HomeMy WebLinkAboutItem 1d - Ordinance Nos. 2314 and 2315 regarding Seabiscuit Pacifica�� � GALI F O R.Vt�"Ydr
A S.•,19f�t
�al"ity 00V STAFF REPORT
Development Services Department
DATE: April 1, 2014
TO: Honorable Mayor and City Council
FROM: Jason Kruckeberg, Assistant City Manager /Development Services Director
Jim Kasama, Community Development Administrator
By: Lisa L. Flores, Planning Services Manager
SUBJECT: ORDINANCE NO. 2314 ADOPTING THE SEABISCUIT PACIFICA
SPECIFIC PLAN WITH A FLOOR AREA RATIO OF 1.03, THE ART
DECO ARCHITECTURAL STYLE FOR THE TWO HOTELS (MARRIOTT
RESIDENCE INN AND FAIRFIELD INN SUITES), AND THE SPECIFIC
LAND USE REGULATIONS OF THE SEABSICUIT PACIFICA PROJECT
Recommendation: Adopt
ORDINANCE NO. 2315 MAKING CERTAIN AMENDMENTS TO THE
TEXT OF THE ARCADIA ZONING CODE; AND AMENDING THE
ZONING DESIGNATION OF CERTAIN PROPERTY WITHIN THE CITY
FROM "C -2 WITH DOWNTOWN AND H -8 HEIGHT OVERLAYS" TO "SP-
SP, SEABISCUIT PACIFICA SPECIFIC PLAN," WITH RESPECT TO THE
SEABISCUIT PACIFICA SPECIFIC PLAN PROJECT AT 130 W.
HUNTINGTON DRIVE
Recommendation: Adopt
SUMMARY
At the March 18, 2014, meeting, the City Council adopted Resolution No. 7013 and
introduced the attached Ordinances No. 2314 and No. 2315 to adopt the Seabiscuit
Pacifica Specific Plan with a Floor Area Ratio of 1.03 for the development of two new
hotels (Marriott Residence Inn and Fairfield Inn & Suites) that total 142,320 square feet
of hotel space in two connected buildings, with a total of 210 rooms, and a hotel
condominium tower with 50 units. The project site at 130 W. Huntington Drive consists
of one parcel with an approximate area of 249,599 square feet (5.73 acres). A copy of
the March 18, 2014, City Council staff report is attached for reference.
Adoption of Seabiscuit Pacifica Ordinances
April 1, 2014
Page 2 of 2
RECOMMENDED ACTION
It is recommended that the City Council adopt the following Ordinances:
ADOPT ORDINANCE NO 2314 ADOPTING SPECIFIC PLAN
SEABISCUIT PACIFICA SPECIFIC PLAN (SP -SP) WITH A FLOOR
AREA RATIO OF 1.03, THE ART DECO ARCHITECTURAL STYLE FOR
THE TWO HOTELS (MARRIOTT RESIDENCE INN AND FAIRFIELD INN
& SUITES), AND THE SPECIFIC LAND USE REGULATIONS OF THE
SEABISCUIT PACIFICA PROJECT AT 130 W. HUNTINGTON DRIVE;
AND
ADOPT ORDINANCE NO. 2315 MAKING CERTAIN AMENDMENTS TO
THE TEST OF THE ARCADIA ZONING CODE; AND AMENDING THE
ZONING DESIGNATION OF CERTAIN PROPERTY WITHIN THE CITY
FROM "C -2 WITH DOWNTOWN AND H -8 HEIGHT OVERLAYS" TO "SP-
SP, SEABISCUIT PACIFICA SPECIFIC PLAN,' WITH RESPECT TO THE
SEABISCUIT PACIFICA SPECIFIC PLAN PROJECT AT 130 W.
HUNTINGTON DRIVE.
Approved.
Dominic Lazzareftd
City Manager
Attachments: Ordinance No. 2314
Ordinance No. 2315
City Council Staff Report dated March 18, 2014 (no attachments)
ORDINANCE NO. 2314
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ARCADIA,
CALIFORNIA, ADOPTING SEABISCUIT PACIFICA SPECIFIC PLAN (SP-
SP) WITH A FLOOR AREA RATIO OF 1.03, THE ART DECO
ARCHITECTURAL STYLE FOR THE TWO HOTELS (MARRIOTT AND
FAIRFIELD INN SUITES), AND SPECIFIC LAND USE REGULATIONS
FOR THE SEABISCUIT PACIFICA PROJECT AT 130 W. HUNTINGTON
DRIVE
WHEREAS, the City Council is authorized by Article II, Section 200 of the City
Charter to prepare, adopt, and amend Specific Plans for the purpose of systematically
implementing the City's General Plan with respect to particular geographical areas and
projects within the City; and
WHEREAS, the Arcadia Municipal Code, Section 9296.7(2) provides that the
adoption or amendment of any Specific Plan within the City shall be accomplished by
ordinance; and
WHEREAS, in August 2013, Mr. Andy Chang submitted applications for General
Plan Amendment No. GPA 14 -01, Specific Plan No. SP 13 -02, and Zone Change No.
ZC 13 -02 and draft Initial Study /Mitigated Negative Declaration for the Seabiscuit
Pacifica Specific Plan development that consists of two new hotels (Marriott Residence
and Fairfield Inn & Suites) having a total of 142,320 square feet of hotel space in two
connected buildings, with a total of 210 rooms, and a hotel condominium with 50 units at
130 W. Huntington Drive ( "Project "); and
WHEREAS, on December 3, 2013, the Draft Initial Study /Mitigated Negative
Declaration for the Seabiscuit Pacifica Specific Plan (SCH #2013121018) was circulated
for public review and comments from December 5, 2013 to January 13, 2014; and
1
WHEREAS, the Initial Study /Mitigated Negative Declaration concluded that the
implementation of the Project will have less- than - significant impacts with mitigation
measures for the following categories: Aesthetics, Air Quality, Biological Resources,
Geology and Soils, Hazards and Hazardous Materials, Hydrology and Water Quality,
Noise, Transportation/Traffic, and Utilities and Service Systems; and
WHEREAS, a lead agency approves a project requiring the implementation of
measures to mitigate or avoid significant effects on the environment, CEQA also
requires a lead agency to adopt a mitigation monitoring and reporting program to ensure
compliance with the mitigation measures during project implementation, and such a
mitigation monitoring and reporting program has been prepared for the Project (the
"Mitigation Monitoring and Reporting Program ") for consideration by the City Council of
the City of Arcadia as lead agency for the Project; and
WHEREAS, on December 5, 2013, and January 31, 2014, a duly noticed public
hearing was held before the Planning Commission on said applications, including the
Initial Study /Mitigated Negative Declaration ( "IS/MND ") at which time all interested
persons were given full opportunity to be heard and to present evidence; and
WHEREAS, after the public hearing the Planning Commission adopted
Resolution No. 1897 with a 3 -2 vote to recommend denial of the Project to the City
Council; and
WHEREAS, on March 6, 2014, a duly noticed public hearing was held before the
City Council on said applications, including the 1S /MND at which time all interested
persons were given full opportunity to be heard and to present evidence; and
FA
WHEREAS, all other legal prerequisites to the adoption of this Ordinance have
been fulfilled.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ARCADIA,
CALIFORNIA, DOES ORDAIN AS FOLLOWS:
SECTION 1. That the factual data submitted by the Development Services
Department in the associated staff report are true and correct.
SECTION 2. That the City Council, based upon the entire record, including all
written and oral evidence presented, finds as follows with respect to the proposed
Specific Plan as shown in Exhibit "A ":
0) The Specific plan is consistent with the City's General Plan, as amended,
including the goals, objectives, policies, and action programs of the City's General Plan,
as amended. The subject site is identified in the General Plan as an expansion of the
Downtown area for future urban development. As a result, the Specific Plan will provide
for two new hotels and the first hotel condominium in the City, which will be required to
be subject to the City's Transient Occupancy Tax (TOT) requirement. The proposed
Project will help revitalize the Downtown area of Arcadia, as well as contribute positively
to the existing downtown setting. Therefore, the proposed Specific Plan is consistent
with the General Plan.
(ii) The Specific Plan will not adversely affect the public health, safety and
welfare or result in an illogical land use pattern. The Initial Study /Mitigated Negative
Declaration for the Specific Plan and General Plan Amendment analyzed all the
potential impacts and all the Project's impacts are less than significant or can be
reduced to less than significant level with the implementation of the recommended
3
mitigation measures. Therefore, the proposed Project would not be detrimental to the
public health and welfare. Instead, the proposed project will be a superior "landmark"
development that will provide an entry statement for the City.
(iii) The Specific Plan is a desirable planning tool to implement the provisions
of the City's General Plan, The proposed Project is to be built over time and in two
phases. Phasing involves many considerations, such as market demand and the
availability of financing. A Specific Plan can address these particular matters so that
the hotels will be developed in a particular order, including the timing for demolition of
the existing Santa Anita Inn. The intent of the Specific Plan is to ensure that he
proposed Project is developed in the right order, and by a set time table.
SECTION 3. Based upon the Initial Environmental Study, the City Council finds
that a Mitigated Negative Declaration is appropriate for the Project and there will be less
than significant impacts on the environment as a result of the Project, as further
described in the Initial Environmental Study.
SECTION 4. That for the foregoing reasons, the City Council approves Specific
Plan No, SP 13-02 for two new hotels and a hotel condominium as set forth in Sections
2 and 3 hereof.
SECTION 5. If any section, subsection, subdivision, paragraph, sentence,
clause or phrase of this Ordinance, or any part thereof, is for any reason held to be
unconstitutional or otherwise invalid, such decision shall not affect the validity of the
remaining portions of this Ordinance or any part thereof. The City Council hereby
declares that it would have passed each section, subsection, subdivision, paragraph,
sentence, clause or phrase thereof, irrespective of the fact that any one or more
2
sections, subdivisions, paragraphs, sentences, clauses or phrases may be declared
unconstitutional or otherwise invalid.
SECTfON 6. The City Clerk shall certify to the adoption of this Ordinance and
shall cause a copy of same to be published at least once in the official newspaper of
said City within fifteen (15) days after its adoption. This Ordinance shall take effect on
the thirty -first (315) day after its adoption.
Passed, approved and adopted this day of 2014,
ATTEST:
City Clerk
APPROVED AS TO FORM:
j � 0 l
Stephen P, Deitsch
City Attorney
5
Mayor of City of Arcadia
EXHIBIT "A"
SEABISCUIT PACIFICA SPECIFIC PLAN
GENE FOND
A S S O C IA T ES
ARCNNEMLIRE - PLANNING - INTERIORS
1190 VISMO oSMI, U]9AN6 MCA90021
910 - 209. 7620 910 - 209.7616 FAX
F'F(UJLCI:
SEABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
T HUJLUI LUUAIIUN:
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
Alk, ,`
of III
CwUmmtol Assels
M9niI
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
TITLE
SHEET
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -O.O
COPYRIGHT 2013, GENE FONG ASSOCIATES
PROJECT SUMMARY
SEABISCUIT PACIFICA
ARCADIA, CALIFORNIA
THE PROPOSED WORK IS THE TWO PHASE
REDEVELOPMENT OF THE SANTA ANITA INN IN ARCADIA,
CALIFORNIA.
SPECIFIC PLAN SUBMITTAL
THE FIRST PHASE IN THE NORTHERN HALF OF THE
PROPERTY WILL BE THE CONSTRUCTION OF DUAL
BRANDED HOTEL BY MARRIOTT AND THE SECOND PHASE
OF THE CONSTRUCTION WILL BE A 50 UNIT HOTEL
CONDOMINIUM ON THE WESTERN PORTION OF THE SITE.
BUILDING AREA
PHASE I
EXISTING SANTA ANITA INN
ROOMS: 63
PARKING: 85
-•, ',
DUAL HOTELS 142,320 SF
ROOMS: 210
-
I
QI I` ��
■!� �.� L I
PARKING: 198
I
. 37] -
�I
PHASE II
HOTEL CONDOMINIUM 115,269 SF
_
UNITS: 50
I
�
11P1
'>� I r. -
ILL
1� I
TOTAL BUILDING AREA: 257,589 SF
+
TOTAL SITE AREA: 249,599 SF
FLOOR AREA RATIO: 1.03
TOTAL PARKING: 352
CODE AND PLANNING INFO
APPLICABLE BUILDING CODES
LIST OF PROFESSIONALS
SHEET INDEX
A -0.0 TITLE SHEET
PARCEL ADDRESS: 130 WEST HUNTINGTON
BUILDING:
CLIENT:
A -0.1 SITE PHOTOGRAPHS
DRIVE, ARCADIA 91007
2013 CALIFORNIA BUILDING CODE (CBC)
CONTINENTAL ASSETS MANAGEMENT
A -0.1a SITE PHOTOGRAPHS
130 WEST HUNTINGTON DRIVE, ARCADIA 91007
A -0.2 VICINITY MAP
PARCEL AIN NO.: 5775 - 024 -014
ELECTRIC:
A -0.3 SITE MAP
2013 CALIFORNIA ELECTRICAL CODE (CEC)
ARCHITECT:
A -0.4 SITE SURVEY
EXISTING USE: R -1 HOTEL
GENE FONG ASSOCIATES
A -0.5 EXISTING SITE PLAN
MECHANICAL:
1130 WESTWOOD BLVD, LOS ANGELES, CA 90024
A -1.0 SITE PLAN
PROPOSED USE: R -1 HOTEL, AND R -2
2013 CALIFORNIA MECHANICAL CODE (CMC)
A -1.0a FIRE TRUCK ACCESS ROUTE
RESIDENTIAL TOWER
SURVEYOR:
A -1.1 SITE PLAN PHASE I
PLUMBING:
TRITECH ASSOCIATES INC.
A -1.2 SITE PLAN PHASE II
2013 CALIFORNIA PLUMBING CODE (CPC)
SUBDIVISION SURVEY ENGINEERING DESIGN
A -2.1 HOTEL GROUND FLOOR PLAN
135 NORTH SAN GABRIEL BOULEVARD,
A -2.2 HOTEL 2ND FLOOR PLAN
ACCESSIBILITY:
SAN GABRIEL, CA 91775
A -2.3 HOTEL 3RD AND 4TH FLOOR PLAN
MORE STRINGENT OF CALIFORNIA BUILDING
A -2.4 HOTEL 5TH AND 6TH FLOOR PLAN
CODE OR APPLICABLE FEDERAL LAW
CIVIL:
A -2.4a HOTEL ROOF PLAN
TRITECH ASSOCIATES INC.
A -2.5 HOTEL ROOM TYPE
ENERGY:
SUBDIVISION SURVEY ENGINEERING DESIGN
A -2.6 HOTEL ROOM TYPE
2013 CALIFORNIA TITLE 24 - CALIFORNIA ENERGY
135 NORTH SAN GABRIEL BOULEVARD,
A -2.7 HOTEL ELEVATIONS
CODE
SAN GABRIEL, CA 91775
A -2.7a HOTEL ELEVATIONS
A -2.8 HOTEL SECTIONS
FIRE PREVENTION:
LANDSCAPE:
A -3.0 HOTEL CONDOMINIUM GROUND FLOOR PLAN
2013 CALIFORNIA FIRE CODE (CFC) AND LOCAL
WILSON ASSOCIATES
A -3.1 HOTEL CONDOMINIUM FLOOR PLANS
ORDINANCE
11262 WARMINGTON ST., RIVERSIDE, CA 92503
A -3.2 HOTEL CONDOMINIUM TOWNHOUSE UNIT PLANS
A -3.3 HOTEL CONDOMINIUM TYPICAL UNIT PLANS
ENVIRONMENTAL:
A -3.4 HOTEL CONDOMINIUM ELEVATIONS
LSA ASSOCIATES, INC.
A -3.5 HOTEL CONDOMINIUM SECTIONS
1500 IOWA AVENUE, SUITE 200
A -4.0 PROJECT SUMMARY
RIVERSIDE, CA 92507
A -4.1 PHASE I VIEWS
A -5.0 VIEWS
A -5.1 VIEWS
A -6.0 HOTEL COLOR AND MATERIAL BOARD
A -6.1 HOTEL CONDO COLOR AND MATERIAL BOARD
L -1.0 SCHEMATIC LANDSCAPE PLAN PHASE
L -1.1 SCHEMATIC LANDSCAPE PLAN PHASE II
GENE FOND
A S S O C IA T ES
ARCNNEMLIRE - PLANNING - INTERIORS
1190 VISMO oSMI, U]9AN6 MCA90021
910 - 209. 7620 910 - 209.7616 FAX
F'F(UJLCI:
SEABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
T HUJLUI LUUAIIUN:
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
Alk, ,`
of III
CwUmmtol Assels
M9niI
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
TITLE
SHEET
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -O.O
COPYRIGHT 2013, GENE FONG ASSOCIATES
Seabiscuit Pacifica Specific Plan
130 W. Huntington Dr., Arcadia, DA 91007
SECTION 1.0 INTRODUCTION
1.1 Purpose and Authority
A Specific Plan is a legislative tool that implements the General Plan by combining zoning
requirements and development regulations that are tailored to a specific property_ A Specific Plan is
commonly used for a large site, a site where many individual properties have been assembled, or a
site that requires special attention in terms of land use or development characteristics. The Seabiscuit
Pacifica site requires special attention due to its limited size but unique location and ability to
economically support Santa Anita Park. the current downtown revitalization community district, and
the City of Arcadia (see Section 2 for site and project details). More specifically, it is the phasing of
the project into two phases that has raised questions, which the Specific Plan looks to address.
Phase 1 will consist of two new Marriott hotels and a portion of the existing Santa ,Anita Inn. Phase 2
will consist of removing the remaining Santa Anita Inn and developing the rest of the site into an 8-
story hotel condominium_ Any questions about the phasing will be addressed in the specific plan as
well as how the planning, selling, and operating of the hotel condominium units will be done.
The purpose of the Seabiscuit Pacifica Specific Plan is to define the range of permitted uses;
development regulations and design guidelines for the development of the project site.
Implementation of the Specific Plan will accomplish the following objectives.
• Provide high quality development consistent with the City's General Plan and in conformance with
municipal standards, codes, and policies;
• Provide uses that will compliment and support the Santa Anita Park race track, other important
regional facilities in the City, and the adjacent Downtown area;
• Design the developmentto minimize the potential for environmental impacts;
• Augment the City's economic base by increasing tax - generating commercial uses within the City;
and
• Create employment - generating opportunities for the citizens of the City and surrounding
communities.
1.2 Document Approval
The Seabiscuit Pacifica Specific Plan has been prepared pursuant to the provisions of the California
Government Code. Title 7. Division 1, Chapter 3, Article 8, and Sections 135450 through 65457. The
California Government Code authorizes jurisdictions to adopt Specific Plans by resolution as policy
documents or by ordinance as regulatory documents_ This Specific Plan is being adopted by the
Arcadia City Council. The law allows preparation of Specific Plans as may be required for the
implementation of the General Plan and further allows for their review and adoption.
1.3 Relationship of the Specific Plan to the General Ilan, Zoning, and Other Ordinances
Specific Plans must be consistent with the goals and policies of the adopted General Plans of local
jurisdictions (California Code Section 65454). The Seabiscuit Pacifica Specific Plan implements the
goals and policies of the City of Arcadia General Plan within the Specific Plan area. The goals and
objectives found in the Land Use Element support the City's desire to continue to create a future in
which the economy and environment of the City is preserved and enhanced by new development.
Section 2.3 provides a specific analysis of the Specific Plan relative to the City General Plan land use
and zoning designations. Appendix B, the General Plan Consistency Analysis, demonstrates how the
Seabiscuit Pacifica Specific Plan implements applicable goals and objectives of the City of Arcadia's
General Plan. Various land use goals that support a viable economic future direction for the City.
This Specific Plan acts as a bridge between the General Plan and individual development proposals_
It combines development standards and guidelines into a single document that is tailored to meet the
development needs of this specific site. The City of Arcadia's General Plan indicates that a Specific
Plan is required for large parcels that may have development characteristics that are not addressed in
the City's General Plan or Zoning. While the Specific Plan site is not very large (5.73 acres), it does
represent a unique property in relation to the Santa Anita Park race track, and so City staff has
supported preparation of a Specific Plan for the hotel project application by Seabiscuit Pacifica, LLC
on this site_
The Seabiscuit Pacifica Specific Plan is developed within the overall framework of the City's Zoning
Ordinance, but provides separate development standards and guidelines that are customized to the
Specific Plan site. The City's zoning standards are utilized for certain aspects of development, such
as parking and landscaping, while the Specific Plan provides other standards that are tailored to the
unique location and opportunities of the Seabiscuit Pacifica Specific Plan site. Future discretionary
approvals for this site vdill be subject to the review procedures; findings and provisions of the
Seabiscuit Pacifica Specific Plan and the City of Arcadia Zoning Ordinance. Related and/or
subsequent approvals, such as Specific Plan amendments or architectural design review as deemed
necessary by the Development Services Director or designee, must be consistent with both the
guidelines of the Seabiscuit Pacifica Specific Plan and the City's Zoning Ordinance. Where
development regulations in this Specific Plan differ from those established in the City's Code, the
provisions of the Seabiscuit Pacifica Specific Plan shall prevail. Where this Specific Plan is silent on a
development regulation, the City of Arcadia Cade shall prevail.
Section 2.3 and Appendix B provide a more detailed analysis of the Specific Plan's consistency with
the General Plan policies and objectives. Although the proposed Seabiscuit Pacifica project is
consistent with the City's General Plan and zoning (see Section 2.3), a Specific Plan was prepared to
address the following project characteristics: (a) development phasing, (b) the development
agreement; and (c) the overall appearance of all buildings within the project.
1.4 Relationship to the California Environmental Quality Act
Adoption or amendment of a Specific Plan constitutes a project under the California Environmental
Quality Act (CF-UA). A Mitigated Negative Declaration (MND) has been prepared in accordance with
the CEQA Guidelines (CCR, Title 14, Division 6, Chapter 3 Section 15000- 15387), and State CEQA
Guidelines Sections 15070 through 15075 in particular, to analyze the environmental impacts of the
Seabiscuit Pacifica Specific Plan. The MIND establishes the existing, onsite environmental conditions
and evaluates the potential impacts of this Specific Plan. The MIND references project design features
and includes various mitigation measures that will be implemented through either the Mitigation
Monitoring and Reporting Program or Conditions of Approval (refer to Appendix A).
1.5 Required Entitlements
The discretionary actions to be considered by the City as part of the proposed Seabiscuit Pacifica
Specific Plan include approval of the following;
• Development Agreement
• Seabiscuit Pacifica Specific Plan No. SP 14 -01 (Ordinance No. 2314);
• General Plan Amendment No. GPA 14-01 and Amendment the General Flan Land Use Map (City
Council Resolution No. 7013);
• Zone Change No. ZC 13 -02 (SP -SP) and Amendment to the Zoning Map (Ordinance No. 2315)
GENE FONG
A S S O C I A T E S
ARCHRECMRE • PIANNINO • IMERMS
1190VAW*X DB W. I0SANMRG9MM
310 ^ 209.7620 910 • 209. 7616 FAX
PROJECT:
SEABISCUIT
PA CIFI CA
r- --1 10
Rcsidcnce
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
f
I's Ito
Condwnlal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SPECIFIC
PLAN
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -O.Oa
• Mitigated Negative Declaration in compliance with CEQA (City Council Resolution No. 7013)!
• Conceptual Review of the overall project site plan and visual renderings;
• Design Review of the Site Plan and Building Elevations for Phase 'I ; and
• Design Review of the Site Plan and Building Elevations for Phase 2.
Qther non - discretionary actions anticipated to be taken by the City at the Staff level as part of the
proposed project include:
• Approval of a Storm Water Pollution Prevention Plan (SWPPP) to mitigate site runoff during
construction (i.e., over the short -term) and a Standard Urban Stormwater Management Plan
(SUSMP) to mitigate for past - construction runoff flows (i.e., over the long -term during project
occupancy and operation).
• Review of landscapingfirrigation plans.
• Certificate of Demolition
• Building permit. The comprehensive building permit includes building permit, plumbing,
mechanical, and electrical permits.
• Grading permit.
• Sewer connection permit.
Development of the proposed Seabiscuit Pacifica project may require the following permits andfor
approvals from other responsible agencies:
A National Pollutant Discharge Elimination System permit from the Regional Water Quality
Control Board - Los Angeles Region to ensure that construction site drainage velocities are equal
to or lessthan the pre - construction conditions and downstream water quality is not harmed.
2.0 LAND USE PLAN
2.1 Location
The project site consists of one parcel of approximately 5.7$ gross acres located just east of the
Santa Anita Park race track, just south of Huntington Drive, and just east of West Huntington Drive in
the City of Arcadia. The site is depicted on the United States Geological Survey (1.15GS) art. Nelson.
California 7 -5- minute topographic quadrangle in Township t North, Range 11 West (no sections
indicated): with a latitude of 34° 8' 21.7' North and a longitude of 118° 2 77 :' Vvest. The parcel is
bounded by Colorado Place /Huntington Drive to the north, the Arcadia City Hall complex to the south;
East Huntington Drive to the east, and West Huntington Drive to the west, The project location is
illustrated in Figures A -0.2 and A -0.3. The legal description is included in Appendix C. The project site
consists of Assessor's Parcel Number 577 -502 -4014. The precise description of the parcel is included
as Appendix C.
2.2 Environmental Setting
The proposed project site gently slopes to the south at a gradient of 2.4 percent with elevations
ranging from 473 feet above mean sea level (amsl) at the north corner sloping down to 466 feet amsl
at the south corner_ Onsite elevations are shown in Figure A -0 -4. The site is fully developed with the
Santa Anita Inn hotel that has occupied this property since 1955. The site has several improved
access roads around its perimeter, including Colorado PlacelHuntington Drive to the north, East
Huntington Drive to the east: and West Huntington Drive to the west -
The project site is in an urbanized area and is surrounded by developed uses. Directly west of the
project site are the Santa Anita Park race track; the Arboretum of Los Angeles County is further west;
W
and a regional mall, Westfield Mall Santa Anita; is to the west of the racetrack. North of the project
site are offices along Colorado Place and Huntington Drive, and a bank along Huntington Drive
North of these commercial and office uses are existing residential neighborhoods. A small bar called
the °100 to V is located at the northeast corner of the project site. To the east of the project site is the
Arcadia County Park. South of the proposed site are the Civic Center Athletic Field Recreational Area
and the City Hall complex. An individual house used by the Salvation Army as a rehabilitation facility
is immediately south of the southwest corner of the site, and farther southwest are the Methodist
Hospital, Quest Diagnostics Medical Lab. and Medical Library.
There are no surface drainage courses on the project site, but the East Branch Arcadia Wash is
located approximately 227 feet west of the site and the Arcadia Wash is located approximately 2,000
feet west of the site. The previous Figure A -0.2 shakes the location of the project site and surrounding
land uses.
2.3 General Plan Land Use and Zoning Constraints
According tc the Arcadia General Plan, the project site is designated for commercial uses. The City's
General Plan Land Use Designation Map shows the land uses of the project site and the surrounding
properties, as shown on Table 2.A.
Table 2.A: General Plan Land Use and Zoning Designations
ArealDirection
Land Use Designations
Zoning Designations
Project Site
Commercial — Downtown Overlay
General Commercial (C -2) with
Downtown Overlay and Special Height
Overlay (H -8)`
North of Project Site
Commercial - Downtown Overlay'
General Commercial (C -2) with
(downtown neighborhoods)
downtown Overlay
South of Project site
PublicAnstitutional
Public Purpose (S- 2)
(City Hall and Hospital)
East of Project Site
Open Space - Outdoor Recreation
Public Purpose (S- 2)
(Arcadia CDunty Park)
Westcf Project Site
Horse Racing
Special Uses (S-1 and R -1)
(Santa Anita Park)
OVU r GC. 1'hr44QUId 47Cr1 Crdl f C11I La1IU USC Ividp. rlUg I C-ncIC r lu cu IV d1IU dPPrOUCU '-I LY cLKIIII J IYIIIP, NVYC I11 un c11 lu.
' allows FloorAreo Ratio (FAR) up to 1.0
H -S allows building heights up to 95 feet or 5 stories
The City's General Plan says the following about the Commercial land use designation
The Commercial designation is intended to permit a wide range of commercial uses which
serve both neighborhood and citywide markets. The designation allows a broad array of
commercial enterprises, including restaurants, durable goods sales, food Stares, lodging,
professional offices, specialty shops, indoor and outdoor recreational facilities. and
entertainment uses. Adjacent to Downtown, the Commercial designation is intended to
encourage small -scale office and neighborhood- serving commercial uses that complement
development in the Downtown Mixed Use areas. While the land use designation provides the
general parameters within which development must take place, the Zoning Code or other land
use regulatory document specifies the type and intensity of uses that will be permitted in a
given area. In the Downtown area, for example, where propert ies are designated Commercial,
land use regulations might specify that restaurants and cafes are permitted; but secondhand
stores are not. The Zoning Code and other regulatory documents also indicate permitted
building height limits for specific properties.
Maximum FAR — 0.50 . , Nrgber intensity overlays are applied to portions of Downtown along
Santa Anita Avenue, Colorado Place, and Hunting on Drive (1.0 FAR)_
4
GENE FONG
SEABISCUIT
PA CIF: CA
in IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
9
I's Ito
Condwnlal Assets
Mana�emenl
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -O.Ob
COPYRIGHT 2013, GENE FONG ASSOCIATES
The description of "permitted" uses lists "lodging` which typically includes hotels and other kinds of
short -term, temporary, vacation, or seasonal residences. The proposed hotel condominiums are
considered to be more like a type of lodging because many of them would be used as "time share" or
othertypes of temporary (short -term) cr seasonal (limited) occupants; typically less than one year at a
time. These units are intended for and will be marketed directly to race track - related guests and staff
as well as overseas investors. They are not intended to support a large number of full -time occupants
compared to standard residential -type units that would have permanent long -term City residents. The
pre - selected buyers of these units will have the intent to only make short seasonal stays and rent out
their unit for the majority of year as part of the hotel booking pool.
Section 9220.29 of the City's Municipal Code (zoning) defines "Hotel is a building in which there are
six or more guest rooms where lodging with or without meals is provided for compensation as the
more or less temporary abiding place of individuals and where no provision is made for cooking in
any individual room or suite.' All of the hotel rooms meet this definition. Although the condominium
units will have kitchens, they are much closer to the definition of hotel units rather than standard
residential units for the reasons listed above. They will also be subject to TOT tax like a typical hotel.
Therefore, the two hotels and the hotel condominiums in the Seabiscuit Pacifica project are
consistent with the allowable uses under the General Plan under the "commercial" land use
designation; therefore, the Seabiscuit Pacifica Specific Plan does not require a General Plan
Amendment.
The City's zoning map indicates the site is zoned General Commercial (C -2) which allows hotels with
a Conditional Use Permit (CUP). Approval of the Specific Plan by the City Council would allow the
hotels and oandominiums by right and eliminate the need for a CUP consistent with state law for
charter cities.
The Citys General Plan and zoning map indicate the site has a "Downtown Overlay' that allows a
"Floor Area Ratio' (FAR) of up to 1.0_ The total building area of the Seabiscuit Pacifica Specific Plan
indicates the project FAR is slightly over 1.0 (see Table 2.B). However; approval of the Specific Plan
by the City Council will constitute acceptance by the City that the proposed Seabiscuit Pacifica
Specific Plan is generally consistent with the General Plan, and that any modification to the building
development characteristics shown in this Specific Plan will require City Council approval of a
Specific Plan Amendment.
Finally, the City's zoning map indicates the site has a Height Overlay (11-8) which allows buildings up
to 95 feet in height or 8 stories, as shown below from the City :s Municipal Code Section 9276,2.2.
9276.2.2. - HEIGHT LIMIT.
Any building or structure in Zone H may, by complying with the provisions of this Title, exceed the
height limitation applicable to the basic zone in which it is located; provided, however, that no
building or structure shall in any event exceed the height limit set forth in the following table:
Zone H4 - Four (4) stories or forty -five () feet;
Zone H5 - Five (5) stories or fifty -five (5 5) feet;
Zone H6 - Six (6) stories or sixty -five (65) feet:
Zone H7 - Seven (7) stories or severdyr -five (75) feet;
Zane H8 - Eight (8) stories or ninety -five (95) feet.
The tallest building in the proposed Seabiscuit Pacifica project is the hotel Condo building at
approximately 95 feet with 8 stories of occupied space. VVith the architectural roof projection, the hotel
condo building will stand 95 feet at its highest point. The Seabiscuit Pacifica Specific Plan will be
within requirements of the H -8 Height Overlay.
2.4 Specific plant Contents
The Seabiscuit Pacifica Specific Plan includes the site plan, floor plans, and elevations far the project
buildings, as well as the accompanying renderings and site information, and the Conditions of
Approval. The Specific Plan also includes the planned building heights: setbacks from West
Huntington Drive, East Hungtington Drive, Colorado Place, and existing uses to the south. The site
plan and associated Initial Study provide information on environmental conditions of the site and
potential environmental effects of the project; including traffic, air quality, noise, drainage, utilities, and
municipal services. Once approved, the Seabiscuit Pacifica Specific Plan will be shown on the City's
official zoning map as SP -SP.
The following graphical materials are hereby incorporated into the Specific Plan and presented at the
end of this section:
A -0.0
Title Sheet
A -0.1
Site Photographs
A -0.1a
Site Photographs
A -0,2
Vicinity Map
A -0.3
Site Map
A -0.4
Site Survey
A-0.5
Existing Site Plan
A -1.0
Site Plan
A -1.0a
Fire Truck Access Route
A -1.'1
Site Plan Phase I
A -1.2
Site Plan Phase 2
A -2.1
Hotel Ground Floor Plan
A-2.2
Hotel 2nd Floor Plan
A-2.3
Hotel 3rd-4h Floor Plan
A -2,4
Hotel 5th -6tn Floor Plan
A -2.4a
Hotel Roof Plan
A -2.5
Hotel Roam Type
A -2.6
Hotel Room Type
A -2.7
Hotel Elevations
A -2,7a
Hotel Elevations
A -2.8
Hotel Sections
A -3.0
Hotel Condominium Ground Floor Plan
A -3.1
Hotel Condominium Floor Plan
A -3.2
Hotel Condominium Townhouse Unit Plan
A -3.3
Hotel Condominium Typical Unit Plans
A -3.4
Hotel Condominium Elevations
A -3.5
Hotel Condominium Sections
A -4.0
Project Summary
A -4.1
Phase 1 Views
A -5.0
Views
A -5.1
Views
A -6.0
Hotel Color and Material Board
A -6.1
Hotel Condominium Color and Material Board
L -1.0
Schematic Landscape Plan
L -1.1
Schematic Landscape Plan Phase II
L -1,3
Schematic Landscape Plan Phase I & II
Appendix
A: Conditions of Approval and Mitigation Measures
Appendix
B: General Plan Consistency Analysis
Appendix
C: Title Report and Assessor's Parcel Map
In addition, the following documents and studies associated with the Specific Plan are on file at the
Planning Division of the Development Services Department, 249 VV. Huntington Drive, Arcadia, CA:
GENE FONG
A S S O C I A T E S
ARCHRECMRE - PIANNINO - IMERMS
1190VAW*X DB W. I0SANMRG9MN
310 - 209.7620 910 - 209. 7616 FAX
PROJECT:
SEABISCUIT
PA CIFI CA
in IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
9 i
I's Ito
Condmdal Assets
Manage �enl
CONTINENTAL ASSETS
MANAGEMENT
SPECIFIC
PLAN
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -O.Oc
• "City of Arcadia General Plar1. City of Arcadia. November 2010
• "PhaseI Environrnenfal Site Assessment. 'Continental Assets Management. March 2003
• " PreliroinaryGeore+; hnicalAssessment . "GeotechnQlQgies, Inc. July2013
• "City of Arcadia Zoning Map.'Nogle- Ireland Inc. 2010
• "Santa Arita inn Redevelopment Project.. Kimley -Horn and Associates, Inc. Original July
2013 and updated November 2013
• Santa Anita inn Redevelopment Project. Addendum to Traffic Impact Analysis. Kimley -Horn
and Associates, Inc. 2013
• "Noise Impact Anaiysis, ;' LSA Associates: Inc. August 2013
"Air Qualify Analysis.' LSA Associates, Inc. August 2013
• The Primary Records farms (full sets — 523A and 523B, a nd Location Map, etc).
• "Initial Study and Mitigated Negative Declaration, For Two Medical Office Buildings. A
General Office Building. and a Four- -Level Parking Structure at 161 Colorado Place and 125
trV, Huntington Drive. Pacific Design Group. December 2012
"Hydraulic & Hydi ology Calculation. ' Tritech Associates. Inc. July 2013
2.5 Specific Plan Land Use Components
The Seabiscuit Pacifica Specific Plan is proposed in the City of Arcadia at the southwest corner of
Colorado Place and West Huntington Drive. The Specific Plan site occupies approximately 5 7 acres
and is located at 130 Huntington Drive. The Seabiscuit Pacifica project proposes to construct two
hotels. a Marriott Residence Inn and a Fairfield Inn and Suites, and a hotel condominium tower and
supporting parking for the entire project. The Seabiscuit Pacifica Specific Plan proposes a total of
257,589 square feet of building, including 142,320 square feet of "dual' (connected) hotel space with
210 roams in two buildings and 115:269 square feet of hotel condominiums with 50 total units. Figure
A -1.0 shows the proposed Seabiscuit Pacifica Specific Plan land use plan and Table 2.B summarizes
the proposed uses of the Specific Plan.
The project hotels are intended to support patrons, employees, and managers of the Santa Anita
Park race track on a regular basis, in addition to general guests to the City of Arcadia. The "dual'
nature of the hotels will allow for a wider range of accommodations for race track and city guests. The
hotel condominiums will also support this overall intent, but provide more long -term accommodations
for race track employees and managers due to the longer racing season that Santa Anita will enjoy
once the Hollywood Park race tack is closed (scheduled for the end of 2013). These lodging- related
uses are consistent with the goals of the General Plan for general commercial uses located around
the Santa Anita Park race track. The dual hotels and the hotel condominiums are expected to
generate a need for 65 new employees at build out.
Table 2.8: Seabiscuit Pacifica Specific Plan Land Uses
Roornsf Floor Area Building Area' Percent
Hotel - Related Land Use Spaces (square feet) (square feet) of Site
Phase I hotels
Residence Inn 121 93,895 22,745 9
Fairfield Inn and Suites 89 48,425 12,395 5
Santa Anita Inn 63 22,050 11,025 4
existin g -tem orar
Subtotal 273 164,370 46,165 18
Phase 11
Hotel Condominiums 50 115,269 1 13,524 5
Subtotal 50 11 5,269 1 13,524 5
Parking
Surface Parking Phase 1 293 —
Dual Hotel Parkin (end of Phase 11) 227
Under round Parkno Phase 11 52 22.122 — —
Surface Parking Phase II 73 — — —
Subtotal ; 352 — — Dove lo p mont TotaI
Dual Hotels 210 142,320 35,14D 14
Hotel Ccndaminiurns 50 115,269 13,524 a
Total Roams 260 257,589 46,664 19
Total Parkin S aces 337
FAR' -- 1.031 — —
Scurce: Gene Fong Associates (July 2013)
Building focfpnnt
At Phase 2 cam pletion. 85 existing surface parking spaces are deleted from Phase 1 surface parking.
' Floor Area Ratio = Building Area (in square feet : Site Area (249,598 square feet or 5.73 acres) per ALTA survey and
County Assessor's Parcel date
` A total of 77 surface parking spaces will constructed as part of Phase II, but 4 of these spaces will he dedicated for
hotel guest parking.
2.5 Project Phasing
The Seabiscuit Pacifica Specific Plan is a self - supporting commercial project with individual
cwnersldevelopers responsible for on -site and off -site improvements necessary to support
development of the project. The previous Table 2.13 provides a summary of the various project uses
by phase. Development of the plan area will occur in two phases, generally as follows,
Phase
Phase I will be completed by 2016 and will include a Residence Inn, a Fairfield Inn, an existing
porlion of the Santa Anita Inn and surface parking. Phase II will consist of the hotel condominium
tower, garage parking, and surface parking. Phase I includes constructing a total of 142,32D square
feet of hotel space in two connected buildings (i.e., the Residence Inn and the Fairfield Inn). The two
hotels will contain a total of 210 rooms as outlined in Table 2.0 and include 63 additional roams from
the existing Santa Anita Inn. The Residence Inn will have six floors with a maximum height of
approximately 80 feet. The Fairfield Inn will have four floors with a maximum height of approximately
60 feet. The existing Santa Anita Inn will have four buildings to be in operation with 63 rooms total.
Phase I surface parking will have 293 spaces for the dual hotels and Santa Anita Inn_ ❑wring
construction of Phase I, a portion of the existing "Santa Anita Inn" hotel will remain in operation
(approximately 63 of the 110 roams) and is to be demolished with Phase II construction. Table 2.0
and Table 2.D show 273 rooms and 293 parking spaces (208 spaces for the two new hotels and 85
spaces for Santa Anita Inn) at the end of Phase I.
Phase 11
Phase II includes demolition of the remaining portion of the Santa Anita Inn and construction of the
hotel condominium tower; which will comprise 115,269 square feet and 50 total units. The hotel
condominium tower will have eight floors and include 9 townhouses, 35 condominium units, 5
penthouses, and subterranean parking. The hotel condominium tower will have a maximum height of
95' -0'. including the penthouse and architectural roof projection. The basement parking: which will be
constructed during Phase II for the condominiums, will contain 34,250 square feet and 52 garage
parking spaces and 92 surface parking spaces as shown in Table 2.D. The parking requirements are
two parking spaces for every unit and an additional one guest parking space for every two units. Each
until have one covered parking space in the garage and one surface parking space, and all the guest
spaces will be located in the parking lot areas. Twelve (12) of the parking spaces in the garage will
be in tandem configuration rather than side by side (refer to the Parking Plan on page A -3.1), but
each set of tandem parking space shall be assigned to a single unit unless a 24 -hour valet service or
equivalent measure is implemented. Any changes or alteration to the parking space assignment shall
be subject to review and approval by the Development Services Director or designee (refer to
condition of approval no. 3 of Appendix A).
GENE FONG
SEABISCUIT
PA CIFI CA
in IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
(NASTY COACHWC
INTERNATIONAL /
d i
of Ito
Condwnlal Assets
Manage went
CONTINENTAL ASSETS
MANAGEMENT
SPECIFIC
PLAN
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -O.Od
Phase II parking will have 144 parking spaces in all, but 19 of the surfaces spaces will be dedicated
to hotel guest parking. After Phase II completion; a grand total of 352 parking spaces will be available
(remove 85 spaces from existing Santa Anita Inn hotel), which will yield a hotel parking ratio of 1.08.
The project must be done in two phases due to the industrys economic cycle. Since the economy
has been steadily climbing for the past two years, it indicates a peak market during the next five
years. This means Phase II could start within 3 -5 years of Phase I completion. Due to the volatility of
the economy, only an estimated timeline provided. The timeline is strictly contingent on the pre -sale
success of the hotel condominiums. At least 50% of the units must be sold in order to secure a loan
and for Phase II to move forward_
During Phase I construction, the Santa Anita Inn will be able to continue employing the same hotel
staff who have been dedicated to working there for many years. Loyalty to employees is taken very
seriously, particularly those whom have reciprocated the same devotion and could be at risk of losing
their job. The Santa Anita Inn equally values relationship with long -time hotel guests, many of whom
enjoy some nostalgic familiarity with the Inn. This will also financially benefit the City with continued
tax revenue of about $120,000 per year_
Table 2.C: Sea biscuit Pacifica Rooms/Units Summar
Project RoomslUnits ;summa
Phase I Building # of Roo ms1Units
Residence Inn 121
Fairfield Inn & Suites 89
Existing Santa Anita Inn (PHI Onf ) 63
Total Phase I Rooms 273
Phase II
Hotel Condominium 50
Total Phase II Units 50
Table 2.a: 5eabiscuit Pacifca Parking Summary
Project Parking SurnmaEy
Phase I
Type
# of S paces
New Surface Parking
208
Existing -Surface Parkin (PHI Only)
85
Total Phase 1 Spaces
293
Phase II
New Surface Parkin
92
New Garage Parking
52
Total Phase 11 Staces
144
' Of the 92 surface parking spaces Constructed in Phase II, 19 will be dedicated
to hotel guests and the remaining 125 will be for hotel condominium guests.
2.6 AccessflmprovementslScreening
Primary access for the hotels will be at the merger of Colorado Place and West Huntington Drive.
Primary access to the hotel condominiums will be off of West Huntington Drive. The Seabiscuit
Pacifica Specific Plan will improve the fourth "leg" of this intersection to provide controlled access to
the main project driveway. A driveway off of East Huntington Drive will serve a$ a
secondarylemergency access point for both the hotels and condominiums.
Main entrance into the parking lot will feature a one way (counterclockwise) circular driveway that will
be one way. Cars entering the driveway will have to either enter the parking area to the south by
immediately turning right or enter the parking area to the north by driving counter- clookwise around
the circle.
The project will prepare a sewer capacity study and provide a "fair share' contribution to help fund an
expansion project already included in the Citys Capital Improvement Program (CIP) that will provide
adequate sewer capacity for this project,
An additional ten (10) feet is allowed for architectural features, chimneys, vents, equipment, and other
accessory rooftop structures on the two hotel buildings. Such appurtenances not fully incorporated as
architectural features shall be adequately screened by a wall. Any roof - mounted mechanical
equipment shall be appropriately screened from view. The method of screening shall be
architecturally integrated with the adjacent structure in terms of materials: color, shape, and size.
Where individual equipment is provided, a continuous screen is desirable.
2.7 Landscaping Requirements
A conceptual landscaping plan is included with the Specific Plan application and it will be phased as
well. The proposal is consistent with City requirements and the overall landscaping plan for the Santa
Anita Park race track and West Huntington Drive_
2.8 Design Narrative
1. Building Architecture
A. Hotels
Art Deco was a prominent style of architecture around the world during the twenties and
thirties. The style has influence from the Modern Age industrialization period combined with
inspiration from ancient cultures such as Greece, Egypt. Mayans, and Aztecs. Art Deco is
the style of the Santa Anita Park grandstand and may also be found throughout Los Angeles.
The Art Deco design of the two hotels drays inspiration directly from the Santa Anita Park
grandstand. Strong vertical and horizontal lines and farms create depth and distinctive
planes. A repeated pattern of rectilinear forms enhance the verticality of the building and
creates a visual experience with flowing waterfall effects that are characteristic of the Art
Deco style. The variation in horizontal setbacks creates a pattern of shadows against a varied
palette of colors and materials. Two vertical spires flanking the Residence Inn pay homage
to the racetrack. Bold shapes and rich colors project a sense of luxury and exuberance, and
exterior spot lighting of the buildings will highlight the two hotels by creating a dramatic night
scene.
The Residence Inn and Fairfield Inn & Suites are Marriott products and must adhere to their
design guidelines, which has its awn requirements and restrictions. Designers are able to
tailor their designs to many different specifications and styles, but still must hold true to
Marriott's prototype design. In comparison to their prototypes, the two Art Deco hotels are
much different and are unique to Arcadia. The interior will feature the newest generation of
Marriott hotel designs, which were only approved for use in the last year. Franchise also
requires all hotels tc be updated every five years so guests will have the latest design and
experience. Marriott's designs have always experienced a lot of success as they are
constantly being honed and have always scored well in customer satisfaction
B. Hotel Condominium
The architectural design of the hotel condominiums is inspired by French Normandy
traditional architecture. Some of the attributes that lend to this style include pilasters, an
accentuated chimney clad with stone veneer, as well as pronounced trim and strategically
10
GENE FONG
SEABISCUIT
PA CIFI CA
in IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
NU ILL IVIANFULIVLN I:
9 ii
I's Ito
Condwnlal Assets
Mana�emenl
CONTINENTAL ASSETS
MANAGEMENT
SPECIFIC
PLAN
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -O.Oe
placed cornices on the building. The building will also have varied forms and profiles with an
interesting skyline profile_ The fagade of the building is adorned with many different forms
such as cylindrical corners. and circular balconies with decorative wrought -iron railing. The
specific style of architecture was chosen because of its traditional and elegant appeal; which
would complement the race track and the surrounding community. However, the aesthetics
and architectural features, but not limited to color. materials, etc. can W modified as a
collaborative effort between the City and design team.
2. Fences & Walls
A. Hotels
Proposed walls would include a 5 -6 perimeter wall that would enclose the hotel pool area,
and separate it from the entry turnaround to create privacy. It will have stucco finish to match
the buildings. There will be a low XY garden wall adjacent to meeting rooms, which would
also be consistent in appearance with the adjacent architecture. The balance of the project
will have extensive landscaping.
B. Hotel Condominium
Proposed walls for the hotel condominiums include a 5 -6' perimeter wall around the pool area
to ensure guest privacy and child safety. It will have stucco finish to match the adjacent
building_ The balance of the project will have extensive landscaping to accentuate the
surrounding architecture and mesh the two phases into one fluent design. No walls or fencing
will divide the phases as required.
C. Property Line
The western property line will include a new 6-0" high wall that will have stucco finish to
match the hotel condominium building.
3. Parking
Parking lot will be illuminated in a manner to provide enough safe visibility and not be a
disturbance to off -site traffic. As part of Specific Plan conditional approval, parking lot lighting
study will be performed prior to issuance of building permit. Guest safety is a priority and on-
site security cameras will also be used to ensure this is achieved.
4. Phased Parking Lot
Curing construction of Phase I, a portion of the Santa Anita Inn is to remain four buildings
with 63 rooms_ There will be 85 parking spaces to accommodate guests and will be
accessible West Huntington Drive and E=ast Huntington Drive. Once Phase I is completed, the
rooms and parking spaces will be added to the two new hotels. Phase II will remove the
remaining Santa Anita Inn to make way for the hotel condominiums. The following
summarizes the phasing of parking for the project:
Phase I — (Residence Inn, Fairfield, and a portion of Santa Anita Inn)
208 new spaces
85 existing from Santa Anita Inn
Total spaces After Phase 1 completion = 293
"Requirement is 1.2 parking -to -roam ratio
Rooms = 210 +63= 273
Parking- 208 +85 - 293
Phase 2 — Hotel Cando (50 Units)
Remove existing 85 spaces from Santa Anita Inn
92 n8w surface parking spaces
52 new garage parking spaces
'Requirement is 2 parking spaces per unit plus 1 guest parking for every 2 units, sv at least
125 spaces must be provided.
M
Total spaces after Phase 2 completion = 352 spaces
'Only 125 spaces will be dedicated to hotel condo guests, while remaining balance of 227
spaces will be dedicated to the two hotels` parking.
5. Landscaping
There will be many new trees; shrubs. and ground covers that will be planted to enhance the
aesthetics of the entire site. Unfortunately, many mature trees will need to be removed from
our site as a majority falls within the buildings' footprints. The windrow of redwoods along
East Huntington will be preserved. Prior to issuance of a grading permit for each phase, the
developer shall provide an assessment of existing trees on the areas to be developed. This
tree assessment shall be prepared by a qualified landscape architect and identify any existing
large bushes or trees that can be relocated or preserved as part of the new development
project. The project landscaping plans shall attempt to preserve existing mature trees onsite
to the extent feasible, based on the tree assessment. This measure shall be implemented to
the satisfaction of the City Planning Division.
6. Signs
Typical directional and room designation signage will be provided per code requirements.
Exterior Marriott signage will also be installed on the exterior of the buildings. There will also
be two small monument signs for the two hotels located along West Huntington. The size,
height: and style shall be subject to review by staff through a Sign Design Review
Application, Any new signage or replacement in the future shall be subject to a formal sign
design review. No amendment to the Specific Plan is required.
7. Outdoor Equipment
Outdoor equipment, devices, and trash will be shown on the landscaping plan.
2.9 Approval and Implementation
The Seabiscuit Pacifica Specific Plan is expected to be built out as outlined in the Specific Plan
document and as shown on the attached plans (A -1.0 through A -5.5 and others outlined above),
including building heights and FAR allowances. Approval of the Seabiscuit Pacifica Specific Plan by
the City Council will constitute acceptance by the City that the proposed Specific Plan is generally
consistent with the General Plan, and that any modification to the building development
characteristics shown in this Specific Plan (with the exception of minor modifications to the
landscaping plan) will require City Council approval of a Specific Plan Amendment.
2.10 Interpretation of the Specific Plan
Interpretation of the provisions of the Specific Plan is the responsibility of the Development Services
Director or designee. This authority extends to determining "substantial conformance" with the
standards, regulations. and guidelines of the Specific Plan and all associated documents, and
includes:
1. Determinations regarding issues, conditions, or situations that arise that not addressed by the
Specific Plan.
2. Approval of signs in compliance with the standards of the zoning designation,
3. Additions, deletions and changes to the Specific Plan exhibits or text that substantially
comply with the Specific Plan.
4. Adjustments to the site plan, building elevations; landscaping; parking, and all other
conceptual plans.
5. Building- mounted mechanical equipment or cellular installations.
The Director or designee may make a decision on the above issues, with or without conditions, or can
refer a decision to the Planning Commission and/or City Council at a noticed public hearing, Notice
W
GENE FONG
A S S O C I A T E S
ARCHRECMRE • PIANNINO • IMERMS
1190VAW#X DB W. I0SANMMCA9MM
310 ^ 209.7620 910 • 209. 7616 FAX
PROJECT:
SEABISCUIT
PA CIFI CA
Msidcnce
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
.r.
9 1
I's Ito
Condwnlal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -O.Of
COPYRIGHT 2013, GENE FONG ASSOCIATES
shall be provided by publication in a newspaper of general circulation. If necessary, additional CEQA
review and/or analysis will be conducted to determine the impacts of the request. Determinations of
substantial conformance shall be made based on findings that the request:
1. Substantially conforms to all applicable provision of the Specific Plan.
2. Will not adversely affect public health and safety.
3. Will not adversely affect adjacent properties.
GENE FONG
A S S O C I A T E S
ARCHIIECMRE • PIANNINO • IMERIOMIS
1130VAW*X D0I LOBMMMKG91MM
310 ^ 209.7620 910 • 209. 7616 FAX
PROJECT:
SEABISCUIT
PA CIFI CA
in
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
NU ILL IVIIL,N/ULI\/ILIN I:
of 0
CDntineldal Assets
Management
:re:ISw oti+aw "
CONTINENTAL ASSETS
MANAGEMENT
SPECIFIC
PLAN
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -O.Og
d, HDTEL AND PCOL N ORTHW ESTj
2. ENTRANCE DRIVEWAY (NORTHWEST)
5. HOTELWORTHWEST]
3. ENTRANCE DRIVEWAY :NORTHWEST)
$ HOTEL (NORTHEP,$_)
GENE FOND
A S S O C IA T ES
ARCNREMLIRE - PLANNING • INTEIOR9
1190 VISMOMSMI, U]9MMMU90021
910 ^ 209. 7620 910 ^ 209.7616 FAX
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
VVV IN LR:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
Cwbmmt8I AssNs
M91���en'lenl
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SITE
PHOTOS
SCALE:
NTS
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -0.1
COPYRIGHT 2013, GENE FONG ASSOCIATES
7. BACK DRIVEWAY (SOUTH EAST)
A
Af
r
k_ JL
517E AERIAL
S. BACK DRIVEWAY 'SCiU FH EAST)
11. PROPERTY LINE(SCIUTHWEST)
13. PP015EFZTY LINI=- (NOPTH)
10. HOTEL (BOUT HWEST)
12- PROPERTY JNF- ISOUTHWEET)
14. PROPILRTY _INL INORTHj
IGENE FOND
A S S O C IA T ES
ARCNREMLIRE - PLANNING • INTEIOR3
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
rnnlnnKAIKI11IRA
I DYNASTY COACHWORK
INTERNATIONAL /
,w
11 111
CwUmmtol Assels
M9���emenl
CONTINENTAL ASSETS
SHEET TITLE:
SITE
PHOTOS
SCALE:
NTS
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -0.1 a
COPYRIGHT 2013, GENE FONG ASSOCIATES
4
WOf
* W-r
Illor 40^
N —All
olloop
� ' Z NTINGTOb DR -�% >
U7 fool" Ago goo
3
sit 4000
PROJECT
N 2� LOCATION � �
iv
p--p
/*
(D
.tea- ♦ .. /,��
'N
PI
GENE F®NG
A S S O C IA T ES
ARCNNEMLIRE - PLANNING • INTERIORS
1190 VISMO oSMI, LOOM MU90021
910 - 209. 7620 910 - 209.7616 FAX
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
H -L I- I- LIVILIN I:
oil Ill
ConbnaTWI Assels
Managaneenl
vtl#I!1 MHMIGMM1.]M!
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SITE
MAP
SCALE:
NTS
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -0.3
COPYRIGHT 2013, GENE FONG ASSOCIATES
< A
2 A
C)
7
j +
T,
Mir
M
I cf)
4 1p
v
pm ASPH + '� 17 A �1 - A
+7
+
GENEFONG
A S S 0 1 IA T ES
�V� 061 ARCHI • PLANNING • INTEII
+V6 + 310 • 209 - 7820 310 • 209.7616 FAX
1130 VIIIIIII I L0i CA III
7,7 + 17
v " I 1\
DENSE TREES PROJECT:
+ k,
T' T-T,-) A SEABISCUIT
SI
+
+76,'
C)
"10 FIT PA CIFICA
0
0 6'
A
T' TREES
+ '76 DENSE
(J TIT 0 RESIDENCE INN
+ +: + +
7 �o FAIRFIELD INN
4� 0
+ \\o
& SUITES
AND HOTEL
m T +
+
cf)
00 11 N
\O' CONDOMINIUM
o FA /A
3� m T-I A
F,//
A A A
>
C/) F, A\ N E, \
_0 I M C)
m 0 1 -"
Z T- 0 PROJECT LOCATION:
sz cf)
FT1
17 A
M 130 HUNTINGTON DR.
FA\
T ARCADIA, CA 91007
Cf) 1 5) ;;o I / rl>:�� I I ) I
C, A N
m FT1 + + OWNER:
--i M T1 A
F-1 AG\1 +
m A T + DYNASTY COACHWORK
INTERNATIONAL
k 61
cn �x \ *
I � \ \ Y I SEABISCUIT PACIFICA, LLC.
I \� A,\\
A
+
+
+ V A HOTEL MANAGEMENT:
0 SO
<i
+ +
C)
6' 0
-T
'A\\
�'Q
J, PC MairlaUemed
n
DO
0
C7 0 +
GO +7 CONTINENTAL ASSETS
V'+- L +V MANAGEMENT ✓F-- +7 5 0,
6, 7D
01
TREES
0
465
DENSE
+
o
r E.
Q)
Fr7 J-E
\1 AD
01 TE r7� —y
j IQ>
rr7
+ SHEET TITLE:
T1 r77 Fn
I\ r-r7 -5\,, cf) +
E:cs + ly
-71---- - C/)
'5'
A A SITE
<1)
>
+
C/) SURVEY
vv
otitis cn
G,
61
I CA3,
Vo +
DENSE TREES <
SCALE:
c� 1/32"=l'-O"
DATE:
Tj +
G�
03/24/14
+7 + 766,
+3A 1 , +7 1 1
6' <
'6Q + PHASE:
+V 6) ASPH
+V
'o ----
6,'
E +V \C \�
N
E T 6,5, A
V06' \+ JOB NUMBER: % TREES 6\\' 1330
-----------
-5- LOD2'- -------- ---c470 --------- - - ------ - - - - -- SHEET NUMBER:
--�W 38 3 _E ------- ------ ------ ------- --- ----- 672 -7 4
L I
-46
+ V6Q
+V +
+ v
+
ASPH
ASPH +
q1jj L U N-T-1 N -G TO N
- - -- ----------- --------- ---------
--41 COPYRIGHT 2013, GENE FONG ASSOCIATES
L
1.0.4
(E) PROPERTY LINE
cdE ADJACENT
i vnTinal
(E) PROPERTY LINE -
o
EXISTING ENTRANCE AND EXIT WEST HUNTINGTON DRIVE
\ fr
i\
IGENE F®NG
A S S O C IA T ES
ARCNREMLIRE - PLANNING • INTERIORS
S'EABI SC,' U11'
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
f%^Klr%^RA l AI II IRA
fti
Conhnel�l Aecaac
Management
CONTINENTAL ASSETS
MANAGEMENT
\\ SHEET TITLE:
EXISTING
SITE
PLAN
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
i
A -0.5
COPYRIGHT 2013, GENE FONG ASSOCIATES
+
N�IN
i 0
'S co
i d dd dd dd dd + I - "Y
GA EBO O
K /
POOL �N I
- - v /ATFFC C
FE4T •
GARDEK
LAWN,'
3BQ
III d
kl ❑
IF
FRESH - -- — R
��' � �
♦ � + / to Z �= � C d 57��
o <= Z'D PODL
C-b g-p
PO d-d lrll, .
+ + sc OF LL
LL
-1-11K IT
7V� J
rs
I GENE FONG
A C C A! 1 A T C C
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
PROJECT LOCATION:
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
Contine�l Aecaac
M9���emenl
Ltl»I!1 NNIXG191�d.,.
SHEET TITLE:
SITE
PLAN
niIACr 11
A -1.2
COPYRIGHT 2013, GENE FONG ASSOCIATES
GENE FOND
A S S O C IA T ES
ARCNREMLIRE - PLANNING • INTERIORS
1190 VISMOMSLM, U]9MMMCAgM
910 ^ 209. 7620 910 ^ 209.7616 FAX
F'F(UJLl' I:
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
T HUJLUI LUUAIIUN:
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
.ft�
Alkf14abb,
of III
Cwbmmt8I Assets
M9T3��erclenl
CONTINENTAL ASSETS
MANAGEMENT
ti
SHEET TITLE:
HOTEL
SECOND FLOOR
PLAN
SCALE:
3/32 " =1 ' -0"
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A-2.2
COPYRIGHT 2013, GENE FONG ASSOCIATES
GENE FOND
A S S O C IA T ES
ARCNREMLIRE - PLANNING • INTERIORS
1190 VISMOMSLM, U]9MMMCAgM
910 ^ 209. 7620 910 ^ 209.7616 FAX
F'F(UJLl' I:
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
T HUJLUI LUUAIIUN:
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
.ft�
Alkf14abb,
of III
Cwbmmt8I Assets
M9T3��erclenl
CONTINENTAL ASSETS
MANAGEMENT
ti
SHEET TITLE:
HOTEL
3RD & 4TH
FLOOR PLAN
SCALE:
3/32 " =1 ' -0"
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -2.3
COPYRIGHT 2013, GENE FONG ASSOCIATES
KING STUDIO
460 S.F.
TWO BEDROOM KING + QQ
796 S.F.
QQ STUDIO
500 S.F.
KING ONE BEDROOM END UNIT
568 S.F.
QQ ONE BEDROOM
622 S.F.
KING ONE BEDROOM
500 S.F.
GENE FOND
A S S O C IA T ES
ARCNREMLIRE - PLANNING • INTERIORS
1190 VISMOMSLM, U]9MMMU90021
910 ^ 209. 7620 910 ^ 209.7616 FAX
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
VVV IN LR:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
Conhne�l Aecaac
M9T3��erclenl
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
RESIDENCE INN
ROOM
TYPE
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -2.5
COPYRIGHT 2013, GENE FONG ASSOCIATES
EAST ELEVATION
WEST ELEVATION
GENE FOND
A S S O C IA T ES
ARCNREMLIRE - PLANNING • INTERIORS
1190 VISMOMSLM, U]9MMMCAgM
910 ^ 209. 7620 910 ^ 209.7616 FAX
F'F(UJtl. I:
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
T HUJLUI LUUAIIUN:
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
,w
of III
Cwbmmt8I Aeca s
M9T3��erclenl
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
HOTEL
ELEVATIONS
SCALE:
3/32 " =1 ' -0"
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A-2.7
COPYRIGHT 2013, GENE FONG ASSOCIATES
Al (BUSINESS ID SIGN)
4r
SOUTH ELEVATION
BI (BUSINESS ID SIGN)
NORTH ELEVATION
GENE FOND
A S S O C IA T ES
ARCNM?C7IIRE - PLANNING • INIEMORS
IM W!ulo0 ELWa WBM1096.0 IRM
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
c,PAPMrl IIT aerlrlrA I I r
Calhne�l Aecaac
M9���emenl
CONTINENTAL ASSETS
uAMAr_rUrMT
HOTEL
ELEVATIONS
3/32 " =1 ' -0"
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -2.7a
RESIDENCE INN SECTION
7--- RESIDENCE INN I FAIRFIELD INN
FAIRFIELD INN SECTION
GENE FOND
A S S O C IA T ES
ARCNREMLIRE - PLANNING • INTERIORS
1190 VISMOMSLM, U]9MMMU90021
910 ^ 209. 7620 910 ^ 209.7616 FAX
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
Calhne�l Aecaac
M9T3��erclenl
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
HOTEL
SECTIONS
SCALE:
3/32 " =1 ' -0"
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -2.8
COPYRIGHT 2013, GENE FONG ASSOCIATES
SECOND FLOOR PLAN
PENTHOUSE FLOOR PLAN
TYPICAL FLOOR PLAN
MECI1. /ELEC.
7A51 I
�I
--
-- -- — I
L
I
I
I
N
m
�— — — — — 52 FARKING SFACES
I
I ♦
I
9
I
I
STORE 3
I
°
rJ
ED � El 5
oc 26 —0°
I
26' -0°
0
I I
I I
L—
—
N
— — — — — — — —
o
STORE 12
MECH. /LEG.
0
171' -4"
PARKING PLAN
mi
GENE FOND
A S S O C IA T ES
ARCNREMLIRE - PLANNING • INTERIORS
1190 VISMOODSLM, U]9MMMU90021
910 ^ 209. 7620 910 ^ 209.7616 FAX
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
I Iv IV LR:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
Conhne�l Aecaac
M9T3��erclenl
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
HOTEL
CONDOMINIUM
FLOOR PLAN
SCALE:
3/32 " =1 ' -0"
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -3.1
COPYRIGHT 2013, GENE FONG ASSOCIATES
SECOND FLOOR TOWNHOUSE UNIT PLAN
LIVING
A D
N
DINING
LIVING
AND LIVING
DINING cl AND
❑ DINING C]- - T 103
105 104
KITCHEN
POWDER
ROOM KITCHEN
KITCHEN OW ROOM
POWDER ROOM M
STORAG => ROOM
21'-61" 22'-21" -2"
AREA: 780 SF AREA: 795 SF AREA: 920 SF
GROUND FLOOR TOWNHOUSE UNIT PLAN
GENE FOND
A S S 0 C IA T ES
ARCHIIIEMIZE - PLANNING • INTEII
SEABINUU11'
PA CIFICA
a
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
f%^Klr%^RA I A111 IRA
Aciiihh,
of III
CwUmmtolAssels
Management
! AKITIKIVKITAI ACCETC
SHEET TITLE:
HOTEL
CONDOMINIUM
TOWNHOUSE
UNIT PLANS
1 SCALE:
1/8" =1' -0"
A-3.2
COPYRIGHT 2013, GENE FONG ASSOCIATES
GENE FOND
A S S 0 C IA T ES
33' -10° ARCHIIIEMIZE - PLANNING • INTERIORS
1130 MWWOW SWCL LOS MMM CA SIM
310 - 209. 7820 310 - 209.7616 FAX
46,-B"
P A OJ E CT:
SEABISCUIT
BEDROOM 60'-0" PA CIFICA
47' -11°
BEDROOM rl E:1 YIT-A
7 LAVN I ND
El Zom
RESIDENCE INN
CLOSET LIVING Ql DIN I NG
LimAND FAIRFIELD INN
DINING 3ATHROOM
T I � rLm & SUITES
ATHROOM 305 STORAGE [El AND HOTEL
KITCHEN
304 BEDROOM 306 LIVING CONDOMINIUM
BEDROOM AND
RGE BEDROOM DINING PROJECT LOCATION:
KITCHEN 130 HUNTINGTON DR.
KITCHEN DER ATHR M CLOSET 0, AT ROO ARCADIA, CA 91007
BEDROOM
=� OWNER:
AREA: 1617 SF AREA: 1670 SF AREA: 1550 SF DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
.ft�.
TYPICAL FLOOR UNIT PLAN
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
HOTEL
CONDOMINIUM
TYPICAL
UNIT PLANS
SCALE:
1/811 =1 I-a„
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A-3-3
COPYRIGHT 2013, GENE FONG ASSOCIATES
u lj�
TOP OF 1 95'
7516,
7
6-51
6 54'6.,
5 44'
4
3.3'-6?'
3
23'
72 12161
EAST ELEVATION
J,
--. 71
[:I
I F�
TOP OF SUILDIIING, 95,
TOP OF ROOF —m67
75'6'
7
65'
6 54W
5 "1
4
33'-6'
3
23'
2
12'6'
WEST ELEVATION
TOP CFBUILDING 9
TOFF OF ROOF 87,61,
8
A
6
44'
®' i'�
z3
7
12'6"
I I I I I p 1 6
7q
LL-
NORTH ELEVATION
I GE -N-E-FON-G
PA CIFICA
a
RESIDENCE INN
FAIRFIELD INN
& SUITES
AKir) WOTPI
PROJECT LOCATION,
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
11111
Cwbmmt8IA&sNs
ManiI
Top OF BUILDING
CONTINENTAL ASSETS
MANAGEMENT
-10P OF 1103r
a
75'6W"
7
SHEET TITLE:
65'
HOTEL
6 S4.6
CONDOMINIUM
5
ELEVATIONS
4
3
SCALE:
23'
3/32"=1 '-0"
2
DATE:
03/24/14
PHASE:
SOUTH ELEVATION
JOB NUMBER:
1330
SHEET NUMBER:
A-3.4
COPYRIGHT 2013, GENE FONG ASSOCIATES
SECTION 1
SECTION 2
GENE FOND
A S S O C IA T ES
ARCNREMLIRE - PLANNING • INTERIORS
1190 VISMOMSLM, U]9MMMU90021
910 ^ 209. 7620 910 ^ 209.7616 FAX
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
,
of it I
CwUmmtol Assels
M9T3��erclenl
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
HOTEL
CONDOMINIUM
BUILDING
SECTIONS
SCALE:
3/32 " =1 ' -0"
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -3.5
COPYRIGHT 2013, GENE FONG ASSOCIATES
PROJECT INFORMATION PROJECT DATA EXISITNG HOTEL - SANTA ANITA INN (PHASE 1)
ADDRESS: 130 HUNTINGTON DR., ARCADIA, CA 91007 SITE AREA: 249,599 SF ROOMS 63
PROJECT DESCRIPTION: DUAL HOTEL AND CONDOMINIUM BUILDING MAX ALLOWED FAR: 1 SURFACE PARKING 85
OCCUPANCY TYPES: RESIDENTIAL: R -1, PARKING: S -3 FAR: 1,03
ROOM COUNT I DETAILED AREA BREAKDOWN
RESIDENCE INN (PHASE 1)
1
` • 000 © ©®
' • ` 000 © ©®
000 ©0®
000 ©0®
® SERVICE + STORE GROSS SF
�� 4 • ® TOTAL
199 9% 4%
FAIRFIELD INN AND SUITES (PHASE 1)
DBL QUEEN
SUITE
SERVICE + STORE GROSSSF
• •
BACKOFHOUSE+ ® TOTAL
9% 99/0 5396 2995
TOTAL KEYS 210
HOTEL CONDOMINIUM BUILDING
HOTEL CONDOMINIUM BUILDING (PHASE 11)
TOTAL
GROSSSF
PHASEII 102
TOTAL 352
* HOTEL CONDOMINIUM
•• r ®�� =•
• r ®�- •
` • ®�- •
• ®�- •
®�- •
®�- . •
* RESIDENCE
INN PUBLIC AREA
Entry Vestibule 155
Lounge +front desk +breakfast +study 2,170
Meeting room 595
Exercise room 420
Guest Laundry 260
Pre Function 1,295
Meeting roams 3,160
Restrooms 660
TOTAL 6,715
42% 26%
•• r •� �® r• . • r
• r ��® • •
• r ��� • •
• ��® • •
*
TOTAL GROSS SF 257,589
PARKING INFORMATION PARKING (PHASE II) GROSS SF
PROVIDED EXISTING BASEMENT GARAGE 22,122
SURFACE PARKING - PHASE I TOTAL 283 PARKING SPACES IN PHASE I 198 85
GARAGE PARKING - PHASE II 52 _
SURFACE PARKING-
FAIRFIELd INN AND SUITES PUBLIC AREA
Entry Vestibule 150
Lounge +front desk +breakfast 2,570
Market 65
Board room 300
Exercise 345
Restrooms 125
TOTAL 3,555
BLDG PUBLIC AREA
Lounge 892
Office on Ground Floor 1860
Concierge 253
Multi Purpose Room 350
Restrooms 75
TOTAL FOR GROUND FLOOR 3,4311
*Additional Office on Second Floor 1,160
GENE F ®NG
A S S O C IA T ES
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
i
RESIDENCE INN (PHASE 1)
1
` • 000 © ©®
' • ` 000 © ©®
000 ©0®
000 ©0®
® SERVICE + STORE GROSS SF
�� 4 • ® TOTAL
199 9% 4%
FAIRFIELD INN AND SUITES (PHASE 1)
DBL QUEEN
SUITE
SERVICE + STORE GROSSSF
• •
BACKOFHOUSE+ ® TOTAL
9% 99/0 5396 2995
TOTAL KEYS 210
HOTEL CONDOMINIUM BUILDING
HOTEL CONDOMINIUM BUILDING (PHASE 11)
TOTAL
GROSSSF
PHASEII 102
TOTAL 352
* HOTEL CONDOMINIUM
•• r ®�� =•
• r ®�- •
` • ®�- •
• ®�- •
®�- •
®�- . •
* RESIDENCE
INN PUBLIC AREA
Entry Vestibule 155
Lounge +front desk +breakfast +study 2,170
Meeting room 595
Exercise room 420
Guest Laundry 260
Pre Function 1,295
Meeting roams 3,160
Restrooms 660
TOTAL 6,715
42% 26%
•• r •� �® r• . • r
• r ��® • •
• r ��� • •
• ��® • •
*
TOTAL GROSS SF 257,589
PARKING INFORMATION PARKING (PHASE II) GROSS SF
PROVIDED EXISTING BASEMENT GARAGE 22,122
SURFACE PARKING - PHASE I TOTAL 283 PARKING SPACES IN PHASE I 198 85
GARAGE PARKING - PHASE II 52 _
SURFACE PARKING-
FAIRFIELd INN AND SUITES PUBLIC AREA
Entry Vestibule 150
Lounge +front desk +breakfast 2,570
Market 65
Board room 300
Exercise 345
Restrooms 125
TOTAL 3,555
BLDG PUBLIC AREA
Lounge 892
Office on Ground Floor 1860
Concierge 253
Multi Purpose Room 350
Restrooms 75
TOTAL FOR GROUND FLOOR 3,4311
*Additional Office on Second Floor 1,160
GENE F ®NG
A S S O C IA T ES
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
199 9% 4%
FAIRFIELD INN AND SUITES (PHASE 1)
DBL QUEEN
SUITE
SERVICE + STORE GROSSSF
• •
BACKOFHOUSE+ ® TOTAL
9% 99/0 5396 2995
TOTAL KEYS 210
HOTEL CONDOMINIUM BUILDING
HOTEL CONDOMINIUM BUILDING (PHASE 11)
TOTAL
GROSSSF
PHASEII 102
TOTAL 352
* HOTEL CONDOMINIUM
•• r ®�� =•
• r ®�- •
` • ®�- •
• ®�- •
®�- •
®�- . •
* RESIDENCE
INN PUBLIC AREA
Entry Vestibule 155
Lounge +front desk +breakfast +study 2,170
Meeting room 595
Exercise room 420
Guest Laundry 260
Pre Function 1,295
Meeting roams 3,160
Restrooms 660
TOTAL 6,715
42% 26%
•• r •� �® r• . • r
• r ��® • •
• r ��� • •
• ��® • •
*
TOTAL GROSS SF 257,589
PARKING INFORMATION PARKING (PHASE II) GROSS SF
PROVIDED EXISTING BASEMENT GARAGE 22,122
SURFACE PARKING - PHASE I TOTAL 283 PARKING SPACES IN PHASE I 198 85
GARAGE PARKING - PHASE II 52 _
SURFACE PARKING-
FAIRFIELd INN AND SUITES PUBLIC AREA
Entry Vestibule 150
Lounge +front desk +breakfast 2,570
Market 65
Board room 300
Exercise 345
Restrooms 125
TOTAL 3,555
BLDG PUBLIC AREA
Lounge 892
Office on Ground Floor 1860
Concierge 253
Multi Purpose Room 350
Restrooms 75
TOTAL FOR GROUND FLOOR 3,4311
*Additional Office on Second Floor 1,160
GENE F ®NG
A S S O C IA T ES
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
9% 99/0 5396 2995
TOTAL KEYS 210
HOTEL CONDOMINIUM BUILDING
HOTEL CONDOMINIUM BUILDING (PHASE 11)
TOTAL
GROSSSF
PHASEII 102
TOTAL 352
* HOTEL CONDOMINIUM
•• r ®�� =•
• r ®�- •
` • ®�- •
• ®�- •
®�- •
®�- . •
* RESIDENCE
INN PUBLIC AREA
Entry Vestibule 155
Lounge +front desk +breakfast +study 2,170
Meeting room 595
Exercise room 420
Guest Laundry 260
Pre Function 1,295
Meeting roams 3,160
Restrooms 660
TOTAL 6,715
42% 26%
•• r •� �® r• . • r
• r ��® • •
• r ��� • •
• ��® • •
*
TOTAL GROSS SF 257,589
PARKING INFORMATION PARKING (PHASE II) GROSS SF
PROVIDED EXISTING BASEMENT GARAGE 22,122
SURFACE PARKING - PHASE I TOTAL 283 PARKING SPACES IN PHASE I 198 85
GARAGE PARKING - PHASE II 52 _
SURFACE PARKING-
FAIRFIELd INN AND SUITES PUBLIC AREA
Entry Vestibule 150
Lounge +front desk +breakfast 2,570
Market 65
Board room 300
Exercise 345
Restrooms 125
TOTAL 3,555
BLDG PUBLIC AREA
Lounge 892
Office on Ground Floor 1860
Concierge 253
Multi Purpose Room 350
Restrooms 75
TOTAL FOR GROUND FLOOR 3,4311
*Additional Office on Second Floor 1,160
GENE F ®NG
A S S O C IA T ES
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
PHASEII 102
TOTAL 352
* HOTEL CONDOMINIUM
•• r ®�� =•
• r ®�- •
` • ®�- •
• ®�- •
®�- •
®�- . •
* RESIDENCE
INN PUBLIC AREA
Entry Vestibule 155
Lounge +front desk +breakfast +study 2,170
Meeting room 595
Exercise room 420
Guest Laundry 260
Pre Function 1,295
Meeting roams 3,160
Restrooms 660
TOTAL 6,715
42% 26%
•• r •� �® r• . • r
• r ��® • •
• r ��� • •
• ��® • •
*
TOTAL GROSS SF 257,589
PARKING INFORMATION PARKING (PHASE II) GROSS SF
PROVIDED EXISTING BASEMENT GARAGE 22,122
SURFACE PARKING - PHASE I TOTAL 283 PARKING SPACES IN PHASE I 198 85
GARAGE PARKING - PHASE II 52 _
SURFACE PARKING-
FAIRFIELd INN AND SUITES PUBLIC AREA
Entry Vestibule 150
Lounge +front desk +breakfast 2,570
Market 65
Board room 300
Exercise 345
Restrooms 125
TOTAL 3,555
BLDG PUBLIC AREA
Lounge 892
Office on Ground Floor 1860
Concierge 253
Multi Purpose Room 350
Restrooms 75
TOTAL FOR GROUND FLOOR 3,4311
*Additional Office on Second Floor 1,160
GENE F ®NG
A S S O C IA T ES
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
INN PUBLIC AREA
Entry Vestibule 155
Lounge +front desk +breakfast +study 2,170
Meeting room 595
Exercise room 420
Guest Laundry 260
Pre Function 1,295
Meeting roams 3,160
Restrooms 660
TOTAL 6,715
42% 26%
•• r •� �® r• . • r
• r ��® • •
• r ��� • •
• ��® • •
*
TOTAL GROSS SF 257,589
PARKING INFORMATION PARKING (PHASE II) GROSS SF
PROVIDED EXISTING BASEMENT GARAGE 22,122
SURFACE PARKING - PHASE I TOTAL 283 PARKING SPACES IN PHASE I 198 85
GARAGE PARKING - PHASE II 52 _
SURFACE PARKING-
FAIRFIELd INN AND SUITES PUBLIC AREA
Entry Vestibule 150
Lounge +front desk +breakfast 2,570
Market 65
Board room 300
Exercise 345
Restrooms 125
TOTAL 3,555
BLDG PUBLIC AREA
Lounge 892
Office on Ground Floor 1860
Concierge 253
Multi Purpose Room 350
Restrooms 75
TOTAL FOR GROUND FLOOR 3,4311
*Additional Office on Second Floor 1,160
GENE F ®NG
A S S O C IA T ES
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
•• r •� �® r• . • r
• r ��® • •
• r ��� • •
• ��® • •
*
TOTAL GROSS SF 257,589
PARKING INFORMATION PARKING (PHASE II) GROSS SF
PROVIDED EXISTING BASEMENT GARAGE 22,122
SURFACE PARKING - PHASE I TOTAL 283 PARKING SPACES IN PHASE I 198 85
GARAGE PARKING - PHASE II 52 _
SURFACE PARKING-
FAIRFIELd INN AND SUITES PUBLIC AREA
Entry Vestibule 150
Lounge +front desk +breakfast 2,570
Market 65
Board room 300
Exercise 345
Restrooms 125
TOTAL 3,555
BLDG PUBLIC AREA
Lounge 892
Office on Ground Floor 1860
Concierge 253
Multi Purpose Room 350
Restrooms 75
TOTAL FOR GROUND FLOOR 3,4311
*Additional Office on Second Floor 1,160
GENE F ®NG
A S S O C IA T ES
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
TOTAL GROSS SF 257,589
PARKING INFORMATION PARKING (PHASE II) GROSS SF
PROVIDED EXISTING BASEMENT GARAGE 22,122
SURFACE PARKING - PHASE I TOTAL 283 PARKING SPACES IN PHASE I 198 85
GARAGE PARKING - PHASE II 52 _
SURFACE PARKING-
FAIRFIELd INN AND SUITES PUBLIC AREA
Entry Vestibule 150
Lounge +front desk +breakfast 2,570
Market 65
Board room 300
Exercise 345
Restrooms 125
TOTAL 3,555
BLDG PUBLIC AREA
Lounge 892
Office on Ground Floor 1860
Concierge 253
Multi Purpose Room 350
Restrooms 75
TOTAL FOR GROUND FLOOR 3,4311
*Additional Office on Second Floor 1,160
GENE F ®NG
A S S O C IA T ES
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
FAIRFIELd INN AND SUITES PUBLIC AREA
Entry Vestibule 150
Lounge +front desk +breakfast 2,570
Market 65
Board room 300
Exercise 345
Restrooms 125
TOTAL 3,555
BLDG PUBLIC AREA
Lounge 892
Office on Ground Floor 1860
Concierge 253
Multi Purpose Room 350
Restrooms 75
TOTAL FOR GROUND FLOOR 3,4311
*Additional Office on Second Floor 1,160
GENE F ®NG
A S S O C IA T ES
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
BLDG PUBLIC AREA
Lounge 892
Office on Ground Floor 1860
Concierge 253
Multi Purpose Room 350
Restrooms 75
TOTAL FOR GROUND FLOOR 3,4311
*Additional Office on Second Floor 1,160
GENE F ®NG
A S S O C IA T ES
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
ARCNNEC7URE • PLANNING • INIEOIOR9
:190 W�i1N70D •.Wa WBM1096. U9110>121 a a
SFABISCUIT
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL
cPealcrl Ilr aerlP'
lre I I r
ContinellmlAsse93
kh9laa�eln9nl
,a,w, wx,xay.uwr
.•c.w. srr4...+.vM
CONTINENTAL ASSETS
ununr_rU
rnlr
PROJECT
SUMMARY
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
A -4.0
I'
IT
7 O
10-
S 3 S-1 S -7 S -2 ST 3 ST-4
ReAdence Inn m 4
arrioll
All
i
p r r
_I
S -1 S -2 I 5 -3 S -4 ST 1 ST -2
m -1
SW 6150 SW 5083 SW 6137 SW 7005 STONE TILE STONE TILE ACCENT METAL
UNIVERSAL KHAKI SABLE BURLAP PUREWHITE VENEER VENEER
S -S FS-6 5 -8 5T 3 5T 4
SW 5133 SW 7073 5W 6073 SW 6392 STONETILE STONETILE
MUSLIN NETWORK GRAY PERFECTGREIGE VITAL YELLOW VENEER VENEER
M -T
WINDOW MULLION
NE
G -1
SOLARBAN60
GLASS BELOI+V +CLEAR GLASS INSULATING UN
PPG
-
SOLARBAN 60 CLEAR GLASS INSULATING UN I1
WITH COLORED SPANDREL
PPG
GENE FONG
A S S O C I A T ES
AQpnFCTwrrr • PLwuwc • Irr>Er.4M
Sao arswrm a� .ac »� a. oms.
EABISC Il
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUMS
I DYNASTY COACHWORK -
INTERNATIONAL
all.
CQnlInentaI A"s
Managelneni
75+lawimgrd+r..,E
K�aava.y.ao-
CGMTINENTAL ASSETS
SHEET TiT::
COLOR AND
MATERIAL
BOARD
jQ0 NVO9ER:
I�ao
SHf'FT MjMSER'
6i0
WEST ELEVATION
5 -4
a
NORTH ELEVATION
fVl -'i S -4 Ca -1 L2T 2 ST 1
Fri
I
'T' _
SOUTH ELEVATION EAST ELEVATION
S-71 5 -2 ] FS --s
STUCCO STUCCO STUCCO
SW 6073 SW 6083
PERFECT GREIGE SABLE
I S-4
STUCCO
SW 7005
PURE WHITE
F'6
STUCCO
SVV 7073
NETWORK GRAY
E
METAL BATTEN ROOF
_. ter-... � • AC
rl
4
. �]:n,:L
IiF
1 X ,
i
,
,t.
ST -2
STONE VENEER
ST -1
ROOF SLATE TILE
Oki
Illf —2
WINDOW MULLION
SOLARBAN 60 CLEAR GLASS INSULATING UNIT
GENE FONG
A$ S O C I A T E S
S li A 1J I k-] 4-r U I 1
PA CIFICA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUMS
DYNASTY COACHWORK
INTERNATIDNAL
SFAAISC'-L11T PACIFICA- I IC.
Egn�ir�nlal Assatg
Management
CONTINENTAL ASSETS
UANAr —FUENT
SHEET TLTLE:
COLOR AND
MATERIAL
BOARD
SCALE:
WE-,
09%24%13
PHASE:
JOB NUMBER:
1330
SHEET NVMUER:
A-6.1
pp FYMGW 2013. GENE FCM ASSWA.TES
(�ON(�EFT PLANT Sr-HEDULE
VERITCAL ACCENT TREE
PHOENIX DACTYLIPERA / DATE PALM
20' 5TH
FLOWERING ACCENT TREE
V-V JACARANDA MIM051POLIA / JACARANDA MULTI -TRUNK
36" SOX
W aTREET TREE
GEDRUS DEODARA 'AUREA' / DEODAR CEDAR
56'' BOX
PARKING LOT TREE
I EN5I5 / CHILEAN MEaOUITE
;ANOPY TREE
/ WEEPING PIG
/ERC�REEN TREE
MPERVIRENE, / ITALIAN CYPRESS
RGREEN SUFFER PLANTING
PERVIRENE, / COAST REDWOOD
E5
VERTICAL TREE
4 R05USTA / MEXICAN PAN PALM
EET TREES
sAR / I7EODAR CEDAR
E HUNTINGTON DR
WILSON
ASSOCIATES
Landscape
Architecture
11262 Warmington St.
I, qFIF VV Riversi0e, CA 92503
issi 243 Ph.
Sr-AL E: I �O' 9571 353:1103 6 Fax
GENE FONG
A S S O C IA T E S
ARCHITECTURE • PLANNING • INTERIORS
1150 WESTWOM SI LOS AN6E K CA 90024
310 ^ 209.7620 910 ^ 209.7616 FAX
PROJECT:
SEABISCUIT
PA CIFI CA
IIII 122—d
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
RESIDENTIAL TOWER
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA. LLC.
.e5=_
C0 ASS913
M�Bnagemgnl
CONTINENTAL ASSETS
MANAGEMENT
LAN SAFE
FLAN
FHASE
SCALE:
DATE:
11/15/13
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
L -1.0
COPYRIGHT 2013, GENE FONG ASSOCIATES
C,ONC�EFT FL,4-,NT ��HEIXLE
VERTTCAL AGGENT TREE
PHOENIX DAGTI'LIFERA / DATE FALM
Gvu� 20' 5TH
FLOWERING AGGENT TREE
JACARANDA MIMO�IFOLIA / JACARANDA MULTI -TRUNK
36" BOX
�1J STREET TREE
GEDRUS DEODARA AUREA' / DEODAR CEDAR
Sb" 5OX
FARKINC LOT TREE
+ FRO50F15 CHILENSIS / CHILEAN ME50UITE
24" BOX
COLUMNAR EVERGREEN TREE 16
21 + CUFRE55U5 5EMFERVIRENa / ITALIAN CYFREaa
24'' BOX
EXISTING EVERGREEN BUFFER FLANTING 208
51 5EOUOIA SEMFERVIREN5 / GOAST REDW00D
EXISTING TREE5
5ECONDARY VERTICAL TREE 88
14 WASHINCTONIA R05U5TA /MEXICAN FAN FALM
165TH
EXISTING STREET TREES 3
120 GEDRU3 DEODAR / DEODAR CEDAR
EXISTING
NDC0VER5 - 5 GAL. / 36 5F 24,035 SF
dIGA / JAFANE5E 50XW00D
-LE -JOHN'/ DWARF 50TTLE ERJ3H
IECATA' / FLAX LILY
DNDRA
BENS / 5LUE OAT CRASS
SODS' / DOUBLE YELLOW DAYLILY
�,5F5ERRY BREEZE'/ CHINE5E H1515CU5
ANA'/ HALLS HONEYSUCKLE FLOWERING VINE
INK'/ TRAILING MYOFORUM
>VANDER' / LAVANDER NY GERANIUM
Y DATE FALM MULTI -TRUNK
ER'S VARIEGATED DWARF / VARIEGATED DWARF FITT05FORUM
U5 / YEW FINE
'R05TRATU5' / DWARF ROSEMARY
sUM ' VARIEEGATA' / VARIEGATED DVNARF JASMINE
I,g02 5F
TERSAVER 5LEND' / WATERSAVINC 5LEND OF TALL FESCUE
2,358 5F
12" O.G.
E HUNTINGTON DR
MAWA m (ET®) (.7) (LA) (.62)
50.2 X .7 X 48,720 X .62 � 1,061 453 GAL /YEAR
ESTIMATED TOTAL WATER USE
ETWU � (ETo) (.62) (PLANT FACTOR) (LA)
.q
50.2 X .62 X .5 X 48,720 = a42,423 CAL /YEAR
.q
ALL LANDSCAFE AREAS SHOWN SHALL 5E FRIVATELY MAINTAINED.
ALL LANDSCAFE AREA5 TO 5E IRRIGATED WITH A LOW -FLOW DRIP 5Y5TEM.
ALL LANDSCAFE AREAS TO RECEIVE MIN. 3'' LAYER OF SHREDDED 5ARK MULCH.
LAND50AFE PLANS SHALL OOMFLY WITH ALL AFFLIOAELE CODES OF THE ARCADIA
MUNIOIFAL CODE
THE LAND5CAFE 5OUARE FOOTAGE IS AS FOLLOWS:
51TE = 24q,77I 5F
TOTAL LANDSCAFE = 48 ?20 = Iq.5%
PARKING 5OUARE FOOTAGE = 48,7171 SF X 10% = 4?77 I SF LAND50AFE REOUIRED
13,007 SF LANDSCAFE PROVIDED
WILSON
ASSOCIATES
Landscape
Architecture
11262 Warmington St.
P, VjWqWV Riverside, CA 92503
Sr-issi
ALE: 30' 9571 353 -1 03 Fax
GENE FONG
A S S O C IA T E S
ARCHITECTURE • PLANNING • INTERIORS
1150 WESTWOM SI LOS AN6E K CA 90024
310 ^ 209.7620 910 ^ 209.7616 FAX
PROJECT:
SEABISCUIT
PA CIFI CA
7
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
RFSIr)FNTIAI TnWFR
I DYNASTY COACHWORK
INTERNATIONAL /
.e5=_
11 WIN
C0 ASS913
M�Bnagemgnl
CONTINENTAL ASSETS
FLAN
FHASE
3/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
L -1.1
COPYRIGHT 2013, GENE F0 G ASSOCIATES
SURVEY NOTES
/�
A
L I OU I DAMSAR AND .JACARANDAS ARE TOFFED AND THE
CIHORI5IA 15 TOO L AROE TO MOVE.
FICUA NITIDA AND DEODAR CEDAR ARE TOO ALRC-,,E TO MOVE
AND THE — IACARANDA5 ARE TOFFED.
FLATANU5, 5ALIX, 5ETULA AND LIOUIDAM5AR ARE TOFFED AND
THE FINES ARE TOO LAR &E TO M0\/F— OR IN FOOR HEALTH.
ri
a
l
Q`
5EOUOIA5 ARE E3EAUTIFUL AND TOO L AROE TO MOVE.
- IACARANDS ARE TOFFED, ERYTHF'INAS ARE NICE E3UT TOO
LARGE TO MOVE.
F 5ETUL A� AND JACARANDAS TOFF'ED, FRUNU5 FOOR HEAL TH, 5
FINUS TOO LARGE TO MOVE, LIOUIDAMPAR AND FLATANUS
TOFFED, LA(�,ERSTROEMIA AND ACER FALMATUM ARE TOO
CLOSE TO 5UILDINr-,,5 TO SALVAr::,F—.
3 5F—OUOIA5 THAT ARE TOO L AROE TO MOVE.
H TRAOHYOARFU5 FALM5 (6) NOT IN GREAT SHAFE, AREOASTRUM
FALM SALVAC7EAE3LE, AROHONTOFHOENIX OLUSTER NOT
\ TRAN5FLANTA5LE.
\
r /I
-fig �.
WILSON
ASSOCIATES
Landscane
Architecture
11262 Warmington St.
Riverside, CA 92503
J�i AJ = E3O� 19511 353 - 103 Fax
GENE FONG
A S S O C 1A T E S
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
PROJECT LOCATION:
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
�■s�
kill
CSI A.%mAR
FA8eag9mgnl
I I - ;_-_ I---
5UR \/E'T"
FHASE
11/15/13
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
L -1.2
COPYRIGHT 2013, GENE FONG ASSOCIATES
(�,C)N(�,EFfi FLANT 5(�,HEI%LE
VERITCAL ACCENT TREE
PHOENIX DACTYLIFERA / DATE PALM
20' E3TH
FLOWERING AGGENT TREE
JACARANDA MIM051FOLIA / JACARANDA MULTI -TRUNK
36" 50X
W STREET TREE
GEDRUS DEODARA AUREA' / 1DE01FAR GED,4R
36" BOX
® PARKING LOT TREE
PROSOPIS GHILENSIS /CHILEAN MESQUITE
24 '' BOX
l EVERGREEN CANOPY TREE
FICU5 NITDA / WEEPING FIC-
56" 50X
- O
R
_ F
mnn 116- �\ nnmx� mnn
irm Arm
__ -� mnn �I � IIIIIIII I I 1111111
_ � III �� � �IIIIIII � IIIIIIII `�
I I I�H ■�__ �'F �� I�
�r ►
'I� 1
�F
y
E HUNTINGTON DR
COLUMNAR EVERGREEN TREE 16
21 GUPRE55U5 5EMPERVIREN5 / ITALIAN GYPRE55
24'' BOX
EXI5TNC� EVERGREEN 5UFFER PLANTING 205
51 5EOUOIA SEMPERVIRENS / COAST REDWOOD
EXISTING TREES
5ECONDARY VERTICAL TREE 88
4 WAEHIN6TONIA ROBUSTA / MEXICAN PAN PALM
16' 5TH
EXI5TINC, 5TREET TREES 5
120 GEDRUS E=EDAR / DEODAR CEDAR
EX 1ST I NG
37 PRELIMINARY 5HRU5 / CROUNDCOVER5 - 5 COAL. / 36 5F 24,035 5F
5UXU5 MIGROPHYLLA JAPONICA / JAPANESE 50XW001F
GALLISTEMON CITRINUS 'LITTLE JOHN'/ DWARF 50TTLE BRUSH
OIANELLA TA5MANICA VARIECATA' / FLAX LILY
DICHONDRA REPEN5 / DICHONDRA
HELICTOTRICHON EEMPERVIRENE, / BLUE OAT GRASS
HEMEROC-ALL15 X 'BETTY W00D5' / DOU5LE YELLOW DAYLILY
HIB15CU5 R05A- 51NENSIS 'RASPBERRY BREEZE'/ CHINE5E HIB15CU5
LONIGERA JAPONICA 'HALLIANA' / HALLS HONEYSUCKLE FLOWERING VINE
WUOOLE -L
MYOPORUM PARVIFOLIUM 'FINK'/ TRAILING MYOPORUM
WUCOL5-L
PELARGONIUM PELTATUM 'LAVANDER' / LAVANDER IVY GERANIUM
WUGOLS�M
PHOENIX ROEBELENII / PIGMY DATE PALM MOLT -TRUNK
FITT05FORUM T051RA 'TURNER'S VARIEGATED DWARF'/ VARIEGATED DWARF PITT05PORUM
PODOCARPUS lACROPH-rLLUE /YEW PINE
R05MARINUS OFFICINALI5 'PR05TRATU5' / DWARF R05EMARY
WUCOLS -L
TRAC- HELOSPERMUM ASIATIC-UM 'VARIEGATA' / VARIEGATED 1DWARF JA5MINE
WUCOLS - M
RECREATIONAL TURF 1,802 SF
FEETUCA ARUNI7INACEA 'WATERSAVER BLEND' / WATEREAVING BLEND OF TALL FE5GUE
■ ANNUAL COLOR 2,355 5F
ANNUAL COLOR, 4" POTS © 12" O.G.
qL
Alk,
I
NOTE: TH15 LAND5GAPE PLAN WILL COMPLY WITH THE WATER
EFFICIENT LAND5CAPE ORDINANCE and CITY 5TANOARD5
MAXIMUM APPLIED WATER ALLOWANCE
MAMA = (ETo) (.7) (LA) (.62)
50.2 X .7 X 46,720 X .62 = 1,061455 GAL /YEAR
E57MATED TOTAL WATER U5E
ETWU = (ETo) (.62) (PLANT FACTOR) (LA)
.1�
50.2 X .62 X .5 X 43,720 m 042,425 OAL /YEAR
.1�
ALL LAND5GAP5 AR5A5 SHOWN SHALL 55 PRIVATELY MAINTAINED.
ALL LANDSOAPE AREA5 TO 5E IRRIGATED WITH A LOW -FLOW DRIP 5Y5TEM.
ALL LAN175GAP5 AR5A5 TO R5G51V5 MIN. S" LAYER OF 5HREF, 7 BARK MULCH.
LAND5CAPE PLAN5 5HALL COMPLY WITH ALL APPLIGASLE CODES OF THE AROADIA
MUNICIPAL CODE
THE LAND5GAPE 5OUARE FOOTAGE 15 A5 FOLLOWS:
SITE = 24q,771 5F
TOTAL LAND5GAPE = 48,`120 = 1q.5%
PARKING 5OUARE FOOTAGE = 46,771 5F X 10% = 4,677 5F LAND5CAPE REQUIRED
13,007 SF LANDSCAPE PROVIDED
WILSON
ASSOCIATES
Landscape
Architecture
11262 Warmington St.
Riverside, CA 92503
5GALE: = aO 19511 353 -1109 Fax
GENE FONG
A STS S O C �I A T E^ S
— TY
PA CIFI CA
F
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
PROJECT LOCATION:
130 HUNTINGTON DR.
ARCADIA, CA 91007
OWNER:
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
bf IN
CtL i*nlgiAssals
monagefftem
u,�.—
SHEET TITLE:
SC,HD-IT I C,
LANDSGAFE
FLAN
FHASE II
SCALE:
DATE:
11/15/13
SHEET NUMBER:
L -1.3
COPYRIGHT 2013, GENE FONG ASSOCIATES
APPENDIX A: CONDITIONS OF APPROVAL,
1. The remaining portion of Santa Anita Inn (buildings C -F) shall be demolished within three years
of the issuance of a Certificate of Occupancy for either of the two new hotels. In the event a
Development Agreement is approved by the City Council for the project, the terms of the
development Agreement on the retention of the Santa Anita Inn will supersede this condition.
2_ The portion of Santa Anita Inn remaining following construction of Phase 1 shall be provided
with a new lobby area within the existing building(s). Any changes or alteration to the building
shall be subject to review and approval by the Development Services Director or designee.
3. Each set of tandem parking spaces shall be assigned to a single unit unless a 24 -hour valet
service or equivalent measure is implemented. Any changes or alteration to the parking space
assignment shall be subject to review and approval by the Development Services Director or
designee.
4_ No architectural features, chimneys, vents, equipment, and other accessory rooftop structures
may be placed on top of the mansard roofs of the hotel condominium tower. The maximum
height of all elements is 95 feet.
5. A Tentative Tract Map must be filed with the City and approved prior to issuance of a building
permit for Phase 2 —the hotel condominium tower.
6. The Phase 2 component of the development will be a hotel Use and may be a hotel
condominium tower. Transient Occupancy Tax (TOT) shall be required to be remitted for the
Phase 2 component. The TOT requirement, as well as restrictions on how the units will be
managed: rented, and sold: shall be written into the Homeowners Association (HOA)
Covenants, Conditions, and Restrictions (CC8,Rs) for each individual owner The individual
property owner will not be able to stay indefinitely without paying the TOT_ The owners shall
rent their units by using the on -site management company. In no circumstances shall the units
be used for permanent residences. The site is not suitable for permanent residency; does not
possess facilities for such, and the City's General Plan does not allow residential uses at the
location, The draft HCA CC&Rs shall be submitted for review and approval by the City Attorney
prior to issuance of a Certificate of Occupancy for any of the hotel condominium units and the
CC &Rs shall notify prospective purchasers of the transient nature of the use and that they are
purchasing into a commercial hotel development and not a residential development. If a
DevelopmeM Agreement 1s approved for this project, the terms of the Development Agreement
shall govern on this issue. The applicantfproperty owner shall pay to the City; and make an
advance deposit therefore with the City in an amount determined by the City, all fees and costs
incurred by the City pertaining to the City Attorney's review and approval of the HOA CC &R's,
Any funds remaining on deposit following such review and approval shall be returned to the
applicant /property owner.
7. In accordance with the City's Transportation Impact Fee Program, the applicant shall pay its
development impact fees, which will mitigate the project's contribution to any cumulative
impacts to the westbound 1 -210 intersection at Santa Anita Avenue.
S. The design and construction of any and all traffic signals, signing, and striping modifications or
additions to accommodate the new entrance near the intersection of Huntington Drive and
Colorado Place shall be at the applicant's /property owner's expense.
9. Damaged sections of the existing curb and gutter on Huntington Drive shall be removed and
replaced per City of Arcadia Standards_
14
10. The applicantiproperty owner shall provide a street dedication along westbound Huntington
Drive, to create a continuous 1 U -0" parlavay width.
11. The applicant/property owner shall provide signage to clearly mark the monument roundabout
as "One Way," and also provide signage to clearly mark the exits from the condorninium hotel
site onto westbound and eastbound Huntington Drive(s) as "Left Turn Only."
12. New sidewalk along eastbound Huntington Drive per City Standard shall be constructed at the
applicant'sfproperty owner's expense. The property owner and site superintendent shall
coordinate with City Engineer and Public Works Services Director for the protection and/or
replacement of existing trees within the City's rights -cf -way.
13. The applicantiproperty owner shall prepare a Standard urban Stormwater Mitigation Flan
(SUSMP) for the proposed development, as prescribed by Los Angeles Department of Public
Works SUSMP Manual.
14. Prior to issuance of a building permit for each phase of the project, a detailed landscaping and
irrigation plan shall be prepared by the applioant/property owner for the project site. The
proposed project shall comply with the requirements of the City's Water Efficient Landscaping
Ordinance_
15. No cell tower or other similar wireless communication facilities or electronic structure, antenna,
or equipment (other than HVAC or air control units) shall be installed on the roof or exterior of
any buildings.
16. The applicantiproperty owner shall enter into and maintain at all times reciprocal parking
agreements with owners of property on which parking lot is located within 2,000 feet of the
project site, as measured from the property line, for purposes of providing parking for guests
and employees of uses on the project site during special events and periods of high demand.
Promptly upon demand by the City, from time to time the applicantiproperty owner shall provide
to the City evidence of all such agreements then in effect_
17. All City requirements regarding disabled access and facilities, occupancy limits, building safety,
fire prevention; detection and suppression; health code compliance; emergency access,
egress. and equipment; water Supply and facilities; sewer facilities, trash reduction and
recycling requirements, environmental regulation compliance, including National Pollution
Discharge Elimination System (NPOES) measures; and parking and site design shall be
complied with to the satisfaction of the Building Official, City Engineer, Community
Development Administrator, Fire Marshal, and Public Works Services director. Ccmpliance
with these requirements shall be determined by having fully detailed construction plans
submitted for plan check review and approval by the foregoing City officials and employees.
18. The uses approved by these applications shall be operated and maintained in a manner that is
consistent with the proposal and plans submitted and approved- and shall be subject to periodic
inspections, after which the provisions of this approval may be adjusted after due notice to
address any adverse impacts to the adjacent streets, rights -of -way, and/or the neighboring
businesses, residents, or properties.
19. Noncompliance with the plans, provisions and conditions of approval shall be grounds for
irnmediate suspension or revocation of any approvals. which could result in the closing of the
hotels and hotel condominium.
GENE FONG
A S S O C I A T E S
ARCHRECMRE - PIANNINO - IMERMS
1190VAW*X DB W. IOBANMRG9MM
310 - 209.7620 910 - 209. 7616 FAX
PROJECT:
SEABISCUIT
PA CIFI CA
in IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
.1&9
of Ito
Condwnlal Assets
Mana�emenl
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX A
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
20. The applicant shall defend, indemnify; and hold harmless the City of Arcadia and its officials,
officers, employees; and agents from and against any claim; action, or proceeding against the
City of Arcadia, its officials, officers: employees or agents to attack: set aside; void; or annul
any approval or conditional approval of the City of Arcadia concerning this project andlor land
use decision; including but not limited to any approval or conditional approval of the City
Council; Planning Commission, or City Staff, which action is brought within the time period
provided for in Government Code Section 66499.37 or other provision of law applicable to this
project or decision. The City shall promptly notify the applicant of any claim, action, or
proceeding concerning the project andlor land use decision and the City shall cooperate fully in
the defense of the matter. The City reserves the right, at its own option, to choose its own
attomey to represent the City, its officials, officers, employees, and agents in the defense of the
matter.
21. Approval of GPA 14 -41, SP 13 -02, and ZC 14 -01 shall not be of effect unless on or before 30
calendar days after City Council adopts the Resolution and Ordinance, the property
ownerlapplicant has executed and filed with the Community development Administrator an
Acceptance Form available from the Development Services Department to indicate awareness
and acceptance of these conditions of approval.
Mitigation Measures as Conditions of Approval
The foflowing conditions are found in ripe MingeVon tl omtorrr,g and Repoding Program (VIVRP).
They are recorded here to facilitate review and implementabon. More information on the timing and
responsible parties for rhese mitigation measures is derailed in the IUMMRP.
22. Prior to issuance of a building permit, the applicant shall demonstrate that all project windows
are glazed or otherwise treated to minimize glare on surrounding roads and properties, to the
satisfaction of the Development Services Director or designee.
23. Prior to issuance of a grading permit, the general contractor for the project shall prepare and
file a Dust Control Plan with the City that complies with SCQAMD Rule 403 and requires the
following during excavation and construction as appropriate:
• Apply nontoxic chemical soil stabilizers according to manufacturers' specifications to all
inactive construction areas (previously graded areas inactive for 10 days or more).
Water active sites at least twice daily (locations where grading is to occur will be
thoroughly watered prior to earthmoving).
• Cover all trucks hauling dirt, sand, soil. or other loose materials, or maintain at least 2
feet of freeboard (vertical space between the top of the load and top of the trailer) in
accordance with the requirements of California Vehicle Code (CVC) Section 23114.
• Pave construction access roads at least 100 feet onto the site from the main road.
Control traffic speeds within the property to 15 mph or less.
24. Prior to the issuance of a grading permit, the project developer shall require by contract
specifications that contractors shall utilize California Air Resources Board (GARB) Tier II
Certified equipment or better during the roughfmass grading phase for rubber -tired dozers and
scrapers. Contract specifications shall be included in the proposed project construction
documents, which shall be reviewed by the City.
25. Prior to the issuance of a grading or building permit for each phase; the project developer shall require
by contract specifications that contractors shall place construction equipment staging areas at least
200 feet away from sensitive receptors. Contract specifications shall be included in the project
construction documents; which shall be reviewed by the City.
15
26. Prior to the issuance of a building permit for each phase, the project developer shall require by
contract specifications that contractors shall utilize power poles or clean -fuel generators for
electrical construction equipment. Contract specifications shall be included in the proposed
project construction documents, which shall be reviewed by the City.
27. Prior to issuance of a grading permit for each phase; the developer shall provide an
assessment of existing trees on the areas to be developed. This tree assessment shall be
prepared by a qualified landscape architect and identify any existing large bushes or trees that
can be relocated or preserved as part of the new development project. The project landsoaping
plans shall attempt to preserve existing mature trees onsite to the extent feasible, based on the
tree assessment. This measure shall be implemented to the satisfaction of the City Planning
Division.
28. During project construction in either phase, the existing redwood trees along the east side of
the property shall be protected by being taped or roped off with appropriate signage so
construction equipment will not accidentally come in contact with and damage or destroy any
trees. The trees shall be sprayed with water at the end of each day when substantial amounts
of dust are generated (e.g., during grading or demolition) -o minimize damage from dust
deposition. This measure shall be implemented to the satisfaction of the City Planning Division.
29. Construction in either phase should not occur during the local nesting season (estimated
February 1 to July 15). If any construction occurs during the nesting season, a nesting bird
survey shall be conducted by a qualified biologist prior to the issuance of a grading permit or
removal of any large trees on the existing hotel property. If the biologist determines that nesting
birds are present, an area of 100 feet shall be marked off around the nest and no construction
activity can occur in that area during nesting activities. Grading and/or construction may resume
in this area when a qualified biologist has determined the nest is no longer occupied and all
juveniles have fledged. This measure shall be implementec to the satisfaction of the City
Planning Services.
30. Prior to demolition of any existing hotel buildings on the site, the completed DPR 523A and 523B
forms and a cover memorandum shall be submitted to the City for filing to officially document the
historical assessment far the Santa Anita Inn. This measure shall be implemented to the satisfaction of
the City Planning Services,
31. While there is no known historical significance as that term is defined under CEQA, the applicant
has proposed to install a plaque indicating the location of the former Santa Anita Inn and its place in
the history of the City of Arcadia. The size, construction, and location of this plaque shall be up to the
discretion of the City Manager, in consultation with the Planning Services, as well as other historical
facts about the site as reasonably recommended by the Arcadia H storical Society or the City; and as
reasonably determined by the City.
32. If cultural artifacts are discovered during project grading, work shall be halted in that area until a
qualified historian or archaeologist can be retained by the developer to assess the significance
of the find. The project cultural monitor shall observe the remaining earthmoving activities at the
project site consistent with Public Resources Code Section 21083.2(b), (c), and (d). The
monitor shall be equipped to record and salvage cultural resources that may be unearthed
during grading activities. The monitor shall be empowered to temporarily halt or divert grading
equipment to allow recording and removal of the unearthed resources.
33. If any resources of a prehistoric or Native American origin are discovered the appropriate
Native American tribal representative will be contacted and invited to observe the monitoring
program for the duration of the grading phase at tribal expense. Any Native American
resources shall be evaluated in accordance with the CEGA Guidelines and either reburied at
the project site or curated at an accredited facility approved by the City of Arcadia. Once
grading activities have ceased or the cultural monitor determines that monitoring is no longer
17
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
.r.
9 1
I's Ito
Condwnlal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX A
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
necessary, such activities shall be discontinued. This measure shall be implemented to the
satisfaction of the City Planning Services.
34. If paleontological resources (fossils) are discovered during project grading, work will be halted
in that area until a qualified paleontologist can be retained to assess the significance of the find.
The project paleontologist shall monitor remaining earthmoving activities at the project site and
shall be equipped to record and salvage fossil resources that may be unearthed during grading
activities. The paleontologist shall be empowered to temporarily halt or divert grading
equipment to alloy recording and removal of the unearthed resources. Any fossils found shall
be evaluated in accordance with the CEQA Guidelines and offered for curation at an acoredited
facility approved by the City of Arcadia. Once grading activities have ceased or the
paleontologist determines that monitoring is no longer necessary, monitoring activities shall be
discontinued. This measure may be combined with CUL -3 at the discretion of the City Planning
Services.
35. In the event of an accidental discovery or recognition of any human remains, California State
Health and Safety Code § 7050.5 dictates that no further disturbance shall occur until the
County Coroner has made the necessary findings as to origin and disposition pursuant to
CEQA regulations and PRC § 5097.98. If human remains are found, the LA County Coroner's
office shall be contacted to determine if the remains are recent or of Native American
significance. Prior to issuance of a grading permit, the developer shall include a note to this
effect on the grading plans for the project.
36. To ensure reductions below the expected "Business As Usual" (BAU) scenario, the project will
implement a variety of measures that will reduce its greenhouse gas (GHG) emissions. To the
extent feasible, and to the satisfaction of the City of Arcadia (City): the following measures will
be incorporated into the design and construction of the SP -SP project prior to the issuance of
building permits:
Corrstrucrien and Building Materlais
Recyclelreuse at least 50 percent of the demolished andlor grubbed construction
materials (including; but not limited to, soil, vegetation, concrete, lumber: metal; and
cardboard).
• Use 'Green Building Materials," such as those materials that are resource- efficient and
are recycled and manufactured in an environmentally friendly way, for at least 10
percent of the project.
Energy Efflciency Measures
• Design all project buildings to exceed the 2013 California Building Code's (CBC) Title
24 energy standard by 10 percent, including, but not limited to. any combination of the
following-.
• Design buildingsto accommodate future solar installations as appropriate.
• Limit air leakage through the structure or within the heating and coaling distribution
system to minimize energy consumption.
• Incorporate ENERGY STAR or better rated windows, space heating and cooling
equipment, light fixtures, appliances, or other applicable electrical equipment.
Install efficient lighting and lighting control systems. Use daylight as an integral part of
the lighting systems in buildings.
NP Install light - colored roofs and pavement materials where possible.
• Install energy - efficient heating and cooling systems, appliances and equipment, and
control systems.
♦ Install solar lights or light- emitting diodes (LEDs) for outdoor lighting or outdoor lighting
that meetsthe 2013 California Building and Energy Code.
Water Conservation and Efficiency Measures
Devise a comprehensive water conservatian strategy appropriate for the project and its location
consistent with the City s Water Efficiency Landscape Ordinance (WELD)_ The strategy may
include the following, plus other innovative measures that may be appropriate-.
+ Create water- efficient landscapes within the development.
• Install water- efficient irrigation systems and devices, such as soil moisture -based irrigation
controls.
Design buildings to be water- efficient. Install water - efficient fixtures and appliances,
including low -flow faucets, dual -flush toilets, and waterless urinals.
• Restrict watering methods (e.g., prohibit systems that apply water to non - vegetated
surfaces) and control runoff.
Saiid Wasfe Measures
To facilitate and encourage recycling to reduce landfill - associated emissions, among others,
the project will provide trash enclosures that include additional enclosed area(s) for collection of
recyclable materials. The recycling collection area(s) will be located within, near, or adjacent to
each trash and rubbish disposal area. The recycling collection area will be a minimum of 50
percent of the area provided for the trash /rubbish enclosure(s) or as approved by the City's
Public Works Services Department, Provide employee education on waste reduction and
available recycling services_
Transportafion Meesures
To facilitate and encourage non - motorized transportation, bicycle racks shall be provided in
convenient locations to facilitate bicycle access to the project area. The bicycle racks shall be
shown on project landscaping and improvement plans submitted for Planning Services
approval and shall be installed in accordance with those plans.
Provide pedestrian walkways and connectivity throughout the project
Fund or participate in some type of shuttle service for hotel guests to access-the City`s
downtown Gold Line Station.
37. Prior to demolition of any existing hotel buildings or associated structures; a qualified contractor
shall be retained to survey structures proposed for demolition to determine if asbestos -
containing materials (AGMs) and /or lead -based paint (LBP) are present. If AGMs andlor LBP
are present, prior to commencement of general demolition, these materials shall be removed
and transported to an appropriate landfill by a licensed contractor. This measure shall be
implemented to the satisfaction of the City Building Services including written documentation of
the disposal of any ACMs or LBP in conformance with all applicable regulations.
38. Prior to issuance of a grading permit, the developer shall file a Notice of Intent (NOI) with the
Los Angeles Regional Water Quality Control Board to be covered under the National Pollutant
Discharge Elimination System (NPDES) General Construction Permit for discharge of storm
water associated with construction activities. The project developer shall submit to the City the
Waste Discharge Identification Number issued by the State Water Quality Control Board
(SWQCB) as proof that the project's NOI is to be covered by the General Construction Permit
has been filed with the 3VVQCB. This measure shall be implemented to the satisfaction of the
City Engineer.
M
GENE FONG
A S S O C I A T E S
ARCHRECNRE - PIANNINO - IMERMS
1190VAW*X D0 W. I08ANMRG9MM
310 - 209.7620 910 - 209. 7616 FAX
PROJECT:
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
.r.
9 i
I's Ito
Condwnlal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX A
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
39. Prior to issuance of a grading permit; the developer shall submit to the Los Angeles Regional
Water Quality Control Board (RWUCB) and receive approval for a project - specific Storm Water
Pollution Prevention Plan (SVVPPP) The SWPPP shall include a surface outer control plan and
erosion control plan citing specific measures to control on -site and off -site erosion during the
entire grading and construction period. In addition, the SWPPP shall emphasize structural and
nonstructural best management practices (BMPs) to control sediment and non - visible
discharges from the site. BMPs to be implemented may include (but shall not be limited to) the
fallowing:
• Potential sediment discharges from the site may be controlled by the following: sandbags,
silt fences, straw wattles, fiber rolls, a temporary debris basin (if deemed necessary), and
other discharge control devices. The construction and condition of the BMPs are to be
periodically inspected by the RWQCB during construction; and repairs would be made as
required.
• Area drains within the construction area must be provided with inlet protection. Minimum
standards are sandbag barriers, or two layers of sandbags with filter fabric over the grate,
properly designed standpipes, or other measures as appropriate.
• Materials that have the potential to contribute non - visible pollutants to stormwater must not
be placed in drainage ways and must be placed in temporary storage containment areas.
• All loose soil, silt; clay, sand, debris; and other earthen material shall be oontrolled to
eliminate discharge from the site. Temporary soil stabilization measures to be considered
include: covering disturbed areas with mulch, temporary seeding, soil stabilizing binders,
fiber rolls or blankets, temporary vegetation, and permanent seeding. Stockpiles shall be
surrounded by silt fences and covered with plastic tarps.
• Implement good housekeeping practices such as creating a waste collection area, putting
lids en waste and material containers, and cleaning up spills immediately.
• The SWPPP shall include inspection forms for routine monitoring of the site during the
construction phase.
• Additional required BMPs and erosion control measures shall be documented in the
SWPPP.
• The SWPPP would be kept on site for the duration of project construction and shall be
available to the local Regional Water Quality Control Board for inspection at any time.
The developer andlor construction contractor shall be responsible for performing and
documenting the application of 6MPs identified in the project - specific SWPPP. Regular
inspections shall be performed on sediment control measures called for in the SWIDPP. monthly
reports shall be maintained and available for City inspection. An inspection lag shall be
maintained for the project and shall be available at the site for review by the City and the
Regional Water Quality Control Board as appropriate.
40. Prior to issuance of a grading permit, a site - specific Standard Urban Stormwater Management
Plan (SUSMP) shall be submitted to the City Planning Division for review and approval. The
SUSMP shall specifically identify the long -term site design: source control, and treatment
control BMPs that shall be used on site to control pollutant runoff and to reduce impacts to
water quality to the maximum extent practicable. At a minimum, the SUSMP shall identify and
the site developer shall implement the following site design, source control, and treatment
control BM Ps as appropriate:
20
Site Design BMPs
• Minimize urban runoff by maximizing permeable areas and minimizing impermeable areas
(recommended minimum 25 percent of site to be permeable).
• Incorporate landscaped buffer areas between sidewalks and streets.
• Maximize canopy interception and water conservation by planting native or draught - tolerant
trees and large shrubs wherever possible.
• Where soil conditions are suitable, use perforated pipe or gravel filtration pits far low flow
infiltration.
• Construct onsite pending areas or retention facilities to increase opportunities for infiltration
consistent with vector control objectives.
' Construct streets, sidewalks and parking lot aisles to the minimum widths necessary,
provided that publio safety and a walkable environment far pedestrians are not
compromised.
• Direct runoff from impervious areas to treatment control BMPs such as
landscaping/bioretention areas.
Source Control BMPs
Source control BMPs are implemented to eliminate the presence of pollutants through
prevention. Such measures can be both non - structural and structural.
Non - Structural Source Control BMPs
• Education for property owners, tenants, occupants; and employees.
• Activity restrictions_
• Irrigation system and landscape maintenance to minimize water runoff.
• Common area litter control.
• Regular mechanical sweeping of private streets and parking lots_
• Regular drainage facility inspection and maintenance_
Structural Source Control F3MPs
• Municipal Separate Storm Sewer System (MS4) stenciling and signage at stormdc %vn drains
• Properly design trash storage areas and arry outdoor material storage areas.
Treatment Control BIVIPs
Treatment control BMPs supplement the pollution prevention and source control measures bytreating
the water to remove pollutants before it is released from the project site. The treatment control BMP
strategy for the project is to select Low Impact Development (LID) BMPs that promote infiltration and
evapotranspiration, including the construction of infiltration basins; bioretention facilities; and
extended detention basins. Where infiltration BMPs are not appropriate, bioretention andFor
biatreatment DMPS (including extended detention basins, bioswales, and constructed wetlands) that
provide opportunity for evapotranspiration and incidental infiltration may be utilized_ Harvest and use
RMPs (e.g.: storage pods) may be used as a treatment control BMP to store runoff for later non -
potable uses_
Nj
GENE FONG
SEABISCUIT
PA CIFI CA
in IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
9i
I's Ito
Continenlal Assets
Mana�emenl
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX A
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
41. Prior to issuance of grading and building permits for each phase of the project, the developer
shall prepare a Construction Noise Control Plan and will submit the plan to the City for review
and approval. The plan shall include but will not be limited to the fallowing.
• During all project site excavation and grading, contractors shall equip all construction
equipment, fixed or mobile, with properly operating and maintained mufflers consistent with
manufacturers' standards.
• The project contractor shall place all stationary construction equipment so that emitted
noise is directed away from the closest sensitive receptor to the project site (i.e., the
Salvation Army facility at the southwest corner of the site).
• The construction contractor shall locate equipment staging in areas thatwill create the
greatest distance between constructian- related noise sources and the closest naise-
sensitive receptor to the project site (i.e., the Salvation Army facility at the southwest corner
of the site) during all project construction.
• During all project site construction; the construction contractor shall limit all construction-
related activities that would result in high noise levels to between the hours of 7;00 a.m. to
7:00 p.m. on weekdays and Saturdays. No construction shall be permitted on Sundays or
any of the holidays listed in AMC Section 4261.
• Prior to the start of Phase 2 grading, the developer shall install a wooden noise barrier along
the common boundary of the project and the Salvation Army rehab facility at the southwest
corner of the project site. This barrier shall be removed upon completion of Phase 2
construction.
42. Prior to the issuance of building permits for each phase, the developer shall demonstrate that
all buildings shall have air - conditioning to minimize noise impacts on hotel rooms along West
and East Huntington Drives.
43. Prior to the issuance of occupancy permits for the Phase 2 hotel condominium building, the
developer shall install a filled -cell concrete block wall along the common boundary with the
Salvation Army rehab facility at the southwest corner of the project site. In lieu of the temporary
construction wall outlined in condition no. 39; the developer may install this permanent wall
"early' (i_e., prior to issuance of occupancy permits for Phase 1) which would eliminate the need
for that portion of condition no. 39.
44. Prior to issuance of an occupancy permit for either hotel in Phase 1, the developer shall be
responsible for installing an additional signal phase to accommodate northbound movements
exiting the shared hotel driveway and southbound movements entering the hotel driveway_ The
developer will also change the number one lane to a shared through and left turn lane to
access the driveway for the hotels and madify the signal to account for the added phases and
lanes. These changes shall be made to the satisfaction of and in coordination with the City
traffic engineer.
45. Prior to issuance of occupancy permits far either of the hotels or the hotel condominiums, the
developer shall install bike racks and provide showers and locker rooms for employees who
wish to ride bicycles to ~work. Bike racks shall also be installed for project guests in appropriate
locations. An appropriate number of bike racks as determined by the City of Arcadia shall be
located near each building to serve the anticipated number of employees and guests. This
measure shall be implemented to the satisfaction of the City Engineer.
46. Prior to issuance of building permits for either Phase 1 or Phase 2, the project plans shall be
circulated to Foothill Transit (FT) and the Metropolitan Transit Authority (MTA) to determine if
there is a need for a taus stop on the south side of Colorado Place in front of the project site
(e.g.: for either FT Route 187 or VITA routes 78, 79, or 378). If either agency determines a need
for such a stop; the developer shall install a bus stop to agency specifications prior to issuance
W
of occupancy permits for the affected phase of development. This measure shall be
implemented for each phase to the satisfaction of the City Engineer.
47. Prior to issuance of occupancy permits for either hotel in Phase 1, the developer shall
demonstrate that the main hotel entrance for Phase 1 has a circular drive with signage to allow
only one way circulation (Counter- cl0ckwise) to provide adequate vehicle queuing lanes for
exiting at the traffic signal. This measure shall be implemented to the satisfaction of the City
Engineer.
48. Prior to issuance of a building permit for either hotel, the developer shall retain a qualified
licensed civil engineer to conduct a sewer study to evaluate before and after conditions of the
project on the City's existing sewer system {both lateral and main lines)_ This measure shall be
implemented to the satisfaction of the City Public Works Services Department and the County
Sanitation Districts of Las Angeles County as appropriate.
49. Prior to issuance of an occupancy permit for either hotel, the developer shall make a fair share
contribution to the City to help fund upgrading of the existing sewer in West Huntington Drive
included in the City's 2014 -15 Capital Improvement Project Plan budget, based on the results
of the sewer study outlined in Mitigation Measure UTL -1. This measure shall be implemented
to the satisfaction of the City Engineer and/or the City Public Works Services Department as
appropriate.
50. Prior to issuance of an occupancy permit for either hotel, the developer shall also make a fair
share contribution to the County Sanitation Districts of Los Angeles County for any trunk line
improvements required to serve the project based on the results of the sewer study. This
measure shall be implemented to the satisfaction of the City Public Work's Services Department
in consultation with the County Sanitation Districts of Los Angeles County as apprapriate.
51. In accordance with the City's Transportation Fee Prograrn, the applicant shall pay its
development impact fees which will mitigate any cumulative impacts in the future at the
westbound I -201 intersection at Santa Anita Avenue.
52. Prior to issuance of an occupancy permit for either hotel, the developer shall make a fair share
contribution to fund project - related portions of any improvements needed to provide adequate
electrical service to the project. This measure shall be implemented to the satisfaction of the
City Public Works Services Department in consultation with Southern California Edison.
Milk
GENE FONG
SEABISCUIT
PA CIFI CA
in IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
9
I's Ito
Condwnlal Assets
Manage �enl
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX A
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
APPENDIX B: GENERAL PLAN CONSISTENCY
Table 13-1: Seahiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
Land Use and Community Design
Goal LU -1
A balance of land uses that preserves Arcadia's status as a
Consistent The project is generally consistent with the General
Community of Homes and a community of opportunity
Plan and zoning requirements for commercial zoning (C -2) and
will provide a variety of lodging opportunities for visitors to Santa
Anita Park race track and the City as a whole.
Policy LU -1.1
Promote new infill and redevelopment projects that are consistent with
Consistent The project will redevelop the Santa Anita Inn
the City's land use and compatible with surrounding existing uses.
property with higher FAR and modern hotel accommodations.
The Initial Study for the project indicates it is generally
compatible with surrounding land uses despite the proposed
height of the hotel condo building. The hotel condo building is
proposed at 98 feet while the zone height allowance is 95 feet.
However, the additional 3 feet is for architectural treatment only
(it still meets the 8 -story limit) and the additional space is
unoccupied. Therefore, it is generally consistent with the City's
height limit for this area ( +3 %)
Policy LU -1.2
Promote new uses of land that provide diverse economic, social, and
Consistent The project proposes two hotels and hotel
cultural opportunities, and that reinforce the characteristics that make
condominiums that will provide a variety of jobs and attractive
Arcadia a desirable place to live.
places for race track workers to live during the Santa Anita Park
race season.
Policy LU -1.4
Encourage the gradual redevelopment of incompatible, ineffective,
Consistent The project will redevelop the older Santa Anita Inn
and/or undesirable land uses.
property with higher FAR and modern hotel accommodations.
Policy LU -1.5
Require that effective buffer areas be created between land uses that
Consistent The project will have a redwood tree windrow and
are of significantly different character or that have operating
street as a buffer for the County Park to the east. The City Hall
characteristics which could create nuisances along a common
recreation fields to the south also have a landscaping windrow to
boundary.
help buffer it from the new project. The other boundaries of the
site are streets except the far north end which is adjacent to an
older bar ("100 to 1 Club "). These features provide adequate
buffers for the proposed project from surrounding land uses.
Policy LU -1.7
Encourage developments to be placed in areas that reduce or better
Consistent The project proposes various kinds of lodging that
distribute travel demand.
will not generate large amounts of long -term traffic within the
City. The project traffic study concludes that the surrounding
road network is sufficient for project traffic with mitigation
outlined in the Initial Study.
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
dt
oil IN
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
Policy LU -1.8
Encourage development types that support transit and other
Consistent The roads adjacent to the project site allow for
alternative forms of transportation, including bicycling and walking.
transit and pedestrian access (i.e. sidewalks), and it is
accessible to the downtown area to the north which has a new
Gold Line transit station.
Policy LU -1.9
Establish incentives and development standards to encourage
Consistent The project will provide extensive landscaping, a
development of land uses that provide public amenities and/or
central lawn area with gardens and statuary, and public activity
desirable facilities or features, as well as private open space and
areas.
recreation areas.
Policy LU -1.10
Require that new development projects provide their full fair share of
Consistent The project will construct improvements indicated in
the improvements necessary to mitigate project generated impacts on
the project traffic study or pay its full fair share toward
the circulation and infrastructure systems.
improvements necessary to mitigate project impacts on
circulation and utility infrastructure.
Goal LU -2
A City with a distinctive and attractive public realm, with pedestrian-
Consistent The project will add to the City's distinctive and
friendly amenities in commercial and mixed -use districts and single
attractive public realm through its architecture, aesthetic quality,
family neighborhoods that continue to maintain Arcadia's standard of
and pedestrian - friendly amenities. It will have extensive
architectural and aesthetic quality
landscaping, a central lawn area with gardens and statuary, and
public activity areas that will be accessible to pedestrians from
surrounding roadways.
Policy LU -2.3
Develop a public art program that encourages and guides the creation,
Consistent The proposed project will add to the public art
promotion, implementation, and maintenance of public art throughout
program by including statues and rose gardens around the
the City. Emphasize art that draws upon the local history and is placed
central lawn area as part of its comprehensive landscaping plan.
at locations accessible to the public.
Policy LU -2.5
Develop a hierarchy of gateways to mark entrances into the City, as
Consistent The project will be visible to travelers entering the
illustrated by Figure LU -6.
City along Huntington Drive and other nearby major streets due
to its height and visual appeal.
Policy LU -2.6
Ensure the aesthetic quality and pedestrian orientation of the City's
Consistent The project will add to the aesthetic quality and
commercial corridors by implementing the recommendations of this
pedestrian orientation of the City's commercial corridors through
Community Design section, as well as the Architectural Design
the use of its attractive architecture, and the site is accessible to
Guidelines for commercial and industrial properties.
pedestrians from surrounding streets.
Goal LU -6
Attractive and vibrant commercial corridors that provide for the retail,
Consistent The project will provide lodging and related
commercial, and office needs of Arcadia with expanded opportunities
commercial space in support of Santa Anita Park and the City
for mixed -use development
downtown area.
Policy LU -6.1
Encourage all new commercial development, through the use of
Consistent The project will provide areas for public gatherings
entitlement incentives and /or requirements, to provide public gathering
that are accessible to pedestrians from adjacent streets.
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
t
oil WIN
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
spaces and pedestrian facilities and connections.
Policy LU -6.4
Encourage design approaches that create a cohesive, vibrant look and
Consistent The appearance of the project will mainly be the
that minimize the appearance of expansive parking lots on major
hotel and condominium buildings and landscaping. It will have
commercial corridors for new or redeveloped uses.
limited surface parking and some subterranean parking.
Policy LU -6.6
Develop landscaping that is compatible with the City's water efficient
Consistent Landscaping for the project site will be consistent
landscape ordinance and facade standards for commercial properties,
with the city's water efficient landscape ordinance.
and require all new development to adhere to them. Encourage the
improvement of rundown buildings by offering entitlement incentives.
Policy LU -6.8
Encourage the intensification of commercial uses on underutilized
Consistent The project will replace the older Santa Anita Inn
commercial properties and the transitioning of non - commercial uses on
(34,775 square feet and 0.13 FAR) with larger more modern
commercial properties in accordance with the Land Use Policy Map
hotels and related uses (260,609 square feet and FAR 1.04)
and all applicable regulations.
consistent with the General Plan and zoning for the site.
Policy LU -6.9
Pursue public /private partnerships aimed at creating an investment
Consistent The new hotel and condominium uses will help
strategy for the City's commercial corridors.
support employees and managers of Santa Anita Park as well
as other visitors to the City.
Policy LU -6.11
Provide mature street trees, continuous landscaping (that includes
Consistent The project will provide extensive landscaping
drought - tolerant plants), and pedestrian amenities along corridors and
along perimeter streets and as buffers for adjacent land uses as
within districts to create a more visually pleasing and cohesive
outlined in the Specific Plan.
streetscape.
Policy LU -6.12
Create pedestrian connections along corridors and districts that link
Consistent The site will have pedestrian access from
surrounding neighborhoods and provide a more pedestrian friendly
surrounding streets with direct access to Santa Anita Park to the
atmosphere.
west and the City's downtown area to the north.
Policy LU -6.13
Redesign focal intersections and public areas to create outdoor
Consistent The project will create public areas and outdoor
amenities and improve the pedestrian experience.
amenities which will improve the pedestrian experience.
Goal LU -9
Preservation of the City's existing natural and recreation - oriented open
Consistent The project will be adequately buffered from the
space areas.
adjacent City Hall recreation fields to the south and Arcadia
County Park to the east.
Policy LU -9.1
Ensure that new development does not infringe upon open space
Consistent The project will be adequately buffered from the
areas.
adjacent City Hall recreation fields to the south and Arcadia
County Park to the east.
Goal LU -10
A thriving Downtown, with healthy commercial areas supported by
Consistent The project will support the downtown area and the
high - quality, residential uses and supportive of the Metro Gold Line
planned Metro Gold line station due to the project's proximity to
transit station
these areas and existing bus stops.
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
t
oil WIN
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
Policy LU -10.1
Provide diverse housing, employment, and cultural opportunities in
Consistent The project will provide diverse lodging (not
Downtown, with an emphasis on compact, mined -use, transit- and
housing) options for workers associated with Santa Anita Park
pedestrian - oriented development patterns that are appropriate to the
and will also provide new employment in the City's downtown
core of the City.
area.
Policy LU -10.3
Work toward the establishment of public gathering areas in Downtown
Consistent The project will support downtown public activities
to bring public activities and civic events into Downtown.
and civic events by providing lodging for visitors and indoor and
outdoor activity space for public gatherings.
Policy LU -10.4
Establish commercial uses that complement the vision of the
Consistent The project will provide high quality hotels and
Downtown core with opportunities for more intense, quality
related condominiums at a major gateway and along major
development at key intersections that are unique from the regional
roadways and a key intersection in the City.
offerings at the regional mall.
Policy LU -10.6
Encourage high standards for property maintenance, renovation and
Consistent The project will maintain high standards for
redevelopment.
property maintenance, renovation, and redevelopment, as
evidenced by the history of the two national chain hotels
proposed for this site.
Policy LU -10.7
Provide accessible plazas and public spaces throughout Downtown
Consistent The project will provide both indoor and outdoor
that provide both intimate, outdoor rooms and larger spaces that could
spaces that will accommodate public gatherings and
accommodate public gatherings and celebrations.
celebrations.
Policy LU -10.11
Buildings should be oriented to the pedestrian and the street.
Consistent The project's three buildings will be oriented to the
pedestrians on the street and will be directly accessible to
visitors and guests from adjacent streets.
Policy LU -10.12
Encourage architecture that uses quality, lasting building materials;
Consistent The Specific Plan demonstrates the high quality
provides building scale that relates to intimate nature of Downtown;
appearance and use of lasting building materials that will be
and applies a unified theme.
used for this project. The project is on the outskirts of the
downtown area and is adjacent to Santa Anita Park, so its scale
will be more fitting to this urban location rather than the more
intimate nature of the Downtown area to the north.
Policy LU- 10.13
Recognize that well- designed public open spaces are vital to the
Consistent The project will provide high quality indoor and
success of Downtown. Work with private developers and landowners
outdoor public activity areas with extensive landscaping and
to facilitate the construction of such spaces.
artistic treatments.
Policy LU -10.14
Create a high - quality pedestrian experience in Downtown through the
Consistent The project will include landscaping with trees and
use of street trees, public art, street furniture, and public gathering
public art to create a high - quality pedestrian experience in the
spaces. Using signage, art, and unique uses, entice and encourage
Downtown area. Its location will allow project guests to walk and
people to walk and explore the commercial core of Downtown.
explore the commercial core of the Downtown area.
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
t
oil IFIN
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
Goal LU -15
Maintenance of the many benefits —cultural, fiscal —that live horse
Consistent The project will increase the benefits of Santa Anita
racing at Santa Anita Park brings to Arcadia.
Park by providing lodging to workers and management staff of
Santa Anita Park.
Policy LU -15.1
Promote continued economic viability of the Santa Anita Park race
Consistent The project will provide a variety of lodging
track by providing opportunities for compatible commercial uses.
opportunities for the workers of Santa Anita Park.
Policy LU -15.2
Recognize that Santa Anita Park and live horse racing are historically
Consistent The project will help support preservation of Santa
and commercially important to the community, and that the race track
Anita Park by providing a variety of lodging for racetrack
facility —and the grandstand in particular— is a significant community
workers.
feature worthy of preservation.
Economic Development
Goal ED -3
Re- creation of Downtown as the social and symbolic "Heart of the City"
Consistent The tall buildings of the project will provide a new
landmark for the City Downtown area as well as Santa Anita
Park.
Policy ED -2.1
Work proactively to eliminate physical and business deterioration
Consistent The proposed project will decrease physical and
within the Downtown area.
business deterioration by providing brand new buildings for
lodging.
Goal ED -4
Continued revitalization of public infrastructure and private properties
Consistent The project will provide onsite and offsite
within the redevelopment project area
improvements necessary to support redevelopment of the older
Santa Anita Inn property.
Policy ED -4.1
Use the City's redevelopment authority to create opportunities for
Consistent Although this project is not funded by
businesses to establish in Arcadia and bring high -skill and professional
redevelopment, the site is being privately redeveloped to provide
jobs and new revenue sources into the community.
a variety of lodging for racetrack workers and other guests to the
City.
Policy ED -4.6
Support and encourage redevelopment opportunities such as
Consistent Although this project is not funded by
community revitalization programs and redevelopment plans focused
redevelopment, the site is being privately redeveloped to provide
on policies for high - quality development in the project area, and use
high quality commercial development on this older site. Guests
Redevelopment Agency funds as a means of achieving transit-
of this project will be able to take advantage of local transit as
supportive development surrounding the Metro Gold Line station.
well as the planned Gold Line station in Downtown.
Circulation and Infrastructure Element
Goal CI -1
An efficient roadway system that serves all of Arcadia, supports all
Consistent The project will not impact surrounding streets with
transportation modes, and balances the roadway system with planned
the planned improvement of the West Huntington Drivel
land uses
Colorado Place intersection which will provide primary access to
the two hotels.
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
dt
oil WIN
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
Policy CI -1.1
Pursue enhancements to the roadway network consistent with the
Consistent The project transportation mitigation will be
Figure CI -3, Master Plan of Roadway, and the Transportation Master
consistent with the Master Plan of Roadway and the
Plan.
Transportation Master Plan.
Policy CI -1.2
Implement street design standards on arterial corridors consistent with
Consistent The project transportation mitigation will be
the Master Plan of Roadways to address bicycle facilities, sidewalks,
consistent with the Master Plan of Roadway and the
and on- street parking that are context sensitive to adjacent land uses
Transportation Master Plan. The project includes bicycle
and districts, and to all roadway users, where appropriate.
facilities for hotel staff as air quality mitigation.
Policy CI -1.3
Maintain a maximum Level of Service (LOS) D throughout the City,
Consistent Implementation of the project with mitigation will
except that LOS E may be permitted in the following circumstances:
maintain LOS at area intersections at LOS D or better per the
- I nte rsecti o ns/roadways at, or adjacent to freeway ramps
General Plan.
- Intersections /roadways adjacent to Santa Anita Park during
racing season
- Intersections /roadways at or adjacent to designated
Downtown, Baldwin Avenue, and Live Oak Avenue
commercial and mixed -use districts
These performance standards may require, but are not intended
to mandate, roadway and/or intersection widenings. They
represent goals used to monitor traffic conditions and to assess
traffic impacts of development projects. Because LOS standards
apply only to vehicular mobility and do not account for enhanced
pedestrian movement or other modes, the City will not use them
as the sole criteria for judging transportation system performance.
Pedestrian convenience, transit access and operations, urban
aesthetics, and other factors will be considered.
Policy CI -1.4
Require the cost of transportation mitigation and improvements
Consistent The project will pay required Development Impact
necessitated by new development be borne by new development—
Fees to mitigate potential traffic impacts.
including non - automobile solutions— through the Traffic Impact Fee
Program.
Goal CI -2
Maximized operational efficiency of the street system
Consistent The proposed project mitigation measures will
maximize operational efficiency of the surrounding street
system.
Policy CI -2.1
Implement traffic management and traffic signal operations measures,
Consistent The proposed project mitigation measures will
where feasible, to:
implement traffic management and signal operations that will
- Minimize delay and congestion for all modes, without
minimize delay and congestion for all modes of transit.
GENE FONG
SEABISCUIT
PA CIFI CA
= IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
dt
oil WIN
CDnllnental Assets
Management
q"
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
adversely impacting transit, bicycles, and pedestrians, and
- Focus traffic onto arterial streets, and minimize intrusion into
residential neighborhoods.
Policy CI -2.2:
Design and operate arterials and intersections for the safe operation of
Consistent With mitigation, the project will operate at
all modes, including transit, bicyclists, and pedestrians.
acceptable levels of service, and has access to local transit
stops. The site will provide pedestrian and bicycle access as
necessary.
Policy CI -3.8
Encourage private efforts to connect Gold Line riders to local places of
Consistent The site is approximately a half mile from the
employment.
planned Gold Line station and project workers may be able to
take advantage of transit as a result of its location.
Policy CI -3.9
Require all new and substantially renovated office, retail, industrial,
Consistent The project will install and implement transit
and multifamily developments to install and implement transit
amenities if recommended by MTA per the Initial Study.
amenities, including bus turnouts, transit shelters, and other
streetscape elements, as appropriate.
Goal CI4
Connected, balanced, and integrated bicycle and pedestrian networks
Consistent The project will include bicycle racks for workers
that provide viable alternatives to use of the car
and will have pedestrian access from adjacent roadways
networks.
Policy CI -4.8
Require that development projects within commercial districts provide
Consistent The project will have pedestrian - focused access
pedestrian - focused access independent from vehicle entrances, as
separate from vehicular access via surface and subterranean
feasible.
parking (Phase II only).
Policy CI -4.12
Require new and substantially renovated office, retail, industrial, and
Consistent The project will include bicycle and pedestrian
multifamily developments to include bicycle and pedestrian amenities
amenities, including bike racks and sidewalk improvements.
in the vicinity of the development to facilitate bicycling and walking,
including on -site bike paths where appropriate, sidewalk
improvements, benches, and pedestrian signal push - buttons at nearby
signals.
Policy CI -4.13
Require new and major renovations to office, industrial, and
Consistent The proposed will include off - street bicycle parking
institutional developments to provide secure off - street bicycle parking,
and showers and changing rooms for workers.
and encourage such developments to provide bicycle facilities, such
as showers and changing rooms.
Goal CI -9
A water production, storage, and distribution system that provides
Consistent The project will install state -of -the -art water
quality service equally to all areas of Arcadia, allows the City to
conservation devices and will utilize recycled water for
maximize use of local water sources, and includes use of recycled
landscape irrigation if it is economically available to the site.
water
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
4ft-
� 1
oil Ito
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
Policy CI -9.6
Require developers to pay the full costs associated with water system
Consistent The project will pay fair share costs for water
improvements needed specifically to service their development, as well
improvements included in the Water Master Plan and Capital
as fair -share costs for enhancements identified in the Water Master
Improvement and Equipment Plan.
Plan and Capital Improvement and Equipment Plan.
Policy CI -9.8
Continue to implement programs that require use of low -flow plumbing
Consistent The project will include low-flow plumbing fixtures
fixtures and other water conservation features as a means of
and other water conservation features consistent with the
optimizing existing water production, storage, and transmission
current California Green Building Code and as outlined in the
infrastructure, and to reduce volumes of wastewater entering the
Initial Study.
sewage collection system.
Goal CI -1 0
A local wastewater collection system that provides quality service
Consistent The project site will tie into the existing wastewater
equally to all areas of Arcadia
collection system and will pay appropriate Development Impact
Fees for wastewater facilities if needed.
Policy CI -10.5
Require developers to pay the full costs associated with sewer system
Consistent The developer will prepare a sewer capacity study
improvements needed specifically to service their development, as well
and provide a "fair share" payment to the City to help fund
as fair -share costs for enhancements identified in the Capital
upgrading of the existing sewer in Vilest Huntington Drive
Improvement and Equipment Plan.
included in the City's 2014-15 Capital Improvement and
Equipment Plan,
Goal CIA 1
Storm drain infrastructure that minimizes regional and localized flood
Consistent Planned storm drain infrastructure on the project
hazards
site will minimize and prevent local flood hazards.
Policy CI -11.5
Require developers to pay the full costs associated with storm drain
Consistent The project will pay the full costs associated with
system improvements needed specifically to service their
storm drain system improvements needed specifically to serve
development, as well as fair -share costs for enhancements identified in
the project site, as well as fair share costs for storm drain
the Capital Improvement and Equipment Plan.
improvements identified in the Capital Improvement and
Equipment Plan.
Goal CIA 3
Private telecommunications and utilities infrastructure and services
Consistent The project will have modern telecommunication
responsive to consumer demands and consistent with City aesthetic
systems that will allow for more efficient emergency response.
objectives
Policy CI -13.3
Continue to require the placement of utilities underground for all new
Consistent Per City requirements, the project will underground
developments.
utilities.
Resource Sustainability
Goal RS -1
Continued improvement in local and regional air quality
Consistent The project will not exceed regional thresholds and
will not interfere with continued improvement in local and
regional air quality.
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
t
oil IN
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
Policy RS -1.1
Reduce local contributions of airborne pollutants to the air basin.
Consistent The project will help reduce local airborne
pollutants by maintaining emission levels below SCAQIVID
levels.
Policy RS -1.5
Promote the reduction of vehicular traffic and improved efficiency of
Consistent The project mitigation measures will improve
the City's circulation system (i.e. roadways) as a means to improving
efficiency of the City's circulation system which will directly
air quality.
improve air quality by incrementally reducing local congestion.
Policy RS -1.6
Require projects that generate potentially significant levels of air
Consistent The project will implement appropriate mitigation to
pollutants to incorporate the most effective air quality mitigation into
help reduce both short- and long -term project air emissions.
project design, as appropriate.
Policy RS -1.7
Promote energy - efficient building construction and operation practices
Consistent The project will include energy - efficient building
that reduce emissions and improve air quality.
construction and operation practices that will reduce emissions
and improve air quality.
Goal RS -2
Reducing Arcadia' carbon footprint in compliance with SB 375 and AB
Consistent The project will comply with SB 375 and AB 32
32
requirements to reduce GHG emissions.
Policy RS -2.1
Cooperate with the state to implement AB 32, which calls for reducing
Consistent The project air quality study indicates project GHG
greenhouse gas emissions to 1990 levels by 2020, and Executive
emissions will comply with SB 375 and AB 32.
Order 5 -3 -05, which calls for 1990 levels by 2020 and 80% below
1990 levels by 2050.
Policy RS -2.4
Pursue the strategies in the Land Use and Community Design Element
Consistent The project will encourage the use of bus transit
to encourage transit - oriented development in established focused
due to its close proximity to bus stops on Huntington Drive.
areas.
Policy RS -2.5
Pursue the enhancement of bicycle and pedestrian infrastructure set
Consistent The project will install bicycle racks to increase
forth in the Circulation and Infrastructure Element to help decrease
bicycle and pedestrian infrastructure.
vehicle miles traveled and vehicle trips.
Goal RS -4
Wise and sustainable water use practices that respond to and support
Consistent The project will be consistent with water
the needs of City residents and businesses
conservation practices outlined in the current California Green
Building Code.
Policy RS -4.3
Require that applications for major new development projects address
Consistent The project does not exceed the thresholds
the adequacy and reliability of water supplies as described in SB 610.
established in SB 610 and so does not need to prepare a Water
Supply Assessment as part of the CEQA process.
Policy RS -4.6
Implement aggressive public and private programs to reduce water
Consistent The project will landscape with native and drought -
use and water waste associated with landscape irrigation, including
tolerant plants and use efficient irrigation systems.
the planting of native and drought - tolerant plants, use of efficient
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
t
oil IN
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
irrigation systems, and collection and recycling of runoff.
Policy RS -4.9
Incorporate Love Impact Development (LID) strategies into new
Consistent The project will implement low impact development
construction and city projects.
construction strategies to minimize runoff and help retain
irrigation water onsite.
Policy RS -4.10
Fulfill the City's responsibilities relative to the requirements of the
Consistent The project will prepare a Storm Water Pollution
County's NPDES permit program by enforcing regulations aimed at
Prevention Plan (SWPPP) to address short -term water quality
reducing groundwater and urban runoff pollution.
impacts during construction, and a Standard Urban Storm Water
Management Plan (SUSMP) to address long -term water quality
impacts during project occupancy, in compliance with the
County's NPDES requirements.
Policy RS -4.12
Require the installation of efficient irrigation systems (e.g., drip
Consistent The project will install water conserving efficient
irrigation, soil moisture sensors and automatic irrigation systems)
irrigation systems.
which minimize runoff and evaporation, and which maximize the water
that will reach the plant roots.
Goal RS -5
Wise and creative energy use that incorporates new technologies for
Consistent The project will install solar systems on its building
energy generation and new approaches to energy conservation
to help offset a portion of its energy demand.
Policy RS -5.3
Require that all new development meets or exceeds the state and
Consistent The project will exceed current state energy
local energy conservation requirements.
conservation requirements (2013 Title 24) by 10 percent or
more.
Policy RS -5.8
Promote innovative building, site design, and orientation techniques
Consistent The project will minimize energy use through site
which minimize energy use.
design and other techniques outlined in the current California
Green Building Code.
Policy RS -5.17
Investigate providing incentives for LEED certifiable or equivalent for
Consistent The project will comply with many LEED certified
new and/or retrofitted private commercial and industrial buildings.
building requirements but cannot commit to a specific LEED
standard at this time.
Goal RS -5
A higher level of waste reduction and recycling city -wide relative to
Consistent The project will be consistent with the City's current
2009 achievements
policies regarding waste minimization and recycling, including
reuse of building materials during construction.
Parks, Recreation, and Community Resources
Goal PRA
Providing superior parks, public spaces, and recreation facilities to
Consistent The project will not provide park space but will
meet the community's evolving needs
provide public meeting and activity space, both indoors and
outdoors, in an aesthetically pleasing setting.
Policy PR -1.5
Maximize public space by requiring plazas and similar spaces in
Consistent The project will provide indoor and outdoor public
10
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
d 1
oil IN
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
private developments that can serve multiple uses, including
meeting spaces that can be used as public gathering areas.
recreation and public gathering areas.
Policy PR -1.8
Explore opportunities to create joint -use community space at facilities
Consistent Community groups would be able to use the onsite
owned by private organizations such as faith -based groups, service
indoor and outdoor meeting and public spaces as appropriate.
clubs, banks, and hospitals.
Goal PR -3
Ensuring that trees and the urban forest make a continuing and
Consistent The project will include both existing and new trees
significant contribution to community character
in its landscaping design.
Policy PR -3.5
Require that new private and public developments incorporate trees in
Consistent The project will incorporate trees in its overall
a manner that maximizes the utility of trees for passive cooling,
design in such a way that it maximizes the utility of the trees for
screening, carbon sequestration, erosion and runoff control, and
the lower stories of the project buildings.
integration of landscape design into the overall design of the
development.
Policy PR -3.6
Ensure that existing mature trees on private property are considered in
Consistent The project will preserve the strand of redwood
the planning and development process and are retained to the
trees on its eastern border adjacent to the Arcadia County Park.
greatest extent feasible.
Goal PR -4
A network of City, school, and private community facilities that
Consistent The project does not propose any school or specific
provides spaces for recreation, education, enrichment, and social
education facilities, but the public spaces onsite would be
service programs
available for school or community functions.
Policy PR -4.5
Investigate opportunities for partnering with commercial entities for the
Consistent The project will contain indoor and outdoor public
development and use of private spaces for City - sponsored activities
spaces that could be used for City - sponsored activities and
and events.
events.
Policy PR -4.7
Prioritize the development of needed facilities, such as a multi - purpose
Consistent The project will have public activity areas that may
facility, as described in Arcadia's Department of Recreation and
help provide some of the multi - purpose space needed by the
Community Services 2006 Strategic Plan.
City.
Goal PR -6
Continued superior educational facilities and resources for residents of
Consistent The project will contain indoor and outdoor public
all ages and backgrounds
spaces that could be used for community and school activities.
The project will also pay applicable Development Impact Fees to
the local school district.
Policy PR -6.2
Require that new development provide adequate mitigation for impacts
Consistent The project will provide the required development
on area schools as provided in State law.
impact fees to area schools.
Goal PR -8
Continued recognition and support of the diverse historical and cultural
Consistent The project will support the historic Santa Anita
organizations that celebrate and enrich the community
Park by providing a variety of lodging opportunities for race track
workers.
ik
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
>rr
01111 0
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
Goal PR -9
Retention and proper stewardship of historical and cultural resources
Consistent The Initial Study for the project will require
mitigation to document the potential historical aspects of the
Santa Anita Inn prior to demolition and provide a plaque in the
new hotel to acknowledge the past contributions of the Santa
Anita Inn to the history of Arcadia.
Policy PR -9.1
Encourage the maintenance and preservation of historically, culturally,
Consistent The Initial Study for the project will require
and or/ architecturally significant structures and sites in the community.
mitigation to document the potential historical aspects of the
Santa Anita Inn prior to demolition.
Policy PR -9.3
Collect, preserve, and celebrate Arcadia's heritage with quality exhibits
Consistent The Initial Study for the project will require
and programs.
mitigation to document the potential historical aspects of the
Santa Anita Inn prior to demolition.
Safety
Goal S -2
Superior storm drainage and flood control facilities that minimize risk of
Consistent The project will provide adequate flood control and
flooding
protection for planned onsite uses and users.
Policy S -2.3
Require that new development projects retain as much runoff as
Consistent The project will employ Best Management Practices
possible on the development site to reduce flow volumes into the
to retain as much runoff as possible on the project site, which
storm drain system, allow for recharge of the groundwater basins, and
will reduce flowvolumes into the storm drain system.
comply with the City's storm water permitting requirements (consistent
with the National Pollutant Discharge Elimination Systems program, or
NPDES) and employ Best Management Practices (BMPs).
Goal S -4
A continued high level of protection from risks to life, the environment,
Consistent As outlined in the Initial Study, the project will not
and property associated with human - caused hazards in Arcadia.
hinder or add to risks to life, the environment, and property
associated with human - caused hazards.
Policy S -4.3
Ensure that all businesses and hazardous materials transportation
Consistent The proposed project will not transport or need
services within the City adhere to the requirements of the City's
transportation of hazardous materials other than commercial
hazardous materials plans and programs.
cleaning supplies and other types of domestic chemicals.
Goal S -5
To provide a continued high level of fire and police protection services,
Consistent The project will not hinder police and fire services
with an emphasis on prevention and education
and provide modern hotel facilities on the site. The project will
also pay all appropriate Development Impact Fees for public
services such as police and fire protection
Noise
Goal N -1
Effective incorporation of noise considerations into land use planning
Consistent The project, through mitigation outlined in the Initial
decisions.
Study, will effectively control potential noise impacts on
12
GENE FONG
SEABISCUIT
PA CIFI CA
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
t
oil WIN
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Table 13-1: Seabiscuit Pacifica Specific Plan — General Plan Consistency Analysis
General Plan Goals
and Policies
Description
Consistency Analysis
surrounding land uses.
Policy N -1.5
Require that proposed projects that have the potential to result in noise
Consistent The noise study for the project recommended
impacts include an acoustical analysis and appropriate mitigation to
mitigation to achieve interior and exterior noise standards.
achieve the interior and exterior noise standards indicated in Table N -2
Interior/Exterior Noise Standards.
Goal N -3
Limited intrusion of point - source noise within residential
Consistent The project noise analysis identifies local sensitive
neighborhoods and on noise sensitive uses.
receptors and incorporates noise protection for them into the
Initial Study.
Policy N -3 -4
Require any new mixed use structures to be designed to minimize the
Consistent There are no residential or other noise sensitive
transfer of noise and vibration from commercial or industrial to
uses adjacent to the project site, and the project noise study
residential and other noise - sensitive uses.
determined the project would not have significant noise impacts
on the nearby park or City Hall facilities.
Policy N -3 -5
Require noise created by new non - transportation noise sources to be
Consistent The project includes mitigation measures to reduce
mitigated so as not to exceed acceptable interior and exterior noise
noise impacts to acceptable interior and exterior noise levels.
level standards identified in this Noise Element.
Policy N -1.1
Consider noise impacts as part of the development review process
Consistent The project noise assessment determined the
relative to residential and other noise- sensitive land uses.
project would not have any significant noise impacts on
residential or other sensitive land uses in the project area.
However, fencing will be installed during construction and a
permanent wall along the western property line will be in place to
mitigate any noise.
Policy N -1.2
Ensure that acceptable noise levels are maintained near schools,
Consistent The project noise assessment determined the
hospitals, and other sensitive areas in accordance with the Noise /Land
project would not have significant noise impacts on nearby
Use Compatibility Guidelines in Figure N -4, Table N -2 Interior /Exterior
sensitive uses, including the hospital south of the site.
Noise Standards, and the City's noise ordinance.
13
GENE FONG
SEABISCUIT
PA CIFI CA
in
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
t
oil IN
CDnllnecdal Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX B
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
APPENDIX C: TITLE REPORT AND ASSESSOR'S PARCEL MAP
For„ No. 1402,92 (10/17.62)
PLTA Standard Owner's Pdicy
Western Regional Exceptions
Order Number: NOS - 158970 -SA1
Page Number: 1
r
Fiat American Title Insurance Company
National Commercial Services
502 N. Central Avenue, 8th Floor
Glendale, CA 91203
Andrew S. Chang and Linda H. Chang
c/o Continental Asset Management
1000 So. Fremont, Suite 1212
Alhambra, CA 91803
Title Officer: Jeanie Quintal
Phone: (800) 668 -4853 Ext. 5021
Policy Number:
Escrow Officer; Brian Serikaku
Phone; (714) 800 -3000
Buyer: Dynasty Coachwork International, Inc.
Property: 130 West Huntington Drive
Arcadia, CA 91007
Attached please find the fallowing items):
A Policy of Title Insurance
Thank You for your confidence and support. We at First American Title Company maintain the
fundamental principle:
Custom er First!
Ff-st Amerran T1Itla lnsrrarxe Corrpany
GENE FONG
SEABISCUIT
PA CIFI CA
in IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SFAat';rtIIT PArtFWA I I r..
.r.
.1&9 1
of Ito
Continental Assets
Management
:re:o:t a.+e� :.
CONTINENTAL ASSETS
MANAr F'MF'NT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX C
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Form No. 1402.92 (10 112b2) Order Number: NCS-158970 -SA1
.OLTA Standard Owner's Policy Page Number: 2
Western Regional Exceptions
Policy of Title Insurance
4 AN1 F. k� }l�
{
ISSUED BY
)gist merican Title Insurance Company
SLB3ECT TO THE EXCLUSIONS FROM COVERAGE, THE EXCEPTIONS FROM COVERAGE CONTAINED IN SO -EDULE B AND TFIE CONDITIONS AND
STIPLLATIONS, FIRST AMERI{AN TITLE INSURANCE COMPANY, a California corporakiorb herein called the Company, insures, as of Date of Pd icy
shown in Schedule A, against lass or damage, not exceedng the Amount of Insurance staked in Schedule A, sustained or incurre d by the insured by
reason of;
1. Title to the estate or interest described in Schedule Abeingvestedother than as staked therein;
2. Any defect in or lien or encumbrance on the title;
3. Urmarkekabili ky of the title;
4. Lack of a right of access t and from the land.
The Company will also pay the costs, attorneys' fees and expenses incurred in defense of the title, as irstred, but arty to the extent provided in the
Conditions and Stipulations.
RrstA of aw Title Insurance Company
6V PRESIDENT ,
AT' EST F. RF;ThR
F,,st Amerrcar Trt}e Irrsrra ree Corrpar?y
Form No. 1402.92 (10117/92)
ALTA Standard Owner's Policy
Western kegional Exceptions
Order Number: N CS- 156970 -SA1
Page Number: 3
SCHEDULE A
Premium; $4,001.40
Amount of Insurance: $5,265,000.00 Policy Number; NCS- 158970 -SA1
Date of Policy: May 31, 2005 at 8:00 A.M.
1. Name of insured:
Dynasty Coachwork International, Inc., a California corporation
2. The estate or interest in the land which is covered by this policy is:
A fee
3. Title to the estate or interest in the land is vested in:
Dynasty Coachwork International, Inc., a California corporation
4. The land referred to in this policy is described as follows;
Real property in the City of Arcadia, County of Los Angeles, State of California.. described as
follows;
THAT PORTION OF LOT 5 OF TRACT NO. 949, IN THE CITY OF ARCADIA, COUNTY OF LOS
ANGELES, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 17 PAGE 13 OF MAPS, IN
THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS:
BEGINNING AT A POINT IN THE SOUTHEASTERLY LINE OF SAID LOT 5, DISTANT THEREON
SOUTH 380 33' WEST 163.93 FEET FROM THE MOST EASTERLY CORNER OF SAID LOT; THENCE
ALONG THE SOUTHEASTERLY LINE OF SAID LOT, SOUTH 38° 33' WEST 671.56 FEET; THENCE
NORTH 510 27' WEST 307.71 FEET, MORE OR LESS, TO THE MOST SOUTHERLY CORNER OF
THE LAND DESCRIBED IN THE DEED TO HERBERT S. KAMIN, RECORDED ON IULY 3, 1936
INSTRUMENT N0. 435 IN BOOK 14205 RAGE 282 OF OFFICIAL RECORDS, OF SAID COUNTY,
THENCE PARALLEL WITH THE SOUTHEASTERLY LINE OF SAID LOT 5, NORTH 380 33' EAST 60
FEET, TO THE MOST EASTERLY CORNER OF SAID LAND OF KAMIN, THENCE ALONG THE
NORTHEASTERLY LINE OF SAID LAND OF KAMIN, NORTH 51° 27' VILEST 193.80 FEET, MORE OR
LESS TO THE SOUTHEASTERLY LINE OF HUNTINGTON DRIVE, AS DESCRIBED IN THE DEED TO
THE CITY OF AROADIA, RECORDED IN BOOK 9396 PAGE 145, OFFICIAL RECORDS OF SAID
COUNTY; THENCE NORTHEASTERLY, SOUTH AND EAST ALONG SAID SOUTHEASTERLY AN D
SOUTH LINES OF SAID HUNTINGTON DRIVE, TO A LINE WHICH BEARS NORTH 51° 27' WEST
PASSES THROUGH THE POINT OF BEGINNING, THENCE ALONG SAID LAST MENTIONED LINE,
SOUTH 510 27' EAST 125.49 FEET TO THE POINT OF BEGINNING.
APN: 5775 - 024-014
FirstArramncan Title Insurance Coupany
GENE FONG
SEABISCUIT
PA CIFI CA
in IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SFAAMCHIT PArtFir.A I I r..
.r.
9i
of Ito
Contiwnlal Assets
Management
=;Z=:.
CONTINENTAL ASSETS
MANAr F'MF'NT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX C
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Fcrrn No. 1402.92 (10117/92) Order Number: NC5- 158970 -SAI
ALTA Standard Dv,Inets Policy Page Number:4
Westem Regional Exceptions
SCHEDULE B
EXCEPTIONS FROM COVERAGE
This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees
or expenses) which arise by reason of:
PART ONE
SECTION ONE
1. Taxes or assessments which are not shown as existing liens by the records of any twang
authority that levies taxes or assessments on real property or by the public records.
2. Any facts, rights, interests, c claims which are not shown by the public records but which could
be ascertained by an inspection of said land or by making inquiry of persons in possession
thereof.
3. Easements, claims of easement or encumbrances which are not Shawn by the public records,
4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts
which a correct survey would disclose, and which are not shown by public records.
5, Unpatented mining claims; reservations or exceptions in paterrts or in Acts authorizing the
issuance thereof; water rights, claims or title to water,
6. Any lien, or right to a lien, for services, labor or material heretofore or hereafter furnished,
imposed by law and not shown by the public records.
SECTION TWO
1. General and special taxes and assessments for the fiscal year 2005 -2006, a lien not yet due or
payable.
2 The lien of supplemental taxes, if any, assessed pursuant to Chapter 3.5 commencing with
Section 75 of the California Revenue and Taxation Code.
3 Water rights, claims or title to water, whether or not shown by the public records.
41 An easement for electric lines and incidental purposes in the document recorded November 8,
1976 as Instrument No. 3286 of Official Records.
5 A document entitled "An Ordinance of the City Council of the City of Arcadia Amending the
Central Redevelopment Plant to Reauthorize the Power of Eminent Dornain far the Period of
January 1, 1999 to December 31, 2010, Excepting Therefrom Certain Designated Residential
Areas", dated January 1, 1999 executed by City of Arcadia, subject to all the terms, provisions
First Arrrerlcan Title Insurance CorMany
Form Na. 1402.42 (10117M) Order Number: N CS- 156970 -SA1
ALTA Standard Duvner's Policy Page Number: 5
Western Regional Exceptions
and conditions therein contained, recorded July 8, 1999 as Instrument No. 99- 1244121, Official
Records.
6. The terms and provisions contained in the document entitled "Agreement Regarding Application
for Land Use Approvals and Regarding Indemnification of City of Arcadia" recorded December 2-2,
2004 as Instrumient No. 04- 3311428 of Official Records.
7. Rights of parties in possession.
8. A deed of trust to secure an indebtedness in the original principal amount of
$6,000,000.00 recorded June 01, 2005 as Document No. 05- 1275582 of Official Records.
Dated: May 24, 2005
Trustor: Dynasty Coachwork International, Inc., a California corporation
Trustee: Chicago Title Company, a California Corporation
Beneficiary: Cathay Bank, a California Banking Corp.
9. The terms and provisions contained in the document entitled "Hazardous Substances Certificate
and Indemnity Agreement" recorded June 01, 2005 as Instrument No. 05- 1275663 of Official
Records.
10, A financing statement recorded June 01, 2005 as Instrument No. 05- 1275684 of Official Records.
Debtor: Dynasty Coachwork International, Inc.
Secured party: Cathay Bank, a California Banking Corp.
11. A Deed of Trust to secure an original indebtedness of $1,000,000,00 recorded December 6,
2004 as Instrument No. 0+3143290 of Official Records.
Dated: November 19, 2004
Trustor: Arcadia Land Corporation, a limited liability company
Trustee: Investors Title Company
Beneficiary: Grant Silver Development Limited
Affects the fee
A document recorded June 01, 2005 as Instrument No 05- 1275685 of Official Records
provides that the above document was subordinated to the document recorded June 01,
2005 as Instrument No. 05- 1275682 of Official Records.
The map attached, if any, may or may not be a survey of the land depicted hereon. Rrst American
expressly disclaims any liability for loss or damage which may result from reliance on this neap except to
the extent coverage for such loss or damage is expressly provided by the term and provisions of the title
insurance policy, if any, to which this map is attached.
First Arrwrican Title Insurance Company
GENE FONG
SEABISCUIT
PA CIFI CA
in
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
1Zrea11Zr111T GArIrIrA I I r
.r.
1
oil Ito
Continental Assets
Management
';"="
CONTINENTAL ASSETS
\IAAIAr C\ /CHIT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX C
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Ftimn No. 1402.92 (10117192) Order Number: NCS- 158970 -SA1 Form No. 1442.92 (10 {17}92) Order Number: NCS- 158970 -SA1
ALTA Standard Owners Policy Page Number:6 ALTA Standard Owner's Policy Page Number: 7
Western Regional Exceptions Western Regional Exceptions r'(L;E N E F O N G
EXCLUSIONS FROM COVERAGE
The Following matters are expressly excluded from die coverage of this policy and the Company will not pay loss or damage, cost, attomeys' fees or
expenses which arise by reason oF:
1.(a) Any law, ordinance orgovemmentaI regulation (including but not limited to building and zoning lawsr ordinances, or regulations) restricting,
regulating, prohibiting or relating to
(i) the occupancy, use, ar enjoyment of the land;
(ii) the character, dimensions Dr location of any improvement now or h area fter erec tred on th e land;
(iii) a separation in ownership or a change in the dimensions or area c the land or any percel of which the land is or was a part; or
(iv) environmental protection, or th e effect of any violation of these laws, ardinanom or governmental regulations, except to th e extent that a notice of
the anforcemaent rhereaF o r a nodca of a defect, lien or encumbrance resulting from a violation or alleged violation aFFectng the land has been recorded
in the public records at Date of Policy.
(b) Any governmental police power not excluded by (a) abover except to the extent thata notice of the exercise thereof or a notice of a defect, lien or
encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy.
2. Rights of eminent domain unless notice of the exercise thereof has been recorded in the public records at Date of Policy, but not excluding from
coverage any taking which has cccurred pri or to Date c Policy which would be binding on the rights of a purcihaser Far value without knowledge.
3. Defects, Ilansr encumrbranoes, adverse claims, or other matters;
(a) created, suffermed, assumed aragreed to by the insured claimant;
(b) not known to the Company, not recorded in the public records at Date of Policy, but known to the insured claimant and not disclosed in writing to
the Company by the insured claimant prior to the date the insured claimant become an insured under this policy;
(c) resulting in no loss or damage to the insured claimant;
(d) attaching or created subsequent to Date of Policy; or
(e) resulting in loss or damage which would not have been sustained if the insured claimant had paid value for the estate or interest insured by this
P-1 iry-
4. Any elaimr which ari ses out of the transaction vesting in the Insured the estate or interest insured by th is poligrr by reason of th e operation of
federal hankruptzy, state in solvency r orsimi[arcreditors' rights laws, that is teased on;
(i) th e transaction creating the estate or interest insured by th is policy being deemed a fraudulent conveyance or Fraudulent transfer; or
(ii) the transaction creating the estate or interest insured by this policy being deemed a preferential transfer exceptwhere the preferential transfer
results From the failure:
(a) to timely record the instrument of transfer; or
(b) of such rem rdathn tc impart notice to a purchaser for value or a judgment or lien creditor.
1. DEFINITION OFTERMS.
The following terms when used in this policy mean:
(a) "insuned ": the insured named in Schedule A ar>dr subject to any nght5 ardeFenses the Gornpany would have had against the named insured, those
who succeed to the interest of the named insured by operation of lave as distinguished From purchase including, but not limited to, heirs, distributees,
dmisees, survivors, personal representatives, next of kin, or corporate or fidudary successors
(b) "insured claimant"; an insured claiming loss or damage,
(c) "knoNrk�dge" or "known "; actual knowledge, not constructive knowledge C1 notice which may he imputed to an insured by reason of any publ c
reco rds as defined in this policy or any other records which impart constructive notice of matters affecting the land,
(d) 'land ": the land described or referred to in Schedule (A), and improvements affixed thereto which by law constitute real property. The term "land"
does not indude any property beyond the lines of the area described or referred to in Schedule (A), nor any right, title, interest, estate or easement in
abutting SbWtSr roadsr avenuesr alleysr lanesr ways or waterways, but nothing herein shall modify or limit the extent to which a right of access to and
from the land is insured by this policy.
(e) "mortgage": mortgage, deed of trust, trust deed, or other security instrument
(f) "public records records established under state statutes at Date of Policy for the purpose of imparting constructive notice of matters relating to real
property to purchasers for value and without knowledge. Wi th respect to Section 1(a)(iv) of the ExdUSCris from Coverage" "public records" shall also
include enviro nmental protection liens filed in the records of the clerk of the United States district court For the distri ct in which the land is located.
(g) "un ma rke ta bi I ity of the titre ": an alleged or apparent matter affecting the title to the land, not excluded or excepted from coverage which would
entitle a purchaser of the estate or interest described in Schedule A to be released from the cbligabon to purchase by virtue oFa contractual condition
requiring the delivery of marketable title.
Z. CONTINUAT'IpN AF INSU RAN CC AFTER COHVEYANCE OF TITLE.
The coverage of th is policy shall continue in force as of Date of Policy in Favor of an insured only so brig as the insured retains an esta te or interest in
the land, or holds an indebtedness secured by a purchase money mortgage given by a purchaser From the insured, oranly so long as the insured shall
have Iiahility by reason of covenants of warranty made by the insured in any transfer or oonveyarice of the estate or interest. This policy shall not
continue in force in Favor of any purchaser from th e insured of either
(i) an estate or interest in the land, or
(n) an indebtedness secured by a purE hase money mortgage given to an insured.
3. NOTICE OF CLAIM TO BE GIVEN BY INSURED CLAIMANT.
The insured shall notify the Company promptly in writi ng
(i) in case of any litigation as set Forth in Section 4(a) below,
First Amerlcan Title Insurance Corrrparry
(ii) in case knowledge shall carne to an insured hereunder of any claim of tide or interest which is adverse to the tide to the estate or interest, as
insuredr and which might cause loss or damage fvr which the Company may be liable by virtue of th is Policy ar
(iii) if title to the estate or interest, an insured, is rejected w unmarketable. If prompt notice shall not be given to the Company, then as m the insured
all liability of the Company shall terminate with regard to the matter or matters for whkh prompt notice is required; provided, however, that failure to
notify the Company shall in no ease prejudice the rights of any insured under this policy unless the Company shall be prejudiced by th e failure and then
only to the extent of the prejudice.
4. DEFENSE AND PROSECUTION OF ACTION S, DUTY OF INSURED CLAIMANT TO COOPERATE.
(a) Upon written request by the insured and subject to the options contained in Section 6 of these Conditions and Stipulations, the Gompanyr at its own
cost arhd without unreasonable delay, shall provide Far the defense of an insured in lidgaCon in which any thimJ party asserts a daim adverse to the title
or interest as insured but only as to those stated causes oFacticn alleging a deFectr lien orencumbrance or other matter insured against by this policy,
The Company Shall have the rig ht to select counsel of its choice (subject bo the right of the insured Ga object for reasonable cause) to represent tit
insured as try those stated causes of action and shall not be liable for and will not pay the fees of any other counsel. The Company will not pay any
Fees, costs or expenses incurred by an insured in the defense of those causes of acti on which allege matters not insured against by th is policy.
(b) The Company shall have the right, at its own cost, to institute and prosecute any action or proceeding or to do any other act which in its opinion
may be necessary or desirable to establish the title to th e estate or interrestr as insu red r or to prevent or reduce Ions or damage to an insured. The
Company may take any appropriate action under the terms of this policy, whether or not it shall be liable hereunder, and shall not thereby concede
Iiahility or waive any provision of this police, If the Corrpamy shall exercise its rights under this paragraph, it shall do so diIigentiy.
(c) Whenever the G7mpany shall have brought an action or interposed a defense as required or permitted by the provisions of this PClicyr the
Company may pursue any litigation to Final determination by a court of competent jurisdiction and expressly reserves the right, in its sole discretion, to
appeal from any adverse judgment or order.
(d)In all cases where this policy permits or requires the Company to prosecute or provide For the defense aFany action or proceeding, the insured shall
secure to the Gompany the right to so prosecute or provide defense in the action or proceeding, and all appeals therein, and permit the Company to
use, at Its option, the name of the insured for this purpose. Whenever requested by the Company, the insured, at the Company's expense. shall give
the Company all reaso nable aid (i) in any action or pr❑[eeding, securing evidence, chtaining vntnessas, prosecuting o defending the acti on or
proceeding, or effecting settlement, and (ii) in any other lawful act which in the opinion of the Company may be necessary or des irable to establish the
ULW to the estate or interest as insured. If the Company is prejudiced by the Failure of the insured to furnish the required cooperation, the Company's
obligations to the insured under the policy shall te!rminate, including any liability or obligation to defend, prosecute, orcontinue any litigation, with
regard to the matter or matters requiting such coo peradon.
5. PROOF OF LOSS OR DAMAGE.
In addition to and after the notices required under Section 3 of these Conditions and Stipulations have been provided the Company, a proof of loss or
damage signed and swo rn to by the insured daimant shall be fumisbed to the Company within 90 days after the insured ciainrant shall ascertain the
Facts giving rise to the loss or damage. The proof of lass or damage shall describe the defect in, or lien or encumbrance en the titter or other matter
insured against by this policy which constitutes the basis of loss or damage and shall state, to the extent possible, the basis of calculating the arrount
of the loss or damage. IF the Company is prejudiced by the failure of the insured claimant to provide the required proof of loss or damage, the
Company's obligatiions to the insured urhder t►e policy shall Germinate, including any Iiability or obligation to defend, prosecute, or continue any
litigation, with regard to the rnaRer ar matters requiring such proof of loss ar &rage.
In addition, the insured claimant may reasonably be required to submit to examination under oath by any authorized representative of the Company
and shall produce for examination, inspection and copying, at such reasonable times and places as may be designated by any authorized representative
of the Company, all rem rds, books, Ledge rsr checks, correspondence and memoranda, whether bearing a date before or after Date of Fblicy, vrhich
reasonably pertain to the lass or damage. Further, if requested by any authorized representative oFthe Company, the insured daimantshaII grant its
permission, in writing, for any authori zed representative of the Company to examine, inspect and copy all records, books, ledgers, checks,
correspondence and memoranda in the custody or contro l of a third party, which reasonably pertain to the loss or dernage. AJI information designated
as confidential by the insured claimant provided to the Company pursuant to th is Section shall not be disclosed to others unless, in the reasonable
judgmentof the Company, it is necessary in the administration oFthe claim. Failure of the insured claimant to subrrit fe- exanvnabon under oath,
produce other reasonably requested infomnation or grant permission to secure reasonahly necessary inFnm-hatian From third parties as required in this
paragraph shall terminate any lability of the Company under this pal icy as to that claim.
6. OPTIONS TO PAY DR OTHERWISE 5 ETTLE CLAIMS; TERMINATION OF LIAIILITtf.
In case of a claim under this policy, the Company shall have the Following additional options:
(a) To Pay orTe rid erPayrrentef the ArnountofInsurance.
To pay or tender payment of the amount of insurance under this policy together with any costs, attorneys' Fees and expenses incurred by the insured
claimant, which were authorized by the Company, up 17 the time of paymrent or tender of payment and which the Company is obligated to pay.
Upon th e exercise by the Company of th is op tic nr all liability and obligadons to insured under this policy, other than to make the payment required,
shall terminate, i rid uding any liability or obligation to defend, prosecute, or continue any litigation, arrd the policy shall be surrendered to the Company
for cancellation.
(b) To pay or otherwise 5ette tiVi th Parties Other than the Insured yr With the insured Claimant.
(i) to pay or otherwise settle with other parties for or in the name of an insured claimant any claim insuned against under this policy, together with any
costs, attomays' fees and expenses incurred by the insured dairrant which were authorized by the Company up bo the time of payment and which the
Company is obligated to pay; or
(ii) to pay orotherwise setde with the insured claimant the loss ordamage provided For under this policy, together with arty casts, attorneys' fees and
expenses incumed by the insured daimantwhich vere authorized by the Company up to the ti me of payment and which the Company is obligated to
pay•
Upon the exerzise by the Company of either of the options provided for in paragraphs (b) (i) or (ii), the Company's obligations to the insured under this
policy for the claimed loss or damage, other than the payments required to be ,,,Made, shall terminate, including any liability or obligation to de Fend,
prosecute or Continue any litigation.
7. DETERMINATION, EXTENTOF LIABILITYAND COINSURANCE.
This policy is a contract of indemnity against actual monetary loss or damage sustained or incurred by the insured daimant who has suffered loss or
damage by reason of matters insured against by this policy and only to the extent herein described.
(a) The liability a the Camps ny under this policy shall not exceed the least of,
(i) the Amountaf Ins urance stated in Schedule A; or,
(ii) the differrenee between th e value of the insured estate or interest as insured and tl-re value of the insured estate or interest subject to the defect,
lien or encumbrance insured against by this policy.
First America,, Title Insurance Copan}
SEABISCUIT
PA CIFI CA
in
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
lilhl
oil Ito
Cvntinerdal Assets
Management
:FC+o-w oti+cw.:q'�
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX C
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
Fenn No. 1402.92 (10/11192) Order Number: NCS- 158970 -SA1
ALTA Standard Owner's Policy Page Number:8
Western Regional Exceptions
(b) In the event the Arnaunt of Insurance stated in Schedule A at the Date of Policy is less than 80 percent of the value of the insured estate or
interest or the full consideration paid for the land, whichever is less, or iF subsequent to the Date of Policy an improvement is erected on the land which
increases the value of the insured estate or interest by at least 20 percent over the Amount of Insurance stated in Schedule A. then this Policy is
subject to the following:
(i) where no subsequent improvement has been made, as to any partial loss, the Company shall only pay the loss pro rata in the proportion that the
amount of insurance at Date of Policy bears to the total value of the insured estate or interest at Date of Policy; or (ii) where a subsequent
improvement has been made, as to- any partial loss, the Company shall only pay the loss pro rata in he proportion that 120 percent oFthe Amount of
Insurance stated in Schedule: A bears to the sum of the Amount of Insurance stated in Schedule Aand the amountexpended for the improvement.
The provisions of this paragraph shall mat apply to Co5t5r attorneys' Fees and expenses for which the Company is liable under this policy, and shall only
apply to that portion of any loss which exceeds, in the aggregate, 10 percent of the Armunt c Insurance stated in Schedule A
(c) The Company will pay only these costs, attorneys Fees and expenses ir>{urred in acCordanci� with Section 4 of these Conditions and Stipulations.
8. APPORTIDNMENT.
If the land described in Schedule (A)(C) consists of two or more parcels which are not used as a single site, and a lass is established affecting one or
mare of the parcels but not all, the loss shall be computed and Settled on a pry rata basis as if the amount of insurance under this policy was divided
pro rata as to the value on Da tie of Policy of each separate parcel t>7 the whole, exdusive of any improvements made subsequent to Date of policy,
unless a liability or value has otherwise been agreed upon as to each pa reel by the Company and the insured at the time of the issuance of this policy
and shown by an express sta tement or by an endorsement attached to this policy.
9. LIMITATION OF LIABILITY.
(a) If the Company establishes the title, or removes the alleged defect, lien a encumbranoe, c cures the lack of a right of access to or from the lard,
or cures the claim of unrrrarketaUlity of title, all as insured, in a reasonably diligent "ricer by any method, including litigation and the corrpletion of
any appeals therefrom, it shat l have fully performed its obligations with respect to that matter and shall not be liable for any lass or damage caused
thereby.
(b) In the event of arty litigation, in dud! ng litigation by the Company or with the Company's consent, the Company shall have no liability for loss or•
damage unti l them_ has been a final determination by a court oFcompe tent ju6i did on, and disposition oFaII appeals tiwrefirom, adverse to the tide as
insured.
(c) The Company shall not be liable for loss or damage to any insured for liability voluntarily assumed by the insured in settling any claim or suit
v.- ithout the prior written co risen tofthe Company,
10. REDUCTION 0 INSURANCE; REIUCTION ORTERMINATION OF LIABILITY.
All payments under this policy, except payments made for costs, attomeys' Fees and expensesr shall reduce the amount of the insurance pro Canto.
11. LIABILITY NONCUMULATIVE.
It is expressly u ride rs too d that the amount of insurance under this policy shall be reduced by any amount the Company may pay under any policy
insuririg a mortgage to which exception is taken in Schedule 5 or to which the insured has agreed, assumed, or taken subject, or which is hereafter
executed by an insured and which is a charge or lien an the estate or interest described or referred to in Schedule A, and the amount so paid shall be
deerrled a payment u rid er this policy to the insured owner.
12. PAYMENT OF LOSS.
(a) Ne payment shall be made without producing this policy for endorsement of the payment unless the polit=y has been lost or destroyed, in which
case prooFof loss c destruction shall be furnished to the satisfaction of the Company.
(b) When liability and the ex bent of loss ordamage has been definitely fixed in accordance with these Conditions and Stipulations, the loss or damage
shall be payable mthin 30 days thereafter.
13. SUBROGATION UPON PAYMENT 0R SETTLEMENT.
(a) The Company's Right of 5ubrogalion.
Whenever the Company shall have settled and paid a claim under this policy, all right of subrogation shall vest in the Company unaffected by any act of
the insured claimant.
The Company shall be subrogated tq and be entitled to all rights and remedies which the insured claimant would have had against any person or
property in respect to the claim had this policy not been issued. If requested by the Company, the insured claimant shall transfer to the Company all
rights and remedies against ary person or property necessary in order to perfect this right of subrogation, Th e insured claimant shall permit the
Company to sue, compromise or settle in the name of the insured clairmnt and to use the name a the insured claimant in any transaction or litigati on
involving these r jhts or remedies.
If a payment on account of a claim does not fully cover the loss of the insured claimantr the Company shall be subrogated to these rights and remedies
in the proportion which the Company's payment bears to the whole amount of the lass.
If loss should result from any act of the insured claimant, as stated above, that act shall not mitt this policy, but the Company, in that event, shall be
required to pay only that part of any losses insured against by this policy which shall exceed the arnountr if anyr lost to the Company by reason of the
impaim7ent by the insured claimant of tfre Company's right of subro gati on.
(b) The Company's Rights Against Mon- insured Obligors.
The Company's night of suVQgatiQn against non- insured Qbligors shall exist and shall include, without limitation, the rights of the insured tQ
indemnities, guaranties, other policies of insurance or bonds, notwithstanding any terms or conditions contained in those instruments which provide for
subrogation rights by reason of this policy,
14. ARBITRATION.
Unless prohibited by applicable law, either the Cormmny or the insured may demand arbitration pursuant to the Title Insurance ArNtrnCon Rules of the
American Arbitration Association, Arbitrable ,natters may include, but are not limited to, any controWersy or claim between the Company and the
insured arising out of or relating to this policy, any service of the Company in connecti on with its issuance or the breach of a policy provision or other
obligation. All arbitrable matters when the Amount of Insurance is s1,D00,000 or less shall be arbitrated at the Q0on of either the Company or- the
insured. All arbitrable matters when th e Amount of Insurance is in excess of 51,000,000 shall be arbitrated only when agreed to by both the Company
and the insured, Arbitration pursuant to this poliry and udder the Rules in effect on the date the demand for arbitration is made or, at the option of the
insured, the Rules in effect at Date of Policy shall be binding upon the parties. The award may i rid ude attomeys' fees only iFthe laws oFthe state in
which the land is located permit a court to award attorneys' fees to a prevailing party, - Udgment upon the award rendered by the Arbitrators) may be
entered in any court having jurisdiction thereof.
The law of the situs of the land shall apply to an arbitration under the Title Insurance Arbitration Rules.
A copy of the Rules may be obtained from the Company upon request.
IS. LIABILITY LIMrMI) To THIS POLICY; POLICY ENTIRE C0NTRACT.
First Arr7erkan Trtle Insurance CoiM any
Farm No. 1402.92 (10117N2)
ALTA Standard Owner's Policy
Westem Regional Exceptions
Order Number; NCS- 158970 -SAI
Page Number:9
(a) This policy togetherwith all endorsements, if any, attached hereto by th e Company is the entire policy and co ntract between the insured and the
Company. In interpm tin g any provision oFthis policy, this polity shall be construed as a whole.
(b) Any daim of loss or damage, whether or not haled on negligence, and which arises out of the status of the tide to the estate or interest Covered
hereby or by any action asserting such claim, shall be restricted to this policy,
(c) No amendment of or endorsement to this policy can be made except by a writing endorsed hereon or attached hereto signed by either the
President, a Vice President, the Secretary, an Assistant Secretary, orvalidafing officer or authorized signatory of the Company,
16. SEVERABILITY.
In the event any provision of the policy is held invalid or unenforceable under ap0ireble law, the policy shall be deemed not to incude that provision
and all other provisions shall remain in Full force and effect.
17. NOTICES, WHERE SENT.
AJI notices requires to be given the Company and any statement in wri ti ng required to be Fumished the Company shall include the number of this policy
and shall be addressed to the Company at 1 First American Way, Santa Ana, California 92707, or to the office which issued this policy,
f rrstArnwxan Title Insurance Company
GENE FONG
A S S O C I A T E S
ARCHIIEMIZE • PLANNING • IMERIORS
1130 VAWVX 0D0 W. LOBH9GMG9mM
310 ^ 209.7620 910 • 209. 7616 FAX
PROJECT:
SEABISCUIT
PA CIFI CA
in IN
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
(NASTY COACHWC
INTERNATIONAL /
. dti
I's Ito
Continental Assets
Management
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX C
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
AN RAFAEL ANNA CL`ARA
7# Y 0 R0 ST AN 400 f a
DR-
2 -5r2 ck!a 21a ar Ze, or -r'2
,.
c.s xr AS
ST
BOWTA
M� ST
rIlk i r s
crry
CALIFORNIA
�y,## DIAMOND
x
46
EL DORADO
' ARCADIA PARK ST
arr .c
2R �
f87
e1 '� FA ND
ST
i Y
906 I $$7
GENO -A
ftj
0 ST
Rf �i�•10 -
yy y ♦ .i� V` ` 1 lf_ L
+�!'!�
T 5 +ii
ALICE
T
CA A f , t -Xygo 2c .z#w •' f
19 92 ,-. L
1887
1906 0 ,
B SANTA AI ITA RANCHO IF I T 97 -- 98
T. 7 8 TRACT NO. M, B, `17 - . 13
.r - TRACT NC-
57'75 -- 2� TO 's0 2409 M. — B. 23 — —
19
GENE FONG
SEABISCUIT
PA CIFI CA
in
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
r+nninnnelniliine
'di6di"ilk,
oil Ito
CDntineldal Assets
Meunagement
rnuTluF7uTei ecccrc
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX C
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
APPENDIX D: ALTA SURVEY
20
GENE FONG
A S S O C I A T E S
ARCHRECMRE • PIANNINO • IMERMS
1190VAW*X D0M LOBANIARG91MM
310 ^ 209.7620 910 • 209. 7616 FAX
PROJECT:
SEABISCUIT
PA CIFI CA
in
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
CONDOMINIUM
DYNASTY COACHWORK
INTERNATIONAL /
SEABISCUIT PACIFICA, LLC.
HOTEL MANAGEMENT:
4fll-
d 1
oil Ito
Continental Assets
Management
:re:ISw oti+aw "
CONTINENTAL ASSETS
MANAGEMENT
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX D
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
GENERIILL JJ9TES:
,u gwp 6w PANEL s72s -oxa -old
aRWECT - D3ME-Sl I-10 w HUNtl -WON Ok?W. ARII CA &LOON
T1rLE COLW■TVW: ORDER NO , 170UM DAIS rEWUU.R,r k ZOW 0r
;BUrNLIWd VUL
ADDInI 7530 N. O- EN0WLS EII RURBAllx, CA 91604
{EEL) dle -76 A -7000 (FAJL} bld- 771 -i1D1S
nrLE OFrK= AM NDOiCALIFT
04085 L4# ARfA - 419,594 W. rr 60 S 75 kMM.
ILOQD iq.#. L"NAaWL,Al941E.
UPB18 OF BRAkEMGBF
W REARWG Of II WM'UQ• EAST DF THE %drHEkW.ftY L7¢ QF LQT
a iftw 100. 444. AS FEN mw NECDR"D W &mK 17. PALE Ij DF
UAK NEEMIOS OF LLIS ANGELES MtMfY WAS LSED AS 1E44 1iL515 OF
BUMMCS SOWN of MS WAF.
E 49 +Ab4nE5 COUNrT LtQOD OWPOL BE-c-E Si« TAD a51
DESCRVT*N. I WnNGXp4 DRNE (rESTBOUND) AND ARIGW WASH &DT
HIWICHI. 35 FEET RORFHIIW OF CENTEKLINE OF OiLD" AS 5OUTP7
OfIll�r 01 CATCH DA51N W SWTHEiT riURB Of NUWD*g DN OR.i
iLEVA1dN 46111n
ODKWFr LKWI DE PATIL ALSO kRftm As 001E0[NY 1YNIGM %witlii, AN
1Q AN UNWDED 18.75% WER£ST; wYRA 7. &NIFTY. T11I Or TILE NYJtA 1
Mint TRUST EYTTED AWL 1s, ItH7. AS TO AN EIND IDED 4.75% WTEREST_
'YJ9dJK R FAJRW, TRUSTEE OF THE FAM FNLlY TWU7 OATEO ITBRUAIYF S.
' x95, AS T6 AN WIWOMD 6.751 Wr[REST: PETII.LWK D EI Ah
'JNL MMfl WUWAN, AS IQ All UNDMBED P-K% IWKWX; -r; A KAU5 IgTA4
FIW3HWZ AM POLLSHH* COL. A CGPPGRtl10N, AS TO AN UMPAQER e.7-%K
'INTEREST. N1156 OR OEMSEL4 VIF WALT; =R s. LEE.. r16E*ASE13. SUBJECt tO
ADD- STRATION OF THE ESTAll of %-& DUWmT. 9ErA1WN PAc1FC &NIK.
ILEIK 111E WILY APPDWILD mM W LJFY.6 iRLl5TfL WE 110. III AS
T5 AN uNDRKID 3d% MEaEST
LEGAL DESCREP7TQV; a6S
!.AT PORTKEN Or LD1 5 OF rWT Nu. 949, A 7rc rYIT OF ARCADM_ COUNI
a 106 +'1'FS Lr L "FATE of cdwjrmNYk AS PER MFA RECOALE.B 17 L4'OK 77-
PNLE 1; 9F hLP:. IN THE OFFICE OF THE COUNTY RECORDER OF SAS
CDU1LLr, CCSM riD As FOLAOAf
!aT.57
9EDf111Nb Al R PDINF !r. 11fC S[1u11MAS1ETar uNE OF SAID LD7 0. DISIJYFI
I-MON SOUTH M.17 FELT TIII FEET I'AN THE LN1MT EMEkr OdNHEA
OF UD LOFL M)CE X&IIG THE MuFNE -PERtr L1iIC OF SAO LUF, Mull f
X44 W[47 671,58 FEET: TM-CE FJDNM 51'7'r KV 3D7.71 rEFF. 40NIf
ON LES5. TO 114 kKW SQUnHEHLY COMR OF THE LAND DEai76BE0 W THE {
DKW Tn HEMX- S W
. AIL. R ET
ECQIPM0 ON MY :% 19M A5 FH5TRULFr W. /
L35, IN 980A 11170% PAGE 762 of DrrXK REQDROS, OF SW CQUNTY:
I,+ENCE PARLLUI vn!h4 IRC SOUTHIAS3traY UNE 7Y &AD 4111 'A NORUH
16:33' ?AST E8 FEET, rb rNE MOST EASTERLY GOMIER 17f YAD LARD Or
rswni; THEME: ALOK 7NE NDwr- fASTERLh;ALE Or SOD LAND Of aAAL 6
NQRt1E 51.77' *E5F t93.60 FEET. U4RE OR UE55 TO RIC SOVI).11 ALY f/
U4 OF RITE hkrTON DrW AS DETKWINFL RL THE WAD TQ THE mr Dr ! -{66.6
Al W%k 1e.1LCAQE0 W BWR *111k PALE 30. DFFIIAL RET7,1RP5 OF SAD i
COtWr. INCKA NOR'MEAS7FALY, SDLmi Afro EAST ALDNO SAD
SDurHGSTEREY AND %OLrRL LFET W iAJb 11{1x11HGrON W T7] A 1JfHE f
NHCH BEAn NDRM 51'7F' wE57 PM 13ASSF3 lkdKWu THE WONT OF S` f
ALTAIACSM SURVEYS
f �¢
'SS
11
IN THE CITY OF ARCADIA. COUNTY OF LOS ANGELUS
9�yI STATE OF CAMFORMA
pa
o r
�
,
WE f1F s1AROeY_ Al1GEA5Y a, Knox
-�
CEN7EIh1hE ESIAJTU9,rtL it RE {pAh OE71+ +MLLE I.D. cRnpL.
47s kro -OW W RREPSEL710N -EA PARCEL WAP 110 559x-
F.IAN. 1 M-W -9A m9 POWs LLOf UMI C
�+
WS: EASTEK, CCRIKw
or .OE
r
WIE1LIERL7� [� 7
-
u0 LI -L1,
f
1 76.2T .476 a3
H
1
}
_ u+.4x
GGAWWW ES AEI ryILpllrLE
HLLCRD 1NG,E aLk S.Y4 rr1L1
Asp. - - -f
rO,rv�r,.Lur.
,ro
.
,d7Z.e�7s�k
N 635x•,6- x y Y 1163.91 474-M
U r
Wir. f011 l SVSIA 7
&EE WftlrM NOME M AD I
2 71"35 -1 4 57 DRIVE
'rt.za - - -
J h"
1 AELOPD wok'5 Trn u- ; - ppk-er ..
75657 g
}
LOT 5 KR
ae Las `04
-P 47,7; Ri[XprlAl rO11YR YEI,lrN'ARNI'lF i7j 76 O �7a,
rl -9k e7T. ,T eeo-an0499PT1lIIL ,F7 . In
Lx,.4o_
i !71.54 171 �0 u B w
a75.T In
+7 +,53F.S
}+
1
- --
Jf - - - -�
r IF ~* u A73
� J
>f
a7} Q7
174.67
f .;cars � 1 `r;'L' ILE eoPR,
--t .R 17�r� ur
r
�+
a7e.Bs
eSr,i8�E.5 5'
1 .471.
D
,4Fi6.7 ,47tl.15
A7 77 �^
al
NW W -0LRLT U14 OF Iflu
015- 01L.W. Mk*" AT
C AW
r r .4dx
,r. ,dd9.3D 7 wP" cDND A7
Y ia6.a p 7
f r 7r. •
f rf f
r
f1EG0Fib d57WCK PbTA K.
r "-
��I�
Mad 2* l
•A}L f / Q TIES. -
` Y }
REFERENQQ.
,,�xLL
REWINLINC: 7HDCE ALGK SAJO LAST 60STd]f6D LINE. UKfM 51W ELST
175.0 FAT TO TOE F'W QF 9VdWWM4.
f �¢
'SS
04+-3 T}
o r
f VC-
p
. 4 r .465 8+
46 +.7,
46
{
H
1
}
_ u+.4x
GGAWWW ES AEI ryILpllrLE
HLLCRD 1NG,E aLk S.Y4 rr1L1
rO,rv�r,.Lur.
,ro
.
U r
Wir. f011 l SVSIA 7
&EE WftlrM NOME M AD I
r
d'
1!
}
LOT 5 KR
ae Las `04
%
TRACT NO 949
5407NAEEAILI a{of rY 1PLF f
M. a 17.13 role,+INf,,,. EsrASawn
in-go,, M fcoc LIOM.lE1.' , f lT
QTY
,dd
eSr,i8�E.5 5'
,ad4.j4
■ _� f E FPJJND RuMm, ESTAH ,Wv AT REC41T0 rS�rArLE,E x$7.75) PER PARCEL IFAP W 15957,
. {6{. a ,468.3& P.N.N. 176 -x6 -94 rRm PW b_
wRRA+c o % �7p.
y b LjaQA{ F FDWW ;E/i} AW fACIC (ND REFERERCE�� AI�CEF7Ep A$ A Pp1ET
ON THE • STI:ALY
emxmGLIR]N Or THE 3IXM._STM LWE Fi IR1E Cd1111'ILrt Nt
FO+IJQ SFAA. TKA AND 7X LS 313F. A"II la THE PINT OF R+7ERSiCTR7'f OF LHE
i '� 160,17 NORT11wEsVLKY Pfi uNr AlFfm Or THC 5DUTHWY.STTIaY um c* TFR# c9YUrrWhY• AWO TI-:
1} SOUII'm1ENLY SMI DF w1}Rmcmm CANT % r !47,69 = irf,
rrr � F91Pm N711YTfG 1:57AAttJSrHED At FIEE:OOD OISYAAAOC [307.717 PER TITLE COLIY114AErY•
Y 1 f rOt*W I*lw7C. 657AUL15HED PARALLEL w7fH III UK OF LOT S OF 71ZACT 1q. ELI.,
r �1 N.8 11-33 X'm AE[8AL LISTWJEL (01I MR IRLE DLLTL ln".
ri rrY r1 fr
7 . 67.{6 f f f ```1.44 F04A4 JTDr1�rC. £iTAHL15L1E4 6Y /ir{RSECr101L,
PCRS19 TREI r / ,J- xiMTERUM ESfLmlgNn PAWIaaFL WH rOUND NOT-LNG AT NM HEkSrEE0.Y MITNER OF 71TIE *5, MIrWW. ESTAWS-ED AT II
,f 40`- RSTFIRY Qms LANE e+ CUUM00N 7TIE7M .&TANcr (Te1x3') PER SAT] TRLE cCam LRTR. PQWr OF BE FNWF
i G- WA.SIMY PON% E. FNS REwm OIGLE
,48T_5 / f YTn PA,xh No sesx. P-0 La -71-w HA9ZMM4T NOTES:
.42 rfrr AN EA,EMENT GRANTED FO 4MTHERH Ck%0RNN EDISON CO~- A CORPDIEATIQN rOLR
f f r ELfCrFK ONES PWtRO % PER DEED RECDKXQ KVEMgER 11. tvra AS 615rRUMFNI ND
sled or aArR•m fmcIX*s. NEDDRbs Dr LDS ALDERS COUNtY. +HE EXAM L• +�
A CAA INTENT Of SA,G [A",ENIESR 11 NOT DrMMD Ill 114C I FKCCIr
/ rf
r f iA1 rrr 3EIFR1niYDR'3 CSR7IRCATB
r r46♦k {¢ FO' Obfh}TLrr II 1IE hArIL ET AL.. fc NERSi Am said LAND n11L
r 67. jr
r �171fIET.@r cE7rI1FV HEAT.
ri! Aa THr5 6W OR PUT AW WC 5&RAr Cff WHIL7r R 5 PLACED WERE MADE (q N
ALca"A"N : W1rH THE i1WR.R17A SIANUNW NEQuKaCNF3 rDN ALTAA/jALSO LJ flu WR�Ify
!r jW41L,' EST+BLISNED AND ADOPTED BT ALTA, ACSm AND NW3 IN 19 9.. H.UBES IFDA° 7
f I fff TWO" 4, 5 T1dRO+OGH 1 L ANO 13 OF TAB" A THWAF, W [R} PJR$iLINF TO T14 ADC.vANCY
57 5TAAM4963 •s ab DPiCb I PLTA R&M AMb ALSw AND *N ErrEES f]N IM[ DATE or THr5
CENTWICArIII
r r 91 1.% TIE 25Ta D%T Or AtCuir. 3ub2, LLi R*dy IRAs wbf ON lml CWLAO AN DER W
FIELD HOLES 5HM ON TH15 SLJR1[r, YRn4 TDPOCRWNC DETAILS FROW AfRTIL F7fO7= WHS OF
UK Pjl l-UT PROPPM AND THE WE, MCA". Alm TYPE OF WMNGS Arm YWRf6dLTLENFS
,84 He ff TL41AMN AAG THE b ikkil TH WiHJN TD IHE NUKtI rAGYw F91E1hGP MIIERrF UNE& M
7 , I TFE 91JedECT PROKR7Y. (FI THE LOCATION OF ALL "05- OF -Vy. [AW- MIEUT5, AND ANT OrHFR
r /.4 rrr Hoot OF Nr)EGfal (DN a WHCH 13W,E NM7N EWA CA HWM HEEN AIMSE6. Al+ETLEA cP
r ,fr NOT OF NLODROj +FTEiCTLa 99 9EN MNO r E SUBJECT RNOPCRTT, {'1 THE LGCATWN OF T...
} rr PARIJNF AREAS ON TK $L1114 -0 PRDPWD PIL MNG THE NUNT7ER bF PAWNC SPADES HNrD', .
T59REeY, LND ALL AMMING 0EONJTC0 PLGA VAMS PROAD3H1 AcrM TO THE 5E18LSLT
PROPERTY, TQGETf4©F •TTY- W. MOTH THE ilimE THEREOF. W (III) ALL DT-m A 1FICAW ITEW
.5 .i�fr OIL THE AJBEL7 PRWENr,
,r
r 0, F5ECi7'•'r AS SET FWAf EELOW, THERE ARE TAD ;q ENCRQACIBIELRS UPON THE SUEiAEC7
5 .30 rr rW B1r 1MPRQY{A4kK UN THE AQMeLFl1 PF4aERf7, in) EX- =- W:HNERIS ON AM
f E18EILENT5 0R ON AD=ENT r+ROFEArY. STREETS_ OR 41£75 By ANY IWRg"EN15 ON THE
r suit gcr PRDPpbr. n rum y'AO.LS. Ewrx KTS DR PROTRUSKINS T}E EK IRI9DOf4' TD THE
fl rfr A OM 57ATOOTNTS 45 FCaiON5:
r
,rf{.71 D) QA kmt TD AND EWd FRDN Mt SLHIL EC1 hADPEHIY ra "DWOW W HUMPINGItM DR4E-
f + ffr W SWE II PO-WD. DEDGILO MLC RGJT(5 } -OT -ar 11AWAS" 8Y TL4 01v OF
f •Yr ARCA{}LL.
fj��J r ARE
i t iIAA[A� PRD THERE RE, AND
�+IDLFTIC04 THE 561 -W1 Lngi Fr AW ENrr-
Hr -a r
Tt%n ARE; NO YAV0;N5 OF TP%K DFt15KWPSS. RKSERICr10N^ DR D Val NLILES A4,'..
AtM"7045 ALTH AEFERENM TO WE LOCATNx7 DF SPA RJIL11+16S AhI7 WIPOvEmEN7s.
f��u.yus�t Gam.' AEtuaI+wC.
w �
BA 697+
78704E PL. L3. NU
LfL• EXA'P. 6- 90-2005
(A ROE. UATA TABEP.:
-1011NI Rm4ES ANC LrNGTH ALTA / #CSU SURVEYS
' °.:I X1:7'.:• Aaaw 9T�.I] n67Jld TIi)TEGH ASSOCIATES INC.
cs 17sss4Q afaa 91577 eD.ra sua-E: +-.Aa- �Da.LrNnY cv
W 03'338 30.,7 9,5 +7 88.37' SIISONE404 SLOVEY ENMNEiFDNG DESIGN DATE 0, -04 -r+ 9E41S[D.
s P •346]11 xTAe 1 +S. +a fxeee 1A N. sw C40M FICULIEWCL I3p W HUNTINGTON DR] VF,
sAY rverl a'W?s ARCADIA, CA 91007
SHEET 1 OF l SllE�7�pgp0
21
GENE FONG
SEABISCUIT
PA CIFI CA
= in
RESIDENCE INN
FAIRFIELD INN
& SUITES
AND HOTEL
err r1r>ab�
oil Ito
CDrltlnecItal A,5set9
Meunagement
SHEET TITLE:
SPECIFIC
PLAN
APPENDIX D
SCALE:
DATE:
03/24/14
PHASE:
JOB NUMBER:
1330
SHEET NUMBER:
ORDINANCE NO. 2315
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ARCADIA,
CALIFORNIA, MAKING CERTAIN AMENDMENTS TO THE TEXT OF
THE ARCADIA ZONING CODE; AND AMENDING THE ZONING
DESIGNATION OF CERTAIN PROPERTY WITHIN THE CITY FROM "C-
2 WITH DOWNTOWN AND H -8 HEIGHT OVERLAYS' TO "SP-SP,
SEABISCUIT PACIFICA SPECIFIC PLAN," WITH RESPECT TO THE
SEABISCUIT PACIFICA SPECIFIC PLAN PROJECT AT 130 WEST
HUNTINGTON DRIVE
WHEREAS, the City of Arcadia, as a function of its regulatory authority, is
empowered, under the Arcadia Municipal Code, Section 9293.1 et seq. to amend the
text of its Zoning Code (Arcadia Municipal Code, Title 9) and to amend the zoning
designation of land within the City, by adoption of an ordinance ; and
WHEREAS, in August 2013, Mr. Andy Chang submitted applications for General
Plan Amendment No, GPA 14 -01, Specific Plan No. SP 13 -02, and Zone Change No.
ZC 13 -02 and draft Initial Study/Mitigated Negative Declaration for the Seabiscuit
Pacifica Specific Plan development that consists of two new hotels (Marriott Residence
and Fairfield Inn & Suites) having a total of 142,320 square feet of hotel space in two
connected buildings, with a total of 210 rooms, and a hotel condominium with 50 units at
130 W. Huntington Drive ( "Project "); and
WHEREAS, on December 3, 2013, the Draft Initial Study/Mitigated Negative
Declaration for the Seabiscuit Pacifica Specific Plan (SCH #2013121018) was circulated
for public review and comments from December 5, 2013 to January 13, 2014; and
WHEREAS, the initial Study /Mitigated Negative Declaration concluded that the
implementation of the Project will have less- than - significant impacts with mitigation
measures for the following categories: Aesthetics, Air Quality, Biological Resources,
Geology and Soils, Hazards and Hazardous Materials, Hydrology and Water Quality,
Noise, Transportation/Traffic, and Utilities and Service Systems; and
WHEREAS, a lead agency approves a project requiring the implementation of
measures to mitigate or avoid significant effects on the environment; CEQA also
requires a lead agency to adopt a mitigation monitoring and reporting program to ensure
compliance with the mitigation measures during project implementation, and such a
mitigation monitoring and reporting program has been prepared for the Project (the
"Mitigation Monitoring and Reporting Program ") for consideration by the City Council of
the City of Arcadia as lead agency for the Project; and
WHEREAS, on December 5, 2013, and January 31, 2014, a duly noticed public
hearing was held before the Planning Commission on said applications, including the
Initial Study /Mitigated Negative Declaration ( "ISIMND ") at which time all interested
persons were given full opportunity to be heard and to present evidence; and
WHEREAS, after the public hearing the Planning Commission adopted
Resolution No. 1597 with a 3 -2 vote to recommend denial of the Project to the City
Council; and,
WHEREAS, on March 6, 2014, a duly noticed public hearing was held before the
City Council on said applications, including the ISIMND at which time all interested
persons were given full opportunity to be heard and to present evidence; and
WHEREAS, all other legal prerequisites to the adoption of this Ordinance have
been fulfilled.
2
NOW, THEREFORE, THE CITY COUNCIL. OF THE CITY OF ARCADIA,
CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. That the factual data submitted by the Development Services
Department in the associated staff report are true and correct.
SECTION 2. That the City Council, based upon the entire record, including ail
written and oral evidence presented, finds as follows with respect to the proposed Zone
Change:
(i) The proposed Zone Change (ZC 14 -01) is consistent and compatible with
the City's General Plan, as amended, as well as the goals, objectives, policies, and
action programs of the City's General Plan, as amended;
(ii) The proposed Zone Change is consistent with the Seabiscuit Pacifica
Specific Plan (SP -SP) and com. The zoning change made by this Ordinance adds a
Specific Plan zoning designation to the Arcadia Municipal Code in order to incorporate
the regulations of the Specific Plan. To the extent that the zoning is changed, this is
intended to designate a land use with the Project site in such a way as to facilitate
development of the Project in manner called for in the Specific Plan.
(iii) The public necessity, convenience, general welfare, and good zoning
practice, justify the proposed Zone Change and higher floor area ratio of 1.03 for this
site. The General Plan has articulated the City's vision of what kind of project(s) will
serve the public necessity, convenience and welfare for future development of the
Project Area, A project of the type set forth in the Specific Plan implements those
General Plan policies and goals, and the proposed Zone Change, as set forth in this
Ordinance, implements the Specific Plan, As such, the proposed Zone Change, as set
c
forth in this Ordinance, demonstrates the good zoning practice of the City, consistent
with the City's General Plan.
SECTION 3, Based upon the Initial Environmental Study, the City Council finds
that a Mitigated Negative Declaration and the associated Mitigated Monitoring and
Reporting Program are appropriate for the Project and there will be less than significant
impacts on the environment as a result of the Project, as further described in the Initial
Environmental Study,
SECTION 4. Section 9231.21.2 of Chapter 2, Part 3, Division 1 of Article IX of
the Arcadia Municipal Code is hereby amended to read:
"9231.21.2 SP -SP — SEABISCUIT PACIFICA SPECIFIC PLAN"
SECTION 5. That for the foregoing reasons, the City Council approves Specific
Plan No. SP 13 -02 for two new hotels and a hotel condominium as set forth in Sections
2 and 3 hereof.
SECTION 6. If any section, subsection, subdivision, paragraph, sentence,
clause or phrase of this Ordinance, or any part thereof is for any reason hefd to be
unconstitutional or otherwise invalid, such decision shall not affect the validity of the
remaining portions of this Ordinance or any part thereof. The City Council hereby
declares that it would have passed each section, subsection, subdivision, paragraph,
sentence, clause or phrase thereof, irrespective of the fact that any one or more
sections, subdivisions, paragraphs, sentences, clauses or phrases may be declared
unconstitutional or otherwise invalid.
4
SECTION 7. The City Clerk shall certify to the adoption of this Ordinance and
shall cause a copy of same to be published at least once in the official newspaper of
said City within fifteen (15) days after its adoption. This Ordinance shall take effect on
the thirty -first (31St) day after its adoption.
Passed, approved and adopted this day of
ATTEST:
City Clerk
APPROVED AS TO FORM:
jevoa�
Stephen P. Deitsch
City Attorney
5
Mayor of City of Arcadia
2014.
EXHIBIT "A"
Seabiscuit Pacifica Specific Plan — SP -SP Zone
Existing Zoning
General Commercial (C -z) Downtown Overlay (1.o FAR)
Q Special Height Overlay (H)
F Feet
500 0 500
Proposed Zoning
Seabiscuit Pacifica Specific Plan (SP -SP) Downtown Overlay (1.o FAR)
O Special Height Overlay (H)
City of Arcadia
�l
Gk► sr• a r�,�r9 5���
a�
STAFF REPORT
°'unity nCi�
Development Services Depar-tirnent
DATE: March 18, 2014
TO: Honorable Mayor and City Council
FROM: Jason Kruckeberg, Assistant City Manager /Development Services Director
Jim Kasama, Community Development Administrator
By: Lisa L. Flores, Planning Services Manager
SUBJECT: GENERAL PLAN AMENDMENT NO. GPA 14 -01, SPECIFIC PLAN NO.
SP 13 -02, AND ZONE CHANGE NO. ZC 14 -01 WITH A MITIGATED
NEGATIVE DECLARATION FOR THE SEABISCUIT PACIFICA
SPECIFIC PLAN FOR TWO NEW HOTELS AND A HOTEL
CONDOMINIUM AT 130 W. HUNTINGTON DRIVE
Recommendation: Adopt Resolution No. 7013 Conditionally
Approving the project, thereby approving the Art Deco architectural
style for the two new hotels and the Mitigated Negative Declaration,
and Introduce Ordinance Nos. 2314 and 2315
SUMMARY
The applicant, Mr. Andy Chang, has submitted applications for Specific Plan No. SP 13-
02 (Seabiscuit Pacifica Specific Plan), General Plan Amendment No. GPA 14 -01, and
Zone Change No. ZC 14 -01 for the development of two hotels (Marriott Residence Inn
and Fairfield Inn & Suites) that total 142,320 square feet of hotel space in two
connected buildings, with a total of 210 rooms, and a third hotel which will be described
as a hotel condominium tower with 50 units — see the attached site plan. The project
site at 130 W. Huntington Drive consists of one parcel with an approximate area of
249,599 square feet (5.73 acres).
The proposed project requires approval of the following applications and documents:
• A General Plan Amendment to revise the Downtown Overlay of 1.0 FAR in the
General Plan Commercial Land Use Designation to a Downtown Overlay with a
1.03 FAR
• A Specific Plan to develop the 5.73 -acre site with two hotels (a total of 210
rooms) and a hotel condominium with 50 units
• A Zone Change and Zoning Map Amendment to revise the zoning from C -2 with
Downtown and H -8 Height Overlays to SP -SP (Seabiscuit Pacifica Specific Plan)
with a 1.03 FAR
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 2 of 26
• A Mitigated Negative Declaration in compliance with the California Environmental
Quality Act (CEQA)
BACKGROUND
The Santa Anita Inn, formerly the Flamingo Hotel and the Ramada Inn, is a two -story
hotel comprised of six buildings with 110 rooms (34,775 square feet) that was originally
constructed in 1955 and remodeled in 1985. The property also includes a rose garden
with a fountain, many mature trees, and a gated pool area. While named, "The Santa
Anita Inn" since 1988, the hotel does not have any particular association with the
racetrack. A cultural resource study was prepared for this project site and there were
no significant resources found.
In 2010, as part of the General Plan Update, a Downtown Overlay was added to the C -2
zoning and H -8 Height Overlay of the subject property that increased the floor area ratio
(FAR) from 0.5 to 1.0. The height overlay of H8 allows up to eight (8) stories and 95
feet in height.
A public hearing for this proposed project was initially scheduled for the January 28,
2014, Planning Commission meeting. But, due to a request by Caltrans for additional
traffic analyses, the hearing was continued to the February 25, 2014, meeting. This
proposal was presented to the Planning Commission at their regular meeting on
February 25, 2014, for the consideration and recommendation to the City Council. At
this meeting, the Planning Commission adopted Resolution No. 1897 with a 3 -2 vote to
recommend denial of the project for the following reasons:
• The project would have profound effect on the character of the city and its
reputation as a Community of Homes.
• The project was over - ambitious for the site and should be scaled back (although
the overall sentiment was favorable to the project).
• There was not a supportable need to deviate from the Code to allow 8 feet of
additional height for architectural features, equipment, and other rooftop
structures on the hotel condominium.
• Concerns with the parking modification.
A copy of the Planning Commission minutes and the Executive Summary have been
provided (refer to Attachment No. 1). Since that meeting, the applicant chose to revise
the project based on the Planning Commission's concerns and comments and made the
following changes to the project (refer to Attachment No. 2):
1. Reduced the overall height of the hotel condominium tower to meet the maximum
height of 95 feet allowed by the H -8 height overlay. This eliminates the need for
a height modification of 98 feet and an additional 8 feet in height for an overall
height of 106 feet for architectural features, chimneys, vents, and other
accessory rooftop structures; and,
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 3 of 26
2. Modified the site and landscape plan to provide 15 additional parking spaces at
the completion of Phase 2. The final parking count will be 352 parking spaces in
lieu of 377 spaces required for the three hotels.
DISCUSSION
The proposed project involves the construction of 257,589 square feet of lodging with
142,320 square feet of "dual" (connected) hotel space in two buildings, and 115,269
square feet of hotel condominiums in 50 units on 5.73 (249,599 square feet) acres of
land. The project will be completed in two phases, as proposed in the Table 1 below:
Table 1
During Phase 1, a portion of the existing Santa Anita Inn hotel will be demolished, and
63 units will remain in operation until the start of Phase 2. The second phase is a 50-
unit hotel condominium that will have eight (8) floors and include nine (9) two -story
townhomes, 36 one -floor condominiums, five (5) penthouses, and one level of
subterranean parking. The phasing of the various components of the project is
discussed in more detail later in this staff report and in the Specific Plan (refer to
Attachment No. 3).
This proposed hotel development combines two Marriott brands, Residence Inn and
Fairfield Inn & Suites, with shared amenities, event and meeting space totaling 3,160
square feet, a 1,200 square -foot house - keeping facility, and an outdoor recreational
area with a swimming pool. Each hotel will have its own lobby and breakfast area with
an associated kitchen facility (for hotel guests only). The Residence Inn is an extended -
stay, all -suite hotel that offers studios and one- and two - bedroom suites, each with a
kitchenette. The Fairfield Inn & Suites is comprised of hotel suites with separate
living /working spaces and sleeping areas. These units do not include kitchenettes, but
the hotel offers a complimentary hot breakfast and a 24/7 convenience store in the
lobby area.
The proposed 50 unit hotel condominium building is considered as a type of lodging.
The units would be used like "time shares" or for other temporary (short -term) or
seasonal (limited) occupancies. These units are intended for and will be marketed
directly to racetrack - related guests and staff, as well as overseas investors. These units
are not intended to support full -time occupants. The pre - selected buyers of these units
will have a need to only make short seasonal stays and rent out their units for the
majority the time as part of a hotel booking pool. The units will also be subject to
Transient Occupancy Tax (TOT) like a typical hotel. The TOT requirement will be written
Project Summary
Phase 1
Building
No. of
Rooms /Units
No. of Floors
Gross
Square Feet
Marriott Residence Inn
121
6
93,985 sq. ft.
Fairfield Inn & Suites
89
4
48,425 sq. ft.
Existing Santa Anita Inn
(Phase 1 Only)
63
2
22,050 sq. ft.
Total Phase 1
273
164,460 sq. ft.
Phase 2
Hotel Condominium
50
8
115,269 sq. ft.
Total Rooms and Units
260
257,679 sq. ft.
During Phase 1, a portion of the existing Santa Anita Inn hotel will be demolished, and
63 units will remain in operation until the start of Phase 2. The second phase is a 50-
unit hotel condominium that will have eight (8) floors and include nine (9) two -story
townhomes, 36 one -floor condominiums, five (5) penthouses, and one level of
subterranean parking. The phasing of the various components of the project is
discussed in more detail later in this staff report and in the Specific Plan (refer to
Attachment No. 3).
This proposed hotel development combines two Marriott brands, Residence Inn and
Fairfield Inn & Suites, with shared amenities, event and meeting space totaling 3,160
square feet, a 1,200 square -foot house - keeping facility, and an outdoor recreational
area with a swimming pool. Each hotel will have its own lobby and breakfast area with
an associated kitchen facility (for hotel guests only). The Residence Inn is an extended -
stay, all -suite hotel that offers studios and one- and two - bedroom suites, each with a
kitchenette. The Fairfield Inn & Suites is comprised of hotel suites with separate
living /working spaces and sleeping areas. These units do not include kitchenettes, but
the hotel offers a complimentary hot breakfast and a 24/7 convenience store in the
lobby area.
The proposed 50 unit hotel condominium building is considered as a type of lodging.
The units would be used like "time shares" or for other temporary (short -term) or
seasonal (limited) occupancies. These units are intended for and will be marketed
directly to racetrack - related guests and staff, as well as overseas investors. These units
are not intended to support full -time occupants. The pre - selected buyers of these units
will have a need to only make short seasonal stays and rent out their units for the
majority the time as part of a hotel booking pool. The units will also be subject to
Transient Occupancy Tax (TOT) like a typical hotel. The TOT requirement will be written
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 4 of 26
into the Homeowners Association (HOA) Covenants, Conditions, and Restrictions
(CC &Rs) for each individual owner to pay through a management company. The
individual property owner will not be able to stay indefinitely without paying the TOT.
The owners must rent their units by using the on -site management company. Therefore,
the hotel condominium is consistent with the allowable use (i.e. lodging) under the
General Plan "Commercial" land use designation. However, the proposal exceeds the
1.0 floor area ratio (FAR) limit by 0.03 or 7,990 square feet.
The proposed project requires approval of the following applications:
• A General Plan Amendment to revise the Downtown Overlay (1.0 FAR) in the
General Plan Commercial Land Use Designation to a Downtown Overlay with a
1.03 FAR for this site.
• A Specific Plan to develop the 5.73 -acre site with two hotels (a total of 210
rooms) and a hotel condominium tower with 50 units.
• A Zone Change and Amendment to the Zoning Map to revise the zoning from C-
2 with Downtown and Height Overlays to SP -SP (Seabiscuit Pacifica Specific
Plan) with a Downtown Overlay of 1.03 FAR.
• A Mitigated Negative Declaration in compliance with CEQA.
A Specific Plan is required for the timing of the two phases and the project's overall size
and particular design. At the request of the City Council, a Development Agreement is
currently being negotiated between the applicant and the City, and this agreement will
provide further detail on the timing of the construction of each phase, the operational
restrictions on the condominium hotel portion of the project, and the method of paying
TOT. The Development Agreement will be presented to the Planning Commission and
City Council following the consideration of the entitlements.
The following are summaries of each of the required entitlements, excepting the
Development Agreement, for the proposed Seabiscuit Pacifica hotel development.
A. General Plan Amendment
The site currently allows a 1.0 floor area ratio (FAR) for up to 249,599 square feet of
commercial development. The applicant is requesting an amendment for a 1.03 FAR for
an additional 7,990 square feet of additional hotel space for a total development of
257,589 square feet. The proposed 1.03 FAR does not include a portion of the Santa
Anita Inn hotel that is proposed to remain in operation following Phase 1 but will be
removed prior to the construction of Phase 2.
The proposed project was taken to the City Council in concept several times in a Study
Session format and the Council agreed that a multi -hotel development on this site would
be acceptable, but that the phasing of the development would have to be adequately
addressed through the Specific Plan.
The site has an H -8 height overlay and a 1.0 FAR to accommodate a "landmark" project
directly across from a main entrance to the racetrack. Such a "landmark" project is to
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 5 of 26
provide a visual focus and entry statement, but is not to detract from the visual qualities
of the immediate neighborhood or impose upon any residential neighborhoods near the
project site.
California law also requires a Specific Plan to be consistent with the General Plan. The
proposed Seabiscuit Pacifica Specific Plan and the General Plan are complementary
and consistent on more than 100 General Plan goals and policies (refer to Appendix B
of the Specific Plan). For this reason, the increase in the FAR for this project is
appropriate.
The General Plan Land Use Map would be revised as follows with a higher Downtown
Overlay on the site.
W4131111i111ERa ITAMEN K Imam t11 «a.Jia
1�
117J N.Ma7- 01 I&R -1I W NMI 11141 11Ti INK! 17X36i
® 0- O' t Lrr(..o FOR: ® Wwm QMl F(i F fil
B. Seabiscuit Pacifica Specific Plan
♦ 1s
The purpose of the proposed Seabiscuit Pacifica Specific Plan (SP -SP) is to define the
range of permitted uses, the development regulations, the design guidelines, and the
phasing for the development of the project site. The SP -SP proposes to construct three
hotels, a Marriott Residence Inn, a Fairfield Inn and Suites, and a third hotel (proposed
to be hotel condominium), as previously described. The proposed hotels are expected
to support patrons and employees of the Santa Anita Park racetrack on a regular basis,
as well as general and business - related guests. These lodging uses are consistent with
the goals of the General Plan for general commercial uses located in the Downtown
area near the Santa Anita Park racetrack. Implementation of the Specific Plan will
accomplish the following objectives:
• Provide high quality development consistent with the City's General Plan and in
conformance with municipal standards, codes, and policies;
• Provide uses that will compliment and support the Santa Anita Park racetrack,
other important regional facilities in the City, and the adjacent Downtown area;
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 6 of 26
• Minimize the potential for environmental impacts;
• Augment the City's economic base by increasing tax - generating commercial
uses within the City; and
• Create employment - generating opportunities for the citizens of the City and
surrounding communities.
Standards within the Specific Plan include the phasing of the project; building height;
access; architectural design guidelines for the improvements, landscaping, fences and
walls; architecture; phasing of parking areas; signs; outdoor equipment; screening of
ancillary facilities; and methodology for interpretations of the provisions. Future
discretionary approvals for this site will be subject to procedures, findings, and
provisions described in the Specific Plan. The proposed Specific Plan development
standards match most of the development standards of the C -2 zoning of the site, with
the following modifications:
1. A total of 352 parking spaces in lieu of 377 spaces required for the three hotels.
2. The Specific Plan will supplant the requirements for a Conditional Use Permit
and Architectural Design Review that is required in a General Commercial (C -2)
zone for hotels.
The applicant has proposed to develop the project in two phases due to market demand
and the availability of financing. There are specific requirements and deadlines in the
Specific Plan for the hotels to be developed in a particular order, when the existing
Santa Anita Inn shall be demolished, and when the hotel condominium is to be
developed. It also sets forth the development plans and design, including the requested
modifications from the underlying C -2 zoning and the Downtown and H -8 height
overlays.
Development Phasing
Phase 1 is to be completed by 2016 and will include the following: a total of 142,320
square feet of hotel space in two connected buildings; 93,895 square feet in an
approximately 80 -foot tall, six -story building for the Marriott Residence Inn, and an
approximately 60 -foot tall, four - story, 48,425 square foot building for the Fairfield Inn
and Suites. The project site contains the existing 110 -room (34,775 square feet) Santa
Anita Inn hotel. A 47 -room portion of this hotel will be demolished in this phase, and the
four southernmost buildings (buildings C -F, 22,050 square feet of hotel space) are
proposed to remain in operation with 63 rooms following the completion of Phase 1
(refer to the renderings on page A -4.1 of the Specific Plan). Based on the proposal, the
63 -room portion of the Santa Anita Inn could remain open for 3 years following
completion of Phase 1. There will be 293 surface parking spaces for both new hotels
and the Santa Anita Inn. According to the applicant, there will also be a financial benefit
to the City to keep a portion of the Santa Anita Inn in operation since the City could
continue to receive hotel tax revenue from those units.
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 7 of 26
Phase 1 - Building Architecture
An initial conceptual design of the project was presented to the City Council last year,
and the Council felt the design appeared "generic" and indicated that the design should
be iconic and representative of Arcadia and the Santa Anita Park racetrack. The
Residence Inn and Fairfield Inn & Suites are Marriott products that are subject to their
corporate design guidelines. However, the applicant's architect has been able to
customize the designs. The applicant is proposing two different architectural styles for
consideration.
Option 1 (preferred option) — Inspired by Art Deco (refer to Exhibit A) - Art
Deco was a prominent style of architecture around Los Angeles during the 1920s
and 1930s.. Art Deco is the style of the Santa Anita Park grandstand and may
still be found in some of the most iconic buildings throughout Los Angeles.
The Art Deco design of the two hotels draws inspiration directly from the Santa
Anita Park grandstand. Strong vertical and horizontal lines and forms create
depth and distinctive planes with a repeated pattern of rectilinear forms to
enhance the verticality of the building. The variation in horizontal setbacks
creates a pattern of shadows against a varied palette of colors and materials.
Two vertical spires flanking the Residence Inn pay homage to the racetrack.
Exterior spot lighting of the buildings will highlight the two hotels by creating a
dramatic night scene.
Option 2 - Contemporary & Modern (refer to Exhibit B) — This design style is
contemporary with bold and distinctive lines and forms. Strong horizontal lines
are balanced with strong vertical elements. Ample variations in the height of the
vertical features create an interesting profile, and variation in the horizontal
setbacks creates structural and shadow patterns. The proposed materials
include stone veneer, stucco, and tinted windows in two distinctive colors.
Council Action: It is recommended that City Council select design Option 1, which has
more architectural interest, relates better to its surroundings, and would be compatible
with the style of the hotel condominium tower.
Phase 2 is to include demolition of any remaining portion of the Santa Anita Inn and
removal of 85 surface parking spaces for the construction of the eight -story, 95 -foot tall,
115,269 square -foot hotel (hotel condominium) tower with a 52 -space subterranean
parking structure and a surface parking lot with 77 spaces. The hotel condominium will
have nine townhomes, 36 condominium units, and five penthouses. Based on the
revised plans, the tower will have a maximum building height of 95 feet as allowed by
the H -8 height overlay. The site will have a total of 352 parking spaces after the
completion of Phase 2.
The proposed Seabiscuit Pacifica Specific Plan allows for Phase 2 to start immediately
after Phase 1 is completed. The timeline is based on the pre -sale success of the hotel
condominium units. According to the applicant, at least 50% of the units must be pre -
sold in order for a loan to be secured for the construction of Phase 2. The dual hotels
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 8 of 26
and the hotel condominium are expected to generate a need for 85 new full -time
equivalent employees at build out.
Phase 2 — Building Architecture and Height
The architectural design of the hotel condominiums is inspired by French Normandy
architecture. Some of the attributes that lend to this style include pilasters, an
accentuated chimney clad with stone veneer, as well as pronounced trim and
strategically placed cornices. The building will also have varied forms and profiles with
an interesting skyline profile. The facade of the building is adorned with many different
forms such as cylindrical corner pieces, and curvilinear balconies with decorative
wrought -iron railing. The specific style of architecture was chosen because of its
traditional and elegant appearance, which would complement the racetrack and the
surrounding community. However, the aesthetics and architectural features can be
modified in a collaborative effort between the City and design team. Such changes may
include enhancing the front entries to the hotels and hotel condominium, reducing the
amount of stone veneer on the walls of the hotel condominium tower, lowering the
height of the windows, increasing the roof pitch on the condominium tower, and
reducing the breadth and height of the porte cochere.
Phased Parking Lot
The existing surface parking lot has 194 parking spaces with access off of West
Huntington Drive. The primary access point for the new hotels will be near the junction
of Colorado Place and West Huntington Drive. Primary access to the hotel
condominium tower will also be off of West Huntington Drive. A driveway off of East
Huntington Drive will serve as a secondary /emergency access point for both the hotel
condominium and the two new hotels.
During construction of Phase 1, a portion of the Santa Anita Inn is proposed to remain
open — four buildings with 63 rooms. There will be 85 surface parking spaces to
accommodate guests, and access will be off of East and West Huntington Drive. Once
Phase 1 is completed, the parking lots will have a total of 293 parking spaces; 208
spaces for the two new hotels and 85 spaces for the Santa Anita Inn. Phase 2 will
remove the remaining Santa Anita Inn and the 85 parking spaces to make way for the
hotel condominiums and associated parking, with a total of 352 parking spaces in lieu of
377 spaces at the completion of Phase 2. The City's right -of -way dedication along
Huntington Drive will require the elimination of three (3) parking spaces.
The parking requirement for this project is subject to the development standards of the
Specific Plan, but according to the requirements in the height overlay, the two hotels at
the completion of Phase 2 should be parked at 1.2 parking space per guest room
totaling 252 parking spaces. The applicant is requesting that the two hotels only provide
227 parking spaces, which is 1.08 parking spaces per room or approximately an 10%
reduction from the Code requirement of 1.2 parking spaces per room. The applicant
projects that the hotel occupancy would stabilize after several years at an average of
72% occupancy. In addition, due to the proximity of the facility to the future Gold Line
Station, parking demands for staff and guests will be somewhat lessened. The City
Engineer agreed that the proposed parking ratio of 1.08 is acceptable. Most of the other
hotels in the City were approved with a parking modification to allow less than 1.2
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 9 of 26
spaces per guest room, and none have demonstrated any parking deficiencies. For
example, the Hilton Garden Inn was approved with 1.0 parking space per guest room in
lieu of 1.2 spaces, and the Marriott Courtyard was approved at 1.08 spaces per guest
room including 11 compact spaces. It would actually be less than 1.0 space per guest
room if those compact spaces were converted to standard parking spaces. The
Embassy Suites was parked to Code at 1.2 spaces per guest room with an additional 38
spaces to accommodate the banquet facilities since it is a full service hotel that has a
lounge, full service restaurant, and a meeting /banquet room that is 7,500 square feet,
twice as large as the proposed meeting rooms at the new hotels. Of those 38 parking
spaces, 29 were approved as compact spaces. The proposed ratio of 1.08 parking
space per guest room is in line with the similar hotels in the City.
In Phase 2, the applicant will remove the existing 85 parking spaces of the Santa Anita
Inn, and provide 73 new surface parking spaces and 52 parking spaces within a
subterranean parking garage. The hotel condominium will be parked at two parking
spaces for each unit, and one guest space for every two units. Each unit will have one
covered parking space in the garage and one surface parking space, and all the guest
spaces will be located in the parking lot areas. The applicant is proposing that 12 of the
parking spaces in the garage be in a tandem configuration rather than side by side
(refer to the Parking Plan on page A -3.1 of the Specific Plan). The problem with tandem
parking is that someone is usually boxed in, and this will discourage the use of those
parking spaces especially if the spaces might be used by different owners. Tandem
parking works only when both parking spaces are under the same ownership. For this
reason, it is recommended that each set of tandem parking spaces be assigned to a
particular unit, and that the Specific Plan include such a provision unless a 24 -hour valet
service or similar measure is provided so that the tandem spaces can be readily
accessed by any of the occupants.
At the February 25, 2014, Planning Commission meeting, the Commission had
concerns with the parking space deficiency, and whether the parking spaces will be
adequate in the instance of 100% occupancy and use of the spaces by hotel employees
and the 3,160 square foot meeting space. Since the proposed hotels are not
convention -type hotels, and do not include banquet rooms, restaurants, clubs,
auditoriums, etc., the 0.08 factor per room is sufficient for any of the supporting facilities
within the hotels. The primary use pattern of the meeting rooms will be by hotel guests.
Furthermore, it is usually the restaurants and clubs within various hotel developments
that would draw a large percentage of patrons from outside of the hotel, and would
rationally need more parking than those that were primarily used by hotel guests. Since
the applicant is not proposing either one of these uses, parking for the supporting
facilities as a "stand alone" use is not recommended. In addition, since the Planning
Commission meeting, the applicant has revised the site and landscape plans to provide
19 parking spaces at the completion of Phase 2. Table 1 is a breakdown of the total
parking proposed at buildout.
Based on the available information, the parking reduction will not create a parking
problem at the proposed hotels. In the event the hotel hosts a special event, the hotel
operators can utilize valet parking or can make special arrangements with the Santa
Anita Racetrack across the street since those parking lots are usually available during
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 10 of 26
evening hours. The City Hall west parking lots may also be available for occasional
short term use.
Table 1 — Parkina Buildout Parkina Summary
Hotel Market Study
Before the applicant chose Marriott hotels for this project, a market study was
performed by PKF Consulting to determine what type of hotel would be best suited for
this site and the surrounding area. The consultant recommended an extended stay hotel
and /or a limited service hotel. Mr. McAllister, Vice President of Marriott Lodging
Development, provided a letter that states the company has very strict policies
pertaining to new hotel development and the financial implications any new Marriott
hotels might have on existing, or nearby Marriott hotels (refer to Attachment No. 8). As
a result, Marriott did an internal analysis to determine potential financial impact on the
other Marriott branded hotels in the Arcadia, Monrovia, and Pasadena markets. They
determined that the potential financial impact on their existing hotels was within their
policy guidelines. Furthermore, an independent, third party consulting firm came to the
same conclusion.
FINnINr;S
Section 9296.8 of the Arcadia Municipal Code requires that for a Specific Plan to be
granted, it must be concluded that the following three findings of fact can be made in an
affirmative manner:
1. The proposed specific plan or specific plan amendment is consistent with the
General Plan, including the goals, objectives, policies, and action programs of
the City's General Plan.
Facts to Support the Finding: The subject site is identified in the General Plan
as an expansion of the Downtown area for future urban development. As a
result, the Specific Plan will provide for two new hotels and the first hotel
condominium in the City, which will be required to be subject to the City's
Transient Occupancy Tax (TOT) requirement. The proposed project will help
Code Required
Proposed
Proposed Parking
Parking
Parking Spaces
Ratio
Parking Space
Phase 1 —two
252
227
1.08
hotels, 210
rooms
Phase 2 — 50
125
125
2.5 spaces per unit
units
Total
377
352
1.08 space per guest
room
2.5 spaces per unit
Hotel Market Study
Before the applicant chose Marriott hotels for this project, a market study was
performed by PKF Consulting to determine what type of hotel would be best suited for
this site and the surrounding area. The consultant recommended an extended stay hotel
and /or a limited service hotel. Mr. McAllister, Vice President of Marriott Lodging
Development, provided a letter that states the company has very strict policies
pertaining to new hotel development and the financial implications any new Marriott
hotels might have on existing, or nearby Marriott hotels (refer to Attachment No. 8). As
a result, Marriott did an internal analysis to determine potential financial impact on the
other Marriott branded hotels in the Arcadia, Monrovia, and Pasadena markets. They
determined that the potential financial impact on their existing hotels was within their
policy guidelines. Furthermore, an independent, third party consulting firm came to the
same conclusion.
FINnINr;S
Section 9296.8 of the Arcadia Municipal Code requires that for a Specific Plan to be
granted, it must be concluded that the following three findings of fact can be made in an
affirmative manner:
1. The proposed specific plan or specific plan amendment is consistent with the
General Plan, including the goals, objectives, policies, and action programs of
the City's General Plan.
Facts to Support the Finding: The subject site is identified in the General Plan
as an expansion of the Downtown area for future urban development. As a
result, the Specific Plan will provide for two new hotels and the first hotel
condominium in the City, which will be required to be subject to the City's
Transient Occupancy Tax (TOT) requirement. The proposed project will help
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 11 of 26
revitalize the Downtown area of Arcadia, as well as contribute positively to the
existing downtown setting. Therefore, the proposed Specific Plan is consistent
with the General Plan.
2. The proposed specific plan or specific plan amendment will not adversely affect
the public health, safety, and welfare or result in an illogical land use pattern.
Facts to Support the Finding: The Initial Study /Mitigated Negative Declaration
for the Specific Plan and General Plan Amendment analyzed all the potential
impacts and all the projects impacts are less than significant or can be reduced
to less than significant level with the implementation of the recommended
mitigation measures. Therefore, the proposed project would not be detrimental to
the public health and welfare. Instead, the proposed project will be a superior
development that will provide an entry statement for the City.
3. The specific plan or proposed specific plan amendment is a desirable planning
tool to implement the provisions of the City's General Plan.
Facts to Support the Finding: This proposed project is to be built over time and
in two phases. Phasing involves many considerations; such as market demand,
and the availability of financing. A Specific Plan can address these particular
matters so that the hotels will be developed in a particular order, and when the
existing Santa Anita Inn shall be demolished. The intent of the Specific Plan is to
ensure that he proposed project is developed in the right order and by a set time
table.
Zone Change and Amendment to the Zoning Map
Currently, the site is zoned C -2 with a Downtown Overlay and a special height overlay
of H -8. The proposed Specific Plan will create a new zone of "SP -SP" with a 1.03 FAR
for the 5.73 acre project site. To facilitate the zone change, the following section would
replace the existing language within Section 9231; Establishment of Zones in the
Arcadia Municipal Code:
9231.21.2 SP -SP - Seabiscuit Pacifica Specific Plan
Existinvy Zoni
W �H A vY /�i [tom•
�GhSnal {on.ntr[YI(Ca1 ®�fi O y(i FAR] Sr.h_f N. spa p (ER&.) ® YlwM8n110. dN (i FM)
0
in[ FVW..o YF(H: 0° Llx•gfrtoml4(M
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 12 of 26
The above zoning map showing the proposed revision is attached to this staff report
(refer to Attachment No. 6). All development within the SP -SP Zone will be consistent
with the provisions of the Specific Plan. The Zoning Map would be revised to reflect the
proposed zoning changes to the property.
With the following recommended conditions of approval, the proposed project would
satisfy each prerequisite condition.
RECOMMENDATION
It is recommended that the City Council conditionally approve the project and adopt the
Mitigated Negative Declaration by adopting Resolution No. 7013 and Introduce
Ordinance Nos. 2307 and 2308, subject to the following conditions of approval:
1. The remaining portion of Santa Anita Inn (buildings C -F) shall be demolished within
three years of the issuance of a Certificate of Occupancy for either of the two new
hotels. In the event a Development Agreement is approved by the City Council for
the project, the terms of the Development Agreement on the retention of the Santa
Anita Inn will supersede this condition.
2. The portion of Santa Anita Inn remaining following construction of Phase 1 shall be
provided with a new lobby area within the existing building(s). Any changes or
alteration to the building shall be subject to review and approval by the
Development Services Director or designee.
3. Each set of tandem parking spaces shall be assigned to a single unit unless a 24-
hour valet service or equivalent measure is implemented. Any changes or
alteration to the parking space assignment shall be subject to review and approval
by the Development Services Director or designee.
4. No architectural features, chimneys, vents, equipment, and other accessory
rooftop structures may be placed on top of the mansard roofs of the hotel
condominium tower. The maximum height of all elements is 95 feet.
5. A Tentative Tract Map must be filed with the City and approved prior to issuance of
a building permit for Phase 2 — the hotel condominium tower.
6. The Phase 2 component of the development will be a hotel use and may be a hotel
condominium tower. Transient Occupancy Tax (TOT) shall be required to be
remitted for the Phase 2 component. The TOT requirement, as well as restrictions
on how the units will be managed, rented, and sold, shall be written into the
Homeowners Association (HOA) Covenants, Conditions, and Restrictions (CC &Rs)
for each individual owner The individual property owner will not be able to stay
indefinitely without paying the TOT. The owners shall rent their units by using the
on -site management company. In no circumstances shall the units be used for
permanent residences. The site is not suitable for permanent residency, does not
possess facilities for such, and the City's General Plan does not allow residential
uses at the location. The draft HOA CC &Rs shall be submitted for review and
approval by the City Attorney prior to issuance of a Certificate of Occupancy for
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 13 of 26
any of the hotel condominium units and the CC &Rs shall notify prospective
purchasers of the transient nature of the use and that they are purchasing into a
commercial hotel development and not a residential development. If a
Development Agreement is approved for this project, the terms of the Development
Agreement shall govern on this issue.
7. In accordance with the City's Transportation Impact Fee Program, the applicant
shall pay its development impact fees, which will mitigate the project's contribution
to any cumulative impacts to the westbound I -210 intersection at Santa Anita
Avenue.
8. The design and construction of any and all traffic signals, signing, and striping
modifications or additions to accommodate the new entrance near the intersection
of Huntington Drive and Colorado Place shall be at the applicant's /property
owner's expense.
9. Damaged sections of the existing curb and gutter on Huntington Drive shall be
removed and replaced per City of Arcadia Standards.
10. The applicant/property owner shall provide a street dedication along westbound
Huntington Drive, to create a continuous 10' -0" parkway width.
11. The applicant/property owner shall provide signage to clearly mark the monument
roundabout as "One Way," and also provide signage to clearly mark the exits from
the condominium hotel site onto westbound and eastbound Huntington Drive(s) as
"Left Turn Only."
12. New sidewalk along eastbound Huntington Drive per City Standard shall be
constructed at the applicant's /property owner's expense. The property owner and
site superintendent shall coordinate with City Engineer and Public Works Services
Director for the protection and /or replacement of existing trees within the City's
rights -of -way.
13. The applicant/property owner shall prepare a Standard Urban Stormwater
Mitigation Plan ( SUSMP) for the proposed development, as prescribed by Los
Angeles Department of Public Works SUSMP Manual.
14. Prior to issuance of a building permit for each phase of the project, a detailed
landscaping and irrigation plan shall be prepared by the applicant/property owner
for the project site. The proposed project shall comply with the requirements of the
City's Water Efficient Landscaping Ordinance.
15. All City requirements regarding disabled access and facilities; occupancy limits;
building safety; fire prevention, detection and suppression; health code
compliance; emergency access, egress, and equipment; water supply and
facilities; sewer facilities; trash reduction and recycling requirements;
environmental regulation compliance, including National Pollution Discharge
Elimination System (NPDES) measures; and parking and site design shall be
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 14 of 26
complied with to the satisfaction of the Building Official, City Engineer, Community
Development Administrator, Fire Marshal, and Public Works Services Director.
Compliance with these requirements shall be determined by having fully detailed
construction plans submitted for plan check review and approval by the foregoing
City officials and employees.
16. The uses approved by these applications shall be operated and maintained in a
manner that is consistent with the proposal and plans submitted and approved;
and shall be subject to periodic inspections, after which the provisions of this
approval may be adjusted after due notice to address any adverse impacts to the
adjacent streets, rights -of -way, and /or the neighboring businesses, residents, or
properties.
17. Noncompliance with the plans, provisions and conditions of approval shall be
grounds for immediate suspension or revocation of any approvals, which could
result in the closing of the hotels and hotel condominium.
18. The applicant shall defend, indemnify, and hold harmless the City of Arcadia and
its officials, officers, employees, and agents from and against any claim, action, or
proceeding against the City of Arcadia, its officials, officers, employees or agents
to attack, set aside, void, or annul any approval or conditional approval of the City
of Arcadia concerning this project and /or land use decision, including but not
limited to any approval or conditional approval of the City Council, Planning
Commission, or City Staff, which action is brought within the time period provided
for in Government Code Section 66499.37 or other provision of law applicable to
this project or decision. The City shall promptly notify the applicant of any claim,
action, or proceeding concerning the project and /or land use decision and the City
shall cooperate fully in the defense of the matter. The City reserves the right, at its
own option, to choose its own attorney to represent the City, its officials, officers,
employees, and agents in the defense of the matter.
19. Approval of GPA 14 -01, SP 13 -02, and ZC 14 -01 shall not be of effect unless on or
before 30 calendar days after City Council adopts the Resolution and Ordinance,
the property owner /applicant has executed and filed with the Community
Development Administrator an Acceptance Form available from the Development
Services Department to indicate awareness and acceptance of these conditions of
approval.
Mitigation Measures as Conditions of Approval
The following conditions are found in the Mitigation Monitoring and Reporting Program
(MMRP). They are recorded here to facilitate review and implementation. More
information on the timing and responsible parties for these mitigation measures is
detailed in the MMRP.
20. Prior to issuance of a building permit, the applicant shall demonstrate that all
project windows are glazed or otherwise treated to minimize glare on surrounding
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 15 of 26
roads and properties, to the satisfaction of the Development Services Director or
designee.
21. Prior to issuance of a grading permit, the general contractor for the project shall
prepare and file a Dust Control Plan with the City that complies with SCQAMD
Rule 403 and requires the following during excavation and construction as
appropriate:
• Apply nontoxic chemical soil stabilizers according to manufacturers'
specifications to all inactive construction areas (previously graded areas
inactive for 10 days or more).
• Water active sites at least twice daily (locations where grading is to occur will
be thoroughly watered prior to earthmoving).
• Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at
least 2 feet of freeboard (vertical space between the top of the load and top of
the trailer) in accordance with the requirements of California Vehicle Code
(CVC) Section 23114.
• Pave construction access roads at least 100 feet onto the site from the main
road.
• Control traffic speeds within the property to 15 mph or less.
22. Prior to the issuance of a grading permit, the project developer shall require by
contract specifications that contractors shall utilize California Air Resources Board
(CARB) Tier II Certified equipment or better during the rough /mass grading phase
for rubber -tired dozers and scrapers. Contract specifications shall be included in
the proposed project construction documents, which shall be reviewed by the City.
23. Prior to the issuance of a grading or building permit for each phase, the project
developer shall require by contract specifications that contractors shall place
construction equipment staging areas at least 200 feet away from sensitive receptors.
Contract specifications shall be included in the project construction documents, which
shall be reviewed by the City.
24. Prior to the issuance of a building permit for each phase, the project developer
shall require by contract specifications that contractors shall utilize power poles or
clean -fuel generators for electrical construction equipment. Contract specifications
shall be included in the proposed project construction documents, which shall be
reviewed by the City.
25. Prior to issuance of a grading permit for each phase, the developer shall provide
an assessment of existing trees on the areas to be developed. This tree
assessment shall be prepared by a qualified landscape architect and identify any
existing large bushes or trees that can be relocated or preserved as part of the
new development project. The project landscaping plans shall attempt to preserve
existing mature trees onsite to the extent feasible, based on the tree assessment.
This measure shall be implemented to the satisfaction of the City Planning
Division.
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 16 of 26
26. During project construction in either phase, the existing redwood trees along the
east side of the property shall be protected by being taped or roped off with
appropriate signage so construction equipment will not accidentally come in
contact with and damage or destroy any trees. The trees shall be sprayed with
water at the end of each day when substantial amounts of dust are generated
(e.g., during grading or demolition) to minimize damage from dust deposition. This
measure shall be implemented to the satisfaction of the City Planning Division.
27. Construction in either phase should not occur during the local nesting season
(estimated February 1 to July 15). If any construction occurs during the nesting
season, a nesting bird survey shall be conducted by a qualified biologist prior to
the issuance of a grading permit or removal of any large trees on the existing hotel
property. If the biologist determines that nesting birds are present, an area of 100
feet shall be marked off around the nest and no construction activity can occur in
that area during nesting activities. Grading and /or construction may resume in this
area when a qualified biologist has determined the nest is no longer occupied and
all juveniles have fledged. This measure shall be implemented to the satisfaction of
the City Planning Services.
28. Prior to demolition of any existing hotel buildings on the site, the completed DPR 523A
and 523B forms and a cover memorandum shall be submitted to the City for filing to
officially document the historical assessment for the Santa Anita Inn. This measure shall
be implemented to the satisfaction of the City Planning Services.
29. While there is no known historical significance as that term is defined under CEQA,
the applicant has proposed to install a plaque indicating the location of the former
Santa Anita Inn and its place in the history of the City of Arcadia. The size,
construction, and location of this plaque shall be up to the discretion of the City
Manager, in consultation with the Planning Services.
30. If cultural artifacts are discovered during project grading, work shall be halted in
that area until a qualified historian or archaeologist can be retained by the
developer to assess the significance of the find. The project cultural monitor shall
observe the remaining earthmoving activities at the project site consistent with
Public Resources Code Section 21083.2(b), (c), and (d). The monitor shall be
equipped to record and salvage cultural resources that may be unearthed during
grading activities. The monitor shall be empowered to temporarily halt or divert
grading equipment to allow recording and removal of the unearthed resources.
31. If any resources of a prehistoric or Native American origin are discovered, the
appropriate Native American tribal representative will be contacted and invited to
observe the monitoring program for the duration of the grading phase at tribal
expense. Any Native American resources shall be evaluated in accordance with
the CEQA Guidelines and either reburied at the project site or curated at an
accredited facility approved by the City of Arcadia. Once grading activities have
ceased or the cultural monitor determines that monitoring is no longer necessary,
such activities shall be discontinued. This measure shall be implemented to the
satisfaction of the City Planning Services.
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 17 of 26
32. If paleontological resources (fossils) are discovered during project grading, work
will be halted in that area until a qualified paleontologist can be retained to assess
the significance of the find. The project paleontologist shall monitor remaining
earthmoving activities at the project site and shall be equipped to record and
salvage fossil resources that may be unearthed during grading activities. The
paleontologist shall be empowered to temporarily halt or divert grading equipment
to allow recording and removal of the unearthed resources. Any fossils found shall
be evaluated in accordance with the CEQA Guidelines and offered for curation at
an accredited facility approved by the City of Arcadia. Once grading activities have
ceased or the paleontologist determines that monitoring is no longer necessary,
monitoring activities shall be discontinued. This measure may be combined with
CUL -3 at the discretion of the City Planning Services.
33. In the event of an accidental discovery or recognition of any human remains,
California State Health and Safety Code § 7050.5 dictates that no further
disturbance shall occur until the County Coroner has made the necessary findings
as to origin and disposition pursuant to CEQA regulations and PRC § 5097.98. If
human remains are found, the LA County Coroner's office shall be contacted to
determine if the remains are recent or of Native American significance. Prior to
issuance of a grading permit, the developer shall include a note to this effect on the
grading plans for the project.
34. To ensure reductions below the expected "Business As Usual" (BAU) scenario, the
project will implement a variety of measures that will reduce its greenhouse gas
(GHG) emissions. To the extent feasible, and to the satisfaction of the City of
Arcadia (City), the following measures will be incorporated into the design and
construction of the SP -SP project prior to the issuance of building permits:
Construction and Building Materials
• Recycle /reuse at least 50 percent of the demolished and /or grubbed
construction materials (including, but not limited to, soil, vegetation,
concrete, lumber, metal, and cardboard).
• Use "Green Building Materials," such as those materials that are resource -
efficient and are recycled and manufactured in an environmentally friendly
way, for at least 10 percent of the project.
Energy Efficiency Measures
• Design all project buildings to exceed the 2013 California Building Code's
(CBC) Title 24 energy standard by 10 percent, including, but not limited to,
any combination of the following:
• Design buildings to accommodate future solar installations as appropriate.
• Limit air leakage through the structure or within the heating and cooling
distribution system to minimize energy consumption.
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 18 of 26
• Incorporate ENERGY STAR or better rated windows, space heating and
cooling equipment, light fixtures, appliances, or other applicable electrical
equipment.
• Install efficient lighting and lighting control systems. Use daylight as an
integral part of the lighting systems in buildings.
• Install light- colored roofs and pavement materials where possible.
• Install energy- efficient heating and cooling systems, appliances and
equipment, and control systems.
• Install solar lights or light- emitting diodes (LEDs) for outdoor lighting or
outdoor lighting that meets the 2013 California Building and Energy Code.
Water Conservation and Efficiency Measures
Devise a comprehensive water conservation strategy appropriate for the project
and its location consistent with the City's Water Efficiency Landscape Ordinance
(WELD). The strategy may include the following, plus other innovative measures
that may be appropriate:
• Create water - efficient landscapes within the development.
• Install water - efficient irrigation systems and devices, such as soil moisture -
based irrigation controls.
• Design buildings to be water - efficient. Install water - efficient fixtures and
appliances, including low -flow faucets, dual -flush toilets, and waterless urinals.
• Restrict watering methods (e.g., prohibit systems that apply water to
nonvegetated surfaces) and control runoff.
Solid Waste Measures
To facilitate and encourage recycling to reduce landfill- associated emissions,
among others, the project will provide trash enclosures that include additional
enclosed area(s) for collection of recyclable materials. The recycling collection
area(s) will be located within, near, or adjacent to each trash and rubbish disposal
area. The recycling collection area will be a minimum of 50 percent of the area
provided for the trash /rubbish enclosure(s) or as approved by the City's Public
Works Services Department. Provide employee education on waste reduction and
available recycling services.
Transportation Measures
To facilitate and encourage non - motorized transportation, bicycle racks shall be
provided in convenient locations to facilitate bicycle access to the project area. The
bicycle racks shall be shown on project landscaping and improvement plans
submitted for Planning Services approval and shall be installed in accordance with
those plans.
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 19 of 26
Provide pedestrian walkways and connectivity throughout the project.
Fund or participate in some type of shuttle service for hotel guests to access the
City's downtown Gold Line Station.
35. Prior to demolition of any existing hotel buildings or associated structures, a
qualified contractor shall be retained to survey structures proposed for demolition
to determine if asbestos - containing materials (ACMs) and /or lead -based paint
(LBP) are present. If ACMs and /or LBP are present, prior to commencement of
general demolition, these materials shall be removed and transported to an
appropriate landfill by a licensed contractor. This measure shall be implemented to
the satisfaction of the City Building Services including written documentation of the
disposal of any ACMs or LBP in conformance with all applicable regulations.
36. Prior to issuance of a grading permit, the developer shall file a Notice of Intent
(NOI) with the Los Angeles Regional Water Quality Control Board to be covered
under the National Pollutant Discharge Elimination System (NPDES) General
Construction Permit for discharge of storm water associated with construction
activities. The project developer shall submit to the City the Waste Discharge
Identification Number issued by the State Water Quality Control Board (SWQCB)
as proof that the project's NOI is to be covered by the General Construction Permit
has been filed with the SWQCB. This measure shall be implemented to the
satisfaction of the City Engineer.
37. Prior to issuance of a grading permit, the developer shall submit to the Los
Angeles Regional Water Quality Control Board (RWQCB) and receive approval for
a project- specific Storm Water Pollution Prevention Plan ( SWPPP). The SWPPP
shall include a surface water control plan and erosion control plan citing specific
measures to control on -site and off -site erosion during the entire grading and
construction period. In addition, the SWPPP shall emphasize structural and
nonstructural best management practices (BMPs) to control sediment and non -
visible discharges from the site. BMPs to be implemented may include (but shall
not be limited to) the following:
• Potential sediment discharges from the site may be controlled by the following:
sandbags, silt fences, straw wattles, fiber rolls, a temporary debris basin (if
deemed necessary), and other discharge control devices. The construction and
condition of the BMPs are to be periodically inspected by the RWQCB during
construction, and repairs would be made as required.
• Area drains within the construction area must be provided with inlet protection.
Minimum standards are sandbag barriers, or two layers of sandbags with filter
fabric over the grate, properly designed standpipes, or other measures as
appropriate.
• Materials that have the potential to contribute non - visible pollutants to
stormwater must not be placed in drainage ways and must be placed in
temporary storage containment areas.
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 20 of 26
• All loose soil, silt, clay, sand, debris, and other earthen material shall be
controlled to eliminate discharge from the site. Temporary soil stabilization
measures to be considered include: covering disturbed areas with mulch,
temporary seeding, soil stabilizing binders, fiber rolls or blankets, temporary
vegetation, and permanent seeding. Stockpiles shall be surrounded by silt
fences and covered with plastic tarps.
• Implement good housekeeping practices such as creating a waste collection
area, putting lids on waste and material containers, and cleaning up spills
immediately.
• The SWPPP shall include inspection forms for routine monitoring of the site
during the construction phase.
• Additional required BMPs and erosion control measures shall be documented
in the SWPPP.
• The SWPPP would be kept on site for the duration of project construction and
shall be available to the local Regional Water Quality Control Board for
inspection at any time.
The developer and /or construction contractor shall be responsible for performing
and documenting the application of BMPs identified in the project- specific SWPPP.
Regular inspections shall be performed on sediment control measures called for in
the SWPPP. Monthly reports shall be maintained and available for City inspection.
An inspection log shall be maintained for the project and shall be available at the
site for review by the City and the Regional Water Quality Control Board as
appropriate.
38. Prior to issuance of a grading permit, a site - specific Standard Urban Stormwater
Management Plan ( SUSMP) shall be submitted to the City Planning Division for
review and approval. The SUSMP shall specifically identify the long -term site
design, source control, and treatment control BMPs that shall be used on site to
control pollutant runoff and to reduce impacts to water quality to the maximum
extent practicable. At a minimum, the SUSMP shall identify and the site developer
shall implement the following site design, source control, and treatment control
BMPs as appropriate:
Site Design BMPs
• Minimize urban runoff by maximizing permeable areas and minimizing
impermeable areas (recommended minimum 25 percent of site to be
permeable).
• Incorporate landscaped buffer areas between sidewalks and streets.
• Maximize canopy interception and water conservation by planting native or
drought - tolerant trees and large shrubs wherever possible.
• Where soil conditions are suitable, use perforated pipe or gravel filtration pits
for low flow infiltration.
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 21 of 26
• Construct onsite ponding areas or retention facilities to increase opportunities
for infiltration consistent with vector control objectives.
• Construct streets, sidewalks and parking lot aisles to the minimum widths
necessary, provided that public safety and a walkable environment for
pedestrians are not compromised.
• Direct runoff from impervious areas to treatment control BMPs such as
landscaping /bioretention areas.
Source Control BMPs
Source control BMPs are implemented to eliminate the presence of pollutants
through prevention. Such measures can be both non - structural and structural:
Non - Structural Source Control BMPs
• Education for property owners, tenants, occupants, and employees.
• Activity restrictions.
• Irrigation system and landscape maintenance to minimize water runoff.
• Common area litter control.
• Regular mechanical sweeping of private streets and parking lots.
• Regular drainage facility inspection and maintenance.
Structural Source Control BMPs
• Municipal Separate Storm Sewer System (MS4) stenciling and signage at
stormdown drains.
• Properly design trash storage areas and any outdoor material storage areas.
Treatment Control BMPs
Treatment control BMPs supplement the pollution prevention and source control
measures by treating the water to remove pollutants before it is released from the
project site. The treatment control BMP strategy for the project is to select Low Impact
Development (LID) BMPs that promote infiltration and evapotranspiration, including the
construction of infiltration basins, bioretention facilities, and extended detention basins.
Where infiltration BMPs are not appropriate, bioretention and /or biotreatment BMPs
(including extended detention basins, bioswales, and constructed wetlands) that provide
opportunity for evapotranspiration and incidental infiltration may be utilized. Harvest and
use BMPs (e.g., storage pods) may be used as a treatment control BMP to store runoff
for later non - potable uses.
39. Prior to issuance of grading and building permits for each phase of the project, the
developer shall prepare a Construction Noise Control Plan and will submit the plan
to the City for review and approval. The plan shall include but will not be limited to
the following:
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 22 of 26
• During all project site excavation and grading, contractors shall equip all
construction equipment, fixed or mobile, with properly operating and maintained
mufflers consistent with manufacturers' standards.
• The project contractor shall place all stationary construction equipment so that
emitted noise is directed away from the closest sensitive receptor to the project
site (i.e., the Salvation Army facility at the southwest corner of the site).
• The construction contractor shall locate equipment staging in areas that will
create the greatest distance between construction - related noise sources and
the closest noise - sensitive receptor to the project site (i.e., the Salvation Army
facility at the southwest corner of the site) during all project construction.
• During all project site construction, the construction contractor shall limit all
construction - related activities that would result in high noise levels to between
the hours of 7:00 a.m. to 7:00 p.m. on weekdays and Saturdays. No
construction shall be permitted on Sundays or any of the holidays listed in AMC
Section 4261.
• Prior to the start of Phase 2 grading, the developer shall install a wooden noise
barrier along the common boundary of the project and the Salvation Army
rehab facility at the southwest corner of the project site. This barrier shall be
removed upon completion of Phase 2 construction.
40. Prior to the issuance of building permits for each phase, the developer shall
demonstrate that all buildings shall have air - conditioning to minimize noise impacts
on hotel rooms along West and East Huntington Drives.
41. Prior to the issuance of occupancy permits for the Phase 2 hotel condominium
building, the developer shall install a filled -cell concrete block wall along the
common boundary with the Salvation Army rehab facility at the southwest corner of
the project site. In lieu of the temporary construction wall outlined in condition no.
39, the developer may install this permanent wall "early" (i.e., prior to issuance of
occupancy permits for Phase 1) which would eliminate the need for that portion of
condition no. 39. .
42. Prior to issuance of an occupancy permit for either hotel in Phase 1, the developer
shall be responsible for installing an additional signal phase to accommodate
northbound movements exiting the shared hotel driveway and southbound
movements entering the hotel driveway. The developer will also change the
number one lane to a shared through and left turn lane to access the driveway for
the hotels and modify the signal to account for the added phases and lanes. These
changes shall be made to the satisfaction of and in coordination with the City traffic
engineer.
43. Prior to issuance of occupancy permits for either of the hotels or the hotel
condominiums, the developer shall install bike racks and provide showers and
locker rooms for employees who wish to ride bicycles to work. Bike racks shall also
be installed for project guests in appropriate locations. An appropriate number of
bike racks as determined by the City of Arcadia shall be located near each building
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 23 of 26
to serve the anticipated number of employees and guests. This measure shall be
implemented to the satisfaction of the City Engineer.
44. Prior to issuance of building permits for either Phase 1 or Phase 2, the project
plans shall be circulated to Foothill Transit (FT) and the Metropolitan Transit
Authority (MTA) to determine if there is a need for a bus stop on the south side of
Colorado Place in front of the project site (e.g., for either FT Route 187 or MTA
routes 78, 79, or 378). If either agency determines a need for such a stop, the
developer shall install a bus stop to agency specifications prior to issuance of
occupancy permits for the affected phase of development. This measure shall be
implemented for each phase to the satisfaction of the City Engineer.
45. Prior to issuance of occupancy permits for either hotel in Phase 1, the developer
shall demonstrate that the main hotel entrance for Phase 1 has a circular drive with
signage to allow only one way circulation (counter - clockwise) to provide adequate
vehicle queuing lanes for exiting at the traffic signal. This measure shall be
implemented to the satisfaction of the City Engineer.
46. Prior to issuance of a building permit for either hotel, the developer shall retain a
qualified licensed civil engineer to conduct a sewer study to evaluate before and
after conditions of the project on the City's existing sewer system (both lateral and
main lines). This measure shall be implemented to the satisfaction of the City
Public Works Services Department and the County Sanitation Districts of Los
Angeles County as appropriate.
47. Prior to issuance of an occupancy permit for either hotel, the developer shall make
a fair share contribution to the City to help fund upgrading of the existing sewer in
West Huntington Drive included in the City's 2014 -15 Capital Improvement Project
Plan budget, based on the results of the sewer study outlined in Mitigation
Measure UTL -1. This measure shall be implemented to the satisfaction of the City
Engineer and /or the City Public Works Services Department as appropriate.
48. Prior to issuance of an occupancy permit for either hotel, the developer shall also
make a fair share contribution to the County Sanitation Districts of Los Angeles
County for any trunk line improvements required to serve the project based on the
results of the sewer study. This measure shall be implemented to the satisfaction
of the City Public Works Services Department in consultation with the County
Sanitation Districts of Los Angeles County as appropriate.
49. In accordance with the City's Transportation Fee Program, the applicant shall pay
its development impact fees which will mitigate any cumulative impacts in the
future at the westbound 1 -201 intersection at Santa Anita Avenue.
50. Prior to issuance of an occupancy permit for either hotel, the developer shall make
a fair share contribution to fund project - related portions of any improvements
needed to provide adequate electrical service to the project. This measure shall
be implemented to the satisfaction of the City Public Works Services Department in
consultation with Southern California Edison.
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 24 of 26
ENVIRONMENTAL ANALYSIS
Pursuant to the provisions of the California Environmental Quality Act (CEQA), the
Development Services Department prepared the attached Initial Study and Mitigated
Negative Declaration (MND) for the proposed project (refer to Attachment No. 4). The
project with mitigation measures will have less- than - significant impacts for the following
areas: Aesthetics, Air Quality, Biological Resources, Geology and Soils, Hazards and
Hazardous Materials, Hydrology and Water Quality, Noise, Transportation /Traffic, and
Utilities and Service Systems. A detailed review is included in the Initial Study. The
mitigation measures have been added as conditions of approval (Condition nos. 20 -50)
for the project. The City has prepared a Mitigated Negative Declaration and a Mitigation
Monitoring and Reporting Program (MMRP).
In accordance with Section 21091 of the California Environmental Quality Act (CEQA)
and Section 15073 of the CEQA Guidelines, the Draft Initial Study /Mitigated Negative
Declaration (IS /MND) for the Seabiscuit Pacifica Specific Plan Project (SCH
#2013121018) was circulated for public review and comments for 30 days from
December 5, 2013, to January 13, 2014; this includes an extra week of review because
of the holidays. CEQA also requires the lead agency (City of Arcadia) to specify the
location and custodian of the documents and other materials which constitute the record
of proceedings upon which the lead agency's decision is based. These documents
were made available at Arcadia City Hall and at the Arcadia Public Library. During this
time period, public agencies, organizations, and the public in general were afforded the
opportunity to review the Draft IS /MND, and submit written comments regarding the
documents and the proposed project.
During the comment period, staff received comments from the following agencies:
• California Department of Transportation ( Caltrans), dated December 12, 2013,
January 13, 2014, and February 25, 2014
• Native American Heritage Commission (NAHC), dated December 12, 2013
• California Department of Fish & Wildlife (CDWF), dated January 10, 2014
• County Sanitation Districts of Los Angeles County (CSDLAC), dated January 10, 2014
• Southern California Edison (SCE), dated January 10, 2014
The comments on the Draft IS /MND necessitated additional traffic analyses to evaluate
the impacts to the Interstate -210 freeway and local freeway ramps to ensure that the
impacts would be within Caltrans guidelines, and at the request of Caltrans, additional
analysis was performed for the horizon year of 2038, which correlates to 20 years after
the build -out of the project. The City Council is required to consider the IS /MND together
with any comments received during the public review process. Attached is the
Response to Comments, which adequately addresses the comments made by the
various agencies on the Seabiscuit Pacifica Specific Plan IS /MND. The comments and
their responses do not change the conclusion of the IS /MND (i.e., that all the project
impacts are less than significant or can be reduced to less than significant levels by
implementation of the recommended mitigation measures, including the additional
measures outlined in the memorandum).
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 25 of 26
FISCAL IMPACT
Fees from the project will fund the development's fair share of impacts from the project
on City utilities and services, including sewer, transportation, electrical, and storm water.
The proposed development would have a limited impact on fire or police services, and
would not have any significant impacts on local schools or parks. Instead, the proposed
development will significantly increase the assessed value of the subject property,
which will result in substantial additional property tax. Additionally, the project will have
a substantial increase in receipts from Transient Occupancy Tax (TOT) because the site
will ultimately include 100 additional hotel rooms and 50 hotel condominium units.
RECOMMENDED ACTION
It is recommended that the City Council approve the following items including the
conditions of approval listed in this staff report:
1. Adopt Resolution No. 7013 approving General Plan Amendment No. GPA 14 -01
to amend the Downtown Overlay of 1.0 Floor Area Ratio (FAR) in the General
Plan Land Use Designation to a Downtown Overlay with a 1.03 FAR and
approving the Mitigated Negative Declaration and Mitigated Monitoring Project at
130 W. Huntington Drive; and
2. Introduce Ordinance No. 2314 adopting Specific — Seabiscuit Pacifica Specific
Plan (SP -SP) with Floor Area Ratio of 1.03, the Art Deco Architectural Style for
the two hotels (Marriott and Fairfield Inn Suites), and the Specific Land Use
Regulations of the Seabiscuit Pacifica Project at 130 W. Huntington Drive; and
3. Introduce Ordinance No. 2315 making certain amendments to the text of the
Arcadia Zoning Code; and amending the Zoning Designation of certain property
within the City from "C -2 with Downtown and H -8 Height Overlays" to "SP -SP,
Seabiscuit Pacifica Specific Plan," with respect to the Seabiscuit Specific Plan
Project at 130 W. Huntington Drive.
Approved:
Dominic Lazza
City Manager
Attachment No. 1: Planning Commission Minutes and Executive Summary, dated
February 25, 2014
Attachment No. 2: Revised Site Plan and Elevations to the Hotel Condo tower, dated
March 6, 2014
Attachment No. 3: Seabiscuit Pacifica Specific Plan
Attachment No. 4: Draft Initial Study /MND, Mitigated Monitoring and Reporting
Program, Response to Comments, and Technical Studies
GPA 14 -01, SP 13 -02, and ZC 14 -01
130 W. Huntington Drive
March 18, 2014
Page 26 of 26
Attachment No. 5: Planning Commission Resolution No. 1897
Attachment No. 6: Planning Commission Staff Report and Attachments, dated
February 25, 2014
Attachment No. 7: Resolution No. 7013
Attachment No. 8: Ordinance No. 2314
Attachment No. 9: Ordinance No. 2315
Exhibit A: Art Deco Design for the proposed hotels
Exhibit B: Modern Contemporary Design for the proposed hotel