STAFF REPORT
Public Works Services Department
DATE: July 15, 2014
TO: Honorable Mayor and City Council
FROM: Tom Tait, Public Works Services Director
By: Heloise King, P.E., Associate Civil Engineer
SUBJECT: CONTRACT WITH ROADWAY ENGINEERING AND CONTRACTING
INC. FOR THE CIVIC CENTER PARKING LOT IMPROVEMENT
PROJECT IN THE AMOUNT OF $395,978
Recommendation: Approve
SUMMARY
As part of the Fiscal Year 2013 -14 Capital Improvement Program, the Civic Center
Parking Lot Improvement Project will involve the renovation of the pavement for City
Hall north parking lot and the Police Department visitor parking lot including the
installation of a storm water infiltration system. The pavement area in both parking lots
is in unacceptable shape and in need of renovation to maintain the structural integrity of
the underlayment. To ensure that the City is receiving the most competitive prices and
quality service for this work, a formal bid was conducted and Roadway Engineering and
Contracting Inc. submitted the lowest responsive bid. It is recommended that the City
Council authorize and direct the City Manager to execute a contract with Roadway
Engineering and Contracting Inc. for the Civic Center Parking Lot Improvement Project
in the amount of $395,978. A copy of the Project Location Map and proposed contract
are attached.
DISCUSSION
The Civic Center and the Police Department public parking lots provide parking and
access to the Civic Center Campus, which includes City Hall, Council Chambers,
Athletic Field, and the Police Department. These parking lots have not been renovated
since the mid- 1950's when the original asphalt pavement was installed. As a result, the
pavement surface condition is distressed to the point that there is severe "alligator
cracking" (cracking into a pattern resembling the back of an alligator). In addition to
daily parking, the Civic Center lot is also heavily used during major City events, such as
the Concert in the Park series and the Breeders' Cup.
Award Civic Center Parking Lot Improvement Project
July 15, 2014
Page 2 of 3
In order to be consistent with the City's General Plan and overall emphasis on
sustainability, the project will incorporate storm water capture and infiltration. The storm
water capture system will infiltrate the first inch of a rainstorm and excess runoff will be
diverted to the City's storm drain system. Additionally, replacement and repair of the
original pavement at both parking lots will improve the functionality, safety features, and
aesthetics. There will be no changes to the existing parking space design or quantity of
parking spaces.
A Notice Inviting Bids was published in the City's adjudicated publication and bid
packages were acquired by area contractors. On June 24, 2014, the Office of the City
Clerk received and opened six sealed bids with the following results:
RANK BIDDER LOCATION TOTAL BID
1 Roadway Engineering
Mira Loma
$395,978
2 Ben's Asphalt
Santa Ana
$409,887
3 Excel Paving
Long Beach
$424,692
4 Terra Pave
Whittier
$434,915
5 E.C. Construction
S. El Monte
$518,520
6 All American Asphalt
Corona
$528,351
The bid documents were reviewed for accuracy and content. The total bid prices shown
in the table above include the base bid and all bid alternates. Bid alternates were
included to allow for flexibility in the event that the bids received were over the amount
budgeted. Specifically, the total project includes removal and replacement of
approximately 78,000 square feet of asphalt; installation of a storm water capture and
infiltration system; replacement of lifted sidewalk and curb; replacement of an existing
curb ramp; and renovation of a built -up curb ramp to restore drainage along the existing
gutter.
Roadway Engineering and Contracting Inc. recently completed similar projects for
several agencies such as the County of San Bernardino, Cal Poly Pomona, City of
Chino Hills, and Orange County Transportation Authority. Public Works Services
contacted project managers from several of these agencies and it was reported that
Roadway Engineering and Contracting Inc. completed these projects on time and within
budget. Following this review, it was determined that Roadway Engineering and
Contracting Inc. submitted the lowest responsive and responsible bid, and is qualified to
successfully complete the project as defined in the bid documents.
Award Civic Center Parking Lot Improvement Project
July 15, 2014
Page 3 of 3
FISCAL IMPACT
The total project cost, including bid alternatives, is $395,978. Funds have been
budgeted in the Fiscal Year 2013 -14 Capital Improvement Budget in the amount of
$435,000.
ENVIRONMENTAL ANALYSIS
This project is considered a Class 1 exemption as defined in Section 15301 of the
California Environmental Quality Act, as the project consists of the repair and
maintenance of a public facility with a negligible expansion of use.
RECOMMENDATION
It is recommended that the City Council authorize and direct the City Manager to
execute a contract with Roadway Engineering and Contracting Inc. for the Civic Center
Parking Lot Improvement Project in the amount of $395,978.
Approved.
Dominic rejdd
City Manager
Attachment: Project Location Map
Contract
PROJECT LOCATION MAP
CIVIC CENTER PARKING LOT IMPROVEMENTS
PROJECT NO. 17820514
CITY HALL NORTH LOT
INCLUDING
ATHLETIC FIELD PORTION
ATHLETIC FIELD
J O
Q—
O
O
O �
� O J
Al • I TY
HA O
J�
� 0 �
e O
p POLICE
DEPT
ye
Al
O
J
ye e e
POLICE DEPARTMENT
VISITOR LOT
LOCATION MAP
NO SCALE
CITY OF ARCADIA
CIVIC CENTER PARKING LOT IMPROVEMENTS
PROJECT NO. 17820514
CONTRACT
BETWEEN
CITY OF ARCADIA
AND
ROADWAY ENGINEERING AND CONTRACTING, INC.
RVPUB\DRD \570015 GB - STATE & LOCAL (505/507/660) (7/24/00)
(PROJECT NO. 17820514)
CONTRACT FOR THE
CITY OF ARCADIA
CIVIC CENTER PARKING LOT IMPROVEMENTS
PARTIES AND DATE.
This Contract is made and entered into this day of , 20_, by and
between the CITY OF ARCADIA (hereinafter called the "City ") and ROADWAY ENGINEERING
AND CONTRACTING, INC. (hereinafter called the "Contractor ").
2. RECITALS.
2.1 The City is a charter City organized under the laws of the State of California, with
power to contract for services necessary to achieve its purpose;
2.2 Contractor, in response to a Notice Inviting Bids issued by City on June 2, 2014, has
submitted a bid proposal for construction the CIVIC CENTER PARKING LOT IMPROVEMENTS
described in the Contract.
2.3 City has duly opened and considered the Contractor's bid proposal, and duly
awarded the bid to Contractor in accordance with the Notice Inviting Bids and the other Bid
Documents, and has given written notice to Contractor on [* *INSERT DATE * *].
2.4 Contractor has obtained, and delivers concurrently herewith, Performance and
Payment Bonds and evidences of insurance coverage as required by the Contract.
3. TERMS.
3.1 Incorporation of Documents.
This Contract includes and hereby incorporates in full by reference the following documents,
including all exhibits, drawings, specifications and documents therein, and attachments and
addenda thereto:
a. Notice Inviting Bids
b. Instructions to Bidders
C. Contract Bid Forms
d. Contract
e. Contract Appendix
Part "A" - General Conditions
Part "B" - Supplementary General Conditions
Part "C" - Special Provisions
Part "D" - Specifications
Part "E" - Drawings
RVPUB\DRD \570015 CCKRRACT - 1 GB - STATE & LOCAL (505/507/660) (7/24/00)
(PROJECT NO. 17820514)
Part "F" - Performance Bond
Part "G" - Payment Bond
ADDENDUM NO. 1 dated June 18, 2014.
The above documents, including the General Conditions, are an integral part of the Contract
Documents. In addition to signing this Contract, Contractor shall initial this paragraph immediately
below acknowledging that he or she has read, understood and agrees with all of the terms of the
Contract Documents, including, but not limited to, provisions of the General Conditions relating to
indemnification, insurance, standards of performance, termination, compensation and time of the
essence performance. Contractor shall not disclaim knowledge of the meaning and effect of any
term or provision of the Contract Documents, and agrees to strictly abide by their meaning and
intent. In the event that Contractor fails to initial below, the City shall have the right to declare
the Contract unexecuted and to award the Contract to another contractor in accordance with
state law.
Contractor, s Initials
3.2 Contractor's Basic Obligation.
Contractor promises and agrees, at its own cost and expense, to furnish to the City all labor,
materials, tools, equipment, services, and incidental and customary work for the construction of Bid
Category number(s) 1 -20 and Bid Alternates 1 -3 necessary to fully and adequately complete CIVIC
CENTER PARKING LOT IMPROVEMENTS, including any alternates selected by the City, and all
structures and facilities described in the Contract (hereinafter the "Work "), for a total of Three
Hundred Ninety -Five Thousand, Nine Hundred Seventy -Eight DOLLARS AND NO CENTS
($395,978), as specified in the Contract Bid Forms submitted by the Contractor in response to the
above referenced Notice Inviting Bids. Such amount shall be subject to adjustment in accordance
with the applicable terms of this Contract. All Work shall be subject to, and performed in
accordance with the above referenced documents.
3.3 Standard of Performance.
Contractor shall perform all Work under this Contract in a skillful and workmanlike manner,
and consistent with the standards generally recognized as being employed by professionals in the
same discipline in the State of California. Contractor represents and maintains that it is skilled in the
professional calling necessary to perform the Work. Contractor warrants that all employees and
subcontractors shall have sufficient skill and experience to perform the Work assigned to them.
Finally, Contractor further represents that it, its employees and subcontractors have all licenses,
permits, qualifications and approvals of whatever nature that are legally required to perform the
Work, and that such licenses and approvals shall be maintained throughout the term of this
Contract.
RVPUB\DRD \570015 CONTRACT - 2 GB - STATE & LOCAL (505/507/660) (7/24/00)
(PROJECT NO. 17820514)
3.4 Period of Performance.
Contractor shall perform and complete all Work under this Contract within sixty (60)
Calendar Days, beginning ten (10) Calendar Days after the date on which the Notice to Proceed is
sent by the City to the Contractor. Moreover, Contractor shall perform its Work in strict accordance
with any completion schedule, construction schedule or project milestones developed pursuant to
provisions of the Contract, including but not limited to the Project Schedule located in the
Specifications.
Contractor agrees that if such Work is not completed within the aforementioned period
and /or pursuant to any such completion schedule, construction schedule or project milestones
developed pursuant to provisions of the Contract, including but not limited to the Project Schedule
located in the Specifications, it is understood, acknowledged and agreed that the City will suffer
damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed
and liquidated damages the sum of Five Hundred DOLLARS ($500.00) PER DAY as provided by
the applicable provisions of the General Conditions, found in Part "B" of the Contract Appendix.
3.5 City's Basic Obligation.
City agrees to engage and does hereby engage Contractor as an independent contractor to
furnish all materials and to perform all Work according to the terms and conditions herein contained
for the sum set forth above. Except as otherwise provided in the Contract, the City shall pay to
Contractor, as full consideration for the satisfactory performance by the Contractor of the services
and obligations required by this Contract, the above referenced compensation in accordance with
compensation provisions set forth in the Contract.
3.6 Contractor's Labor Certification.
Contractor maintains that he is aware of the provisions of Section 3700 of the California
Labor Code which require every employer to be insured against liability for Worker's Compensation
or to undertake self- insurance in accordance with the provisions of that Code, and agrees to comply
with such provisions before commencing the performance of the Work. A certification form for this
purpose is attached hereto as Exhibit "A" and incorporated herein by reference, and shall be
executed simultaneously with this Contract.
3.7 Attorneys' Fees.
If either party commences an action against the other party, either legal, administrative or
otherwise, arising out of or in connection with this Contract, the prevailing party in such action shall
be entitled to have and recover from the losing party reasonable attorneys' fees and all other costs
of such action.
3.8 Successors.
The parties do for themselves, their heirs, executors, administrators, successors, and
assigns agree to the full performance of all of the provisions contained in this Contract. Contractor
may not either voluntarily or by action of law, assign any obligation assumed by Contractor
hereunder without the prior written consent of the City.
RVPUB\DRD \570015 CONTRACT - 3 GB - STATE & LOCAL (505/507/660) (7/24/00)
(PROJECT NO. 17820514)
3.9 Notices.
All notices hereunder and communications regarding interpretation of the terms of the
Agreement or changes thereto shall be provided by the mailing thereof by registered or certified
mail, return receipt requested, postage prepaid and addressed as follows:
Contractor
Roadway Engineering and Contracting, Inc.
10247 Bellegrave Suite 122
Mira Loma, CA 91752
Attn: Eric Alvarez, President
CAL
City of Arcadia
240 W. Huntington Drive
P.O. Box 60021
Arcadia, CA 91066 -6021
Attn: Heloise King, Project Manager
Any notice so given shall be considered received by the other party three (3) days after
deposit in the U.S. Mail, first class postage prepaid, addressed to the party at the above address.
Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the
method of service.
CITY OF ARCADIA ROADWAY ENGINEERING AND
CONTRACTING, INC.
la
Dominic Lazzaretto
City Manager
ATTEST:
By:
City Clerk
Approved as to Form:
By:
Stephen P. Deitsch
City Attorney
By:
Title
By:
Title
RVPUWDRD\570015 CONTRACT - 4
GB - STATE & LOCAL (505i507/660) (7/zaioo)
(PROJECT NO. 17820514)
EXHIBIT "A"
CERTIFICATION
LABOR CODE - SECTION 1861
I, the undersigned Contractor, am aware of the provisions of Section 3700 et seg. of
the California Labor Code which require every employer to be insured against liability for
Worker's Compensation orto undertake self- insurance in accordance with the provisions of
the Code. I agree to and will comply with such provisions before commencing the Work
governed by this Contract.
CONTRACTOR:
Name of Contractor: Roadway Engineering & Contracting, Inc.
:0
Signature
Name
Title
Date
RVPUB\DRD \570015 l..lA V F RACT (EXHl BIT A) GB - STATE & LOCAL (505/507/660) (7/24/00)