Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutDecember 17, 2002\. ' ' ~. '
~~x ~
.,. > . `S
_ ~ QA'.
.. ~
INVOCATION
~ , .
AGENDA'~
Arcadia City Council
and
Redevelopment Agency
Meeting
December 17, 2002
7:00 p.m.
Cay Mortenson Auditorium
Arcadia Public Library, 20 Duarte Road
PLEDGE OF ALLEGIANCE
~ _ `r r' ~
~I, i ;~,Cr! c, . _ ~ /S
^^^ ~
~, _ i
_ ;
• • ~~
~
ROLL CALL: Council Members: Chang, Kovacic, Segal, Wuo and Marshall
1. SUPPLMENTAL INFORMATION FROM STAFF REGARDING
AGENDAITEMS
MOTION: Read all Ordinances and Resolutions by title only and waive reading in
full
2. PRESENTATION of Citizen of the Month Award to Carmen Thibault
3. PRESENTATION to Judge Patrick Hegarty
4. PRESENTATION to Soroptimist International
5. PUBLIC HEARING
All interested persons are invi[ed [o appear at the Public Heanng and to provide evidence or testimony conceming Ihe proposed item
of consideration. You are hereby advised Ihat should you dcsire to Icgally challenge any action taken by the CiTy Councii with respect
W Ihe proposed Item 5(a) you may be limited to raising only those issues and objec4ons which you or someone else raised at or prior
to the time of the public hearing.
a. Abnronriate Unallocated Community Development Block Grant (CDBG
Funds and approve the FY 2003/04 CDBG Program
Recommendation: Appropriate $47,906.00 in unallocated CDBG funds
for the 2002/03 Residential Rehabilitation Program and approve the
2003/04 CDBG Program
Gail A. Marshall, Mayor . De Sheng Chang, Mayor Pro tempore . Mickey Segal, John Wuo, Gary A. Kovaciq Council Members .~ ~~
William R Kelly, Ciry Manager ,-T
June D. Alford, City Clerk ~,d"~ ~
_~~`.. di _ ,
~.._- - .. ~ f ~_ _~
. ~ ~
~
~ ~^ .
~~
TIME RESERVED FOR THOSE IN THE AUDIENCE WHO WISH TO~::~`~
ADDRESS THE CITY COUNCIL (NON-PUBLIC HEARING/FIVE-MINUTE-- __
TIME LIMIT PER PERSOi~
6. MATTERS FROM ELECTED OFFICIALS
City Council Reports/Announcements/Statements/Future Agenda Items
7. CITY CLERK
a. Appointment of one member to the Arcadia Historical Museum
Commission
Recommendation: Appoint
RECESS OF CITY COUNCIL
H. MEETING OF THE ARCADIA REDEVELOPMENT AGENCY
ROLL CALL: Agency Members: Chang, Kovacic, Segal, Wuo and Marshall
TIME RESERVED FOR THOSE IN THE AUDIENCE WHO WISH TO
ADDRESS THE REDEVELOPMENT AGENCY (NON-PUBLIC HEARING/
FIVE-MINUTE TIME LIMIT PER PERSON)
9. CONSENT
a. Minutes of the December 3, 2002 regular meetin¢
Recommendation: Approve
b. FY 2001-2002 Redevelonment Aeencv State Controller and State HousinQ
and Communitv Development Reports
Recommendation: Approve and authorize transmittal to the State
EXECUTIVE DIRECTOR
Desi¢n Review - 140 East Huntington Drive
Recommendation: Approve
d. Desien Review - 55 West HuntinQton Drive
Recommendation: Approve
ADJOURN the Arcadia Redevelopment Agency to January 7, 2003 at 530 p.m., Cay
Mortenson Auditorium, Arcadia Public Library, 20 Duarte Road
-2-
r"
7 ,
~ ~1~~- ~ y.. 4: ~~1
~~' ~`/ ~~~ ~
RECONVENE CITY COUNCIL
10. CONSENT
a. Minutes of the December 3, 2002 regular meeting
Recommendation: Approve
b. Resolution No. 6334 approving and adopting an amended appendix to the
Citv's Conflict of Interest Code nursuant to the Political Reform Act of
1974
Recommendation: Adopt
c. Professional Services Agreement-GASB 34Infrastructure Valuation
Services
Recommendation: Authorize the City Manager to enter into a
Professional Services Agreement in the amount of $23,000.00 with
Moreland and Associates for GASB 34 Infrastructure Valuations Services
d. Acce~tance - 2001-2002 Slunv Seal Proiect
Recommendation: Accept all work performed by Doug Martin
Contracting, Incorporated as complete and autharize the final payment to
be made in accordance with the contract documents, subject to a retention
of $29,541.40
e. Purchase of D.A.R.E. van
Recommendation: Approve the purchase of a D.A.R.E. van in the amount
of $10,951.09 from Chevrolet of El Monte
11. CITY MANAGER
a. Gold Line Phase II Joint Powers Agreement (JPA)
Recommendation: Approve conceptual structure of JPA supporting the
formation of a Gold Line Construction Authority and an eleven member
Governing Board
b. Construction of a Skate Pazk and park rehabilitation at Bonita Park
Recommendation: Provide direction - award or reject bids
c. Ordinance No. 2157 amending Division 8 to Part 2, Chapter 1. Article IV
of the Arcadia Municipal Code reQazdinQ vicious and danQerous does
Recommendation: Introduce
ADJOURN the City Council to January 7, 2003 at 5:30 pm., Cay Mortenson
Auditorium, Arcadia Public Library, 20 Duarte Road
-3-
ffi .y1TY
0
ag ►N PA, k
ARM]
`o¢ "
r�°OR-0RAT�9 STAFF IRIEP OIRT'
Public Works Services Depal taient
December 17, 2002
TO: Mayor and City Council
FROM: Pat Malloy, Public Works Services Director /
Prepared by: Gary F. Lewis, General Services M nager
Ken Herman, Associate Civil Engineer
Chris Ludlum, Management Analyst
SUBJECT: Award of Contract — Construction of Skate Park and Park Rehabilitation at
Bonita Park
Recommendation: Provide Direction —Award or Reject Bids
SUMMARY
The 2001-2002 Capital Improvement Program (CIP) includes the construction of a
Skateboard Park in the northeast portion of Bonita Park. In conjunction with this project,
the existing playground equipment will be relocated to a new playground area in the
southeast portion of the Park.
On October 1, 2002, the City Council directed staff to rebid the skate park, with
Construction Alternatives 2 & 3M (See Exhibit's B - #2 and B - #3), with a six (6) month
window to begin construction, and with a 90-day completion schedule once construction
begins. Staff received five (5) bids for the construction of the Skate Park and Tot Lot.
4-Con Engineering, Inc. provided the lowest qualified base bid and alternate bid for this
work, $540,256 and $510,322 respectively. 4-Con Engineering has successfully
completed similar projects for numerous cities and is qualified to provide these services.
Staff requests the City Council to provide direction as to how to proceed with this
Project: (1) accept all bids and award a contract to 4-Con Engineering, Inc for either
Alternative 2 or 3M or (2) reject all bids and cancel the project.
BACKGROUND
The feasibility and design of the skate park began in December of 2000 with the award
of a Professional Service Contract to Purkiss Rose RSI. Community workshops were
held to collect and analyze data, develop conceptual alternatives, and to prepare final
construction and bid documents for a skate park in the City of Arcadia.
LASER IMAGED
lam;
Mayor and City Council
December 17, 2002
Page 2
Staff accepted bids for this project in March of 2002, and again in April of 2002. The City
Council rejected the single bid of $566,308 received from 4-Con-Engineering. Inc. in
March, and rejected all bids in May, with the lowest qualified bid coming from Pacific
Sundance Construction, Inc. for$611,112.
At the City Council meeting of May 21, 2002 the City Council directed staff to redesign
the park with the goal of reducing the overall cost of the project. This was to be
accomplished by possibly reducing the depth of the skate bowl, reducing the overall
square footage of the park, and/or eliminating other special features. On October 1,
2002, the City Council directed staff to rebid the skate park using the original design
with some value engineering modifications to be considered as the base bid, and a
modified design with some of the features reduced or removed, to be considered as an
alternate bid. Staff had presented cost estimates for the two bid options. It was
expected that the construction phase of the base bid option would cost $559,752, and
the construction phase of the alternate bid option would cost $487,506. These options
were presented to bidders with a six (6) month window in which to begin construction,
and with a 90-day completion schedule once construction begins.
DISCUSSION
Notices Inviting Bids were published in the adjudicated paper, trade journals, and
posted on the Internet. Five (5) firms attended the Pre-bid Conference. As advertised,
the City Clerk publicly opened the sealed bids on November 26, 2002 with the following
results:
Rank Firm Base Bid Cost Alternate Bid Cost
•
1 4-Con Engineering, Inc. $ 540,256 '� $ 510,322
2 John Zgrablich Construction $ 558,810 $ 525,075
3 Pacific Sundance Constr. Inc. $ 597,061 $ 562,422
4 Tricon, Inc. $ 626,587 $ 587,972
5 Basec, Inc. $ 695,430 $ 632,580
Staff has reviewed the bid documents for content and investigated the contractors'
background and recent projects for competency. Staff has concluded that 4-Con
Engineering, Inc. is the lowest responsible bidder to perform the construction of this
project.
A breakdown of the bid results for the bid provided by 4-Con Engineering is provided in
Exhibit "A". This breakdown shows the distribution of costs as they compare to the
revised estimates presented to the City Council on October 1, 2002.
Staff presented the . base bid (original design) and bid alternate (reduced design) to the
Recreation Commission on December 11, 2002. Following discussion, the Commission moved
to recommend the construction of the base bid (original design) and asked staff to forward their
' recommendation to the City Council for final approval.
1
3 c,
Mayor and City Council
December 17, 2002
Page 3
ENVIRONMENTAL IMPACT
This project is categorically exempt per Section 15301 class 1c from the requirements
of the California Environmental Quality Act (CEQA).
- FISCAL IMPACT
The 2001/02 Capital Improvement Budget provided for a project budget of $300,000 to
be funded from the General Fund. This amount reflected construction costs for the
skatepark structure only, but did not include Inspection, Project Management or Design.
To date $85,227 has been expended for the design of the skatepark and for Environmental
Assessment &Asbestos Abatement of the multi purpose building. The building was demolished
by City Crews at no cost to the City. An additional $40,325 has been earmarked for the
electrical relocation and lighting controls as part of the Bonita Park project, leaving a project
balance of $174,448 the balance of the project. The following is a summary breakdown of
the project costs for the base bid #2, contingencies and Inspection:
Construction costs:
Construction Contract $540,256
Contingencies 10% $ 54,000
Inspection/Contract Management $ 50,000
Total Project Costs $644,256
Revenue:
Project Balance 2001/02 CIP (State Bond) $174,448
Additional State Bond Funds $184,230
Prop "A" Funds (County) (Tot Lot) $ 74,476
Capital Outlay Fund (Additional Appropriation) $211,102
Total Revenue from other sources $644,256
RECOMMENDATION
It is recommended that the City Council:
1. Direct Staff to accept all bids and award a contract to the lowest
responsible bidder, and appropriate an additional $211,102 from the Capital
Outlay fund and approve the expenditure of State Bond and Prop "A" funds
for this project. Or
2. Reject all bids and cancel the project.
Approved by: Uni 1
William R. Kelly, City Manager
PM:GL:KH:CL:dw
Attachment
EXHIBIT A
COST BREAKDOWN
Low Bid Base Bid Base Bid Alternate Bid Alternate Bid
Estimate Results Estimate Results
5/21/02 1011/02 Opened 10/1/02 Opened
Report Report 11/26/02 Report 11/26/02
Skate Park 349,972 319,531 324,892 247,285 297,558
Tot Lot 89,920 70,247 74,476 70,247 73,176
Restroom 41,078 41,078 66,175 41,078 66,175
Site Prep, Landscaping, Irrigation and 130,242 128,896 * 74,713 128,896 * 73,413
Electrical
Subtotal $611,212 $559,752 $540,256 $487,506 $510,322
Inspection and Construction Mgt. 50,000 50,000 50,000 50,000 50,000
Contingencies 75,000 56,000 54,000 49,000 51,000
Total $736,212 $665,752 $644,256 $586,506 $611,322
* Excludes $40,325 for electrical Relocation
and lighting controls.
r
w•
I [ --.71,•...!..7:.' / . ,,
- ;
110.16 %*4*:. : .. . 'LI....:,:.:.7.: ''' .0 Ii.:. . .rm.''. ' - •...i. . - .'. .. .
7 \-i ,• •,' ..I 1 .. .
/ \1 Fp ?It,.
„ _ .
/ � , ,moo /// —4-7
- ,.. , / -.„,,,,,,,,, ,
. /• , .
' 0� '%�i�rig` ■ /. �'t*
/ / 4 1
N. . i �// J r\
r, W
/0 /®//// / J/ ZS
o
' N 'CL
•
N . .
. ,
7--- ."?j, g
❑
m
i♦
0 Modify specifications to reduce labor& materials without any physical changes E
A: Bench foundations minimized requiring less concrete s
. B: Ledges detailed to monolithic requiring less forming
0 Reposition restroom for economy •� a
• a
EXHIBIT B - #2 " ► 0
ORIGINAL DESIGN
NOT TO SCALE
/ / pia : ....1 � z
�/ of sq�wsuc 1
L .., . ! /
( I/
/ `* • '•' X I
. / 6 ,..) 1
\ \ I
US
. / / / -. - 414, .4.
/ :: - 0 ' N ' ,.
1
7_,,;:.: , (,?. 7.... /
N rl., I
/ A - . e /
/ .7 2 i
0 ono � o' /.j/P/4.,.• , .,,-, "./I - • /
• Qom, sue: l .: `� , 0 I N 4,,,,,sozz, _-------..--..----_z___
/ \ -
•
- - 3
® Modify specifications to reduce labor& materials
p.
A: Bench foundations minimized requiring less concrete g
f.
B: Ledges detailed to monolithic requiring less forming
Q Reposition restroom for economy •
® Eliminate two steps
® Eliminate quarter pyramid
® Eliminate one step EXHIBIT
® Replace steps with ramps s -
7Q Shorten concrete ledge
VALUE A'G C C®E® DESIGN NOT TO SCALE . '
I / ® 3O-40
4
0
IW AREA . 61;1111
• o IOW
r�� °g STAFF REPORT
Administrative Services Department
DATE: - _ December 17, 2002
TO: Mayor and City Council
FROM: Tracey L. Hause, Administrative Services Director
By: Michael A. Casalou, Senior Management Analyst NV -
,
SUBJECT: Appropriate Unallocated Community Development Block Grant (CDBG)
Funds and Approve the FY 2003/04 CDBG Program
Recommendation: Appropriate $47,906.00 in unallocated CDBG funds or
the 2002/03 Residential Rehabilitation Program and approve the 2003/ 4
CDBG Program
SUMMARY
The Community Development Block Grant program (CDBG) was initiated by Congr ss
in 1974 as part of the Housing and Community Development Act. Administered un er
the auspices of the Los Angeles County Community Development Commission (CDIC),
this program provides funding for a wide range of services, activities and programs to --
improve the quality of life for people of low and moderate income in unincorporated
areas and participating cities in Los Angeles County. Recent legislative changes ow
require cities to allocate all CDBG funds. Therefore, staff is requesting the City Cou cil
' appropriate $47,906.00 from CDBG unallocated funds to be used for the FY 200 103
Residential Housing Rehabilitation Program.
Additionally, staff is recommending the City Council approve the 2003/04 CDBG
Program as set forth below.
DISCUSSION S
The. CDBG program is funded directly by the federal government's Department of
Housing and Urban Development (HUD). The CDC administers this funding on behalf
of the Los Angeles County Board of Supervisors, which oversees the CDC. A project
must meet one of the following criteria in order to qualify for CDBG funding: (1) the
project benefits low and moderate income persons, (2) the project aids in the preven ion
or elimination of slum and blight and/or (3) has a particular urgency due to existing
conditions posing a threat to the health and welfare of the community where other
financial resources are not available to meet such needs.
LASER IMAGED
1
FY 2002/2003 Programs
Meals On Wheels - $7,500.00 (Public Service Program)
The funds for this program helped offset operating expenses incurred by the American
Red Cross to deliver two meals a day to approximately 40 homebound residents in
Arcadia.
Youth Services Program - $20,000.00 (Public Service Program)
This is an ongoing program directed to help youths 18 years and under who come f om
low-income families. This program sends youths to day camp, music club, educational
field trips, summer camp and may subsidize band equipment and uniforms.
Congregate Meals For Seniors - $39,000.00 (Public Service Program)
This is an ongoing program providing senior citizens with a nutrition program hat
features hot noon-time meals, Monday through Friday at the Community Center.
Information.and Referral Program - $40,000.00 (Public Service Program)
This is an ongoing program that provides senior citizens with essential informatio to
maintain independent living and healthy lifestyles. Specific services incl de:
government benefits assistance (Medicare, social security, income tax, Medi-Cal, SSI),
housing, transportation, legal assistance, in-home services, health services and
educational opportunities.
Residential Housing Rehabilitation - $407,293.00 (Low/Mod)
This is an ongoing program offering assistance to low/moderate income homeowiers
for necessary home improvements. A maximum grant of $10,000.00 is available per
household. A total of 26 grants were awarded in FY 2001/02.
Program Administration - $20,027.00 (Planning/Administration)
These funds offset the cost of annual general management, oversight and coordination
of CDBG projects and programs.
RECOMMENDED PROGRAMS FY 2003/2004
Due to the success of the fiscal year 2002/03 programs, staff is recommending the
ongoing programs be continued and funded as represented in Table 1.2.
3
•
RECOMMENDATION
Authorize staff to appropriate $47,906.00 from CDBG unallocated funds to be
used for the Fiscal Year 2002/03 Residential Housing Rehabilitation Program; and
approve the allocation of funds for FY 2003/04 as outlined in the attached staff
report, or as modified by the City Council, and authorize staff to adjust the
program budgets as necessary to expend any remaining unspent funds at he
close of the fiscal year; and authorize the City Manager to execute the
Memorandums of Understanding which are submitted to the CDC at a later date.
Approved:
William R. Kelly, City Manager
5
NOTICE OF PUBLIC HEARING
BEFORE THE
ARCADIA CITY COUNCIL
A PUBLIC HEARING will be held before the City Council on Tuesday, December 17, 2002 at
7:00 p.m. in the Cay Mortensen Auditorium at the Arcadia Public Library, 20 West Duarte Road,
Arcadia. The purpose of the Public Hearing will be to obtain views of citizens on community
development and housing needs in order to determine what Community Development Block
Grant(CDBG) Programs the City should undertake for fiscal year 2003-2004.
In fiscal year 2003-2004, the City will receive approximately $426,000.00 in Community
Development Block Grant (CDBG) funds. These funds may be used for programs suc'1 as
community conservation, i.e., housing rehabilitation programs; neighborhood development
programs; community business revitalization programs; retrofitting public facilities to comply
with federal ADA requirements; senior citizen programs, meals programs and public wlorks
projects such as the removal of architectural barriers, construction of handicap rawps,
replacement of street lighting, street resurfacing, undergrounding of utilities, etc.; and public
service programs. Any program undertaken with CDBG funds must benefit low and moderate-
income families or aid in the prevention of slum and blight.
Any persons wishing to speak on this item are invited to attend the Public Hearing. Any pe son
wishing to challenge any action taken after the public hearing may be limited to raising only
those matters raised by him/herself or others at the public hearing.
In compliance with the Americans With Disabilities Act, if you need specials assistance to
participate in a city meeting, please contact the Office of the City Clerk at (626) 574-5455 at
least three working days before the meeting or time when special services are needed. {This
notification will help city staff in making reasonable arrangements to provide you with access to
the meeting.
Further information regarding the use of CDBG funds are available in the Administr tive
Services Department located at 240 West Huntington Drive, Arcadia. If you have questions, you
may contact Michael Casalou at (626) 574-5127 between the hours of 7:30 a.m. and 5:30 p.m.,
Monday through Thursday and 7:30 a.m. to 4:30 p.m. on alternate Fridays. City Hall will be
closed on Friday, December 13, 2002.
ADMINISTRATIVE SERVICES DEPARTMENT
Tracey Hause
Administrative Services Director
Publication date: November 28, 2002
ARCADIA '4,7 •
ifitr
1�\ p�
°14'ORATV j
(I1ity of CERTIFICATION
Arcadia
I, June D. Alford, the duly elected, qualified and acting City Clerk
of the City of Arcadia, California, do hereby CERTIFY that the follow-
ing is a full, true and correct copy of a MINUTE MOTION adopted by the
Arcadia City Council at its regular meeting held on December 17, 2002,
Office of the in consideration of the FY 2002/03 Community Development Block Grant
City Clerk Funds (CDBG) to be used for its Residential Housing Rehabilitation
Program. The following action was taken by the Arcadia City Council.
"It was MOVED by Councilmember Segal, seconded by Mayor
June D. Alford Pro Tem Chang and CARRIED on roll call vote as follows
City Clerk to AUTHORIZE staff to APPROPRIATE $47,906 From CDBG un-
allocated funds to be used for the Fiscal Year 2002/03
Residential Housing Rehabilitation Program; and, APPROVE
the allocation of funds for FY 2003/04 as outlined in the
December 17, 2002 staff report; and AUTHORIZE staff to
adjust the program budgets as necessary to expend any re-
maining unspent funds at the close of the fiscal year; and,
AUTHORIZE the City Manager to EXECUTE the Memorandums of
Understanding which are submitted to the Community Devel-
opment Commission (CDC) at a later date."
AYES: Councilmembers Chang, Kovacic, Segal, Wuo and
Marshall
NOES: None
ABSTAIN: None
ABSENT: None
IN WITNESS WHEREOF, I HAVE HEREUNTO SET MY HAND AND AFFIXED THE SEAL
•
OF THE CITY OF ARCADIA THIS 3RD DAY OF JANUARY, 2003.
• June D. Alf.
City Cle.
City of Arcadia, California
240 West Huntington Drive
Post Office Box 60021
Arcadia,CA 91066-6021
(626) 574-5455
(626) 447-7524 Fax
O1 1O la
I AA„c,(
F PI staff report
arcadia redevelopment agency
DATE: December 17, 2002
TO: City Council
Arcadia Redevelopment Agency
FROM: "Ion Penman, Assistant City Manager/Deputy Executive Director
1)�,By: Pete Kinnahan, Economic Development Administrator
Prepared By: Brian Saeki, Management Analyst V?
SUBJECT: FY 2001-2002 Redevelopment Agency State Controller & State Housing
and Community Development Reports
Recommendation:__Approve and authorize transmittal to the State
SUMMARY
The California Redevelopment Law requires the preparation of an annual report on an
Agency's financial transactions, including an audit, and a detailed report on the
Agency's activities in low/moderate income housing for the previous fiscal year (2001-
2002). These reports are to be forwarded by the Agency to the legislative body (City
Council) for review and transmittal to the State Controller and the State Housing and
Community Development Department (HCD) prior to December 31, 2002.
Staff recommends approval of the 2001-2002 State Annual Report (Attachment 1) and
2001-2002 State Housing and Community Development Report (Attachment 2) by the
City Council and authorize the transmittal of the reports to the State Controller and the
State HCD respectively.
DISCUSSION
The Agency annually submits a detailed report on the status of the Agency's previous
year's finances on forms provided by the State Controller. This year's report has been
prepared by the Agency's audit firm, Conrad &Associates.
The housing component of the Annual Report has been prepared by both Conrad &
Associates (financial section) and staff(housing projects/programs).
•
Similar to last year, staff is able to transmit these reports to the State via the internet.
The attached documents are copies of the information Conrad & Associates and staff
has prepared for internet transmittal to the State Controller and the State HCD.
LASER IMAGED
Arcadia City Council/Redevelopment Agency
December 17, 2002
Page 2
Conrad & Associates has advised the Agency that both the financial status and the
administrative performance of the Agency are in accordance with Federal and State
Guidelines.
FISCAL IMPACT
The report must be submitted to the State by December 31, 2002, to avoid a potential
financial penalty.
RECOMMENDATION
1) That the Arcadia Redevelopment Agency approve the State Annual Report
for FY 2001-2002 (Attachment 1) and the State Housing and Community
Development Report for FY 2001-2002 (Attachment 2) and forward them to
the City Council.
2) That the City Council approve the State Annual Report for FY 2001-2002
and the State Housing and Community Development Report for FY 2001-
2002 and authorize staff to forward them to the State Controller and the
State HCD.
Approved by:
William R. Kelly, Executive Director/City Manager
Attachments: 1. FY 2001-02 State Annual Report
2. FY 2001-02 State Housing and Community Development Report
•
•
REDEVELOPMENT AGENCIES
FINANCIAL TRANSACTIONS REPORT
COVER PAGE
Arcadia Redevelopment Agency
Fiscal Year: 2002 ID Number: 13981902300
Submitted by:
Signature Title
Name(Please Print) Date
Per Health and Safety Code section 33080,this report is due within six months after the end of the fiscal year.The report is to
include two(2)copies of the agency's component unit audited financial statements,and the report on the Status and Use of
the Low and Moderate Income Housing Fund(HCD report). To meet the filing requirements,all portions must be received by
the California State Controller's Office.
To file electronically: To file a paper report:
1.Complete all forms as necessary. 1. Complete all forms as necessary.
2.Transmit the completed output file using a File 2. Sign this cover page,and mail complete report to either
Transfer Protocol(FTP)program or via diskette. address below with 2 audits and the HCD report.
3.Sign this cover page and mail to either address
below with 2 audits and the HCD report.
Report will not be considered filed until receipt of
this signed cover page.
Mailing Address: Express Mailing Address:
State Controller's Office State Controller's Office
Division of Accounting and Reporting Division of Accounting and Reporting
Local Government Reporting Section Local Government Reporting Section
P. O. Box 942850 3301 C Street, Suite 700
Sacramento, CA 94250 Sacramento, CA 95816
ATTACHMENT 1
---, .......->r-,-.---,--,--,..,--.,,,,---,A.I.,-,--,::,-,,.•71.41;,,--.74.---1..4.,,,,4-.4.---1 .1,-...7iaw,q,"'roil:lit,',14,.',Qzkice,.....,2W4§...q:tts-cfii.VASiX:07.01.7.4*''t-...:ot"iy.tiV:f.t&W.Z.MgtVpi.xP.gM.anfp.*
'.-igNif:t:.3"k i■,t;f.7...1-T.:11,ft 7 4W i 1.1-47i1VIAR AX:11,"'":-..ft9 tt"..WZ7,"461Milt 0_.,i 1'ff. .71:It-1 r 6=421'''-.:Cittln".4 1 tir cirraOlant05,.R 42_W.-41.4:.'_',;.:?%!,'IR,t1;',4 cif*,eittiAtifftfil..,5:4 Of.6.***1 0 g 4
fi.*4 :16.':":"''''''''''''t4-'7';.--.''' —W"'"'-''''''''''''''''''''''''';''''''''''''•'''I''''''''''''''911.1:024-'1:-"'F.M7AC-'4,,i,'ZI''..';:,'V'a,",40'.74',•'::.4,-414VII4i'4.•,:AY2.ift.TSS:Fi`a.A..,•••41'474;17.,-.ViZgA*•5_,40.31,1-*W.,-:',;:414'..,,,,911- 17.474.,....:•A•L•Nt,, ,•.....t,43....7;,‘•- •,,V•44,-,6•4....,..•'.,.. .
. .
W4 -.f..' —',L'=54,74,A.:,gliigg.- gi::k- 1.,55t,irt: 1•5Giiife-falitiliftittlitatitliiiI351--,•'.!:1:24.1- g. .:;.k.;'?:" 2. 74.Z*-ff-2.-4*7-:,--7----4;tt---..Z--3_.1052&4:2;- ..:--eFFi.$'-ke7..s,7-4EQ.P
Fiscal Year •:.:::V.7:t-7:7-gla;i2.4.0741:: . .
MOM berValheiPQMOrninirBgaiStig*---Ye.i.-it-tit,
0:','"*.'4.-1- 1,.- 7-j'!:`.''.'A''--:■iff.?q:',.r7=...T .....--;--7.,;,j1,1.f.;:il..:;;; ;*;j1.,..:44,:fi.j.,'
.!:Nlitidlen. 40SeNnIrile.t-=',,'rz•z:-,-;, First-Name-. L-...., . 4•4 :5,,crit,...T-0:: .,:f...11...,:,,,_,...i5.i.;;;17,1- ,,,..;.,:
. . -,-.
:11-a4,NinfejcZ4r: flistifIapw.-,_ '-±-;=llnitiaV..
,C-raft13-erso-'-r-ii = Marshall Gail A iiietntivOtiirectorT.:, Kelly William R (626)5745401
,.....
rolookipv ....,,i. --„, Chang Sheng Fisoial,affidet4 Hause Tracey L (626)574-5425
.. .:,
IM#171-114770.50cr,f';,73:::',1-::. Kovacic Gary A Secretaty4t Alford June D (626)5745410
Member Segal Mickey
Report Prepare-d440-7 107.41,44iiit-Wirga;
Metilihetl.ts--T. , Wuo John !FirrilliNam-e-A-, Conrad and Associates,LLP •
..---.-=-7- ---4, -F.-:::7,..;,,,
Membee.-..45,..-,,,,
taiVii2tD:=;'52T:F;;t:Di Hamson Harrison
IVienrihn-r ....,;:7::-4
;phit,;:::11,-.4-2.2.:!, Michael Michael
Alerhher-T-17,,,,,-
IVIldilielniftialtt.7 A A
Meinhet4; ,- - Stree...t-`;4: 1100 Main Street,Ste.C 1100 Main Street,Ste.C
lliember#:,;: ::-,
ieltiti Irvine Irvine
-,-...,...,!..
ti CA CA
filiIII0414iiikratilEWg .M41S _________
,:...::::....:::::47..ir.,,,,,:.!=
-,.14.742:-.-.,,,.. 7.-=.7-f=rt - —,- .-.::..- 41.1f:90..--510- 92614- 92614-
...;H-;:, :iii..
Street 1 240 West Huntington Drive wkone,-- (949)474-2020 (949)474-2020
Street 2
City Arcadia State CA Zip 91007-
P hone (626)5745424 ., Is Address Changed? ,
- .
, ,, .f.:..w..,7,„ ,..T,„.-.„•7.1;..,..t,.,rgy;,.T„i„;,t.,..",..Fq,,ty,,,,:A,,„z:,L:„,f.o25/02;,:,,f,.
46til'fr':'a'PYfifaiaifOWM-rjhg5aWagifge'Agtg:lq.rVAr:-f.gg:M.:gi.M:;R-0:0.0i-ZM;-EiOZI-kzr,,,,:*It-fa:,-:,T-tk-4gg-g:i-tg::gi_frg5RAe'ggfi,FAZWt:=w:N,
,,w:,;f-,,,-g ,4,-::t , ;,:-q,, : - u- • -- ,f,r4.,z,i;:g7aqif;:'L' ;.:::gi-:'' '.tr !,r;,tV::.=:, " .,,.'.
..4 �, { '.•,: 5 a]^ .'.' ?, ..e,'; _f-a _ / `!.'ry
- rr ta•i%r a 1. r oI-- t``/ -, C.C. '',� St w;t,..,.-N,:S..q„ aY -Z" 4„ _..._ ••,?�
• .;, , =• ,rt 1.14 l;nk_ •
••- . fit _ , _ S' , -I i - • F ,�„"-a x t v r"x�}'�� h""x>'T%L�
; e ;
• � , _ ,._ _;-.,._ ..y._,'_. _-t . .-+• T_":. ... � ,.z t , t,=�x ..,. ._I,f ,:?'�`x.,.:"_.'*"":t•JOrr..'�e'rn'i.,....r-.,,�'� ".
..•. ,,.,._..._r.�:_................y.... +<-,. .. ...... �. en. ."rte, rs,..+. .,,.•,..........:..._... _ �„' __.4• - -
._!h ... ....;__..__.._. .M1_.. �_*�i'_M..,. .. ...� _...�!'. .. ..„,...�.Y. n•...Y. ....,.___ ..r:;_- '!'v... '...J.i.....] .^��:E•Y_�;M1'f•p-.f0.'•:�,r��-•,_,,..=e�',j.
-
+� :-. .. , � r ..... � <`�°._ ... .s� .-._. ,:� -v:'.':.j,;�:_<��•4:.r � �,�: .�'i? _�.,r%r:,.:r,,C c =";a.�:;5•f,•--
__s:,..<_.fs._.._?-„... .,.kr. yn _�.- - ii,: �,�5:
......_ �_-.,_r,.. .,......6.-..-.'�Ylitx'-'i�;.>...'.___•.J:._.<„-.._.:.�._a f' s �':a- ;F4. :rf. az..5'.,sr.. - _
..:..:...J-;. ..,.r.}..:--.�,.,..-.:•_'-.--..� :-nom_....... A+-..,'`.,-_.....:. _. ,-,'�,-. j "A.r ��.�/?��.y�y/� , _v.:'F.i:%]:^v ...4_. _ �'.��. :j:i� ',�(
_._..Y' r:`!.'...re.--.(�,_• r-,...._.t{v.,.._=.a:t_�'_,s•_�,.`T r_._(.'__.,-._-^_..rlt+rn.._.:::,.:�r {i'. ..:� -n-0�� ..�� 1M!Yt4�M-! _i"e�"fa ,r 1 J.a/( = :"�'
-� _ ..._ _ _'_-. .... ..a r -...,.,,_. __'�.r•'•?:,_,._c,..•�.�.___
•
Fiscal Year :. g:'Yti ;=-2002
Indicate Only Those Achievements Completed During the Fiscal Year of this Report as a Direct Result
of the Activities of the Redevelopment Agency. -
Please provide a description of the agency's Square Footage Completed
activities/accomplishments during the past Enter the amount of square
year. footage completed this year by
(Please be specific,as this information will building type and segregated by New Rehabilitated
be the basis for possible inclusion in the new or rehabilitated construction. Construction
publication.) T -.
za4 "'1n? ?�'`� . Commercial Buildings 20,000
The Arcadia Redevelopment Agency had several projects for FY 2001-02. Industrial Buildings
The Agency completed several traffic signal upgrade projects in the Public Buildings 4,000
downtown($291,000). The Agency contributed a total of$53,000 to two
Commercial Facade Rehabilitation projects(20 new jobs). Other Buildings
The Agency and City,with support of the PAC, Planning Commission, Total Square Footage 24,000 ( 0
Chamber of Commerce,and the community, completed amending 75 non- Enter the Number of Jobs Created 70
contiguous acres in South Arcadia into the existing Central Redevelopment from the Activities of the Agency
Project Area. However, LA County sued to stop the amendment and was
successful in court. The Agency will not appeal nor re-file the amendment. Types Completed •
Also during FY 2001-02,a second 20,000 square foot office building
(Morris/Church of the Nazarene)was completed(50 jobs). The Agency A=Utilities B=Recreation C=Landscaping D=Sewer/Storm E=Streets/Roads
previously contributed$100,000 to the recently competed Glib Historical F=Bus/Transit
Museum,$4,000,000(over two fiscal years)to the new police office station
(now under construction),and finalized a DDA with a local developer for two
3-story office buildings totaling 87,000 square feet(under construction)and
approximately 175 new jobs(Hale/Waken - Fifth Avenue). .
The Agency also completed its biannual Lease Rate Survey of all available
commercial and industrial businesses in the City and prepared materials for
three senior housing developers for potential projects in the City.
-.t.-- '. .z_,-z:-,�..t...: _�..y r,''t,:�.a�,._.zu:. ....:=,t, ,-.- .. .:-._ ,,:.r—:..,- ........... ... ....... .n. :,r?". -.•:at:r*,--- 'i- - -
y,...s.
;:.Ae leVe ent-ln hnation_U aad �; .- -�,.,_ � •.... .�._._,
i .43- -
-I""`, i r:� -t='..1. -•1'*:1�d - ,. .
,.,.>p],',a,T _...:c_" _.:...:+Fµ�.....::r.. _,;;.,::::ra=r':i'-,'s...n r-' i�� v .
r s•.- .tt,,,,::.--.r'+ ,.Tr'•..M _M,-.,.• *.,- _.(...c_:. r,. Vgz r:!�..-,,.> r{ :., r,+o-.I;. K.. .;
i .rt - �u.� rn �1`. .f7�'' aq<te'. :I;• :�s. _ .,,
;::,,•,_.::.., _ _t..1;_. ._.-.-. ....::. .-_.- - ...::�•q .-..r^'LL-�,=•.:.....o.r.:.rfa:=•..r. •.�...., .....
,''`x# ,a .f'' `. v`'3'`'-.'�m.a.7 •a'e"r ,+Y±,...•a x§:ic r �� u,_'^"' w4- s :104124.�-1 :155, '�i`�Yn�'-u*ttl
t fii,k'� a...:. 4 �; �t i'� 7'' �'� ✓: r tom+""r° -` -S. r' - +'•tfr t;�-••r.Z,,nd�prir d. 1 '` yrr."'e .�-'s..�:" 'Y
r-';'"i ty� r.J 01 7 0L�� ly 0 �j� �>}�- �an.a -; `. y .. -e4 ! sy r.� o {n _i pp� II��!�(..._ p_ (n ,..3 1,.( n�J—,.'.,.x...°. ,:.a�4.
-.f .'' I'Rtl 'LdI 'Y�. .�i•�U1.3- `--M1 f
`� � -:. rte• r -§-' 1. y�k ' '- � �L c - -.•,z� ° �_'�'-"_
--..r,s•a_z_._. _....�...3._...�.-_,h_.:.� ?.:,,�.�=v,�_.r'-#'k.,��_..r..,.....�.=-=iz�c." '�,-�c-:`-�Zd...,s..,_a...,,.�-^—,`-,ra._.:.,_"-.u.+.=u�-�3.':..s_�'.S'io-=-sue '9. ,
r , Audit tnfotTriation �r
ti
f� r
Fiscal Year 34002.
•
If compliance opinion includes exceptions,
Was the Report Prepared from Audited Financial Data, Yes
and Did You Submit a Copy of the Audit? state the areas of non-compliance,and
describe the agency's efforts to correct.
Indicate Financial Audit Opinion Unqualified
If Financial Audit is not yet Completed,What is the
Expected Completion Date?
If the Audit Opinion was Other than Unqualified,State
Briefly the Reason Given
Was a Compliance Audit Performed in Accordance with Yes
Health and Safety Code Section 33080.1 and the State
Controller's Guidelines for Compliance Audits,and Did
You Submit a Copy of the Audit?
Indicate Compliance Audit Opinion Unqualified
If Compliance Audit is not yet Completed,What Is the
Expected Completion Date?
•
•
Audit nformation x Pa e 1
+ r
,.�'n j-•f•✓:.tx ,a--r`r�" ay,-�"1+v fi7.;.� .trx�i-k,>.,,t'a.f�f..,4•. +,.y��. F_ ' ""ate" .-,i.:�t-. -r:.r.Y,z`'c ,en'••q w } a: '.': „i'y�•1,- :. . €"-�•{ ;. r.<• 7Nf, '
4724f ys ,. ,(,./ w' o : ° 7 0 ° ' o ° .. '3''�''�i" w
a.t.:.�t.w ur.•t, If... - ,.. i'11 11,2 � x�.!v ', �{ e� .s „At. A2 °P. 7*t
n5 4
t,,,A,L- ':{T 7.t A " L•14 ly*`.. F +7 kr` "�M..6... 6i -.f 1. :_.F. ;»9:�^ 3'yY 1 Y4 F •.t. " - F1. ;4•t--Fi`t' iu• d"L.
t a z t f k 3 7 fi a 7i
-y' `�,n a .ca ° nl- l-t—',D s A l ° fisn,1�' o of.,da-i v" n ;{ , `°�'``1!�, }�y wla�,c
s 41�.1�.P-� � R ��1�� � 1�, ''•J�' '1 � n 'k k . °
a $ '}a,- t rt 9 y,.' �, •il r••r p. "; •tat '-
5 'x
SS 5•. ..5� -s .s t { - � irf v-I� 4s+-..0 c,,."l, t� t -c rnvi �°r'.r -.9'A'" -mot+
e-'_�•'" {t—rs''. 'k. '�arm-f. s 3L T- - '- /�-er,�.�2"�y'•2'L �(a f a•r �., is ,F '3
? n .1N`�v'^� �,�il {T"K3 �r r•4X �E {.y...�ro���i�P[16��1t0p�1L�1 7. 7 ��1 ,I-,q.-'
.,yl,-+�.t _.-•... ,t+s `-r 7 J c +?xt,c•j ` i.R£} 4r fi 4i ,Z q. !1 -s,yr,,.-i ry'''i,1 "_, t ,-
�' 7' .c zw G.,... •+[ ? y ray 1 lr fit_:
'" Fiscal Year ' 002 0,: w.o` 'reject eagName f •4 "t Central Project Area ;.
._ Fes. .� fi� TY.-�. •-f� t �.. �� �.. f � S _
Please Provide a Brief Description of
the Activities for this Project Area
During the Reporting Year. Forwarded from Prior Year? rw
Enter Code for Type of Project Area Report P
91Avp` °° i ; P=Standard Project Area Report A=Administrative Fund
The Arcadia Redevelopment L=Low and Moderate Income Housing Fund M=Mortgage Revenue Bond Program
Agency had several projects for FY 0=Other.Miscellaneous Funds or Programs S=Proposed(Survey)Project Area
2001-02. The Agency completed Does the Plan Include Tax Increment Provisions? Yes
several traffic signal upgrade •
projects in the downtown Date Project Area was Established (MM-DD-YY) 12/26/73
($291,000). The Agency Most Recent Date Project Area-was Amended 6/4/99
contributed a total of$53,000 to
two Commercial Facade Did this Amendment Add New Territory? No
Rehabilitation projects(20 new Most Recent Date Project Area was Merged
jobs).
Will this Project Area be Carried Forward to Next Year? Yes
The Agency and City,with support
of the PAC, Planning Commission, Established Time Limit:
Chamber of Commerce, and the Repayment of Indebtedness (Year Only) 2024
community, completed amending
75 non-contiguous acres in South Effectiveness of Plan (Year Only) 2014
Arcadia into the existing Central New Indebtedness (Year Only) 2004
Redevelopment Project Area.
However,LA County sued to stop Size of Project Area in Acres 252
the amendment and was Percentage of Land Vacant at the Inception of the Project Area 1.0
successful in court. The Agency Health and Safety Code Section 33320.1 (xx.x%)
will not appeal nor re-file the
amendment. Also during FY 2001- 'Percentage of Land Developed at the Inception of the Project Area 99.0
02, a second 20,000 square foot Health and Safety Code Section 33320.1 (xx.x%)
office building(Morris/Church of
the Nazarene)was completed(50 Objectives of the Project Area as Set Forth in the Project Area Plan RIC
jobs). The Agency previously (Enter the Appropriate Code(s)In Sequence as Shown)
contributed $100,000 to the
R=Residential I=Industrial C=Commercial P=Public 0=Other
•
Project Area Report r t r wi z d+ Page,1 < v{ ra 1 r t�tnr I1/25/02N
. r .a s• �;—' S ` -' i
..-..•:= r ..3�-14... _d fit. ... Ttta.:�'. _�. •:•' f.._}S._ :r. .f ... �.._;:.. c .-.`.: f".�,i 11..4ir .-I�. �". ....._ .... .. :'3.... ._.. ._�. i-� ' 1`pl I ...
r x w _��...t � y'...5•' r s }.,,. c l-o s" r� a ve:„� L as h ,.]:
.L-.�11 YOU 1EN:- .t\�C-i°.�,.._8..�l-r-xP,� �'s1v; 11 -°iij: _ .J.:::` •_. . ..K.� ,te_. u u,::z.'9
•I o(_„+ 1 0 1fl �:� Voa t v� � a � }� 3nPoi�� 1 `x
ia..• ,l� .a- k 7.1i L �L.+.`2 �..-�. F- 1J' 1`. .1'��.
,,,-.,... m„ -.kB'�.r` ,.-..,..vdn�.a7x•.-��;s1„ .i u,.,h.,...
r... �_.. :. A.°Y•^-;.:�_cam-r �:.:� _ _ _ _ _ _ ''. _-
nn - _
..... ............-r,-.r....__.__.—_.;...ter;_......_,........ __...,-.=.�_.>_.:,-..,�._.__,_ _"•""_ _
Fiscal Year 2002
Project Area Name Central Project Area
Frozen Base Assessed Valuation 32,132,229
•
Increment Assessed Valuation 261,654,729
Total Assessed Valuation 293,786,958
•
•
•
•
•
Assessed Valuation.Data - ,7;. r- t 15�Q2
•
{ t - `t.
i�,°:n,-,.-r"`,h.S+:,
::E.. ."'?Q J .w�f^i,'<,-.F :c:-ns...R^.;•� -:,,:;,;n-,_3,:. F-�,r- --ar:- - -�.= *r^,y+- .--:*s- -"_:cC, _.
Fiscal Year 2002
Project Area Name Central Project Area
• Tax increment Pass Through Detail Other Payments
Amounts Paid To Taxing H&S Code H&S Code H&S Code. Total H&S Code H&S Code
Agencies Pursuant To: Section 33401 Section 33676 Section 33607 Section 33445 Section 33445.5
Coun ty mm f h's34.}as- ,_ 1wi'".iCt•a
Cities $0
School Districts $0 I
Community College District I. I I $0
Special Districts i...ttftitaliZaWWAS'ill)&e.EN
Total Paid to Taxing $0 I $0 I $0 a $0 $0 I $0
Agencies •
Net Amount to Agency� _ C ' _" F ?:wtf .orhr > $2,610,502
-
I :'•'-'r�"i-s`i't_ `- �°r�.�.F'_�>"C.y E-`'3'.J3 R"'sr ice, •:wi` `.
Gross Tax Increment .�j_�,��„ a '._,:,�s� .,-� � "�,���, �,t.���, �;;a.�_ 2,610,502
Generated
•
•
•
•
v-sue-.ae� -i ".:: ....._.:. • r
+r n , .. G y;.a-T.. � -. ..- ,- ..r.:-.._... . _....-.__....:_::.a_r..::;_+., .vs.. . :::�::ii.: -.: - •:.'vr`il .
f. ry ri_r.. n.......::.r..:r1 v. .:..,v+�-+ .. .. ... ..._. ....:K_..T. .__.. Y-. ..a..__. ..-_.� - -_'.'_'A�ly�"t'fi.._ .c��_r.� .:.•_._.�.
`kekl r. h=f=S oa DisttietTAss st nee i �. r i Pa a�1;�-• - =-a=•=-_ ='<_- f 1 1/25/UZ' 4=
..-:A 4 �+.11 _�,,, � �,..: ,7_ t. _ :1„ '}?:. s.�..'.-- _ i.}ii.•`f `'+'i:'.i ��i�ir '-'r1' -��=u: i. M .
•
_ _ _ -1:_ ��* !, i .� •,,.._ --�+�7'`r r r _;r.r.�.F�' t i- 5,,'i.. -`''S•i;i �1:
•
Y
IelaQ uawanadu��e;ide�La6ed 4iT"
=ZL L s�
•
•
•
•
• i
]
7
. _ = _ 4
.�_. - tau - �� - ... ..
-� _ • _ - - -.1,._.
_
Kofai'- a ::.:- .c : i- , -
mr Uogaagzapb _ fno.w f _,�Soua6y`Bulxel o awed i �ogdu1 sad - ameN ealy�oa o�d
mot;
` } } ZOOZ:r 4reaA ISM
z
-r-a—'-`s-- • -Ats.z,,,k-c',4 a- �-, �,d K ^z . ..s7.G r ter- ` t�
' `. x 4 e� '. ; '�' - ` ter^!i -r`� y z' .}■PW' ^k^Z'it3-."° '.' "'.,-rkc .5 F K ?.j;, ;A' X _ * te `- ,-'1.T ;r :
7 t-. '= h- 'm'- ; yr p. ;„ - n � Ft .cl5 'x; a.. P Y .� ,>r�
= � "+�f-�yv.,�„-�mc� �„aY'„� s ..,� -» ,*-:tom, 3.-`. �-�- ;�c''�= .,�-°sc+ -"'"' �- S. .. � � �� � �, n..g,-,,,,,�,
h i4 s t-t."a '.,u.1'-'-' �s-...xi z- r � .Ss'' J � Ti i�I � )-11,.o e p . 3, $1e s,:t
.:t-1ea�su+_=-'''�'_-..iL 11, -'t''..lass.,. .+ ^' ,;_,::; x.:-.5-«-*x,.�..2,_:.,s-'7 S',.tiri.to `Ti,7_. .:._,.. c^m�. -?-,,,.,,=,-7:•ti,^.`rx ox ;...h . 'ate�`wh F
s
.awe oue
•
X0
i-. .•_'F r 1 y • ` y oi2�4.j 111 -�1 TFir ai . ...'S_rv�..,i.S a ,✓.1. °r ..;"."t,.,.tlo��
+ .
— ,:mT? _ - -• �rv'is..t.•er� �,, _ _."_�*-:�� ,e'�]s"°.f .:G7,:,.a. - �.:1.E•'L?=�'���:�t__ 3.:=Y=-�..�r.r: _�.r+r 11. _'`�q}.�� '
Y� �5arnary�fEth S�tementflf4lrt�delitedss srpject,AT�
Fiscal Year - -2— 20Q2
Project Area Name
Tax Allocation Bond Debt 35,823,911
Revenue Bonds
Other Long Term Debt
City/County Debt
Low and Moderate Income Housing Fund 14,013,122
Other
Total I $49,837,033
Available Revenues 1,175,009
Net Tax Increment Requirements $48,662,024
iSymfnary of;�e StaVtem�nYgisin�ebtgdness+�Rfo�(e�-uArea•�' ,. �. � ''' �' `` ��'�ge.�l" � � r v �-�� 11/25/02 �' �
U s _!..Tr?. v. ��„ -.;L :�-r:._r i' 35 _. _.. j`.,.'. ...�. '. �`�i.'a::.k=`.•::..._a(..-,•t= �f -- r :: 4 i'� �� lt
:C '"'f ;:.i,.fi .z � �'k, " z. }+'r.N.. ��yrt'��-� = --��rr�(4cy ... ',,. a � use k.3 'rr�,C-.y ,'ti x Naar � ter+„ •,�.Yi'�+".._
• r -f N.n`rS:7, "r .:!'.gr.,1J. d..i}.rl o.�.�. � '.'IL /`y/` }, c� 7,rty��^� } ' ' § r 3..-#n t 1iti•+
�-,Y- .�....:�"S. A g' - � .. !''" 4�=.?r•r¢., 4*`rs-_.w.i._S'"`_P"'.:, r._rc._r_. '�._•�:.-:_,j.-'...t`"•s-•..n-:f� 't_ -4s."�'3i..�s�. �aa...:.•..iH
++� � �X-s �a -y, � �. a,- -w. ,p .. a� .' �. � hz �-:,�. ;x� i',..rt��'��s" �- -x` .Y�°� �S'� � �c.,y`„+ ^`Ji
• s( a �l a 11 r i o 1 0 1 r i f F' rtt. { s o a i o iUr. a ge s 3
�`_.... -.... 'r�"?: .... ?1`nk-e��.ft.�.�i ,�.,f�i:l. r�i-i.f�1�J��- p.�.�,.�h._.J--9a�......,'�^-.���,f'',��_m '�r4-.:�J _., .s._..-�h'^' ^i s,;s'.-r.,., ,,::' -.'�• .o.•-w
Agency Long Term Debt
Fiscal Year 2002
Project Area Name !Central Project Area
Forward from Prior Year
Bond Type Tax Allocation Bonds
Year of Authorization 2001
Principal Amount Authorized 11,655,000
4 Principal Amount Issued 11,655,000
Purpose of Issue To finance capital improvements,repay
City loan,and refund 1989 bonds
Maturity Date Beginning Year 2002
Maturity Date Ending Year 2023
Principal Amount Unmatured Beginning of Fiscal Year I $11,655,000 I
Adjustment Made During Year
Adjustment Explanation
Interest Added to Principal
Principal Amount Issued During Fiscal Year
Principal Amount Matured During Fiscal Year 415,000
Principal Amount Defeased During Fiscal Year
Principal Amount Unmatured End of Fiscal Year I $11,240,000 I
Principal Amount In Default
Interest In Default
Bond Types Allowed:
Tax Allocation Bonds;Revenue Bonds;Certificates of Participation;Tax Allocation Notes;Financing Authority Bonds;City/County Debt;US;State;
Loans;.Lease Obligations;Notes;Deferred Pass-Throughs;Deferred Compensation;Other
v�_.J°� ^S L.. - _ - - •�..of
y:::.. - � .'�t .v..� -: :_�..vf.___,:•.-. ., .': +.. ... .�..... ... ._..t .__ ..- i'av ..... _.-•' �. .... ; L� M1-.�..;_ � ::-.i.---'��•�=1"??%:y r i .�t%ir"
. grP*'a �C - i t k r..',,,. 5'-zS r4 an-:^ ,;r' I`6r Fa'sf t�. - "?-'r`.S 1 ;, 4 .... x,wn.,;..,M,N -, ts1�''.3. Po L M F,,-'. :f3 xE ':e., 4y'-'�zry x, yh;ir^°'•
,-.� •c+ r r+W ..: "E 1 hx. L ,,� b J F '� � +t+. `a-'tieir,� n, F';t x '�'�
tz i M'x h t�f { }y �i try v -t'1�r 0.� °syr a 0 .. ? 0 4 C 0 YL- r �. " h P -x"y � ti .-u:
�i'er�`S:s1:".�� �..saN�ss'.!�^,:L' s`:h-2 �',%l�i3z c.*�xr.'�4gt.�.'.F°,..4 i�t:�1,4'.v"J'!�i.r.?ex::4-,v:'.• _ � .�i,�'.�b'?,".a ..,,....�'kYH,��",?# �... '���b'E`adS4f:,..eaS"`7F. +�`:i+' ...,.�.a�.'��''�nr+z
ZSI3 ,�"t+rs, sr �ffx�• '..w�.: i,.:r'mod"�•^,:w.v:-�•c w ...4.-,�-' lwv-'�•• yry; �_.-":i•t�� ��a,,,,, ,r; '• 7 i'-v. ..,��£in.��Nr`rr '�-;'F'�S"�'h'at.�.+��•�' �.
" w ,t.S a r•�+,&`�t A . 0 o gp�S.�f�/0—r i f ': r"? - $ a.,RI M� o t'. "s yrwClak" �� 4ft
Agency Long-Term Debt
Fiscal Year 2002
Project Area.Name Central Project Area
Forward from Prior Year a°" ; `''t "' ' 4
Bond Type Tax Allocation Bonds
Year of Authorization 2001
Principal Amount Authorized 9,240,000
Principal Amount Issued 9,240,000
Purpose of Issue To finance private business incentive
programs
Maturity Date Beginning Year 2002
Maturity Date Ending Year 2023
Principal Amount Unmatured Beginning of Fiscal Year I $9,240,000 I
Adjustment Made During Year
Adjustment Explanation
Interest Added to Principal
Principal Amount Issued During Fiscal Year
Principal Amount Matured During Fiscal Year 335,000
Principal Amount Defeased During Fiscal Year
Principal Amount Unmatured End of Fiscal Year $8,905,000
Principal Amount In Default
Interest In Default
Bond Types Allowed:
Tax Allocation Bonds;Revenue Bonds;Certificates of Participation;Tax Allocation Notes;Financing Authority Bonds;City/County Debt;US;State;
Loans;Lease Obligations;Notes;Deferred Pass-Throughs;Deferred Compensation;Other
A`geney�L�ogg�Terr►1 Debt- �� � ;; r t1 ,�� �+ f 1„ase��.z ' � f' 11/�5(Q2„'t
a^ 11 e. (o 3 rp\ -;'o l r 1 �l tli'�RJ`i(.r�Y.°�j'3
r
-rvi+, ev � "_.; tee- •4 '.Y" �,_
1 -.R':£ m
5 �;mf; 4';e..�;p ar, 2 ta"k r
Agency Long-Term Debt
Fiscal Year 2002
Project Area Name Central Project Area
Forward from Prior YearEf=us,X•,` o 4�,x
Bond Type City/County Debt
Year of Authorization 2001
Principal Amount Authorized 1,599,037
Principal Amount Issued 1,599,037
Purpose of Issue - To utilize tax increment funds for
redevelopment projects
Maturity Date Beginning Year 2001
Maturity Date Ending Year 2001
Principal Amount Unmatured Beginning of Fiscal Year I
Adjustment Made During Year
Adjustment Explanation -
Interest Added to Principal
Principal Amount Issued During Fiscal Year 1,599,037
Principal Amount Matured During Fiscal Year 1,599,037
Principal Amount Defeased During Fiscal Year
Principal Amount Unmatured End of Fiscal Year I $0
Principal Amount In Default
Interest In Default
Bond Types Allowed:
Tax Allocation Bonds;Revenue Bonds;Certificates of Participation;Tax Allocation Notes;Financing Authority Bonds;City/County Debt;US;State;
Loans;Lease Obligations;Notes;Deferred Pass-Throughs;Deferred Compensation;Other
•
Agency Name:
?'L�F L iAt S'SL� °-t' at � +�.;., x x i, Z c-r...e,� F v.X T T.�a. ��.`r z +e !•t`� 3rk't '^ a -5�� -r 5-i F`y„�n
�k� ;�c, a, s•�' '-� A-r o �` 0 0 0 �{ t d 'i��,.5u o�y��� o�o`+`�i35e�.�"�� '���'�,:r��`�`'h,m �'�
��x c - .A v•t—. r-w\ � -. � �'` , �I`- "i� LtL�JLr� .L:-..:7 -. 3 ' .itZ 'L+' i
rW t,z.w?'�wv.a...�*''..::s7..�. ..:�.,..�vrw::� s"�r ts::.. ..v^f-. _ ... :r _�a.:v h...,�•,�.. ...,_:fix. :5s.:.:..✓s��.,5+a....t '^"''� w '� .�: �}
,.�.---- ir._ -t -::' "1 _rYr t z'L .�rrv-x��z;.w�r.S'" r= r '-x'2'.'=�sw^ 'e-•re?x� "3- - __
Fiscal Year 2002
Project Area Name
Forward from Prior Year 3.,�'reti l
Bond Type
Year of Authorization
Principal Amount Authorized
Principal Amount Issued L
Purpose of Issue
Maturity Date Beginning Year
Maturity Date Ending Year
Principal Amount Unmatured Beginning of Fiscal Year I
1
Adjustment Made During Year
Adjustment Explanation
Principal Amount Issued During Fiscal Year
Principal Amount Matured During Fiscal Year
Principal Amount Defeased During Fiscal Year
Principal Amount Unmatured End of Fiscal Year I
Principal Amount in Default
Interest In Default
Bond Types Allowed:
Mortgage Revenue;Industrial Development;Commercial Revenue Bond;Certificate of Participation
Non ggertcy Long Term Debts T4 ` r'Page 1 t 1 /2$/Ot7
•
ijv ,KS ws >d vp
- 1
✓+1 C-�r' 0 P' I A i A
..w
^)c1P f_,t!'tS r n� tr {r1i_7pp4- 4 - �1j� } _`•
•
U t"�-+a ,� W .,s- �- "Fjc��_a.. ^.c�-�.-"'°'+' -a`S�""��,a�z' s -'�.`r�� �
�,:- a ren- aV 111We Viral: eThNat t r s ROV9n
_.$z -T'' ..._. ..:'L
Fiscal Year 2002
Protect Area Name Central Project Area
Low/Moderate Special
Capital Project Debt Service Income Housing Revenue/Other
Funds Funds Funds Funds Total
Tax Increment Gross 2,088,402 522,100 ry , issx $2,610,502
(Include All Apportionments)
Special Supplemental Subvention
Property Assessments I I $0
Sales and Use Tax I $0
Transient Occupancy Tax $0
Interest Income I 558,489 I 113,383 175,596 I , $847,468 fI
Rental Income I _ � $0 I
Lease Income I $0 (.
Sale of Real Estate I I $0
Gain on Land Held for Resale I $0
Federal Grants I I $0 I
Grants from Other Agencies I I $0 f(
Bond Administrative Fees $0 1
Other Revenues I 2,525 $2,525
Total Revenues $561,014 I $2,201,785 I $697,696 I $0 1 $3,460,495
•
•
t
' '• = Frier; flj3'.,ift,SIA\0 L':•40-1,5:71
'":. !".--'" •,'"; ; '
• ;• -
-.t - , "• 7.7"
TgirdifirilS4"":"%litaittlfia47113311135:MIONSARTAS
Fiscal Year 2002
Project Area Name Central Project Area
Capital Project Debt Service Low/Moderate Special
Funds Funds Income Housing Revenue/Other .Total
Administration Costs 455,245 51,286 15,994
Professional Services 1,465,888 I I $1,465,888 1
Planning,Survey,and Design
Real Estate Purchases $0 I
Acquisition Expense
Operation of Acquired Property
• Relocation Costs I $0
• Relocation Payments
Site Clearance Costs
• Project Improvement/Construction Costs 70,866 I $70,866
Disposal Costs $0
Loss on Disposition of Land Held for I $0
Resale
•
•
tileiiiii.OW6O-WelatiliaTtaiiiNfiKiliKiKaW;g05:Ki":0,6451Fart-MMEifitiallgiTIMIRSAIERIV.K104;
•jfF 3 _�{:� ��. �SLgJ't[rad.rt ' 11 ..•1 z' t r N_t_r-.�
D�U" Ifi� r
tatemenfo income°alLC� xAendit re �cpendiiGUres =r.1 _
Fiscal Year 2002
Project Area Name Central Project Area
Capital Project Debt Service Low/Moderate Special
Funds Funds Income Housing. Revenue/Other Total
Decline in Value of Land Held for Resale I $0
•
Rehabilitation Costs 1 I $0 �(
Rehabilitation Grants ( $0
Interest Expense 1,079,3811 .I $1,079,381 j
Fixed Asset Acquisitions 999 1 I $999 I
Subsidies to Low and Moderate Income $0
Housing -
Debt Issuance Costs 1 I $0 1
Other Expenditures Including Pass- 1 $0
Through Payment(s)
Debt Principal Payments:
Tax Allocation Bonds and Notes 750,000 $750,000
Revenue Bonds,Certificates of $0
Participation,Financing Authority
Bonds .
City/County Advances and Loans 1 1,599,0371 1 I $1,599,037 f
All Other Long-Term Debt - - I $0
Total Expenditures $1,992,998 I $3,479,704 I $15,994 I $0 I $5,488,696 1
Excess(Deficiency)Revenues over ($1,431,984) I ($1,277,919) I $681,702 I $0 I ($2,028,201)
(under)Expenditures
State rtt of Income d endlts Expends es VT Rage2 ,_ -=; 1�IlZ [02 •
U
i 41 u n t� ,F'... fi ,.�...-,_c�''..,K:`-". , " -I°-,Q01:4-11151,-• 1 :.:,, ,, •
f'.:.
L .-. n k. x I- r -1 � p � . _ l
ai v o'o a t ,1.9! �"D J.' LPYc i ..P_k.. a . P3.7.7,r t
_ ='.tf-'.�"��s`y'--:�=a4��-� �u-,,;�^-z E,.� ^-w_._=• ,Fr ��s e. �� 7 _ 1•:
rvr-�:'.:,y��"'s�ry�r"Eksxry-;�§- .a._ • ,^ '� .:ti�`r:.
`-T�i+.n•---__.+fir=aq _-.a=F w.rare „T.-n' --+�-z. nTE_ ilredrts, tit er 1:=llrarr�cf 610:i ce .�- 'N. `:- -..,,.- .,. _, . . .._.-.,,...L ,
Ar-
. -ey— r �,,, ` Sfaf erlt"Qf I�rCO>�neta p.: . -.. , ,.- - . .. s.
•Fiscal Year 12002
Project Area Name Central Project Area -
Capital Project Debt Service Low/Moderate Special
Funds Funds Income Housing Revenue/Other
Total
$0
Proceeds of Long-Term Debt $0
Proceeds of Refunding Bonds $0
Payment to Refunded Bond Escrow Agent $1,599,037
• Advances from City/County 1,599,037 •
$0
Sale of Fixed Assets ($2,500,000
Miscellaneous Financing Sources(Uses) -2,500,000
1,799,358 $1,799,358
Operating Transfers In $0
Tax Increment Transfers In $1 799 3$$0
Operating Transfers Out 1,799,358 I
Tax Increment Transfers Out
(To the Low and Moderate Income Housing Fund) $0 $900,963)
Total Other Financing Sources(Uses) $900,963 $0 $0
t\
� T' ?• �_ M'
.2 �,.. `
r...._—..p_ T_ _ 42 k �. s " w' R ' R F , s� � a E _ S k y� ,y� " F� 125/02 -S"':.F x v e
�Sfaterse of`rlcomr@ andi ExPe[i1(u resoOt.4 erF po ilig SQtln� . _r 1' 4 t Rge4: i 3 ▪: '1:.4kii t ' f ,A T .4
\rT 'C L .ft I - J` } , �" v t i i. ryh , a J 7_,. '+�a.: a1 Ir�;� r _?:f j::�. . r - ;; .�,,
ieaNt.... .... ^
i Lr
r
.C.- _ i 3.,agyt; 6 ^'sue t/ r "3"'.i U`.'1_'.{ (--U�J°/R.n.� '\�. \r---r-„,s---in Oa,j7.'+h'••.-•Jx^, i-,1 F *43' ''t t .r+'4• ,, j .. :
k,.,^.'_ ....: ... - a C . _a t , a k F 1- ^_f /� 4 y .� I�,{I s y1` , c tff ra a i
C u i
NefiW
k,. •;- -� . f . . , . ,7&,., „pr.'''. a, .:: f.,;;; ,1 X.t tea . .�i N ',Ati i x5--" +h.
.- ; - _,: r Scr� a" - : -W B �Sn ie=mS=r t L bl^,u rcrt y,jfed d - :`_ y - om s � ' n
... -- . ...�a. - 1-_._. ....�.. .■' _._�..�.,v�.T .. .-_ ..
Low/Moderate Special
Capital Projects Debt Service Income Housing Revenue/Other General Long- General i Fixed Total
Fiscal Year 2002 Funds Funds Funds
Funds
•
Equities 's ] 32 32
a2 $8
Investment In General Fixed ,{y 6 W l.-w3;„,„,>_.__k„A --
�J
Assets -5 -. ! , G,6, ? ,, ` ` , $4,284,680
4,045,715 r r -} "'" '
Fund Balance Reserved 238,965 $2,284 680
Ir .a,.^. ,,i- 'at's".,Wit` �','F,;yc ,4.7: ' r ,,__+ •
Fund Balance 18,101 2.432,549
Unreserved-Designated r vµ i $8,669,199
Fund Balance 8,724,956 -3,578,576 3,522,819
Unreserved-U ndesig Hated
Total Equities $8,982,022 ($1,146,027) $7,568,534
$0 $8,232 $15,412,761
Total Liabilities,
Other Credits, and
Equities $0 $20,145,000 $8,232 $39,631,926
$8,991,305 I $2,918,855 f $7,568,534 '
.._. * "_ - --.T. - - .__ ,. _._ ,. ..� - =— nom+/i
rte' a _..,�-�
B�tar,ce,Sheetf L`l b l 1'74 ansl©tLi13:*I Jts`' s :' % ...: _. . ._ ..._ M- .,-.._ . -•--°-'-
p 1- Vii.
i
' t
I ■
•
•
•
•
s' •-•- "'•47"."
L.7-T-72.46.7741;;.th?,,tTi,att,rp,7R,Pgfiqglrrle-MiR-f,rjEp_,9,nU,R,Ure,,S,M_-,,PPITIntaLWAIOjpOtiPePAranSjerSan VR.,j.iit5nief,;1t7=1,31%
Fiscal Year ?.41:•.•)-,-.7-F-F-..0„!,";--A-:=--:,---43:20132-=', •
Operating Transfers In $1,799,358 •
Tax Increment Transfers In $0 •
(— Operating Transfers Out $1,799,358 I
,
•
Tax Increment Transfers Out ' $0
• •
• •
•
•
• •
• •
•
•
•
• •
•
• •
•
' •-"--
g§tOter11.0fitOltISPF004.414POrekilttgOWSUn,191,0ViTZ:42tgaI.RW.it.7.14nIMMRpgp,gtaitq'S-107 .TMa.::`,.. ..,:;.,c41145,1047..M.;1, P2glriFiR5.0.-147.4s.Mpggi
•
•
•
•
Arcadia Redevelopment Agency
Redevelopment Agencies Financial Transactions Report
Statement of Income and Expenditures
Revenues-Consolidated
Fiscal Year 2002
Low/Moderate Special
Captial Project Debt Service Income Housing Revenue/Other
Funds Funds Funds Funds Total
Tax Increment Gross $0 _ $2,088,402 $522,100 $0 $2,610,502 1
Special Supplemental Subvention $0 $0 $0 $0 $0 f
Property Assessments $0 $0 $0 $0 $0
Sales and Use Tax ' $0 $0 $0 $0 $0
Transient Occupancy Tax $0 $0 $0 $0 $0 j
Interest Income $558,489 $113,383 $175,596 $0 $847,468 I
Rental Income - $0 $0 $0 $0 $0 I .
Lease Income $0 $0 $0 $0 $0 i •
Sale of Real Estate $0 $0 $0 $0 $0 I
Gain on Land Held for Resale $0 $0 7 f $0_ $0 I
Federal Grants $0 $0. $0 ! $0 $0
Grants from Other Agencies $0 $0 $0 I $0 $0
1 •Bond Administrative Fees $0 $0 $0 I • $0 $0 i
Other Revenues $2,525 $0 $0 ! $0 $2,525
Total Revenues I $561,014 I $2,201,785 I $697,696 ' $0 I $3,460,495 I
•
Revenues-Consolidated Page 1 11/25/02
Arcadia Redevelopment Agency
Redevelopment Agencies Financial Transactions Report
Statement of Income and Expenditures
Expenditures-Consolidated
Fiscal Year 2002
Low/Moderate Special
Capital Projects Debt Service Income Housing Revenue/Other
Funds Funds Funds Funds Total
III Administration Costs $51,286 ' $15,994 $0 ' $522,525
Professional Services $1,465,888 $0 $0 $0 I $1,465,888
Planning,Survey,and Design $0 $0 $0 $0 l $0 I
Real Estate Purchases $0 $0 $0 $0 I $0
Acquisition Expense $0 $0 $0 $0 ' $0 I
Operation of Acquired Property $0 $0 $0 $0 f $0 I
Relocation Costs $0 $0 $0 $0 I $0
Relocation Payments $0 $0 $0 $0 j $0 I
Site Clearance Costs $0 $0 $0 $0 J $0
Project improvement/Construction I $70,866 I $0 N $0 I $0 I $70,866 I
Costs
Disposal Costs $0 $0 $0 $0 $0
Loss on Disposition of Land Held ' $0 I $0 J $0 1 $0 ' $0
IA for Resale
Expenditures-Consolidated Page 1 11/25/02
•
Arcadia Redevelopment Agency
Redevelopment Agencies Financial Transactions Report
Statement of Income and Expenditures
Expenditures-Consolidated
Fiscal Year 2002
Capital Projects Debt Service Low/Moderate Special Total
Funds • Funds Income Housing Revenue/Other
Funds Funds
A B C D E
Decline in Value of Land Held for I $0 $0 $0 J $0 J $0 i
Resale
Rehabilitation Costs I $0 $0 $0 J $0 $0
Rehabilitation Grants $0 $0 $0 J $0 $0
Interest Expense I $0 $1,079,381 $0 J $0 $1,079,381
Fixed Asset Acquisitions $999 $0 $0 J $0 $999
Subsidies to Low and Moderate I $0 $0 $0 J $0 $0 f •
Income Housing Fund
Debt Issuance Costs I $0 $0 $0 J $0 $0
Other Expenditures Including Pass I $0 $0 $0 J $0 $0 I
Through Payment(s)
•
Debt Principal Payments:
Tax Allocation Bonds and Notes I $0 J $750,000 J $0 J $0 J $750,000 I
• Revenue Bonds and $0 $0 $0 $0 $0
Certificates of Participation
City/County Advances and Loans I $0 J $1,599,037 J $0 J $0 J $1,599,037 f
U.S.,State and Other Long Term Debt I $0 J $0 J $0 J $0 J $0
Total Expenditures $1,992,998 J $3,479,704 J $15,994 J $0 J $5,488,696
Excess(Deficiency)Revenues I ($1,431,984) J ($1,277,919) J $681,702 J $0 J ($2,028,201) 1
Over(Under)Expenditures
Expenditures-Consolidated Page 2 11/25/02 •
Arcadia Redevelopment Agency
Redevelopment Agencies Financial Transactions Report
Statement of Income and Expenditures
Other Financing Sources(Uses)-Consolidated
Fiscal Year 2002
Low/Moderate Special
Capital Projects Debt Service Income Housing Revenue/Other
IIIFunds Funds Funds Funds Total
Proceeds of Long-Term Debt I' $0 I $0 I $0 I $0 I $0
Proceeds of Refunding Bonds I $0 I $0 I $0 I $0 I $0
.,:. Payment to Refunded Bond Escrow I $0 I $0 I $0 I $0 I $0 f
Agent
Advances from City/County I $1,599,037 I $0 I $0 I $0 I $1,599,037
Sale of Fixed Assets . I $0 I $0 I $0 I $0 I $0 1
Miscellaneous Financing Sources(Uses) I ($2,500,000) I $0 I $0 I $0 I ($2,500,000) I.
Operating Transfers In I $0 I $1,799,358 I $0 I $0 I $1,799,358
Tax Increment Transfers In 4�- ' {,� r `" 51r�.;r ri i $0 ^,4 R r„- nl $0
- �'�i� ate'-.r-,.__ F- ..
Operating Transfers Out I $0 I $1,799,358 I $0 I $0 I $1,799,358 1
iiik Tax Increment Transfers Out $0 111,...--,;..,.:,.%:.X' '°' 'k&r� -4' ~a
$ $0 ..>''i`zCYrvri rxd 7-r� 7.. 1-^..4u���"�.;"' WO
(To the Low and Moderate Income
\_ Housing Fund)
Total Other Financing Sources(Uses) I ($900,963) I $0 I $0 I $0 I ($900,963)
Other Financing Sources(Uses)-Consolidated Page 1 11/25/02
Arcadia Redevelopment Agency
Redevelopment Agencies Financial Transactions Report
Statement of Income and Expenditures •
• Other Financing Sources(Uses)-Consolidated
Capital Projects Debt Service Low/Moderate Special Total
Funds Funds Income Housing Revenue/Other
• Funds Funds
A B C D E
Excess(Deficiency)of Revenues and ($2,332,947) I ($1,277,919) I $681,702 I $0 I ($2,929,164) '
Other Financing Sources over
Expenditures and Other Financing Uses
Equity Beginning of Period $11,314,969 I $131,892 I $6,886,832 I $0 I $0
Prior Year Adjustments - $0 I $0 I $0 I $0 I $0
Residual Equity Transfers I $0 I $0 I $0 I $0 I $0 1
Other(Explain). ' $0 I $0 I so I $0 1 so I
Equity,End of Period ( $8,982,022 I ($1,146,027) I $7,568,534 I $0 I $15,404,529
Other.Financing Sources(Uses)-Consolidated Page 2 J 11/25/02
•
•
•
• Arcadia Redevelopment Agency
7 Iii � ` d It �'+jt ! A�Wx �. p WH t - r _ } iftt i1f !;�
';, ...,ik,Efa .� �W�,ta�i . 12e i Fero l iiitl ger�lesP!�kncialgTran iationslteP°,!'Etfs04.'avig �`,`ti) .f..4 `i ..,a1■a:
Detailed Summary of Footnotes For Fiscal Year 2001-02
Forms Column Additional Details Footnotes
•
•
•
•
•
•
•
•
•
•
`j ylJ7 I t r 1• t,�`
.y~}l,'�Cl, il, �tJ#li�Z.1 trill ilia: It �,l'
Footnotes Page 1 11/25/02
•
•
•
• RDA Reporting System- Agency Tnformation Page 1 of 1
California Department of Housing and Community Development SL x�R"a
( 1'
Redevelopment Agency Reporting System
_,N , Agency Information
You are Here:Select Year>Schedule Menu>Agency Information
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select
Year Please use this form to provide current information about ARCADIA RDA
• FAQ
• User Info Address: ;PO BOX 60021
• Print
• Logout City: ARCADIA
County: !LOS ANGELES
State: Cq.._.r
Zip: 91066-6021
Telephone: (626)574-5415 I 0
Extension: _..___.
Fax: (626)447-3309
E-Mail: Jdpenman @ci arcadia.ca.us 1_
Description:
Update
ATTACHMENT 2
https://appl.hcd.ca.gov/asw/RDA/editAgencylnfo.jsp 12/2/02
RDA Reporting System-Area&Activity Page 1 of 1
California Department of Housing and Community Development 1=1.
-„ m #11-1W"
Redevelopment Agency Reporting System ' '
Project Area Selector(Inside/Outside)
You are Here:Select Year>Schedule Menu>Project Area Selector
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select
Year Please select a project area to work on.
• FAQ
• User Info Create a New Project Area or Mere existin. Project Areas(First:scroll existing project
areas to see those that already exist.)
• Print
Work with an existing project area:
• Logout
• CENTRAL PROJECT
• OUTSIDE PROJECT AREA
•
•
Redevelopment Agency Reporting System -Project Area Selector(Inside/Outside)
California Department of Housing and Community Development
https://app l.hcd.ca.gov/asw/R.DA/proj ectAreaServlet.sry?link=Activities 12/2/02
• RDA Reporting System- Proje" Area General Info - • • -• Page 1'of 1
California Department.of Housing and Community Development °rtr"..
Redevelopment Agency Reporting System
General Project Area Information Sch A, p1
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Project Area General Info
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select For Project Area:CENTRAL PROJECT
Year
• FAQ
• User Info 1.a Project Area Information
• Print
1.Year plan for project area was adopted: 1974
• Logout
2.Year that plan was last amended(if applicable):
3. Current expiration of redevelopment plan: 2014
If the redevelopment plan for the subject project area was adopted before 1/1/76,and the agency has
elected to apply all or part of Section 33413,identify the resolution date and scope(elected
provisions).:Help?
Date: (mm/dd/yyyy)*
*Note:If dd for the date is not available assume 01
Scope:
,Saue
Redevelopment Agency Reporting System - General Project Area Information
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/editProjectAreaGeneralInfo.jsp 12/2/02
RDA Reporting System - Char Cr .Name Page 1 of 1
California Department of Housing and Community Development 44 ;pi
o}fi,�
m r j,=%`: '40'1
Redevelopment Agency Reporting System
Project Area Name Change Sch A, p1 H°
You are Here:Select Year>Schedule Menu>Project Area Selector>Proiect Area Activity Menu>Change Name
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select For Project Area:CENTRAL PROJECT
Year
• FAQ
• User Info 1. Project Area Information
• Print b. Use this form to change the name of the current project area.
• Logout
Enter the new project area name:
CENTRAL PROJECT
Ch'a`nge jl
Redevelopment Agency Reporting System -Project Area Name Change
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/editProjectAreaName.jsp 12/2/02
• RDA Reporting System-Merg�D.oject Area Page 1 o 1 •
California Department of Housing and Community Development
;teaw
Prof
j Redevelopment Agency Reporting System '
Merge of existing project areas Sch A, p1 \�
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Merge Project Area
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select For Project Area:CENTRAL PROJECT
Year
• FAQ
• User Info 'I. Project Area Information
• Print c. Merge existing project area(s) by selecting the project area(s)from the list of project area(s).
• Logout
Hint:By holding your Ctrl key while selecting from the list,you can select and unselect any of the project
areas with your mouse.
The project area(s)currently merged into CENTRAL PROJECT follow:
Currently no project areas have been merged.
Select any project areas being merged: PROJECT AREA 1
1:1!0:00
Merge .LI
Redevelopment Agency Reporting System -Merge of existing project areas
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/mergeProjectArea.jsp 12/2/02
RDAReporting System- Change/in Real Property Page 1 of 1 •
California Department of Housing and Community Development
•
= ' a Redevelopment Agency Reporting System ' '/
,,."` ' Change in Real Property Sch A, p1 .AAA
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Change in Real Property
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select For Project Area:CENTRAL PROJECT
Year
• FAQ
• User Info 1. Project Area Information
• Print d. You can add or remove the years in which real property was added or removed from the
• Logout project area.
The current real property changes for UPTOWN follow:
(NOTE: To remove an entry, select the appropriate 'Delete this Entry'.)
Change Real Property in FY:2001/2002 by selecting the buttons.
(NOTE:If no buttons are present, Property has already been added and removed and only
'Delete'will be possible)
` t "fi$Add Real Property °;E 1. Remoue Real Pro pert 4=
2.Affordable Housing Replacement and/or Inclusionary or Production Requirements
(Section 33413)
(NOTE: Optimal reporting can be met by accessing project area screens and activity reporting
screens.)
Redevelopment Agency Reporting System -Change in Real Property
California Department of Housing and Community Development
https://appl.hccl.ca.gov/asw/RDA/selectChangeRealProp.jsp 12/2/02
RDA Reporting System-Hous-;n-Fund Revenues Page 1•of 2 •
„),7;1"-:N California Department of Housing and Community Development a`�a1A.
Redevelopment Agency Reporting System _' "#'
!ate
Housing Fund Revenues & Other Resources Sch A, p2
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity>Housing Fund Revenues
«Previous Page Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin For Project Area:CENTRAL PROJECT
• Select 3. Project Area Housing Fund Revenues and Other Sources Instructions
Year NOTE:
• FAQ Expenditures for debt service(HCD-C(Page 2, Line 4c.)) should be reported on Agency-wide
• User Info Financial Information 4c.
• Print a. Tax Increment
• Logout
(1) 100% of Gross: $2,610,502
(2) Minimum Deposit to Housing Fund (Gross x 20%): P-52271(50-1
(3)Tax Increment Allocated to Housing Fund: $522,100
If less than 20% of the Gross Tax Increment(see (2)above) is being set aside in this project
area in accordance with Section 33334.3(i); identify the project area(s) contributing the
difference in the box below:
Or
Explain below if less than 20% is being set aside for any other reason:
Less:
(4)Amount Exempted* : $0
(5)Amount Deferred* : $0
* If Amount Exempted or Amount Deferred is entered, after you SAVE, you need to go to
Project Area Activity Menu and select Exemption(s)And/Or Deferral(s) to enter Sch A data.
(6)Total Deposit to the Housing Fund
[Calculated from above, (3)- (4)- (5)] $522,100 2�
b. Interest Income: $175,596
c. Rental/Lease Income:
d. Sale of Real Estate: !
e. Grants:
f. Bond Administrative Fees:
g. Repayment of Prior Year Deferrals: $p f
h. Loan Repayments:
i. Debt Proceeds: 1
https://app 1.hcd.ca.gov/asw/RDA/addEditHousingFundRevenues.j sp 12/2/02
RDA Reporting System-Housing Fund Revenues Page 2 of 2
j. Other Revenue:
(Specify)
k. Total Housing Fund Deposits for this Project Area (3a. through $697,696 I;
3.i.):
; Saves
Redevelopment Agency Reporting System - Housing Fund Revenues & Other Resources
California Department of Housing and Community Development
https://app1.hcd.ca.gov/asw/RDA/addEditHousingFundRevenuesjsp 12/2/02
• RDA Reporting System-Dispj''- nents and Losses • . _. . . -• Page 1.of 2 •
Y1.. California Department of Housing and Community Development £„,,,,,.,v,.,_%
a7 Redevelopment Agency Reporting System f' ,r
Displacements and Losses over reporting Year Sch A, p4; Sch B, p1 Sao
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Displacements&Losses
«Previous Page Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin For Project Area:CENTRAL PROJECT
Displacements and Losses successfully saved
• Select
Year 6.Actual Project Area Households Displaced and Units and Bedrooms Lost over
• FAQ Reporting Year
• User Info
a. Redevelopment Project Activity. Pursuant to Sections 33080.4(a)(1) and (a)(3), report by
• Print income category the number of elderly and nonelderly households permanently displaced and
the number of units and bedrooms removed or destroyed that are subject to the replacement
• Logout requirements of Section 33413.
Income Level VL L M AM Total
Households Removed -
4 ? 1 1 i5
Elderly . . _.,_...,*, i
Households Removed - 17 1 2 ! 16
Non Elderly . ..._J ! ,_ ,. _
Households Removed- 11 i 2 0 IF—
Total
IF-1
Units Lost (Removed or
Destroyed, and Required 11 8 1 4 12°°3
to be Replaced)
Bedrooms Lost
(Removed or Destroyed, 111 18 ! 4 23
and Required to be -- - – -
. .......... ....
Replaced)
Units Lost(Above
Moderate: Not Required 0
to be Replaced)
Bedrooms Lost(Above
Moderate: Not Required 1 0
to be Replaced) _.._. m — _______
b. Other Activity. Pursuant to Sections 33080.4(a)(1)and (a)(3), report by income category the
number of elderly and'nonelderly households permanently displaced as a result of activities
other than the destruction or removal of dwelling units and bedrooms reported on above.
Income Level VL L M AM Total
Households Permanently I
Displaced - Elderly I_ ----� M--- ' I---.- - i 0 - .-•-!
Households Permanently I
.__ ! i 0
Displaced - Non Elderly ... . _. ..m._.--:
Households Permanently '
0 { 0 ` �0 0 0
—Displaced -Total --'
c. Identify each replacement housing plan adopted that is related to permanent displacement,
https://appl.hcd.ca.gov/asw/RDA/unitsLostServlet.sry . . . . 12/4/02
RDA Reporting System- Disp' ments and Losses - Page 2 of 2
destruction or removal of dwelling units or bedrooms during the reporting year and identified in
paragraphs in a. and b. above:
Date* Name of Agency Custodian
11/26/2002 Brian Saeki
* Note- Date should be (mm/dd/yyyy)format. If dd for the date is not available assume 01
Note1 - Date and Custodian Name is mandatory for a record; if either is missing, new record
will not be saved and existing record will be treated as a deletion
Note2 -Additional rows will be made available for data entry on Save, for Date/Name of
Agency Custodian
Save
Redevelopment Agency Reporting System -Displacements and Losses over reporting Year
California Department of Housing and Community Development
•
•
https://appl.hcd.ca.gov/asw/RDAJunitsLostServlet.sry 12/4/02
• RDA Reporting System -Hous?hnlds Displaced Page 1 of 1
California Department of Housing and Community Development 46 a;t,
. 4 Redevelopment Agency Reporting System
Estimate of Households Displaced over Current FY Sch A, p5; Sch B, p2 N0
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Households Displaced
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select For Project Area:CENTRAL PROJECT
Year
• FAQ
• User Info 7, Project Area Households to be Permanently Displaced Over Current Fiscal Year
• Print a.As required in Section 33080.4(a)(2), estimate the type and number of households, by
• Logout income category, to be permanently displaced from this project area during the next reporting
period:
Income Level VL L M AM Total
Households Permanently I
Displaced - Elderly 1. _ I --- — -- �•�� ��—�,- _ !
Households Permanently
Displaced- Non Elderly _ 1 7
Households Permanently 0 0 0 0 '
Displaced -Total
b. Identify each replacement housing plan adopted that is related to permanent displacement,
destruction or removal of dwelling units or bedrooms during the next reporting period and
identified in paragraph a. above:
Date* Name of Agency Custodian
* Note- Date should be (mm/dd/yyyy)format. If dd for the date is not available assume 01
Note1 - Date and Custodian Name is mandatory fora record; if either is missing, new record
will not be saved and existing record will be treated as a deletion
Note2 -Additional rows will be made available for data entry on Save, for Date/Name of
Custodian
Sa�e,s�
Redevelopment Agency Reporting System -Estimate of Households Displaced over Current FY
California Department of Housing and Community Development
https://app l.hcd.ca.gov/asw/R.DA/addEditEstimatesHouseDisplaced.j sp 12/2/02
RDA•Reporting System-Rehabilitated Dwelling Page 1 of 1
California Department of Housing and Community Development yp,M�Nr{
4 H(:
x
Fri ° Redevelopment Agency Reporting System d, .
New or Substantially Rehabilitated Dwelling Units Developed Within
This Project Area From Activities of Other Project Area(s)Sch A, p5
You are Here:Select Year>Schedule Menu>Project Area Selector>Proiect Area Activity Menu>Rehabilitated Dwelling
<<Previous
Page Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
For Project Area:CENTRAL PROJECT
• Select
Year
• FAQ 8. Pursuant to Section 33413(b)(2)(A)(v), agencies may choose one or more project areas to fulfill
• User another project area's requirement to construct new or substantially rehabilitate dwelling units,
provided the agency conducts a public hearing and finds, based on substantial evidence,that the
Info aggregation of dwelling units in one or more project areas will not cause or exacerbate racial, ethnic
or economic segregation. If any dwelling units in this Project Area developed to partially or
• Print completely satisfy another project area's requirement to construct new or substantially rehabilitate
• Logout dwelling units, please provide the following:
When was the initial finding adopted? (mm/dd/yyyy)* ....., �.
Identify Resolution# Date Resolution and facts sent to HCD (mm/dd/yyyy)*
Name of Other Project Area VL L M AM Total
(S)**
Select a Project Area L_______ i 1 0
I
Select a Project Area ;a,' � 0
Select a Project Area .l 0
* Note- If dd for the date is not available assume 01
**-mandatory field; if missing, new record will not be saved and existing record will be treated as a
deletion
Note-Additional rows will be made available for data entry on Save
Save
i
Redevelopment Agency Reporting System -New or Substantially Rehabilitated Dwelling Units Developec
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/addEditNewSubRehabDwelling.jsp 12/2/02
• RDA Reporting System- Sales 'f Owner Occupied Units Page 1 of 1 •
California Department of Housing and Community Development
Redevelopment Agency Reporting System
ek, ='t Sales of Owner-Occupied Units Prior to the Expiration of
Land Use Controls Sch A, p6; Sch B, p2
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Sales of Owner Occupied Units
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
For Project Area:CENTRAL PROJECT
• Select Year
• FAQ
• User Info
9. Sales of Owner Occupied Units Inside the Project Area Prior to the Expiration of Lanc
• Print Controls
• Logout Section 33413(c)(2)(A)specifies that pursuant to an adopted program,which includes but is n(
an equity sharing program, agencies may permit the sales of owner-occupied units prior to the
the period of the land use controls established by the agency. Agencies must deposit sale pro(
Low and Moderate Income Housing Fund and within three (3)years from the date of unit sales
funds to,make affordable an equal number of units at the same income level as the units sold.
a. Report any sales of owner-occupied units during the reporting year.
Proceed$ VL L M
Number of units sold in 2001/2002 $0 j T-11 r
b. Report expended funds in the reporting year to make affordable an equal number of i
over the last three years.
Expended$ VL L M
Equivalent to offset unit 2001/2002
sales $
Equivalent to offset unit 2000/2001
i
sales �_,— I
Equivalent to offset unit 1999/2000
$0
sales t i
Equivalent to offset unit 1998/1999
0 i
sales
Sav§1
Redevelopment Agency Reporting System -Sales of Owner-Occupied Units Prior to the Expiration of Land
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDAJaddEditSalesOwnerOccupiedjsp 12/2/02
RDA Reporting System- Construction of Affordable Units Page 1 of 1
California Department of Housing and Community Development
j Redevelopment Agency Reporting System
r,-..,.'` Affordable Units to be Constructed Inside the Project Area
Within the Next Two Years Sch A, p6; Sch B, p2
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Construction of Affordable Units
<<Previous
Page Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
For Project Area:CENTRAL PROJECT
• Select
Year
• FAQ 10.Affordable Housing Units Anticipated To Be Completed During the Next Two Years
• User Pursuant to Section 33080.4(a)(10), report the number of very low, low, and moderate income units
Info state, local, or private source and constructed inside the project area,within the next two years. Id(
agreement and specify the estimated completion date of these future units and the amount of funds
• Print Encumbrances reported on HCD Schedule C, Item 8.Also, for any unencumbered funds budgeted
Schedule C, Item 8 for intended project use, complete as much information as applicable.
• Logout
Name of Execution Est.Date of Sch'C Amt. Sch C Amt. VL
Contractor/Project** Date* Completion* Encumbered Designated
$0 $0
I so ' $
$o $o
*Note-Date should be(mm/dd/yyyy)format.If dd for the date is not available assume 01
**-mandatory field;if missing,new record will not be saved and and existing record will be treated as a deli
Note-Additional rows will be made available for data entry on Save
Save
Redevelopment Agency Reporting System -Affordable Units to be Constructed Within the
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/addEditConsAffordUnits.jsp 12/2/02
• RDA Reporting System- Se1ec"'-oject -Page 1 of 1..-
California Department of Housing and Community Development
Redevelopment Agency Reporting System _
Af
r Z. Project Selector
M D�
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Project Selector
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select For Project Area:CENTRAL PROJECT
Year
• FAQ
• User Info Please select a program/project to report.
• Print Create a New Program/Project. (First:scroll existing projects to see if already exists.)
• Logout
No Active projects for this Project Area
•
Redevelopment Agency Reporting System -Project Selector
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDAJselectProject.jsp. 12/2/02
RDA Reporting System-Displacements and Losses Page 1 of 2
,,, California Department of Housing and Community Development �� ® o
;� Redevelopment Agency Reporting System
P ,. Displacements and Losses over reporting Year Sch A, p4; Sch B, p1
You are Here:Select Year>Schedule Menu>Project Area Selector>Prolect Area Activity Menu>Displacements&Losses
«Previous Page Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin For Project Area:OUTSIDE PROJECT AREA
• Select 6. Actual Project Area Households Displaced and Units and Bedrooms Lost over
Year Reporting Year
• FAQ
• User Info a. Redevelopment Project Activity. Pursuant to Sections 33080.4(a)(1)and (a)(3), report by
income category the number of elderly and nonelderly households permanently displaced and
the number of units and bedrooms removed or destroyed that are subject to the replacement
• Print requirements of Section 33413.
• Logout Income.Level VL L M AM Total
Households Removed -
Elderly
0.... �_�
Households Removed -
Non Elderly ..-. ' -0 1
Households Removed - 0 I 13-1 0 0 ' 0
Total
Units Lost(Removed or
Destroyed, and Required
to be Replaced)
Bedrooms Lost
(Removed or Destroyed q y I ?
Removed
and Re ulred to be
Replaced)
Units Lost(Above
Moderate: Not Required
to be Replaced)
Bedrooms Lost(Above
Moderate: Not Required 0
to be Replaced) -
b. Other Activity. Pursuant to Sections 33080.4(a)(1) and (a)(3), report by income category the
number of elderly and nonelderly households permanently displaced as a result of activities
other than the destruction or removal of dwelling units and bedrooms reported on above.
Income Level VL L M AM Total
Households Permanently
Displaced - Elderly i
Households Permanently
Displaced - Non Elderly
Households Permanently 0 ; 0 0 0 0
Displaced -Total
c. Identify each replacement housing plan adopted that is related to permanent displacement,
destruction or removal of dwelling units or bedrooms during the reporting year and identified in
https://appl.hcd.ca.gov/asw/RDA/addEditDisplAndLossesjsp 12/2/02
RDA Reporting System-Displacements and Losses rage 2 of 2
paragraphs in a. and b. above:
Date* - Name of Agency Custodian
*Note-Date should be (mm/dd/yyyy)format. If dd for the date is not available assume 01
Note1 - Date and Custodian Name is mandatory for a record; if either is missing, new record
. will not be saved and existing record will be treated as a deletion
Note2-Additional rows will be made available for data entry on Save, for Date/Name of
Agency Custodian
' Save:
Redevelopment Agency Reporting System -Displacements and Losses over reporting Year
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/addEditDisplAndLossesjsp 12/2/02
RDA Reporting System - Households Displaced - Page 1 of 1
California Department of Housing and Community Development spoir,r_,,
t Redevelopment Agency Reporting System � +
�
Estimate of Households Displaced over Current FY Sch A, p5; Sch B, p2
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Households Displaced
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select For Project Area:OUTSIDE PROJECT AREA
Year
• FAQ
• User Info 7. Project Area Households to be Permanently Displaced Over Current Fiscal Year
• Print a. As required in Section 33080.4(a)(2), estimate the type and number of households, by
• Logout income category, to be permanently displaced from this project area during the next reporting
period:
-Income Level VL L IVI AM Total
Households Permanently I 0
Displaced- Elderly - -- ..
Households Permanently
Displaced - Non Elderly
0
Households Permanently 0 0�. 0 0
Displaced -Total --- --- _ _-• 3---------
b. Identify each replacement housing plan adopted that is related to permanent displacement,
destruction or removal of dwelling units or bedrooms during the next reporting period and
identified in paragraph a. above:
Date* Name of Agency Custodian
* Note- Date should be (mm/dd/yyyy)format. If dd for the date is not available assume 01
Note1 -Date and Custodian Name is mandatory for a record; if either is missing, new record
will not be saved and existing record will be treated as a deletion
Note2-Additional rows will be made available for data entry on Save,for Date/Name of
Custodian
1 Save
Redevelopment Agency Reporting System - Estimate of Households Displaced over Current FY
California Department of Housing and Community Development
https://app 1.hcd.ca.gov/asw/RDA/addEditEstimatesHouseDisplaced jsp 12/2/02
. RDA Reporting System- Sales of Owner Occupied Units -. Page 1 of 1
•
California Department of Housing and Community Development
purir..:t.
,t44 .477„ Redevelopment Agency Reporting System
▪i �s1I
4Z-...14'' Sales of Owner-Occupied Units Prior to the Expiration of
Land Use Controls Sch A, p6; Sch B, p2
You are Here:Select Year>Schedule Menu>Project Area Selector>Proiect Area Activity Menu>Sales of Owner Occupied Units
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
For Project Area:OUTSIDE PROJECT AREA
• Select Year
• FAQ
• User info
9. Sales of Owner Occupied Units Outside the Project Area Prior to the Expiration of Lai
• Print Controls
• Logout Section 33413(c)(2)(A)specifies that pursuant to an adopted program,which includes but is rn
an equity sharing program, agencies may permit the sales of owner-occupied units prior to the
the period of the land use controls established by the agency.Agencies must deposit sale pros
Low and Moderate Income Housing Fund and within three (3)years from the date of unit sales
funds to make affordable an equal number of units at the same income level as the units sold.
a. Report any sales of owner-occupied units during the reporting year.
Proceed$ 1 VL L M
Number of units sold in 2001/2002 $0 ri
b. Report expended funds in the reporting year to make affordable an equal number of
over the last three years.
Expended$ VL L M
Equivalent to offset unit 2001/2002
q $ } �
sales
Equivalent to offset unit 2000/2001 ..
$0 II
sales F
Equivalent to offset unit 1999/2000
$0
sales
Equivalent to offset unit 1998/1999 $0 1
sales i
1;Save<<l
Redevelopment Agency Reporting System -Sales of Owner-Occupied Units Prior to the Expiration of Land
California Department of Housing and Community Development
https://appl.hed.ca.gov/asw/RDAJaddEditSalesOwnerOccupiedjsp . 12/2/02
RDA Reporting System- Construction of Affordable Units Page 1 of 1
California Department of Housing and Community Development
71 Redevelopment Agency Reporting System
Affordable Units to be Constructed Inside the Project Area
Within the Next Two Years Sch A, p6; Sch B, p2
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Construction of Affordable Units
«Previous
Page Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
For Project Area:OUTSIDE PROJECT AREA
• Select
Year
• FAQ 10.Affordable Housing Units Anticipated To Be Completed During the Next Two Years
• user Pursuant to Section 33080.4(a)(10), report the number of very low, low, and moderate income units
Info state, local, or private source and constructed inside the project area,within the next two years. Id(
agreement and specify the estimated completion date of these future units and the amount of funds
• Print Encumbrances reported on HCD Schedule C, Item 8.Also, for any unencumbered funds budgeted;
Schedule C, Item 8 for intended project use, complete as much information as applicable.
• Logout
Name of Execution Est.Date of Sch C Amt. Sch C Amt. VL
Contractor/Project** Date* Completion* Encumbered Designated
American Senior Living 01/31/2003 06/30/2004 $0 I $0 ; 11
I _. J $0 $0 _I
Ern
i
•
$0 f' $0
$o .... _..__._.w' $0. __
*Note-Date should be(mm/dd/yyyy)format.If dd for the date is not available assume 01
**-mandatory field;if missing,new record will not be saved and and existing record will be treated as a deli
Note-Additional rows will be made available for data entry on Save
Sauej'1
Redevelopment Agency Reporting System -Affordable Units to be Constructed Within the
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/addEditConsAffordUnits.jsp 12/2/02
RDA Reporting System - Select Project -•: -. ,- Page 1:of 1
California Department of Housing and Community Development
ti 717y1n. Redevelopment Agency Reporting System tj K
Project Selector
You are Here:Select Year>Schedule Menu>Project Area Selector>Project Area Activity Menu>Project Selector
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select For Project Area:OUTSIDE PROJECT AREA
Year
• FAQ
• User Info Please select a program/project to report.
• Print Create a New Program/Project. (First:scroll existing projects to see if already exists.)
• Logout
No Active projects for this Project Area
Redevelopment Agency Reporting System -Project Selector
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/selectProject.jsp 12/2/02
RDA Reporting System -Agency Wide Financials Page 1 of 2 .
California Department of Housing and Community Development
fej-P ri t a m r �
\,.„4.- Redevelopment Agency Reporting System
rt
Agency-wide Financial Information-Sch C, p1-4 ; }
You are Here:Select Year>Schedule Menu>Agency Wide Financials
«Previous Page Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin Low&Moderate Income Housing Funds
Report on the"status and use of the agency's Low and Moderate Income Housing Fund." Most
• Select information reported here should be based on that reported to the State Controller.
Year
• FAQ 1. Beginning Balance: $6,886,832
• User Info
a. State the Amount of adjustment(s)(indicate whether positive or
negative)and Explain it:
• Print
:Deferred Set-Aside (negative adjustment
• Logout
F
b. Total Adjustments: 1$-4,045,7-15
c.Adjusted Beginning Balance: $2,841,117
2. Receipts and Housing Fund Revenues
a.All Project Areas Total Deposits: $697,696
b. Specify Other Resources not reported on Schedule HCD-A(s):
c. Total Housing Fund Revenues : 1$0
3. Total Resources :[Line lc+2a+2c] $3,538,813
4. Expenditures Subtotal: Sch C, p1-3#4 $15,994
5..Net Resources Available: $3,522,819
6. Encumbrances and Unencumbered Balance
a. Encumbrances (End of Year):Help? j$0
b. Unencumbered Balance (End of Year): 1$3,522,819
7. Designated/Undesignated Amount of Available Funds:
a. Unencumbered Designated: $p
b. Unencumbered Undesignated: $3,52519
https://appl.hcd.ca.gov/asw/RDA/addEditAgencyFinancialsjsp 12/2/02
RDA Reporting System-Agency Wide Financials . . ,.rage_2 of 2 ..
8. Other Housing Fund Assets: Sch C, p3#6 $4,045,715
9.Total fund equity: 1$7,568,534
10. Reporting Year End Unencumbered and Adjusted Balancelnstructions
a. Unencumbered Balance (End of Year):[Page 3, Line 6,b] 1$3,522,819
b. If you are eligible to adjust the Unencumbered Balance (End of Year), identify the type and
amount of the adjustment.
(1) Debt Proceeds: $0
(2) Land Sales: '$0
c. Adjusted Unencumbered Balance: $3,522,819
11. Excess Surplus Tax Increment Deposit Calculation:
1998/1999-Tax Increment: $517,932
1999/2000-Tax Increment: $537,995
2000/2001 -Tax Increment: $519,535
Reporting Years Tax Increment: $522,100
Sum of 3 Prior Years'and Reporting Year Tax Increment: $2,097,562
12. Your calculated excess surplus for next fiscal year is: $1,425,257
Your current excess surplus, calculated last fiscal year, is: $745,474
�Sa�e
Redevelopment Agency Reporting System -Agency-wide Financial Information
California Department of Housing and Community Development
https://app l.hcd.ca.gov/asw/RDA/addEditAgencyFinancials.j sp 12/2/02
RDA Reporting System -Units Benefited Page 1 of 1
nc,
California Department of Housing and Community Development
Redevelopment Agency Reporting System e'
TWO'
Units Benefited from Onsite/Offsite Improvements Sch C, p6 N°°
You are Here:Select Year>Schedule Menu>Units Benefited
<<Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select
Year 13. Miscellaneous Uses of Funds
• FAQ If On/Off-Site Improvement amounts are reported in Expenditures, pursuant to Section
• User Info 33080.4(a)(6), report the total number of very low-, low-, and moderate-income households
that directly benefited from expenditures for onsite/offsite improvement,which resulted in new
• Print construction, rehabilitation, or the elimination of health and safety hazards. (If Sch C line 4e
does not show expenditures for improvements, no units should be reported here.)
• Logout
Income Level VL L M Total
I IInn
Construction 119_
!Rehabilitation 0
'Health and Safety 0
Save ri
Redevelopment Agency Reporting System - Units Benefited from Onsite/Offsite Improvements
California Department of Housing and Community Development
https://appl.hed.ca.gov/asw/RDA/addEditUnitsBenefitedjsp 12/2/02
RDA Keportmg System-Future Development sites rage 1.01
California Department of Housing and Community Development
` �' Redevelopment Agency Reporting System
y7
Future Development Sites Sch C, p6
You are Here:Select Year>Schedule Menu>Future Development Sites
<<Previous
Page Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select 14. Land Held for Future Housing Development
Year If the agency is holding land for future housing development(Sch C, Line 6a), summarize here the
• FAQ including acreage, date of purchase, zoning, and anticipated start date for the housing development
• User acreage in tenths, not square footage)
Info Estimated Start
Site Name* No.of Acres Zoning Purchase Date Date
• Print 117 E.Alta Street OA PR-3 J 12/19/1996 I Curi
• Logout
i0
0 i
*-mandatory field;if missing,new record will not be saved and existing record will be treated as a deletion
Note-Additional rows will be made available for data entry on Save
r' "r s
Save
'
Redevelopment Agency Reporting System - Future Development Sites
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/addEditFutureDevSites.jsp - 12/2/02
RDA Reporting System-LM1HF Deposits/Withdrawals • Page 1 of 1
California Department of Housing and Community Development
MAO Redevelopment Agency Reporting System
"` " Deposits to or Withdrawal from the LMIHF Sch C, p7
You are Here:Select Year>Schedule Menu>Deposits/Withdrawals from LMIHF
• Previous
Page Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin •
• Select 17. LMIHF Deposits/Withdrawals
Year Pursuant to Section 33080.4(a)(11),the description of the agency's activities shall include the date
• FAQ deposits and withdrawals of moneys deposited to and withdrawn from the LMIHF during the reportir
• User deposit and withdrawal information must be promptly submitted to HCD upon request, and/or mad(
Info member of the public upon request.
If your agency made any deposits to or withdrawals from the LMIHF, identify the document(s)descr
• Print activities by listing for each document, the following:
• Logout Document Name* Document Date* Custodian Name* Custodian Phone Wher
r-,==
*-mandatory field;if missing,new record will not be saved and existing record will be treated as a deletion
Note-Additional rows will be made available for data entry on Save
Savej�;'
Redevelopment Agency Reporting System -Deposits to or Withdrawal from the LMIHF
California Department of Housing and Community Development
https://app 1.hcd.ca.gov/asw/RDA/addEditDepositsWithdrawls.j sp 12/2/02
RDA Reporting System- Misc. Information ' rage i or z
California Department of Housing and Community Development
< f Redevelopment Agency Reporting System
Misc Information Sch C, p6,7
You are Here:Change Year>Schedule Menu>Misc Information
«Previous Page Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin 15. Use of the Housing Fund to assist mortgagors
• Select Section 33334.13 requires agencies which have used the Housing Fund to assist
Year mortgagors in a homeownership mortgage revenue bond program, or home financing
• FAQ program described in that Section, to provide the following information:
• User Info a. Has your agency used the authority related to definitions of income or family size
adjustment factors provided in Section 33334.13(a)?
• Print Yes 0 No ° NA
• Logout
b. Has the agency complied with requirements in Section 33334.13(b) related to
assistance for very low-income households equal to twice that provided for above
moderate-income households?
Yes C No C NA re)
16. Use of non-LMIHF funds as matching funds for the Federal HOME or HOPE program
If the Agency used non-LMIHF funds as matching funds for the Federal HOME or
HOPE program during the reporting period, please indicate the amount of non-LMIHF
funds that were used for either HOME or HOPE program support.
J��Q
HOME lw9�______. ,HOPES-_
18. Use of Other Redevelopment Funds for Housing
Please briefly describe the use of any non-LMIHF redevelopment funds (i.e.,
contributions from the other 80% of tax increment revenue)to construct, improve,
assist, or preserve housing in the community.
19. Resource needs
What additional training, information, authority, or other resources would help your
agency more quickly and effectively use its Housing Funds to increase, improve, and
preserve affordable housing?
!Remove Prevailing Wage (AB975) requirement for Affordable
production. _ =
https://app 1.hcd.ca.gov/asw/RDA/addEditMiscInfo.j sp 12/2/02
RDA Reporting System -Misc. Information Page 2 of 2
ays
V
i Sfir„>r1
Redevelopment Agency Reporting System -Misc Information
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/addEditMiscInfo.jsp 12/2/02
, RDA Reporting System- Increased Inclusionary Obligations rage i or I
, _..� California Department of Housing and Community Development
Redevelopment Agency Reporting System
'"` Agency's Increased Inclusionary Obligation Sch E
You are Here:Select Year>Schedule Menu>Increased Inclusionary Obligation
Previous Page
Agency:ARCADIA RDA Fiscal Year:2001/2002 Prepared by: Don Penman
• Admin
• Select Year
• FAQ Summary of Agency's Inclusionary Obligations For All Inside Project Area Activities Di
• User Info Year
• Print Part I
[H&SC Section 33413(b)(1)] AGENCY DEVELOPED
• Logout
1.New Units Developed by the Agency
I2. Substantially Rehabilitated Units Developed by the Agency
3. Subtotal-Baseline of Units Developed by the Agency(add lines 1 &2)
4. Subtotal of Inclusionary Obligation Accrued this Year for Units Developed by the Agency(Line 3
5. Subtotal of Inclusionary Obligation Accrued This Year for Very-Low Income Units Developed by
Agency(Line 4 x 50%)
Part II
[H&SC Section 33413(b)(2)]NONAGENCY DEVELOPED
6.New Units Developed by Any Person or Entity Other Than the Agency
7. Substantially Rehabilitated Units Developed by Any Person or Entity Other Than the Agency
I8. Subtotal-Baseline of Units Developed by Any Person or Entity Other Than the Agency(add lines
9. Subtotal of Inclusionary Obligation Accrued this Year for Units Developed by Any Person or Entit
Than the Agency(Line 8 x 15%)
10. Subtotal of Inclusionary Obligation Accrued This Year for Very-Low Income Units by Any Perso
Entity Other Than the Agency(Line 9 x 40%)
Part III-Totals
11.Total Increase in Inclusionary Obligations During This Fiscal Year(add lines 4 and 9)
12.Total Increase in Very-Low Income Units Inclusionary Obligation During This Fiscal Year(add 1
and 10)NOTE:LINE 12 IS A SUBSET OF LINE 11
Redevelopment Agency Reporting System -Summary of Agency's Inclusionary Obligations For All Inside F
California Department of Housing and Community Development
https://appl.hcd.ca.gov/asw/RDA/showAgencylncluObligationsjsp 12/2/02
o.bq®-yo, -,,
:---,
fl s, ,A, , it . Or,
P9 II staff report
kii i I arcedia redevelopment agency
DATE: December 17, 2002
TO: Chairperson and Agency Board
FROM: S�'Don Penman, Deputy Executive Director
,By: Peter P. Kinnahan, Economic Development Aaninistrator
Prepared by: Brian Saeki, Management Analyst
SUBJECT: Design Review— 55 W. Huntington Drive
Recommendation: Approve
SUMMARY
The Applicant is proposing to construct a 2,644 square foot addition to the southeast
corner of the new car showroom.
The Planning Commission at their December 10, 2002 meeting, approved Conditional
Use Permit (CUP) 02-020 for this two-story addition, the Architectural Design Review for
the building, and revisions to CUP 01-010 regarding signs, fences, gates and
landscaping for the overall site. _
- BACKGROUND
WORK
PROPOSED: Construction of a 2,644 square foot addition to the southeast corner
of the new car showroom at 55 W. Huntington Drive
APPLICANT: Rusnak/Arcadia
55 W. Huntington Drive
Arcadia, CA 91006
LOCATION: 55 W. Huntington Drive (Location Map, Attachment No. 1)
EXISTING .
LAND USE: The site is developed with a new and used car dealership and
automobile service center.
ZONING: C-2/General Commercial, and the subject property is in the Central
Redevelopment Project.Area
GENERAL PLAN
DESIGNATION: Commercial
LASER IMAGED
4 L.z . q .d, --re
Design Review
Page 2
December 17, 2002
SURROUNDING LAND USES AND ZONING:
North: Office bldg. occupied by a private school —zoned C-2
Northeast: Church —zoned CBD
East: Restaurant, Self-Storage & Elk's Lodge—zoned CBD
South: County Park—zoned S-2
Southwest: Cocktail Lounge —zoned C-2
West: Restaurant—zoned C-2
Northwest: Single-family residences —zoned R-1
PURPOSE OF USE AND DESIGN REVIEW
The purpose of the Agency's Design Review.is to ensure that proposed projects meet
adopted City and Agency standards and design guidelines based upon the following
criteria:
1. The general use and design considerations, including the character, scale, and
quality of design are consistent with the Redevelopment Plan, the Zoning Ordinance,
and adopted use and design guidelines;
2. The use and architectural design of structures and their materials and colors are
visually compatible with surrounding development and improvements on the site,
and design.elements (i.e., screening of equipment, exterior lighting, signs, awnings,
etc.) have been incorporated to further ensure the compatibility of the structures with
the character and uses of adjacent development;
3. The location and configuration of structures are compatible with their site and with
surrounding sites and structures, and do not dominate their surroundings to an
extent inappropriate to their use; and
4. The use, design and layout of the proposed project will not unreasonably interfere
with the use and enjoyment of neighboring existing or future development, and will
not result in vehicular and/or pedestrian hazards. -
ANALYSIS
A. DESIGN FEATURES
The Applicant, Rusnak/Arcadia, has prepared and provided a colored elevation of the
addition for staffs review. It is available for review in the Economic Development Office
and will be on display at the Agency meeting of December 17, 2002.
The proposed addition to the new car showroom will be at the southeast corner of the
subject property and across Morlan Place from Rod's. The addition will be 25 feet tall
with 1,828 square feet of ground floor space and an 816 square foot mezzanine. The
Design Review
•
Page 3
December 17, 2002
front of the ground floor will be used to display new automobiles, and the rear portion
will be for offices. The mezzanine will be for open offices.
The showroom addition has been designed to fill in an open area at the southeast
corner of the site. The addition is intended to be the main entrance for the new car
dealership and as such will be a focal point. The addition will be curved and oriented to
the southeast. The ground floor will be fully glazed, except for the rear office area. The
exterior will be finished with "Alucobond" metal panels similar to the fagade of the
existing showroom, except that the color of the addition will be black, and a 36-inch
high, brushed stainless steel "RUSNAK" sign will be above the southeast facing
doorway.
Staff has suggested that the addition match the existing showroom (i.e., "Champagne
Metallic" colored panels). However, the architect explained that the chrome-on-black
color scheme matches the RUSNAK logo, and that a bold architectural statement is
necessary because this corner of the site is not readily visible, especially to westbound
traffic, because of the Arcadia Storage building and the extended roofline of Rod's
Restaurant.
Staff recommends that the Applicant provide a sample of the black "Alucobond" to the
Development Services Department and be subject to final approval by the Deputy
Executive Director/Development Services Director.
Other Requirements
The showroom addition and the new car sales portion of the site shall comply with all
building and safety measures determined to be necessary by the Building Official and
Fire Marshall, and shall be subject to review for, and compliance with all applicable and
necessary National Pollutant Discharge Elimination System (NPDES) provisions as
determined by.the Public Works Services Director.
B. STAFF CONDITIONS OF APPROVAL
• The building colors and materials shall be consistent with the colored elevation
dated 06/18/02 and the plans (Attachment 2 —dated 09/19/02).
• The trash enclosure gate shall be constructed of metal and be painted to match the
buildings.
• The Applicant shall comply with ARA Reso. 126 - which approves this design review
for a period of one year.
•
Design Review
Page 4
December 17, 2002
ENVIRONMENTAL FINDINGS,
This project is categorically exempt from the requirement of the California
Environmental Quality Act per Section 15303(c).
RECOMMENDATION
THAT THE ARCADIA REDEVELOPMENT AGENCY APPROVE THE DESIGN
REVIEW FOR 55 W. HUNTINGTON DRIVE SUBJECT TO THE CONDITIONS.
Approved:
William R. Kelly, Executive Director
Attachments: 1. Location Map
2. Plans for 55 W. Huntington Drive, dated 09/19/02
•
. . _
r - ,
_____________/
-
I I E ' __
.......--
i
i L W
, r
i
i
' z
��''
L W
',i°� / Q
i
,, ORLAN PLACE
0 �(/
Q
® 42- 1
1
a _ i Z r
L -_ NOT TO SCALE /
_T /
1
W ; / Q
LQ ---1 �r '/ Z
Ul r
_ J � ` '/
HUNTINGTON DRIVE
co,,,, / /
Location Map - 55 W. Huntington Drive
N TH )
NO SCALE ATTACHMENT 1 12/09/02
Nn'eHi&41F DAM SRE RAN-♦TIELA1 C/)RTRA!ICO TASTES 017 CF ACAIL FOARNNG Q DEIST WRCNT OTT OF A(1CADIA ERIE DFPA...F..T PLAN 0180(48109
• SEnxcrs-0P 01-mo
TOTAL STE AREA: 161925 SOW19 FEET(SF.) 3.81 AOE.S 1. 2I8&8!0 I. O AIL BI1DIHu WM 2500 SCUM FEET INSTALL
TIE UPPER APPROACH AND WIER TREAD OF EA01 STAR L BAEDM1 8 FREE-SMNOFD 9ENS 11101X€ A tFPA 13(1996 EO9ON)MFIWA1IO FIRE • _
TOM BIF,I 910 AM. 39123 SE.(90055) SEPARATE PEROT•AND ARE ABJECT TO 880160X0 SWIM ALL KM RUST 90 DOE BY
SHALL BE YAKKED BT A SMP 90 OENnY CONTRASTING
ARCHITECTURAL MON REVIEW 8 APPROVAL BY A LKf115ED C-16 C 110108ER ALL 88FRIORR
PARKINS RTO�UM' OFF-STREET PARNNC CUSTOR6&EYPLOIEES wan. CCL90 AT(EAST 2-N01E4 9DE PLACID PARALLEL TO HEMS SUE BE 0001 RESPONSE TYPE HEADS -
}j�DR ARD NOT YORE THAN 1-NOR TRW TIE NOSE CF THE PLATONIC 8 OEV7CPYU7T SERVICES(PASS)
TOTAL DEDICATED 01 SHOWN. Si4O3 TOTAL 5110'90 LANDING THE STMP SHALL EC OF WIFRUl ALL 3RD VICE NTH I WORK SHALL BE DOE N •
THAT IS AT LEAST AS AP RE1STMNT AS TIE OM R 2. CATES ARE meet R 8 was NTH WOUGENCE 8 ACCORDANCE V CA NAPA 24,
ACCE59BLE SPICES. 2-SPACES BOLDED II TOTAL O. SMQL W1E5 ARE 70[E REPLACED AM I9DINi1T-TOOL ARCAIYA 1461�AL CODE(ARIL)31(313 ..
(NOTE TABLE LIB-6,CBC-IBC 1999 ACCESS SPACES MOMS SECTION 11331.11 FONOIG 8 W1ES 90 CONCEALED M A LIMNER 2. THE AUT1IATC FFE 58x1111 SYSTEM RUST BL /
} 9E5ECT TO REVIEW APPROVAL 81 PASS ANY YOBTOED BY A CBMOAL STATION.A CERTFF38
26-50 9'ACES PEOUIE6:-AEYSSSMr SPACES) ALL TREAD SURFACES SHALL BE SEP RESISTANT. BARBED AND/OR RAZOR IIRE IS TO BE REMOVED.
ROPY CF THE CENTRAL STATION YOFTOWD .R•1`P� ./, \ '10e°
prvsE 1 came PRE-O471ED SALES 1L4AFEER-EXPOSED STAIRS Q TIER APPROAOES SHAH CONTRACT SHALL BE PRESFNYD 11107E RACAL \
BE COWED SD DUO-WATER VAL NOT ACCUMULATE 90 1 LATECMNO AT FEW(4)8 CASINO(E)ALFAS OCCUPANCY CAN BE GRANTED. �C� ••^'..�- NEW CAP
TYPE CF COsTRICIIO! II-11 (TABLE 5-8.®f IBC 1998k THE IRMO S EACE".s TREADS SHALL HAVE A SYO0M SHALL 6T.PROWEO PER OAP BOt-01a 5.1E *110 311135 i '
FORDED 90 OAT1EBFD 1100510 EDGES AHD No RESIIADOI TIRO A DETAILED LANDSCAFNG d • , iuvElvroR
MOPE Ems AT THE NOSES&111 NO9D AWL NOT ROWT190 PUN 181 DE SUBMITTED MR RENEW Q 3, PROVIDE A 0188 BOX 90 BOXES RR AQES_'TO 5.-F • •
(durum 8 10.o9D SF./2-STORES) APPROVAL BY D.S.O. ANY TRESTRCTED ALFAS Tv...,
PROJECT YORE THAN t�••NOI PAST THE FART O'TIE .
' AMOS SOUAIE FOOTAGE GROSS: IMAM:
ROM BELOW CALF.FE 000E 903 .• �C+ A
swim 113341.11 8 1118452 4. UNDID STAIDM05 AT THE STE SHALL BE a P: /
P�RIMirnE SMOGS SUBJECT TO 4. PROVIDE LOIOD&SETS FOR FOE LANES RYA y
TOTAL: 1,068 SF. 943 Si. AU.STEPS SHALL HAVE mow T 11 N@IT 8 RENEW 8 APPROVAL BY P0S ANC 31502 1.1p �' •
LRAM TREAD BASINS CONASTENT VON SECOW SEE M.TRW SOFOIAL REND..S(YS90APEEf. y,:
. (NOTE meow DDOOPAL CC 3115.11 DOES NOT APPLY.BUELL 6 11384.STAR WADS S1AU.90 x0 LESS DIAN / (E)SCRfENEL
9X11 A13 1 01111885 SHALL W CREAM TO OPERATE TIE AUTO ,!r,/ I./
LESS THAN 2.700 SOUR[FEEL) 11-NOES BEEP,WASTED FROM DAR TO RISER(NOT pt�¢@0 REPAR GARAGE.STORE FLAI1UEEE AND '.
RNWAIED A PROJECTED NTLAD F 9p�1j,WS'R3 5. c9 1089 3*905 FEUE FCR AL ITC 031BITSTIBLE LIMOS.AND TO DO HOT MIOBE. ,, 4 (CYCLONE)
PRAT-2 MOTO MOWS OUTER SHALL BE 4 m 7-14915.BU1 0 ORM WON OI to KEW a APPROVAL BY CALF.FIRE 000E 105 •
ANY OVEN RIGHT.OPEN RISERS ARE NOT PERMITTED. PASS '
TYPE a Gu1s4I4Tn[ V-N (TABLE 5.-8.CDC-WC 1998k SECTION 113394.5] 6 f5 SUB,ECT ro fEWEW Q 0. NO NA7A1D0115 YAIEHALS 9111.BE STORED AND/OR i� ,m .V7
uSD 81101 DC BLFEDNGS tam 3-0 COOED ITC `� 43
ICE OCCIPANCn B ( B DO SF/2-STORES) 2 SITE PAM- TRAWL;-MAW; • AL QUANTITIES USTED N We TABLES 3-D Q 3-1. .•• ,(,�'� e 4.
5-2 (12000 SF./2410810) WALKS&SDL91A513 SUB•ECT TO THESE REpUTpHS 7. A RARE I 50FDUL X90 601111115 QPRIX-CPS 7. awn X90 TIE PRE-GRAD SAILS Q CAR HASH rl 09.
5-3 ( 0.050 5/2-01001) ftT . .
SHALT.HAZE A CO1111AIOR=ION SURFACE NOT (NOT MIMED 90 HUNS NOTON DR)WI.BE BUIONaS ALL TUMOR STRICTURES AND ME cc M1
OCQIPANCY APARA0OC (TABLE 3-B.9041BC 1998k NTER IPIED UT SEEPS 01 BY 1050'S OUNCE N PROVED R R APPROVAL BY THE 9.SD.NEVI CANS PROVED tt111WA50 . ` ''li • 1 ALE,
O•
B 85-2 HN&) 11111 DEMO){-4101,AND 1X901 BE A 1000H OF 8. A RAN PoR NO PUBLIC ADOFFS..^StS101 AND/0R FIRE SR PEWR YS PERY15 SHALL EC - ,,p�"r0P (PI o
B 8 5-3 (1-HOUR/OP99DSt 80-WWIES) 46-NOHS NOT.SIFAOS SHALL BE SP-RE9SWR �O W1 EC 40548(D FOR REOYUD. i 4 .. 'R' • 'o
S-2&S-3 (1-NDUR/OPERNOSe 60-wu1ES) Es IMAM EOWL m A 1HDw APPROVAL BY D.S.D. + • 5. c . . `,L 0
SALTED RASH.ARMOR SQUARE FOOTAGE: CROSS USEABLE: - ACO21 113307 • .• �‘ {N 1, ��..
•B Q S-2 5,665 S.F. 3330 SF ALL WARNS HEM C 4101)40 90AOENIS SHALL LAVE ,
5-3 3.456 SF. 3279 SF. LEW.AREAS AT LEAST 5-FEET N LEINGM AT NIERYMS ` I9.
CR.LEVEL: 6121 Sr. 8.809 SF. Cr AT LEAST EMERY 100-FEET. SEMEN 11338.7.6 V� ,L( ,r P.C.C.APRON
1EIIM@7E: 1904 SF. 9,417 S.F. 3. WF A/YFSa9E qf--- V �j� 1I nl-'0, P}(II�E 5EQ al
ili AUAWABLE RDOR IKEA: (ACTION 504.900-485 1898) EVERY ACCESS EE PARKINS SPACE SNAIL EC IDENTIFIED 4 `, 6'` 1�•Ai' ,°• `(g, , C B(Aly-
BY A SOL SEE OEMYL SWET A0.6 8 MONO RAMS -/,J S" O •F'•
1. B: 18®SF 5-2 wok. s-3.32H SF AN AROHWAL 5104 SHALL M50 BE POSTED Si A M. aC;L �-"', •�'
O:M..4.48 12Da0-Sr.-au 930E-5F.na Q. ta'.. / y°4 i n46 1 0.13•0-41.Im taxAVaRBLE PLACE AT EACH ENTRANCE m OT-SEE '�� �s.,;, Q,
. , - ...PARQNC FACADES /4.` a, ?' -
(S RIOOERS SHALL SE PROVIDED X'90 1915 MM.SEE F.DEPT.NOTES)
SECTION 1116AS '{ ,,,, CJ A'5.+F•?. _
'PHASE-2 3 8 4 SWARMS'8 CANOPD PLAITS ARE REAM FOR MET 90 mum t m, ..4' (EJ SERVICE YARD - �� '�
. REDUHCAL. ELECMIEALL ER AUTOMATIC FRE SWAM \P - (-P, •c ! C
ST51015 OF RE-WIED) PROVIDE 511E 24 9481907 ;p�'% ``'� POST AND PPE SERVICE Ry• ,¢! �,., .. �ilE•+ p A
110E O'COISRIICTOk V-N (MBLL 1-4 C8f 0501998k CALCULATIONS FLR HYAC.MOW ENVELOPE.AND P �^ • •� MICA!STORAGE / 'Cry . LC1 Op9
W/AVM FIE S'ROOQD6 LOITNn 5 .• •�.ai tiY .mamma=NIAHAOE AREA INCREASES (SEC190 5011.2 S0PARATI90 3-5015) 5. ;' d' •
l I9RNIRCIp1 ME 130-FT:YOINI PLACE.60.33-FT:WEST SIDE 90-11
TIC CONCRETE 9041 SNOW W DC STRUCTURAL PLANS•, RE S 05.WlE .!, // I AHfM1PF IEffHY
WY REOARE SPECIAL INSPECTION%EN NOTEIl ` REVS DSA /),
PER 500.12 BaA-2D•6037•255-13 a 0.000 SF..12000 SI. /..��� :f, 5•F 5 APPROVAL , `i K P.COAB W PRORtt
EASING PLANTING MFRS I
0 +• 'F 1 iS'S• 011 BY OFD.SASE
ARE COSTRG.
OCCUPANCY: B (12000 sr./2-5Tons)'
APPROX.SOME FOOTAGE: CROSS: USABLE SERVICE !�� 904,O• P FR /_ NEW RANTING 80115 01 5
CASTING S 101111 1 NO SF. 9.397 SF SON O O %V� /. P.C.CURBS
/CA+4TP7 6 ��• M1 �' ED SERVICE BAY
EASTER OW(xLCk - 14156 SF.
NEW SNOW=meow -1 I� .p 4l `,/ • NOTE 1 4-f 1 PROVIDE 1L•N.I 5')
GROOM TL1f1: 1.828 Si. 3.730 SF. £ 4.40:' •FL�:«'�•3 2 ` %:`:`Y�■^ 'I / FI SPACED 4-FL IRE TO 5-FL MAX.4.'APSE
v r.•, PMIWG AREAS PAWED FHA ICON
NEZIMINE - D6 u. �1 ' PHASE 2 _ , �� /- MCCOL,R EIT 2 SHEET ALI
r�...� `t4 9.0•x20.0• 1/
TOTAL MOM ROO&11.438 SF ',i 0 SEf(VICE Cl]lIER
TOTAL 13,004 Si. 5{• -
. � 0 � FIRE LANE LP■ �`..._.. PHASE 2 1 W� -
N�'�. I l 7���g�' PARTS STORAGE 1;�
TYPE OF CONSTRUCTION V-N (TABLE 5-9.E�-180 1998) .�.`!/ A i'`/ :'�•"„W �� - I ��� - 1 . OTF_sIRFFT PARxN;
1 814 28-SPACES-SEE UNE-3,H111
N1OL.PANCC 5.'-3 (6000 ss./1-smRq �.�'�' .%r ., -0 .,1119` .. e® r� ' �i a,Y WALL.7-0" © EXISTING VAN AcC�E PAwEE
�. �(��!F�� F!L NOtES/2 >t 5-STANDARD SPREE 9 r 209 Q
*94'90.SLIME FOO1ML• CROSS UAAOF: - •• k:. ..:%' i=!����,�. 1 3@a�.• L° '-
/.." °A� it '1T.P -• • M--,.%i:'•, £ 20-STANDARD SPACES.9.20.
CASTRO NOTI EAST ONO 2611 SF. L532 SF. 0g/ ®1.0•x18 q31 A)N OR ••. }'>•J�Pl���ljj''L�"� -� W EASING NORMIEST MAIO 1744 SF. Ism gs - .t, • A107E WI1VQ �4 �ABN TOTAL: 4431 SF. 6180 sSFF •f ate - •®@�pQII��', t1 ® tz-srAN0AR0 sPA41 9.za- (SPRINTERS SHALL BE PROVDED F W M5 BRAID,SE F.[CPT.NOES) c' 244':
r PNAA-3 EII1TIH6 CAA WASH 9014X5 ."/I y5 0 2 -� SITE PAM-OF-TMVEI.CAR WA91 BATONS E'/s 1:"•91.-r./ 11 0 B.O•xTr y .■9.0••20.0' _ PHASE 2 - - i ., w04RAR TRAVEL 0 DRIVEWAYS
D4P188 E D e N (6 m sF/2-sr-48801 '�y O 20 USED CAR DISPLAY ® . ^�®.IV 9ROWROOM v.((), `-.`` 0 45'x15.0• OPTIONAL STC kw.,4. �.at PNASEA -
AMROx SOIARE FOOTAGE 2665 sr. (USEABLE) '' . - Ara, LOCAn0N �-F ...,; O(HOE ARCAOA WNOPAL 000C 311311 DOS MDT APPLn �r4i, . .. 5d; A 54110AI SUDOD IS LESS MAN 2.500 SWAIE FEET.) - - _f� �F EH p 0.AY` " 6i.F 14 FL I -O 5. �Ir_-yI+I�, N� f�1'V CAR ...�: _-E'_P __ ,`l; n 4>9.0•.X5.0.• �.``�' 1 SITE PLAN
(T.)POLE LTC.TYP. O + - _ " .r. A0.1
£ (N)ACCES 9171 -n.._ + 5, 1 '•'I
. (T.1 OgVLIVAY - ,O_
Rama P,AA!TIPS SITE PLAN us OEWLORD TRW H U /Y NEW 5A1E5 ENTRY 921 __ _ -IP•":��`\:
RAN 003
DEM SOT N A�mC NIB THE t/ V 0 N D R/I/�. (E)TREE Ic T.YCR--F (L0 90EVIAL0 A14
ENDRE SITE.
ACCESS RAMP TYP.
FOR 2
•
,. ROT091C t 9101 TATk _ • - (p1 AAL4i1M BA CONIRACIOR HO1E9 O`•IE AR nA R•"NC t oEKL W tNT OTY K A JOIA NRE DEPMTIEHT RA)1 D$ECN R01ES ,. m
4RVIOF no,of-Ott
IOTA!RTE NEk 165925 SQUARE FEET(SF.) 101 ACRES 1• �Q®J; I. N ALL A 13(1 9 OVER 2500=ME FEET MULL .. 1 r o
HALE CAPPER APPROACH AND NOSIER(READ CF EACH STAR
I ?ALONG t FREE-S IMO'_+!S MOCK A NEPA 13(1996 EpOQE)M�ATIC OC p, _
TOTAL FAIR own APR 30323 U.(GROSS) 91AU. MARKED BY A STRIP ff TREAD CONTRASTING SEPARATE PEAKT.AND ARE SMUT TD A LICENSED SISTER ALL 9840!MUST BE DOE BY ,.- k'•
COLOR AT LEAST 2-NOBS YL9E PLACED PARAllII 10 ARCNIIECNRAL DESIGN REVIEW&APPROVAL BY A IICFt1EID C-t6 CONTRACTOR All SPRINKLER ` °
PARING REDIAREMDIT• OFF-SURLY PAPoONG CU51017OH5 a E11PLOYEE9 VARIES. PLANNING a OENEUPIEAT MINCES(PDS). HEADS SHAM BE OIRM RESPONSE TYPE HEADS rr
AND NOT YORE THAN 1-RCN FR71 1101%I VA
TALE ALL UNDER-FROURD WORK SHALL BE DOZE N •
WD DEDICATED 01 SHORN. %S TOTAL 5TFP 01 LAIONG THE STRIP SHALL EC OF 11ATERAL 2 mi... x FEHCINC • EIDSnHF FENCE t ACCORDANCE YOH/EPA 24. l.. .'\ .
ACQ9BLE PACES. 2-SPACES NCLIAM N TOTAL THAT IS AT LEAST AS SIP RESISTANT AS DC OTHER CA TO BE REPLACED WTI WIONHT-NON ARCA IA YIA6TpAL CODE(MC)311531 '
TREADS OF THE STAIR. IDIOM a GATES CR CONCEALED IN A ROHM _1
(NOTE:TAKE NB-6.CBC-UBC 1990 ACCESS SPACES REOUIRER SEC10H 11338.1.1 OCT SD,E 10 REVIEW a APPROVAL BY PDS.ANY 2 THE/UTOYATR:FEE RAOFIS AT ON.AY WST tE \•
I8-50 SPACES REOI9AE5 x-ACCESSIBLE 'A(ES) All TREAD SURFACES MA L O YIP RESISTA T. BARBED AND/OR RAZOR MINE s ID BE IIYOVEII CCOOx1BADiff B, L SSTATA1 1 U O u 0.`.4..AO y •\ 10 0 9,p 010.0
FTASE-L EASING PRE-MGR I SAIR` WEARER-QPMED STAGS k HEIR APHROACHES SHALL 1 LAIDSAPNC AT NEW(1L)a COSTWG(E)AREAS CONTRACT CM EC PRESENT 3,61 .N IOW CAR
BE DESIGNED SD THAT RATER WU.NOT ACCLIMATE ON 9HUL BE PRONGED PER CUP IM-010.YE AMC 311512 'a
TYPE OF C0751RU1'R07: V-N (TARE 5-B.Get-1BC 1998} THE WAITING 9&3&0.3 TREADS 9011 HAVE A 9ROOM TEN 1610 A DETAILED LAADS:AFNG a INVENTORY
ASOIPT EDGES A MOO DE NOSNO SHALL NOT `1 �.BE SUMMED FILL RENEW a 3. FRONDE A NNOA BOX OR BOARS FOR ACOSS TO Sd /a
OCCUPANCY: B (LOCO SF./2-SPORES) APPROVAL BY DU. ANY RESIRCIED AREAS Td.
PROJECT MORE THAN I K-NOI PAST THE FACE CF 7101 / '. /a/a
APPROX.SOUAIE FOOTAGE DROSS USE/KE: USER Bf10x' l MUTING STANDARDS AT THE 9101 SWl BE GUS.FOE CODE 907 /� `i
SECnOxS 1138/31 A II]8/.SZ PAINTED TO MATCH HE BUILDINGS 9BFCT TO 1, FRONDE MARKING a SI07S FCR FIRE LAIRS • •",ii-,. ` .
TOTAL: 1.068 5F. 943 U. RENEW a APPROVAL BY PDS. AMC 3150.2 � �1 7•'`
ALL SEEPS SHALL NAYS WPM RISER MOOT k 50.MT.FIRM SCHEDULE,IIELI.'9OSWAPFR'. ��6T��yE �• {\\
. (NOTE ARCAOA WT�A. 311511 DQS NOT APPLY.BURGHS 6 I113K1.TREAD 1DS COAL BE ETR WU7 5 SIEET AU 5. PERMITS SHALL BE WTANED TO CREWE THE AUTO •',, /SAW a/ 1--•(E)SCREENED FENCE
IL55 THAN 2'AD SWARE FEEL) 11-1OES OFEP.lffA991D F1T01 ram TO PoSEPt(NOT COMBUSTIBLE TIBLE .STORE AND TO DO ND -'I A (CYCLONE) NQ
5 0,LOH SAIPLE BOARDS LLALL D FOR ALL TIE REPAIR LOAM.ARID TO Do NOT W3K
MCCOOO A ERUCTED HOSING I SNOW).RISERS BUILDINGS SUCLECI TO REVIEW a APPROVAL BY CALF.FRE COOS 305 _
01 c_-E7JS1N0 LTV. INTER SHALL BE 1 TO 7-NOES.BUT CF TRIM NOT PE HEIGHT ON PDS a Q
HYPE CF tKQR7RIC110E v-N (TABLE 5-a LBC-IBC 1998 ' OWN RIGHT.CPO RISES ARE PUMPED.tOE +.ss 6. NO HAIAPDOl15 YAIERALS 6:,(44,1676,AND/OR !� m
5 11$MONO AC-PAVING IS SELECT 12 RESTED A USm WT6N 1101 N0IDINGS 0.ED HALE ,,•. 4$` a�'.. Z CI
MOOD OCCPANCY: N ( asoo 5F./2-SR1RE5) 2 YTE PAn1-OF-1RA', APPROVAL BY PDS. C UMTTES NESTED N UBC TAKES 3-0 k 3-E - 9 'A9
5-2 (12000 SF./T-STOOES) 7. A FUN t SCHEDULE FOE DEUNERE.S a NIX-UPS 0 / 0
HUNS&SOEWAUXS SOMME TO THESE REIN ATIOG 7. QCIPT FOR DE PIE-OWST SEES A ID WASH 6
S-3 ( x000 SF./2-510M) (NOT ALLAYED ON RIVAL BY OR)ILL BE KIEONCS ALL MINIM STRUCTURES AID THE �,Iy� ti . Z
9011 HAVE A Cd1190/0U5 COW W SIREN/NOT FRONDED FOR APPROVAL BY THE DS0.09ECTNL NEW CANOPY SHALL BE PROMO co AUTOMATIC `:y \ + .U
OCCUPANCY SFPAPAnOG 8 a 5-2 (NONE)3-B.CBC-IBC 1998k Q�GOV ffMO SHALL BE A LO MA CF 0. A PUJI FEN UET PIIBUC MORE55 SKPEY UA/UR PRIMER PATIOS CR MPONATS MALL BE .a .LRATe�. ♦ 0*100
B a 5-3 (I-HOUR/OPOKNGS 80-A10 155) 16-&015 MX'493&0.5 9A1L 901 SP-PR95TMT. • 0ND007 4EUO:RS Wll BE PRONOD FOAL ROOMS 4A i}� . O 9.
0-2&5-3 (I-HONK/CDLRG4 60'-1ENHES) SM,IED FR. s7E IaOAIY EOIAL 10 A LED9N APPROVAL BY LSD. . ., / . �A, 1/l • .. ,1 -
ARROX$WARE FOOTAGE: (ROSS IISE/BIE• SECTOR 11]87 /�//(�6i 04" d, L. (E)SCREENED FENCE Cl) m
B 45-2 5665 SF. 5330 SF. AL WALKS NTH CONIQDOl15 GRADENK MALL HAVE - ';/per Qe V -
LEUM AREAS AT LEAST 5-FEET/S LENGTH AT/SIERRAS .(
S-3 3.456 SF. 3,279 SF. \ • IIII
CF AT LEAST EVERY 100-FEEL (
OL REVEL: 9,121 SF. &609 SF. SECTION 11378.7.6 V iC' P.0.G APRON
I/EIIANNE 10.911 SF. 9.417 S.F. 1 StF AUf'eamF SCAR !1 V ',/J `f` 'I..U'i•' �,i�• SE 9 /.
ALLOWABLE ROrn AREA: (=MN 504.®C-UBC(998) �` '�F� ),pew Q �''III EMT AC0.S�E MOO SPACE 9&11 BE DFNIFIED ,h'a y� 'I' 0+0 O 602
I. B: SF S-2 1�17 SF_. S-]:3,279 SF. BY A SOL SEE DETAIL MEET MIL k MMHG PLANS �,
1 .0.13 e�3 SF.&"'" AN AMORAL SIGN SHALL ALSO BC POSTED N A P. J T4 :o /� ' �� '
'o•AU -?.�4' C8 PARTING PLACE AT EACH POUNCE TO OFF SITE '3 6 1 „Q
Z. 0.16+013+0.11•1A0 PAPo018 pA011� ` I •va -,0 <SECTION 11168.3 G�� + .• �, 4�f, y
(SPRIMES MULL BE MOOED FRI 1195 MUM SEE F.OPT.NOTES) - T..; -;-• ...".._...._.___ _
fIg/, aPARAE pFTDATS -
9� 1- ....'PHASE- &
FIOIAPRCAL. ELECTRICAL OR AUTOMATIC FIRE 9Mro00ER �� / CE :F-3 ,i R,r• POST AND PRE SERVICE A,lt ..+NE``•'''S `6R,(�AP� PLACE C •'Up
SALCULA OF RE-OM C. PRONDE 111E 24 ERERGY • P % &.,. V YE}HG.E STORAGE J•. �O o , .p
TYPE ff CONSTRICT0.`E V-N (TABLE S-8,L8C-•UBC 1996k CALCULATIONS FM MC.111f6D&10 LM4EOPE.AM / ) :r. '+
0/AUTO.FIE APIOIBLLERS LI01TINa �j .A'" .e)' ag v ZO CO rn
5 mFON FF�iR'W-45- • CC F.... O 44 AURAS/AREA N(ACA49 (1COON 505.1.2.SEPARATOR 3-9DES) •,f,6 (N)WALL*GATE / F M1>Q'(PF 15GFNO rn•2
1101 CONCRETE WON 9D*N W THE STRUCTURAL PLANS . _&i RED'S DSO /8).' - LO C
IL M1NOL0f9 DOTS.130-FT:608M RACE 6033-FT:W6T ME 90-FT. MAY REWIRE SPECK NSWEC1IOI WON NOTED. '�� •�. = APPROVAL. / '��� OOSTNO PLANING N3A5 PROPERTY NE NtEAS NAVE 9 c
PER SOS1.2 60.33-20.60.33 a 255.1A a 0.000 SF,12000 SF. 1..� 2 d 54 ,.7 /, ��i:: 6'P.CCOB ON PROPERTY SIDE DRIP.ON-95 AREAS 1-
4 /,': "
SURROUNDED BY MM.SDEWALA TREE 9415(CYAN.)
MO N= B (12000 SF./2-SIOOES)' O x AN >t I %. ARE EASING Q O._-.U
APPROX SWAM FOOTAGE: GROSS USEABLE: SERVICE /��♦O y'10 0 •� NR FIR I: i■ NEW PLANING AREAS 01 SALE TO HAVE CONTINUOUS r Z 0 n 6
E051010 9101ROOM/CANOPP 9.610 SF. 9303 SF. SCR . 1 O ® �, P.C.ORBS m o sy p
E705TNG ATTIC(NLC) - 10.458 S.F. ENTRY •4 7M1®9 .`�� m SERVICE BAY • I /� • NOTE EWER 10 PROYOE IF 10 a 501-3'L SECURITY RAJ.OF 1'T.S. N TO -
T -+'f 2 4 ..% A I SPACED 4-FT.M&.TO 5-Fl.UAL APART ALONG PROP.la AT AL
KEW GHOLRD LEVEL• 1,826 SF. 1730 SF. £ •R:S:':%:.. �ItS: g G�I PHASE 2 � ��,1 1 NOM AREAS PAWED PRAA 1C0N car PER EAT.FNIPT g
LEZIN fi AL M00D FLOOt 11138 5F. 916 SF. i1 '1' ...`... ..014 o 9.o•xzo.o• SERVICE CENTER •1�+ S
TOTAL: 11001 S.F. 0 FIRE AANF 3 k i �-- _ PHASE 2
./ - ig �'-.�- PARTS STORAGE f'
0.EFSREYI00 GRAY-t]K1Y0 SA UlE SFRV9E 0801 3_y./--,c.'4.12.4-:::::, G� ` .. 1�°j��.._..__`a� 1 f8T'-SmOT PARKING tEEE905 •
•m •
TYPE OF I»HSmucnaE v-N (TABLE 5-El.tBC�BC 098k ', �i ''%::'�•-0•;%".-�,.q ���� OW Ides•; (1191.28-SPACES-SEE UM-1 RUM a 9TE DATA) d Iiii.
-
,�'/r .'� SE F PRE:AL I® 1 �l�� 9101 PATH a CUY YOU..+Y-0' © 0105070 VAN ACCESS®LE PARTING SPACE,OCCUPANCY: 5-3 (1000 SF./1-5'COD) r•f, %? 8ALE3' '��® TRAV0.-SEE b tK
! O ���'a�,- �''•. -:it:I_.R j� ��l GEH NOtES/2 ('� 1? k. I ® 5-STANDARD SPACE.9 a 20.a I-ACESSI/3E SPACE. ` r.-
COSTING S/UME FOOTAGE: 2.687 USEABLE:32 Sr. .1; .. C' � `i'•••••'�f,,,--.3:, .._Alt®ft o £ 20-STANDARD SPACR 9 a 2a sS
�N• 4ry 1K 0 9.0'x17• Ba .. '��gF�R 81"ali ® ii O m m EaStNC x2RT1EAST tMG 2AIT7 SF. 2532 SMISTING TTHWEST BMOC 6131 SF,, 3.6,5105116 SF. f•J;-f'/. ••„O•'/ DE 1RA .. ������ ��! �P .II ® IT-SPNiDND SPAOS 9 a R,6EY; 0i TOTALR 36-SPACES(2-AOI59011) MI
(SPRI1OEAS SHALL BC('BONDED FOR 1H IS BLOIDNG SEE F.(OPT.NOTES) o.p / 214 ((�0 r. R' -� 9101 PATH-ff-TRAVEL U .
PH ASE-3.DUSTING CM WASH BU9DHC `). °-I 8 0 9.0'0 W II O 9,0'x17' Fn 20.0' PHASE 2 Q VD9Cl1UR 1RAVEL 0 OOKNAK n,.UR.+ / m ��nPE awH nDR v x (TABLE 6 a®C 7 BC 1998 1/(�i 113ED CM DISPLAY o . �®� SHOWROOM >a4 owe
OCCUPANCY: B (6000 5F./2-SCORES) S.", 414 I 211 0 8.5'X13.0' RCN ''••;v.:.� .\ PHASE i <
/MOT.SWARE FOOTAGE: 2,065 S.F. (001(01) - I�`! - LOCATION a3` - `.'".' ••, ,<.Fr SHOWROOM o s
(0217 AROMA IMOOPA.CODE 311511 ALES NOT APPLY•. • IiROP,`�-'`!I - ;�f ,1 �yY CAR D15N.AY`'�-"�... _ t N °\' W 5 .6 •
• ITIIIDNG IS LESS THAN 2500 SQUARE FEEL) 214 CONE Wax `F m... _ -.".•. 0.__ -`rr• .'4 U ;j� HI o 9.q•.RS.o•,--s o. 4- . 1 SITE PLAN © 7 a S .
£ (017 POE LTG.TYP. O ` �`:.. - - 7 A0.1 1•=311•-O' gy g
• (N)ACCES RCN (E)Di n._ _ • ..16, i^,•• 0 f3' 30' OQ g '�'•
EXISTING OOLONGS OAMNCS19 5)STEED LAN W OLN-01111R.TEE HUNT N Q T NEW SALES ENTRY 9a I •••,-• �•Y F _ -.L' ' 9EEk
FNI61D91SE,OTT WAS REPRESENT A CURRENT GF THE O N D R/V F (E)TREE a T.W.R. (E)SM ALR 40
' IIRRNEYENTS NOM TI(05ONG MOMS FOR 2 OF SHEE15
g
0 °
El TYP. Z
EL+25.-_•0"i 0
-------DEfl,N6D_-t ;
1 I I I I 1 I I I l 1 t I W
J
Mercedes-Benz I ": © —�+,2_ W•I I I I I I �l I I I I 1 — _ � .fI Z
i� CUING OR SOFFIT
© SOFFITS, 5 m �'• O) ® m m ■ i� __ 0
•
TYP. 1 -Q
a.Rff ,O, I - } ,gfill — ELLS
5
RN.FLOOR - - `---- -FIN.FLOOR m
El
EXISYG.4 3
® )SHOWeT00Y
SHOWROOM ADDITION
. SOUTH ELEVATION
SHOWROOM ADDMON 1/8-.1'-0.
OTEMPRED GLASS REQUIRED
•
. a
c
a
• O z .rn
CC F.2 o
•
ai o o
. D EXTERIOR FINISHES a o=
__ 1. ALUCOBOND PANEL SYSTEM OR EQUAL Z {�m p
II Typ.
&+25 COLOR: ALUCOBOND SERIES-C, 'DURANAR XL" CO %3'o
������ ��� - EL+l POWDER COAT FINISH.''BLACK". _ N ¢
20Q
PARAPET Sin
2. RUSNAK LOGO: 36" HIGH RAISED LETTERS IN
IEIUNG -___ _i_EL+16•_O-3 BRUSHED STAINLESS STEEL
�� �-own..I 1 (f)PARAPET 3. CLEAR ANODIZED STOREFRONT de GLAZING TO
EEL+12_x_-- A 0 u u r MATCH EXISTING. ��nn�
CENNGFlN•FUL 11���_■�■'■_, 4. ARCHITECTURAL RIBBED. LONG SPAN SIDING. E-i I7 IAO1'-
OR SOFFIT- � - e CPI "VERTI-LINE"SERIES T-1 OB. RUN -q v9 II 3 CD u I a) u ® ' 41 �, HORIZONTALLY. FULL-WIDTH(30'). MINIIAIZING =o q BUTT JOINTS SHNG. FACTORY POWDER °1 w© ' -'I COAT FlNISFi.COLOR: MATCH EXISTING, ICI .- as FlN.FLOOR RE,'0' PAINTS• #1680, SNOWFELD, MP-00NN 72/000• 2 .1qr,O n n
AFIN.FLOOR OR EQUAL
SHOWROOM EXISYG. 5. ALUCOBOND PANEL SYSTEM OR EQUAL
ADDITION SHOWROOM COLOR: ALUCOBOND SERIES-B. 'DURANAR XL"
POWDER COAT FINISH. COLOR: 'CHAMPAGNE r F
® EAST ELEVATION METALLIC' AT SHOWROOM FASCIA TWO SIDES. _
SHOWROOM ADDITION 1/8'=1'-O- 6. MANUFACTURER'S SIGN BAND IN ALUCOBOND m u
OTEMPRED GLASS REQUIRED SERIES-B FINISH, COLOR: 'CHAMPAGNE
METAWC AT SHOWROOM FACADE(TWO SIDES).
3 p tll
7. OPTIONAL: ARCHITECTURAL ALUMINUM BAR a 0 - q
GRILLE SYSTEM. 12"W.a6'H.x2-DP. MODULAR $
PATTERN. 0.1258" TO 0.250- TH. FINISH: 8 <
FACTORY POWDER COAT TO MATCH SERIES-C
- ALUCOBOND COLOR, -BLACK'. NOTE: 1
GRILLE/SUNSCREEN SECTIONS TO BE g ,
±24"H.148"w. AND RUN CONTINUOUSLY AROUND a
THE EXISTING & NEW SHOWROOM SOFFITS, A SWEET:
MIN. Be ABOVE FINISH SLAB. A 4.1
1
•