HomeMy WebLinkAboutItem 2k - Repair of Streets with Stone Pine Trees\Lay DATE: June 18, 2013 TO: Honorable Mayor and City Council STAFF REPORT Public Works Services Department FROM: Tom Tait, Public Works Services Director By: Ken Herman, Deputy Public Works Services Director Mark Rynkiewicz, P.E., Associate Civil Engineer SUBJECT: ACCEPT ALL WORK PERFORMED BY CJ CONSTRUCTION, INC. FOR THE REPAIR OF STREETS WITH STONE PINE TREES AS COMPLETE AND AUTHORIZE THE FINAL PAYMENT TO BE MADE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, SUBJECT TO RETENTION OF $2,919.09 Recommended Action: Approve SUMMARY On December 18, 2012, the City Council awarded a contract to CJ Construction, Inc. in the amount of $60,780, for Repair of Streets with Stone Pine Trees (Phase 3). The terms and conditions of this project have been complied with and the work has been performed to staff's satisfaction for a total project cost of $58,381.75. This amount reflects the original contract amount of $60,780 minus quantity changes totaling $2,398.25, or 4% less than the original contract amount. It is recommended that the City Council accept all work performed by CJ Construction, Inc. as complete and authorize the final payment to be made in accordance with the contract documents, subject to retention of $2,919.09. DISCUSSION The Stone Pine trees in the Highland Oaks area north of Elkins Drive caused significant damage to City streets, curbs and gutters, sewer laterals, sprinkler systems, and private property hardscape. These conditions resulted in safety concerns for motorists and pedestrians in addition to several instances when trees or tree limbs have fallen due to the size and age of the trees. In response to problems associated with these massive trees, the Public Works Services Department had an arborist review the Stone Pine trees in the Highland Oaks neighborhood and asses the condition of each tree. Accept Repair of Streets with Stone Pine Trees Project June 18, 2013 Page 2 of 2 At the August 3, 2010, Study Session, the City Council directed the Public Works Services Department to move ahead with its plan to rehabilitate the City streets damaged by the Stone Pine trees that included removing the Stone Pine trees in the Highland Oaks neighborhood north of Elkins Drive. The project was broken up into three phases based on the level of damage: Phase 1 was streets with the most extreme damage; Phase 2 was streets with severe damage; and Phase 3 is streets with the least or moderate street damage. Phases 1 and 2 were completed in July of 2011. The work to complete Phase 3 was awarded under two separate contracts. One contract included the removal of the Stone Pine trees and replacement with trees that were indentified in the Urban Forest Master Plan. The second contract (Streets), which is the work considered in this staff report, included the replacement of damaged pavement, curbs, and gutters. On December 18, 2012, the City Council awarded a contract to CJ Construction, Inc. for Repair of Streets with Stone Pine Trees (Phase 3) in the amount of $60,780. The work was completed under budget due to the contractor having to do less removal and replacement work than was anticipated. As a result, there is a savings of $2,398.25, or 4% less than the original contract amount. FISCAL IMPACT Phase 3 of the project has a total approved budget of $140,000. This portion of the work was completed for $58,381.75, which is a 4% savings from the authorized contract amount. RECOMMENDATION It is recommended that the City Council accept all work performed by CJ Construction, Inc. for the Repair of Streets with Stone Pine Trees as complete and authorize the final payment to be made in accordance with the contract documents, subject to retention of $2,919.09. Approved Dominic Lazzareit City Manager Attachment: Project Location Map Repair of Streets with Stone Pine Trees Project No.: 33855713B G ND VIEW NORTH 4 CITY OF ARCADIA SIER DR o Q yy t FIRE a A7 0 w ORANGE GROVE H z S Q Q o Z � a m FOREST PARK COLORADO ST B = PROJECT COLORA FNIRA 'S LOCATION PARK ���\ mop NTA Lill S n2ACk — { U G ON R < o z A G Qe z < ?r J FAN O = g F ��� OC swTA ANRA m R Y GOLF COURSE rcF H TI < N W FAIRVIEW AVE A R C A D I A H S >Q 3 > 0 e < o Q DUARTE R t M O z 0 3 F a p Q N N REAL CAMIN REAL AV J J O z LL Q F U) J LONGDEN AV z w 3 0 CD LNE AK AV TUNAS UVE O K AN 1 0 a D LOCATION MAP NOT TO SCALE