HomeMy WebLinkAboutItem 2STAFF REPORT DATE: TO: FROM: SUBJECT: February 26, 2013 Development Services Department Honorable Chairman and Planning Commission Jim Kasama, Community Development Administrator By: Tim Schwehr, Associate Planner TENTATIVE PARCEL MAP NO. TPM 12 -03 (72139) TO SUBDIVIDE AN EXISTING FOUR -UNIT WAREHOUSE /MANUFACTURING BUILDING INTO FOUR INDUSTRIAL CONDOMINIUM UNITS AT 11742 CLARK STREET Recommendation: Conditional Approval SUMMARY Tentative Parcel Map Application No. TPM 12 -03 (Parcel Map No. 72139) was submitted by the applicant (2003 Chen Family Trust) for a four -unit, industrial - condominium subdivision at 11742 Clark Street — see the attached aerial photograph and tentative parcel map, and photographs of the subject property. The proposed subdivision is consistent with the City's General Plan, Zoning, and Subdivision Codes. It is recommended that the Planning Commission approve TPM 12 -03 subject to the conditions listed in this staff report. BACKGROUND APPLICANT: 2003 Chen Family Trust LOCATION: 11742 Clark Street REQUEST: Tentative Parcel Map No. 12 -03 to subdivide an existing four -unit, 4,965 square -foot warehouse /manufacturing building into four 1,241 square - foot industrial condominium units. SITE AREA: 12,842 (0.30 acre) FRONTAGE: 100 feet along Clark Street EXISTING LAND USE & ZONING: The subject property is currently improved with a four -unit, 4,965 square - foot warehouse /manufacturing building constructed in 1984 — see the attached photographs. The building is divided into four, 1,241 square -foot units. The site is zoned M -1, Planned Industrial District. SURROUNDING LAND USES & ZONING: The surrounding properties are improved with warehouse /manufacturing buildings, and are zoned M -1, Planned Industrial District — see the attached aerial photograph. GENERAL PLAN DESIGNATION: Industrial (0.5 FAR) — The Industrial designation provides for an array of warehouse, distribution, manufacturing, and assembly uses in appropriate locations. DISCUSSION The applicant is requesting a Tentative Parcel Map for industrial condominium purposes. The site is zoned M -1, Planned Industrial District, and has a total land area of 12,842 square feet. The site is developed with a 4,965 square -foot, four -unit warehouse /manufacturing building and an 11 -space surface parking lot. The proposal is to maintain the existing configuration of the building, which is equally divided into four, 1,241 square -foot industrial units. No changes to the exterior of the building are proposed. All City requirements shall be complied with to the satisfaction of the Building Official, Community Development Administrator, Fire Marshal, and Public Works Services Director. The proposed plans have been reviewed by these departments and the conditions of approval are listed in this staff report. ENVIRONMENTAL ANALYSIS Pursuant to the provisions of the California Environmental Quality Act (CEQA) the Development Services Department has determined that the proposed project is a minor land division, and is therefore categorically exempt from further environmental review per Section 15315 of the CEQA guidelines. A Preliminary Exemption Assessment is attached. PUBLIC NOTICE Public hearing notices for this item were mailed on February 15, 2013 to the property owners and tenants of those properties that are located within 300 feet of the subject property — see the attached radius map. RECOMMENDATION It is recommended that the Planning Commission approve Tentative Parcel Map No. TPM 12 -03 (72139), subject to the following conditions: 1. The developer shall pay the following fees prior to approval of the final Parcel Map: Map Fee: $100.00 + Final Approval Fee: $25.00 = Total $125.00. 2. The developer shall post a $200 deposit for the Mylar copy of the recorded map prior to approval of the final Parcel Map. TPM 12 -03 11742 Clark Street February 26, 2013 Page2of5 3. A new trash /recyclables enclosure shall be constructed on -site in the location shown on the Tentative Parcel Map. The design of the enclosure shall be subject to the review and approval of the Development Services Department. 4. The existing on -site fences and walls shall be brought into compliance with the City's fence and wall regulations, including the removal of the chain -link dividing the front and back portions of the parking lot. 5. The parking lot shall be restriped to comply with the City's parking standards and handicap accessibility requirements. 6. One -hour fire separations shall be provided as required between each unit. 7. A separate accessible bathroom shall be provided as required for each unit. 8. Separate electrical, mechanical, and plumbing shall be provided as required for each unit. 9. The proposed project is subject to the requirements of the City's Industrial Waste Program. The developer shall submit a plumbing plan to the Public Works Services Department for approval. 10. The Developer shall separate the fire service from domestic water service with an approved back flow device. The location of the back flow device shall be approved by the Development Services Department. The back flow device shall be screened from public view by a screening method consistent with the requirements of the Development Services Department. 11. New water service shall be provided by the developer, and installation shall be in accordance with the specifications of the Engineering Division of the Public Works Services Department. Abandonment of existing water services, if necessary, shall be done by the developer in accordance with the specifications of the Engineering Division of the Public Works Services Department. 12. Sewer services are available on Clark Street, and the developer shall utilize the existing sewer lateral if possible. 13. If any fixture elevation is lower than the elevation of the next upstream manhole cover (339.57'), an approved type of backwater valve shall be installed on the lateral in accordance with the specifications of the Public Works Services Department. 14. All City code requirements shall be complied with to the satisfaction of the Fire Department, Public Works Services Department, and Development Services Department. 15. The applicant shall defend, indemnify, and hold harmless the City of Arcadia and its officers, employees, and agents from and against any claim, action, or proceeding against the City of Arcadia, its officers, employees or agents to attack, set aside, void, or annul any approval or condition of approval of the City of Arcadia TPM 12 -03 11742 Clark Street February 26, 2013 Page 3 of 5 concerning this project and /or land use decision, including but not limited to any approval or condition of approval of the City Council, Planning Commission, or City Staff, which action is brought within the time period provided for in Government Code Section 66499.37 or other provision of law applicable to this project or decision. The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and /or land use decision and the City shall cooperate fully in the defense of the matter. The City reserves the right, at its own option, to choose its own attorney to represent the City, its officers, employees, and agents in the defense of the matter. 16. Approval of TPM 12 -03 (72139) shall not take effect until the property owner(s) and applicant(s) and civil engineer have executed and filed the Acceptance Form available from the Development Services Department to indicate acceptance of the conditions of approval. PLANNING COMMISSION ACTION Approval If the Planning Commission intends to approve this subdivision, the Commission should move to approve TPM 12 -03 (72139) subject to the following findings and actions: A.1. That the project and the provisions for its design and improvements are consistent with the Arcadia General Plan, and that the discharge of sewage from the project into the public sewer system will not violate any requirements prescribed by the California Regional Water Quality Control Board for this region. A.2. That this project is categorically exempt from CEQA per Section 15315. A.3. Authorize and direct the Development Services Director or designee to approve and execute, if necessary, a subdivision agreement for this project. A.4. Approve this project subject to the conditions of approval set forth in the staff report or as modified by the Planning Commission. Denial If the Planning Commission is to take action to deny this subdivision, the Commission should make specific findings based on the evidence presented and move to deny the project. The Planning Commission may wish to consider the following findings which must be expanded upon with specific reasons for denial: D.1. That the proposed map is not consistent with the applicable general and specific plans as specified in Section 66451 of the Subdivision Map Act. D.2. That the design or improvement of the proposed subdivision is not consistent with applicable general and specific plans. D.3. That the site is not physically suitable for the type of development. D.4. That the site is not physically suitable for the density of development. TPM 12 -03 11742 Clark Street February 26, 2013 Page 4 of 5 D.5. That the design of the subdivision or the proposed improvements is likely to cause substantial environmental damage. D.6. That the design of the subdivision or the types of improvements is likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. D.7. That the design of the subdivision or the type of improvements is likely to cause serious public health problems. D.8. That the requested subdivision injuriously affects the neighborhood wherein said lot is located. D.9. That the design of the subdivision or the type of improvements will conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. In this connection, the legislative body may approve a map if it finds that alternate easements for access or for use, will be provided and that these will be substantially equivalent to ones previously acquired by the public. This finding shall apply only to easements of record or to easements established by judgment of a court of competent jurisdiction and no authority is hereby granted to a legislative body to determine that the public at large has acquired easements for access through or use of property within the proposed subdivision. If any Planning Commissioner or other interested party has any questions or comments regarding this matter, prior to the February 26, 2013 public hearing, please contact Tim Schwehr, Associate Planner at (626) 574 -5422, or tschwehraci.arcadia.ca.us. Approved: Ji sama munity Development Administrator Attachments: Aerial Photograph with Zoning Information Tentative Parcel Map No. 12 -03 (72139) Photographs of the Subject Property Preliminary Exemption Assessment 300 -foot Radius Map TPM 12 -03 11742 Clark Street February 26, 2013 Page 5 of 5 - - THIS PAGE INTENTIONALLY BLANK - - 0, o u 0., R F:go o 4 z k 0 • 0 p U <(f) V.) Z U g o o z z D.; o w <4. r. 0 11 z rwtramn imononrav vi.m) — — — — — 0— 1110M Igga.LS yen 1,„ 11 6 11 5 11 I 973 ‘3 innray Al.m1 11742 CLARK Sf — — — .0990 -rt 43 — — IL — — ,stx.ol ! Dm.vm 101 IZO-LIO-Ug8 NdV 3NOZ 001.-0£ .211'N 'NNVd ODVDIHD A1Sfl1DNI 'R9 nmi-n MK SIO'I 30 '210d M.E0.c,c9 N 0 0 • z < 0 cri z, SUBJECT PROPERTY- DRIVEWAY ENTRANCE SUBJECT PROPERTY- BUILDING FRONTAGE ON CLARK ST. SUBJECT PROPERTY - BUILDING FRONTAGE ON CLARK ST. SUBJECT PROPERTY - FRONT GATE AND PARKING LOT SUBJECT PROPERTY - INDUSTRIAL UNIT ENTRANCE SUBJECT PROPERTY - PARKING LOT CHAINLINK FENCE WITH BARBWIRE TO BE REMOVED AS CONDITION OF APPROVAL PRELIMINARY EXEMPTION ASSESSMENT (Certificate of Determination When Attached to Notice of Exemption) 1. Name or description of project: TPM 12 -03 2. Project Location — Identify street address and cross streets or attach a map showing project site (preferably a USGS 15' or 7 1/2' topographical map identified by quadrangle name): 11742 Clark Street — between Peck Rd and Kardashian Ave 3. Entity or person undertaking project: A. B. Other (Private) (1) Name 2003 Chen Family Trust (2) Address 135 N. San Gabriel Blvd San Gabriel, CA 91775 4. Staff Determination: The Lead Agency's Staff, having undertaken and completed a preliminary review of this project in accordance with the Lead Agency's "Local Guidelines for Implementing the California Environmental Quality Act (CEQA)" has concluded that this project does not require further environmental assessment because: a. ❑ The proposed action does not constitute a project under CEQA. b. ❑ The project is a Ministerial Project. c. ❑ The project is an Emergency Project. d. ❑ The project constitutes a feasibility or planning study. The project is categorically exempt. e. ■ Applicable Exemption Class: 15 - Minor Land Divisions f. ❑ The project is statutorily exempt. Applicable Exemption: g. ❑ The project is otherwise exempt on the following basis: h. ❑ The project involves another public agency which constitutes the Lead Agency. Name of Lead Agency: Date: February 12, 2013 Preliminary Exemption Assessment Staff: Tim Schwehr, Associate Planner FORM "A" CITY OF ARCADIA ~cee A LOT 300' RADIUS MAP GC MAPPING SERVICE, INC. 3055 WEST VALLEY BOULEVARD ALHAMBRA CA 91803 (626) 441 -1080 FAX (626) 441 -8850 gcmapping @radiusmaps.com LEGEND e OWNERSHIP NO. OWNERSHIP HOOK CASE NO. DATE: 11 -26 -2012 SCALE: 1" = 100' OWNERSHIP MAP - - THIS PAGE INTENTIONALLY BLANK - -