HomeMy WebLinkAboutItem 2d - Accept Water Main Replacement ProjectV~ GP,1F0$nl9Fjdf
-01 STAFF REPORT
�4nity of �o
Public Works Services Department
DATE: December 3, 2013
TO: Honorable Mayor and City Council
FROM: Tom Tait, Public Works Services Director
By: Ken Herman, Deputy Public Works Services Director
Tiffany Lee, Associate Civil Engineer
SUBJECT: ACCEPT ALL WORK PERFORMED BY DOMINGUEZ GENERAL
ENGINEERING, INC. FOR THE WATER MAIN REPLACEMENT
PROJECT AS COMPLETE AND AUTORIZE THE FINAL PAYMENT TO
BE MADE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS
Recommendation: Approve
SUMMARY
On June 4, 2013, the City Council awarded a contract to Dominguez General
Engineering, Inc. in the amount of $324,055 for the Water Main Replacement Project on
Tenth Avenue between Camino Real Avenue and Longden Avenue. The terms and
conditions of this project have been complied with and the work has been completed to
satisfaction for a total project cost of $331,255. This amount reflects the original
contract amount of $324,055 plus contract change orders for additional work, totaling
$7,200, or 2.2% of the original contract price. It is recommended that the City Council
accept all work performed by Dominguez General Engineering, Inc. as complete and
authorize the final payment to be made in accordance with the contract documents.
DISCUSSION
The 6 -inch cast iron water main along Tenth Avenue was installed in 1938. Over the
years, Public Works Services Water Section crews have had to make several
emergency repairs to the water main along Tenth Avenue, primarily due to the age and
condition of the pipe. The 2008 Water Master Plan Update recommended the
replacement of under sized and aging water distribution pipes. The 2012 -13 Capital
Improvement Program includes a project for the replacement and of the 6 -inch cast iron
water main on Tenth Avenue with new 10 -inch ductile iron pipe.
Accept Water Main Replacement Project
December 3, 2013
Page 2 of 2
Changing the pipe material from cast iron to ductile iron provides a stronger pipe which
will minimize future main breaks. Changing the size of the pipe will also improve the fire
flow and water flow in the pipe by allowing the water to flow more freely, with less
internal friction in the pipe. Together, these improvements have increased the overall
reliability of the pipe and the City's water system. The project also replaced and
upgraded the existing fire hydrants to meet current fire protection standards.
The final construction cost of the project is $331,255. This amount reflects the original
contract amount of $324,055 plus contract change orders for additional work, totaling
$7,200, or 2.22% of the original contract price. The change orders encountered during
this work were the result of conditions found in the field during construction that were
different than the information provided by other utilities, and not discovered during the
preliminary site investigations performed during the design of the project.
A summary of the items included in the change orders is as follows:
Change Order Description of Change or Work
2
FISCAL IMPACT
Additional work due to conflict with an unmarked
abandoned gas main
$ 3,200.00
$ 7,200.00
Amount
$ 4,000.00
Addition of one 2 -inch water service
Total Change Orders
Fiscal Year 2012 -13 Capital Improvement Program has a budget of $400,000 for this
Water Main Replacement Project. The total cost for this project is $331,255, which is
within the approved budget.
RECOMMENDATION
It is recommended that the City Council accept all work performed by the Dominguez
General Engineering, Inc. for the Water Main Replacement Project as complete and
authorize the final payment to be made in accordance with the contract documents
Approved.
Dominic Lazzarettd
City Manager
Attachment: Project Location Map
V~ GP,1F0$nl9Fjdf
-01 STAFF REPORT
�4nity of �o
Public Works Services Department
DATE: December 3, 2013
TO: Honorable Mayor and City Council
FROM: Tom Tait, Public Works Services Director
By: Ken Herman, Deputy Public Works Services Director
Tiffany Lee, Associate Civil Engineer
SUBJECT: ACCEPT ALL WORK PERFORMED BY DOMINGUEZ GENERAL
ENGINEERING, INC. FOR THE WATER MAIN REPLACEMENT
PROJECT AS COMPLETE AND AUTORIZE THE FINAL PAYMENT TO
BE MADE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS
Recommendation: Approve
SUMMARY
On June 4, 2013, the City Council awarded a contract to Dominguez General
Engineering, Inc. in the amount of $324,055 for the Water Main Replacement Project on
Tenth Avenue between Camino Real Avenue and Longden Avenue. The terms and
conditions of this project have been complied with and the work has been completed to
satisfaction for a total project cost of $331,255. This amount reflects the original
contract amount of $324,055 plus contract change orders for additional work, totaling
$7,200, or 2.2% of the original contract price. It is recommended that the City Council
accept all work performed by Dominguez General Engineering, Inc. as complete and
authorize the final payment to be made in accordance with the contract documents.
DISCUSSION
The 6 -inch cast iron water main along Tenth Avenue was installed in 1938. Over the
years, Public Works Services Water Section crews have had to make several
emergency repairs to the water main along Tenth Avenue, primarily due to the age and
condition of the pipe. The 2008 Water Master Plan Update recommended the
replacement of under sized and aging water distribution pipes. The 2012 -13 Capital
Improvement Program includes a project for the replacement and of the 6 -inch cast iron
water main on Tenth Avenue with new 10 -inch ductile iron pipe.
Accept Water Main Replacement Project
December 3, 2013
Page 2 of 2
Changing the pipe material from cast iron to ductile iron provides a stronger pipe which
will minimize future main breaks. Changing the size of the pipe will also improve the fire
flow and water flow in the pipe by allowing the water to flow more freely, with less
internal friction in the pipe. Together, these improvements have increased the overall
reliability of the pipe and the City's water system. The project also replaced and
upgraded the existing fire hydrants to meet current fire protection standards.
The final construction cost of the project is $331,255. This amount reflects the original
contract amount of $324,055 plus contract change orders for additional work, totaling
$7,200, or 2.22% of the original contract price. The change orders encountered during
this work were the result of conditions found in the field during construction that were
different than the information provided by other utilities, and not discovered during the
preliminary site investigations performed during the design of the project.
A summary of the items included in the change orders is as follows:
Change Order Description of Change or Work
2
FISCAL IMPACT
Additional work due to conflict with an unmarked
abandoned gas main
$ 3,200.00
$ 7,200.00
Amount
$ 4,000.00
Addition of one 2 -inch water service
Total Change Orders
Fiscal Year 2012 -13 Capital Improvement Program has a budget of $400,000 for this
Water Main Replacement Project. The total cost for this project is $331,255, which is
within the approved budget.
RECOMMENDATION
It is recommended that the City Council accept all work performed by the Dominguez
General Engineering, Inc. for the Water Main Replacement Project as complete and
authorize the final payment to be made in accordance with the contract documents
Approved.
Dominic Lazzarettd
City Manager
Attachment: Project Location Map
WATER MAIN REPLACEMENT PROJECT
NORTH
CITY OF ARCADIA
GRAND VIEW
eo e
y�
SIE RA DRE BL o e
2 =
by
Q
FlRE 0
T �
> ORANGE GROVE
S�z
0
Q
m
FOOTHILL BL
RIE FOOTHILL FY FOREST PARK
COLORADO
—
J OLOR BL
AJ SANTA T J EPH
i
2 q� PARK �ST
4 ! 0 'l5�, "tiF a SAN A ST
� � 0
Z iQ,ek
A! ! > { H I MWT N R
�Y
/�
? C�
FAg N �O ? !
o
F COURSE seRTA aiRA
�+ DR r O 1yz >
HUNTIIJGTOow G< ¢
CAMPUS DR �
N A R C A D I A N 5
W
¢ RD 9 > C
z o ¢ DUARTE ¢
U) O
7 Z
o > , z PROJECT LOCATION
m CAMINO REAL ¢ '¢ TENTH AVE. Al CAMINO REAL BETWEEN
> o CAMINO REAL AVE. AND LONGDEN AVE.
o z
w
O < ti
w LONGDEN AV to
LNE O AV
LAS TUNAS DR
1
o err
>f
D
5