Loading...
HomeMy WebLinkAboutItem 1c: Contract for Wilderness Park Restroom Project.IiuFU, ", "r STAFF REPORT Public Works Services Department DATE: March 19, 2013 TO: Honorable Mayor and City Council FROM: Tom Tait, Public Works Services Director By: Ken Herman, Deputy Public Works Services Director Mark Rynkiewicz, P.E., Associate Civil Engineer SUBJECT: AUTHORIZE AND DIRECT THE CITY MANAGER TO EXECUTE A CONTRACT WITH VARGAS OLSON ENTERPRISES, INC. FOR THE WILDERNESS PARK RESTROOM PROJECT IN THE AMOUNT OF $144,000 Recommendation: Approve SUMMARY The Public Works Services Department was notified by the Department of Justice regarding the inaccessibility of the restrooms at Wilderness Park for people with disabilities. In response, the City included the Wilderness Park Restroom Remodel Project as part of the Fiscal Year 2012 -13 Capital Improvement Program. The goal of the project was to provide access to the existing restrooms that conform to Americans with Disabilities Act (ADA) standards. After considering several design options, it was concluded that the most effective way to achieve the ADA requirements for access and use of the restrooms would be to construct a new restroom facility at the same level as the existing park shelter. Plans and specifications were distributed to local contractors and Vargas Olsen Enterprises, Inc. responded with the lowest responsive bid for the project. Therefore, it is recommended that the City Council authorize the City Manager to execute a contract with Vargas Olson Enterprises Inc. for the Wilderness Park Restroom Project in the amount of $144,000. DISCUSSION The Americans with Disabilities Act (ADA), enacted in 1990, is landmark legislation intended to extend civil rights protection to people with disabilities. A result of this act has been the creation and implementation of design standards intended to provide access to publicly available buildings, facilities, and rights -of -way, regardless of the individual's physical abilities. Wilderness Park Restroom Project March 19, 2013 Page 2 of 3 Wilderness Park is a unique City facility located in the Santa Anita Canyon and the facilities at the park were constructed prior to the enactment of the Americans with Disabilities Act. The existing restroom for the park is located next to the park shelter, on a small hill about five feet higher in elevation than the shelter. Access to the restrooms is achieved by walking up several steps; however, this access does not meet ADA standards. In addition, the facilities within the restrooms do not meet ADA standards (Attachment "A "). Several designs including sloped walkways, and ramps were considered, as well as ways to modify the existing restrooms to meet the ADA requirements. All of the designs considered were very expensive, or reduced the existing capacity of the restrooms. The design to construct a new restroom at the same level as the existing park shelter was the only design that met all of the requirements of cost, ADA compatibility, and providing a continued level of service to the public (Attachment "B "). Plans and specifications were prepared to construct a 525 square foot restroom facility that includes ADA compliant space and railings. The men's restroom will include two urinals, one toilet, and two sinks. The women's restroom will include three toilets and two sinks. The facility includes a janitor's closet that provides access for mechanical and plumbing maintenance. The bid package was prepared including a base bid, which involved the construction of the restroom structure and all of the interior finishes, and a bid alternate which involved construction of the connection for utilities, such as electricity, water, and sewer. Since the lowest bid received is within the budgeted amount for the restroom, the bid alternate will be included in the contract. Notices inviting bids were published in the City's adjudicated paper and bid packages were distributed to area contractors. The City Clerk publicly opened three (3) sealed bids on February 19, 2013. The following bid results are listed for the City Council's review and consideration: Rank Firm Base Bid Alternate Location Amount Bid Amt. Total 1 Vargas Olson Enterprises, Inc. Azusa $116,763 $27,237 $144,000 2 D &J Foothill Elect. Cont. Inc. La Verne $130,625 $18,835 $149,460 3 Parsam Construction, Inc. Glendale $142,750 $14,200 $156,950 Bid documents were carefully reviewed for content and the contractors' backgrounds and recent projects were investigated for competency. It has been determined that Vargas Olson Enterprises, Inc. is the lowest responsive bidder to perform the construction of this project. Wilderness Park Restroom Project March 19, 2013 Page 3 of 3 ENVIRONMENTAL ANALYSIS The Wilderness Park Restroom Project involves the replacement of existing utility systems and is therefore categorically exempt per Section 15302 of the California Environmental Quality Act Guidelines. FISCAL IMPACT The Wilderness Park Restroom Project was budgeted in the Fiscal Year 2012 -13 Capital Improvement Program (CIP) for construction cost of $150,000. RECOMMENDATIONS It is recommended that the City Council authorize and direct the City Manager to execute a contract with Vargas Olson Enterprises, Inc. for the Wilderness Park Restroom Project in the amount of $144,000. Approved. Dominic LazzarAd City Manager Attachments ATTACHMENT A (Approximate Location of I new restroom ATTACHMENT B 13' -2" SOUTH ELEVATION SCALE: NTS WEST ELEVATION SCALE: NTS NORTH ELEVATION SCALE: NTS EAST ELEVATION SCALE: NTS