfare-4% of gross payroll) (Pension Plan-21h:% of gross pay-
roll) (Vacation & Holidays-71>% of gross payroll)
10/1/62
~~~ ~~~~r::.: ~~~~~'~'.~~'.'.'...~'...'.'...~'.'.'.'.~'.....~'.~~-.-.~~~~~'.-_~~'.~'.''-.'.'.~'.'.~~~'.~-.~~~~..''-''.~'''.~~'.~~'.~'.~~'.~i
(Health & Welfare-4%) (Pension Plan-21>%)
(Vacation & Holidays-71'a%)
6/23/62
~~~:~~: J~~~~:a';;'~ ~:~~~~:~~~~~::~:~:~~ :~:~:~~~~~~~ ~~~~~~~~~~ ~~~~~~~~~~ ~~~~~~ ~~~~~: ::::: $~ :~5
Probationary Pipeline Apprentice Helper ............___m____m........... 3.40
(Health &: Welfare-19t) (Pension Plan-12~)
Industrial Pipefitter General Foreman-20% above gross Journeyman rate.
Industrial Pipefitter Foreman-lO% above gross Journeyman rate.
7/1/61.
Industrial Pipefitter Journeyman .....................________ ...--..........-...--.-...__.._._.....$4.83
(Health &: Welfare-20t) (Pension Plan-13t) (Vacation &: Holidays-37tJ
6/23/63
$5,64
5,13
3,55
~
, ... - 9/110%
~~~:~ ~::: ..~~~~~~..:::::::::::::::::::::::::::::::::::::.::::::::::::::::::::::::::.:.::::::::.::~~:fgs
(Health &: WeUare-7\2t) (Pension Plan-lOt)
9/1/61.
Refrigeration Fitter Foreman ...................................................................__...$5.31
Ref~:::~i':; ;~~:r~:::15t)....(P~~j~~..pi;;;;:::12~)....(V~~~.;;~~-.&.H~i.id~;~~2~~) .
PLASTERER 5-/.'.3 ~
Plasterer Foreman ........................h..........._.....un_nn_nn__n...n......__._.~....$4. 72
Plasterer h.............................._............................................................h._n...__._ 4.345
(Health &: WeUare-15t) (Pension Plan-lOt) (Vacatinn Plan-~ 3~
C5~ 5/1/63 5/1/64
Pl(~::;~::~~if~;;;:::12~t).-..(P~~;j;;~..pi~~:::17i)...~ ~ 4. ;2S'~::e
(Vacation Plan-l5(!. Ta h.!.. fB'.~e"'u.J eM ""'MHn" or ur"gn~ alter 1,'1,'63) ~/p 6.J
NOTE: The following increases to be designated to wages or fringe benefits on
the !peciDed dates.
18~..' ~'1 'O~
14t per hour-5/1/64
.
ROOFER
ROOFER: 8/15/01
Foreman ......................................_.,....................,....................,.............,.._......$4.75
Sub~Foreman .......................hu.nn....__............................................................ 4.65
Journeyman ................_.....................................h.nnun.nnn_n...__h_................. 4.40
PITCH ROOFER & ENAMELER:
ForeIIlan nu..............................h.....__n....................................................._00__.00 5.05
Sub-Foreman ........................................._..............._......00_00......00...................... 4.95. .
Journeyman ............................hhnn_._..__....................hn..._n._...n....00__.._.__.00_.. 4.70
DAMP, WATERPROOF &: BITUMINOUS ENAMELER:
Foreman ___.......................nhnnn___.n_..n.................._.hh_h.n0000_._.0000._......._...._.. 5.05
Sub-Foreman .................................................._..................................._...._...._. 4.95
Journeyman ......0...........................................................0..._............................... 4.70
(Health &: WeUare-IOt)
SHEET METAL
Sheet Metal Foreman-lO% above Journeyman rate. 7/1/62 711/63 7/1/6~
Sheet Metal Worker .................._______,____..._..................__$4,75 $5,02 $5,31
Residential Healing I05taller .......................___...__._.._.. 4,75 5.02 5.31
(Health &: WeUare-16t) (Pension Plan-II <I; 13t-7/1/63)
TERRAZZO
Terrazzo Setter Foreman in charge of less than 5 men, $1.00 per day and in
charge of 5 or more men, $2.00 per day MORE THAN Terrazzo Setters' rate.
7/1/51
Terrazzo Setter 0.....0.......... .0....._......._...._...._......................................._.............$4.10
711/61 7/1/63 7/1/64
Base Machine Operator ...__.........__..._.._....................,....$3.90 $4,06 $4.23
Floor Machine Operator &: Helper ...__....................... 3.635 3.795 3.965
TILE
Tile Setter Foreman in charge of less than 11 men, $2.50 per day and in charge
of 11 or more men, $5.00 per day MORE THAN the Tile Setters' rate.
1/1/63 6/1/63
Tile Seller ___...__.............,..........................,...,.___.____,____,____,___.....,....$4.55 $4.725
(Health &: WeUare-I4\2<1) (Pension Plan-IO<l)
Til(H;~l:hr &:H~Il.;~:::14~~j..'..,.--.--"'.-'-.........,.,...,....-.---'----"--.. 3,78
..
3,92
(1.63)
SUB.TRADES HOURLY WAGE RATES OF
BUILDING AND CONSTRUCTION TRADES UNIONS
Affill...d with the
LOS ANGELES BUILDING & CONSTRUCTION
TRADES COUNCIL
1626 Bevtrly BI.d., Lo. Angele. 26 - 483-4222
.--.. III
l~DDITIONAL COST ITEMS: For Subsistence Allowance, Tramportation and
'l'ravel 'l'ime Allowance, Apprentice Program Contributions, etc., contact the
Local Union or its District Council having jurisdiction.
RIGGERS & WELDERS: Same wage scales as crafts to which they are inci-
denttl.
ASBESTOS ~
~=~~~.~~~:~~:~::::~~~::::::::::::::~::::::::::::::::::::::::::::::::::::::::::::::::::::: . ~
Mechanic ..................................,............__.__....__.............._......._...____ 4.58
(Health &: WeUare-15t) (Pension Plan-20t) (Vacation Plan-25t)
BOILERMAKER 6- BLACKSMITH '0/1 /62
Boilennaker &: BlaCKsmith Foreman .........................................................._.__$5.25
Boilermaker & Blacksmith Assistant Foreman or Leadman .....______............. 5.00
Boilermaker ~ Blacksmith.....................h..n..................h.h.mnnn_.._nn.nm._.. 4.75
Boilermaker &: Blackmllth Helper ...............................................0._.............. 4.45
(Health &: Welfare-lOt) (Pension Plan-lOt)
111/63
$5,26
5,01
4,885
4.76
8RICKLA YER
Bricklayer Foreman-Not less than $2.00 per day above the journeyman rate if
he has supervision over 5 or less men.
-Not less than $3.00 per day above the journeyman rate if
he has supervision over 6 or more men.
mt6to 5/1/0'
B~~:r;;:-; ~~~::';:, l~~..:.i-;.i:if:..s::;;:.,.:;T.......$U15 ~"?5
B~~~f~e~ w~iI;;~:::i.2*i)....(p~~~;~~.pi;;;;:::liit)...~ jg ~'71j~r
NOTE: The following increases to be designated to wages or fringe benefits,
including a Vacation Plan on the specified dates:
154 k'.... hatlf J!/l,'&3
15t per bour-5/1/64
CARPET 6- LINOLEUM LAYER 8/1/02 8/1163
Carpet, Linoleum &: Soft Tile Layer ..______............__........,.._____......$4.25 $4.40
(Health &: WeUare-IIt) (Vacation Plan-2% 1st 12 mos., 3% 2nd 12 mas"
thereafter 4%) (Pension Plan-lOc-2/1/64)
ELECTRICIAN
WIREMAN: '/I/O,
General Foreman _.n_m._..h..........................___m_..__.n..n$6.30
Foreman ..........0....._....._..00..._..00.._00...0..00_._..._................. 5.72
Cable Splicer .___,....__,'____.__..,....,....__...,........________________._ 5.44
Journeyman Wireman n.m..n_...............nnh...._.._.._....... 5.14
Journeyman Technician _m..n_.___........_m_mnnn.._.....n... 5.14
711/6J
$6.45
5,85
5.56
5.26
5.26
'/1/0'
$6,60
5.99
5,68
5.38
5,38
-~
"
...
~
", TlAMSTERS (Contlnuod I
DW 10 and DW 20 Euclid-type Equipment. Le
. Tourneau Pulls, Terra Cobras and similar type
of equipment; also PB and similar type trUCKS
when performing work within the Teamster
jurisdiction, regardless of types of attachments.. 4.765 4.915 5.065
Winch Truck Driver-121hd per hour additional when operating
power winch. or similar special attachments.
BUSINESS ADDRESSES
OF
HEALTH & WELFARE PROGRAMS
CAllPENTERS Health &. WeUare Trust for Southern California
M. A. Cornell 6: Co.--412 W. 6th St.,
Los Angeles 14, Calif. ..........................................................MAdison 2-3141
CEMENT MASONS Southern California Health 6: Welfare Fund
M. A. Cornell 6: Co,--412 W. 6th St.,
Los Angeles 14, Calif. ...................,.................,................,...MAdison 2.6111
California mONWORKERS' Field Welfare Plan
320 Judah St., San Francisco, Calif. ..........mn......m.....h...OVerbnd 1-1720
LABORERS Health &: Welfare Trust for Southern California
810 So, Spring St., Los Angeles 14, Calif. ..........................MAdison 2-1212
OPERATING ENGINEERS Health 6: Welfare Fund
724 So, Park View, Los Angeles 57, Calif. ,.........................DUnkirk 8-5138
Construction TEAMSTERS Security Fund for Southern California
General Correspondence:
412 W. 6th St., Los Angeles 14, Calif. ......uu..uu.u..u.MAdison 2-9187
Claims: Teamsters Security Plans. Inc.
1616 W. 9th St" Los Angeles 15, C,lif, ..........uu........DUnkirk 1.3571
Fwnished hy
LOS ANGELES BUILDING lit CONSTRUCfrON TRADES COUNCIL
AFL-ClO
1626 Beverly Blvd., Los Angeles 28, Calif.
4ll3~2
~111
,
-
TEAMSTERS
Health t Welfare-15t per hour
Pension-S, per hour; 15; per hour 1/1/64
OWNER-OPERATORS-owning tractor only, to be put on payroll of Contrac-
tor; all others, payment of 121>t per hour (50t per half day, $1.00 per full
day) to provide Health &. Welfare.
Foremen: When a Contractor employs on his payroll, on a jobsite, lIar more
Teamsters operating equipment under the jurisdiction of the Team~
stCr9, excluding any equipment less than six tons and maintenance
equipment, the Contractor shall designate one Teamster as a work-
ing Foreman and he shall receive 254 per hour more than the highest
classiBcation over which he is Foreman.
Driver of Dump Trude of less than:
.
511/63
4 yards water level ....................mm.................... 3.82
4 yards but less than 8 yards water level _......... 3.85
8 yards but less than 12 yards water level........ 3.90
12 yards but less than 16 yards water level ___..... 3.98
16 yards but less than 25 yards water level ....m. 4.20
25 yards or more, water level (single unit or
combination of vehicles, excluding trash
or rubbish trucks) ......................_............,.... 4.53
Driver of Trude: Legal Payload Capacity:
Less than 6 tons ...._.................._..........................$3.82
6 tons to 10 tons n................h..__.__.__..........__........ 3.85
10 tons to 15 tons ...-..........0.....__..........................__ 3.90
15 tons to 20 tons ..................__.............................. 3.98
20 tons or more ...........0..0..................0......0...__........ 4.20
Driver of Dumpster Truck ..__m.........h....__.____............... 4.20
Driver of Transit-Mix Trock-Under 3 yards h.......m.. 4.06
Driver of Transit-Mix Truck-3 yards or more 0.,,__,_"" 4.20
Gas and Oil Pipeline Truck Driver, including
Winch Truck and all sizes of Trucks, or any
other pipeline where a composite crew is used__.. 4.00
Driver of Road Oil Spreader Truck ...................__.0..... 4.00
Boohnan h.........hn..................h...n..............hh.............. 4.00
Dumpcrete Truck less than 6* yards water level...... 4.06
Dumpcrete Truck, 6:.n yards water level and over ...... 4.20
Ross Carrier Driver-Highway ...............................0.... 4.485
Water or Tank.Type Truck Driver-Under 2500
gallons ........__...........__.0............0................0..__...____ 3.88
Water or Tank-Type Truck Driver-2500 gallons to
4000 gallons ............._......_...._.............._................. 4,00
Water or Tank-Type Truck Drivcr-4000 gallons
and over .....__.__.__........__.....__.....__.0.......____..__......0... 4.12
Fork Lift Driver __.............0..........._................._.............. 4.485
Traflic.Control Pilot Car, excluding moving heavy
equipment, permit loads .........h....m....-m.__......... 3.82
Truck Greaser and Tireman .........0._0...__........................ 4.15
Truck Repainnan ......._n_.................__......__.................--. 4.765
Truck Repairman Helper ...__.........................h__.......... 4.035
Warehouseman and Teamster ....................0................. 3.74
Warehouseman-Clerk mn...............m.......................h.. 3.88
A-Frame or Swedish Crane Driver .....00....................... 4.485
Driver of Euclid-Type Spreader Truck, less than
25 rards water level (over 25 yards water
leve , use Dump Trock ClassiBcation) ................ 4.39
5/1/64 1/1/65
3.95 4.10
3.98 4.13
4,03 4,18
4,11 4,26
4,33 4.48
4,79 4.94
$3,95 $4.10
3,98 4.13
4.03 4,18
4.11 4,26
4.33 4.48
4,33 4.48
4.19 4,34
4.33 4.48
4.13 4.28
4,13 4.28
4,13 4.28
4,19 4.34
4.33 4.48
4,635' 4,785
4,01 4.16
4,13 4,28
4,25 4,40
4.635 4,785
3,95 4,10
4,28 4.43
4,915 5,065
4,185 4,335
3.87 4.02
4.01 4.16
4,635 4.785
4.52 4.67
OPERATING ENGINEERS (Continu.d)
Skip Loader Wheel Type over" yard, up to and including II> yards
Slip FonD. Pump Operator (power~ven hydraulic lifting device lor concrete
forms)
Tractor Operator-Dragtype Shovel. Bulldozer. Tamper, Scraper and Push
Tractor
'/1/64
$4.91
.
'I'I.J
GROUP 6 ............._......................................................$4.66
Combination Heavy Duty Repairman and Welder
Concrete Mixer Operator-Paving
Concrete Mobile Mixer Operator
Concrete Pump or Pumpcrete Gun Operator
Crushing Plant Engineer
Elevating Grader Operator
Crade-AlIOperator
Highline Cableway Operator
Hoist Operator (Chicago Boom and Mine)
Kolman Belt Loader and Similar Type
Lift Slab Machine Operator
Loader Operator-Athey. Euclid, Hancock, Sierra or Similar Type
Motor Patrol Operator (Any type or size)
Multiplo Engi.ne-Earth Moving Machinery Operator
Party Chief
Pneumatic Concrete Placing Machine Operator-Hackley-Presswell or Similar
Type
Rotary Drill Operator, Excluding Caisson Type
Skiploader- Wheeltype over 1 ~ yards
Surface Henter and Planer Operator
Tractor Loader Operator, Crawler Type-All Types and Sizes
Tractor Operator-with Boom Attachmenl!l
Traveling Pipe Wrapping, Cleaning and Bending Machine Operator .
Trenching Machine Operator (over 6 foot Depth Capacity, Manufacturer'.
Rating)
Universal Equipment Operator (Shovel, Back Hoe. Dragline. Clamshell. Derrick.
Derrick Barge, Crane. Pile Drivel', and Mucking Machine)
Any employee who does any work underground in tunnels during anyone
shift shall receive a differential of 254 per hour premium pay above the stipu-
lated rate of pay for the classification of work in which he may be engaged.
All operators and oilers on equipment with booms of 80 to 100 feet includ-
ing jib and pile driving rigs with hammer leads of 80 to 100 feet. shall receive
15; per hour premium pay additional to the regular rate of pay. Thereafter they
shall receive an additional lOll per hour j)remium pay additional to the regular
rate of pay for each additional 20 feet of boom. including jib.
It is agreed that two or more Engineer Operators will constitute a complete
operating crew on all Tower Crane equipment (American Pecco. Bucyrus Erie.
Mayco-Weitz. Linden and similar types), and they shall receive 45~ per hour
premium pay in addition to the aQplicable Uillversal Equipment Operator'!
rate of pay (Long Boom premium shall not apply to this equipment).
Operators on all hoisting equipment with three drums or more, shall receive
15 d per hour premium pay additional to the regular rate of pay.
Combination Mixer and Compressor Operators on Gunite work shall be
classified as Concrete Mobile Mixer Operator.
Operators on Equipment with scrapers or dragtype shovels in tandem shaIT .
receive premium pay of $1.00 per hour above the regular rate. .
The necessity for the use of an employee as a Signalman shall he deter-
mined by the Contractor. \Vhen used, he shall be an Engineer.Oiler. who
assists in giving or relaying signals by mechanical means (also by means of
hand signals on excavation work) directly to the Operator of hoisting equip-
ment only.
00 a survey crew the Party Chief shall receive premium pay of 10~ per
hour above the regular rate.
....
.
f
LABORERS
Health and Welfare-12'n4 per hour
Pension-I04 per hour
Foreman: Not less than 304 per hour more than the houdy wage rate of the
classification over which he has leadership.
.
5/1/U
Laborer-General or Construction ................................$3.38
DemoUtion Laborer. the Cleaning of Brick &:
Lumber ..........................n.........'n...n............._.._.... 3,36
Dry Packing of Concrete .................._...........,............... 3.36
Operator of Pneumatic ~ Electric Tools, Vibrating
Machines l'c similar mechanical tools not sepa~
rately classified herein .......................................... 3.57
Concrete Saw Man. excluding Tractor Type u.......... 3.57
Roto-Scraper .__..........................._................___.....__......... 3.57
Concrete Core Cutter ..................._h...................._....... 3.57
Asphalt Raker l'c Ironer .h_h_..........._...__........................ 3.57
Asphalt Shoveler .m__m.........'_................n.................... 3.46
Buggymobileman ..h.._........_.______...___........._.._._._____.__...... 3.57
Cemdlfn~b~fice~~ne~l~.~--~.~.~~~.~.~~.~.~~~..~-~-~~.... 3.57
Cesspool Digger & Installer ......nm............................. 3.54
Chucktender ..........nn............................n...................... 3.51
Concrete Cutter Impervious Membrane & Fonn
Oiler _.nnnn..nnm........._m._'n'm........'......'..'m"n'_._ 3.55
Cribber or Sharer .......................................................... 3.72
Cutting Torch Operator (Demolition) ..............._.......... 3.41
Driller (Core. Diamond or Wagon), Joy Driller.
Model TW M-2A. Gardner-Denver Model
DH 143 & ,miliar type drill, (in accord.
ance with memorandwn of undentanding
between Laborers ond Operating Engineers
dated at Miami, Florida, Februnry 3, 1954) ........ 3.81
Driller. Jackhammer, 2lk foot drill steel or longer .... 3.65
Fine Grader. Highway &: Street Paving. Airports.
Runways. t.t similar type heavy construction ...... 3.46
Flagman ..........................................._................m.......... 3,36
Gas l'c Oil Pipeline Laborer ._...................................... 3.36
Gas t:c Oil Pipeline Wrapper-Pot Tender t:c Form
Man ....................m..'..........m_nh.'.......................... 3,57
Gas &:: Oil Pipeline Wrapper-6-inch pipe and over.... 3.70
Guinea Chaser ...................___................._h........._.......... 3.44
Laborer paclcinJ Rod Steel &: Pans ............................ 3.485
Landscape Ga eneI' ~ Nursery Man- .........m_d....... 3.46
Laying of all non-metallic pipe. including Sewer
Pipe, Drain Pipe &: Underground Tile ................ 3.67
Making & Caulking of all non.metallic Pipe Joints .... 3,55
Powderman .._.........._...................................................... 3.72
Riprap Stonepaver ....................................__......._.......... 3.55
~~~~ SK~xr si;;;ii~;..::::::::::::::::::::::::::::::::::::::::::::::::::::: g:~~
Sandblaster (Nowoman) .........................m.................. 3,81
Sandblaster (Pot Tender) ....m................m......n._.n....... 3.55
Scaler ...............m._......m................................................. 3.4L
Scaler (Using Bomon's Chair or Safety Belt or Power
Tools) .m............,...................................................... 3.62
Septic Tank Digger & I...taller (Lead Man) ...........m 3,51
Steel Headerboard Man ................................................ 3.785
Tank Scaler &: Cleaner ......h..................h_h......h...m..... 3.485
Tannan l'c Mortannan ............._..__d.............................. 3.41
Tree Climber, Faller. Chain Saw Operator. Pitts-
burgh Chipper & .imiltr type Brush Shredder.... 3.57
.
5/1/64
$3.50
3.50
3.50
3.71
3.71
3,71
3.71
3,71
3.60
3,71
3.71
3.68
3,85
3.69
3.86
3,55
3,95
3.79
3,60
3.50
3,50
3.71
3.84
3.58
3.625
3,60
3.81
3.69
3.86
3.69
3.76
4.02
3.95
3,69
3.55
3.76
3.65
3.925
3.625
3.55
3.71
LABORERS (continued)
5/1/63
Underground Laborer. including Caisson Bellower.... 3.49
Watchman ._.._.._..........un....._............._nnnnnn.n_.......... 2.70
Window Cleaner ....nh....n.........__n_._..___nn..........n.____.. 3.36
5/1/64
3,63
2.84
3,50
"'Hu 'knowledge oI plant Dlaterials and bow to plant them. LaYl out plant lllTangementl to
follow landscapo pllln.
TUNNEL CLASSIFICATIONS (5.. Notel
Health &; Welfare-12\2, per hour
Pension-IO,
NOTE: Workmen on each shift receive 8 hours' pay for 7 hours' work except.
ing that on single shift operatioD.!l (starting at 7:00, 7:30, or 8:00 a.m.)
for tunnels less than 200 feet, workmen receive 8 hours' pay for 8
hours' worle.
The classification "Shifter" receives a 351 per hour diHerential over the
highest Laborer classification worlcing.
6/1/6) 6/1/6~
Shaft and Raise Miner .................,_._............_................$4,37 $4,605
Miner-Tunnel (hand or machine) ............_..............__. 4,12 4.355
Timberman, Retimberman-wood or steel.................. 4.12 4.355
Blaster, Driller, Powdennan ..........__.................n_........ 4.12 4.355
Cherry Pickennan ....___.................._..............._.............. 4.12 4.355
Nipper .___................_........_................_.....___.__........._...... 3,97 4.205
Chucktender, Cabletender .__..nu..........___..._........._.___n 3.97 4.205
Swamper (Brakeman and Switchman on Tunnel
Work) .__._.............._.............._.,..........,..__....,........... 3,87
Powdennan-Primer House .......____._........____..........n.n_. 4.12
Bull Gang Foreman .n..........____._........n...__............._.n._. 4.12
Bull Gang Mucker, Traclcman .............n__._.......____n...... 3.87
Dumpman ......._................................._._.................__.._.... 3.87
Steel Form Raiser &; Setter .........._..................___........._ 4.12
Helper for Steel Form Raiser &: Setters h_n.___............_ 3.97
Vibratonnan, Jack Hanuner, Pneumatic Tools
(except driller) .__............'..__m.__............_...__........., 3,97
Concrete Crew, includes Rodden ~ Spreaders ........__ 3.87
Grout Crew ..n....................._................n____............n.... 3.87
Grout Gunman ............_...._.............'...___00_..................... 4.07
Kemper &: other Pneumatic Concrete Placer Operator 4.12
5/1/63
Watchman ................m_..........._........................____........$2.70
4.105
4.355
4.355
4.105
4.105
4,355
4.205
4.205
4.105
4.105
4.305
4.355
5/1/64
$2.84
OPERATING ENGINEERS
Health and Welfare-15, per hour
Pension-15f!' per hour
Vacation-Holiday Savings Fund-25~ per hour; 30, effective 6/1/64
Foreman: Receives not less than 354f per hour over the hourly rate
higheSt classiBcation under his direction.
6/1/0
GROUP 1 ......m_....._m.__..................__.........................3,78
Air Compressor, Pwnp or Generator Operator
Engineer-Oiler and Signalman
Heavy Duty Repairman's Helper
Switchman or Brakeman
6/1/64
$4,03
of the
.
.
.
OPERATING ENGINEERS (C..ti...dl
611164
$4,27
.
6/1/63
GROUP 2 ................__mm__.._._.........______......m...............~4,02
Concrete Mixer Operator, Skip Type
Conveyor Operator and BeItman
Fireman
Generator, Pump or Compressor Operator (2-5 Inclusive, portable units)
Generator, Pump or Compressor Plant Operator
Hydrostatic Pump
Rotary Drill Helper (Oilfield type)
Slciploader-Wheeltype-Ford, Ferguson, Jeep or similar type % yard or leas
(Without dragtype attachments)
Temporary Heating Plant Operator
Truck Crane Oiler
.
GROUP 3 ._.__.__........................................._..................$4.26 $4,51
A-Frame or Winch Truck Operator
Dinkey Locomotive or Tunnel Motor Operator
Elevator Hoist Operator
Equipment Greaser
Ford, Ferguson or Similar Type (With Dragtype Attachments)
Hydra-Hammer or Similar Type Equipment
Power Concrete Curing Machine
Power Concrete Saw Operator
Powder-driven Jumbo Form Setter Operator
Rodman and Chainman
Ross Carrier or Fork Lift Operator Oob Site)
Self-Propelled Tar Pipelining Machine Operator
Stational1" Pipe Wrapping and Cleaning Machine Operator
Towblade Operator
GROUP 4 ......_..................................__m..__m...._.__.......$4.37 '4.62
Asphalt Plant Fir.man
Boring Machine Operator
BODIlan or Mixer Box Operator (Concrete or Asphalt Plant)
Derrick Man (Oilfield type)
Drilling Machine Operator (including water wells)
Highline Cableway Signalman
lnstrumentman
Locomotive Engineer
Power Sweeper Operator
Roller Operator, Compacting
Screed Operator
Trenching Machine Operator (Up to 6 foot depth capacity. manufacturer',
rating)
.
GROUP 5 ..........................................".__"'............._.._$4,56 S4.81
Asphalt or Concrete Spreading, Mechanical Tamping or Finishing Machine
Operator, Roller (All types and sizes), Soil, Cement, Asphalt-Finish
Asphalt Plant Engineer
Deck Engine Operator
Crade Checker
Heavy Duty Repainnan
Heavy Duty Welder
Machino Tool Operator
Pavement.Breaker Operator
Pneumatic Heading Shield-Tunnel
Road Oil Mixing Machine Operator
Rubber-tired. Heavy Duty Equipment Operator-Oshkosh, DW, Euclid, LeTour-
neau, LaPlant:, Choate. or Similar Type Equipment, with any Type Attach.
ments
I"