HomeMy WebLinkAboutJULY 13,2000
I
I
I
O/llJ -. }-o
() ); "J.
42:0153 ( ('
CITY COUNCIL PROCEEDINGS ARE TAPE RECORDED AND ON FILE IN THE OFFICE OF
THE CITY CLERK
1.
ROLL CALL:
2.
3_
4_
ARCH. STYLE
NEW POLICE
FACILITY &
CIVIC CTR.
MASTER PL.
(Model No.4)
(APPROVED)
0730. (>.(,
071rJ I I
MINUTES
CITY COUNCIL OF THE CITY OF ARCADIA
and the
ARCADIA REDEVELOPMENT AGENCY
ADJOURNED REGULAR MEETING
July 13, 2000
The City Council and Arcadia Redevelopment Agency met in an Adjourned Regular
Meeting on Thursday. July 13, 2000, at 4:00 p.m., in the Conference Room of the Council
Chambers.
PRESENT: Council/Agency Members Chandler, Chang, Marshall and Segal
ABSENT: Mayor Kovacic (arrived at 4:54 p.m.)
It was MOVED by Council/Agency Member Chang, seconded by Council/Agency Member
Marshall and CARRIED to excuse the absence of Mayor Kovacic_
SUPPLEMENTAL INFORMATION FROM STAFF REGARDING AGENDA ITEMS
None.
AUDIENCE PARTICIPATION
None.
City Manager Kelly presented Model No. 4 of the proposed new police facility which
incorporated the refinements to Model No.3, which was selected by the City Council at its
June 20'h meeting as the design most favored for its curved design features_ Model NO.4
incorporated the curved features into an update of City Hall and the Council Chamber
buildings to establish a Civic Center Campus Master Plan.
The concept design displayed by Model NO.4 included an off-white exterior for the Police
Department buildings with the subtle use of glass. The City Manager pointed out features
which would connect the new police facility to City Hall and the Council Chambers and
improve the exteriors of these buildings and provide an entrance to the Civic Center
Campus by LIse of flag and fountain areas; public areas, landscaping and continuity of
design_ Mr. Kelly noted the estimated amount for improvements to City Hall, the Council
Chambers and public arens in order to blend with the new police facility at $1.5 million.
He added thi~ amount is not a part of the $16 million proposed for the police facility.
Donald Penman, Assistant City Manager/Director of Development Services, advised that
Council will be aSKed t::> approve by motion the schematic design of the police facility.
which is t"chnically within the contract, and is one of several phases. Upon approval of
the schematic pilase the design/de'leloprnent phase wi!1 commence. This will incorporate
specific materials to be used inside and outside of the facility, the exact dimensions
1
7/13/00
"
"~.~..
. :.
J " ~ .
42:0154
and landscaping. This phase is a three month process. at the conclusion of which Council
will know just how the buildings will look, the size. and materials that will be used in the
interior and exterior. Renderings and an exact model will be prepared for Council's review
and materials also will be presented at a Council study session for finalization and
presented at a regular Council meeting for approval. -
I
The construction' document phase then follows, which may take from four to six months...
this will include preparation of the actual bid documents and the plans. Mr. Penman
noted, construction could begin in late spring of 2001, depending on the length of time
taken for the preceding phases. He estimates the construction period to be approximately
fifteen (15) months for the main building.
Considerable discussion ensued centered on Model NO.4 and the design tie-in with City
Hail buildings. Mr. Lumsden, architect with WMM Associates, explained in detail the
various elements of design incorporated in the Civic Center Master Plan as they relate to
City Hall and. the new police facility, in particular, the window areas.
Council/Agency Member Marshall stated in part that she is very pleased with the
refinements to Model NO.3 which are incorporated in Model NO.4.
Mayor Pro tem Segal stated in part that it is important to keep the curved treatment of the
new building and incorporate this into the plan for City Hall and the Council Chambers. He
will support the design of Model NO.4.
Council/Agency Member Chandler noted that he will support the design of Model NO.4
also.
I
At 4:46 p.m. the Council/Agency RECESSED to await the arrival of Mayor Kovacic, who
was detained in traffic. The meeting RECONVENED at 4:56 p.m.
Following the arrival of Mayor Kovacic. the City Manager presented a brief description of
the design elements of Model NO.4 which could be incorporated into an upgrade of the
Council Chambers, City Hall, and areas between them and the new police facility to create
a Civic Center Campus.
Mayor Kovacic expressed his concern that he would not like the new police structure to be
dated such as the old Library before its expansion. He is also concerned about the added
expense of Model No. 3 as compared to Models 1 and 2. The Mayor would like to
incorporate more landscaping and water, and those type of treatments to the development.
The City Manager commented, if Council agrees with the architectural style of Model NO.4
and the concept of a plaza extension to City Hall, this would focus a vision and give
direction of where we are going. The new police facility setforth in Model No. 4 will be
further enhanced in the right setting with the backdrop of lighting, shade and shadows for
the preparation of a handout to the public. This in respond to citizen's requests for
information relative to the architecture of the police facility.
The City Manager requested a roll call vote on the proposed architecture and schematic
site plan of Model NO.4.
It was MOVED by Council/Agency Member Segal, seconded by Council/Agency Member
Marshall and CARRIED on roll call vote as follows to APPROVE the schematic design as I
presented under Option NO.4 (Model No. '4), which would complete the schematic design
phase of the new police facility.
2
7/13/00
I
I
I
AYES:
NOES:
ABSENT:
'I:~'" ~ ~ ; -; -;', ..'
, ';"'''')1\'-
42:0~ 55
Council/Agency Members Chandler. Chang, Marshall, Segal and Kovacic
None
None
The City Manager noted that the motion included the Master Plan concept.
ADJOURNMENT At 5:05 p.m. the July 13, 2000 Adjourned Regular Meeting ADJOURNED to 6:00 p.m. Juiy
(July 18, 2000) 18, 2000, in the Conference Room of the Council Chambers for a Regular Meeting to
conduct the business of the City Council and Redevelopment Agency and any Closed
Session necessary to discuss personnel, litigation maters or evaluation of properties.
ATTEST:
3
7/13/00