Loading...
HomeMy WebLinkAboutItem 2aSTAFF REPORT Development Services Department DATE: May 28, 2013 TO: Honorable Chairman and Planning Commission FROM: Jim Kasama, Community Development Administrate -~` SUBJECT: Determination that the proposed Capital Improvement Program for Fiscal Year 2013 -14 is consistent with the General Plan SUMMARY Per Section 65403(c) of the State Government Code, the Planning Commission is required to make a determination that finds each fiscal year's Capital Improvement Program (CIP) to be consistent with the City's General Plan. It is recommended that the Planning Commission find that the CIP for Fiscal Year 2013 -14 is consistent with the City's General Plan. CIP INFORMATION Attached for review is the list of projects proposed for the Fiscal Year 2013 -14 Capital Improvement Program. The projects are City buildings and facilities maintenance and improvements, streets and public rights -of -way maintenance and improvements, sewer and water facilities maintenance and improvements, landscaping and irrigation maintenance and improvements, and parking and transit enhancements. The FY 2013- 14 CIP projects are consistent with the following goals of the City's General Plan: Land Use Element Goal LU -3: Goal LU -6: Goal LU -8: Goal LU -9: Preservation and enhancement of Arcadia's single- family neighborhoods, which are an essential part of the City's core identity. Attractive and vibrant commercial corridors that provide for the retail, commercial, and office needs of Arcadia with expanded opportunities for mixed -use development. Public and institutional uses that provide community -wide benefits and meet the needs of Arcadia residents and businesses. Preservation of the City's existing natural and recreation - oriented open space areas. Goal LU -10: A thriving Downtown, with healthy commercial areas supported by high - quality, residential uses and supportive of the Metro Gold Line transit station. Economic Development Element Goal ED -5: A public image of Arcadia that promotes and reinforces the City's special qualities and resources as a means of attracting businesses and economic opportunities. Circulation and Infrastructure Element Goal 0I -1: An efficient roadway system that serves all of Arcadia, supports all transpc1rtation modes, and balances the roadway system with planned land uses. Maximized operational efficiency of the street system. Enhanced local and regional transit service. Connected, balanced, and integrated bicycle and pedestrian networks that provide viable alternatives to use of the car. Limited cut - through traffic in residential neighborhoods. Reduced auto traffic and improved traffic management around schools. A water production, storage, and distribution system that provides quality service equally to all areas of Arcadia, allows the City to maximize use of local water sources, and includes use of recycled water. A local wastewater collection system that provides quality service equally to all areas of Arcadia. Storm drain infrastructure that minimizes regional and localized flood hazards. Waste management practices that provide efficient and cost - effective Goal CI -2: Goal CI -3: Goal CI -4: Goal CI -5: Goal 01-6: Goal CI -9: Goal CI -10: Goal CI -11: Goal CI -12: includ services to Arcadia residents, businesses, and institutions, and that e an emphasis on waste reduction and recycling. Resource Sustainability Element Goal RS -1: Continued improvement in local and regional air quality. Goal RS -3: Promoting and utilizing clean forms of transportation to reduce Arcadia's carbon footprint. Capital Improvement Program May 28, 2013 — Page 2 Goal RS -4: Wise and sustainable water use practices that respond to and support the needs of City residents and businesses. Parks, Recreation, and Community Resources Element Goal PR -1: Providing superior parks, public spaces, and recreation facilities to meet the community's evolving needs. Goal PR -2: Preserving open space resources to meet the City's recreation and conservation needs. Goal PR -3: Ensuring that trees and the urban forest make a continuing and significant contribution to community character. Goal PR -4: A network of City, school, and private community facilities that provides spaces for recreation, education, enrichment, and social service programs. Goal PR -6: Continued superior educational facilities and resources for residents of all ages and backgrounds. Goal PR -7: A library system that continues to provide a superior level of educational, informational, and cultural services for the Arcadia community. Goal PR -8: Continued recognition and support of the diverse historical and cultural organizations that celebrate and enrich the community. Safety Element Goal S -2: Superior storm drainage and flood control facilities that minimize risk of flooding. Goal S -4: A continued high level of protection from risks to life, the environment, and property associated with human - caused hazards in Arcadia. Goal S -5: To provide a continued high level of fire and police protection services, with an emphasis on prevention and education. Goal S -6: Comprehensive and effective emergency and disaster response preparedness. RECOMMENDATION It is staffs opinion that the projects set forth in the Fiscal Year 2013 -14 Capital Improvement Program (CIP) are consistent with the City's General Plan. Based on the information set forth above, it is recommended that the Planning Commission find that the FY 2013 -14 CIP is consistent with the General Plan. Capital Improvement Program May 28, 2013 — Page 3 PLANNING COMMISSION ACTION The Planning Commission should approve a motion finding that the Fiscal Year 2013 -14 Capital Improvement Program is consistent with the City's General Plan. If a Planning Commissioner, or other interested party has a question or comment regarding this matter, or on a particular CIP project, please contact Jim Kasama at (626) 574 -5442 or Ikasama(a�ci.arcadia.ca.us prior to May 28, 2013 so that specific details can be made available either prior to, or at the Planning Commission meeting. If necessary, the appropriate staff from other departments may be available to answer questions regarding specific projects. Attachment: List of Fiscal Year 2013 -14 Capital Improvement Program Projects Capital Improvement Program May 28, 2013 — Page 4 N us o a, 0N P W w a a o o tfi, o U a y my i O y l N H V N Z Q m m S° w m ry o E m 6 0 Q a a 2 I I I r I I • I I I I I I 30,000 I 592,900 i I O 0 0 N N I 1 c7n 1 'AA i I 500,000 - 15,000 ! - I I I O N. I I I 30,000 - 200,000 - I I 120,000 - 70,000 I - I 42,000 - o 135,000 - 9,880 1 -1 174,100 ! - 0 o 0 0 m j 521 22,000 3,750 I . I I ' O o O I , I 000'0! O O N Q I 15,000 41,400 O O V I I I r I 157 I 1 I I I I I I I I I r I r r I I r r I I I I I I I I r O o .- N a I I I I I . r I I I I r I I I r I 142 300,000 302 200.000 55,000 N O 7,000 O 25,000 N J30,000 I ! 23,000 I I rp . I N I 68,900 12,040 00 I 435,000 I I REQUESTING Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works ? U a' ! Public Works H U a' Public Works ! Public Works N U .75 a N U am m a Public Works Public Works N U_ 7ii ' a N U_ 0 a' Public Works Development Development 1 PROJECT DESCRIPTION !Annual Slurry Seal Program Annual Meter Replacement Program Annual Replacement of HVAC Units Annual Sewer CCTV Inspection Public Works Facility Improvements Community Center Facility Improvements Fire Station HVAC Compressor Replacement Greenscape Maintenance and Imgabon Upgrades for Water Conservation Annual Tree Removal and Replacement Program Library Facility Improvements Police Department Facility Maintenance Improvements SCADA System upgrades and Computerized Utilities System Mapping Orange Grove Disinfection System Upgrade Historical Museum Building Facility Improvements Water Master Plan Update Budget -Based Water and Sewer Rate Study seen Avenue Sewer Capacity Improvement Project - Construction Alternative Fuel Use Feasibility Study Well Inspection and Rehabilitation of Live Oak Well City Hall Primus Lock Upgrade Development of Enhanced Watershed Management Program (EWMP) Plan Fiber Optics to Public Works Service Center Fleet Management Systems Upgrade Par 3 Golf Course ADA Restroom Remodel Santa Anita Seismic Rehabilitation Project Civic Center Parking Lot Improvements Sold Line Transit Plaza transportation impact Fee Study transit Service Restructuring and Feasibility Study roothill Boulevard Concrete Repairs L.L. a M N ) � N m N N N N M M C0) r;3 M c c v )v Qn v ) 0 uQ i r n m n o L R Projects - $113,750; TDA I MTA Call for Projects STP -L w tom. HJ Pedestrian /ADA 1 c 5 J 1 L TOTAL FOR FISCAL YEAR 2013 -14 $7,230,520 I $ 1,187,690 1 S 375,000 1 i wv,vvv 1 ••• i • • -• - -- I - -- o o in M 333,700 440,000 50,000 c y 156 Transportation 333,700 520 WATER 35,000 • 521 SEWER ■ 38.500 45,000 T200,000 0 0 N r . . 0 o , 25,000 30,000 75,000 . 0 p CO . REQUESTING DEPARTMENT Development Development Development Development c E E c TV' a Development Development Development m c 0 m IX 0 0 E 0 o Co I— m rn 'o a c o c a U 0 v0 N d 2 w N H 0 c n 0 rn 0 c_ 7 O W C r-1 • ilflui Downtown Parking and Pedestrian Aw » Improvemen t Pavement Rehabilitation Project at First Avenue and Tenth Avenue th'll BI d Inter==rti ^n Improvements Micnannda Avenue Sidewalk Accessible Ramp Replacement € d m 0 W J E o cu a 8 c V O U `a in 0 c ° 0 I ■ a C 0 Q m o 0 m r- 0- 0- ti m m m i