Loading...
HomeMy WebLinkAboutItem 3 OF AR _�Lr•0kv1R�l0 v f A=ri9 fitg °a�ty°f STAFF REPORT Development Services Department DATE: September 9, 2014 TO: Honorable Chairman and Planning Commission FROM: Jason Kruckeberg, Assistant City Manager/Development Services Director SUBJECT: RESOLUTION NO. 1914 — AMENDMENT TO THE SEABISCUIT PACIFICA SPECIFIC PLAN (SP NO. 13-02) TO MODIFY CONDITIONS OF APPROVAL FOR TWO NEW HOTELS AND A HOTEL CONDOMINIUM AT 130 W. HUNTINGTON DRIVE. Recommendation: Adopt Resolution No. 1914 and forward a recommendation to the City Council SUMMARY The applicant, Mr. Andy Chang of Seabiscuit Pacifica LLC, has submitted an amendment to the recently approved Seabiscuit Pacifica Specific Plan. The project, approved by the City Council on March 18, 2014, includes the development of two hotels (Marriott Residence Inn and Fairfield Inn & Suites) that total 142,320 square feet of hotel space in two connected buildings, with a total of 210 rooms, and a hotel condominium tower with 50 units. These project components are to be developed in phases, with Phase 1 consisting of the two Marriott hotels and a remnant of the existing Santa Anita Inn (60 rooms plus a new lobby) remaining on site. Phase 2 is to be the demolition of the remnant of the Santa Anita Inn and the development of the hotel- condominium tower. The March 18 approval included a Specific Plan, a General Plan Amendment (GPA 14- 01), and a Zoning Change and Zoning Map Amendment (ZC 14-01). The proposed project simply requests the elimination of a condition of approval, modification of a second condition of approval, and addition of one condition of approval for the Seabiscuit Pacifica Specific Plan. No other portions of the General Plan Amendment, Specific Plan, or Zone Change, are impacted by this proposal. It is recommended that the Planning Commission recommend approval of this amendment to the City Council, subject to the conditions listed in the staff report. BACKGROUND APPLICANT: Andy Chang, Property Owner (Seabiscuit Pacifica LLC) LOCATION: 130 W. Huntington Drive — A 5.73-acre site just east of Santa Anita Park REQUESTS: Amendment to Specific Plan No. SP 13-02 to modify the approved conditions of approval. FRONTAGES: The subject site has 742.94 feet of frontage on Huntington Drive along the westbound side, and 672.74 feet along the eastbound side. EXISTING LAND USE & ZONING: The site is developed with the Santa Anita Inn hotel, and is currently zoned SP- SP (Seabiscuit Pacifica Specific Plan). SURROUNDING LAND USES & ZONING: North: Office Development, zoned C-2; and Citizens Bank, zoned C-2; both with the Downtown Overlay South: Salvation Army (rehab facility), zoned C-2 with the Downtown Overlay; and the Civic Center Athletic Field and City Hall, zoned S-2 (Public Purpose) East: A small bar called The 100 to 1," zoned C-2 with the Downtown Overlay; and the Arcadia County Park, zoned S-2 West: Santa Anita Park racetrack and surface parking lot, zoned S-1 (Special Uses) GENERAL PLAN DESIGNATION: Commercial with the Downtown Overlay (1.03 FAR was approved for the site) — The Commercial designation is intended to permit a wide range of commercial uses which serve both neighborhood and citywide markets. The designation allows a broad array of commercial enterprises, including restaurants, durable goods sales, food stores, lodging, professional offices, specialty shops, indoor and outdoor recreational facilities, and entertainment uses. Higher intensity overlays are applied to portions of Downtown along Santa Anita Avenue, Colorado Place, and Huntington Drive (1.0 FAR). The following entitlements were approved by the City Council on March 18, 2014: • A General Plan Amendment to revise the Downtown Overlay of 1.0 FAR in the General Plan Commercial Land Use Designation to a Downtown Overlay with a 1.03 FAR Amendment to SP 13-02 130 W.Huntington Drive September 9,2014 Page 2 of 7 • A Specific Plan to develop the 5.73-acre site with two hotels (a total of 210 rooms) and a hotel condominium with 50 units • A Zone Change and Zoning Map Amendment to revise the zoning from C-2 with Downtown and H-8 Height Overlays to SP-SP (Seabiscuit Pacifica Specific Plan) with a 1.03 FAR • A Mitigated Negative Declaration in compliance with the California Environmental Quality Act (CEQA) DISCUSSION The applicant has proposed to develop the project in two phases due to market demand, and the availability of financing. There are specific requirements and deadlines in the Specific Plan and conditions of approval for the hotels to be developed in a particular order, when the existing Santa Anita Inn shall be demolished, and when the hotel condominium is to be developed. Of course, the Specific Plan also sets forth the development plans and design for the project. The proposed amendment to the Specific Plan only impacts the timing of aspects of the development. Phase 1 of the project includes a total of 142,320 square feet of hotel space in two connected buildings; 93,895 square feet in an approximately 80-foot tall, six-story building for the Marriott Residence Inn, and an approximately 60-foot tall, four-story, 48,425 square foot building for the Fairfield Inn and Suites. The project site contains the existing 110-room (34,775 square feet) Santa Anita Inn hotel. A 47-room portion of this hotel will be demolished in this phase, and the four southern-most buildings (C-F, 22,050 square feet of hotel space) are proposed to remain in operation with 60 rooms and a new lobby following the completion of Phase 1 (refer to the renderings on page A- 4.1 of the Specific Plan). Based on the approved Specific Plan, the 60-room portion of the Santa Anita Inn could remain open for 3 years following completion of Phase 1. There will be 293 surface parking spaces for both new hotels and the Santa Anita Inn, which is ample for these uses. The proposed amendment to the Specific Plan simply requests the elimination of a condition of approval, modification of a second condition of approval, and addition of a condition of approval for the Seabiscuit Pacifica Specific Plan related to phasing. No other portions of the General Plan Amendment, Specific Plan, or Zone Change, are impacted by this proposal. The conditions of approval requested to be changed are as follows; text to be removed is shown in str-i-keth-r-Gug#, new proposed text is shown underlined and italicized. The full list of the conditions of approval can be found in the attached Resolution No. 1914. three years of the issuance of a Certificate of Occupancy for either of the two new Amendment to SP 13-02 130 W.Huntington Drive September 9,2014 Page 3 of 7 1. The remodeling of the portion of the Santa Anita Inn remaining shall start immediately- before the construction of Phase 1 and shall include, without limitation, a new lobby area within the existing building(s). Any changes or alteration to the building shall be subject to review and approval by the Development Services Director or designee, and additional design enhancements to the building, lobby, or parking area may be required. The commencement of Phase 2 shall be permitted only upon (i) the execution of a mutually binding development agreement between the developer and the City that allows the City to provide for the orderly regulation of condomiuim units within the Phase 2 hotel, or (ii) the City's prior adoption of an Ordinance providing for the orderly regulation of condominium units within the Phase 2 hotel. 2. These conditions shall be deemed to be part of the Specific Plan and are fully incorporated therein by this reference. Notwithstanding any provisions or interpretations to the contrary, the Specific Plan shall remain subject to such amendment or termination as may be adopted by the City pursuant to its zoning authority. The effect of these changes is to allow the remaining units of the Santa Anita Inn to remain on site longer than the original approval. The original approval required the remnant of the Santa Anita Inn to be demolished within three years of the issuance of the first Certificate of Occupancy for the first hotel in Phase 1. This was acceptable because it was the Developer's intent to build Phase 2 within this timeframe. However, since the approval, the City and the Developer have been working on a Development Agreement to place operational regulations on the Phase 2 portion of the project. Through this process, it has become apparent that planning and executing Phase 2 is too difficult for the Developer at this time, and issues related to prevailing wage and other concerns have hampered the Development Agreement process. As a result, the Developer would like to simplify the project and focus on Phase 1 at this time. The Developer believes that by eliminating the requirement that the remnant of the Santa Anita Inn be demolished in three years, he will have the flexibility to effectively plan for and execute both phases of the Specific Plan. Finally, a condition is proposed to be added to incorporate all of the conditions of approval into the Specific Plan. While this is inferred from the approval, the City Attorney recommends adding this condition along with this amendment. It should be mentioned that the Development Services Department, Planning Commission, or City Council can, at any time, bring forward an amendment to the Specific Plan to modify and/or void Phase 2 of the Specific Plan or any other element of the Plan. There are no impacts of this request on the design, building orientation, or any other feature of either of the Marriott hotels or the hotel condominium component. However, as part of this request, the design of the remnant of the Santa Anita Inn is important. The applicant has provided proposed elevations of the redesigned Santa Anita Inn which include the remodeling of three existing hotel rooms into a redesigned lobby. The lobby will be equipped with a new storefront on both sides, and new bulkhead and glazing. A new canopy and signage above the lobby will provide a focal point for the hotel and orient patrons as to the entrance. In addition, the Santa Anita Inn will be provided with a new roof and new paint and color palette throughout as shown in the Amendment to SP 13-02 130 W.Huntington Drive September 9,2014 Page 4 of 7 proposed elevations (Attachment 4). These improvements are the minimum needed to improve the Santa Anita Inn into a viable standalone hotel once the Marriott hotels are completed, however, condition 2 has been amended to require that the final design must be approved by the Development Services Director and may include additional changes to the building, lobby, or parking area. FINDINGS Section 9296.8 of the Arcadia Municipal Code requires that for a Specific Plan Amendment to be granted, it must be found that the following three findings of fact can be made in an affirmative manner: 1. The proposed specific plan or specific plan amendment is consistent with the General Plan, including the goals, objectives, policies, and action programs of the City's General Plan. Facts to Support the Finding: The subject site is identified in the General Plan as an expansion of the Downtown area for future urban development. As a result, the Specific Plan will provide for two new hotels and the first hotel condominium in the City, which will be required to be subject to the City's Transient Occupancy Tax (TOT) requirement. The proposed project will help revitalize the Downtown area of Arcadia, as well as contribute positively to the existing downtown setting. The Amendment does not change these facts, it merely modifies the timing of phasing of the project. Therefore, the proposed Specific Plan is consistent with the General Plan. 2. The proposed specific plan or specific plan amendment will not adversely affect the public health, safety and welfare or result in an illogical land use pattern. Facts to Support the Finding: The Initial Study/Mitigated Negative Declaration for the Specific Plan and General Plan Amendment analyzed all the potential impacts, and all the project's impacts are less than significant or can be reduced to less than significant level with the implementation of the recommended mitigation measures. The Specific Plan Amendment does not impact any of the mitigation measures for the project and an Addendum has been prepared that memorializes this. Therefore, the proposed project would not be detrimental to the public health and welfare. Instead, the proposed project will be a superior "landmark" development that will provide an entry statement for the City. 3. The specific plan or proposed specific plan amendment is a desirable planning tool to implement the provisions of the City's General Plan. Facts to Support the Finding: This proposed project is to be built over time and in two phases. Phasing involves many considerations; such as market demand, and the availability of financing. A Specific Plan can address these particular matters so that the hotels will be developed in a particular order. The intent of the Specific Plan is to ensure that he proposed project is developed in the right order, and by a set time table. Amendment to SP 13-02 130 W.Huntington Drive September 9,2014 Page 5 of 7 ENVIRONMENTAL ASSESSMENT Pursuant to the provisions of the California Environmental Quality Act (CEQA), the Development Services Department prepared the attached Addendum to the approved Initial Study and Mitigated Negative Declaration (MND) for the proposed project (refer to Attachment No. 6). The Addendum concludes that there are no new impacts created by the project, no changed circumstances, and no need for any further environmental review than that which was provided along with the original project. The project with mitigation measures will have less-than-significant impacts for the following areas: Aesthetics, Air Quality, Biological Resources, Geology and Soils, Hazards and Hazardous Materials, Hydrology and Water Quality, Noise, Transportation/Traffic, and Utilities and Service Systems. A detailed review is included in the original Initial Study. The City has prepared a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program (MMRP), which are also attached for reference. PUBLIC NOTICE/COMMENTS Public hearing notices for this item were mailed on August 28, 2014 to the property owners and tenants of those properties that are located within 300 feet of the subject property. Pursuant to the provisions of the California Environmental Quality Act (CEQA), the public hearing notice was published in the Arcadia Weekly on August 28, 2014, and referenced the Addendum to the approved Mitigation Negative Declaration. Staff did not receive any public comments on this project from residents. RECOMMENDATION The Development Services Department is recommending adoption of Resolution No. 1914, which recommends approval to the City Council of the Amendment to Specific Plan No. SP 13-02, and the adoption of an Addendum to the approved Mitigated Negative Declaration for the Seabiscuit Pacifica Specific Plan, subject to the following changes to the conditions of approval: • _ • • - _ - - - • -'•e - e- ••e • • -e - - three years of the issuance of a Certificate of Occupancy for either of the two new 1. The remodeling of the portion of the Santa Anita Inn remaining shall start immediately before the construction of Phase 1 and shall include, without limitation, a new lobby area within the existing building(s). Any changes or alteration to the building shall be subject to review and approval by the Development Services Director or designee, and additional design enhancements to the building, lobby, or parking area may be required. The commencement of Phase 2 shall be permitted only upon (i) the execution of a mutually binding development agreement between the developer and the City that allows the City to provide for the orderly regulation of Amendment to SP 13-02 130 W.Huntington Drive September 9,2014 Page 6 of 7 condominium units within the Phase 2 hotel, or ail the City's prior adoption of an Ordinance providing for the orderly regulation of condominium units within the Phase 2 hotel. 2. These conditions shall be deemed to be part of the Specific Plan and are fully incorporated therein by this reference. Notwithstanding any provisions or interpretations to the contrary, the Specific Plan shall remain subject to such amendment or termination as may be adopted by the City pursuant to its zoning authority. PLANNING COMMISSION ACTION The Planning Commission should consider the project proposal and staffs analysis and recommendations, adopt Resolution No. 1914, and direct staff to convey the Commission's recommendations and comments on the Amendment to Specific Plan No. SP 13-02 to the City Council for their consideration at a public hearing. If any Planning Commissioner, or other interested party has any questions or comments regarding this matter prior to the September 9, 2014 hearing, please contact Jason Kruckeberg, Assistant City Manager/Development Services Director at (626) 574-5414 or ikruckeberq a(�arcadiaCA.gov. Attachments Attachment No. 1: Resolution No. 1914 Attachment No. 2: August 12, 2014 Letter Requesting Specific Plan Amendment Attachment No. 3: Relevant Excerpts of the approved Specific Plan, including site plans showing Phase 1, landscape and parking plans showing Phase 1, and elevations. Attachment No. 4: Proposed Design for the remodeled remaining portion of the Santa Anita Inn. Attachment No. 5: Staff Report to City Council for original project, dated March 18, 2014 Attachment No. 6: Addendum to the Mitigated Negative Declaration for an Amendment to the Seabiscuit Pacifica Specific Plan, including the original Mitigated Negative Declaration/Initial Study, and Mitigation Monitoring and Reporting Program Attachment No. 7: Specific Plan Document (on CD) Amendment to SP 13-02 130 W.Huntington Drive September 9,2014 Page 7 of 7 This page has been left blank intentionally Attachment No . 1 Resolution No. 1914 Attachment No. 1 RESOLUTION NO. 1914 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ARCADIA, RECOMMENDING TO THE CITY COUNCIL APPROVAL OF AN AMENDMENT TO THE SEABISCUIT PACIFICA SPECIFIC PLAN (SP NO. 13-02) TO MODIFY CONDITIONS OF APPROVAL FOR TWO NEW HOTELS AND A HOTEL CONDOMINIUM AT 130 W. HUNTINGTON DRIVE. WHEREAS, in August 2013, Mr. Andy Chang submitted applications for General Plan Amendment No. GPA 14-01, Specific Plan No. SP 13-02, and Zone Change No. 13-02 and draft Initial Study/Mitigated Negative Declaration for the Seabiscuit Pacifica Specific Plan development that consists of two new hotels (i.e. Marriott Residence and Fairfield Inn & Suites) that totals 142,320 square feet of hotel space in two connected buildings, with a total of 210 rooms, and a hotel condominium with 50 units at 130 W. Huntington Drive ("Project"); and WHEREAS, on December 3, 2013, the Draft Initial Study/Mitigated Negative Declaration for the Seabiscuit Pacifica Specific Plan (SCH #2013121018) was circulated for public review and comments for 30-days from December 5, 2013 to January 13, 2014; and WHEREAS, the Initial Study/Mitigated Negative Declaration concluded that the implementation of the Project will have less-than-significant impacts with mitigation measures for the following areas: Aesthetics, Air Quality, Biological Resources, Geology and Soils, Hazards and Hazardous Materials, Hydrology and Water Quality, Noise, Transportation/Traffic, and Utilities and Service Systems; and WHEREAS, a lead agency approves a project requiring the implementation of measures to mitigate or avoid significant effects on the environment; CEQA also requires a lead agency to adopt a mitigation monitoring and reporting program to ensure compliance with the mitigation measures during project implementation, and such a mitigation monitoring and reporting program has been prepared for the Project (the "Mitigation Monitoring and Reporting Program") for consideration by the decision-maker of the City of Arcadia as lead agency for the Project; and WHEREAS, after a duly noticed public hearing on March 18, 2014 the City Council approved General Plan Amendment No. GPA 14-01, Specific Plan NO. SP 13- 1 02, and Zone Change No. 13-02, and a Mitigated Negative Declaration with a Mitigation Monitoring Reporting Program; and WHEREAS, on August 13, 2014, Mr. Andy Chang submitted an amendment to Specific Plan No. 13-02 requesting a modification to the conditions of approval for the project to modify the timing of the phases of the project; and WHEREAS, an Addendum to the approved Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF ARCADIA HEREBY RESOLVES AS FOLLOWS: SECTION 1. That the factual data submitted by the Community Development Division in the attached report and Mitigated Negative Declaration is true and correct. SECTION 2. This Commission finds, based upon the entire record: a. That the proposed Specific Plan Amendment is consistent with the General Plan as amended and the goals, objectives, polices and action programs of the City's General Plan in that the Amendment will not change any of the characteristics of the approved Specific Plan, but merely will modify the timing within which phases of the project can be developed. The subject site is identified in the General Plan as an expansion of the Downtown area for future urban development. As a result, the Specific Plan will provide for two new hotels and the first hotel condominium in the City, which will be required to be subject to the City's Transient Occupancy Tax (TOT) requirement. The proposed project will help revitalize the Downtown area of Arcadia, as well as contribute positively to the existing downtown setting. The Amendment does not change these facts, it merely modifies the timing of phasing of the project. Therefore, the proposed Specific Plan is consistent with the General Plan. b. That the proposed Specific Plan Amendment will not adversely affect the public health, safety, and welfare. The Initial Study/Mitigated Negative Declaration for the Specific Plan and General Plan Amendment analyzed all the potential impacts, and all the project's impacts are less than significant or can be reduced to less than significant level with the implementation of the recommended mitigation measures. The Specific Plan Amendment does not impact any of the mitigation measures for the project and an Addendum has been prepared that memorializes this. Therefore, the 2 proposed project would not be detrimental to the public health and welfare. Instead, the proposed project will be a superior "landmark" development that will provide an entry statement for the City. c. The specific plan amendment is a desirable planning tool to implement the provisions of the City's General Plan. The proposed project is to be built over time and in two phases. Phasing involves many considerations such as market demand and the availability of financing. A Specific Plan can address these particular matters so that the hotels will be developed in a particular order. The intent of the Specific Plan is to ensure that he proposed project is developed in the right order, and by a set time table. SECTION 3. That for the foregoing reasons the Planning Commission recommends to the City Council approval of the Amendment to Specific Plan No. SP 13-02 to modify the Conditions of Approval for the Seabiscuit Pacifica Specific Plan development at 130 W. Huntington Drive, as shown in the attached "Exhibit A". SECTION 4. The Secretary shall certify to the adoption of this Resolution. Passed, approved and adopted this 9th day of September, 2014. Chairman, Planning Commission ATTEST: Secretary APPROVED AS TO FORM: Stephen P. Deitsch City Attorney 3 EXHIBIT A REVISED CONDITIONS OF APPROVAL three years of the issuance of a Certificate of Occupancy for either of the two new 1. The remodeling of the portion of the Santa Anita Inn remaining shall start immediately before the construction of Phase 1 and shall include, without limitation, a new lobby area within the existing building(s). Any changes or alteration to the building shall be subject to review and approval by the Development Services Director or designee, and additional design enhancements to the building, lobby, or parking area may be required. The commencement of Phase 2 shall be permitted only upon (i) the execution of a mutually binding development agreement between the developer and the City that allows the City to provide for the orderly regulation of condominium units within the Phase 2 hotel, or (ii) the City's prior adoption of an Ordinance providing for the orderly regulation of condominium units within the Phase 2 hotel. 2. These conditions shall be deemed to be part of the Specific Plan and are fully incorporated therein by this reference. Notwithstanding any provisions or interpretations to the contrary, the Specific Plan shall remain subject to such amendment or termination as may be adopted by the City pursuant to its zoning authority. 3. Each set of tandem parking spaces shall be assigned to a single unit unless a 24- hour valet service or equivalent measure is implemented. Any changes or alteration to the parking space assignment shall be subject to review and approval by the Development Services Director or designee. 4. No architectural features, chimneys, vents, equipment, and other accessory rooftop structures may be placed on top of the mansard roofs of the hotel condominium tower. The maximum height of all elements is 95 feet. 5. A Tentative Tract Map must be filed with the City and approved prior to issuance of a building permit for Phase 2 —the hotel condominium tower. 6. The Phase 2 component of the development will be a hotel use and may be a hotel condominium tower. Transient Occupancy Tax (TOT) shall be required to be remitted for the Phase 2 component. The TOT requirement, as well as restrictions on how the units will be managed, rented, and sold, shall be written into the Homeowners Association (HOA) Covenants, Conditions, and Restrictions (CC&Rs) for each individual owner The individual property owner will not be able to stay 4 indefinitely without paying the TOT. The owners shall rent their units by using the on-site management company. In no circumstances shall the units be used for permanent residences. The site is not suitable for permanent residency, does not possess facilities for such, and the City's General Plan does not allow residential uses at the location. The draft HOA CC&Rs shall be submitted for review and approval by the City Attorney prior to issuance of a Certificate of Occupancy for any of the hotel condominium units and the CC&Rs shall notify prospective purchasers of the transient nature of the use and that they are purchasing into a commercial hotel development and not a residential development. If a Development Agreement is approved for this project, the terms of the Development Agreement shall govern on this issue. 7. In accordance with the City's Transportation Impact Fee Program, the applicant shall pay its development impact fees, which will mitigate the project's contribution to any cumulative impacts to the westbound 1-210 intersection at Santa Anita Avenue. 8. The design and construction of any and all traffic signals, signing, and striping modifications or additions to accommodate the new entrance near the intersection of Huntington Drive and Colorado Place shall be at the applicant's/property owner's expense. 9. Damaged sections of the existing curb and gutter on Huntington Drive shall be removed and replaced per City of Arcadia Standards. 10. The applicant/property owner shall provide a street dedication along westbound Huntington Drive, to create a continuous 10'-0" parkway width. 11. The applicant/property owner shall provide signage to clearly mark the monument roundabout as "One Way," and also provide signage to clearly mark the exits from the condominium hotel site onto westbound and eastbound Huntington Drive(s) as "Left Turn Only." 12. New sidewalk along eastbound Huntington Drive per City Standard shall be constructed at the applicant's/property owner's expense. The property owner and site superintendent shall coordinate with City Engineer and Public Works Services Director for the protection and/or replacement of existing trees within the City's rights-of-way. 13. The applicant/property owner shall prepare a Standard Urban Stormwater Mitigation Plan (SUSMP) for the proposed development, as prescribed by Los Angeles Department of Public Works SUSMP Manual. 14. Prior to issuance of a building permit for each phase of the project, a detailed landscaping and irrigation plan shall be prepared by the applicant/property owner 5 for the project site. The proposed project shall comply with the requirements of the City's Water Efficient Landscaping Ordinance. 15. All City requirements regarding disabled access and facilities; occupancy limits; building safety; fire prevention, detection and suppression; health code compliance; emergency access, egress, and equipment; water supply and facilities; sewer facilities; trash reduction and recycling requirements; environmental regulation compliance, including National Pollution Discharge Elimination System (NPDES) measures; and parking and site design shall be complied with to the satisfaction of the Building Official, City Engineer, Community Development Administrator, Fire Marshal, and Public Works Services Director. Compliance with these requirements shall be determined by having fully detailed construction plans submitted for plan check review and approval by the foregoing City officials and employees. 16. The uses approved by these applications shall be operated and maintained in a manner that is consistent with the proposal and plans submitted and approved; and shall be subject to periodic inspections, after which the provisions of this approval may be adjusted after due notice to address any adverse impacts to the adjacent streets, rights-of-way, and/or the neighboring businesses, residents, or properties. 17. Noncompliance with the plans, provisions and conditions of approval shall be grounds for immediate suspension or revocation of any approvals, which could result in the closing of the hotels and hotel condominium. 18. The applicant shall defend, indemnify, and hold harmless the City of Arcadia and its officials, officers, employees, and agents from and against any claim, action, or proceeding against the City of Arcadia, its officials, officers, employees or agents to attack, set aside, void, or annul any approval or conditional approval of the City of Arcadia concerning this project and/or land use decision, including but not limited to any approval or conditional approval of the City Council, Planning Commission, or City Staff, which action is brought within the time period provided for in Government Code Section 66499.37 or other provision of law applicable to this project or decision. The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and/or land use decision and the City shall cooperate fully in the defense of the matter. The City reserves the right, at its own option, to choose its own attorney to represent the City, its officials, officers, employees, and agents in the defense of the matter. 19. Approval of GPA 14-01, SP 13-02, and ZC 14-01 shall not be of effect unless on or before 30 calendar days after City Council adopts the Resolution and Ordinance, the property owner/applicant has executed and filed with the Community Development Administrator an Acceptance Form available from the Development Services Department to indicate awareness and acceptance of these conditions of approval. 6 Mitigation Measures as Conditions of Approval The following conditions are found in the Mitigation Monitoring and Reporting Program (MMRP). They are recorded here to facilitate review and implementation. More information on the timing and responsible parties for these mitigation measures is detailed in the MMRP. 20. Prior to issuance of a building permit, the applicant shall demonstrate that all project windows are glazed or otherwise treated to minimize glare on surrounding roads and properties, to the satisfaction of the Development Services Director or designee. 21. Prior to issuance of a grading permit, the general contractor for the project shall prepare and file a Dust Control Plan with the City that complies with SCQAMD Rule 403 and requires the following during excavation and construction as appropriate: • Apply nontoxic chemical soil stabilizers according to manufacturers' specifications to all inactive construction areas (previously graded areas inactive for 10 days or more). • Water active sites at least twice daily (locations where grading is to occur will be thoroughly watered prior to earthmoving). • Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least 2 feet of freeboard (vertical space between the top of the load and top of the trailer) in accordance with the requirements of California Vehicle Code (CVC) Section 23114. • Pave construction access roads at least 100 feet onto the site from the main road. • Control traffic speeds within the property to 15 mph or less. 22. Prior to the issuance of a grading permit, the project developer shall require by contract specifications that contractors shall utilize California Air Resources Board (GARB) Tier II Certified equipment or better during the rough/mass grading phase for rubber-tired dozers and scrapers. Contract specifications shall be included in the proposed project construction documents, which shall be reviewed by the City. 23. Prior to the issuance of a grading or building permit for each phase, the project developer shall require by contract specifications that contractors shall place construction equipment staging areas at least 200 feet away from sensitive receptors. Contract specifications shall be included in the project construction documents, which shall be reviewed by the City. 24. Prior to the issuance of a building permit for each phase, the project developer shall require by contract specifications that contractors shall utilize power poles or clean-fuel generators for electrical construction equipment. Contract specifications 7 shall be included in the proposed project construction documents, which shall be reviewed by the City. 25. Prior to issuance of a grading permit for each phase, the developer shall provide an assessment of existing trees on the areas to be developed. This tree assessment shall be prepared by a qualified landscape architect and identify any existing large bushes or trees that can be relocated or preserved as part of the new development project. The project landscaping plans shall attempt to preserve existing mature trees onsite to the extent feasible, based on the tree assessment. This measure shall be implemented to the satisfaction of the City Planning Division. 26. During project construction in either phase, the existing redwood trees along the east side of the property shall be protected by being taped or roped off with appropriate signage so construction equipment will not accidentally come in contact with and damage or destroy any trees. The trees shall be sprayed with water at the end of each day when substantial amounts of dust are generated (e.g., during grading or demolition) to minimize damage from dust deposition. This measure shall be implemented to the satisfaction of the City Planning Division. 27. Construction in either phase should not occur during the local nesting season (estimated February 1 to July 15). If any construction occurs during the nesting season, a nesting bird survey shall be conducted by a qualified biologist prior to the issuance of a grading permit or removal of any large trees on the existing hotel property. If the biologist determines that nesting birds are present, an area of 100 feet shall be marked off around the nest and no construction activity can occur in that area during nesting activities. Grading and/or construction may resume in this area when a qualified biologist has determined the nest is no longer occupied and all juveniles have fledged. This measure shall be implemented to the satisfaction of the City Planning Services. 28. Prior to demolition of any existing hotel buildings on the site, the completed DPR 523A and 523B forms and a cover memorandum shall be submitted to the City for filing to officially document the historical assessment for the Santa Anita Inn. This measure shall be implemented to the satisfaction of the City Planning Services. 29. While there is no known historical significance as that term is defined under CEQA, the applicant has proposed to install a plaque indicating the location of the former Santa Anita Inn and its place in the history of the City of Arcadia. The size, construction, and location of this plaque shall be up to the discretion of the City Manager, in consultation with the Planning Services. 30. If cultural artifacts are discovered during project grading, work shall be halted in that area until a qualified historian or archaeologist can be retained by the developer to assess the significance of the find. The project cultural monitor shall observe the remaining earthmoving activities at the project site consistent with Public Resources Code Section 21083.2(b), (c), and (d). The monitor shall be equipped to record and salvage cultural resources that may be unearthed during 8 grading activities. The monitor shall be empowered to temporarily halt or divert grading equipment to allow recording and removal of the unearthed resources. 31. If any resources of a prehistoric or Native American origin are discovered, the appropriate Native American tribal representative will be contacted and invited to observe the monitoring program for the duration of the grading phase at tribal expense. Any Native American resources shall be evaluated in accordance with the CEQA Guidelines and either reburied at the project site or curated at an accredited facility approved by the City of Arcadia. Once grading activities have ceased or the cultural monitor determines that monitoring is no longer necessary, such activities shall be discontinued. This measure shall be implemented to the satisfaction of the City Planning Services. 32. If paleontological resources (fossils) are discovered during project grading, work will be halted in that area until a qualified paleontologist can be retained to assess the significance of the find. The project paleontologist shall monitor remaining earthmoving activities at the project site and shall be equipped to record and salvage fossil resources that may be unearthed during grading activities. The paleontologist shall be empowered to temporarily halt or divert grading equipment to allow recording and removal of the unearthed resources. Any fossils found shall be evaluated in accordance with the CEQA Guidelines and offered for curation at an accredited facility approved by the City of Arcadia. Once grading activities have ceased or the paleontologist determines that monitoring is no longer necessary, monitoring activities shall be discontinued. This measure may be combined with CUL-3 at the discretion of the City Planning Services. 33. In the event of an accidental discovery or recognition of any human remains, California State Health and Safety Code § 7050.5 dictates that no further disturbance shall occur until the County Coroner has made the necessary findings as to origin and disposition pursuant to CEQA regulations and PRC § 5097.98. If human remains are found, the LA County Coroner's office shall be contacted to determine if the remains are recent or of Native American significance. Prior to issuance of a grading permit, the developer shall include a note to this effect on the grading plans for the project. 34. To ensure reductions below the expected "Business As Usual" (BAU) scenario, the project will implement a variety of measures that will reduce its greenhouse gas (GHG) emissions. To the extent feasible, and to the satisfaction of the City of Arcadia (City), the following measures will be incorporated into the design and construction of the SP-SP project prior to the issuance of building permits: Construction and Building Materials • Recycle/reuse at least 50 percent of the demolished and/or grubbed construction materials (including, but not limited to, soil, vegetation, concrete, lumber, metal, and cardboard). 9 • Use "Green Building Materials," such as those materials that are resource- efficient and are recycled and manufactured in an environmentally friendly way, for at least 10 percent of the project. Energy Efficiency Measures • Design all project buildings to exceed the 2013 California Building Code's (CBC) Title 24 energy standard by 10 percent, including, but not limited to, any combination of the following: • Design buildings to accommodate future solar installations as appropriate. • Limit air leakage through the structure or within the heating and cooling distribution system to minimize energy consumption. • Incorporate ENERGY STAR or better rated windows, space heating and cooling equipment, light fixtures, appliances, or other applicable electrical equipment. • Install efficient lighting and lighting control systems. Use daylight as an integral part of the lighting systems in buildings. • Install light-colored roofs and pavement materials where possible. • Install energy-efficient heating and cooling systems, appliances and equipment, and control systems. • Install solar lights or light-emitting diodes (LEDs) for outdoor lighting or outdoor lighting that meets the 2013 California Building and Energy Code. Water Conservation and Efficiency Measures Devise a comprehensive water conservation strategy appropriate for the project and its location consistent with the City's Water Efficiency Landscape Ordinance (WELO). The strategy may include the following, plus other innovative measures that may be appropriate: • Create water-efficient landscapes within the development. • Install water-efficient irrigation systems and devices, such as soil moisture- based irrigation controls. • Design buildings to be water-efficient. Install water-efficient fixtures and appliances, including low-flow faucets, dual-flush toilets, and waterless urinals. 10 • Restrict watering methods (e.g., prohibit systems that apply water to nonvegetated surfaces) and control runoff. Solid Waste Measures To facilitate and encourage recycling to reduce landfill-associated emissions, among others, the project will provide trash enclosures that include additional enclosed area(s) for collection of recyclable materials. The recycling collection area(s) will be located within, near, or adjacent to each trash and rubbish disposal area. The recycling collection area will be a minimum of 50 percent of the area provided for the trash/rubbish enclosure(s) or as approved by the City's Public Works Services Department. Provide employee education on waste reduction and available recycling services. Transportation Measures To facilitate and encourage non-motorized transportation, bicycle racks shall be provided in convenient locations to facilitate bicycle access to the project area. The bicycle racks shall be shown on project landscaping and improvement plans submitted for Planning Services approval and shall be installed in accordance with those plans. Provide pedestrian walkways and connectivity throughout the project. Fund or participate in some type of shuttle service for hotel guests to access the City's downtown Gold Line Station. 35. Prior to demolition of any existing hotel buildings or associated structures, a qualified contractor shall be retained to survey structures proposed for demolition to determine if asbestos-containing materials (ACMs) and/or lead-based paint (LBP) are present. If ACMs and/or LBP are present, prior to commencement of general demolition, these materials shall be removed and transported to an appropriate landfill by a licensed contractor. This measure shall be implemented to the satisfaction of the City Building Services including written documentation of the disposal of any ACMs or LBP in conformance with all applicable regulations. 36. Prior to issuance of a grading permit, the developer shall file a Notice of Intent (NOI) with the Los Angeles Regional Water Quality Control Board to be covered under the National Pollutant Discharge Elimination System (NPDES) General Construction Permit for discharge of storm water associated with construction activities. The project developer shall submit to the City the Waste Discharge Identification Number issued by the State Water Quality Control Board (SWQCB) as proof that the project's NOI is to be covered by the General Construction Permit has been filed with the SWQCB. This measure shall be implemented to the satisfaction of the City Engineer. 37. Prior to issuance of a grading permit, the developer shall submit to the Los Angeles Regional Water Quality Control Board (RWQCB) and receive approval for 11 a project-specific Storm Water Pollution Prevention Plan (SWPPP). The SWPPP shall include a surface water control plan and erosion control plan citing specific measures to control on-site and off-site erosion during the entire grading and construction period. In addition, the SWPPP shall emphasize structural and nonstructural best management practices (BMPs) to control sediment and non- visible discharges from the site. BMPs to be implemented may include (but shall not be limited to) the following: • Potential sediment discharges from the site may be controlled by the following: sandbags, silt fences, straw wattles, fiber rolls, a temporary debris basin (if deemed necessary), and other discharge control devices. The construction and condition of the BMPs are to be periodically inspected by the RWQCB during construction, and repairs would be made as required. • Area drains within the construction area must be provided with inlet protection. Minimum standards are sandbag barriers, or two layers of sandbags with filter fabric over the grate, properly designed standpipes, or other measures as appropriate. • Materials that have the potential to contribute non-visible pollutants to stormwater must not be placed in drainage ways and must be placed in temporary storage containment areas. • All loose soil, silt, clay, sand, debris, and other earthen material shall be controlled to eliminate discharge from the site. Temporary soil stabilization measures to be considered include: covering disturbed areas with mulch, temporary seeding, soil stabilizing binders, fiber rolls or blankets, temporary vegetation, and permanent seeding. Stockpiles shall be surrounded by silt fences and covered with plastic tarps. • Implement good housekeeping practices such as creating a waste collection area, putting lids on waste and material containers, and cleaning up spills immediately. • The SWPPP shall include inspection forms for routine monitoring of the site during the construction phase. • Additional required BMPs and erosion control measures shall be documented in the SWPPP. • The SWPPP would be kept on site for the duration of project construction and shall be available to the local Regional Water Quality Control Board for inspection at any time. The developer and/or construction contractor shall be responsible for performing and documenting the application of BMPs identified in the project-specific SWPPP. Regular inspections shall be performed on sediment control measures called for in the SWPPP. Monthly reports shall be maintained and available for City inspection. An inspection log shall be maintained for the project and shall be available at the 12 site for review by the City and the Regional Water Quality Control Board as appropriate. 38. Prior to issuance of a grading permit, a site-specific Standard Urban Stormwater Management Plan (SUSMP) shall be submitted to the City Planning Division for review and approval. The SUSMP shall specifically identify the long-term site design, source control, and treatment control BMPs that shall be used on site to control pollutant runoff and to reduce impacts to water quality to the maximum extent practicable. At a minimum, the SUSMP shall identify and the site developer shall implement the following site design, source control, and treatment control BMPs as appropriate: Site Design BMPs • Minimize urban runoff by maximizing permeable areas and minimizing impermeable areas (recommended minimum 25 percent of site to be permeable). • Incorporate landscaped buffer areas between sidewalks and streets. • Maximize canopy interception and water conservation by planting native or drought-tolerant trees and large shrubs wherever possible. • Where soil conditions are suitable, use perforated pipe or gravel filtration pits for low flow infiltration. • Construct onsite ponding areas or retention facilities to increase opportunities for infiltration consistent with vector control objectives. • Construct streets, sidewalks and parking lot aisles to the minimum widths necessary, provided that public safety and a walkable environment for pedestrians are not compromised. • Direct runoff from impervious areas to treatment control BMPs such as landscaping/bioretention areas. Source Control BMPs Source control BMPs are implemented to eliminate the presence of pollutants through prevention. Such measures can be both non-structural and structural: Non-Structural Source Control BMPs • Education for property owners, tenants, occupants, and employees. • Activity restrictions. • Irrigation system and landscape maintenance to minimize water runoff. • Common area litter control. • Regular mechanical sweeping of private streets and parking lots. 13 • Regular drainage facility inspection and maintenance. Structural Source Control BMPs • Municipal Separate Storm Sewer System (MS4) stenciling and signage at stormdown drains. • Properly design trash storage areas and any outdoor material storage areas. Treatment Control BMPs Treatment control BMPs supplement the pollution prevention and source control measures by treating the water to remove pollutants before it is released from the project site. The treatment control BMP strategy for the project is to select Low Impact Development (LID) BMPs that promote infiltration and evapotranspiration, including the construction of infiltration basins, bioretention facilities, and extended detention basins. Where infiltration BMPs are not appropriate, bioretention and/or biotreatment BMPs (including extended detention basins, bioswales, and constructed wetlands) that provide opportunity for evapotranspiration and incidental infiltration may be utilized. Harvest and use BMPs (e.g., storage pods) may be used as a treatment control BMP to store runoff for later non-potable uses. 39. Prior to issuance of grading and building permits for each phase of the project, the developer shall prepare a Construction Noise Control Plan and will submit the plan to the City for review and approval. The plan shall include but will not be limited to the following: • During all project site excavation and grading, contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers consistent with manufacturers' standards. • The project contractor shall place all stationary construction equipment so that emitted noise is directed away from the closest sensitive receptor to the project site (i.e., the Salvation Army facility at the southwest corner of the site). • The construction contractor shall locate equipment staging in areas that will create the greatest distance between construction-related noise sources and the closest noise-sensitive receptor to the project site (i.e., the Salvation Army facility at the southwest corner of the site) during all project construction. • During all project site construction, the construction contractor shall limit all construction-related activities that would result in high noise levels to between the hours of 7:00 a.m. to 7:00 p.m. on weekdays and Saturdays. No construction shall be permitted on Sundays or any of the holidays listed in AMC Section 4261. 14 • Prior to the start of Phase 2 grading, the developer shall install a wooden noise barrier along the common boundary of the project and the Salvation Army rehab facility at the southwest corner of the project site. This barrier shall be removed upon completion of Phase 2 construction. 40. Prior to the issuance of building permits for each phase, the developer shall demonstrate that all buildings shall have air-conditioning to minimize noise impacts on hotel rooms along West and East Huntington Drives. 41. Prior to the issuance of occupancy permits for the Phase 2 hotel condominium building, the developer shall install a filled-cell concrete block wall along the common boundary with the Salvation Army rehab facility at the southwest corner of the project site. In lieu of the temporary construction wall outlined in condition no. 39, the developer may install this permanent wall "early" (i.e., prior to issuance of occupancy permits for Phase 1) which would eliminate the need for that portion of condition no. 39. . 42. Prior to issuance of an occupancy permit for either hotel in Phase 1, the developer shall be responsible for installing an additional signal phase to accommodate northbound movements exiting the shared hotel driveway and southbound movements entering the hotel driveway. The developer will also change the number one lane to a shared through and left turn lane to access the driveway for the hotels and modify the signal to account for the added phases and lanes. These changes shall be made to the satisfaction of and in coordination with the City traffic engineer. 43. Prior to issuance of occupancy permits for either of the hotels or the hotel condominiums, the developer shall install bike racks and provide showers and locker rooms for employees who wish to ride bicycles to work. Bike racks shall also be installed for project guests in appropriate locations. An appropriate number of bike racks as determined by the City of Arcadia shall be located near each building to serve the anticipated number of employees and guests. This measure shall be implemented to the satisfaction of the City Engineer. 44. Prior to issuance of building permits for either Phase 1 or Phase 2, the project plans shall be circulated to Foothill Transit (FT) and the Metropolitan Transit Authority (MTA) to determine if there is a need for a bus stop on the south side of Colorado Place in front of the project site (e.g., for either FT Route 187 or MTA routes 78, 79, or 378). If either agency determines a need for such a stop, the developer shall install a bus stop to agency specifications prior to issuance of occupancy permits for the affected phase of development. This measure shall be implemented for each phase to the satisfaction of the City Engineer. 45. Prior to issuance of occupancy permits for either hotel in Phase 1, the developer shall demonstrate that the main hotel entrance for Phase 1 has a circular drive with signage to allow only one way circulation (counter-clockwise) to provide adequate vehicle queuing lanes for exiting at the traffic signal. This measure shall be implemented to the satisfaction of the City Engineer. 15 46. Prior to issuance of a building permit for either hotel, the developer shall retain a qualified licensed civil engineer to conduct a sewer study to evaluate before and after conditions of the project on the City's existing sewer system (both lateral and main lines). This measure shall be implemented to the satisfaction of the City Public Works Services Department and the County Sanitation Districts of Los Angeles County as appropriate. 47. Prior to issuance of an occupancy permit for either hotel, the developer shall make a fair share contribution to the City to help fund upgrading of the existing sewer in West Huntington Drive included in the City's 2014-15 Capital Improvement Project Plan budget, based on the results of the sewer study outlined in Mitigation Measure UTL-1. This measure shall be implemented to the satisfaction of the City Engineer and/or the City Public Works Services Department as appropriate. 48. Prior to issuance of an occupancy permit for either hotel, the developer shall also make a fair share contribution to the County Sanitation Districts of Los Angeles County for any trunk line improvements required to serve the project based on the results of the sewer study. This measure shall be implemented to the satisfaction of the City Public Works Services Department in consultation with the County Sanitation Districts of Los Angeles County as appropriate. 49. In accordance with the City's Transportation Fee Program, the applicant shall pay its development impact fees which will mitigate any cumulative impacts in the future at the westbound 1-201 intersection at Santa Anita Avenue. 50. Prior to issuance of an occupancy permit for either hotel, the developer shall make a fair share contribution to fund project-related portions of any improvements needed to provide adequate electrical service to the project. This measure shall be implemented to the satisfaction of the City Public Works Services Department in consultation with Southern California Edison. 16 This page has been left blank intentionally Attachment No . 2 August 12 , 2014 Letter Requesting Specific Plan Amendment Attachment No 2 RECEIVED AUG 1 3 2014 August 13, 2014 DEVELOPMENT SERVICES VIA ELECTRONIC MAIL Mr. Jason Kruckeberg Assistant City Manager/Development Services Director City of Arcadia 240 W. Huntington Drive Arcadia, CA 91007 Re: Modifications to Sea Biscuit Project Conditions of Approval Dear Mr. Kruckeberg: I want to thank you, Mr. Lazzaretto and Mr. Deitsch for speaking with and meeting with my development team over the course of the past several weeks. As you know, we are excited to move forward with Phase I of the Sea Biscuit project, originally approved by the City Council in March 2014. We believe the implementation of Phase I of the project will stimulate the local economy and provide a high quality hotel venue to the City of Arcadia ("City") and its residents. As we have discussed, while we are tremendously excited to break ground on Phase I as soon as possible in the weeks ahead, we do not desire to implement Phase II at the present time. This is simply a result of the fact that trying to implement a condominium hotel project in today's market is exceedingly challenging, and we do not want any difficulties attendant to implementing Phase II to impede or distract our focus from the prompt delivery of Phase I to the City and the community. In addition, we are no longer requesting a loan from the City in the form of the advance of the Transient Occupancy Tax ("TOT"), which was originally envisioned as necessary for the implementation of Phase II. Although we appreciate the City's desire to provide economic stimulus with respect to Phase II, we no longer seek any financial assistance from the City with respect to any Phase of the project. Therefore, the purpose of this letter is to inform the City of the project's revised implementation schedule as follows: (i) we are withdrawing our earlier request for any economic assistance from the City; (ii)we are in the process of processing ministerial permits from the City to immediately implement Phase I consisting of two new Marriott Hotels; (iii) the remaining portion of the Santa Anita Inn will be remodeled with new lobby area and other upgrades; (iv) Phase II will be implemented following the completion and market absorption of Phase I. In order to implement Phase I along with a remodel of the Santa Anita Inn, the following minor amendments to the City's March 18, 2014 Conditions of Approval appear to be necessary: 1032/031740-0001 7365697.1 a08/13/14 Mr. Jason Kruckeberg August 13, 2014 Page 2 Condition 1, on page 12, needs to be amended as follows: 1. .• • • _•. . . . : .' . - -• - - ! • - . - - - . - . In addition, Condition 2, on page 12, should be modified as follows: 2. The portion of Santa Anita Inn remaining will start remodeling immediately before the construction of Phase 1 and shall be provided with a new lobby area within the existing building(s). Any changes or alteration to the building shall be subject to review and approval by the Development Services Director or designee. Implementation of Phase II in the future shall be permitted only upon (i) the execution of a mutually binding development agreement between the developer and the City that allows the City to provide for the orderly regulation of condominium units within the Phase II hotel, or (ii) the city has adopted an Ordinance providing for the orderly regulation of Condominium units within the Phase II hotel. We look forward to working cooperatively with the City and to processing this project before the City's Planning Commission on September 9, 2014, and at the City's subsequent City Council hearing on October 7, 2014. Sincerely, Sea :'scuit, LLP -• ew Ch.a 1032/031740-0001 7365697.1 a08/13114 This page has been left blank intentionally Attachment 3 Relevant Excerpts of the approved Specific Plan , including site plans showing Phase 1 , landscape and parking plans showing Phase 1 , and elevations Attachment No. 3 Mn e �"� z,1u s 3t N 1 V Z W W gg i 0 • Vj Lt, ZW�Si t7 , Y (1� 1111 d ? \ n .. Oj d O cj�J Q.9.tt w.,,2 2 g 1 14 I laai Ail 1§ �� 0., ii 0. co& 0 C8 YE 0. • r J1 +E . r' ---' s _ ;;v'Sa,)to a fe_ now . �_ `Y ._. ! 4), .- `.. •C.' ,`r. ' ' "I: we ' , ,,- f. orir i . , ,,I+ ft, Veit • AA firm �' tea.i ‘ I x ' , . f "A* ' c ! ry . . 0 ' C`' 1 i t lit 9 : r, I 4 :o....,•,,,,r .,1 1,t` rf , 4 i jai: M sr=�,; E6\ • F 1 . ' 7 ! l' l lC l ' fx l - O+4tr •s,r. R�.' r ��• i, :\'',..'- ' ' • P s ,,: •'. i w�" •io �J \ gyp, '--_.m -7,5„a,i ta-r2053-f• ._ L., .w • "N. y .;,� !k tom• „"' Q .ww.. • ‘‘,0,,,,d tl \ U 4 .. i /- z QN r . r < C: \ � 111 l',4 `" 1 T \ ,. • .t . ' 4,.. ' -•''' A. * i, -144i y y yr ib d i 1 s"" f,,ff, ip-,.....,..........„..H tii m re* .i I, ! ,.. fi.1'.1 ift " f . .., ,,, 4., , ,,, 11 , 1 ...I.. .., 1 ..N., .„ ,, , 1 • , ... ..., 1 If • ,__, ,... . t. ,.....4.,........„. . .s.., , , . . . . . ,......1 •• ., ,L. •-„,,,..1. . ..t, v,;:. . , . ..... ...lit.„:... -1 „„„„. _ , 1. . i ... ....6),_ ,t • ...,, .... . .„....,e... .4,,,-. .,,,,...4-, kals..r. ,/— - [ r1j"."i r 4 kj' `•{�. iJ'� `,; 14.41.' r Y .�' , ' 'PIN.,fir r .?,. ,a-� - �t— —- __-.- �=:1,' .; ;,,fir` y .�+�► "~ '44 ag ' M a• _�rj* 1 i ce 1 1 r Z:�p .�tz t�j 1.= `8 i • . ZMi C K N< Lt � if n _ %.,.......2.... • Ww 1 y�4 O G R �1" • 4 E g �, laltiii)0 ' ' R sue, :fi ,I 1 •.'JBf 4•�+ ,1. - ++a i'S',`. •FF,, g1 ra �yl , f. s$ /4, . r.f c t . . ' 4'"? '.''r. ,,:- iihir " " -,,'" " 0,... , ,— ., it, J *. yam, ,,y *, *_s ik, s w mitfr, , . y V1/4040 - � 9 r =Hn ,,. ma e � 114 1 �t^ .K yy~ ' <k / 4. y• `. � 1. x. , t,6 \1 r„,...,....1.. ON 41 ,,,.:,,,,, ' ' , , 3 • ' '- Yrr \,y, '. J`f �� �, - 444116 . r'°11' eA' Y 1. ,R1' ' - j .1 p ps; yt1 'd. ,�✓' i , , , ,., e < . . ... ,, ,,,i,....,. . ,, L,, . ....,. , , -, ... ` t 4, ; I li 1 0 El \ •• 41 ; I I{ • 4 ; r. 11 . V.. if'-.''' I i p • j I IE I E IA I 2 —14 — i S N, ° '<.• ' X ,,, \ N, 1 ; ,b• r-.4?" ,p -.s , 11 r . 4,1s. N 111/ 1,11 tiliffiliiiii; gigifilibseatiragliii 6 1 li-.6 ... N.. v, ii .4. ,... -... .,,... 4 . %1 ;lielliitoiRophttil it' 1 E,n, _ e___, avo , /sl;1 , t i it 1 X F 10 ■ . ill 0 i ) , t, • , i ---- --.• ( -:,... s,.. , ,:.„ , , g;1111111.140„111;m01•1 . , i P tingg8;11Z11ifillialiAl#11 i , 4 4 I Li ,..47 7---., , , ...,„ ....0. 1 14,-• q./.N. f ‘', 4,'' ' N ' '` ,vaisiledAitffizttrIerstmlii 1 .g . ,,,- I . , • ,,,, : N., .,,,..,• ',,, ,,, ',';,,, i r `" 4 k ' A it../ k‘ / .4 Y'i 1 :. , 4,,s4c>r .:\b74,, 1: 8 1 1 ;'• -, . ..r' 44' ( \N‘Ns,', ''• 1 ' 1 " ),', i 4411$ ?,..&*,, * '•, , it, li ; t'4`4 i ' v f/ NN„:,,,,s, rt NNNN , .. 44.0 ,.. ,.., ,, „ 7. s ,,, , , . .. ---,-4.--„ii ,.. ••• I i 4 ,I;- ' i - 11 — k mu /,) -----.-1 , k4 ‘..__ ,) / N 41■444 ,fr, ?) ,---2.',/\: ', ‘e.:4'1.i;•s:. ;114i 4 i ' V A - lif?' f- i -41/..,,, ' ,/■ % ''--: . -K.: '4,1'. 1 §11h,, ik $ \ ' frieW 77 , c . _, ___, -1' . "; Um - 'it 4:` 150 \.,\ ',\ -g ), • ' 4 A, i 1N' 11 t , w ,,..\ / id 1,1 \ \ \ I . . , 4 ....., .0 . • . --- __ ,,, til - ---- --7;7 0 .,1 ° W 416 CII . lk,A, \ N e , ,/, \ \vl * xr.....,..,_-..... --le • •-----..-- _____./..--'‘,. , AP • -"- E H.: _ .... ,,, 7,.., \ L. , #A, — ,... ,)r7 › ,,, 1 % CC \ - \ / ■ ---:--- ' , 'i,/ ---- ':'., 11°4 ,-• \, 7 , , ,T--•,,, ,-, . ...., § dh , \ 0 oft. ' ■ '''''' P h '1 P . ill, i2 i II cc cr) ..„. .4, + , 4' .. 01 < x \scsie* N,,,... ii b NN, %t 0141 z 10E: ••I II `... NNN 'P 111111 1 Illi : alNa UJ ......„I• , i.1 IE 40 Or F it 5 li t r` N W— i14iii 1 "Iu q0 V c¢H c c $ ii~ t4 W LL <V C R5 ; _ Q k " K 8 G h I .......aa♦..ua�,iw�a�\T101 Cr T{`y S r-i.. '/ .. i�� ` r..� 101 -► 01 ��� r.1'�, IOt ` rQ� .r4 1 �� �NS —yam , I \ N k ` lernati k ,-.,-;',..„-_:,,,r..-.7a,:,-.-/._z.:.:,A.k.,,._ : iv 11,.--I MI — > a:Iv 4. ♦ _ i-' X3°4. vo'r+ ! , i -" O - 1L': I iy !`o %�`F �. o + N 6+1i , ,.. 0 \•.::,;,\,,.. ----„..,:. -,- ..... 141.,... <-140-it— ,, 1 if Iii - _,..., ,„,per/4., Anp, \ _ ,,,..., i°) i --fi r ran:: �' C '-' z3.1K. Al:..1 I -.------- 4 4 7..-..„T le: ' ANA4 V-11\ l'''''- "?" ...'4"4 P -----,;',-;-4-&..,.4 a difillri bill ; 4,0,-.9 ,:P.4/.051,01,,„,11„. , . _. , ____ 14.1 ■SO IIIIL I P +•h -,�y 1•. is,i!i ,,..V>- r 'tom•11 mo 0) Q / i R A 1 `* '¢L eaArl: r.�l�a rr ' /..._p) 0�. z '.• A r41�,; „p pi Z 8 R AAA W laI II lei to - p 111 4 1 N;\ 14 N._____ E �9' € 1 i11 rr I �� '401 Ir. 41 ;01 IA I . - 77\----\--'1' • .. - ill r 14 \ 40 -, \\..\.\\\\\\\\-.\-\\\.\\Y\\\ ,4. • 1 ° 0 • e C)`1 V W O.T.'4 1;3 7' < P .. Val- c=r S I W< G w < t �`✓ u t Q Z r a w r O F I .awl .‘, s , ■ ;j 4, W S 5 Jr ' •:" II RI t I.I — _ " = ''�i 111' R "' 16111'1110 1 - i . a .,,,.: (19, i C t tt�� ry D J � ! ?Lkel x � '. x y ya;; (.9 W FZ- -. � w k I • E' IL.-..: O< r; U __ ° gs"iii � L -- t... .1, 1: 11 \ .. � illf O � � 1`giil IL N y r 1 �7< tP C L. / I' R g dN Q d Q a ; J i te 8 I I w i H r��II @ I 1 IL IN 1 i 0 � J ItS) .,.. I / :, k- 14 k : Is t W 1 8 l' 4 li :k ix x R 8 lR s iR g ` 41 IIIIiiIM1idi LL n Sp a 3 41,,„*..„01.,e1,1111..` �� Mb . x \ �x: o o . � a oA 0 \ s II i ./..,..,.. -- , `4 --.."(tOgilk *pi ge) 61 ,,,,, 10./1_ �, 1 t.: ' ,,...A.f......,,.. . :. G. m t 7�• Is. h , li t. C` G gr a �, �� .' I, fell ■ ;egg! 7 w• i. a I ;�o� /yp a libikilit t I&' � a o p i � k" / , .• '� ' o' Ojl ' 1:6 0;) n / ,1 111' +'0.1171181 -__ 1 /G T u �� t1,w Ca w 1. 2 • i/ / -it ,�j.r u• �';'- ��!. ; � r.:',% gip\ �u r�i®1®111111 1. i/i ;:• i _ i • •�Sr; 1f '' . : itc,418181.1.,,,,,,.....: " .1 wows - Nen air, _ 4, .ee .10,---_____ter . .Y Ili iv i ' I i __ liailiiiiiiiifill6;/ It 1 1 + i 40 4. `l G � , - U „. , , . — =ill+ i=11` i ' a .. i - . - - k,:-i S , \ —\\ —11 —\\ ‘ \ \''. ,. 1 ii.!. , .„ .. ' ' ''---- 1 MO =rte- _ ._....-:,l Q1,+ z ! r -;14. } F i1� t. AL �`- F j ■ 1 Olitrl:tirii\ i a, Ti 1.,.... , I� i xt J ,,Alkof E' , / 7,e ! 't r .. { i , f i >G b us- t` �f 4�. , It: 1Et1 'f.i , i 4 1 ri = ; , I' x S 11....L ,: M_ill , 1'- • • -- .. ...... .„ ,.-... ! . .‘.7.. . I' ' f I 1 . , ,■ I '' • 1 4.1011kr C I. i 4..--- 4 1:i.:"....... • , 1 I -:-----.10'._74•77...-1---7----fp'.--—7-- ' , -.----"'-'' i miur , 6 , pipaings aiawsrprit,e,,,,,,,An . rtitaiitintirgliMiNagratt....,_1m1 1-.7.--wenr_`.:- '- f . . , .1. l' ; ! -.. '' / r • . r , ' ,,,,....,.. . 1 If -I. • . 1 r ..—..... ........._ 11111111111111t._ i { ,.............. . ■•••......---... 1 . 1 f . , . 4,%.- -„. , 4„;,.; iliii vy , ..,1; 9,7 '�'° pi to.. S a 'a: I ."?. ......i . 4 1 m dew "a 1,91 1 1 - • ''t,'.:::1,111-.11.--;i1 L I: '':-.. ;.--3 r: . .. 1 1_' _ 4111INININININ =IV .-= I 1111 I. — 1'n = 1 11 I -' - meatwissawim mas.......marl ;•. ' triii, ; -.- - ....._ l' \071 _ _._,._4911.11 it, .(� .1 . . h Ittu1JIj _1 taxii ��� Ike ._... .-. .. illit i - I I ;I li . ,w I �# v n , ■ r•� '' • ' &.4"4 I '• _ iit ,' 1• . 2 t '' ' t #• , 10':x, k,'� 1 ' 4 1 • 'Nyttct NMI ......i 5 \ .... .,.,1• ---i ■ ••■••• , "1111 ink..:-.-......lidivai / / __,-/ ,/ /,/ /.__--t7--. ..._i i--_•!--1 ' - / 7 /-7 LT---/ i-'-----27 = _ _ i lille • i k rilil ' i 14 _ I- _.---,---k, 1111E7 . ..._........ 1 . _ „.-- 1. • ..._____„ ,..„, _ . ,,, 111114 anna - i 11 \ . 1 '. t.. . , 1 T ' 'et'ffir'l 4..1'4 •-; ' - ,, f 4” A ' "• i.L.:'" .4L,t1 f, . • 1 - ,1i4 . ' : ' ■ 41 I "'■.A, ,.',, .....: if . ma -- --Z2 / 7 ,440..i.,tot *. • / --------------------- "'""'"----- a ,i - 1, 4 }- 1F7 / 7 ,4 4 / ,-,,,-,,..., ,1,1.-...",,...,'1,- .7,..1,' p*. Iaft, ^.,',. de. .,+f i '17 't 'Si\( 1 —'"*" -":i'"..,4 4 F 41 A 4 ?sYb \1I\ _ t..._ _ ... ..��,. ...__..,....__...._ 7, 7;.7_ II i .z t' shy :Am- r, d 1 e 1 In i �I II ,. c, L ' ii '' 4. r 7 \ ' 2 r4 1, aft "..e------'- 140....\ , * r -C ...... M�ammiart irir PI NS 1.1111.11 ! 1,0/ . r '. m„ lkSH / it. # 4, i *-"— ----- WM -. -.1I f I �. Z 1 1: II • \ ............. 1 i !.f i. _ .. IL i 4 . Ti�Y ��s ��� j ww.... ew 1 i G l r! -- - ---- IIL T raw• Q MS i I i 7 1 r . • MO 1.11161 _1 ^..., al . s s•r; Attachment No . 4 Proposed Design for the remodeled remaining portion of the Santa Anita Inn Attachment No.4 a N xi a• Z NN\NNNNN , > > ;,,,, .,:„.,,,.. ...gr,.. n ? AIF o > • .-a m Ox co mZ 33 O m e> o � Z � , p CA * r O �� � Z .�� W d \ D ..\-A yG ics„ Z . 2 co > - . • .k4.*4 # ...--. GI > :4:47 r :16. - OZ.,t:;:fy:&...4, '4, Z -� > ' , , ' •4431t,w%.s:•A 41111111 - /'-':. .;-.75.7.1.7) 24' • - ir €;•IP ' ,,,,,,24 N•N .. _...........::... .• - ,,/z „ ,\44. 441r. * / '/' ''%' 41*,=. t' t e M . .: ' __ 1 IF , , Si. , -�0' ,-- .� yeti �.. ;iikt''. ' •'` • __ L° Teti ;� N� 'j�//' \,.Nip"'PJ o> . f / EH'Z \ \. i I N: q6i "n m 91eoZ m ;Q 1>o d$ i "z i!5 ; :n U' oYJ Z_ its J 1 pw < O< It 6-,SZ 1 7l� Zo jR ,0-,4Z • f w O `_ o �Z r • f A o H I .ca I. o z ao a a m CO LG ` N O.y \ m o O E20.. ....- . . `t 372$. v+ < O2 O cc Z • i-- �., u - ❑ � �mw S< � z iz z - 0 ce J 'I-16 w H ' o 0 Q 2 N LJL n �Z_ CI CC 0 . �I Z 0 El 0 0 w r \1 er,< N z ,w o2 n oz `- 1 :1. 019R 0 ,,,, u >_. a °z` Z a Z Z a o f 4 F- a a ■aaa cn z = _~� Z V o 1.... Q IA °° I-- a Qo CO a o z ■l J Z„ _ l o 6a 0 1 5 t z 6_,g, t Z ur R o ! < a, 1 . . re Z� n ,...._ , „., p�J ❑ '• � of 03 m \m i trirS1. j Z Z ,� 8i O Z 8`Q' t- - 7 = I- UJ NZ . ❑ TI/ o Q rs- Z w °m3 / W , O O u_ cp " Z O Z Li A ce Z � it j�r.1i L�J �� ❑ 4 11 2 i II' �'. O 1 W 1--_1.� ==ism U i _= 1 z m w 0 cc F== w O ' W g j 1 ~ Z (_�3 __ • 0 11 i;L•J; �o� a o o co a ❑ 'd o E T at5t5 11. r D ail li I �∎ ` L�__13 z z co $i P 8 8 C7 z c z z z Z a It ▪ y N Z Z ffi fl I 1° ZQ c Q N a o Z ca —. u' g 411; ° �zd z_ I .e-,sz o< i a zo i d .0-4Z 4 rr II 8 i C V< . c,Z – t 0 o a clk 03 Q , �c 1 ` N 0 0 O U < m LL _ w �Q O^ Z cc Z e- J Q J in i- 'av Isar w — \ 8w .■` ' ,_g. - 1r. z ¢ Z J • O K J — a LU f a w p UV a Et ;1 Z o 2 I z O it I ¢z_ L 0 8-,91 n , Z ce mow.+, a.'° w CO f„ , 0 , •im9 ._ 1 „�1 4 1 :. 1 a 1 CI O L_ NS301N021A 1 .< n Z _ — `..,,„%h. ,., ....most• a0pqq Z W \ __ _ :i < O ,'. .ter , p4m L. O 7 �.aa, Z O 2 , -- Z I o2LL - O �A„ < Z C) – :.\ _ a31Nf100 ` rz Q IL U Jw w �s ” w`\ � a Jc�„ m Q 2 u" g 111 zW W V °,,, ill 11 u"< 1 E9! -1_ ci , f 41,2 sl _f e I ek .-': I ""` ` ii u a17` 1111 ! N R �__ w 4'.4 1 q I-I HO 9 �r r t ,. ,, Z .' N iimil z I sass ^+ i, .r sr a. cc a ;S �,,' i i Z w u i i , + O sQ J _ .. , D a; a. 1 t Ng W W Q. 1 Il II. I 7 o W zN z w co C7 MI < ! CO o �1 � ■ z } z - - , ' _ins �I wall_ mil. ' ar Z I i Z z IS . . W w. I �,.i Q LL `tom �ti Q �■ z in • V) a Vet Rt t � � Z �., ; i: a :� n ,1`a "0rta i .rd•.. g c' 71tl�.Lf.i 11-rmiii- --------____ __11' o-• tit Wl •�,.s- . — . ;_ o o = w < LL Z W ._=.=.,.I p Z ¢ -' o F- a• z '':I i J 1. CI CC 31 ` '.I `Z °a jz J f w .._...=. I=1N w cc i , I- 5 ,� . _I �.c_ a +',t co w .�[ w � Z o I i ` W I a J H W .. W In :V* r g';'s:A 2 o .. '. ti 'i<7r i J r a' Y, U) is ill 0 11 ZZ ?o j - Q � 4 � Z•. a 41 cc Z U N < ? i '' re: ) .,— 11H ::3197> „„„„„,„. nor y.--,,,,. ....-..! 1,1 • E 5 .*: illr—ii zt cou'ia. 0 ..., I u ARE ...1 ) 2 .... < f L,.. _ , 1 311 r • 1,_. c„..___ _i ,• .0 .. 4 Necc ccv, 2 z ! g .., 6 II I 6 to . .. . , -......, 1. 1.17.,c,rd 1 ilE 1-.11 ' - lig : gl? . , ,,.., ' N '16 C ...—a (2-...ig cc' • '' , ..........„ „, , ca' . a • .,-, ' • " e • i 1 .. ,' ,• . '',•".•: , . ,• — 41 ‘ ' • OP,' /./ • . .. t'' M MI ' _ • . ■ . .-.. .:..J..--•3 ,. P. (..) . ' • :'-‘ : . .... , .... • , . i 1F. fi, , ; ' • , . i ; i u., F . *03,M 0 . , , ; t.4.• i ge " ' , . (.2 , 4,, 1; 11 ■ . . ' i 44 •P. I E. ;.:, Ej el .r.',,....r2r:`%, -..,. - • ji.• \ ____..,, . .. 1 :' a . ., 0 1. i • i ' tz 4 ‘„ .... _, •_. • ,,:• ,, ., , r • 8m ' 1._ -- -- z 4 z g ,..:1--*‘J • : . ,,,,,,4 I • . _ t 1 z ' z ' ''' . ‘ • • 'It: : I • 642g --; . . - ec _ . ,, (.1. ii,..1,------ • ,.•\. a !I . " ggli 2,1g ital ii • __-•• -g- z . a V • • • •* - 8 • ...-,.• '1-4 • . It r V - —1 (I) . "-- • 9 1' Lti •.... • .., p.... i „ . .... a ' f..„\---IA\\ 1 .. i .) 1 1 , i i/7. . I ce< u_ce 1 i (.: •t,r, I.,e4.1,7„,..,. ,ite41' .., _ Ok .... ,, .,. .':. - ; tk 1 ,tia Or i ' • :........1,1 ti :-: ,,,._..t, Fr 1.• •,,, .... . "''t;■''.''. ,,,,. \.., ••2,.' "it'rt.,,Vit'W ' \ • '''',:-•''',•P• , , 1, 1....(.... , ',•;',r;rt,'"..i, ,- ...? i I 1 2 ' • ,,, ....,-, i 0 It '..''-r' 'r•'' ,',,,I.;,:• :''', \ ,,..j•'. '. '.' ; • r •• ,i . - '',r. ., .•. . . . . t •r t 14 IL 1 8 tV • _P:',7-• • - —'. ..,.... . -'..•- .•,•'. •- ... ___ ... , __. % 1 . . 1 2 / ... I ..-;'''''''' ''' -•, ,.,,,,,:.r.i... 'Z'=„*. .-,-,•.;;;.,r.•''. ., • ..:47:, --'.....17- .:,:-.. -:,',..:, !f':•."4'.;',..,,',1- ; ,-, ,,,,,,,,,;.,,•,. : __,,__.• Attachment No . 5 Staff Report to City Council for original project, dated March 18, 2014 Attachment No. 5 Or ARC 0,1,11'011,vii ..t v~ 1111. � �`� STAFF REPORT „„.airy o[i Development Services Department DATE: March 18, 2014 TO: Honorable Mayor and City Council FROM: Jason Kruckeberg, Assistant City Manager/Development Services Director Jim Kasama, Community Development Administrator By: Lisa L. Flores, Planning Services Manager SUBJECT: GENERAL PLAN AMENDMENT NO. GPA 14-01, SPECIFIC PLAN NO. SP 13-02, AND ZONE CHANGE NO. ZC 14-01 WITH A MITIGATED NEGATIVE DECLARATION FOR THE SEABISCUIT PACIFICA SPECIFIC PLAN FOR TWO NEW HOTELS AND A HOTEL CONDOMINIUM AT 130 W. HUNTINGTON DRIVE Recommendation: Adopt Resolution No. 7013 Conditionally Approving the project, thereby approving the Art Deco architectural style for the two new hotels and the Mitigated Negative Declaration, and Introduce Ordinance Nos. 2314 and 2315 SUMMARY The applicant, Mr. Andy Chang, has submitted applications for Specific Plan No. SP 13- 02 (Seabiscuit Pacifica Specific Plan), General Plan Amendment No. GPA 14-01, and Zone Change No. ZC 14-01 for the development of two hotels (Marriott Residence Inn and Fairfield Inn & Suites) that total 142,320 square feet of hotel space in two connected buildings, with a total of 210 rooms, and a third hotel which will be described as a hotel condominium tower with 50 units — see the attached site plan. The project site at 130 W. Huntington Drive consists of one parcel with an approximate area of 249,599 square feet (5.73 acres). The proposed project requires approval of the following applications and documents: • A General Plan Amendment to revise the Downtown Overlay of 1.0 FAR in the General Plan Commercial Land Use Designation to a Downtown Overlay with a 1.03 FAR • A Specific Plan to develop the 5.73-acre site with two hotels (a total of 210 rooms) and a hotel condominium with 50 units • A Zone Change and Zoning Map Amendment to revise the zoning from C-2 with Downtown and H-8 Height Overlays to SP-SP (Seabiscuit Pacifica Specific Plan) with a 1.03 FAR GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18, 2014 Page 2 of 26 • A Mitigated Negative Declaration in compliance with the California Environmental Quality Act (CEQA) BACKGROUND The Santa Anita Inn, formerly the Flamingo Hotel and the Ramada Inn, is a two-story hotel comprised of six buildings with 110 rooms (34,775 square feet) that was originally constructed in 1955 and remodeled in 1985. The property also includes a rose garden with a fountain, many mature trees, and a gated pool area. While named, "The Santa Anita Inn" since 1988, the hotel does not have any particular association with the racetrack. A cultural resource study was prepared for this project site and there were no significant resources found. In 2010, as part of the General Plan Update, a Downtown Overlay was added to the C-2 zoning and H-8 Height Overlay of the subject property that increased the floor area ratio (FAR) from 0.5 to 1.0. The height overlay of H8 allows up to eight (8) stories and 95 feet in height. A public hearing for this proposed project was initially scheduled for the January 28, 2014, Planning Commission meeting. But, due to a request by Caltrans for additional traffic analyses, the hearing was continued to the February 25, 2014, meeting. This proposal was presented to the Planning Commission at their regular meeting on February 25, 2014, for the consideration and recommendation to the City Council. At this meeting, the Planning Commission adopted Resolution No. 1897 with a 3-2 vote to recommend denial of the project for the following reasons: • The project would have profound effect on the character of the city and its reputation as a Community of Homes. • The project was over-ambitious for the site and should be scaled back (although the overall sentiment was favorable to the project). • There was not a supportable need to deviate from the Code to allow 8 feet of additional height for architectural features, equipment, and other rooftop structures on the hotel condominium. • Concerns with the parking modification. A copy of the Planning Commission minutes and the Executive Summary have been provided (refer to Attachment No. 1). Since that meeting, the applicant chose to revise the project based on the Planning Commission's concerns and comments and made the following changes to the project (refer to Attachment No. 2): 1. Reduced the overall height of the hotel condominium tower to meet the maximum height of 95 feet allowed by the H-8 height overlay. This eliminates the need for a height modification of 98 feet and an additional 8 feet in height for an overall height of 106 feet for architectural features, chimneys, vents, and other accessory rooftop structures; and, GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 3 of 26 2. Modified the site and landscape plan to provide 15 additional parking spaces at the completion of Phase 2. The final parking count will be 352 parking spaces in lieu of 377 spaces required for the three hotels. DISCUSSION The proposed project involves the construction of 257,589 square feet of lodging with 142,320 square feet of "dual" (connected) hotel space in two buildings, and 115,269 square feet of hotel condominiums in 50 units on 5.73 (249,599 square feet) acres of land. The project will be completed in two phases, as proposed in the Table 1 below: Table 1 Project Summary Phase 1 Building No. of No. of Floors Gross Rooms/Units Square Feet Marriott Residence Inn 121 6 93,985 sq. ft. Fairfield Inn & Suites 89 4 Existing Santa Anita Inn 48,425 sq.ft. 63 2 22,050 sq. ft. (Phase 1 Only) Total Phase 1 273 164,460 sq.ft. Phase 2 Hotel Condominium 50 Total Rooms and Units 260 8 115,269 sq.ft. 257,679 sq.ft. During Phase 1, a portion of the existing Santa Anita Inn hotel will be demolished, and 63 units will remain in operation until the start of Phase 2. The second phase is a 50- unit hotel condominium that will have eight (8) floors and include nine (9) two-story townhomes, 36 one-floor condominiums, five (5) penthouses, and one level of subterranean parking. The phasing of the various components of the project is discussed in more detail later in this staff report and in the Specific Plan (refer to Attachment No. 3). This proposed hotel development combines two Marriott brands, Residence Inn and Fairfield Inn & Suites, with shared amenities, event and meeting space totaling 3,160 square feet, a 1,200 square-foot house-keeping facility, and an outdoor recreational area with a swimming pool. Each hotel will have its own lobby and breakfast area with an associated kitchen facility (for hotel guests only). The Residence Inn is an extended- stay, all-suite hotel that offers studios and one- and two-bedroom suites, each with a kitchenette. The Fairfield Inn & Suites is comprised of hotel suites with separate living/working spaces and sleeping areas. These units do not include kitchenettes, but the hotel offers a complimentary hot breakfast and a 24/7 convenience store in the lobby area. The proposed 50 unit hotel condominium building is considered as a type of lodging. The units would be used like "time shares" or for other temporary (short-term) or seasonal (limited) occupancies. These units are intended for and will be marketed directly to racetrack-related guests and staff, as well as overseas investors. These units are not intended to support full-time occupants. The pre-selected buyers of these units will have a need to only make short seasonal stays and rent out their units for the majority the time as part of a hotel booking pool. The units will also be subject to Transient Occupancy Tax (TOT) like a typical hotel. The TOT requirement will be written GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 4 of 26 into the Homeowners Association (HOA) Covenants, Conditions, and Restrictions (CC&Rs) for each individual owner to pay through a management company. The individual property owner will not be able to stay indefinitely without paying the TOT. The owners must rent their units by using the on-site management company. Therefore, the hotel condominium is consistent with the allowable use (i.e. lodging) under the General Plan "Commercial" land use designation. However, the proposal exceeds the 1.0 floor area ratio (FAR) limit by 0.03 or 7,990 square feet. The proposed project requires approval of the following applications: • A General Plan Amendment to revise the Downtown Overlay (1.0 FAR) in the General Plan Commercial Land Use Designation to a Downtown Overlay with a 1.03 FAR for this site. • A Specific Plan to develop the 5.73-acre site with two hotels (a total of 210 rooms) and a hotel condominium tower with 50 units. • A Zone Change and Amendment to the Zoning Map to revise the zoning from C- 2 with Downtown and Height Overlays to SP-SP (Seabiscuit Pacifica Specific Plan) with a Downtown Overlay of 1.03 FAR. • A Mitigated Negative Declaration in compliance with CEQA. A Specific Plan is required for the timing of the two phases and the project's overall size and particular design. At the request of the City Council, a Development Agreement is currently being negotiated between the applicant and the City, and this agreement will provide further detail on the timing of the construction of each phase, the operational restrictions on the condominium hotel portion of the project, and the method of paying TOT. The Development Agreement will be presented to the Planning Commission and City Council following the consideration of the entitlements. The following are summaries of each of the required entitlements, excepting the Development Agreement, for the proposed Seabiscuit Pacifica hotel development. A. General Plan Amendment The site currently allows a 1.0 floor area ratio (FAR) for up to 249,599 square feet of commercial development. The applicant is requesting an amendment for a 1.03 FAR for an additional 7,990 square feet of additional hotel space for a total development of 257,589 square feet. The proposed 1.03 FAR does not include a portion of the Santa Anita Inn hotel that is proposed to remain in operation following Phase 1 but will be removed prior to the construction of Phase 2. The proposed project was taken to the City Council in concept several times in a Study Session format and the Council agreed that a multi-hotel development on this site would be acceptable, but that the phasing of the development would have to be adequately addressed through the Specific Plan. The site has an H-8 height overlay and a 1.0 FAR to accommodate a "landmark" project directly across from a main entrance to the racetrack. Such a "landmark" project is to GPA 14-01, SP 13-02,and ZC 14-01 130 W. Huntington Drive March 18, 2014 Page 5 of 26 provide a visual focus and entry statement, but is not to detract from the visual qualities of the immediate neighborhood or impose upon any residential neighborhoods near the project site. California law also requires a Specific Plan to be consistent with the General Plan. The proposed Seabiscuit Pacifica Specific Plan and the General Plan are complementary and consistent on more than 100 General Plan goals and policies (refer to Appendix B of the Specific Plan). For this reason, the increase in the FAR for this project is appropriate. The General Plan Land Use Map would be revised as follows with a higher Downtown Overlay on the site. Existing General Plan Land Use Proposed General Plan Land Use ''f r fi ► ° 4 � �% ° // / .14.. ;,,,- /y..0 '-', Y., '," r/.." iv f /, ''z / / - 4witttv ,,, , , „/ 0, .1, /A N.,,, , //4 ./i 1. 4 % s / / / i try s f .,. ' 'V+ ",,s`. B. Seabiscuit Pacifica Specific Plan The purpose of the proposed Seabiscuit Pacifica Specific Plan (SP-SP) is to define the range of permitted uses, the development regulations, the design guidelines, and the phasing for the development of the project site. The SP-SP proposes to construct three hotels, a Marriott Residence Inn, a Fairfield Inn and Suites, and a third hotel (proposed to be hotel condominium), as previously described. The proposed hotels are expected to support patrons and employees of the Santa Anita Park racetrack on a regular basis, as well as general and business-related guests. These lodging uses are consistent with the goals of the General Plan for general commercial uses located in the Downtown area near the Santa Anita Park racetrack. Implementation of the Specific Plan will accomplish the following objectives: • Provide high quality development consistent with the City's General Plan and in conformance with municipal standards, codes, and policies; • Provide uses that will compliment and support the Santa Anita Park racetrack, other important regional facilities in the City, and the adjacent Downtown area; GPA 14-01, SP 13-02, and 2C 14-01 130 W. Huntington Drive March 18,2014 Page 6 of 26 • Minimize the potential for environmental impacts; • Augment the City's economic base by increasing tax-generating commercial uses within the City; and • Create employment-generating opportunities for the citizens of the City and surrounding communities. Standards within the Specific Plan include the phasing of the project; building height; access; architectural design guidelines for the improvements, landscaping, fences and walls; architecture; phasing of parking areas; signs; outdoor equipment; screening of ancillary facilities; and methodology for interpretations of the provisions. Future discretionary approvals for this site will be subject to procedures, findings, and provisions described in the Specific Plan. The proposed Specific Plan development standards match most of the development standards of the C-2 zoning of the site, with the following modifications: 1. A total of 352 parking spaces in lieu of 377 spaces required for the three hotels. 2. The Specific Plan will supplant the requirements for a Conditional Use Permit and Architectural Design Review that is required in a General Commercial (C-2) zone for hotels. The applicant has proposed to develop the project in two phases due to market demand and the availability of financing. There are specific requirements and deadlines in the Specific Plan for the hotels to be developed in a particular order, when the existing Santa Anita Inn shall be demolished, and when the hotel condominium is to be developed. It also sets forth the development plans and design, including the requested modifications from the underlying C-2 zoning and the Downtown and H-8 height overlays. Development Phasing Phase 1 is to be completed by 2016 and will include the following: a total of 142,320 square feet of hotel space in two connected buildings; 93,895 square feet in an approximately 80-foot tall, six-story building for the Marriott Residence Inn, and an approximately 60-foot tall, four-story, 48,425 square foot building for the Fairfield Inn and Suites. The project site contains the existing 110-room (34,775 square feet) Santa Anita Inn hotel. A 47-room portion of this hotel will be demolished in this phase, and the four southernmost buildings (buildings C-F, 22,050 square feet of hotel space) are proposed to remain in operation with 63 rooms following the completion of Phase 1 (refer to the renderings on page A-4.1 of the Specific Plan). Based on the proposal, the 63-room portion of the Santa Anita Inn could remain open for 3 years following completion of Phase 1. There will be 293 surface parking spaces for both new hotels and the Santa Anita Inn. According to the applicant, there will also be a financial benefit to the City to keep a portion of the Santa Anita Inn in operation since the City could continue to receive hotel tax revenue from those units. GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18, 2014 Page 7 of 26 Phase 1 - Building Architecture An initial conceptual design of the project was presented to the City Council last year, and the Council felt the design appeared "generic" and indicated that the design should be iconic and representative of Arcadia and the Santa Anita Park racetrack. The Residence Inn and Fairfield Inn & Suites are Marriott products that are subject to their corporate design guidelines. However, the applicant's architect has been able to customize the designs. The applicant is proposing two different architectural styles for consideration. Option 1 (preferred option) — Inspired by Art Deco (refer to Exhibit A) - Art Deco was a prominent style of architecture around Los Angeles during the 1920s and 1930s.. Art Deco is the style of the Santa Anita Park grandstand and may still be found in some of the most iconic buildings throughout Los Angeles. The Art Deco design of the two hotels draws inspiration directly from the Santa Anita Park grandstand. Strong vertical and horizontal lines and forms create depth and distinctive planes with a repeated pattern of rectilinear forms to enhance the verticality of the building. The variation in horizontal setbacks creates a pattern of shadows against a varied palette of colors and materials. Two vertical spires flanking the Residence Inn pay homage to the racetrack. Exterior spot lighting of the buildings will highlight the two hotels by creating a dramatic night scene. Option 2 - Contemporary & Modern (refer to Exhibit B) — This design style is contemporary with bold and distinctive lines and forms. Strong horizontal lines are balanced with strong vertical elements. Ample variations in the height of the vertical features create an interesting profile, and variation in the horizontal setbacks creates structural and shadow patterns. The proposed materials include stone veneer, stucco, and tinted windows in two distinctive colors. Council Action: It is recommended that City Council select design Option 1, which has more architectural interest, relates better to its surroundings, and would be compatible with the style of the hotel condominium tower. Phase 2 is to include demolition of any remaining portion of the Santa Anita Inn and removal of 85 surface parking spaces for the construction of the eight-story, 95-foot tall, 115,269 square-foot hotel (hotel condominium) tower with a 52-space subterranean parking structure and a surface parking lot with 77 spaces. The hotel condominium will have nine townhomes, 36 condominium units, and five penthouses. Based on the revised plans, the tower will have a maximum building height of 95 feet as allowed by the H-8 height overlay. The site will have a total of 352 parking spaces after the completion of Phase 2. The proposed Seabiscuit Pacifica Specific Plan allows for Phase 2 to start immediately after Phase 1 is completed. The timeline is based on the pre-sale success of the hotel condominium units. According to the applicant, at least 50% of the units must be pre- sold in order for a loan to be secured for the construction of Phase 2. The dual hotels GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18, 2014 Page 8 of 26 and the hotel condominium are expected to generate a need for 85 new full-time equivalent employees at build out. Phase 2 —Building Architecture and Height The architectural design of the hotel condominiums is inspired by French Normandy architecture. Some of the attributes that lend to this style include pilasters, an accentuated chimney clad with stone veneer, as well as pronounced trim and strategically placed cornices. The building will also have varied forms and profiles with an interesting skyline profile. The façade of the building is adorned with many different forms such as cylindrical corner pieces, and curvilinear balconies with decorative wrought-iron railing. The specific style of architecture was chosen because of its traditional and elegant appearance, which would complement the racetrack and the surrounding community. However, the aesthetics and architectural features can be modified in a collaborative effort between the City and design team. Such changes may include enhancing the front entries to the hotels and hotel condominium, reducing the amount of stone veneer on the walls of the hotel condominium tower, lowering the height of the windows, increasing the roof pitch on the condominium tower, and reducing the breadth and height of the porte cochere. Phased Parking Lot The existing surface parking lot has 194 parking spaces with access off of West Huntington Drive. The primary access point for the new hotels will be near the junction of Colorado Place and West Huntington Drive. Primary access to the hotel condominium tower will also be off of West Huntington Drive. A driveway off of East Huntington Drive will serve as a secondary/emergency access point for both the hotel condominium and the two new hotels. During construction of Phase 1, a portion of the Santa Anita Inn is proposed to remain open — four buildings with 63 rooms. There will be 85 surface parking spaces to accommodate guests, and access will be off of East and West Huntington Drive. Once Phase 1 is completed, the parking lots will have a total of 293 parking spaces; 208 spaces for the two new hotels and 85 spaces for the Santa Anita Inn. Phase 2 will remove the remaining Santa Anita Inn and the 85 parking spaces to make way for the hotel condominiums and associated parking, with a total of 352 parking spaces in lieu of 377 spaces at the completion of Phase 2. The City's right-of-way dedication along Huntington Drive will require the elimination of three (3) parking spaces. The parking requirement for this project is subject to the development standards of the Specific Plan, but according to the requirements in the height overlay, the two hotels at the completion of Phase 2 should be parked at 1.2 parking space per guest room totaling 252 parking spaces. The applicant is requesting that the two hotels only provide 227 parking spaces, which is 1 .08 parking spaces per room or approximately an 10% reduction from the Code requirement of 1.2 parking spaces per room. The applicant projects that the hotel occupancy would stabilize after several years at an average of 72% occupancy. In addition, due to the proximity of the facility to the future Gold Line Station, parking demands for staff and guests will be somewhat lessened. The City Engineer agreed that the proposed parking ratio of 1.08 is acceptable. Most of the other hotels in the City were approved with a parking modification to allow less than 1.2 GPA 14-01, SP 13-02,and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 9 of 26 spaces per guest room, and none have demonstrated any parking deficiencies. For example, the Hilton Garden Inn was approved with 1.0 parking space per guest room in lieu of 1.2 spaces, and the Marriott Courtyard was approved at 1.08 spaces per guest room including 11 compact spaces. It would actually be less than 1.0 space per guest room if those compact spaces were converted to standard parking spaces. The Embassy Suites was parked to Code at 1.2 spaces per guest room with an additional 38 spaces to accommodate the banquet facilities since it is a full service hotel that has a lounge, full service restaurant, and a meeting/banquet room that is 7,500 square feet, twice as large as the proposed meeting rooms at the new hotels. Of those 38 parking spaces, 29 were approved as compact spaces. The proposed ratio of 1.08 parking space per guest room is in line with the similar hotels in the City. In Phase 2, the applicant will remove the existing 85 parking spaces of the Santa Anita Inn, and provide 73 new surface parking spaces and 52 parking spaces within a subterranean parking garage. The hotel condominium will be parked at two parking spaces for each unit, and one guest space for every two units. Each unit will have one covered parking space in the garage and one surface parking space, and all the guest spaces will be located in the parking lot areas. The applicant is proposing that 12 of the parking spaces in the garage be in a tandem configuration rather than side by side (refer to the Parking Plan on page A-3.1 of the Specific Plan). The problem with tandem parking is that someone is usually boxed in, and this will discourage the use of those parking spaces especially if the spaces might be used by different owners. Tandem parking works only when both parking spaces are under the same ownership. For this reason, it is recommended that each set of tandem parking spaces be assigned to a particular unit, and that the Specific Plan include such a provision unless a 24-hour valet service or similar measure is provided so that the tandem spaces can be readily accessed by any of the occupants. At the February 25, 2014, Planning Commission meeting, the Commission had concerns with the parking space deficiency, and whether the parking spaces will be adequate in the instance of 100% occupancy and use of the spaces by hotel employees and the 3,160 square foot meeting space. Since the proposed hotels are not convention-type hotels, and do not include banquet rooms, restaurants, clubs, auditoriums, etc., the 0.08 factor per room is sufficient for any of the supporting facilities within the hotels. The primary use pattern of the meeting rooms will be by hotel guests. Furthermore, it is usually the restaurants and clubs within various hotel developments that would draw a large percentage of patrons from outside of the hotel, and would rationally need more parking than those that were primarily used by hotel guests. Since the applicant is not proposing either one of these uses, parking for the supporting facilities as a "stand alone" use is not recommended. In addition, since the Planning Commission meeting, the applicant has revised the site and landscape plans to provide 19 parking spaces at the completion of Phase 2. Table 1 is a breakdown of the total parking proposed at buildout. Based on the available information, the parking reduction will not create a parking problem at the proposed hotels. In the event the hotel hosts a special event, the hotel operators can utilize valet parking or can make special arrangements with the Santa Anita Racetrack across the street since those parking lots are usually available during GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18, 2014 Page 10 of 26 evening hours. The City Hall west parking lots may also be available for occasional short term use. Table 1 — Parking Buildout Parking Summary Code Required Proposed Proposed Parking Parking Parking Spaces Ratio Parking Space Phase 1 —two 252 227 1.08 hotels, 210 rooms Phase 2 — 50 125 125 2.5 spaces per unit units Total 377 352 1.08 space per guest room 2.5 spaces per unit Hotel Market Study Before the applicant chose Marriott hotels for this project, a market study was performed by PKF Consulting to determine what type of hotel would be best suited for this site and the surrounding area. The consultant recommended an extended stay hotel and/or a limited service hotel. Mr. McAllister, Vice President of Marriott Lodging Development, provided a letter that states the company has very strict policies pertaining to new hotel development and the financial implications any new Marriott hotels might have on existing, or nearby Marriott hotels (refer to Attachment No. 8). As a result, Marriott did an internal analysis to determine potential financial impact on the other Marriott branded hotels in the Arcadia, Monrovia, and Pasadena markets. They determined that the potential financial impact on their existing hotels was within their policy guidelines. Furthermore, an independent, third party consulting firm came to the same conclusion. FINDINGS Section 9296.8 of the Arcadia Municipal Code requires that for a Specific Plan to be granted, it must be concluded that the following three findings of fact can be made in an affirmative manner: 1. The proposed specific plan or specific plan amendment is consistent with the General Plan, including the goals, objectives, policies, and action programs of the City's General Plan. Facts to Support the Finding: The subject site is identified in the General Plan as an expansion of the Downtown area for future urban development. As a result, the Specific Plan will provide for two new hotels and the first hotel condominium in the City, which will be required to be subject to the City's Transient Occupancy Tax (TOT) requirement. The proposed project will help GPA 14-01, SP 13-02,and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 11 of 26 revitalize the Downtown area of Arcadia, as well as contribute positively to the existing downtown setting. Therefore, the proposed Specific Plan is consistent with the General Plan. 2. The proposed specific plan or specific plan amendment will not adversely affect the public health, safety, and welfare or result in an illogical land use pattern. Facts to Support the Finding: The Initial Study/Mitigated Negative Declaration for the Specific Plan and General Plan Amendment analyzed all the potential impacts and all the projects impacts are less than significant or can be reduced to less than significant level with the implementation of the recommended mitigation measures. Therefore, the proposed project would not be detrimental to the public health and welfare. Instead, the proposed project will be a superior development that will provide an entry statement for the City. 3. The specific plan or proposed specific plan amendment is a desirable planning tool to implement the provisions of the City's General Plan. Facts to Support the Finding: This proposed project is to be built over time and in two phases. Phasing involves many considerations; such as market demand, and the availability of financing. A Specific Plan can address these particular matters so that the hotels will be developed in a particular order, and when the existing Santa Anita Inn shall be demolished. The intent of the Specific Plan is to ensure that he proposed project is developed in the right order and by a set time table. Zone Change and Amendment to the Zoning Map Currently, the site is zoned C-2 with a Downtown Overlay and a special height overlay of H-8. The proposed Specific Plan will create a new zone of "SP-SP" with a 1.03 FAR for the 5.73 acre project site. To facilitate the zone change, the following section would replace the existing language within Section 9231; Establishment of Zones in the Arcadia Municipal Code: 9231.21.2 SP-SP - Seabiscuit Pacifica Specific Plan Existing Zoning Proposed Zoning /7, VA e • #0,6;/.-;/,;(; <117 GPA 14-01, SP 13-02,and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 12 of 26 The above zoning map showing the proposed revision is attached to this staff report (refer to Attachment No. 6). All development within the SP-SP Zone will be consistent with the provisions of the Specific Plan. The Zoning Map would be revised to reflect the proposed zoning changes to the property. With the following recommended conditions of approval, the proposed project would satisfy each prerequisite condition. RECOMMENDATION It is recommended that the City Council conditionally approve the project and adopt the Mitigated Negative Declaration by adopting Resolution No. 7013 and Introduce Ordinance Nos. 2307 and 2308, subject to the following conditions of approval: 1. The remaining portion of Santa Anita Inn (buildings C-F) shall be demolished within three years of the issuance of a Certificate of Occupancy for either of the two new hotels. In the event a Development Agreement is approved by the City Council for the project, the terms of the Development Agreement on the retention of the Santa Anita Inn will supersede this condition. 2. The portion of Santa Anita Inn remaining following construction of Phase 1 shall be provided with a new lobby area within the existing building(s). Any changes or alteration to the building shall be subject to review and approval by the Development Services Director or designee. 3. Each set of tandem parking spaces shall be assigned to a single unit unless a 24- hour valet service or equivalent measure is implemented. Any changes or alteration to the parking space assignment shall be subject to review and approval by the Development Services Director or designee. 4. No architectural features, chimneys, vents, equipment, and other accessory rooftop structures may be placed on top of the mansard roofs of the hotel condominium tower. The maximum height of all elements is 95 feet. 5. A Tentative Tract Map must be filed with the City and approved prior to issuance of a building permit for Phase 2 —the hotel condominium tower. 6. The Phase 2 component of the development will be a hotel use and may be a hotel condominium tower. Transient Occupancy Tax (TOT) shall be required to be remitted for the Phase 2 component. The TOT requirement, as well as restrictions on how the units will be managed, rented, and sold, shall be written into the Homeowners Association (HOA) Covenants, Conditions, and Restrictions (CC&Rs) for each individual owner The individual property owner will not be able to stay indefinitely without paying the TOT. The owners shall rent their units by using the on-site management company. In no circumstances shall the units be used for permanent residences. The site is not suitable for permanent residency, does not possess facilities for such, and the City's General Plan does not allow residential uses at the location. The draft HOA CC&Rs shall be submitted for review and approval by the City Attorney prior to issuance of a Certificate of Occupancy for GPA 14-01, SP 13-02,and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 13 of 26 any of the hotel condominium units and the CC&Rs shall notify prospective purchasers of the transient nature of the use and that they are purchasing into a commercial hotel development and not a residential development. If a Development Agreement is approved for this project, the terms of the Development Agreement shall govern on this issue. 7. In accordance with the City's Transportation Impact Fee Program, the applicant shall pay its development impact fees, which will mitigate the project's contribution to any cumulative impacts to the westbound 1-210 intersection at Santa Anita Avenue. 8. The design and construction of any and all traffic signals, signing, and striping modifications or additions to accommodate the new entrance near the intersection of Huntington Drive and Colorado Place shall be at the applicant's/property owner's expense. 9. Damaged sections of the existing curb and gutter on Huntington Drive shall be removed and replaced per City of Arcadia Standards. 10. The applicant/property owner shall provide a street dedication along westbound Huntington Drive, to create a continuous 10'-0" parkway width. 11. The applicant/property owner shall provide signage to clearly mark the monument roundabout as "One Way," and also provide signage to clearly mark the exits from the condominium hotel site onto westbound and eastbound Huntington Drive(s) as "Left Turn Only." 12. New sidewalk along eastbound Huntington Drive per City Standard shall be constructed at the applicant's/property owner's expense. The property owner and site superintendent shall coordinate with City Engineer and Public Works Services Director for the protection and/or replacement of existing trees within the City's rights-of-way. 13. The applicant/property owner shall prepare a Standard Urban Stormwater Mitigation Plan (SUSMP) for the proposed development, as prescribed by Los Angeles Department of Public Works SUSMP Manual. 14. Prior to issuance of a building permit for each phase of the project, a detailed landscaping and irrigation plan shall be prepared by the applicant/property owner for the project site. The proposed project shall comply with the requirements of the City's Water Efficient Landscaping Ordinance. 15. All City requirements regarding disabled access and facilities; occupancy limits; building safety; fire prevention, detection and suppression; health code compliance; emergency access, egress, and equipment; water supply and facilities; sewer facilities; trash reduction and recycling requirements; environmental regulation compliance, including National Pollution Discharge Elimination System (NPDES) measures; and parking and site design shall be GPA 14-01,SP 13-02,and ZC 14-01 130 W. Huntington Drive March 18, 2014 Page 14 of 26 complied with to the satisfaction of the Building Official, City Engineer, Community Development Administrator, Fire Marshal, and Public Works Services Director. Compliance with these requirements shall be determined by having fully detailed construction plans submitted for plan check review and approval by the foregoing City officials and employees. 16. The uses approved by these applications shall be operated and maintained in a manner that is consistent with the proposal and plans submitted and approved; and shall be subject to periodic inspections, after which the provisions of this approval may be adjusted after due notice to address any adverse impacts to the adjacent streets, rights-of-way, and/or the neighboring businesses, residents, or properties. 17. Noncompliance with the plans, provisions and conditions of approval shall be grounds for immediate suspension or revocation of any approvals, which could result in the closing of the hotels and hotel condominium. 18. The applicant shall defend, indemnify, and hold harmless the City of Arcadia and its officials, officers, employees, and agents from and against any claim, action, or proceeding against the City of Arcadia, its officials, officers, employees or agents to attack, set aside, void, or annul any approval or conditional approval of the City of Arcadia concerning this project and/or land use decision, including but not limited to any approval or conditional approval of the City Council, Planning Commission, or City Staff, which action is brought within the time period provided for in Government Code Section 66499.37 or other provision of law applicable to this project or decision. The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and/or land use decision and the City shall cooperate fully in the defense of the matter. The City reserves the right, at its own option, to choose its own attorney to represent the City, its officials, officers, employees, and agents in the defense of the matter. 19. Approval of GPA 14-01, SP 13-02, and ZC 14-01 shall not be of effect unless on or before 30 calendar days after City Council adopts the Resolution and Ordinance, the property owner/applicant has executed and filed with the Community Development Administrator an Acceptance Form available from the Development Services Department to indicate awareness and acceptance of these conditions of approval. Mitigation Measures as Conditions of Approval The following conditions are found in the Mitigation Monitoring and Reporting Program (MMRP). They are recorded here to facilitate review and implementation. More information on the timing and responsible parties for these mitigation measures is detailed in the MMRP. 20. Prior to issuance of a building permit, the applicant shall demonstrate that all project windows are glazed or otherwise treated to minimize glare on surrounding GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 15 of 26 roads and properties, to the satisfaction of the Development Services Director or designee. 21. Prior to issuance of a grading permit, the general contractor for the project shall prepare and file a Dust Control Plan with the City that complies with SCQAMD Rule 403 and requires the following during excavation and construction as appropriate: • Apply nontoxic chemical soil stabilizers according to manufacturers' specifications to all inactive construction areas (previously graded areas inactive for 10 days or more). • Water active sites at least twice daily (locations where grading is to occur will be thoroughly watered prior to earthmoving). • Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least 2 feet of freeboard (vertical space between the top of the load and top of the trailer) in accordance with the requirements of California Vehicle Code (CVC) Section 23114. • Pave construction access roads at least 100 feet onto the site from the main road. • Control traffic speeds within the property to 15 mph or less. 22. Prior to the issuance of a grading permit, the project developer shall require by contract specifications that contractors shall utilize California Air Resources Board (CARB) Tier II Certified equipment or better during the rough/mass grading phase for rubber-tired dozers and scrapers. Contract specifications shall be included in the proposed project construction documents, which shall be reviewed by the City. 23. Prior to the issuance of a grading or building permit for each phase, the project developer shall require by contract specifications that contractors shall place construction equipment staging areas at least 200 feet away from sensitive receptors. Contract specifications shall be included in the project construction documents, which shall be reviewed by the City. 24. Prior to the issuance of a building permit for each phase, the project developer shall require by contract specifications that contractors shall utilize power poles or clean-fuel generators for electrical construction equipment. Contract specifications shall be included in the proposed project construction documents, which shall be reviewed by the City. 25. Prior to issuance of a grading permit for each phase, the developer shall provide an assessment of existing trees on the areas to be developed. This tree assessment shall be prepared by a qualified landscape architect and identify any existing large bushes or trees that can be relocated or preserved as part of the new development project. The project landscaping plans shall attempt to preserve existing mature trees onsite to the extent feasible, based on the tree assessment. This measure shall be implemented to the satisfaction of the City Planning Division. GPA 14-01,SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 16 of 26 26. During project construction in either phase, the existing redwood trees along the east side of the property shall be protected by being taped or roped off with appropriate signage so construction equipment will not accidentally come in contact with and damage or destroy any trees. The trees shall be sprayed with water at the end of each day when substantial amounts of dust are generated (e.g., during grading or demolition) to minimize damage from dust deposition. This measure shall be implemented to the satisfaction of the City Planning Division. 27. Construction in either phase should not occur during the local nesting season (estimated February 1 to July 15). If any construction occurs during the nesting season, a nesting bird survey shall be conducted by a qualified biologist prior to the issuance of a grading permit or removal of any large trees on the existing hotel property. If the biologist determines that nesting birds are present, an area of 100 feet shall be marked off around the nest and no construction activity can occur in that area during nesting activities. Grading and/or construction may resume in this area when a qualified biologist has determined the nest is no longer occupied and all juveniles have fledged. This measure shall be implemented to the satisfaction of the City Planning Services. 28. Prior to demolition of any existing hotel buildings on the site, the completed DPR 523A and 523B forms and a cover memorandum shall be submitted to the City for filing to officially document the historical assessment for the Santa Anita Inn. This measure shall be implemented to the satisfaction of the City Planning Services. 29. While there is no known historical significance as that term is defined under CEQA, the applicant has proposed to install a plaque indicating the location of the former Santa Anita Inn and its place in the history of the City of Arcadia. The size, construction, and location of this plaque shall be up to the discretion of the City Manager, in consultation with the Planning Services. 30. If cultural artifacts are discovered during project grading, work shall be halted in that area until a qualified historian or archaeologist can be retained by the developer to assess the significance of the find. The project cultural monitor shall observe the remaining earthmoving activities at the project site consistent with Public Resources Code Section 21083.2(b), (c), and (d). The monitor shall be equipped to record and salvage cultural resources that may be unearthed during grading activities. The monitor shall be empowered to temporarily halt or divert grading equipment to allow recording and removal of the unearthed resources. 31. If any resources of a prehistoric or Native American origin are discovered, the appropriate Native American tribal representative will be contacted and invited to observe the monitoring program for the duration of the grading phase at tribal expense. Any Native American resources shall be evaluated in accordance with the CEQA Guidelines and either reburied at the project site or curated at an accredited facility approved by the City of Arcadia. Once grading activities have ceased or the cultural monitor determines that monitoring is no longer necessary, such activities shall be discontinued. This measure shall be implemented to the satisfaction of the City Planning Services. GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18, 2014 Page 17 of 26 32. If paleontological resources (fossils) are discovered during project grading, work will be halted in that area until a qualified paleontologist can be retained to assess the significance of the find. The project paleontologist shall monitor remaining earthmoving activities at the project site and shall be equipped to record and salvage fossil resources that may be unearthed during grading activities. The paleontologist shall be empowered to temporarily halt or divert grading equipment to allow recording and removal of the unearthed resources. Any fossils found shall be evaluated in accordance with the CEQA Guidelines and offered for curation at an accredited facility approved by the City of Arcadia. Once grading activities have ceased or the paleontologist determines that monitoring is no longer necessary, monitoring activities shall be discontinued. This measure may be combined with CUL-3 at the discretion of the City Planning Services. 33. In the event of an accidental discovery or recognition of any human remains, California State Health and Safety Code § 7050.5 dictates that no further disturbance shall occur until the County Coroner has made the necessary findings as to origin and disposition pursuant to CEQA regulations and PRC § 5097.98. If human remains are found, the LA County Coroner's office shall be contacted to determine if the remains are recent or of Native American significance. Prior to issuance of a grading permit, the developer shall include a note to this effect on the grading plans for the project. 34. To ensure reductions below the expected "Business As Usual" (BAU) scenario, the project will implement a variety of measures that will reduce its greenhouse gas (GHG) emissions. To the extent feasible, and to the satisfaction of the City of Arcadia (City), the following measures will be incorporated into the design and construction of the SP-SP project prior to the issuance of building permits: Construction and Building Materials • Recycle/reuse at least 50 percent of the demolished and/or grubbed construction materials (including, but not limited to, soil, vegetation, concrete, lumber, metal, and cardboard). • Use "Green Building Materials," such as those materials that are resource- efficient and are recycled and manufactured in an environmentally friendly way, for at least 10 percent of the project. Energy Efficiency Measures • Design all project buildings to exceed the 2013 California Building Code's (CBC) Title 24 energy standard by 10 percent, including, but not limited to, any combination of the following: • Design buildings to accommodate future solar installations as appropriate. • Limit air leakage through the structure or within the heating and cooling distribution system to minimize energy consumption. GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 18 of 26 • Incorporate ENERGY STAR or better rated windows, space heating and cooling equipment, light fixtures, appliances, or other applicable electrical equipment. • Install efficient lighting and lighting control systems. Use daylight as an integral part of the lighting systems in buildings. • Install light-colored roofs and pavement materials where possible. • Install energy-efficient heating and cooling systems, appliances and equipment, and control systems. • Install solar lights or light-emitting diodes (LEDs) for outdoor lighting or outdoor lighting that meets the 2013 California Building and Energy Code. Water Conservation and Efficiency Measures Devise a comprehensive water conservation strategy appropriate for the project and its location consistent with the City's Water Efficiency Landscape Ordinance (WELO). The strategy may include the following, plus other innovative measures that may be appropriate: • Create water-efficient landscapes within the development. • Install water-efficient irrigation systems and devices, such as soil moisture- based irrigation controls. • Design buildings to be water-efficient. Install water-efficient fixtures and appliances, including low-flow faucets, dual-flush toilets, and waterless urinals. • Restrict watering methods (e.g., prohibit systems that apply water to nonvegetated surfaces) and control runoff. Solid Waste Measures To facilitate and encourage recycling to reduce landfill-associated emissions, among others, the project will provide trash enclosures that include additional enclosed area(s) for collection of recyclable materials. The recycling collection area(s) will be located within, near, or adjacent to each trash and rubbish disposal area. The recycling collection area will be a minimum of 50 percent of the area provided for the trash/rubbish enclosure(s) or as approved by the City's Public Works Services Department. Provide employee education on waste reduction and available recycling services. Transportation Measures To facilitate and encourage non-motorized transportation, bicycle racks shall be provided in convenient locations to facilitate bicycle access to the project area. The bicycle racks shall be shown on project landscaping and improvement plans submitted for Planning Services approval and shall be installed in accordance with those plans. GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 19 of 26 Provide pedestrian walkways and connectivity throughout the project. Fund or participate in some type of shuttle service for hotel guests to access the City's downtown Gold Line Station. 35. Prior to demolition of any existing hotel buildings or associated structures, a qualified contractor shall be retained to survey structures proposed for demolition to determine if asbestos-containing materials (ACMs) and/or lead-based paint (LBP) are present. If ACMs and/or LBP are present, prior to commencement of general demolition, these materials shall be removed and transported to an appropriate landfill by a licensed contractor. This measure shall be implemented to the satisfaction of the City Building Services including written documentation of the disposal of any ACMs or LBP in conformance with all applicable regulations. 36. Prior to issuance of a grading permit, the developer shall file a Notice of Intent (NOI) with the Los Angeles Regional Water Quality Control Board to be covered under the National Pollutant Discharge Elimination System (NPDES) General Construction Permit for discharge of storm water associated with construction activities. The project developer shall submit to the City the Waste Discharge Identification Number issued by the State Water Quality Control Board (SWQCB) as proof that the project's NOI is to be covered by the General Construction Permit has been filed with the SWQCB. This measure shall be implemented to the satisfaction of the City Engineer. 37. Prior to issuance of a grading permit, the developer shall submit to the Los Angeles Regional Water Quality Control Board (RWQCB) and receive approval for a project-specific Storm Water Pollution Prevention Plan (SWPPP). The SWPPP shall include a surface water control plan and erosion control plan citing specific measures to control on-site and off-site erosion during the entire grading and construction period. In addition, the SWPPP shall emphasize structural and nonstructural best management practices (BMPs) to control sediment and non- visible discharges from the site. BMPs to be implemented may include (but shall not be limited to) the following: • Potential sediment discharges from the site may be controlled by the following: sandbags, silt fences, straw wattles, fiber rolls, a temporary debris basin (if deemed necessary), and other discharge control devices. The construction and condition of the BMPs are to be periodically inspected by the RWQCB during construction, and repairs would be made as required. • Area drains within the construction area must be provided with inlet protection. Minimum standards are sandbag barriers, or two layers of sandbags with filter fabric over the grate, properly designed standpipes, or other measures as appropriate. • Materials that have the potential to contribute non-visible pollutants to stormwater must not be placed in drainage ways and must be placed in temporary storage containment areas. GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 20 of 26 • All loose soil, silt, clay, sand, debris, and other earthen material shall be controlled to eliminate discharge from the site. Temporary soil stabilization measures to be considered include: covering disturbed areas with mulch, temporary seeding, soil stabilizing binders, fiber rolls or blankets, temporary vegetation, and permanent seeding. Stockpiles shall be surrounded by silt fences and covered with plastic tarps. • Implement good housekeeping practices such as creating a waste collection area, putting lids on waste and material containers, and cleaning up spills immediately. • The SWPPP shall include inspection forms for routine monitoring of the site during the construction phase. • Additional required BMPs and erosion control measures shall be documented in the SWPPP. • The SWPPP would be kept on site for the duration of project construction and shall be available to the local Regional Water Quality Control Board for inspection at any time. The developer and/or construction contractor shall be responsible for performing and documenting the application of BMPs identified in the project-specific SWPPP. Regular inspections shall be performed on sediment control measures called for in the SWPPP. Monthly reports shall be maintained and available for City inspection. An inspection log shall be maintained for the project and shall be available at the site for review by the City and the Regional Water Quality Control Board as appropriate. 38. Prior to issuance of a grading permit, a site-specific Standard Urban Stormwater Management Plan (SUSMP) shall be submitted to the City Planning Division for review and approval. The SUSMP shall specifically identify the long-term site design, source control, and treatment control BMPs that shall be used on site to control pollutant runoff and to reduce impacts to water quality to the maximum extent practicable. At a minimum, the SUSMP shall identify and the site developer shall implement the following site design, source control, and treatment control BMPs as appropriate: Site Design BMPs • Minimize urban runoff by maximizing permeable areas and minimizing impermeable areas (recommended minimum 25 percent of site to be permeable). • Incorporate landscaped buffer areas between sidewalks and streets. • Maximize canopy interception and water conservation by planting native or drought-tolerant trees and large shrubs wherever possible. • Where soil conditions are suitable, use perforated pipe or gravel filtration pits for low flow infiltration. GPA 14-01, SP 13-02,and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 21 of 26 • Construct onsite ponding areas or retention facilities to increase opportunities for infiltration consistent with vector control objectives. • Construct streets, sidewalks and parking lot aisles to the minimum widths necessary, provided that public safety and a walkable environment for pedestrians are not compromised. • Direct runoff from impervious areas to treatment control BMPs such as landscaping/bioretention areas. Source Control BMPs Source control BMPs are implemented to eliminate the presence of pollutants through prevention. Such measures can be both non-structural and structural: Non-Structural Source Control BMPs • Education for property owners, tenants, occupants, and employees. • Activity restrictions. • Irrigation system and landscape maintenance to minimize water runoff. • Common area litter control. • Regular mechanical sweeping of private streets and parking lots. • Regular drainage facility inspection and maintenance. Structural Source Control BMPs • Municipal Separate Storm Sewer System (MS4) stenciling and signage at stormdown drains. • Properly design trash storage areas and any outdoor material storage areas. Treatment Control BMPs Treatment control BMPs supplement the pollution prevention and source control measures by treating the water to remove pollutants before it is released from the project site. The treatment control BMP strategy for the project is to select Low Impact Development (LID) BMPs that promote infiltration and evapotranspiration, including the construction of infiltration basins, bioretention facilities, and extended detention basins. Where infiltration BMPs are not appropriate, bioretention and/or biotreatment BMPs (including extended detention basins, bioswales, and constructed wetlands) that provide opportunity for evapotranspiration and incidental infiltration may be utilized. Harvest and use BMPs (e.g., storage pods) may be used as a treatment control BMP to store runoff for later non-potable uses. 39. Prior to issuance of grading and building permits for each phase of the project, the developer shall prepare a Construction Noise Control Plan and will submit the plan to the City for review and approval. The plan shall include but will not be limited to the following: GPA 14-01, SP 13-02,and ZC 14-01 130 W. Huntington Drive March 18, 2014 Page 22 of 26 • During all project site excavation and grading, contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers consistent with manufacturers' standards. • The project contractor shall place all stationary construction equipment so that emitted noise is directed away from the closest sensitive receptor to the project site (i.e., the Salvation Army facility at the southwest corner of the site). • The construction contractor shall locate equipment staging in areas that will create the greatest distance between construction-related noise sources and the closest noise-sensitive receptor to the project site (i.e., the Salvation Army facility at the southwest corner of the site) during all project construction. • During all project site construction, the construction contractor shall limit all construction-related activities that would result in high noise levels to between the hours of 7:00 a.m. to 7:00 p.m. on weekdays and Saturdays. No construction shall be permitted on Sundays or any of the holidays listed in AMC Section 4261. • Prior to the start of Phase 2 grading, the developer shall install a wooden noise barrier along the common boundary of the project and the Salvation Army rehab facility at the southwest corner of the project site. This barrier shall be removed upon completion of Phase 2 construction. 40. Prior to the issuance of building permits for each phase, the developer shall demonstrate that all buildings shall have air-conditioning to minimize noise impacts on hotel rooms along West and East Huntington Drives. 41. Prior to the issuance of occupancy permits for the Phase 2 hotel condominium building, the developer shall install a filled-cell concrete block wall along the common boundary with the Salvation Army rehab facility at the southwest corner of the project site. In lieu of the temporary construction wall outlined in condition no. 39, the developer may install this permanent wall "early" (i.e., prior to issuance of occupancy permits for Phase 1) which would eliminate the need for that portion of condition no. 39. . 42. Prior to issuance of an occupancy permit for either hotel in Phase 1, the developer shall be responsible for installing an additional signal phase to accommodate northbound movements exiting the shared hotel driveway and southbound movements entering the hotel driveway. The developer will also change the number one lane to a shared through and left turn lane to access the driveway for the hotels and modify the signal to account for the added phases and lanes. These changes shall be made to the satisfaction of and in coordination with the City traffic engineer. 43. Prior to issuance of occupancy permits for either of the hotels or the hotel condominiums, the developer shall install bike racks and provide showers and locker rooms for employees who wish to ride bicycles to work. Bike racks shall also be installed for project guests in appropriate locations. An appropriate number of bike racks as determined by the City of Arcadia shall be located near each building GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18, 2014 Page 23 of 26 to serve the anticipated number of employees and guests. This measure shall be implemented to the satisfaction of the City Engineer. 44. Prior to issuance of building permits for either Phase 1 or Phase 2, the project plans shall be circulated to Foothill Transit (FT) and the Metropolitan Transit Authority (MTA) to determine if there is a need for a bus stop on the south side of Colorado Place in front of the project site (e.g., for either FT Route 187 or MTA routes 78, 79, or 378). If either agency determines a need for such a stop, the developer shall install a bus stop to agency specifications prior to issuance of occupancy permits for the affected phase of development. This measure shall be implemented for each phase to the satisfaction of the City Engineer. 45. Prior to issuance of occupancy permits for either hotel in Phase 1, the developer shall demonstrate that the main hotel entrance for Phase 1 has a circular drive with signage to allow only one way circulation (counter-clockwise) to provide adequate vehicle queuing lanes for exiting at the traffic signal. This measure shall be implemented to the satisfaction of the City Engineer. 46. Prior to issuance of a building permit for either hotel, the developer shall retain a qualified licensed civil engineer to conduct a sewer study to evaluate before and after conditions of the project on the City's existing sewer system (both lateral and main lines). This measure shall be implemented to the satisfaction of the City Public Works Services Department and the County Sanitation Districts of Los Angeles County as appropriate. 47. Prior to issuance of an occupancy permit for either hotel, the developer shall make a fair share contribution to the City to help fund upgrading of the existing sewer in West Huntington Drive included in the City's 2014-15 Capital Improvement Project Plan budget, based on the results of the sewer study outlined in Mitigation Measure UTL-1. This measure shall be implemented to the satisfaction of the City Engineer and/or the City Public Works Services Department as appropriate. 48. Prior to issuance of an occupancy permit for either hotel, the developer shall also make a fair share contribution to the County Sanitation Districts of Los Angeles County for any trunk line improvements required to serve the project based on the results of the sewer study. This measure shall be implemented to the satisfaction of the City Public Works Services Department in consultation with the County Sanitation Districts of Los Angeles County as appropriate. 49. In accordance with the City's Transportation Fee Program, the applicant shall pay its development impact fees which will mitigate any cumulative impacts in the future at the westbound 1-201 intersection at Santa Anita Avenue. 50. Prior to issuance of an occupancy permit for either hotel, the developer shall make a fair share contribution to fund project-related portions of any improvements needed to provide adequate electrical service to the project. This measure shall be implemented to the satisfaction of the City Public Works Services Department in consultation with Southern California Edison. GPA 14-01, SP 13-02,and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 24 of 26 ENVIRONMENTAL ANALYSIS Pursuant to the provisions of the California Environmental Quality Act (CEQA), the Development Services Department prepared the attached Initial Study and Mitigated Negative Declaration (MND) for the proposed project (refer to Attachment No. 4). The project with mitigation measures will have less-than-significant impacts for the following areas: Aesthetics, Air Quality, Biological Resources, Geology and Soils, Hazards and Hazardous Materials, Hydrology and Water Quality, Noise, Transportation/Traffic, and Utilities and Service Systems. A detailed review is included in the Initial Study. The mitigation measures have been added as conditions of approval (Condition nos. 20-50) for the project. The City has prepared a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program (MMRP). In accordance with Section 21091 of the California Environmental Quality Act (CEQA) and Section 15073 of the CEQA Guidelines, the Draft Initial Study/Mitigated Negative Declaration (IS/MND) for the Seabiscuit Pacifica Specific Plan Project (SCH #2013121018) was circulated for public review and comments for 30 days from December 5, 2013, to January 13, 2014; this includes an extra week of review because of the holidays. CEQA also requires the lead agency (City of Arcadia) to specify the location and custodian of the documents and other materials which constitute the record of proceedings upon which the lead agency's decision is based. These documents were made available at Arcadia City Hall and at the Arcadia Public Library. During this time period, public agencies, organizations, and the public in general were afforded the opportunity to review the Draft IS/MND, and submit written comments regarding the documents and the proposed project. During the comment period, staff received comments from the following agencies: • California Department of Transportation (Caltrans), dated December 12, 2013, January 13, 2014, and February 25, 2014 • Native American Heritage Commission (NAHC), dated December 12, 2013 • California Department of Fish &Wildlife (CDWF), dated January 10, 2014 • County Sanitation Districts of Los Angeles County (CSDLAC), dated January 10, 2014 • Southern California Edison (SCE), dated January 10, 2014 The comments on the Draft IS/MND necessitated additional traffic analyses to evaluate the impacts to the Interstate-210 freeway and local freeway ramps to ensure that the impacts would be within Caltrans guidelines, and at the request of Caltrans, additional analysis was performed for the horizon year of 2038, which correlates to 20 years after the build-out of the project. The City Council is required to consider the IS/MND together with any comments received during the public review process. Attached is the Response to Comments, which adequately addresses the comments made by the various agencies on the Seabiscuit Pacifica Specific Plan IS/MND. The comments and their responses do not change the conclusion of the IS/MND (i.e., that all the project impacts are less than significant or can be reduced to less than significant levels by implementation of the recommended mitigation measures, including the additional measures outlined in the memorandum). GPA 14-01, SP 13-02, and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 25 of 26 FISCAL IMPACT Fees from the project will fund the development's fair share of impacts from the project on City utilities and services, including sewer, transportation, electrical, and storm water. The proposed development would have a limited impact on fire or police services, and would not have any significant impacts on local schools or parks. Instead, the proposed development will significantly increase the assessed value of the subject property, which will result in substantial additional property tax. Additionally, the project will have a substantial increase in receipts from Transient Occupancy Tax (TOT) because the site will ultimately include 100 additional hotel rooms and 50 hotel condominium units. RECOMMENDED ACTION It is recommended that the City Council approve the following items including the conditions of approval listed in this staff report: 1. Adopt Resolution No. 7013 approving General Plan Amendment No. GPA 14-01 to amend the Downtown Overlay of 1.0 Floor Area Ratio (FAR) in the General Plan Land Use Designation to a Downtown Overlay with a 1.03 FAR and approving the Mitigated Negative Declaration and Mitigated Monitoring Project at 130 W. Huntington Drive; and 2. Introduce Ordinance No. 2314 adopting Specific — Seabiscuit Pacifica Specific Plan (SP-SP) with Floor Area Ratio of 1.03, the Art Deco Architectural Style for the two hotels (Marriott and Fairfield Inn Suites), and the Specific Land Use Regulations of the Seabiscuit Pacifica Project at 130 W. Huntington Drive; and 3. Introduce Ordinance No. 2315 making certain amendments to the text of the Arcadia Zoning Code; and amending the Zoning Designation of certain property within the City from "C-2 with Downtown and H-8 Height Overlays" to "SP-SP, Seabiscuit Pacifica Specific Plan," with respect to the Seabiscuit Specific Plan Project at 130 W. Huntington Drive. Approved: Dominic Lanza City Manager Attachment No. 1: Planning Commission Minutes and Executive Summary, dated February 25, 2014 Attachment No. 2: Revised Site Plan and Elevations to the Hotel Condo tower, dated March 6, 2014 Attachment No. 3: Seabiscuit Pacifica Specific Plan Attachment No. 4: Draft Initial Study/MND, Mitigated Monitoring and Reporting Program, Response to Comments, and Technical Studies GPA 14-01, SP 13-02,and ZC 14-01 130 W. Huntington Drive March 18,2014 Page 26 of 26 Attachment No. 5: Planning Commission Resolution No. 1897 Attachment No. 6: Planning Commission Staff Report and Attachments, dated February 25, 2014 Attachment No. 7: Resolution No. 7013 Attachment No. 8: Ordinance No. 2314 Attachment No. 9: Ordinance No. 2315 Exhibit A: Art Deco Design for the proposed hotels Exhibit B: Modern Contemporary Design for the proposed hotel Attachment No . 6 Addendum to the Mitigated Negative Declaration for an Amendment to the Seabiscuit Pacifica Specific Plan, including the original MND/lS, and MMRP Attachment No. 6 This page has been left blank intentionally ADDENDUM TO THE APPROVED MITIGATED NEGATIVE DECLARATION FOR AN AMENDMENT TO THE SEABISCUIT PACIFICA SPECIFIC PLAN (SP 13-02) 130 WEST HUNTINGTON DRIVE fi ARXhIA AUGUST 29, 2014 PREPARED BY: CITY OF ARCADIA 240 W. HUNTINGTON DRIVE ARCADIA, CA 91007 ADDENDUM INITIAL ENVIRONMENTAL STUDY TPLAN (SP NEGATIVE 3 OZ) ECLARATION SEABISCUIT P ACIFICA SPECIFIC 1.1 Purpose and Background This Addendum to the approved Mitigated Negative Declaration for the Seabiscuit Pacifica Specific Plan (Specific Plan) has been prepared by the City of Arcadia ("City") in conformance with the California Environmental Quality Act (Public Resources Code, § 21000 et seq.) ("CEQA") and the State CEQA Guidelines (Cal. Code Regs., Title 14, Chapter 3 § 15000 et seq.) The purpose of the Addendum is to address a change in the conditions of approval for the approved Seabiscuit Pacifica Specific Plan. The change to the conditions of approval has been requested through an Amendment to the approved Specific Plan. 1.2 Project Description The site is currently occupied by the Santa Anita Inn, a 110 room hotel. On March 18, 2014, the Arcadia City Council approved a Specific Plan to replace the Santa Anita Inn over time with three new hotel-related buildings. The approved project consists of the development of two Marriott-branded hotels (Residence Inn and Fairfield Inn and Suites) that total 142,320 square feet of hotel space in two connected buildings, with a total of 210 rooms, and a third building which will be developed as a hotel-condominium tower with 50 units. These project components are to be developed in phases, with Phase 1 consisting of the two Marriott hotels and a remnant of the existing Santa Anita Inn (60 rooms plus a new lobby) retheldevelonment of the hotel-condominium towoeifion of the remnant Santa Anita Inn and development terms of entitlements, the March 18 approval included a Specific Plan, a General Plan Amendment (GPA 14-01), and a Zoning Change and Zoning Map Amendment (ZC 14- 01). The proposed project simply requests the elimination of a condition of approval, modification of a second condition of approval, and the addition of a condition of approval for the Seabiscuit Pacifica Specific Plan. No other portions of the General Plan Amendment, Specific Plan, or Zone Change, are impacted by this proposal. The conditions of approval requested to be changed are as follows; text to be removed is shown in 6t eth Gugh, new proposed text is shown underlined and italicized: 1. The remodeling of the portion of the Santa Anita Inn remaining shall start immediately before the construction of Phase 1 and shall include, without limitation, a new lobby area within the existing a d approval ing(s). ny changes or alteration to the building shall be subject to review the Development Services Director or designee, an_onal design Addendum-Mitigated Negative Declaration Seabiscuit Pacifica Specific Plan Page 2 enhancements to the building, lobby, or parking area may be required. The commencement of Phase 2 shall be permitted only upon (i) the execution of a mutually binding development agreement between the developer and the City that allows the City to provide for the orderly regulation of condomiuim units within the Phase 2 hotel, or(ii) the City's prior adoption of an Ordinance providing for the orderly regulation of condominium units within the Phase 2 hotel. 2. These conditions shall be deemed to be part of the Specific Plan and are fully incorporated therein by this reference. Notwithstanding any provisions or interpretations to the contrary, the Specific Plan shall remain subject to such amendment or termination as may be adopted by the City pursuant to its zoning authority. The effect of these changes is to allow the remaining units of the Santa Anita Inn to remain on site longer than the original approval. The original approval required the remnant of the Santa Anita Inn to be demolished within three years of the issuance of the first Certificate of Occupancy for the first hotel in Phase 1. This was acceptable because it was the Developer's intent to build Phase 2 within this timeframe. However, since the approval, the City and the Developer have been working on a Development Agreement to place operational regulations on the Phase 2 portion of the project. Through this process, it has become apparent that planning and executing Phase 2 is too difficult for the Developer at this time, and the Developer would like to simplify the project and focus only on Phase 1. The Developer believes that by eliminating the requirement that the remnant of the Santa Anita Inn be demolished in three years, he will have the flexibility to effectively plan for and execute both phases of the Specific Plan. Finally, a condition is proposed to be added to incorporate all of the conditions of approval into the Specific Plan. While this is inferred from the approval, the City Attorney recommends adding this condition along with this amendment. It should be mentioned that the Development Services Department, Planning Commission, or City Council can, at any time, bring forward an amendment to the Specific Plan to modify and/or void Phase 2 of the Specific Plan or any other element of the Plan. 1.3 Lead Agency and Discretionary Approvals This Addendum documents the City's consideration of the potential environmental impacts resulting from the changes to the conditions of approval, and explains the City's decision that further environmental review is not required. The City of Arcadia is the lead agency and has approval authority over the General Plan and Zoning Code. The appropriate entitlement for this action is an Amendment to the Seabiscuit Pacifica Specific Plan. The Arcadia Municipal Code requires this project be reviewed by the Planning Commission for their consideration and recommendation to the City Council; and by the City Council for their approval. Each of these meetings is a noticed, public hearing. Addendum—Mitigated Negative Declaration Seabiscuit Pacifica Specific Plan Page 3 1.4 Documents Incorporated by Reference Section 15150 of the State other Guielines encourages data environmental documents to alysis. incorporate by reference The following documents are are hereby considered b n orport t dhb preference within this Addendum, and all of these documents • Initial Study and Mitigated Negative Declaration for the Seabiscuit Pacifica Specific Plan, City of Arcadia Lead Agency, prepared by LSA Associates, Inc. February 18, 2014. • Mitigation Monitoring and Reporting Program for the Seabiscuit Pacifica Specific Plan, City of Arcadia Lead Agency, prepared by LSA Associates, Inc. February 18, 2014. These documents that are incorporated by reference are available for review at the City of Arcadia Community Development Department— Planning Division. 1.5 CEQA Requirements for Use of an Addendum When a lead agency has already prepared a Negative Declaration or EIR, CEQA mandates that "no subsequent or supplemental environmental impact report shall be required by the lead agency or any responsible agency, unless one or more of the following events occurs: (a) substantial changes are proposed in the project which will require major revisions of the environmental impact report; (b) substantial changes occur with respect to the circumstances under which the project is being undertaken which will require major revisions in the environmental impact report; (c) new information, which was not known and could not have been known at the time the environmental impact report was certified as complete, becomes available" (Cal. Pub. Res. Code, § 21166). State CEQA Guidelines Section 15162 clarifies that an additional negative declaration, subsequent EIR, or supplemental EIR is only required when "substantial changes" occur to a project or the circumstances surrounding a project, or "new information" about a project indicates "new significant environmental effects" or a "substantial increase in the severity of previously significant effects." Addendum—Mitigated Negative Declaration Seabiscuit Pacifica Specific Plan Page 4 The California Environmental Quality Act provides that when a Negative Declaration or EIR has been prepared for a project, no subsequent Negative Declaration or EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence that: 1. Substantial changes are proposed in the project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects [State CEQA Guidelines, § 15162(a)(1)]; 2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects [State CEQA Guidelines, § 15162(a)(2)]; or, 3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following: A. The project will have one or more significant effects not discussed in the previous EIR [State CEQA Guidelines, § 15162(a)(3)(A)]; B. Significant effects previously examined will be substantially more severe than shown in the previous EIR [State CEQA Guidelines, § 15162(a)(3)(B)];; C. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative [State CEQA Guidelines, § 15162(a)(3)(C)]; D. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative [State CEQA Guidelines, § 15162(a)(3)(D)]. If none of these circumstances are present, and only minor technical changes or additions are necessary to update the previously certified EIR, an Addendum may be prepared. Regarding the proposed Amendment to the Seabiscuit Pacifica Specific Plan, none of the above circumstances are present, and an Addendum has been determined to be the appropriate CEQA document. 1.6 Analysis of the Findings As mentioned above, an Initial Study/Environmental Checklist (IS) was prepared for the Seabiscuit Pacific Specific Plan which resulted in a Mitigated Negative Declaration. The proposed Amendment to the Specific Plan will not substantially alter the circumstances under which the IS and MND were undertaken. The elimination of one Condition of Approval and alteration of a second Condition of Approval will not change the potential impacts of the project in any way. No new significant environmental effects, or substantial increase in the severity of previously identified significant effects, will occur as a result of the proposed Amendment. The proposed Amendment will not change the Addendum—Mitigated Negative Declaration Seabiscuit Pacifica Specific Plan Page 5 underlying analysis completed for the IS and MND, and the proposal will not constitute a substantial change in the project. The Initial Study (see Exhibit A) found that the potentially significant effects of the project could be mitigated through the approval of a Mitigation Monitoring and Reporting Plan (MMRP) for the project. The MMRP is attached as Exhibit C. The proposed Amendment changes none of the required Mitigations and they will all remain in full force and effect. Based on the environmental analysis in the Initial Study and this accompanying Addendum, none of the situations described in CEQA Sections 15162 and 15163 applies. The proposed Amendment will not result in any new significant impacts not discussed in the IS/MND, or any substantial increase in the severity of impacts identified by the IS/MND. In addition, no new information of substantial importance has become available since the IS/MND was prepared regarding new significant impacts, or the feasibility of mitigation measures. Signed Date ason ruckeb g, Development Services Dir ctor Attachment: Exhibit A: Initial Study Exhibit B: Mitigated Negative Declaration Exhibit C: Mitigation Monitoring and Reporting Plan Addendum—Mitigated Negative Declaration Seabiscuit Pacifica Specific Plan Page 6 SEABISCUIT PACIFICA SPECIFIC PLAN PROJECT CITY OF ARCADIA INITIAL STUDY/MITIGATED NEGATIVE DECLARATION Specific Plan No. SP 13-02 General Plan Amendment No. GPA 14-01 Zone Change No. ZC 14-01 February 18, 2014 Planning Commission/ City Council Review Lead Agency: City of Arcadia 240 West Huntington Drive Arcadia, CA 91006 Prepared by: LSA Associates, Inc. 1500 Iowa Avenue, Suite 200 Riverside, CA 92507 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY ARCADIA SEABISCUIT PACIFICA PROJECT CONTENTS INITIAL STUDY SECTION 1 BACKGROUND 1 1 1.1 SUMMARY 1 1.2 INTRODUCTION SECTION 2 PROJECT DESCRIPTION 2 2.1 PROJECT BACKGROUND 2 2 2.2 PROJECT CHARACTERISTICS 12 2.3 REGULATORY REQUIREMENTS, PERMITS, AND APPROVALS SECTION 3 ENVIRONMENTAL DETERMINATION 15 3.1 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED 15 15 3.2 DETERMINATION SECTION 4 ENVIRONMENTAL CHECKLIST AND DISCUSSION 16 I. AESTHETICS 16 II. AGRICULTURE RESOURCES 16 29 III. AIR QUALITY 26 IV. BIOLOGICAL RESOURCES 29 V. CULTURAL RESOURCES 32 VI. GEOLOGY AND SOILS 35 VII. GREENHOUSE GAS EMISSIONS VIII. HAZARDS AND HAZARDOUS MATERIALS 35 39 IX. HYDROLOGY AND WATER QUALITY 2 X. LAND USE AND PLANNING 4 44 XI. MINERAL RESOURCES 54 XII. NOISE 54 XIII. POPULATION AND HOUSING 61 XIV. PUBLIC SERVICES 61 >N. RECREATION 62 XVI. TRANSPORTATION/TRAFFIC XVII. UTILITIES AND SERVICE SYSTEMS 6 67 XVIII. MANDATORY FINDINGS OF SIGNIFICANCE SECTION 4 LIST OF PREPARERS 73 4.1 LSA ASSOCIATES, INC. 73 73 4.2 CM OF ARCADIA SECTION 5 REFERENCES 74 SECTION 6 SUMMARY OF MITIGATION MEASURES 78 LSA CMG1301 II SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY APPENDICES (on CD) A Seabiscuit Pacifica Specific Plan No. 13-02 B Air Quality/Greenhouse Gas Study C Historical Assessment D Geotechnical Constraints E Phase 1 Hazmat Study F Hydrology and Water Quality Studies G Traffic Impact Assessment H Noise Assessment LIST OF TABLES Table A: Seabiscuit Pacifica Specific Plan Land Uses 3 Table B: Short-term Construction Impacts 23 Table C: Long-Term Operational Emissions 23 Table D: Construction LST Impacts (pounds per day) 25 Table E: Long-Term Operational LST Numbers (pounds per day) 25 Table F: Short-Term Construction GHG Emissions 36 Table G: Long-Term Operational Project GHG Emissions 36 Table H: General Plan Land Use and Zoning Designations 50 Table I: Summary of Intersection Analysis (2013) 63 Table J: Summary of Intersection analysis (2016) 64 Table K: Summary of Roadway Analysis Existing (2016) 64 LIST OF FIGURES Figure 1: Regional Location 4 Figure 2: Aerial Photograph 5 Figure 3: Site Photographs 6 Figure 4: Proposed Site Plan 8 Figure 5: Landscaping Plan 9 Figure 6: Project Renderings 10 LSA CMG1301 iii SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY SECTION 1 BACKGROUND 1.1 SUMMARY Project Title: Arcadia Seabiscuit Pacifica Project Lead Agency Name and Address: City W est Huntington Drive Arcadia, CA 91006 Contact Person and Phone Number: Lisa Flores, Planning 5 Services Manager (626)Project Location: 240 West Huntington Drive Project Sponsor's Name and Address: Continental Santa Clara Management' Street Arcadia, California 91006 General Plan Designation: Commercial - Downtown Overlay (FAR 1.0) Zoning Designation: General Commercial (C-2) with Height Overlay H-8 (95 feet or 8 stories) and Downtown Overlay 1.2 INTRODUCTION The City of Arcadia incorporated in r9 has s had contributed to the rich history of home to the famous Santa Anita Park Southern California for over 100 yea The City horse racing track. In 1955, the Santa Anita Inn, a 2-story hotel with 110 rooms, was rk constructed on 5.73 acres just east Santa Cont Park to Mainagementg actingaas workers, jockeys, guests, and manag ement Seabiscuit Pacifica, LLC, has proposed a new hotel and condominium project on the existing hotel site. The Seabiscuit Pacifica Specific Plan Project Suites pwiph a total construct two rooms ooelun it and a Residence Inn and Fairfield Inn a nd hotel condominium tower with 50 units.taAnita Park as well as other itvisitors continue to to the City.provide lodging for guests and workers of Santa project will be completed in two of phases - Phase 1 the existing Santa will consist of the two to Inn will remain hotels n ervice hotel surface parking, plus a portion Phase 2 has begun. Phase 2 will consist of the hotel condominium tower, garage parking, and condo surface parking.Fairfield Inniand Suites will have four oors w with th a dence Inn will have six maximum height of 80 feet. The 1 Doing business as Seabiscuit Pacifica LLC for this project. LSA CMG1301 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY maximum height of 60 feet. During Phase 1, surface parking with 208 spaces for both hotels will also be developed. In Phase 2, the hotel condominium tower will have eight floors and include 9 townhouses, 36 condos, 5 penthouses, and subterranean parking. The condominium tower will have a maximum height of 88 feet to the roof and 98 feet including the penthouse architecture. During Phase 1, a portion of the existing hotel will be demolished, but 63 units will remain in operation until the start of Phase 2 construction, at which time the remaining hotel buildings will be demolished. SECTION 2 PROJECT DESCRIPTION 2.1 PROJECT BACKGROUND Location and Existing Uses The Seabiscuit Pacifica Specific Plan Project (SPSP or proposed project) proposes to construct two hotels, a Marriott Residence Inn and Fairfield Inn and Suites, and a hotel condominium tower in the City of Arcadia. The project is intended to provide lodging for guests and workers of the nearby Santa Anita Park race track. The project site occupies approximately 5.73 acres and is located at 130 West Huntington Drive in Arcadia The Assessor's Parcel Number (APN) of the site is 577-501-4014 and is found on the Mt. Wilson 7.5 minute USGS Quadrangle. It is located in Township 1 North, Range 11 West (no section listed) and is at latitude 34' 08' 21.7" North and longitude 118° 02' 77" West,). The project site has an existing 110-room (34,775 square feet) hotel on it that the developer plans to demolish. The proposed project site is bounded by Colorado Place to the north, the Arcadia City Hall complex to the south, West Huntington Drive to the east, and Huntington Drive to the west. Figures 1 and 2 show the location of the project site and surrounding land uses, while Figure 3 provides photographs of the project site and surrounding land uses. The project consists of Specific Plan No. SP 13-02, General Plan Amendment No. GPA 14-01, and Zone Change No. ZC 14- 01. The project site current contains the Santa Anita Inn with 110 hotel rooms which was built in 1955. The project site is a potential historical significance due to its age and connection to the nearby Santa Anita Park race track. The developer plans to eventually demolish all of the existing buildings on the project site. 2.2 PROJECT CHARACTERISTICS The Seabiscuit Pacifica Specific Plan project proposes a total of 257,589 square feet of commercial uses with 142,320 square feet of "dual" (connected) hotel space in two buildings and 115,269 square feet of hotel condominiums with 50 total units. Figure 4 shows the proposed project site plan. For financial reasons, the applicant has proposed to develop the project in two phases - Phase 1 will consist of the Residence Inn, Fairfield Inn and Suites, a portion of the existing Santa Anita Inn, and surface parking, while Phase 2 will consist of the hotel condominium tower, garage parking, and surface parking. Phase 1 includes constructing a total of 145,000 square feet of hotel space in two connected buildings, the Marriot Residence Inn and the Fairfield Inn and Suites. The two hotels will contain a total of 210 rooms. The Residence Inn will have six floors LSA CMG1301 2 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY with a maximum height of approximately 80 feet. The Fairfield Inn and Suites will have four floors with a maximum height of approximately 60 feet. During Phase 1, both new hotels will be constructed, a portion of the Santa Anita Inn will be demolished, but the 4 southern-most buildings (C-F) with 63 rooms of the existing hotel will remain in operation until the start of Phase 2 construction. Phase 1 will also include surface parking with 208 spaces for both new hotels plus adequate parking for the portion of the Santa Anita Inn that will remain in service. Phase 2 includes demolition of the remaining Santa Anita Inn buildings and construction of the hotel condominium tower with 118,289 square feet and 50 total units. The hotel condominium tower will have eight floors and include 9 townhouses, 36 condos, 5 penthouses, and subterranean parking. The condominium tower will have a maximum height of 88 feet to the roof and 98 feet including the penthouse architecture. The basement parking, which will be constructed during Phase 2, will contain 22,122 square feet and 52 parking spaces. The Phase 2 surface parking will include 77 parking spaces. Table A provides a summary of the various uses proposed as part of this project. The project landscape plan is shown in Figure 5, and project elevations are shown in Figure 6. Appendix A contain7,000 ecbbic Seabiscuit Specific Grading project require approximately although there may be some need for offsite soil transport. Table A: Seabiscuit Pacifica Specific Plan Land Uses Rooms or Floor Area Building Areal Percent Hotel-Related Land Uses Spaces (square feet) (square feet) of Site Phase I (hotels) 22,745 9 Residence Inn (new) 121 93,895 12,395 5 Fairfield Inn and Suites (new) 89 48,425 11,025 4 Santa Anita Inn 63 22,050 (existing -temporary) 35,140 18 Subtotal 273 142,320 Phase II 13,524 I 5 Hotel Condominium Units 50 115,269 5 Subtotal I 50 115,269 269 13,524 Parking — — Surface Parking Phase I 208 — — • Underground Parking Phase II 52 (22,122) - Surface Parking Phase II 77 — -- — — Subtotal 337 , — New Development Total 210 142,320 35,140 14 Dual Hotel Rooms 13,524 5 Hotel Condominium Units 50 115,269 19 Total Rooms/Units 260 257,589 48,664 — Total Parking Spaces 337 — — New FAR2 -- 1.03:1 — Source:Gene Fong Associates(July 2013) 1 Building footprint 2 Floor Area Ratio=Building Area(in square feet):Site Area(249,599 square feet or 5.73 acres)per County Assessor's office records LSA CMG1301 3 `rIr° r ` it ' 1 WDL or*r_ r+'w ..620. ?b �' � rife 7.--7 't � I s Jr,jiigh.. ! r r ho t.x ow. - _r, J .17,4,- vas L Cen,�■ 1 NI jr Niotto ,fiiti i 1 SANTA AN)TA� �l' �I; € % PARK. OQ'�6p a"Gr I r ,.., Y t'r%y•n �. $GaQlnat '�� p 1`- I �� f 1111111Pli r 4 Station^'H Cl V I ,�/ ✓ /.(\�anta Anita Golf Course '1111111. AIM- . Mefhodist ti; i-, Q, C 3� arpoti l Hospllp S � t�f (__� - i 1 ArcAdia • , �fR 1 r Wx I ¢h PIP' Re_'onal Location � -1 " 1i' r" ..,_ .„.„ ______ 1 San ftil' C�� t �1` Reafd a 1 Bernardino 'r- T-: - ..__.. n= - '' v County . r �o A Wir 4P .� Io a , r.f.,-gm 1 r , ' no �cu ;so ate. " �- Rl - - 8iata � + _. 1 Pacific °� g i �' Ocean . ` w r ® °mpB€Counm Emir t..... . v.?,,,, o t o - .. . _ ....,.....,, ....�." ur,j l Miles './ .:_ ` ^ L S A FIGURE 1 4 o t,000 s,000 SeabiscuitPacificaProject mil. ,��� Specific Plan FEET SOURCE:USGS 7.5'Quads:El Monte(81),CA;Mt.Wilson(88),CA;Thomas Bros.,2009 Regional and Project Location I:\CMG1301\Reports\SpecPlan\figl_reg_loc.mxd(8/13/2013) ra.F fwrr• W.d�,Y2'i'.._. ;.t . ; N 0,, c P, ..< ;� t'' , # � �•• = r...M.w ,, { W •`iy err "4 ''' u tJ ; =-i I ' ' " � C.: G a.. . rarer a ` o • .„,��. 1 r �. Q `4v .< R.ct',i J �. ' ...d . "`..1.".v".7‘'-'a ... ; i.eft 1 4.4 vG Ll+ •^f�� • �...4.-F� 64e �.. ��pg Ul -�'.� • Rw ya 4!"�'�6 ..rt:.ay��+�y.4M, - .� �,.:'.. 1' 1'1 4, 161fk ti a -07 5'Y�w•dl F H F r 3... "" a cep r`: '.. , , !, r; . � - ., VAI #. + d t 1 444"IPI' ii i sin'�n,3 `1 � ' Ii - L ,14, w f , : Lir x s..... A v . 4' m" PHOTOGRAPH 1:View facing south,from the north side of the site,of the Santa PHOTOGRAPH 2:View facing south,from the center of the site,of the interior Anita Inn entryway. landscaping and gazebo. „,,,,,, • _ , , ,, , , r.a •74,1/4) 1 !yyJ.9�y�6^ Y • It �' _ill MI 1' -% ', 4 _ 1:"}I''.' a 'fi, . F § s.y1i rM•'' M PHOTOGRAPH 3:View facing southwestt,from Huntington Drive,of the PHOTOGRAPH 4:View acingsouthwest of the Santa Anita Park racetrack,from Colorado Place and Huntington Drive intersection with the northwest of the site on West Huntington Drive. Santa Anita Park racetrack in the background. L S A FIGURE 3 Seabiscuit Pacifica Project Specific Plan Site Photographs I:\CMG 1 301\Reports\SpecPlan\'ig3_SitePhotos.cdr(08/14/13) Skr ^.r fir. _ '' r a t 4 _ - d PHOTOGRAPH 5:View facing southeast,from the northeast corner of the site,of PHOTOGRAPH 6:View facing north,from south of the site,of city athletic fields a redwood windrow. adjacent to the project site. g.,?.--$0....*V1‘;'*4.4..;74'4.04....-V. ,;',:m0.14'',:.t■ .r:rtl'tejz rt‘V • ).- 4 .0.,4„..„4,7,1,,,,,,,,,-_-,7_ :.,,-„,„..-..--,11,4,14,..---- i_,_.., ,. 4,;::;;., .. 4.,,,,,, -0,,i ;,,,,,,„,i,v..v.,,,_6.,iz.4.:ilmt-zt,t1„.....,, . -., ,9,..,,,,tvi,,,,.. ,:,,,...„..- , ,,;71„....4,..,„.4,,,i, ,.„ tr„,..-,3,-„,,,, --44,-4, 4"44:'7.7t"ftlf:;.''41"'''':ir,k*%t:i''',,f;it,,L:',:'1:*4'.3iee',H*;''':',10 '',-1,4..'13,1*,..1;,-"` . .. ; -ffiffiy' y, ,' yY fir.. 76 `"it' .P'''" ,.. ... !l �p 7 fi - J may.' M<�. . e'- `+ fit. "..* PHOTOGRAPH 8:View acing southwest,from the southern portion of the site,of , ,.^1 the alvation Army facility. S tiwieniimm. 6.01, PHOTOGRAPH 7:View facing southwest,from the southern side of the site,of the Salvation Army facility,site landscaping and the athletic field fence. FIGURE 3 LSA Seabiscuit Pacifica Project Specific Plan Site Photographs 1.•\CMG1301\Reports\SpecPlan\fig3_SitePhotos.adr(08/14/13) , t 0 v ey ea W o a. ^' a a u 0.1 P V v 4. a° "adi = 0 O .0 a ts a A A # # /// gi . s : • - .....14 , .._ A' QrO 111 • o.4 Ike n V0 'ta,• ibex a C. :IIII; ��, ft v �,° 1a j ' f F� h �I L # 'v M l „ 08 IDi � ' # �� # silo • . A ;„:11...... • cp o 1,, # o / / fl ;1 'e O� r r� o" El' - -'A!�!. 4xux " " -I 101 (°# w / x L tt 4.,„„, lir _n " • n re 4 a. �r a 1- u #mirrvi. ...:‘,,, .: ft • ♦ ,� �, t. t 9.. Imo _ �I. n r.,...,: _:.Qt. • V vto �� ` .... en TM r . 10 Ull, o- , ,, . ,„ _. . .n a o t' N "3. u ap p O o1 C U {y en J y :. LC , o 0 4:4 y°' G. u -., u y 1 i Ak ,§I i 1 d r -m_0. - w' A', 0 'P q ,%st d o ono ,. 0,0,,mAt, ` ,,,,,,.. , me , .1.; 1 — ..4e, ,-- 1 e Z r= Rtt ,,': p 4 -► _ . .:.... .. ., . .:_,..._..., , .,... • ,P N� ., 1." .p 111 �. V, A sig\ �i • "' _'•..,. 00 D C� 4 � W. f�, am°, (1 • N c.= , , \ . U .. 'I 3 "'� �'%VUrNP► fir g r '41#0 'i® >,, off_.,O� .�i G o K u a C (zl m Cl) V N U 0 J . .r C H �7J1 W Z g.3.--,�W y U N 1 U ri i',,N- ,_4(..) c.z, -Zi.% ° C C4 1 I'll E 1 : r, , �I i i t i f _ . IV d• _.. { I f 1. _ .'l 4 e, 1 ' ., 4. ✓ 1 n L. F 1 •.5 + Y I `r i} ;,a, 4 Y M 357 [a"'. RCS -t CD C 1 y Ilf t) 5 N a U k u. < a m h c 0.4 4; LL g r w , v 5 a J o tn :. C N W O iy .1 V r=4 Ok , !!! 4. u I�/ :ff° ' fM .. r u H k. = VI ^ .....`.,ti...��...y"�.+�". -0 o tn wWKv-- .,, 111' 1 • - I ' ''41 ,$ + i .7 • w j 914 m ii' taf�R. �tt�11. i u a V C7 N J o y W .o o altfib , v CE-4.' C ,..J ., .... ,',:.' , L'''' ' ,11.7-44, 114 0 '.:,,___._.„_,.....,,i,. .1 t . 1 '.1; ; ---�,�--, •-� ,°bra • =° °„._., --" �9 r^" ° < -+.,s, k t OD i u w. C °n -8 U E. 1 . pC• u r C va ° U U J SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY The primary access point for the hotels will be at the merger of Colorado Place and West Huntington Drive. Primary access to the hotel condominiums tower will be off of West Huntington Drive. A driveway off of East Huntington Drive will serve as a secondary/emergency access point for both the hotel condominium and dual hotel. During construction of Phase 1, only buildings A and B of the existing "Santa Anita Inn" hotel will be demolished (Buildings A and B with 47 rooms), while the remaining buildings will stay in operation (63 of the 110 rooms). The remaining buildings will be demolished with Phase 2 construction. The Seabiscuit Pacifica Specific Plan No. SP 13-02 was submitted to the City to define the range of permitted uses, development regulations and design guidelines for the development of the project site. The Specific Plan document indicates it will accomplish the following objectives: • Provide high quality development consistent with the City's General Plan and in conformance with municipal standards, codes, and policies; • Provide uses that will compliment and support the Santa Anita Park race track and other important regional facilities in the City, and the current downtown revitalization community district; • Design the development to minimize the potential for environmental impacts; • Augment the City's economic base by increasing tax-generating commercial uses within the City; and • Create employment-generating opportunities for the citizens of the City and surrounding communities. 2.3 REGULATORY REQUIREMENTS, PERMITS, AND APPROVALS The project applicant has applied for or will need the following discretionary approvals from the City relative to this project: • Development Agreement; • Seabiscuit Pacifica Specific Plan No. SP 13-02; • General Plan Amendment No. GPA 14-01; • Zone Change No. ZC 14-01; • Mitigated Negative Declaration in compliance with CEQA; • Conceptual Review of the overall project site plan and visual renderings; • Certificate of Demolition; and • Review of landscape and irrigation plans. LSA CMG1301 13 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Other non-discretionary actions anticipated to be taken by the City at the Staff level as part of the proposed project include: • Approval of a Storm Water Pollution Prevention Plan (SWPPP) to mitigate site runoff during construction (i.e., over the short-term) and a Standard Urban Stormwater Management Plan (SUSMP) to mitigate for post-construction runoff flows (i.e., over the long-term during project occupancy and operation). • Building permit. The comprehensive building permit includes building permit, plumbing, mechanical, and electrical permits. • Grading permit. • Sewer connection permit. Development of the proposed Seabiscuit Pacifica project may require the following permits and/or approvals from other responsible agencies: • A National Pollutant Discharge Elimination System permit from the Regional Water Quality Control Board - Los Angeles Region to ensure that construction site drainage velocities are equal to or less than the pre-construction conditions and downstream water quality is not harmed. LSA CMG1301 14 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY SECTION 3 ENVIRONMENTAL DETERMINATION 3.1 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact"as indicated by the checklist on the following pages. ❑ Aesthetics ❑ Greenhouse Gas Emissions ❑ Population and Housing ❑ Agriculture Resources ❑ Hazards/Hazardous Materials ❑ Public Services ❑ Air Quality ❑ Hydrology/Water Quality ❑ Recreation ❑ Biological Resources ❑ Land Use and Planning ❑ Transportation/Circulation ❑ Cultural Resources ❑ Mineral Resources ❑ Utilities and Service Systems ❑ Geology and Soils ❑ Noise ❑ Mandatory Findings of Significance 3.2 DETERMINATION On the basis of this initial evaluation: I find that the Project COULD NOT have a significant effect on the environment, and a ❑ NEGATIVE DECLARATION will be prepared. I find that although the Project could have a significant effect on the environment, there will not be a significant effect In this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the Project MAY have a significant effect on the environment, and an ❑ ENVIRONMENTAL IMPACT REPORT is required. I find that the Project MAY have a "potentially significant impact" or "potentially ❑ significant unless mitigated" impact on the environment but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but It must analyze only the effects that remain to be addressed. I find that although the Project could have a significant effect on the environment, ❑ because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the Project, nothing further is requred. Iia I3 Signature Date " QfeS City of Arcadia Printed Name Agency LSA CMG1301 15 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY SECTION 4 ENVIRONMENTAL CHECKLIST AND DISCUSSION I. AESTHETICS Would the project: a) Have a substantial adverse effect on a scenic Less than Significant vista? Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ I.a) The most prominent scenic resources that can be viewed from the project area are the San Gabriel Mountains to the north. There are no other unique vistas, natural or undisturbed areas, or officially recognized scenic areas in the surrounding area. The Santa Anita Park race track is just west of the project site, but it is not considered a visual resource per se although the grandstands of the park are visual from surrounding land uses. However, the race track is a designated historic district which is discussed in Section V., Cultural Resources. The project site contains the existing Santa Anita Inn, a collection of two-story buildings with extensive mature landscaping. At present, the hotel and landscaping do not generally block views of the San Gabriel Mountains for drivers heading northbound on East and West Huntington Drives. The existing hotel buildings also do not block views of the mountains from City Hall or surrounding public facilities, but views are partially blocked by the tall redwood trees in the center of the existing hotel property, and to some degree by tall trees along the northern boundary of the City Hall athletic fields north of City Hall. There are approximately 45 redwood trees on site with about half of which are part of a windrow on the eastern boundary of the site. The proposed SPSP project would construct one six-story and two eight-story buildings on the site that would temporarily block views of the mountains for northbound travelers on either East or West Huntington Drive. At 35 miles per hour, the time of view obstruction would be approximately five seconds. The proposed project may also block views of the mountains from public facilities and residential areas south of the project site. When viewed from a vantage point of a two-story house south of the golf course and west of Arcadia High School, approximately 3 degrees or 2.2 percent of the existing viewshed (approximately 135 degrees) to the north. Therefore, only a small portion of the permanent view of the mountains from these areas would be blocked by the proposed project. A similar percentage of the viewshed from City Hall would also be blocked by the project buildings. The remainder of the residential and public views south of the project would remain unimpeded. Views of the mountains from the Civic Center Athletic Fields (north of City Hall) would be almost entirely blocked by the proposed project. However, these views are already somewhat obscured by tall trees along the north side of the athletic field property, and individuals using the athletic fields would be present for limited periods of time, so the project would only result in temporary or short-term visual impacts for this area. There is also a 12-foot tall chain link fence with fabric screening and landscaped vines covering most of LSA CMG1301 16 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY the fence along the southern boundary of the site (i.e., north boundary of the athletic fields) that will remain after the completion of the project. The Arcadia County Park is located directly east of the proposed project site and its primary viewshed is the San Gabriel Mountains to the north. The proposed project is not expected to block or eliminate these views for persons using the park or the Santa Anita Golf Course which is located directly south of the Arcadia County Park. In addition, mature trees located in the park and redwood trees located along the eastern boundary of the project site will help soften views of the new dual hotel and hotel condominiums. The height the three proposed buildings will make them visible throughout much of the City of Arcadia, however, the buildings are not expected to significantly block views of the San Gabriel Mountains for the general public. The proposed project will not substantially block any views from residential land uses. Based on this analysis, the project is not expected to result in substantial adverse effects on scenic vistas, so impacts to public views would be less than significant. b) Substantially damage scenic resources, Less than Significant including, but not limited to, trees, rock Potentially with Less than outcroppings, and historic buildings within a Significant Mitigation Significant No state scenic highway? Impact Incorporated Impact Impact ❑ ❑ ❑ IZ I.b) The project site or surrounding area do not contain any designated scenic highways. The nearest designated State scenic highway is the Angeles Crest Highway approximately 15 miles away. Based on these conditions, the project will not significantly damage scenic resources, including trees, rock outcroppings, or historic buildings within a state scenic highway. c) Substantially degrade the existing visual Less than Significant character or quality of the site and its Potentially with Less than surroundings? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ I.c) The project proposes to demolish the existing 2-story hotel buildings and construct three hotel-related buildings with heights of 60, 80, and 86 feet. During construction, persons travelling on area roads, using nearby land uses, and staying in the existing hotel while it is still open would have views of the project site in various stages of site preparation and construction. The proposed project will adhere to the City's standard screened construction fencing requirement, and due to construction and fencing being temporary the impact is considered temporary and less than significant. In addition, the current hotel will be demolished, so impacts to hotel guests'views would be temporary and less than significant. The proposed project will be taller and not to scale with existing office and hospital buildings within the immediate area. However, the zoning of the site includes a height allowance (8 stories or 95 feet) under which the proposed project would be consistent. The City allowed this special height limit for this property to provide a "landmark" project just east of the race track LSA CMG1301 17 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY that would provide a visual focal point or entry statement into the City along Colorado Boulevard. Therefore, the project is not expected to detract from the planned visual quality of the immediate neighborhood, or from any residential neighborhoods to the distance from the project site. Therefore, the proposed project will not significantly degrade the existing visual character or affect the visual quality of the site and its surroundings over the long term. d) Create a new source of substantial light or Less than glare, which would adversely affect daytime Significant Potentially with Less than or nighttime views in the area? Significant Mitigation Significant No Impact Incorporated Impact Impact ® ❑ ❑ I.d) The existing hotel buildings do not cause a substantial amount of glare at present due to the extensive landscaping present onsite. At certain times of day, glare can occur from the sun shining off of the windows of nearby office buildings and the hospital, especially in the morning and late afternoon hours. The SPSP project proposes dual hotel and hotel condominium buildings that will substantially increase the amount of night lighting such as parking lights and streets lights over the lighting levels of the existing hotel buildings. However, the project site is directly east of Santa Anita Park (i.e., horseracing track), which produces a substantially greater amount of night light during its nighttime events compared to the existing hotel or the proposed project due to its large parking lot lighting and stadium lighting. The other substantial source of night lighting in the area is the field lighting of the Civic Center Athletic Fields immediately south of the project site. The proposed project will also be required to be consistent with State Building Code (i.e., Title 24) and City Municipal Code lighting requirements. For more information on exterior lighting and its controls related to energy efficiency, see Section VII. Greenhouse Gas Emissions. Due to their height, the project buildings will be able to be seen at night from much of the City, but the renderings of the project indicate they will be aesthetically pleasing, even at night, so they are not expected to cause significant adverse impacts on nighttime views. The new hotel and condominium buildings will introduce tall buildings into the area with hundreds of glass windows which would need to have glazing or coatings to help minimize glare in the surrounding area and on nearby roadways, therefore, mitigation is required. Mitigation Measures AES-1 Prior to issuance of a building permit, the applicant shall demonstrate that all project windows are glazed or otherwise treated to minimize glare on surrounding roads and properties, to the satisfaction of the Development Services Director or designee. In summary, the proposed hotel buildings will increase ambient lighting levels and glare from the project site, and will change night time views of the area. However, these changes are not expected to result in significant adverse impacts to nighttime views in the area mainly due to visual conditions that already exist in the project area and implementation of the recommended mitigation measure. LSA CMG1301 18 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY II.AGRICULTURE RESOURCES In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state's inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest protocols adopted by the California Air Resources Board. Would the project: a) Convert Prime Farmland, Unique Farmland, Less than or Farmland of Statewide Importance Potentially with Less than No (Farmland), as shown on the maps prepared Significant Incorporate Sigmpact ficant Impact pursuant to the Farmland Mapping and Monitoring Program of the California El ❑ Resources Agency, to non-agricultural use? CI II.a) The site is almost completely covered over at present by impervious man-made surfaces. According to the Farmland Mapping and Monitoring Program (FMMP) maps, the project site is designated as "Urban Land" and is not underlain by any Prime Farmland, Unique Farmland, or Farmland of Statewide Importance, so there will be no impact in this regard. b) Conflict with existing zoning for agricultural Less than use, or a Williamson Act contract? Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ LI IZ II.b) There is no agricultural use zoning or Williamson Act contracts in the City of Arcadia. Therefore, there will be no impacts in this regard. c) Conflict with existing zoning for, or cause Less than rezoning of , forest land (as defined in Public potentially with Less than Resources Code section 12220(g)), Significant Mitigation Significant No timberland (as defined by Public Resources Impact Incorporated Impact Impact Code section 4526, or timberland zoned ❑ 1:1 ❑ Timberland Production (as defined by Government Code section 51104 (g))? II.c) The site is almost completely covered by man-made impervious surfaces (e.g., buildings and parking lots) at present. The City of Arcadia has no timberland or timberland production land, and has no property zoned for forest land. There is no farmland in the City of Arcadia, so the project will not convert farmland to non-agricultural use, and there are no impacts in this regard. LSA CMG1301 19 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY d) Result in the loss of forest land or Less than conversion of forest land to non-forest use? Significant Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ❑ II.d) As outlined in II.c above, the proposed development will not result in the loss of forest land or conversion of forest land to non-forest use. Therefore, there is no impact. e) Involve other changes in the existing Less than environment which, due to their location or Significant Potentially with Less than nature, could result in conversion of Significant Mitigation Significant No Farmland, to non-agricultural use or Impact Incorporated Impact Impact conversion of forest land to non-forest use? ❑ ❑ ❑ II.e) As outlined in II.c above, there is no farmland in the City of Arcadia. Therefore, the project would not convert farmland to non-agricultural use and there is no impact. III. AIR QUALITY Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of Less than the applicable air quality plan? Significant Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ III.a) LSA Associates, Inc. (LSA) prepared a detailed assessment of air quality impacts for the proposed project based on the project development characteristics (LSA 2013)(Appendix B) and the project traffic impact analysis (Kimley-Horn and Associates 2013)(Appendix G). The Air Quality Management Plan (AQMP) for the South Coast Air Basin (Basin) sets forth a comprehensive program that will lead the Basin into compliance with all federal and state air quality standards. Air quality in the Basin is regulated by the South Coast Air Quality Management District (SCAQMD). The AQMP control measures and related emission reduction estimates are based upon emissions projections for a future development scenario derived from land use, population, and employment characteristics defined in consultation with local governments. Accordingly, conformance with the AQMP for development projects is determined by demonstrating compliance with local land use plans and/or population projections. The proposed project involves the construction and occupancy of 257,589 square feet of dual hotel and hotel condominiums on 5.73 acres of land. The project would also involve the demolition of an existing hotel, the Santa Anita Inn, with 34,775 square feet of buildings. LSA CMG1301 20 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY As outlined in Section X, Land Use and Planning, the proposed project uses are consistent with the General Plan and zoning land use designations for the site. Since it is consistent with the General Plan, the proposed project is consistent with the Southern California Association of Governments (SCAG) Regional Comprehensive Plan (RCP) Guidelines and the SCAQMD Air Quality Management Plan (AQMP). Therefore, the proposed project is consistent with the applicable air quality plan, and there are no significant impacts in this regard. Less than b) Violate any air quality standard or contribute Significant substantially to an existing or projected air Potentially with Less than quality violation? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ® ❑ ❑ III.b) The following analysis analyzes both operatiop of the project as proposed. activities and long-term impacts caused by occupancy Impacts Grading and other construction activities would result in combustion emissions from heavy-duty construction vehicles, haul trucks, and vehicles transporting construction crews. Exhaust emissions during these construction activities will vary daily as construction activity levels change. The grading and demolition phases of construction represent the most intense construction period during which daily emissions would be at their greatest level, based on the potential amount of equipment and duration of use. The other construction phases would not result in any greater construction emissions due to less equipment being used and shorter construction duration. Construction-related impacts also include demolition of some of the Santa Anita Inn buildings in Phase 1 and the remaining buildings in Phase 2, as well as excavation for the subterranean parking in Phase 2. Currently, the Basin is designated as a nonattainment area for ozone, PM10, and PM2.5. Project construction will be required to comply with regional fugitive dust reduction practices (SCAQMD Rule 403) that assist in reducing short-term air pollutant emissions. The purpose of SCAQMD Rule 403 is to reduce the amount of particulate matter in the atmosphere resulting from man- made fugitive dust sources. Among the requirements under this rule, fugitive dust must be controlled so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source. This is achieved by requiring actions to prevent, reduce, or mitigate dust emissions. Adherence to Rule 403 is a standard requirement for any construction activity occurring within the Basin. Adherence to Rule 403 can reduce fugitive dust emissions by 50 percent or more. As depicted in Table B, construction emissions would not exceed regional thresholds, so impacts less than However, following measure is recommended to help that a rqual tyimpacts during construction, especially on the nearby Salvation Army facility, remain at less than significant levels: AIR-1 Prior to issuance of a grading permit, the general contractor for the project shall prepare and file a Dust Control Plan with the City that complies with SCQAMD Rule 403 and requires the following during excavation and construction as appropriate: LSA CMG1301 21 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY • Apply nontoxic chemical soil stabilizers according to manufacturers' specifications to all inactive construction areas (previously graded areas inactive for 10 days or more). • Water active sites at least twice daily (locations where grading is to occur will be thoroughly watered prior to earthmoving.) • Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least 2 feet of freeboard (vertical space between the top of the load and top of the trailer) in accordance with the requirements of California Vehicle Code (CVC) Section 23114. • Pave construction access roads at least 100 feet onto the site from the main road. • Control traffic speeds within the property to 15 mph or less. AIR-2 Prior to the issuance of a grading permit, the project developer shall require by contract specifications that contractors shall utilize California Air Resources Board (CARB) Tier II Certified equipment or better during the rough/mass grading phase for rubber-tired dozers and scrapers. Contract specifications shall be included in the proposed project construction documents, which shall be reviewed by the City. AIR-3 Prior to the issuance of a grading or building permit for each phase, the project developer shall require by contract specifications that contractors shall place construction equipment staging areas at least 200 feet away from sensitive receptors. Contract specifications shall be included in the project construction documents, which shall be reviewed by the City. AIR-4 Prior to the issuance of a building permit for each phase, the project developer shall require by contract specifications that contractors shall utilize power poles or clean-fuel generators for electrical construction equipment. Contract specifications shall be included in the proposed project construction documents, which shall be reviewed by the City. Long-Term Impacts Long-term air pollutant emission impacts result from stationary sources and mobile sources involving any project-related changes. The project would result in a net increase in the amount of hotel lodging or seasonal residences of 222,814 square feet (257,589 new square feet minus the 34,775 existing square feet). Thus the project would result in net increases in both stationary and mobile source emissions. The stationary source emissions would come from the use of consumer products, landscape equipment, general energy, and solid waste, while trip generation factors were taken from the ITE Trip Generation Manual, Eight Edition and the traffic impact analysis prepared by for the proposed project by Kimley-Horn and Associates (Appendix G). The long-term operational emissions associated with the proposed project, calculated using the CalEEMod 2011.1.1 model are shown in Table C. The air quality study shows that the increase of all criteria pollutants as a result of the proposed project would be less than the applicable SCAQMD daily emission thresholds. Therefore, project-related long-term air quality impacts would be less than significant, and no mitigation is required. LSA CMG1301 22 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Table B: Short-Term Construction Impacts Total Regional Pollutant Emissions(pounds per day) Construction Fugitive Exhaust Fugitive Exhaust Activity/Phase ROG NOx CO SO2 PMlo PM10 PM2.5 PM2.5 Demolition 5.9 56 42 0.054 5.8 2.6 1.3 2.5 Site Preparation 5.8 58 44 0.042 7.2 3.1 3.9 2.9 Grading 4.3 41 28 0.032 2.7 2.4 1.4 2.2 Building Construction 11 41 45 0.07 2.6 2.4 0.7 • Architectural Coating 39 3.1 5.2 0.0086 0.44 0.25 0.12 0.25 Paving 2.9 2.8 4.9 0.0086 0.44 0.23 0.12 0.22 Peak Daily 10 6.8 Emissions 50 58 50 0.079 SCAQMD 75 100 550 150 150 55 Thresholds Significant No No No No No No Emissions? Source: Table I, LSA August 2013 CO = carbon monoxide CO2 = carbon dioxide CO2, = carbon dioxide equivalent lbs/day= pounds per day NO,= nitrogen oxides Table C: Long-Term Operational Emissions Pollutant Emissions(pounds per day) Source ROC NOx CO SOX PMio PM2.5 Existing Hotel 12 8.0 29 0.076 4.7 1.4 Proposed Project Area Sources 25 0.38 29 0.04 3.8 3.8 Energy Sources 0.13 1.2 0.9 0.007 0.089 0.089 Mobile Sources 21 18 71 0.18 12 3.4 .3 Total Proposed Project 46 20 100 0.23 16 Increase from Project 34 12 71 0.154 11 5.9 SCAQMD Thresholds 55 55 550 150 150 55 Si.nificant? No No No No No No Source:Table K,LSA August 2013 CO = carbon monoxide lbs/day = pounds per day NO), = nitrogen oxides PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size ROC= reactive organic compound SCAQMD = South Coast Air Quality Management District SO,= sulfur oxides LSA CMG1301 23 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY c) Result in a cumulatively considerable net Less than increase of any criteria pollutant for which the Significant Potentially with Less than project region is non-attainment under an Significant Mitigation Significant No applicable federal or state ambient air quality Impact Incorporated Impact Impact standard (including releasing emissions which exceed quantitative thresholds for ozone ❑ ❑ ® ❑ precursors)? III.c) The majority of the project-related operational emissions would be due to vehicle trips to and from the new project buildings. The previous Tables B and C indicate that all emissions of criteria pollutants from the proposed project would be under the applicable SCAQMD thresholds, therefore, no significant impacts would occur and no mitigation is required. d) Expose sensitive receptors to substantial Less than pollutant concentrations? Significant Potentially With Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ III.d) Localized Significance Thresholds (LSTs) represent the maximum emissions from a project that would not result in an exceedance of the national or state ambient air quality standards. LSTs are based on the ambient concentrations of that pollutant within the project source receptor area (SRA) and the distance to the nearest sensitive receptor. For this project, the appropriate SRA is the East San Gabriel Valley according to the project air quality analysis (LSA August 2013) included in Appendix B of this report. Short-Term LST Impacts As previously described, it is expected that construction would occur in two phases, so no more than 5 acres of the site would be actively worked on during any given day. Other than the one Salvation Army facility at the southwest corner of the site, the closest sensitive receptors to the site are residences located 1,000 feet north of the project site across Colorado Place. Table D shows that emissions would not exceed LST thresholds and thus would not require mitigation. Short-term emissions from the proposed project will cease once construction of the project is completed, and implementation of Mitigation Measures AIR-1 through AIR-4 will help assure that short-term emissions on nearby sensitive receptors will remain at less than significant levels. Long-Term LST Analysis Table L of the Air Quality Analysis shows the calculated emissions for the proposed operational activities compared with the appropriate LSTs, which only includes on-site sources; however, the CalEEMod 2011.1.1 model outputs do not separate on-site and off-site emissions for mobile sources. For a worst-case scenario assessment, the emissions shown in Table L include all on- site project-related stationary sources and 5 percent of the project-related new mobile sources, which is an estimate of the amount of project-related new vehicle traffic that will occur on site. Considering the total trip length included in the CalEEMod 2011.1.1 model, the 5 percent LSA CMG1301 24 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY assumption is conservative. Table E shows that the operational emission ees would opt atonal the LST thresholds for the closest sensitive receptors. Therefore, the activity would not result in a localized significant air quality impact and no mitigation is required. Table D: Construction LST Impacts(pounds per day) NOx Emissions Sources CO Ni lo PM2.5 10 2 6 8 On-site Emissions 58 LST Thresholds'. 203 1 733 148 3 6N3 Si.nificant Emissions? No No No Source: Table 3, LSA August 2013. 1 LST Assumptions: SRA = East San Gabriel Valley, site disturbance = 5 acres, 80-foot distance for workers and 1,000-foot distance for residents CO = carbon monoxide NOx = nitrogen oxides lbs/day = pounds per day PM2.5 = particulate matter less than 2.5 microns in size LST = local significance threshold PM10 = particulate matter less than 10 microns in size Table E: Long-Term Operational LST numbers(pounds per day) Emissions sources NO, CO PM , PM2 33 4 q 4.0 Onsite emissions 1.3 16 203 1 733 36 LST Thresholds'. No No No Si nificant Emissions? No Source:Table L, LSA August 2013. 1 LST Assumptions: SRA = East San Gabriel Valley, 80-foot distance for workers and 1,000-foot distance for residents, onsite traffic= 5 percent of total CO = carbon monoxide PM2.5 = particulate matter less than 2.5 microns in size lbs/day = pounds per day PM10 = particulate matter less than 10 microns in size NOx = nitrogen oxides Less than g Sinificant e) Create objectionable odors affectin g a Less than substantial number of people? Significant Mitigation With ation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ III.e) Project construction will generate limited rs the short-term, mainly r� gasoline- and diesel-powered construction equipment. These would be temporary and not likely to be noticeable beyond the project limits. MD Rule 18113 buildings oultdlines or tandards installation I paint asphalt surfaces may also create odors. Q application of asphalt. applications, while Rule 1108 identifies standards regardin g the app Adherence to the standards identified in these SCAQMD Rules would reduce temporary odor impacts to a less than significant level, and no mitigation is required. LSA CMG1301 25 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Land uses generally associated with long-term objectionable odors include agricultural uses, wastewater treatment plants, food processing plants, chemical plants, composting operations, refineries, landfills, dairies, and fiberglass molding facilities. The proposed project does not include uses that would generate long-term objectionable odors. Because the project would not involve any substantial short-term or long-term sources of odors, impacts are considered less than significant and no mitigation is required. IV. BIOLOGICAL RESOURCES Would the project: a) Have a substantial adverse effect, either Less than directly or through habitat modifications, on Significant any species identified as a candidate, Significant y wati Less tion Sni than itig sensitive, or special status species in local or Impact n Incorporated Impact t Impact No regional plans, policies, or regulations, or by the California Department of Fish and Game ❑ or U.S. Fish and Wildlife Service? El ❑ IV.a) The proposed project site is located on an urban infill site that contains no native vegetation and supports limited wildlife species, mainly those that are tolerant of regular human activity including ground squirrels, rodents, and song birds such as meadowlarks, finches, chickadees, and mockingbirds. The existing hotel landscaping on the project site includes rose gardens, man-made waterfalls, ornamental bushes and trees, and a windrow of mainly redwood trees adjacent to Huntington East Drive and the Arcadia County Park on the east side of the project site. The project developer is planning on preserving the windrow of redwood trees on the project site. There are approximately 100 other trees on the rest of project site, mainly ornamental varieties, including sycamore, palm, and weeping willow. These trees are mature and may provide roosting but likely not nesting opportunities for raptors and other birds due to the constant level of human disturbance. Migratory and raptorial birds are covered by the Migratory Bird Treaty Act, and may be impacted by project construction if birds or nests are present during grading or tree removal. In addition, redwood trees are not listed or otherwise protected species, but they do constitute a relatively unique biological resource in this area and as such should be preserved if possible. It should be noted that, during Phase 1 construction, the southern portion of the existing Santa Anita Inn and its associated mature landscaping, will remain in place until the start of Phase 2 construction. In addition, the City's development guidelines for commercial uses encourage the preservation of mature trees. Potential impacts to the existing trees and nesting birds are considered potentially significant and require mitigation. Mitigation Measures BIO-1 Prior to issuance of a grading permit for each phase, the developer shall provide an assessment of existing trees on the areas to be developed. This tree assessment shall be prepared by a qualified landscape architect and identify any existing large bushes or trees that can be relocated or preserved as part of the new development project. The project landscaping plans shall attempt to preserve existing mature trees onsite to the extent feasible, based on the tree " 16 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY assessment. This measure shall be implemented to the satisfaction of the City Planning Division. isting redwood trees along the BIO-2 During project construction in either phase, the ex east side of the property shall be protected by being taped or roped off with come in appropriate signage so construction equipment willtrnot hcid n sprayed with contact with and damage or destroy any water at the end of each day when substantial amounts of dust are generated ( g e. ., during grading or demolition) to minim izetdamage from the u t epositio . This measure shall be imp lemented to Division. season _3 Construction in either phase should not occur during the local al nesting season BIO-3 1 to July 15). any(estimated February a qualified biologist prior to season, a nesting bird survey shall be conducted by q a frees biologist the existing the issuance of a grading permit or removal of any large present, x tang of 1 property.sh If the biologist marked ff determines that around the nest and9nobirds construction activity can of 100 feet shall be mark and/or construction may occur in that area during nestuagified i biol Grading ogist has determined the nest is no resume in this area when a q longer occupied and all juveniles have ledge Div s iis , measure shall e implemented to the satisfaction of the City With implementation of Mitigation Measures BIO-1 through BIO-3, no significant impacts on biological resources are expected to occur from project implementation. b) Have a substantial adverse effect on any Less than Significant Less than Potentially with No Significant Mitigation Les than riparian habitat or other sensitive natural Impact Impact community identified in local or regional Significant Incorporated plans, policies, regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? 0 ❑ IE IV.b) The project site does not contain � developed aman madetimprovements sensktve natural communities. The site is completely p ed w landscaping, and does not contain any natural drainages tre or riparian vegetation. Therefore, there are no impacts in this regard, and nomitigation i c) Have a substantial adverse effect on Less than Significant federally protected wetlands as defined by Potentially ni Less than Section 404 of the Clean Water Act Significant Mitigation Significant No (including, but not limited to, marsh, vernal Impact Incorporated Impact Impact pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? IV.c) The project site and immediate surroundlllg area are ��m I made improvements and d0 not cunt?�f ..y Il �ur�i p eel yV d Ana @s g i fed �p� LSA CMG1301 d ally 1 ptiotifeC I _ 27 �d /� Ik -,, SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY any biological resources that would be under the jurisdiction of federal or state resource agencies. Therefore, there are no impacts in this regard, and no mitigation is required. d) Interfere substantially with the movement of Less than any native resident or migratory fish or Significant Potentially with Less than wildlife species or with established native Significant Mitigation Significant No resident or migratory wildlife corridors, or Impact Incorporated Impact Impact impede the use of native wildlife nursery sites? ❑ ❑ ❑ IV.d) There are no known native resident or migratory fish or wildlife species within the City of Arcadia. The site also does not contain any vegetation other than a few landscaped ornamental trees, which provide minimal biological resource value. The site does not contain any drainage features that would support fish or other wildlife, nor does it contain any resources that would assist any species that are migrating or native wildlife raising their young. Mitigation Measures BIO-1 through BIO-3 address impacts to the onsite trees and nesting birds (under the Migratory Bird Treaty Act) if present. With implementation of these measures, there will be no significant impacts in this regard, and no additional mitigation is required. e) Conflict with any local policies or ordinances Less than protecting biological resources, such as a Significant With h Less than tree preservation policy or ordinance? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ❑ IV.e) The City of Arcadia does have an Oak Tree Preservation ordinance. However, there are no oak trees on the proposed project site, so the SPSP project will not conflict with this or any other local policies or ordinances protecting biological resources. Since there are no impacts, no mitigation is required. See Mitigation Measure BIO-2 regarding preservation of onsite redwood trees. f) Conflict with the provisions of an adopted Less than Habitat Conservation Plan, Natural Significant Potentially with Less than Community Conservation Plan, or other Significant Mitigation Significant No approved local, regional, or state habitat Impact Incorporated Impact Impact conservation plan? ❑ ❑ ❑ IV.f) The project site is not covered by any adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other local, regional, or state habitat conservation plan. Therefore, there will be no impacts in this regard, and no mitigation is required. LSA CMG1301 28 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY V. CULTURAL RESOURCES Would the project: Less than a) Cause a substantial adverse change in the Significant significance of a historical resource as defined Potentially with Less than in §15064.5? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ❑ V.a) The Santa Anita Inn, an existing 2-story hotel with 110 guest rooms, is located on the project site. The hotel was built in 1955, and the State Office of Historic Preservation recommends all structures over 50 years of age be surveyed for historical significance prior to demolition. In August 2013, ISA Associates, Inc. conducted a cultural assessment for historical resources of the hotel and the results are incorporated into this section (Appendix C). The Santa Anita Inn helped support Santa Anita Park by providing lodging for race track visitors as well as other City guests over the years. The City of Arcadia incorporated in 1903, and Santa Anita Park was built in its present location in 1934. The racetrack played and continues to play an important role in the City of Arcadia's economy, which is based on entertainment, sporting, hospitality, and gambling opportunities. Other local historical resources in the immediate area include the Methodist Hospital of Southern California built in 1957 a quarter mile south of the project site, and the Los Angeles County Arboretum and Botanic Garden a mile west of the site that opened to the public in 19482. The Santa Anita Inn was built in 1955 almost 50 years after the creation of the Santa Anita Park. The Inn was originally built to house Santa Anita Park workers, jockeys, and visiting guests to the race track. In 1985, the hotel went through a major renovation and all interior spaces were reconstructed or upgraded so that little if any of the original interior treatments or furnishings remain. The building exteriors were also renovated at that time, but the overall appearance and color scheme of the hotel were maintained. In addition, the hotel grounds contain extensive mature landscaping which provides a very pleasant ambiance to the facility. The historical assessment determined that the existing Santa Anita Inn property does not meet the requirements of listing for either the State or National Register of Historic Places. In addition, the City of Arcadia does not maintain a list of locally designated historical resources. Nevertheless, the Santa Anita Inn does represent a connection to the City's past, and its character and contributions to the City's history have been adequately documented in the 2 http://www.santaanita.com/the-park/history http://www.ci.arcadia.ca.us/home/index.asp?page=1102 http://www.methodisthospital.ora/ABOUTUS/Pages/Historv.aspx http://www.arboretum.org/index.php/explore/our_history/ LSA CMG1301 29 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY California Department of Parks and Recreation (DPR) 523A and 523B forms filled out as part of the LSA historical assessment (see Appendix C). This documentation needs to be filed with the City to assure there will be no significant impacts to local historical resources (see Mitigation Measure CUL-1). The proposed dual hotels and hotel condominiums will continue to supply seasonal housing for Santa Anita Park management, workers, jockeys, and guests, as well as other visitors to the City. This is an increasingly important role in the local economy since Hollywood Park has publicly announced its plan to close. Due to the closure of Hollywood Park, the Santa Anita Park race season will likely increase from five to seven months long. In addition, the proposed project would also be consistent with the City's General Plan and appears to be consistent with its recently adopted downtown revitalization plan. Mitigation Measures CUL-1 Prior to demolition of any existing hotel buildings on the site, the completed DPR 523A forms and a cover memorandum shall be submitted to the City for filing to officially document the historical assessment for the Santa Anita Inn. This measure shall be implemented to the satisfaction of the City Planning Division. CUL-2 Prior to issuance of an occupancy permit for Phase 1, the applicant shall install a monument plaque indicating the location of the former Santa Anita Inn and its importance in the history of the City of Arcadia. The size, construction, and location of this plaque shall be up to the discretion of the City Manager, in consultation with the Planning Division. CUL-3 If cultural artifacts are discovered during project grading, work shall be halted in that area until a qualified historian or archaeologist can be retained by the developer to assess the significance of the find. The project cultural monitor shall observe the remaining earthmoving activities at the project site consistent with Public Resources Code Section 21083.2(b), (c), and (d). The monitor shall be equipped to record and salvage cultural resources that may be unearthed during grading activities. The monitor shall be empowered to temporarily halt or divert grading equipment to allow recording and removal of the unearthed resources. If any resources of a prehistoric or Native American origin are discovered, the appropriate Native American tribal representative will be contacted and invited to observe the monitoring program for the duration of the grading phase at tribal expense. Any Native American resources shall be evaluated in accordance with the CEQA Guidelines and either reburied at the project site or curated at an accredited facility approved by the City of Arcadia. Once grading activities have ceased or the cultural monitor determines that monitoring is no longer necessary, such activities shall be discontinued. This measure shall be implemented to the satisfaction of the City Planning Division. Implementation of these measures will assure there will be no significant impacts to any existing or undiscovered historical or archaeological resources. LSA CMG1301 30 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Less than b) Cause a substantial adverse change in the Significant significance of an archaeological resource Potentially with Less than Mitigation Significant No pursuant to §15064.5? Impact Incorporated Impact Impact ❑ ® ❑ LI IV.b) The project site has been completely disturbed by previous development and human activity. Development of the proposed project is not expected to cause any sghif cat iimpacts to archaeological resources on the site. However, it is still possible, archaeological resources may be found during excavation aimpacts the t project site. c pat dplarchaeollogical Mitigation Measure CUL-3 will help assure will be reduced to less than significant levels. Less than c) Directly or indirectly destroy a unique Significant paleontological resource or site or unique Potentially with Less than Mitigation Significant No geologic feature? Impact Incorporated Impact Impact ❑ ® ❑ ❑ with IV.c) The project site has been extensively The project the eotechnical report (Geo Inc.covered 01 ) man-made structures and improvements. p ] uv indicates that the entire area is underlain by hundreds e will be slturbededuriagpproject materials, so it is unlikely that fossil-bearing g g eolo 9 strata grading. However, it is possible, though not likely, that megafaunal (ancient large mammal) or related paleontological resources may be found d nduex excavations elsewhere i�] the site, since Basin. To resources have been occasionally found during prevent impacts to unanticipated paleontological resources, mitigation is required. Mitigatio n Measures CUL-4 If paleontological resources (fossils) are discovered during project grading, work will be halted in that area until a qualified paleontologist can be retained to assess the significance of the find. The project paleontologist shall monitor remaining earthmoving activities at the project site and shall be equipped to record and salvage fossil resources that may be unearthed during grading activities. The paleontologist shall be empowered to temporarily halt or divert grading equipment to allow recording and removal of the unearthed resources. Any fossils found shall be evaluated in accordance with t e the Gtyi clines and Guidelines offered for curation at an accredited facility approved Once grading activities have ceased or the paleontologist determines that monitoring is no longer necessary, monitoring activities shall be discontinued. This measure may be combined with CUL-3 at the discretion of the City Planning Division. Implementation of this measure will unique! assure there featlulres from project const potion to or unexpected paleontological resources geological LSA CMG1301 31 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY d) Disturb any human remains, including those Less than Significant interred outside of formal cemeteries? Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact El IV.d) The proposed project site does not contain any known human remains. However, there is always a small possibility that ground-disturbing activities during construction may uncover previously unknown buried human remains. Therefore, the following mitigation is recommended: Mitigation Measures CUL-5 In the event of an accidental discovery or recognition of any human remains, California State Health and Safety Code § 7050.5 dictates that no further disturbance shall occur until the County Coroner has made the necessary findings as to origin and disposition pursuant to CEQA regulations and PRC § 5097.98. If human remains are found, the LA County Coroner's office shall be contacted to determine if the remains are recent or of Native American significance. Prior to issuance of a grading permit, the developer shall include a note to this effect on the grading plans for the project. Implementation of this measure will help assure there will be no significant impacts if human remains are found during project grading. VI. GEOLOGY AND SOILS Would the project: • a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as Less than Significant delineated on the most recent Alquist- Potentially with Less than Priolo Earthquake Fault Zoning Map Significant Mitigation Significant No issued by the State Geologist for the Impact Incorporated Impact Impact area or based on other substantial evidence of a known fault? Refer to ❑ ❑ ® ❑ Division of Mines and Geology Special Publication 42. LSA CMG1301 32 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY ii) Strong seismic groundshaking? Less than Significant Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ Le s ththan th Less iii) Seismic-related ground failure, including Significant liquefaction? Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ❑ iv) Landslides? Less than Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ El VI.a.i-iv) The Raymond Hill Fault Zone and the Sierra Madre Fault Zone are the only faults located in the City of Arcadia. The project study area is underlined by extremely thick alluvial deposits that are subject to differential settlement during any intense shaking associated with seismic events, which can be expected for any location in Southern California. This can result in damage to property when an area settles to different degrees over a relatively short distance. Almost the entire region is subject to this hazard, but building design standards do significantly reduce the potential for harm. The proposed project site is not located within the boundaries of an Earthquake Fault Zone for fault rupture hazard as defined by the Alquist-Priolo Earthquake Fault Zoning Act of 1972 (CGS 2OO5)(Appendix D), there are no known active or potentially active faults that traverse the project site, and the site is not located in an area with steep or unstable slopes (City General Plan 1995). In addition, local groundwater is found at depths well in excess of 50 feet, so the potential for liquefaction is considered low. As part of its development review process, the City will require the project to be built to withstand expected seismic groundshaking, as well as local soil conditions as outlined in the project geotechnical study (CGS 2005). Therefore, the project site is not expected to be subject to any significant impacts regarding fault zones, strong seismic groundshaking, ground failure, liquefaction, or landslides, and no mitigation is required. Le s ththan th Less b) Result in substantial soil erosion or the loss of Significant topsoil? Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ® ❑ ❑ VI.b) The proposed project site gently slopes to the south at a gradient of 2.4 percent with elevations ranging from 473 feet above mean sea level (amsl) at the north corner sloping down to 466 feet amsl at the south corner. The site is currently covered over by buildings and mainly impervious surfaces and does not exhibit signs of erosion. Excavation and grading for the proposed project would temporarily expose some onsite soils to erosion from wind or water. LSA CMG1301 33 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY However, the City will apply its standard erosion control measures as conditions of approval, so these potential impacts would be less than significant. Development of the site would involve more than one acre, therefore, the proposed project is required to obtain a National Pollutant Discharge Elimination System (NPDES) permit. A Storm Water Pollution Prevention Plan (SWPPP) would also be required to address erosion and discharge impacts associated with grading of the site for development of the proposed project. The majority of the soils present on the site have at least a slight erosion hazard potential, so the proposed project is required to adhere to the City's grading requirements, obtain an NPDES permit, prepare a Standard Urban Stormwater Management Plan (SUSMP), and prepare an SWPPP. These actions are outlined in Mitigation Measures HYD-1 through HYD-3 in Section IX, Hydrology and Water Quality. Compliance with these measures will reduce potential impacts associated with soil erosion hazards to less than significant levels. c) Be located on a geologic unit or soil that is Less than unstable, or that would become unstable as a Significant Potentially with Less than result of the project, and potentially result in Significant Mitigation Significant No on-site or off-site landslide, lateral spreading, Impact Incorporated Impact Impact subsidence, liquefaction or collapse? VI.c) Subsidence is the sudden sinking or gradual downward settling of the earth's surface with little or no horizontal movement. Subsidence is caused by a variety of activities, which includes, but is not limited to, withdrawal of groundwater, pumping of oil and gas from underground, the collapse of underground mines, liquefaction, and hydrocompaction. However, the City of Arcadia is located on an alluvial plain that is relatively flat and expected to be stable. The project site is also a flat site and will not be subject to either onsite or offsite landslide hazards (CGS 2005). There will be no significant impacts in this regard, and no mitigation is required. d) Be located on expansive soil, as defined in Less than Table 18-1-B of the Uniform Building Code Significant Potentially with Less than (1994), creating substantial risks to life or Significant Mitigation Significant No property? Impact Incorporated Impact Impact ❑ ❑ ® ❑ VI.d) Expansive soils generally have a substantial amount of clay particles, which can give up water (shrink) or absorb water (swell). The change in the volume exerts stress on buildings and other loads placed on these soils. The extent or range of the shrink/swell is influenced by the amount and kind of clay present in the soil. The occurrence of these soils is often associated with geologic units having marginal stability. Expansive soils can be widely dispersed and they can occur in hillside areas as well as low-lying alluvial basins. The proposed project site and surrounding area are underlain by deep well-drained alluvial soils that have low to moderate expansion potential. With implementation of the building recommendations in the project geotechnical study (Appendix D), the project will have no substantial risks to life or property related to expansive soils, Impacts in this regard will be less than significant, and no mitigation is required. LSA CMG1301 34 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Less than e) Have soils incapable of adequately supporting Significant the use of septic tanks or alternative Potentially with Less than wastewater disposal systems where sewers Significant Mitigation Significant No are not available for the disposal of waste Impact Incorporated Impact Impact water? ❑ ❑ ❑ VI.e) The proposed project would be connected to the existing sewer system, so no septic or alternative wastewater disposal systems are needed. Therefore, there will be no significant impacts in this regard. VII. GREENHOUSE GAS EMISSIONS Would the project: Less than a) Generate gas emissions, either directly or Significant indirectly, that may have a significant impact potentially with Less than on the environment? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ® ❑ ❑ VII.a) LSA Associates, Inc. (LSA) prepared a detailed assessment of air quality impacts including greenhouse gas emission impacts for the proposed project based on the project development characteristics (LSA 2013)(Appendix B) and the project traffic impact analysis (Kimley-Horn and Associates 2013)(Appendix G). During the construction of the project, expected equipment and vehicles will generate greenhouse gases in small amounts. There currently are no identified thresholds for greenhouse gas emissions. This section provides an analysis of greenhouse gas (GHG) emissions associated with the proposed project. This analysis examines the short-term construction and long-term operational impacts of the proposed project as it relates to greenhouse gases. A detailed assessment of project-related GHG emissions is included in the project's air quality study (Appendix B). Project-related emissions of GHGs have been modeled by including direct emissions from project vehicular traffic. Indirect emissions from electric power plants generating electricity, energy used to provide water, and the processing of solid waste were accounted for taking into account the nature of the project. The project would utilize quantifiable amounts of electricity, natural gas, water and generate haysolid e been estimated u�g parame and ters fromboNhGthe State n of The emissions of GHG resulting California and the federal government. Calculation of Greenhouse Gas Emissions The project's GHG emissions during construction and mobile sources during project operation were estimated by using the CaIEEMod 2011.1.1 computer model developed and maintained by LSA CMG1301 35 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY the South Coast Air Quality Management District (SCAQMD). The project's GHG emissions from on-site equipment were estimated using the emission factors found on the SCAQMD website. The CalEEMod 2011.1.1 program estimates that the project would generate 644 pounds per day or a total of 885 metric tons of CO2e GHGs during construction, as shown in Table F below. By comparison, the proposed project's long-term total unmitigated carbon dioxide equivalents for carbon dioxide, methane, and nitrous oxide would be 3,700 metric tons of CO2e per year or 0.0037 MMTCO2e/year, as shown in Table G below. The carbon dioxide, methane, and nitrous oxide emissions that would be associated with the proposed project is less than 0.0000075 percent of California's total emissions for carbon dioxide, methane, and nitrous oxide (469.95 Tg CO2e). According to the Air Quality Analysis, GHG emissions of 3,700 tpy of CO2e from the proposed project expansion would be lower than the SCAQMD interim tiered GHG emissions threshold for commercial projects of 1,400 tpy of CO2e, and would be below the 25,000 MT of CO2e/yr of residual emissions. Table F: Short-Term Construction GHG Emissions Total Regional Pollutant Emissions (metric tons per year) • Construction Phase CO2 CH4 N20 CO2e Demolition 51 0.010 0 51 Site Preparation 20 0.0056 0 20 Grading 30 0.0086 0 31 _Building Construction 642 0.082 0 644 Architectural Coating 46 0.0042 0 46 Paving 23 0.0064 0 23 Source: Table M, LSA August 2013 CH4 = methane CO2e = carbon dioxide equivalent CO2 = carbon dioxide N20 = nitrous oxide Table G: Long-Term Operational Project GHG Emissions Pollutant Emissions(metric tons per year) Bio- NBio- 1 Total Source CO2 CO2 CO2 CH4 N20 CO2e Construction emissions 0 29 29 0.0042 0 29 amortized over 30 years Operational emissions _ Area 5.3 11 16 0.017 0.00036 17 Energy 0 1,200 1,200 0.028 0.0091 1,200 Mobile 0 2,300 2,300 0.092 0 2,300 Waste 28 0 28 1.7 0 63 Water 2.7 79 82 0.28 0.007 90 Total Project Emissions 36 3,600 3,700 2.1 0,016 3,700 • Source: Table N, LSA August 2013 Note: Numbers in table may not add up correctly due to rounding of all numbers to two significant digits. Bio-CO2 = biologically generated CO2 CO2e = carbon dioxide equivalent CH4 = methane N20 = nitrous oxide CO2 = carbon dioxide NBio-0O2 = Non-biologically generated CO2 LSA CMG1301 36 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY The project air quality study concluded that the proposed SPSP project would be consistent with currently accepted state GHG strategies if it implemented the following mitigation: Mitigation Measures GHG-1 To ensure reductions below the expected "Business As Usual" (BAU) scenario, the project will implement a variety of measures that will reduce its greenhouse gas (GHG) emissions. To the extent feasible, and to the satisfaction of the City of Arcadia (City), the following measures will be incorporated into the design and construction of the SPSP project prior to the issuance of building permits: Construction and Building Materials Recycle/reuse at least 50 percent of the demolished and/or grubbed construction materials (including, but not limited to, soil, vegetation, concrete, lumber, metal, and cardboard). Use "Green Building Materials," such as those materials that are resource- efficient and are recycled and manufactured in an environmentally friendly way, for at least 10 percent of the project. Energy Efficiency Measures Design all project buildings to exceed the 2013 California Building Code's (CBC) Title 24 energy standard by 10 percent, including, but not limited to, any combination of the following: Design buildings to accommodate future solar installations. Limit air leakage through the structure or within the heating and cooling distribution system to minimize energy consumption. Incorporate ENERGY STAR or better rated windows, space heating and cooling equipment, light fixtures, appliances, or other applicable electrical equipment. Install efficient lighting and lighting control systems. Use daylight as an integral part of the lighting systems in buildings. Install light-colored roofs and pavement materials where possible. Install energy-efficient heating and cooling systems, appliances and equipment, and control systems. Install solar lights or light-emitting diodes (LEDs) for outdoor lighting or outdoor lighting that meets the 2013 California Building and Energy Code. Water Conservation and Efficiency Measures Devise a comprehensive water conservation strategy appropriate for the project and its location consistent with the City's Water Efficiency Landscape Ordinance (WELD). The strategy may include the following, plus other innovative measures that may be appropriate: Create water-efficient landscapes within the development. Install water-efficient irrigation systems and devices, such as soil moisture-based irrigation controls. LSA CMG1301 37 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Design buildings to be water-efficient. Install water-efficient fixtures and appliances, including low-flow faucets, dual-flush toilets, and waterless urinals. Restrict watering methods (e.g., prohibit systems that apply water to nonvegetated surfaces) and control runoff. Solid Waste Measures To facilitate and encourage recycling to reduce landfill-associated emissions, among others, the project will provide trash enclosures that include additional enclosed area(s) for collection of recyclable materials. The recycling collection area(s) will be located within, near, or adjacent to each trash and rubbish disposal area. The recycling collection area will be a minimum of 50 percent of the area provided for the trash/rubbish enclosure(s) or as approved by the waste management department of the City of Arcadia. Provide employee education on waste reduction and available recycling services. Transportation Measures To facilitate and encourage non-motorized transportation, bicycle racks shall be provided in convenient locations to facilitate bicycle access to the project area. The bicycle racks shall be shown on project landscaping and improvement plans submitted for Planning Department approval and shall be installed in accordance with those plans. Provide pedestrian walkways and connectivity throughout the project. Fund or participate in some type of shuttle service for hotel guests to access the City's downtown Gold Line Station. With implementation of Mitigation Measure GHG-1 and application of regulatory requirements, the project would have GHG emissions below those expected for a BAU project and would not conflict with or impede implementation of reduction goals identified in AB 32, the Governor's Executive Order S-3-05, and other strategies to help reduce GHGs to the level proposed by the Governor. Therefore, the project's contribution to cumulative GHG emissions would be less than significant. b) Conflict with an applicable plan, policy or Less than Significant regulation adopted for the purpose of Potentially with Less than reducing the emissions of greenhouse gases? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ VII.b) The City of Arcadia has adopted policies under the City's General Plan to reduce greenhouse gas emissions in compliance with SB 375 and AB 32, to reduce greenhouse gas emissions to 1990 levels by 2020, and 80 percent below 1990 levels by 2050. The City's website also discusses an Energy Efficiency Plan that was not available at the time of this report. The SPSP project will be required to comply with these local GHG emission control measures as well. LSA CMG1301 38 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY With implementation of Mitigation Measure GHG-1, the proposed SPSP will less than significant project and cumulative impacts related to GHGs and global climate change. VIII. HAZARDS AND HAZARDOUS MATERIALS Would the project: a) Create a significant hazard to the public or Less than the environment through the routine Significant g Potentially with Less than transport, use, or disposal of hazardous Significant Mitigation Significant No materials? Impact Incorporated Impact Impact ❑ ❑ ❑ VIII.a) The site currently contains an existing hotel, and Phase 1 Environmental Site Assessment prepared for the project site (RJL Associates March 20103) indicates that the site does not contain any hazardous materials or facilities. In addition, there are only a few sites in the surrounding area that store or handle hazardous materials, and none of them would have any effect or impact on the project site or the proposed SPSP project (RJL 2003)(Appendix E). The project proposes to develop two new hotels and hotel condominiums that are not expected to use or generate substantial or significant amounts of hazardous materials. There would be an incremental impact in this regard from these expanded lodging-related uses, but compliance with existing federal, state, and local laws/regulations regarding hazardous materials should help ensure that these impacts are less than significant, and no mitigation is required. b) Create a significant hazard to the public or Less than the environment through reasonably Significant g y Potentially with Less than foreseeable upset and accident conditions Significant Mitigation Significant No involving the release of hazardous materials Impact Incorporated Impact Impact into the environment? VIII.b) The proposed project site is located in Los Angeles County, which is not among the counties that are found to have serpentine and ultramafic rock in their soils. Therefore, the potential risk for naturally occurring asbestos is small. However, due to the age of the existing Santa Anita Inn, it is very likely that asbestos-containing materials (ACMs) and/or lead-based paint (LBP) are present on the project site at this time. Prior to demolition, these materials will need to be removed by licensed personnel, as outlined in the following mitigation: Mitigation Measures HAZ-1 Prior to demolition of any existing hotel buildings or associated structures, a qualified contractor shall be retained to survey structures proposed for demolition to determine if asbestos-containing materials (ACMs) and/or lead- based paint (LBP) are present. If ACMs and/or LBP are present, prior to commencement of general demolition, these materials shall be removed and transported to an appropriate landfill by a licensed contractor. This measure shall be implemented to the satisfaction of the City Building Division including written LSA CMG1301 39 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY documentation of the disposal of any ACMs or LBP in conformance with all applicable regulations. With implementation of Mitigation Measure HAZ-1, the proposed project will not create a significant hazard to the public or the environment. c) Emit hazardous emissions or handle Less than hazardous or acutely hazardous materials, Sigwithant Potentially with Less than substances, or waste within one-quarter mile Significant Mitigation Significant No of an existing or proposed school? Impact Incorporated Impact Impact ❑ ❑ ® ❑ VIII.c) There is one school located within a quarter mile of the project site - Barnhart School (Kindergarten through 8th grade). However, Section VIII.a above indicates the proposed project would not emit or produce any hazardous materials that would represent a health hazard to the public or to students or staff at Barnhart School. Therefore, there would be no significant impact in this regard, and no mitigation is required. • d) Be located on a site which is included on a list Less than of hazardous materials sites compiled Significant Potentially with Less than pursuant to Government Code Section Significant Mitigation Significant No 65962.5 and, as a result, would it create a Impact Incorporated Impact Impact significant hazard to the public or the environment? ❑ ❑ ❑ El VIII.d) There are no properties in the vicinity of the project site, nor is the project site itself on any Federal Superfund Sites (NPL), State Response Sites, Voluntary Cleanup Sites, School Cleanup Sites, Permitted Sites, or Corrective Action sites lists. Neither the project site nor the surrounding properties within one-quarter mile of the site are identified on the California State Water Resources Control Board's Geotracker list of leaking underground fuel tank (LUFT) sites (2012). Therefore, there will be no impact in this regard and no mitigation is required. e) For a project located within an airport land Less than use plan or, where such a plan has not been Significant Potentially with Less than adopted, within two miles of a public airport Significant Mitigation Significant No or public use airport, would the project result Impact Incorporated Impact Impact in a safety hazard for people residing or working in the project area? ❑ ❑ ❑ El VIII.e) The proposed project site is not located within an airport land use plan or within two miles of a public airport or public use airport. There would not be any airport-related safety hazards for people working at the proposed project site or guests of the hotels or condominiums. Therefore, the project will have no impacts related to airport activity, and no mitigation is required. LSA CMG1301 40 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY f) For a project within the vicinity of a private Less than Significant airstrip, would the project result in a safety Potentially with Less than hazard for people residing or working in the Significant Mitigation Significant No Impact Incorporated Impact Impact project area? ❑ ❑ ❑ IZ VIII!) There are no private airstrips within 2 miles of the project site, so there will be no impacts in this regard, and no mitigation is required. g) Impair implementation of or physically Less than interfere with an adopted emergency Potentially with Less than response plan or emergency evacuation plan? Significant t t Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ VIII.g) The Santa Anita Inn currently occupies the project site. Police, fire, and paramedic services are currently provided by the City to the entire downtown area, including the project site. The site is accessible via the merger of Colorado Place and West Huntington Drive to the north and East Huntington Drive to the east. Development of the project site as proposed will not reduce the existing level of emergency access or the ability to evacuate onsite uses if an emergency or disaster occurs, so there will be no significant impacts in this regard and no mitigation is required. h) Expose people or structures to a significant Less than risk of loss, injury or death involving wildland potentially with Less than fires, including where wildlands are adjacent Significant Incorporated Significant I pact to urbanized areas or where residences are Impact intermixed with wildlands? ❑ ❑ ❑ El VIII.h) According to the California Department of Forestry and Fire Protection (CAL Fire) mapping system the City of Arcadia contains areas considered to be Very High Fire Hazards Zones. The map created by CAL Fire has been adopted by the City to target these areas and implement stringent wild land fire mitigation strategies. The proposed project site does not fall within any fire hazard zones, and is not within close proximity to any wildlands and will not have a fire hazard impact. Review of proposed building plans is a standard part of the City's development review process, and the proposed project will be required to comply with any building design requirements of the City Fire Department (see Section XIV, Public Services) to mitigate urban (non-wildland) fire hazards. Therefore, wildfire hazard impacts would be less than significant and no mitigation is required. LSA CMG1301 41 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY IX. HYDROLOGY AND WATER QUALITY Would the project: a) Violate any water quality standards or waste Less than Significant discharge requirements? Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ® ❑ ❑ IX.a) In 1972, the Clean Water Act (CWA) was amended to require National Pollutant Discharge Elimination System (NPDES) permits for the discharge of pollutants into "Waters of the U.S." from any point source. In 1987, the CWA was amended to require that the U.S. Environmental Protection Agency establish regulations for permitting under the NPDES permit program, that at the local level cities must ensure provision of vegetates swales, buffers, and infiltration areas in new development projects. For Arcadia, the NPDES program is issued by the Regional Water Quality Control Board, Los Angeles Region. The NPDES program coordinates the actions of all incorporated cities within this region (except Long Beach) and Los Angeles County to regulate and control storm water and urban runoff into Los Angeles County waterways and ocean. The proposed project will be subject to NPDES requirements as well as the City of Arcadia's Water Efficient Landscape Ordinance (WELO). Although this is a standard regulatory requirement, it is incorporated into the project mitigation to allow for better tracking through the Mitigation Monitoring and Reporting Program (MMRP) that will prepared for this project. Short-Term Impacts. It is possible that runoff during grading and construction activities could result in sediment and other urban pollutants into local drainage facilities. To protect water quality over the short-term (i.e., during construction), the project will be required to prepare a Storm Water Pollution Prevention Plan (SWPPP) which is a written document that describes the construction operator's activities to comply with the requirements in the NPDES permit. Required elements of an SWPPP include (1) site description addressing the elements and characteristics specific to the project site; (2) descriptions of Best Management Practices (BMPs) for erosion and sediment controls; (3) BMPs for construction waste handling and disposal; (4) implementation of approved local plans; and (5) proposed post-construction controls, including a description of local post-construction erosion and sediment control requirements. The SWPPP is intended to facilitate a process whereby the operator evaluates potential pollutant sources at the site and selects and implements BMPs designed to prevent or control the discharge of pollutants in stormwater runoff. During the construction period, the proposed project would use a series of BMPs to reduce erosion and sedimentation. These measures may include the use of gravel bags, silt fences, hay bales, check dams, hydroseed, and soil binders. The construction contractor would be required to operate and maintain these controls throughout the duration of on-site construction activities. Long-Term Impacts. Once the proposed project is completed, it is possible that operation or ongoing activities of project uses may contribute to long-term water quality impacts. To prevent LSA CMG1301 42 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY such impacts, the project must implement a Standard Urban Stormwater Mitigation Plan (SUSMP) is required of the proposed project. Onsite runoff will be either infiltrated into the ground in landscaped areas or be directed to several catch basins and down drains which will then direct runoff into the City's storm drain system. New development is required to meet or exceed pre-project conditions for stormwater discharge, and the proposed project would be required to retain any additional runoff onsite and discharge it to the storm drain system at rates that do not exceed pre-project conditions. Adherence to NPDES requirements is required of all development within the City, the incorporation of these requirements in the following measures is designed to track both standard requirements and specific mitigation measures as identified below: Mitigation Measures HYD-1 Prior to issuance of a grading permit, the developer shall file a Notice of Intent (NOI) with the Los Angeles Regional Water Quality Control Board to be covered under the National Pollutant Discharge Elimination System (NPDES) General Construction Permit for discharge of storm water associated with construction activities. The project developer shall submit to the City the Waste Discharge Identification Number issued by the State Water Quality Control Board (SWQCB) as proof that the project's NOI is to be covered by the General Construction Permit has been filed with the SWQCB. This measure shall be implemented to the satisfaction of the City Engineer. HYD-2 Prior to issuance of a grading permit, the developer shall submit to the Los Angeles Regional Water Quality Control Board (RWQCB) and receive approval for a project-specific Storm Water Pollution Prevention Plan (SWPPP). The SWPPP shall include a surface water control plan and erosion control plan citing specific measures to control on-site and off-site erosion during the entire grading and construction period. In addition, the SWPPP shall emphasize structural and nonstructural best management practices (BMPs) to control sediment and non- visible discharges from the site. BMPs to be implemented may include (but shall not be limited to) the following: • Potential sediment discharges from the site may be controlled by the following: sandbags, silt fences, straw wattles, fiber rolls, a temporary debris basin (if deemed necessary), and other discharge control devices. The construction and condition of the BMPs are to be periodically inspected by the RWQCB during construction, and repairs would be made as required. • Area drains within the construction area must be provided with inlet protection. Minimum standards are sand bag barriers, or two layers of sandbags with filter fabric over the grate, properly designed standpipes, or other measures as appropriate. • Materials that have the potential to contribute non-visible pollutants to storm water must not be placed in drainage ways and must be placed in temporary storage containment areas. LSA CMG1301 43 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY • All loose soil, silt, clay, sand, debris, and other earthen material shall be controlled to eliminate discharge from the site. Temporary soil stabilization measures to be considered include: covering disturbed areas with mulch, temporary seeding, soil stabilizing binders, fiber rolls or blankets, temporary vegetation, and permanent seeding. Stockpiles shall be surrounded by silt fences and covered with plastic tarps. • Implement good housekeeping practices such as creating a waste collection area, putting lids on waste and material containers, and cleaning up spills immediately. • The SWPPP shall include inspection forms for routine monitoring of the site during the construction phase. • Additional required BMPs and erosion control measures shall be documented in the SWPPP. • The SWPPP would be kept on site for the duration of project construction and shall be available to the local Regional Water Quality Control Board for inspection at any time. The developer and/or construction contractor shall be responsible for performing and documenting the application of BMPs identified in the project-specific SWPPP. Regular inspections shall be performed on sediment control measures called for in the SWPPP. Monthly reports shall be maintained and available for City inspection. An inspection log shall be maintained for the project and shall be available at the site for review by the City and the Regional Water Quality Control Board as appropriate. HYD-3 Prior to issuance of a grading permit, a site-specific Standard Urban Stormwater Management Plan (SUSMP) shall be submitted to the City Planning Division for review and approval. The SUSMP shall specifically identify the long-term site design, source control, and treatment control BMPs that shall be used on site to control pollutant runoff and to reduce impacts to water quality to the maximum extent practicable. At a minimum, the SUSMP shall identify and the site developer shall implement the following site design, source control, and treatment control BMPs as appropriate: Site Design BMPs • Minimize urban runoff by maximizing maximizing permeable areas and minimizing impermeable areas (recommended minimum 25 percent of site to be permeable). • Incorporate landscaped buffer areas between sidewalks and streets. • Maximize canopy interception and water conservation by planting native or drought-tolerant trees and large shrubs wherever possible • Where soil conditions are suitable, use perforated pipe or gravel filtration pits for low flow infiltration. • Construct onsite ponding areas or retention facilities to increase opportunities for infiltration consistent with vector control objectives. LSA CMG1301 44 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY • Construct streets, sidewalks and parking lot aisles to the minimum widths necessary, provided that public safety and a walkable environment for pedestrians are not compromised. • Direct runoff from impervious areas to treatment control BMPs such as la ndsca ping/bioretention areas. Source Control BMPs Source control BMPs are implemented to eliminate the presence of pollutants through prevention. Such measures can be both non-structural and structural: Non-Structural Source Control BMPs • Education for property owners, tenants, occupants, and employees. • Activity restrictions. • Irrigation system and landscape maintenance to minimize water runoff. • Common area litter control. • Regular mechanical sweeping of private streets and parking lots. • Regular drainage facility inspection and maintenance. Structural Source Control BMPs • MS4 stenciling and signage at storm down drains. • Properly design trash storage areas and any outdoor material storage areas. Treatment Control BMPs Treatment control BMPs supplement the pollution prevention and source control measures by treating the water to remove pollutants before it is released from the project site. The treatment control BMP strategy for the project is to select Low Impact Development (LID) BMPs that promote infiltration and evapotranspiration, including the construction of infiltration basins, bioretention facilities, and extended detention basins. Where infiltration BMPs are not appropriate, bioretention and/or biotreatment BMPs (including extended detention basins, bioswales, and constructed wetlands) that provide opportunity for evapotranspiration and incidental infiltration may be utilized. Harvest and use BMPs (i.e., storage pods) may be used as a treatment control BMP to store runoff for later non-potable uses. With implementation of these measures, potential short- and long-term impacts of the proposed project on local and regional water quality will be reduced to less than significant levels. b) Substantially deplete groundwater supplies or Less than interfere substantially with groundwater Significant y g Potentially with Less than recharge such that there would be a net Significant Mitigation Significant No deficit in aquifer volume or a lowering of the Impact Incorporated Impact Impact local groundwater table level (e.g., the production rate of pre-existing nearby wells E ® El would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? LSA CMG1301 45 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY IX.b) The proposed project is subject to NPDES requirements and will be designed and constructed to ensure compliance with the water quality standards and waste discharge requirements. It should be noted that there is a 16-inch water main on the west side of the site and a 12-inch water main on the east side of the site, both with 65 pounds per square inch of static pressure (65 psi). It may be necessary that the booster pumps be designed to provide sufficient pressure for the heights of the proposed buildings. Compliance with these regulations, and implementation of Mitigation Measures HYD-1 through HYD-3, along with all City water supply requirements, will assure there will be no significant impacts related to groundwater resulting from the proposed project. c) Substantially alter the existing drainage Less than Significant p attern of the site or area, including through Potentially with Less than the alteration of the course of a stream or Significant Mitigation Significant No river, in a manner that would result in Impact Incorporated Impact Impact substantial erosion or siltation on site or off site? ❑ ® ❑ ❑ IX.c) The proposed project site slopes gently to the south at a gradient of 2.4 percent with elevations ranging from 473 feet above mean sea level (amsl) at the north corner sloping down to 466 feet amsl at the south corner. The proposed project site is fully developed and landscaped and does not contain any natural drainage courses. There is also no historical evidence of localized ponding or flooding on the project site. The proposed project includes landscaping that will reduce the potential for erosion. Although the amount of erosion or siltation onsite might incrementally increase as a result of development, there will be no long- term significant impacts with implementation of Mitigation Measures HYD-1 through HYD-3. d) Substantially alter the existing drainage Less than pattern of the site or area, including through Significant P � 9 9 Potentially with Less than the alteration of the course of a stream or Significant Mitigation Significant No river, or substantially increase the rate or Impact Incorporated Impact Impact amount of surface runoff in a manner that would result in flooding on site or off site? ❑ ❑ ❑ IX.d) The site is already fully developed with structures and impervious surfaces, so construction of the proposed project would not substantially increase the amount of runoff from this site. There are no onsite drainage channels or features, and on-site drainage flows and direction will remain essentially as they are at present. Surface runoff flows from the northeast corner of the property through the southwest corner of the property before draining into the City's storm drain system in East Huntington Drive. The proposed project would not have a significant impact on drainage patterns and will not substantially increase the rate of amount of surface water runoff; therefore, no mitigation is required. LSA CMG1301 46 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Less than e) Create or contribute runoff water, which Significant would exceed the capacity of existing or Potentially With Less than planned stormwater drainage systems or Significant Mitigation Significant No provide substantial additional sources of Impact Incorporated Impact Impact polluted runoff? ❑ ❑ ® ❑ IX.e) The existing site is relatively flat and already developed with a hotel, landscaping, and parking areas, and generally drains toward the south. There are no surface drainage courses on the project site, but the East Branch Arcadia Wash is located approximately 227 feet west of the site and the Arcadia Wash is located approximately 2,000 feet west of the site. The proposed project would replace the existing hotel with new hotel and related lodging facilities, landscaping, and parking areas. As outlined in the project hydrology study (Appendix F), the proposed project will not create or contribute runoff in addition to that already generated by the site, in compliance with the City's flood control requirements, and adherence to the above Mitigation Measures HYD-1 through HYD-3. f) Otherwise substantially degrade water Less than quality? Potentially With Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ® ❑ ❑ IX.f) The proposed project is in a developed urban setting and through adherence to City water quality regulations and Mitigation Measures HYD-1 through HYD-3 would not substantially degrade water quality. g) Place housing within a 100-year flood hazard Less than area as mapped on a federal Flood Hazard Potentially With Less than Boundary or Flood Insurance Rate Map or Significant t Incorporated Significant Impact other flood hazard delineation map? ❑ ❑ ❑ CZ IX.g) Most of the annual rainfall in the region occurs in the winter with potential flooding occurring in the City from intense storms resulting in rapid runoff. The Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRMs) identify areas subject to flooding during the 100-year storm event. Note that the term "100-year" is a measure of the size of the flood, not how often it occurs. The "100-year flood" is a flooding event that has a one percent chance of occurring in any given year. Based on these FIRM maps (map 06037c1400F), the project site is not located within the 100-year floodplain. Because the project site is not located within a floodplain, the proposed project would not impede or redirect flood flows (FEMA 2011). In addition, the project hydrology study (Tritech Associates, Inc. July 2013)(Appendix F) indicates that the proposed project would not result in increased runoff from the project site over existing volumes. Therefore, no impacts associated with this issue would occur, and no mitigation is required. LSA CMG1301 47 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY h) Place within a 100-year flood hazard area Less than structures that would impede or redirect flood Significant flows? Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ❑ IX.h) The proposed project site is not within a 100-year flood hazard zone. Since the proposed project would not place structures that would impede or redirect flood flows, there would be no impact in regards to this issue, and no mitigation is required. i) Expose people or structures to a significant Less than risk of loss, injury or death involving flooding, potentially Significant Less than including flooding as a result of the failure of Significant Mitigation Significant No a levee or dam? Impact Incorporated Impact Impact ❑ ❑ ❑ El IX.i) Construction and operation of the proposed project would not cause or increase the likelihood of failure of a levee or dam that could result in flooding. Although the project site is located within the flood hazard zone for Santa Anita Dam, which is located along the Santa Anita Wash approximately 2 miles north of the project site, the proposed project would not involve housing as part of the project. Additionally, the entire community is in Zone D, which the City is not required to implement any flood plain management regulation as a condition per the National Flood Insurance Program from the Federal Emergency Management Agency. Therefore, impacts in this regard would be less than significant and no mitigation is required. j) Inundation by seiche, tsunami, or mudflow? Less than Significant Potentially With Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ❑ IX.j) The project site does not have any enclosed bodies of water (e.g., reservoir tank or pond) that could cause or result in a seiche (standing wave) during a seismic event. The site is also not located near the Pacific Ocean or within a tsunami or mudflow hazard area. Therefore, the project would not result in any significant impacts related to these hazards, and no mitigation is required. LSA CMG1301 48 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY X. LAND USE AND PLANNING Would the project: Less than a) Physically divide an established community. Significant Potentially With Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ X.a) The project site is in an urbanized area and is surrounded by developed uses. Directly west of the project site are the Santa Anita Park race track, the Arboretum of Los Angeles County is further to the west, and a regional mall called the Westfield Mall Santa Anita is to the southwest just south of the racetrack. these rommerc�al site are offices and uses are existing commercial s dent al areas along Colorado Place. North of t neighborhoods. A small bar called the "100 to 1" is located at the northeast corner of the project site. To the east of the project Recreational Area and the City Hall the proposed individual site are the Civic Center Athletic Field house used by the Salvation Army as r southwest facility the Methodist spitah, Quest southwest corner of the site, and farthe Diagnostics Medical Lab, and Medical Library. Demolition of the existing hotel and construction of new lodging and other commercial uses on the project site would not physically divide o an established Imaindta maintained similar or better than that which indicates that access in and around exists now. The only existing residential land use he resthoff the sueround'ing of land office uses are commercial uses along Colorado Place) commercial in nature or public facilities. Therefore, the proposed project will not divide an existing community, and no mitigation is required. Less than b) Conflict with any applicable land use plan, Significant policy, or regulation of an agency with Potentially With Less than jurisdiction over the project (including, but Significant Mitigation Significant No not limited to the general plan, specific plan, Impact Incorporated Impact Impact local coastal program, or zoning ordinance) ❑ ❑ ® El for the purpose of avoiding or mitigating an environmental effect? X.b) The City of Arcadia is a charter city as opposed to a general law city. Arcadia's General r higher Plan designates the proposed project commercial with the downtown overlayaandf oa height FAR), while the zoning is general commercial overlay (H-8) which allows buildings up to 95 feet or 8 stories, as shown in Table G. LSA CMG1301 49 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Table H: General Plan Land Use and Zoning Designations Area/Direction Land Use Designations Zoning Designations PROJECT SITE Commercial — Downtown Overlay' General Commercial (C-2)with Downtown Overlay' and Special Height Overlay(H-8)' North of Project Site Commercial - Downtown Overlay' General Commercial (C-2)with (downtown neighborhoods) Downtown Overlay' South of Project Site Public/Institutional Public Purpose (S-2) (City Hall and Hospital) East of Project Site Open Space - Outdoor Recreation Public Purpose (S-2) (Arcadia County Park) West of Project Site Horse Racing Special Uses(S-1) (Santa Anita Park) Source: Arcadia General Plan Land Use Map, Hogle-Ireland 2010 and approved City Zoning Map, November 2010. 1 allows Floor Area Ratio(FAR)up to 1.0 otherwise commercial FAR is 0.5 2 H-8 allows building heights up to 95 feet or 8 stories The City's General Plan says the following about the Commercial land use designation... The Commercia/designation is intended to permit a wide range of commercial uses which serve both neighborhood and citywide markets. The designation allows a broad array of commercial enterprises, including restaurants, durable goods sales, food stores, lodging, professional offices, specialty shops, indoor and outdoor recreational facilities, and entertainment uses. Adjacent to Downtown, the Commercial designation is intended to encourage small-scale office and neighborhood-serving commercial uses that complement development in the Downtown Mixed Use areas. While the land use designation provides the general parameters within which development must take place, the Zoning Code or other land use regulatory document specifies the type and intensity of uses that will be permitted in a given area. In the Downtown area, for example, where properties are designated Commercial, land use regulations might specify that restaurants and cafes are permitted, but secondhand stores are not. The Zoning Code and other regulatory documents also indicate permitted building height limits for specific properties. Maximum FAR-0.50 Higher intensity overlays are applied to portions of Downtown along Santa Anita Avenue, Colorado P/ace, and Huntington Drive(1.0 FAR). The description of "permitted" uses above lists "lodging" which typically includes hotels and other kinds of short-term, temporary, vacation, or seasonal residences. The Specific Plan indicates that the proposed hotel condominiums are considered to be more like a type of lodging because many of them would be used as "time share" or other types of temporary (short-term) or seasonal (limited) occupants, typically less than one year at a time. These units will be marketed directly to race track-related guests and staff. They are not intended to support a large number of full-time occupants compared to standard residential-type units that would have permanent long-term City residents. LSA CMG1301 50 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Section 9220.29 of the City's Municipal Code (zoning) defines "Hotel is a building in which there are six or more guest rooms where lodging with or without meals is provided for compensation as the more or less temporary abiding place of individuals and where no provision is made for cooking in any individual room or suite." All of the hotel rooms meet this definition. Although the condominium units will have kitchens, they are much closer to the definition of hotel units rather than standard residential units for the reasons listed above. Therefore, the two hotels and the hotel condominiums in the Seabiscuit Pacifica project are consistent with the allowable uses under the General Plan under the "commercial" land use designation, therefore, the Seabiscuit Pacifica Specific Plan does not require a General Plan Amendment. In response to questions about the specific nature of the hotel condominiums, the developer provided the following information: The hotel condominium concept was first introduced in Miami, Florida during the early 1980's and was further developed through the1990's. Developers started building newer and larger hotel condominiums next to hotels. Then the concept really took off in the last ten years. Franchise hotels have been developing high end, luxury extended stay hotels all over the world. The trend has been extremely successful and will only get more popular as time on. We have studied a handful of luxury hotels in Hawaii and Los Angeles, particularly the iconic buildings, L.A. Live in Los Angeles and W Hotel in Hollywood. Both projects have been very successful. Our hotel condominiums look to mimic the success of L.A. Live and will be anchored similarly by a Marriott hotel, brandishing the Ritz Carlton Residence name. The basic concept of the hotel condominium is to service business and leisure travelers who are looking to stay more than a few days in a luxury hotel in Arcadia. It will boast the full amenities of a real home and a grand view of the Santa Anita Race Track and the San Gabriel Valley. Internet, phone, concierge, mail service, and 24 hour security are just some of the accommodations that will be offered. Ideal patrons can range from international business people to families making long term visits. The condo tower will offer a high end lodging option in the heart of the city, which will accentuate the Arcadia lifestyle and provide something our community lacks. Our studies show a strong demand for a hotel condominium that can provide adequate service for business travelers, leisure travelers and overseas investors who are looking to stay more than a few days in a hotel. The hotel condominium will be a lodging option unlike any other in the city by providing more bedrooms, privacy and luxury comfort for all guests. As the developer, we hope to sell all 50 units to recover some of the construction costs. All units will be subdivided and sold once the certificate of occupancy is issued. The building will stand 8 stories tall with a French Normandy style and feature quality construction that will meet city code and regulations like the Ritz Carlton at L.A. Live. The estimated cost per square foot to market will be around$550/square foot and with an average of 2,000 square feet per unit, each unit will be worth at least$1 million. We estimate the weekly rental to be around $1,200 and monthly to be $4,500. We do not expect any difficulty with either soliciting buyers or renters since we have a limited supply of only 50 units. And at the end of the day, this will only make our project more exclusive and prestigious, falling in line with the 21'century lifestyle of Arcadia. LSA CMG1301 51 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY The management company for the hotel condominiums can either be a licensed hospitality management group or a Marriott-approved management company. We will use Marriott's list of recommended management companies since we hope to apply the Marriott franchise name to this development such as the Ritz Carlton. Through our studies, we feel very strongly that the hotel and hotel condominiums can be linked into one controlling entity. Developer's Preference All new units will be built to the highest standard of quality. Like the Ritz Carlton, they will be sold on the open market to 50 different buyers from all over the world. We expect to have at least 150-200 qualified buyers on our waitlist and will reserve the right to have preference in approving buyers based on the intended use. Our pre-selected buyer will utilize the unit as an investment and only make short stays. Our selection process will be geared towards owners like jockey, horse owners, and especially overseas seasonal travelers. Compliance with City TOT Policy Since the hotel condominiums have some residential elements, guests will be subject to TOT tax just like the existing Santa Anita Inn. The TOT tax requirements will be written into the HOA policy for each individual owner to agree to and pay through the management company. The document will spell out a TOT tax requirement of 10% that will be paid within the first 90 days of stay once the owner turns the unit over for the management company to rent. The individual owner will not have the right to stay indefinitely without paying taxes and will be exposed to TOT tax in the first 90 days as well. The owner can only rent by using the on- site management and leasing company. And once they rent out a unit, there will be tax consequences. Our studies show 85% of buyers at L.A. Live are investors that use their purchases as rental units in the same way. Control of All Units No condominium unit can be sold without an HOA Policy approved by the California Department of Real Estate (DRE) and the City of Arcadia. Our company attorney will draft the HOA forming documents that will spell out all City TOT requirements and that all owners must agree to rent through the hotel management company. The management company will also collect the TOT tax and pay the City monthly. The key to the concept is that the hotel condominiums will be taxed no differently than how a regular hotel is. The additional income to that of the new 210 hotel rooms will benefit the City even more with another source for tax generation. The way the tax is collected and paid to the city makes this project unique and different from any other condominium project in the City. The City's zoning map indicates the site is zoned General Commercial (C-2) which allows hotels with a Conditional Use Permit (CUP). Approval of the Specific Plan by the City Council would allow the hotels and condominiums by right and eliminate the need for a CUP consistent with state law for charter cities. In addition, no zone change would be required as the Specific Plan becomes the zoning for the property upon approval by the City. LSA CMG1301 52 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY The City's General Plan and zoning map indicate the site has a "Downtown Overlay" that allows a "Floor Area Ratio" (FAR) of up to 1.0 compared to a non-overlay commercial FAR of 0.5. The total building area of the Seabiscuit Pacifica Specific Plan indicates the project FAR is slightly over 1.0 (see Table 2.B). However, approval of the Specific Plan by the City Council will constitute acceptance by the City that the proposed Seabiscuit Pacifica Specific Plan is generally consistent with the General Plan, and that any modification to the building development characteristics shown in this Specific Plan will require City Council approval of a Specific Plan Amendment. The City's zoning map indicates the site has a Height Overlay (H-8) which allows buildings up to 95 feet in height or 8 stories, as shown below from the City's Municipal Code Section 9276.2.2: 9276.2.2. - HEIGHT LIMIT. Any building or structure in Zone H may, by complying with the provisions of this Title, however,the height limitation ldior applicable to a shall basic zone in which it is event exceed the height limit dsetrforth in however, that nob g the following table: Zone H8 - Eight (8) stories or ninety-five (95) feet. The tallest building in the proposed Seabiscuit Pacifica project is 98 feet with 8 stories, so the Seabiscuit Specific l is slightly eliminate H-8 Height Overlay (+3% higher). owe ver, app ro l of the would th s minor inconsistency and no mitigation is proposed. Appendix B of the Specific Plan contains a detailed tabular comparison of the General Plan policies and goals that are applicable to this project. It indicates the proposed project is consistent with all of the applicable General Plan policies and goals. Based on this analysis, the proposed Specific Plan appears to be generally consistent with the City's General Plan and zoning designations and applicable development guidelines and the City's zoning designations. Therefore, the proposed project would have no significant land use impacts related to existing applicable land use plans, policies, and regulations, and no mitigation is required. Less than c) Conflict with any applicable habitat Significant conservation plan or natural community Potentially with Less than conservation plan? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ❑ X.c) The project site is not designated for any type of habitat protection under the City's General Plan, and is not covered by any adopted Habitat Conservation Plan or Natural Community Conservation Plan. Therefore, there will be no impacts in this regard, and no mitigation is required. LSA CMG1301 53 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY XI. MINERAL RESOURCES Would the project: a) Result in the loss of availability of a known Less than mineral resource that would be of value to Significant Potentially with Less than the region and the residents of the state? Significant Mitigation Significant No Impact Incorporated Impact Impact XI.a) The project site is within the fully developed downtown area of Arcadia, and does not contain, nor is it designated as, a source of mineral resources (e.g., construction aggregate). Therefore, there will be no impacts in this regard, and no mitigation is required. b) Result in the loss of availability of a locally- Less than important mineral resource recovery site Significant With Less than delineated on a local general plan, specific Significant Mitigation Significant No plan or other land use plan? Impact Incorporated Impact Impact ❑ ❑ ❑ XI.b) See response XI.a. XII. NOISE Would the project result in: a) Exposure of persons to or generation of noise Less than levels in excess of standards established in Significant Potentially With Less than the local general plan or noise ordinance, or Significant Mitigation Significant No applicable standards of other agencies? Impact Incorporated Impact Impact ❑ ❑ ® ❑ XII.a) The proposed project is in an urbanized area and surrounded by developed uses. Directly west of the project site is the Santa Anita Park horse racing track, while the Arboretum of Los Angeles County is further to the west. A regional mall called the Westfield Mall Santa Anita is located southwest of the site just south of Santa Anita Park. Immediately north of the proposed project site are offices and retail commercial areas along Colorado Place, and further north of these offices are existing residential areas west of the main downtown area. Just east of the project site is the Arcadia County Park, while to the south is the Civic Center Athletic Field Recreational Area and (further south) is the Arcadia City Hall. A rehab facility in a single family house used by the Salvation Army is located at the southwest corner of the project site, while an old bar is located at the northeast corner of the project site. Farther to the southwest are the Methodist Hospital, Quest Diagnostics Medical Lab, and Medical Library. LSA CMG1301 54 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Short-Term Impacts A noise impact assessment for the proposed project was prepared by LSA Associates, Inc. (LSA August 2013)(Appendix H). The assessment indicates that short-term noise impacts would be associated with excavation, grading, and erecting of buildings on site during construction of the proposed project. Construction-related short-term noise levels would be higher than existing ambient noise levels in the project area today but would no longer occur once construction of the project is completed. Construction of the proposed project is expected to require the use of earthmovers, bulldozers, and water and pickup trucks. This equipment would be used on the project site. Based on the information in Table F of the Noise Impact Analysis, and assuming that each piece of construction equipment operates at some distance from the other equipment, the worst-case combined noise level during this phase of construction would be 91 dBA Lmax at a distance of 50 feet from the active construction area. According to the Noise Impact Analysis, the residences nearest to the project site are more than 1,000 feet to the north of the project boundary. These residences may be subject to short-term, intermittent, maximum noise reaching 65 dBA Lmax, generated by construction activities on the project site. Compliance with the construction hours specified in the City's Noise Control Ordinance would reduce the construction noise impacts to less than significant. However, the existing Salvation Army rehab facility is so close to the southwest corner of the project site that demolition of the existing hotel buildings and construction of the new hotel condominiums in Phase 2 may have significant noise impacts on the rehab facility. Out of an abundance of caution, it would be prudent to install a temporary noise barrier for this facility along the common boundary until Phase 2 construction is complete. Long-Term Impacts According to the Noise Impact Analysis, vehicular traffic trips associated with the proposed project would not result in significant traffic noise impacts on off-site sensitive uses. However, the proposed hotel units adjacent to Huntington Drive (Eastbound) and Huntington Drive (Westbound) would be potentially exposed to significant traffic noise from these streets. The Noise Impact Analysis Tables G-H (see Appendix H pages 12-16 in the study) show the existing traffic noise levels, existing plus cumulative with project traffic noise levels, opening year (2016) without project traffic noise levels , and opening year (2016) plus cumulative with project scenarios traffic noise levels. "These noise levels represent the worst-case scenario, which assumes that no shielding is provided between the traffic and the location where the noise contours are drawn" (page 12, LSA August 2013). The largest increase in noise in the area will be 1.0 dBA and will occur due to increased traffic along Huntington Drive (westbound) from Holly Drive to Santa Clara Street because of the proposed project. This noise increase is not perceptible to the human ear and will have a less than significant impact on long term noise impacts to off-site land uses. According to the Noise Impact Analysis, hotel balconies and patios along Huntington Drive westbound and eastbound will be exposed to traffic noise reaching 63 dBA CNEL, which is lower than the City's 65 dBA CNEL noise standard for noise-sensitive outdoor active uses. Therefore, no noise barrier is required. Interior noise levels with windows closed would also be below the City's 45 dBA CNEL noise standard. However, with windows open, interior noise levels would LSA CMG1301 55 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY be higher than 45 dBA CNEL. This is a significant impact and requires mitigation in the form of an air-conditioning system for frontline hotel rooms along both Huntington Drives. Residential uses north of the project site would be physically blocked from noise emanating from onsite loading/unloading activities for proposed project uses. Therefore, no significant noise impacts would occur for these off-site residences from on-site noise generating activities. Noise levels from parking lot noises are anticipated to be lower than that of the truck delivery and loading/unloading activities. Parking lot noise is not anticipated to be a significant noise issue with respect to hotel customers within the project site. HVAC equipment is typically located on the building rooftop and is assumed that, as a worst-case scenario, HVAC equipment would operate 24 hours a day. The closest neighboring residence to the HVAC equipment is estimated to experience noise levels below the City's nighttime maximum noise level of 60 dBA Lmax• Therefore, noise generated from HVAC equipment would not have a significant noise impact. Mitigation is not required for less than significant impacts from truck delivery loading, parking lot noises, and HVAC equipment. As with short-term noise impacts from construction, there may be long-term noise impacts at the existing Salvation Army rehab facility due to its proximity to the southwest corner of the project site. Occupancy of the new hotel condominiums in Phase 2 is not expected to cause significant long-term noise impacts on the rehab facility. However, out of an abundance of caution, it would be prudent to install a filled cell block wall as a permanent noise barrier for this facility along its common boundary with the proposed project once construction of the hotel condominium building is complete. This wall would help minimize any potential long-term noise impacts on the Salvation Army facility. Mitigation Measures N-1 Prior to issuance of grading and building permits for each phase of the project, the developer shall prepare a Construction Noise Control Plan and will submit the plan the City for review and approval. The plan shall include but will not be limited to the following: • During all project site excavation and grading, contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers consistent with manufacturers'standards. • The project contractor shall place all stationary construction equipment so that emitted noise is directed away from the closest sensitive receptor to the project site (i.e., the Salvation Army facility at the southwest corner of the site). • The construction contractor shall locate equipment staging in areas that will create the greatest distance between construction-related noise sources and the closest noise-sensitive receptor to the project site (i.e., the Salvation Army facility at the southwest corner of the site) during all project construction. • During all project site construction, the construction contractor shall limit all construction-related activities that would result in high noise levels to LSA CMG1301 56 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY between the hours of 7:00 a.m. to 7:00 p.m. on weekdays and Saturday. No construction shall be permitted on Sundays or any of the holidays listed in AMC Section 4261. • Prior to the start of Phase 2 grading, the developer shall install a wooden noise barrier along the common boundary of the project and the Salvation Army rehab facility at the southwest corner of the project site. This barrier shall be removed upon completion of Phase 2 construction. N-2 Prior to the issuance of building permit for each phase, the developer shall demonstrate that all buildings shall have air-conditioning to minimize noise impacts on hotel rooms along West and East Huntington Drives. N-3 Prior to the issuance of occupancy permits for the Phase 2 condominium building, the developer shall install a filled-cell concrete block wall along the common boundary with the Salvation Army rehab facility at the southwest corner of the project site. In lieu of the temporary construction wall outlined in Measure N-1, the developer may install this permanent wall "early" (i.e., prior to issuance of occupancy permits for Phase 1) which would eliminate the need for that portion of Measure N-1. With implementation of these measures, the proposed project will not have any significant short- or long-term noise impacts on surrounding land uses. Less than b) Exposure of persons to or generation of Significant excessive groundborne vibration or Potentially with Less than groundborne noise levels? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ XII.b) Vibration refers to groundborne noise and perceptible motion. Groundborne vibration is almost exclusively a concern inside buildings and is rarely perceived as a problem outdoors, where the motion may be discernible, but without the effects associated with the shaking of a building, there is less adverse reaction. Bulldozers and other heavy-tracked construction equipment generate approximately 92 VdB of groundborne vibration when measured at 50 feet. This level of groundborne vibration exceeds the threshold of human perception, which is around 65 VdB. Every doubling of distance from 50 feet results in the reduction of the vibration level by 6 VdB; therefore, receptors at 100 and 200 feet from the construction activity may be exposed to groundborne vibration up to 86 and 80 VdB, respectively. Existing and proposed streets surrounding the project area are paved, smooth, and unlikely to cause significant ground-borne vibration. In addition, the rubber tires and suspension systems of buses and other on-road vehicles make it unusual for on-road vehicles to cause ground- borne noise or vibration problems. It is therefore assumed that no such vehicular vibration impacts would occur and that no vibration impact analysis of on-road vehicles is necessary. LSA CMG1301 57 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY During Phase 1, demolition and excavation will take place mainly in the northern portion of the site, so the Salvation Army facility would not be significantly impacted by vibration from grading. During Phase 2, and especially during excavation of the subterranean parking, vibration from grading may be felt by residents of the Salvation Army facility. However, no blasting or pile-driving activities are expected as part of grading for this project, so vibration effects will be temporary and relatively limited relative to the Salvation Army facility. No other sensitive receptors would be affected by project grading and construction due to the distance from the project site to these uses (i.e., residences to the north). Ground-borne vibration from construction activities will be mostly low to moderate, except during on-site grading and earthmoving activities. Vibrations associated with on-site construction would be reduced to a level less than what is perceptible to the average human. Additionally, groundborne vibration during construction activity would be temporary and cease upon completion of construction, and is therefore considered to be a less than significant impact of the proposed project. c) Substantial permanent increase in ambient Less than noise levels in the project vicinity above levels Significant Potentially with Less than existing without the project? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ XII.c) Current noise levels on the project site are relatively low and are related to activities of the existing Santa Anita Inn. The proposed project would introduce more intense development to the site, which will increase ambient noise levels compared to those of the Santa Anita Inn. The project noise study indicated that these increases would be noticeable but would not represent a significant adverse noise impact (page 18, LSA August 2013). With the proposed Mitigation Meaures N-1 through N-4, the proposed project is not expected to result in significant adverse noise impacts or noise levels in excess of identified standards. For a more detailed analysis, see Section XII.a above. d) Substantial temporary or periodic increase in Significant e s h t ambient noise levels in the project vicinity Potentially with Less than above levels existing without the project? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ XII.d) Although activity on the site will increase as a result of the new land uses and construction, the analysis provided in Section XII.a demonstrates that the proposed project will not generate significant noise impacts over the long-term for either onsite or offsite uses (LSA August 2013). LSA CMG1301 58 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY e) For a project located within an airport land Less than Significant use plan or, where such a plan has not been potentially with Less than adopted, within two miles of a public airport Significant Mitigation Significant No or public use airport, would the project Impact Incorporated Impact Impact expose people residing or working in the ❑ CI ❑ El project area to excessive noise levels? XII.e) The project site is not located within an airport land use plan study area, or within two miles of a public airport or public use airport. The proposed project would therefore have no impacts related to exposure of residents or workers to excessive airport noise levels, and no mitigation is required. f) For a project within the vicinity of a private Less than airstrip, would the project expose people potentially with Less than residing or working in the project area to Significant Mitigation Significant No Impact Incorporated Impact Impact excessive noise levels? ❑ El ❑ IZ XII.f) The project site is not located within the influence area of a private airstrip. The proposed project would therefore have no impact related to exposure of residents or workers to excessive airstrip noise levels, and no mitigation is required. XIII. POPULATION AND HOUSING Would the project: a) Induce substantial population growth in an Less than area, either directly (for example, by Potentially with Less than No proposing new homes and businesses) or Significant Incorporated Significant t Impact indirectly (for example, through extension of Impact roads or other infrastructure)? ❑ El El CI XIII.a) The proposed project would result in only minor population growth for the City. The site contains an existing hotel with 26 employees at present (14 full time employees and 12 part time employees), while the proposed project would add 85 full-time or part-time commercial service employees to the local workforce. Also, the "population" of the new hotel and hotel condominiums would be approximately 442 people at buildout based on at 85 percent average occupancy and assuming 2 people per unit.3 The population of the existing Santa Anita Inn at 85 percent occupancy would be 187 persons.4 Assuming similar occupancy for the existing 110 units of the Santa Anita Inn (i.e., 187 occupants on average), the proposed project would increase the hotel-related "population" of the City by approximately 255 people. It should be remembered that the proposed project uses are lodging and so would not add this number 3 210 rooms x 0.85 x 2 people per room = 357 persons 4 50 rooms x 0.85 x 2 people per room = 85 persons LSA CMG1301 59 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY of actual full-time residents to the City's population. For additional information on the nature of the hotel condominiums, see Section X, Land Use and Planning. This "population" increase would be primarily transient or seasonal based on the Santa Anita Park race schedule. The proposed project would also not result in the need for any new utilities, except for the planned sewer improvements. Therefore, due to the nature and size of the project, it is not expected to result in any significant indirect growth inducement to the City's population or housing. No significant impacts are expected in this regard, and no mitigation is required. b) Displace substantial numbers of existing Less than housing, necessitating the construction of Significant Potentially with Less than replacement housing elsewhere? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ❑ XIII.b) The site does not currently contain any housing units, so construction of the proposed project would not result in displacement of existing housing or construction of replacement housing elsewhere in the City or nearby County areas. However, the project would eventually result in the loss of 110 hotel units, but provide a total of 260 hotel and condominium units, for a net increase in 150 lodging units. No significant housing impacts are expected, and no mitigation is required. c) Displace substantial numbers of people, Less than necessitating the construction of replacement Significant Potentially with Less than housing elsewhere? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ❑ XIILc) The site does not currently contain any housing units but does have and an existing hotel. As outlined in Section XIII.a and XIII.b above, the existing hotel has an average occupancy of 187 guests, while the new hotel and condominium units would have an average occupancy of 442 guests. Demolition of the existing hotel is not expected to result in the displacement of existing housing (as opposed to lodging) or construction of replacement housing elsewhere in the City or nearby County areas. Therefore, no impacts are expected in this regard and no mitigation is required. LSA CMG1301 60 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY XIV. PUBLIC SERVICES Less than a) Would the project result in substantial Significant adverse physical impacts associated with the potentially with Less than provision of new or physically altered Significant Mitigation Significant No governmental facilities, need for new or Impact Incorporated Impact Impact physically altered governmental facilities, the ❑ ❑ construction of which could cause significant El 0 environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: ♦ Fire Protection? ♦ Police Protection? ♦ Schools? ♦ Parks? ♦ Other Public Facilities? XIV.a) The project site contains the existing Santa Anita Inn, a hotel with 110 rooms. The proposed project would place similar lodging-oriented commercial uses on this site that would generate more local traffic and introduce more employees and guests to the project area. The proposed project would introduce more employees to the site than at present p t 85 vs. 26), and this change of use would incrementally increase the need for fire, police, public facilities. However, these increases would be incremental and not result in any significant service impacts. Since it will not include new homes or generate new residents, the proposed project will not have any significant impacts on local schools or parks. The proposed project will pay all applicable Development Impact Fees to the City and local school district to alleviate potential impacts related to public services. XV. RECREATION Less than a) Would the project increase the use of existing Significant neighborhood and regional parks or other potentially with Less than recreational facilities such that substantial Significant Mitigation Significant No physical deterioration of the facility would Impact Incorporated Impact Impact occur or be accelerated? ❑ ❑ ® ❑ XV.a) The project proposes only commercial uses that will not generate a significant amount of new permanent residents in the City who would require additional recreational facilities or programs. Many project workers will likely live in or near to Arcadia, and can take advantage of existing City and County park facilities and services. Some new workers outsiery of Arcadia and may place incremental increased demand on City park However, these impacts would be incremental and would not represent significant impacts to City recreation facilities or services. LSA CMG1301 61 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY b) Does the project include recreational facilities Less than or require the construction or expansion or Sigwithant Potentially with Less than recreational facilities, which might have an Significant Mitigation Significant No adverse physical effect on the environment? Impact Incorporated Impact Impact ❑ ❑ ❑ XV.b) The project proposes commercial lodging uses which would not generate a substantial amount of new City residents, so the proposed project would not generate a need to expand existing City recreational facilities. The proposed project will also have a number of indoor and outdoor event or public spaces which will help reduce potential impacts on local park facilities. Therefore, no significant impacts associated with this issue would occur, and no mitigation is required. XVI. TRANSPORTATION/TRAFFIC Would the project: a) Conflict with an applicable plan, ordinance or Less than policy establishing measures of effectiveness Sigwithant Potentially with Less than for the performance of the circulation system, Significant Mitigation Significant No taking into account all modes of Impact Incorporated Impact Impact transportation including mass transit and non-motorized travel and relevant ❑ ® ❑ ❑ components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit? XVI.a) The traffic impact analysis prepared for the proposed project (Kimley Horn & Associates July 2013)(Appendix G) evaluated twelve (12) local roadways and four (4) local intersections based on the City's traffic study requirements and the County's Congestion Management Plan (CMP) criteria. It concluded that Phase 1 of the proposed project will generate a total of 842 daily trips on weekdays, 24 in the AM peak and 62 in the PM peak, and 844 trips on Saturday, 75 of which are during the PM peak. Phase 2 would generate a total of 412 daily trips on a weekday, 43 tips in the AM peak and 62 trips in the PM peak, and 395 trips on Saturday, 44 of which are during the PM peak. The project traffic impact analysis used the Highway Capacity Manual (HCM) methodology for both signalized and unsignalized intersections. The HCM method examines the ratio of volume to capacity (V/C) and emphasizes seconds of delay on each leg of an intersection. All traffic data are presented in Appendix G of this document. The following analysis summarizes the project traffic impacts using Level of Service (LOS) rankings, which are on a sliding scale of A though F, with A being excellent traffic flow through an intersection and F being extensive congestion. A more detailed explanation of LOS values is provided in the project traffic impact analysis and a supplemental memorandum addressing City staff comments in Appendix G. LSA CMG1301 62 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY The City of Arcadia utilizes CMP traffic impact study guidelines that define a "significant traffic impact" as an increase in demand by at least 2 percent where the intersection would operate at LOS F with the project traffic. According to the traffic report the intersection at Huntington Drive and Colorado Place would be negatively impacted due to the proposed project. Phase 1 will have significant impacts on the intersection of Huntington Drive Colorado ol project increase of have sign than 2 percent impacts on demand. However, Phase 2 o f the o proposed surrounding intersections. Table I: Summary of Intersection Analysis (2013)1 —_ — — — — Saturday — -- -- — — Weekday PM Peak Hour Impact PM Peak Hour Impact Intersection Am Peak Hour * V/C LOS Change* V/C LOS Change* V/C LOS Change 1. Huntington 0.747 C 0.010 0.811 D 0.001 No 0.691 B 0.001 No Drive/Santa Anita Avenue 2. Huntington 0.904 D 0.005 0.787 C 0.005 No 0.646 B 0.007 No Drive/Santa Clara Street 3. Huntington 868.850 F 868.306 887.6 F 886.42 Yes 1181.350 F 1180.71 Yes Drive/Colorado Place 0.001 No 4. Huntington 0.786 C 0.001 0.567 A 0.001 No 0.598 A Drive/Holly Ave Source:Table 13, Kimley Horn&Associates,July 2013 Level of Service(LOS)values that include Existing(2013)plus Cumulative plus Ambient plus Project traffic V/C = HCM methodology showing volume to capacity ratio = HCM only applies to signalized intersections LOS = Level of Service(A through F) 63 LSA CMG1301 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Table.]: Summary of Intersection Analysis(2016)1 Weekday Saturday Intersection Am Peak Hour PM Peak Hour Impact PM Peak Hour Impact V/C LOS Change* V/C LOS Change* V/C LOS Change* 1. Huntington 0.785 C 0.012 0.840 D 0.000 No 0.716 C 0.000 No Drive/Santa Anita Avenue 2. Huntington 0.938 E 0.002 0.818 D 0.003 No 0.672 B 0.003 No Drive/Santa Clara Street 3. Huntington 0.530 A 0.003 0.792 C 0.004 No 0.655 B 0.000 No Drive/Colorado Place 4. Huntington 0.813 D 0.000 0.586 A 0.000 No 0.618 B 0.000 No Drive/Holly Ave Source:Table 21, Kimley Horn&Associates,July 2013 Level of Service values include 2016 plus Ambient Plus Project traffic V/C = HCM methodology showing volume to capacity ratio - = HCM only applies to signalized intersections LOS = Level of Service(A through F) Table K: Summary of Roadway Analysis: Existing (2016)1 Roadway Segment �. LOS Change 1. Huntington Drive Baldwin Avenue to Holly Drive 0.443 A 0.002 2. Huntington Drive (EB) Holly Drive to Santa Clara Street 0.505 A 0.001 3. Huntington Drive (WB) Holly Drive to Colorado Place 0.620 B 0.005 4. Huntington Drive Santa Clara Street to Santa Anita Avenue 0.657 B 0.005 5. Duarte Road Holly Drive to Santa Anita Avenue 0.592 A 0.000 6. Live Oak Avenue Anta Anita Avenue to Second Avenue 0.691 B 0.000 7. Baldwin Avenue Colorado Street to Santa Anita Mall 0.823 D 0.003 Driveway A 8. Baldwin Avenue** Santa Anita Mall Driveway A to 0.590 A 0.002 Huntington Drive 9. Santa Anita Avenue Foothill Blvd to I-210 WB Ramps 0.699 B 0.004 10. Santa Anita Avenue Colorado Boulevard to Santa Clara Street 0.795 C 0.004 11. Santa Anita Avenue Santa Clara Street to Huntington Drive 0.627 B 0.004 12. Santa Anita Avenue Huntington Drive to Campus Drive 0.686 B 0.001 Source:Table 20, Kimley Horn&Associates,July 2013 1 Level of Service values include 2016 plus Ambient Plus Project traffic V/C =HCM methodology showing volume to capacity ratio - =HCM only applies to signalized intersections LOS = Level of Service(A through F) LSA CMG1301 64 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Regarding parking, the site plan includes 337 parking spaces and the City requires 312 parking spaces. While parking was recently removed from the State CEQA Guidelines Appendix G Checklist as an environmental issue, it is nonetheless important to know how much parking is being provided by the project compared not have to how park on adjacendt properties due rto a deficiency of assure that project occupants w onsite parking. Miticiation Measures The following measures are proposed to help ensure that project-related traffic, both short-term during construction and long-term after project occupancy, are reduced to less than significant levels, as outlined in the project traffic study (KHA 2013): TRA-1 Prior to issuance of an occupancy permit for either hotel in Phase 1, the developer shall be responsible for installing an additional signal phase to accommodate northbound movements exiting the shared hotel driveway and southbound movements entering the hotel driveway. The developer will also change the number one lane to a shared through and left turn lane to access the driveway nlanes.for These changes shall the signal made to t account the sati satisfaction o added and in and lanes. 9 coordination with the City traffic engineer. TRA-2 Prior to issuance of occupancy permits for either of the hotels or the hotel condominiums, the developer shall install bike racks and provide showers and locker rooms for employees who wish to ride bicycles to work. Bike racks shall also be installed for project guests in appropriate locations. An appropriate number of bike racks shall be located near each building to serve the anticipated number of employees and guests. This measure shall be implemented to the satisfaction of the City Engineer. TRA-3 Prior to issuance of building permits for either Phase 1 or Phase 2, the project plans shall be circulated to Foothill Transit (FT) and the Metropolitan Transit Authority (MTA) to determine if there is a need for a bus stop on the south side of Colorado Place in front of the project site (i.e., for either FT Route 187 or MTA routes 78, 79, or 378). If either agency determines a need for such a stop, the developer shall install a bus stop to agency specifications prior to issuance of occupancy permits for the affected phase of development. This measure shall be implemented for each phase to the satisfaction of the City Engineer. TRA-4 Prior to issuance of occupancy permits for either hotel in Phase 1, the developer shall demonstrate that the main hotel entrance for Phase 1 has a circular drive with signage to allow only one way circulation (counter-clockwise) to provide adequate vehicle queuing lanes for exiting at the traffic signal. This measure shall be implemented to the satisfaction of the City Engineer. With implementation of these , potential tial traffic and significant d non-vehicular circulation impacts of the proposed project will be reduced levels. LSA CMG1301 65 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY b) Conflict with an applicable congestion Less than management program, including, but not Significant Potentially with Less than limited to level of service standards and travel Significant Mitigation Significant No demand measures, or other standards Impact Incorporated Impact Impact established by the county congestion management agency for designated roads or ❑ ❑ ❑ El highways? XVI.b) The project Traffic Impact Analysis was performed in accordance with the Los Angeles County Congestion Management Program (CMP) guidelines. Therefore, the proposed project will not conflict an applicable congestion management program with implementation of Mitigation Measures TRA-1 through TRA-4. c) Result in a change in air traffic patterns, Less than including either an increase in traffic levels or Significant Potentially with Less than a change in location that result in substantial Significant Mitigation Significant No safety risks? Impact Incorporated Impact Impact ❑ ❑ ❑ XVI.c) The proposed project does not include uses or components that would affect air traffic, so no substantial safety risks would result from project implementation. No significant impacts would occur, and no mitigation is required. d) Substantially increase hazards due to a Less than design feature (e.g., sharp curves or Significant Potentially with Less than dangerous intersections) or incompatible uses Significant Mitigation Significant No (e.g., farm equipment)? Impact Incorporated Impact Impact ❑ ® ❑ ❑ XVI.d The proposed project will increase traffic onsite and on adjacent streets and intersections. The project leg of the skewed intersection adjacent to the project site entrance is presently uncontrolled and signed for "right turn only". Although there have been no accidents at this location, a substantial increase in traffic from the project site would substantially increase the risk of traffic accidents at this location due to this leg of the intersection being uncontrolled. The project traffic study recommends the proposed project be responsible for improvements to the existing traffic signal to add controls to the project leg of the intersection (see Mitigation Measure TRA-1). This measure will provide traffic control as development intensity of the site increase and will prevent the increase of hazards due to design features of the proposed project. There will be no significant impacts with implementation of this mitigation measure. LSA CMG1301 66 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Le ess than e) Result in inadequate emergency access? S s cant Potentially with Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑he Arcadia XVI.e) The Arcadia Police Department is ale aTraffictassoc ated withiproject Fire Department is only three minutes away from the project site construction may have a temporary effect direct access to the site will patterns.beavailable pr imar,primarily proposed project is in a urban setting and from West Huntington Drive and os�henaoxmty of emergency se will rvibesPthe uebabysettingeand on East Huntington Drive. Due p availability of access to the site impacts tall of the will be less foh emergency access. proposed project will also comply Therefore, there will be no significant impacts and no mitigation is required. Less than Conflict with adopted policies, plans, or Significant Potentially Less than programs regarding public transit, bicycle, or witn pedestrian facilities, or otherwise decrease Significant Mitigation Significant No the performance or safety of such facilities? Impact Incorporated Impact Impact ❑ ® ❑ ❑ XVI.g) With implementation of Mitigation Measures TRA-2 and TRA-3, the proposed project would be consistent with City policies supporting public transit, bicycle, and pedestrian facilities. With this mitigation, impacts will be less than significant and no additional mitigation is required. XVII. UTILITIES AND SERVICE SYSTEMS Would the project: Less than a) Exceed wastewater treatment requirements Significant Quality the applicable Regional Water uali ty Potentially with Less than Control Board? Significant Mitigation Significant Impact Impact Incorporated Impact ❑ ❑ ® ❑ XVII.a) The project site currently has eatment existing the City ofsArcad Arcadia and the sanitary sewerage collection and treatment systems of Los Angeles, respectively. Under Section 402 of the Fe eral Clean non ater Act WA), the Regional Water Quality Control Board (RWQCB) issues Elimination System (NPDES) permits to ta9ul wateas .t Was t discharges discharges"water cl�deh discharges which of includes rivers, lakes, and their tribu ry in the stormwater and construction project discharges. ires a 9 NPDES permit. Construct project project proponents disturbance of more than one acre requires LSA CMG1301 67 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY are also required to prepare a Storm Water Pollution Prevention Plan (SWPPP). These measures are outlined in Mitigation Measures HYD-1 through HYD-3 in the previous Section IX.a, Hydrology and Water Quality. Prior to the issuance of grading permits, the project applicant would be required to satisfy City requirements related to the payment of fees and/or the provision of adequate wastewater facilities. The project would comply with the waste discharge prohibitions and water quality objectives established by the RWCQB and the City by implementing Mitigation Measures HYD-1 through HYD-3. By implementing these measures, project impacts related to this issue would be reduced to a less than significant level and no mitigation is required. b) Require or result in the construction of new Less than water or wastewater treatment facilities or Significant Potentially with Less than expansion of existing facilities, the Significant Mitigation Significant No construction of which could cause significant Impact Incorporated Impact Impact environmental effects? XVII.b) Water and wastewater services are provided to the project site by the City of Arcadia Public Works Services Department. The department obtains water from both groundwater and imported water. The City also provides sewer service collection to the local area. Wastewater from the area is carried by sewers to the San Jose Creek Water Reclamation Plant which is operated by the Sanitation Districts of Los Angeles County. The proposed project would need to connect to the existing sewer line in West Huntington Drive which is currently considered to be deficient according to the City's Public Work's Department, and the proposed project would increase this deficiency. However, a Capital Improvement Project (CIP) design to upgrade the existing sewer pipe from 10" to 12" is scheduled for Fiscal Year (FY) 2014-2015 while actual construction is planned for FY 2015-2016. The proposed project would need to participate in (i.e., help fund) this CIP project. If the project participates in this CIP improvement, it will not cause a need to construct any new water or wastewater treatment facilities, or expansion of existing facilities because these facilities are adequately sized to service the site. Mitigation Measures UTL-1 Prior to issuance of a building permit for either hotel, the developer shall retain a qualified licensed civil engineer to conduct a sewer study to evaluate before and after conditions of the project on the City's existing sewer system (both lateral and main lines). This measure shall be implemented to the satisfaction of the City Public Works Services Department. UTL-2 Prior to issuance of an occupancy permit for either hotel, the developer's fair share payment to the City will be determined to help fund upgrading of the existing sewer in West Huntington Drive included in the City's 2014-15 Capital Improvement Project Plan budget, based on the results of the sewer study outlined in Mitigation Measure UTL-1. This measure shall be implemented to the satisfaction of the City Engineer and/or the City Public Works Services Department as appropriate. With implementation of these measures, the proposed project will not have a significant impact on water and wastewater facilities. LSA CMG1301 68 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY c) Require or result in the construction of new Less than Significant stormwater drainage facilities or expansion of potentially with Less than No existing facilities, the construction of which Significant t Incorporated Significant Impact could cause significant environmental effects? p ❑ ❑ ® ❑ XVII.c) The proposed project will pay the City's established Development Impact Fees (DIF) to help offset costs for new stormwater drainage facilities. Therefore the proposed project will have a less than significant impact on these facilities, and no mitigation is required. d) Have sufficient water supplies available to Less than Significant serve the project from existing entitlements potentially with Less than and resources, or are new or expanded Significant Mitigation Significant No Impact Incorporated Impact Impact entitlements needed? ❑ ❑ ® ❑ XVII.d) Water service is provided to the project site by the City of Arcadia Public Works Services Department. The department obtains groundwater from the Main San Gabriel and Raymond Groundwater Basins. The City also obtains water imported from the Metropolitan Water District of Southern California (MWD) via the State Water Project and the Colorado River. According to MWD's website, it will be able to meet the region's water needs through 2030. In addition, the proposed project does not meet the threshold to prepare a project-specific Water Supply Assessment (WSA) under SB 610. Therefore, impacts related to water supply are considered to be less than significant, and no mitigation is required. e) Result in a determination by the wastewater Less than treatment provider, which serves or may Potentially with Less than serve the project that it has adequate Significant Mitigation Significant No capacity to serve the project's projected Impact Incorporated Impact Impact demand in addition to the provider's existing ❑ ❑ ® ❑ commitments? XVII.e) The proposed project would not increase the area population or otherwise induce substantial new population growth, as outlined in the previous Section XIII, Population and Housing. Therefore, impacts related to wastewater are less than significant, and no mitigation is required. f) Be served by a landfill with sufficient Less than permitted capacity to accommodate the Potentially with Less than project's solid waste disposal needs? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ XVII.f) The City of Arcadia does not contract with a particular landfill. However, the existing hotel contracts with Waste Management to dispose of trash generated on the site. The LSA CMG1301 69 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY proposed project would likely contract with the same company or with a similar company in the area. The proposed project would generate wastes both during construction and occupancy of the hotels and condominiums. According to the California Recycle website, hotel uses generate approximately 10 pounds of trash per person per day, so the proposed project as a worst case scenario could generate up to 5,270 pounds of trash each day or 2.6 tons per day which adds to 962 tons per year (5275 persons times 10 pounds per person per day). g) Comply with federal, state, and local statutes Less than and regulations related to solid waste? with Significant g Potentially w Less than Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ❑ ® ❑ XVII.g) The proposed project would be required to comply with applicable elements of AB 1327, Chapter 18 (California Solid Waste Reuse and Recycling Access Act of 1991), and other applicable local, state, and federal solid waste disposal standards, thereby ensuring that impacts associated with this issue would be considered to be less than significant, and no mitigation is required. 5 260 total rooms x 85 percent occupancy x 2 persons per room average= 442 guests plus 85 employees = 527 persons. This is a worst case estimate. LSA CMG1301 70 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY XVIII. MANDATORY FINDINGS OF SIGNIFICANCE a) Does the project have the potential to Less than degrade the quality of the environment, Potentially With Less than substantially reduce the habitat of a fish or Significant Incorporated Significant Impact wildlife species, cause a fish or wildlife population to drop below self-sustaining ❑ ® ❑ ❑ levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? XVIII.a) The project site already supports an existing hotel and is fully developed. Development of the proposed project would not result in any significant impacts to important plants (redwood trees) or wildlife with implementation of the recommended mitigation measures BIO-1 through BIO-3. Less than b) Does the project have impacts that are Significant individually limited, but cumulatively Potentially with Less than considerable? ("Cumulatively considerable" Significant Mitigation Significant No Impact Incorporated Impact Impact means that the incremental effects of a project are considerable when viewed in ❑ ❑ ® ❑ connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.) XVIII.b) As presented in the discussion of environmental checklist questions I through XVII, the project has no impact, a less than significant impact, or a less than significant impact with implementation of mitigation with respect to all environmental issues. Due to the limited scope of direct physical impacts to the environment associated with this development project, the project is not expected to have significant cumulative impacts within the City or surrounding areas. Less than c) Does the project have environmental effects Significant that will cause substantial adverse effects on Potentially with Less than human beings, either directly or indirectly? Significant Mitigation Significant No Impact Incorporated Impact Impact ❑ ® ❑ ❑ XVIII.c) In general, impacts to human beings from the project may occur due to air pollutant emissions, hazards and hazardous materials, and noise. The South Coast Air Basin is currently designated as a non-attainment area for ozone, PM10, and PM2.5. Development of the project would contribute to air pollutant emissions on a short-term basis. The proposed project would be required to comply with regional rules that assist in reducing short-term air pollutant emissions. The purpose of from man-made fugitive dust sources (seeuAIR-1). Imi t pleme ation of the atmosphere resulting LSA CMG1301 71 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Mitigation Measures AIR-1 through AIR-4 We to these mea l help red soresnwould help assure that short- term impacts from the project. Adherence air quality impacts from construction would remain at less than significant levels. In addition, potential impacts related to potential hazardous materials and to water resources have also been addressed in the appropriate sections, including Mitigation Measures HAZ-1 and HYD-1 through HYD-3, respectively. With im reduced entti to less than s significant easure ,le oeential impacts of the project in these areas will remain o r As detailed in the preceding responses, development noiseh effects, resulting in cocoa responding either directly or indirectly, in adverse hazards less than significant impact to human beings. LSA CMG1301 72 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY SECTION 4 LIST OF PREPARERS 4.1 LSA ASSOCIATES, INC. • Kent Norton, AICP, REA (Project Manager) • Lynn Calvert-Hayes, AICP (Principal in Charge) • Tony Chung, Ph.D. (Noise/Air Quality/GHG Studies) • Katherine Best (Environmental Planner) • Casey Tibbet (Historical Assessment) • Steve Dong (Editor) • Margaret Gooding (Graphics) 4.2 CITY OF ARCADIA • Jason Kruckeberg (Development Services Director) • Lisa Flores (Planning Services Manager) LSA CMG1301 73 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY SECTION 5 REFERENCES Arcadia 2010 "City of Arcadia General Plan."City of Arcadia. November 2010. BB&N 1987 "Noise Control for Buildings and Manufacturing Plants,"Bolt, Beranek & Newman (BB&N), 1987. CaIEPA 2013a "Managing Hazardous Waste," California Environmental Protection Agency (CaIEPA) and Department of Toxic Substances Control, website accessed August 1, 2013. http://www.dtsc.ca.gov/hazardouswaste CaIEPA 2013b "Certified Unified Program Agency(CUPA) Program Directory,"California Department Environmental Protection Agency (CaIEPA), website accessed August 10, 2013. http://www.calepa.ca.gov/CUPA/Directory/default.aspx CALREC Calrecycle website accessed August 12, 2013. www.calrecycle.ca.gov Caltrans 2001 "Transportation Related Earthborne Vibrations (Caltrans Experiences)': California Department of Transportation (Caltrans), Division of Environmental Analysis, Office of Noise, Air Quality, and Hazardous Waste Management. Technical Advisory, Vibration. TAV-02-01-R9601. February 20, 2001. Caltrans 2013 California Department of Transportation Scenic Highway Program, California Department of Transportation (Caltrans), website accessed August 2, 2013. http://www.dot.ca.gov/hq/LandArch/scenic_highways/scenic_hwy.htm CAPCOA 2008 "CEQA & Climate Change: Evaluating and Addressing Greenhouse Gas Emissions from Projects Subject to the California Environmental Quality Act," California Air Pollution Control Officers Association (CAPCOA), January 2008. CARB 2007 "Proposed Early Actions to Mitigate Climate Change in California," California Air Resources Board (CARB), April 20, 2007. CCCPP 2013 "Hydrofluorocarbon, Per-fluorocarbon, and Sulfur Hexatluoride Emissions," California Climate Change Policy and Program (CCCPP), California Climate Change Portal, website accessed July 21, 2013. http://www.climatechange.ca.gov/policies/1990s_in_depth/pagel1.html CCR 2013 "California Health and Safety Code,"Section 7050.5, California Code of Regulations (CCR). July 2013. LSA CMG1301 74 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY CDC 2013 "Farm/and Mapping and Monitoring Program,"California Department of Conservation (CDC), Division of Land Resource Protection. Website accessed July 30, 2013. CGS 2013 "Fault Mapping in California". California Geological Survey (CGS). 2005. Website accessed August 3, 2013. CIWMB 2013 "Estimated Waste Generation Rates," California Integrated Waste Management Board (CIWMB) website accessed on August 2, 2013. www.ciwm b.ca.gov/wastechar/wastegen rates/defa u It.htm CWC 2013 "Sections 10750-10756," California Water Code (CWC), California Department of Water Resources website accessed August 2, 2013. DOF 2013 "E-5 Population and Housing Estimates for Cities, Counties and the State, 2001-2010, with 2000 Benchmark "State of California, Department of Finance (DOF), Sacramento, California, July 2013. DOT 2013 "Code of Federal Regulations, Title 49—Transportation, Pipeline and Hazardous Materials Safety Administration," U.S. Department of Transportation (DOT), website site accessed August 3, 2013. http://ecfr.gpoaccess.gov/cgi/t/text/text- idx?sid=585c275ee19254ba 07625d8c92fe925f&c=ecfr&tp1=/ecfrbrowse/ Title49/49 cfrv2_02.tpl DTSC 2013 "Hazardous Waste and Substance Site (Cortese) List," California Department of Toxic Substance Control (DTSC), website accessed August 3, 2013. http://www.envirostor.dtsc.ca.gov/public FEMA 2013 "Flood Limit Data and Mapping,"U.S. Federal Emergency Management Agency (FEMA), Flood Insurance Rate Map Program, website accessed August 1, 2013. Geo Inc 2013 "Preliminary Geotechnica/Assessment" Geotechnologies, July 2013. Geotracker 2013 "Geotracker" database of hazardous material sites maintained by the Regional Water Quality Control Board, website accessed July 25, 2013. HII 2010 "City of Arcadia Zoning Map."Hogle-Ireland Inc. 2010. KHA 2013 "Traffic Impact Assessment, Santa Anita Inn Redevelopment Project. " Kimley-Horn and Associates, Inc. 2013. LSA 2013a "Air Quality Analysis." (includes greenhouse gas emissions). LSA Associates, Inc. August 2013. LSA 2013b "Noise Impact Analysis. "LSA Associates, Inc. August 2013. NRCS 2013 "Soil Data Mart,"Natural Resources Conservation Service, United States Department of Agriculture, website accessed August 2, 2013. LSA CMG1301 75 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY http://soildatamart.nres.usda.gov/Report.aspx?Survey=CA675&UseState =CA and as documented in the "Soil Survey of Los Angeles County, California" issued by the U.S. Department of Agriculture, Soil Conservation Service, original research dated 1971. PDA 2012 "Initial Study and Mitigated Negative Declaration, For Two Medical Office Buildings, A General Office Building, and a Four-Level Parking Structure at 161 Colorado Place and 125 W, Huntington Drive."Pacific Design Group. December 2012. RJLA 2003 "Phase I Environmental Site Assessment, Continental Assets Management" RJL Associates, March 19, 2003. SCAG 2008 "Final 2008 Regional Comprehensive Plan," Southern California Association of Governments (SCAG), adopted October 2, 2008. SCAG 2012a "2012-2035 Regional Transportation Plan/Sustainable Communities Strategy," Southern California Association of Governments (SCAG), adopted April 2012. SCAG 2012b "Growth Forecast Appendix of the Regional Transportation Plan/Sustainable Communities Strategy" Southern California Association of Governments, adopted April 2012. http://rtpscs.scag.ca.gov/Documents/2012/pfinal/SR/2012pfRTP_Growth Forecast.pdf SCAQMD 2010 "Air Quality Management Plan," South Coast Air Quality Management District (SCAQMD), 2010. SCAQMD 2013 SCAQMD website accessed August 2, 2013. www.aamd.gov/cega/handbook/LST TTA 2013 "Hydraulic & Hydrology Calculation." Tritech Associates, Inc. July 2013. USEPA 1998 "AP-42 Emission Factors, Natural Gas Combustion,"U.S. Environmental Protection Agency (USEPA), July 1998. www.epa.gov/ttn/chief/ap42/ch01/final USEPA 2004a "EPA420-P-04-016: Update of Methane and Nitrous Oxide Emission Factors for On-Highway Vehides,"U.S. Environmental Protection Agency (USEPA), prepared by ICF Consulting. November 2004. http://www.epa.gov/otaq/models/ngm LSA CMG1301 76 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY USEPA 2004b "EPA430-K-03-004, Direct HFC and PFC Emissions from Use of Refrigeration and Air Conditioning Equipment." U.S. Environmental Protection Agency (USEPA), Climate Leaders, October 2004. http://www.epa.gov/climateleaders/documents/resources/refrige_acequi puseguidance.pdf. USFWS 2011 "HCP/NCCP Planning Areas, Southern California,"U.S. Fish and Wildlife Service (USFWS), October 2011. LSA CMG1301 77 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY SECTION 6 SUMMARY OF MITIGATION MEASURES I. AESTHETICS AES-1 Prior to issuance of a building permit, the applicant shall demonstrate that all project windows are glazed or otherwise treated to minimize glare on surrounding roads and properties, to the satisfaction of the Development Services Director or designee. II. AGRICULTURAL RESOURCES None III. AIR QUALITY AIR-1 Prior to issuance of a grading permit, the general contractor for the project shall prepare and file a Dust Control Plan with the City that complies with SCQAMD Rule 403 and requires the following during excavation and construction as appropriate: • Apply nontoxic chemical soil stabilizers according to manufacturers' specifications to all inactive construction areas (previously graded areas inactive for 10 days or more). • Water active sites at least twice daily (locations where grading is to occur will be thoroughly watered prior to earthmoving.) • Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least 2 feet of freeboard (vertical space between the top of the load and top of the trailer) in accordance with the requirements of California Vehicle Code (CVC) Section 23114. • Pave construction access roads at least 100 feet onto the site from the main road. • Control traffic speeds within the property to 15 mph or less. AIR-2 Prior to the issuance of a grading permit, the project developer shall require by contract specifications that contractors shall utilize California Air Resources Board (CARB) Tier II Certified equipment or better during the rough/mass grading phase for rubber-tired dozers and scrapers. Contract specifications shall be included in the proposed project construction documents, which shall be reviewed by the City. AIR-3 Prior to the issuance of a grading or building permit for each phase, the project developer shall require by contract specifications that contractors shall place construction equipment staging areas at least 200 feet away from sensitive receptors. Contract specifications shall be included in the project construction documents, which shall be reviewed by the City. LSA CMG1301 78 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY AIR-4 Prior to the issuance of a building permit for each phase, the project developer shall require by contract specifications that contractors shall utilize power poles or clean-fuel generators for electrical construction equipment. Contract specifications shall be included in the proposed project construction documents, which shall be reviewed by the City. IV. BIOLOGICAL RESOURCES BIO-1 Prior to issuance of a grading permit for each phase, the developer shall provide an assessment of existing trees on the areas to be developed. This tree assessment shall be prepared by a qualified landscape architect and identify any existing large bushes or trees that can be relocated or preserved as part of the new development project. The project landscaping plans shall attempt to preserve existing mature trees onsite to the extent feasible, based on the tree assessment. This measure shall be implemented to the satisfaction of the City Planning Division. BIO-2 During project construction in either phase, the existing redwood trees along the east side of the property shall be protected by being taped or roped off with appropriate signage so construction equipment will not accidentally come in contact with and damage or destroy any trees. The trees shall be sprayed with water at the end of each day when substantial amounts of dust are generated (e.g., during grading or demolition) to minimize damage from dust deposition. This measure shall be implemented to the satisfaction of the City Planning Division. BIO-3 Construction in either phase should not occur during the local nesting season (estimated February 1 to July 15). If any construction occurs during the nesting season, a nesting bird survey shall be conducted by a qualified biologist prior to the issuance of a grading permit or removal of any large trees on the existing hotel property. If the biologist determines that nesting birds are present, an area of 100 feet shall be marked off around the nest and no construction activity can occur in that area during nesting activities. Grading and/or construction may resume in this area when a qualified biologist has determined the nest is no longer occupied and all juveniles have fledged. This measure shall be implemented to the satisfaction of the City Planning Division. V. CULTURAL RESOURCES CUL-1 Prior to demolition of any existing hotel buildings on the site, the completed DPR 523A and 523B forms and a cover memorandum shall be submitted to the City for filing to officially document the historical assessment for the Santa Anita Inn. This measure shall be implemented to the satisfaction of the City Planning Division. CUL-2 Prior to issuance of an occupancy permit for Phase 1, the applicant shall install a monument plaque indicating the location of the former Santa Anita LSA CMG1301 79 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Inn and its importance in the history of the City of Arcadia. The size, construction, and location of this plaque shall be up to the discretion of the City Manager, in consultation with the Planning Division. CUL-3 If cultural artifacts are discovered during project grading, work shall be halted in that area until a qualified historian or archaeologist can be retained by the developer to assess the significance of the find. The project cultural monitor shall observe the remaining earthmoving activities at the project site consistent with Public Resources Code Section 21083.2(b), (c), and (d). The monitor shall be equipped to record and salvage cultural resources that may be unearthed during grading activities. The monitor shall be empowered to temporarily halt or divert grading equipment to allow recording and removal of the unearthed resources. If any resources of a prehistoric or Native American origin are discovered, the appropriate Native American tribal representative will be contacted and invited to observe the monitoring program for the duration of the grading phase at tribal expense. Any Native American resources shall be evaluated in accordance with the CEQA Guidelines and either reburied at the project site or curated at an accredited facility approved by the City of Arcadia. Once grading activities have ceased or the cultural monitor determines that monitoring is no longer necessary, such activities shall be discontinued. This measure shall be implemented to the satisfaction of the City Planning Division. CUL-4 If paleontological resources (fossils) are discovered during project grading, work will be halted in that area until a qualified paleontologist can be retained to assess the significance of the find. The project paleontologist shall monitor remaining earthmoving activities at the project site and shall be equipped to record and salvage fossil resources that may be unearthed during grading activities. The paleontologist shall be empowered to temporarily halt or divert grading equipment to allow recording and removal of the unearthed resources. Any fossils found shall be evaluated in accordance with the CEQA Guidelines and offered for curation at an accredited facility approved by the City of Arcadia. Once grading activities have ceased or the paleontologist determines that monitoring is no longer necessary, monitoring activities shall be discontinued. This measure may be combined with CUL-3 at the discretion of the City Planning Division. CUL-5 In the event of an accidental discovery or recognition of any human remains, California State Health and Safety Code § 7050.5 dictates that no further disturbance shall occur until the County Coroner has made the necessary findings as to origin and disposition pursuant to CEQA regulations and PRC § 5097.98. If human remains are found, the LA County Coroner's office shall be contacted to determine if the remains are recent or of Native American significance. Prior to issuance of a grading permit, the developer shall include a note to this effect on the grading plans for the project. LSA CMG1301 80 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY VI. GEOLOGY AND SOILS None VII. GREENHOUSE GAS EMISSIONS GHG-1 To ensure reductions below the expected "Business As Usual" (BAU) scenario, the project will implement a variety of measures that will reduce its greenhouse gas (GHG) emissions. To the e extent feasible, and will the satisfaction of the City of Arcadia (City), following incorporated into the design and construction of the SPSP project prior to the issuance of building permits: Construction and Building Materials Recycle/reuse at least 50 percent of the demolished and/or grubbed construction materials (including, but not limited to, soil, vegetation, concrete, lumber, metal, and cardboard). Use 'Green Building Materials," such as those materials that are resource- efficient and are recycled and manufactured in an environmentally friendly way, for at least 10 percent of the project. Energy Efficiency Measures Design all project buildings to exceed the 2013 California Building Code's (CBC) Title 24 energy standard by 10 percent, including, but not limited to, any combination of the following: Design buildings to accommodate future solar installations. Limit air leakage through the structure or within the heating and cooling distribution system to minimize energy consumption. Incorporate ENERGY STAR or better rated windows, space heating and cooling equipment, light fixtures, appliances, or other applicable electrical equipment. Install efficient lighting and lighting control systems. Use daylight as an integral part of the lighting systems in buildings. Install light-colored roofs and pavement materials where possible. Install energy-efficient heating and cooling systems, appliances and equipment, and control systems. Install solar lights or light-emitting diodes (LEDs) for outdoor lighting or outdoor lighting that meets the 2013 California Building and Energy Code. Water Conservation and Efficiency Measures Devise a comprehensive water conservation strategy appropriate for the project and its location consistent with the City's Water Efficiency Landscape Ordinance (WELO). The strategy may include the following, plus other innovative measures that may be appropriate: LSA CMG1301 81 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Create water-efficient landscapes within the development. Install water-efficient irrigation systems and devices, such as soil moisture- based irrigation controls. Design buildings to be water-efficient. Install water-efficient fixtures and appliances, including low-flow faucets, dual-flush toilets, and waterless urinals. Restrict watering methods (e.g., prohibit systems that apply water to nonvegetated surfaces) and control runoff. Solid Waste Measures To facilitate and encourage recycling to reduce landfill-associated emissions, among others, the project will provide trash enclosures that include additional enclosed area(s) for collection of recyclable materials. The recycling collection area(s) will be located within, near, or adjacent to each trash and rubbish disposal area. The recycling collection area will be a minimum of 50 percent of the area provided for the trash/rubbish enclosure(s) or as approved by the waste management department of the City of Arcadia. Provide employee education on waste reduction and available recycling services. Transportation Measures To facilitate and encourage non-motorized transportation, bicycle racks shall be provided in convenient locations to facilitate bicycle access to the project area. The bicycle racks shall be shown on project landscaping and improvement plans submitted for Planning Department approval and shall be installed in accordance with those plans. Provide pedestrian walkways and connectivity throughout the project. Fund or participate in some type of shuttle service for hotel guests to access the City's downtown Gold Line Station. VIII. HAZARDS AND HAZARDOUS MATERIALS HAZ-1 Prior to demolition of any existing hotel buildings or associated structures, a qualified contractor shall be retained to survey structures proposed for demolition to determine if asbestos-containing materials (ACMs) and/or lead- based paint (LBP) are present. If ACMs and/or LBP are present, prior to commencement of general demolition, these materials shall be removed and transported to an appropriate landfill by a licensed contractor. This measure shall be implemented to the satisfaction of the City Building Division including written documentation of the disposal of any ACMs or LBP in conformance with all applicable regulations. LSA CMG1301 82 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY IX. HYDROLOGY AND WATER QUALITY HYD-1 Prior to issuance of a grading permit, the developer shall file a Notice of Intent (NOI) with the Los Angeles Regional Water Quality Control Board to be covered under the National Pollutant Discharge Elimination System (NPDES) General Construction Permit for discharge of storm water associated with construction activities. The project developer shall submit to the City the Waste Discharge Identification Number issued by the State Water Quality Control Board (SWQCB) as proof that the project's NOI is to be covered by the General Construction Permit has been filed with the SWQCB. This measure shall be implemented to the satisfaction of the City Engineer. HYD-2 Prior to issuance of a grading permit, the developer shall submit to the Los Angeles Regional Water Quality Control Board (RWQCB) and receive approval for a project-specific Storm Water Pollution Prevention Plan (SWPPP). The SWPPP shall include a surface water control plan and erosion control plan citing specific measures to control on-site and off-site erosion during the entire grading and construction period. In addition, the SWPPP shall emphasize structural and nonstructural best management practices (BMPs) to control sediment and non-visible discharges from the site. BMPs to be implemented may include (but shall not be limited to) the following: • Potential sediment discharges from the site may be controlled by the following: sandbags, silt fences, straw wattles, fiber rolls, a temporary debris basin (if deemed necessary), and other discharge control devices. The construction and condition of the BMPs are to be periodically inspected by the RWQCB during construction, and repairs would be made as required. • Area drains within the construction area must be provided with inlet protection. Minimum standards are sand bag barriers, or two layers of sandbags with filter fabric over the grate, properly designed standpipes, or other measures as appropriate. • Materials that have the potential to contribute non-visible pollutants to storm water must not be placed in drainage ways and must be placed in temporary storage containment areas. • All loose soil, silt, clay, sand, debris, and other earthen material shall be controlled to eliminate discharge from the site. Temporary soil stabilization measures to be considered include: covering disturbed areas with mulch, temporary seeding, soil stabilizing binders, fiber rolls or blankets, temporary vegetation, and permanent seeding. Stockpiles shall be surrounded by silt fences and covered with plastic tarps. • Implement good housekeeping practices such as creating a waste collection area, putting lids on waste and material containers, and cleaning up spills immediately. • The SWPPP shall include inspection forms for routine monitoring of the site during the construction phase. LSA CMG1301 83 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY • Additional required BMPs and erosion control measures shall be documented in the SWPPP. • The SWPPP would be kept on site for the duration of project construction and shall be available to the local Regional Water Quality Control Board for inspection at any time. The developer and/or construction contractor shall be responsible for performing and documenting the application of BMPs identified in the project-specific SWPPP. Regular inspections shall be performed on sediment control measures called for in the SWPPP. Monthly reports shall be maintained and available for City inspection. An inspection log shall be maintained for the project and shall be available at the site for review by the City and the Regional Water Quality Control Board as appropriate. HYD-3 Prior to issuance of a grading permit, a site-specific Standard Urban Stormwater Management Plan (SUSMP) shall be submitted to the City Planning Division for review and approval. The SUSMP shall specifically identify the long-term site design, source control, and treatment control BMPs that shall be used on site to control pollutant runoff and to reduce impacts to water quality to the maximum extent practicable. At a minimum, the SUSMP shall identify and the site developer shall implement the following site design, source control, and treatment control BMPs as appropriate: Site Design BMPs • Minimize urban runoff by maximizing maximizing permeable areas and minimizing impermeable areas (recommended minimum 25 percent of site to be permeable). • Incorporate landscaped buffer areas between sidewalks and streets. • Maximize canopy interception and water conservation by planting native or drought-tolerant trees and large shrubs wherever possible • Where soil conditions are suitable, use perforated pipe or gravel filtration pits for low flow infiltration. • Construct onsite ponding areas or retention facilities to increase opportunities for infiltration consistent with vector control objectives. • Construct streets, sidewalks and parking lot aisles to the minimum widths necessary, provided that public safety and a walkable environment for pedestrians are not compromised. • Direct runoff from impervious areas to treatment control BMPs such as landscaping/bioretention areas. Source Control BMPs Source control BMPs are implemented to eliminate the presence of pollutants through prevention. Such measures can be both non-structural and structural: Non-Structural Source Control BMPs • Education for property owners, tenants, occupants, and employees. • Activity restrictions. LSA CMG1301 84 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY • Irrigation system and landscape maintenance to minimize water runoff. • Common area litter control. • Regular mechanical sweeping of private streets and parking lots. • Regular drainage facility inspection and maintenance. Structural Source Control BMPs • MS4 stenciling and signage at storm down drains. • Properly design trash storage areas and any outdoor material storage areas. Treatment Control BMPs Treatment control BMPs supplement the pollution prevention and source control measures by treating the water to remove pollutants before it is released from the project site. The treatment control BMP strategy for the project is to select Low Impact Development (LID) BMPs that promote infiltration and evapotranspiration, including the construction of infiltration basins, bioretention facilities, and extended detention basins. Where infiltration BMPs are not appropriate, bioretention and/or biotreatment BMPs (including extended detention basins, bioswales, and constructed wetlands) that provide opportunity for evapotranspiration and incidental infiltration may be utilized. Harvest and use BMPs (i.e., storage pods) may be used as a treatment control BMP to store runoff for later non-potable uses. X. LAND USE AND PLANNING None XI. MINERAL RESOURCES None XII. NOISE N-1 Prior to issuance of grading and building permits for each phase of the project, the developer shall prepare a Construction Noise Control Plan and will submit the plan the City for review and approval. The plan shall include but will not be limited to the following: • During all project site excavation and grading, contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers consistent with manufacturers'standards. • The project contractor shall place all stationary construction equipment so that emitted noise is directed away from the closest sensitive receptor to the project site (i.e., the Salvation Army facility at the southwest corner of the site). LSA CMG1301 85 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY • The construction contractor shall locate equipment staging in areas that will create the greatest distance between construction-related noise sources and the closest noise-sensitive receptor to the project site (i.e., the Salvation Army facility at the southwest corner of the site) during all project construction. • During all project site construction, the construction contractor shall limit all construction-related activities that would result in high noise levels to between the hours of 7:00 a.m. to 7:00 p.m. on weekdays and Saturday. No construction shall be permitted on Sundays or any of the holidays listed in AMC Section 4261. • Prior to the start of Phase 2 grading, the developer shall install a wooden noise barrier along the common boundary of the project and the Salvation Army rehab facility at the southwest corner of the project site. This barrier shall be removed upon completion of Phase 2 construction. N-2 Prior to the issuance of building permit for each phase, the developer shall demonstrate that all buildings shall have air-conditioning to minimize noise impacts on hotel rooms along West and East Huntington Drives. N-3 Prior to the issuance of occupancy permits for the Phase 2 condominium building, the developer shall install a filled-cell concrete block wall along the common boundary with the Salvation Army rehab facility at the southwest corner of the project site. In lieu of the temporary construction wall outlined in Measure N-1, the developer may install this permanent wall "early" (i.e., prior to issuance of occupancy permits for Phase 1) which would eliminate the need for that portion of Measure N-1. XIII. POPULATION AND HOUSING None XIV. PUBLIC SERVICES None XV. RECREATION None XVI. TRANSPORTATION/TRAFFIC TRA-1 Prior to issuance of an occupancy permit for either hotel in Phase 1, the developer shall be responsible for installing an additional signal phase to accommodate northbound movements exiting the shared hotel driveway and southbound movements entering the hotel driveway. The developer will also change the number one lane to a shared through and left turn lane to access the driveway for the hotels and modify the signal to account for the added LSA CMG1301 86 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY phases and lanes. These changes shall be made to the satisfaction of and in coordination with the City traffic engineer. TRA-2 Prior to issuance of occupancy permits for either of the hotels or the hotel condominiums, the developer shall install bike racks and provide showers and locker rooms for employees who wish to ride bicycles to work. Bike racks shall also be installed for project guests in appropriate locations. An appropriate number of bike racks shall be located near each building to serve the anticipated number of employees and guests. This measure shall be implemented to the satisfaction of the City Engineer. TRA-3 Prior to issuance of building permits for either Phase 1 or Phase 2, the project plans shall be circulated to Foothill Transit (FT) and the Metropolitan Transit Authority (MTA) to determine if there is a need for a bus stop on the south side of Colorado Place in front of the project site (i.e., for either FT Route 187 or MTA routes 78, 79, or 378). If either agency determines a need for such a stop, the developer shall install a bus stop to agency specifications prior to issuance of occupancy permits for the affected phase of development. This measure shall be implemented for each phase to the satisfaction of the City Engineer. TRA-4 Prior to issuance of occupancy permits for either hotel in Phase 1, the developer shall demonstrate that the main hotel entrance for Phase 1 has a circular drive with signage to allow only one way circulation (counter- clockwise) to provide adequate vehicle queuing lanes for exiting at the traffic signal. This measure shall be implemented to the satisfaction of the City Engineer. XVII. UTILITIES AND SERVICE SYSTEMS UTL-1 Prior to issuance of a building permit for either hotel, the developer shall retain a qualified licensed civil engineer to conduct a sewer study to evaluate before and after conditions of the project on the City's existing sewer system (both lateral and main lines). This measure shall be implemented to the satisfaction of the City Public Works Services Department. UTL-2 Prior to issuance of an occupancy permit for either hotel, the developer's fair share payment to the City will be determined to help fund upgrading of the existing sewer in West Huntington Drive included in the City's 2014-15 Capital Improvement Project Plan budget, based on the results of the sewer study outlined in Mitigation Measure UTL-1. This measure shall be implemented to the satisfaction of the City Engineer and/or the City Public Works Services Department as appropriate. LSA CMG1301 87 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Appendix A: Seabiscuit Pacifica Specific Plan (on CD) LSA CMG1301 88 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Appendix B: Air Quality/Greenhouse Gas Study (on CD) LSA CMG1301 89 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Appendix C: Historical Assessment (on CD) LSA CMG1301 90 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Appendix D: Geotechnical Constraints (on CD) LSA CMG1301 91 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Appendix E: Phase 1 Hazmat Study (on CD) LSA CMG1301 92 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Appendix F: Hydrology and Water Quality Studies (on CD) LSA CMG1301 93 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Appendix G: Traffic Impact Assessment (on CD) LSA CMG1301 94 SEABISCUIT PACIFICA SPECIFIC PLAN INITIAL STUDY Appendix H: Noise Assessment (on CD) LSA CMG1301 95 mm (0 c ° = an m N o n o m0 Cn ° C Q ° Dn mca oa m r m c oN O m m C < = ° F) (i C N m � Cn m 3 0 CD = D r • m m a –m . - O a 0 3 m a) c a N o -0• o – N Cr Q crt . o CD N N N 0. O `G ° CDD ca O m 0 m ry m m m 0• ° �-. 'A 5 ccv N v N co u) (O. o mC N _,. 0 ( 7. z 0 °- (n a s - a cm) c N m N 0- a,p m 0 v' -n CD (D CD Cr m m N O O° 0 C m ° n aj N 7-vOi ° <. n = a) 0 0 , h Q < v CD o m n ° � moo om ° : mQ . . aa) g, o 3' g - m 2 v m o a o ? m (n . a c co N CD 7- CD D a) = o 0 0 0' 7 -1-.) 0. m m sv cn ^ v < 0 0 o 3 N m 3 -. o o � c m• a si � a a oNm � 3 Duo °� �_ U) Cv v, a) �' o 0 °CO, =: m o 03 v o 0 0 3 o a � � n m o cNn m °� n CD o' vooDom = , °a0a7i oco"" m -<--" aop0-,00- F0- 0 �. o cc° N O Z C_ E ° Co-0 0- m m Nco ya) vo ..co vao —1 m m a�Zi m o icin �(V 3 a QwCO m °� � N ao o o N �cn n� E 'G pm o < m ° co c co 5/2 n O 0. ? � 3 � � 0 � �+ = ° ZD - c m m a (n -173v � y. m C O n � 5o D� = n -' -0 3S m c7QO8v3 7a3crosm � ocn 7oC mv, ° 00C „r a CD o: m nc CD a' �v CD F'� 0) -5 * (0Cn 3 c° 5. o o m m w m 0 ai ° CD ro v Q C1,< 41 D CD X (D D) ? O O (0 CD O o to N 0_in (0 _ _, a a 7 _• = .-r �� CDC o o a � m o a � m 0. 7c-a, --, 07. uCD, v an m y 5 � ° o m O o avaiv; DmmmN ' - m -. o moa °- con mQ - ac 8c- -a � - o 3 m Q, (. o ° m m ac 0 o a 'C�' � o v ° co cn am °Q � a� c cn v m �co v y 5 ° "'oca7cD. aDa < = vu°, mOCD0mvcnoCD , ° cnov 5ic� `n3 �� c v C) co ac co c • o m 5"< m a - CD o m m o .° a- o m CD a ° '' 3: o= m =CCD ] P- Z aca a, -, CD 0. cn v ° _ v o � c� �, 7 0 am 8 CD v o °—' 0 v O 01. E m m 7 N. aam m y g ° 7 $ CO ° ° C ° N �cn a � a° ° o D � � 7 -17'5. om CD -gym v `T 5 7 7 m 7 Z Z ti o av ° 7 D0 m m ? d �' CD �� w� v. m m so m co cD ego o p' N 7' �' CD CD Nc° a) N a4 aO 3 N (0 CA) Oa. d 61 c E �i a7N 0 7 N . a = 7. o� 7 st O O ,< ^Q 7•'D CD A c uj CD ED o� � � �.� CD �> > a <� " 3 � oa ° r' n°i �' v�, co � � cn � a� ° °' 2 Z 0 CA ter,,-°2. D (-3 -o o ° '0 o v N m vsc ~ CD 7"a 0S o R o 5C0m ccDD ° m o = ?. < o c° BCD 3 C' m n v y. � R 7 ] m . v, o an m =-o Z ° m w CU O ado c v o CD O ,D5 c 0 _ << Sa filc C,D �1 �°. - 7 � c < C 7 .9, =. ] 61 3 m vCfl w<c CD T. Q� mcn' am cCDD mcn CD 0. aa5co v CD CD nico �� 1ST ? ° Z D Z (/� 0.0 00 17 y Ir 51 (7). ' v -. -.,Ts Z — o 0 _ > > o ° = �'1 C0 - m 13 w r v = o T 73 Z a3 CD ° t° CD c o Z C7 a 0 Y, n O O Ds 0 0 D c � J n � GI _ ■ Q (D -, N C) 07 0 Ct? 0 O O 7 = 0 7D) a (� a 3 7 (� o n D CD � < _. c � o �<. ,<. a C cD N 7 c D N < O < < aC -0 N am N C N (0 D? m — Cn =;a 3 = -• .+ O N CD 7 CD CD (n 7 0 0 7 p 0 0 N -0 y •-.1 o r-1- ac 5 O3 O O 7 O H. a m 7 7. 0 CCU a co m• N a. ooN o0 n cn 7 6 it N D--0 s 0 7 0 ' wmo 3 Z .C. m . o 3 0 cn = o. O O C• CD o �-o • u)a di 0 o - C) N 0 w s 5 c N a n < -0 o- � o 0 o (0 -o 5 j S a a TI o ca 0 3 3 (0 o -1 3 C� a 5 ? ! �' O W a r j < O CD a) n C CD CD '< CD a) -,. Q c) O 7 CD 7• m co ,„ n 7 10 CD CD A N 7' 3 co 7' C 7 CD CD 7 a -, 7 CD Q (�. 7 c (D up) CD (ll O -- CD (D , '- o• `� 3 ? a cn r- 7. 3 vC * c a_= om (n0 o) Q. cN. m ° m7caox. N Ct) oS�Upc� �io (c) CD rn S o CCD .. c 0 ncomma000_ '0 0 3 a_;.•--n p �+ a) 0 z 7 o C 0 CD a - 7 7 O 7 ._. n 7 O -, 7 7 (n f1 a`G N O ° 0'(p 7 CD p 'A Q Stn 1D" <-(7), a Co 7 a) a 7 d CD CD C1 co 7 O(° .-F N CD a) CD S 7 `< 7 3 v 1 CD o 7 (D O p. _o -' co CD a N O m ,N+ L. 7- c 7 - 3 (a ? - CD N c _ a N O (-5- C N „O,. ,. C O 7 CD v _ CD = a �, (2 a rn CI) (� �, n 0 7 m 09 o ° o cD o w a(o `< o c CD.m a 7 m 7 - m- - o °• C4 �D /� CO• fD cn sZ S1) (a tij 7 N 7 -+. g O 7 CO g, 20) a (S O fD a) Y/ W co OF CD= 3oQc- o C (D _� `� (D , a' a , 3. 7c° '< mom _ _ o-0 . a- a � ma ° D 'A ch. c N 7 7 C• p a i0 y ' O a C C1 O O CD O C1 a) (fl ' 7 7 < CD O (O Cn a) 3 .7•. a o ._. V cD =^ O n N 072. c (n CD j',, O 74 co co y. 3 3 co N`< a) -O 0 (D 7 CD ...t O 7' O 3 8 7 m C o o 7 p co x,co c c a) � o CD -.. a(O CD UO) .y. O / 03 go m ° Cl, v m �co 7c° � y o <ca co p °' F o 0. m °' O _C n 3 o �.3cD o o a c o c p) CD n CD co �. a cn 7 0 -7 o a(0 3 ? a m m o co 1 3 cnI@ < 7 - m o o m o .< 07 CD m Q. 7 o CD a tv . o Q O - j' w O C y o 7 0 E 11 D N a co 0 O y vOi 7 m�• ° o°-� A O CD o CD o a) (n Cr O o• '� 0- w CD — < � < :10)c1� (n0 . C° - •—• 5-.m CO al —1 11 ° v D m m �' � � '2 m ua, o � c � 3 a w o Cn --0 CD ) m 7" 0 0 3 — v o n a 3- m o ao < °<—' •o c m 7 a 7 a) ° m o am v X D CD R _ (D a 0 `. co CD a) a In cn 7 °�'. CD -w ° O`< (() a O 7 N O N a y ((D o ° O .CD• o0 0. 0 oco 0 0) 6. o' -0 W -0 0 u 0 m 7 a) O C - Z• O -, 7 (n co (o(o =. cn n CO 2 rn -0 is,. o 20 oO_ 0 > � 0 n7 0 ,. a, � � xi z o c (.0 Xi°7 O 7 O o C N O co N. -0 O o e O O `< O co 7.(D d C o' _ ' (D _ S Cn 7 CD CD -, O Q X � CD (O ... 3 7 j N w 7 a 3 N TT N m ° 7 CD CD(n O CD 0 0 7 0 .. D m 3 `D 3. ° ° _0 Cn CO p ~) 8 a) 0 a C7 D CO a ,�' -a o - 8 n °130 CD C.S. cm7 < C. D3 CD p W a,' (Dc c. cn m 7 7 (n co n S 7 O N 0 co 7 o O O 7 S•� 7 3 C A �' -, v y a y a C a) N -- Q (D O C 7 co CI) CD a 07 O O n 3 0. W CD (D �' CD > 2 a ACV *1, E. � a a oog � � m` o0� N (D 2 � s - 3 o. c f7 N 7 a ° a N C 3 Z a v CD C a) Z 7 (D 3 -. < ° (0 fD 0 D ~ --� an a ° 0- CO m co Z � � � o (nm o D 07g b" c =� ° D o 3- = c 7 ty •co" CD n, cD o CD m CD Cn n < o. m v ° _ = w 9 . ] 2 c a "a o 10 m CD = < •o < CID 7" O a3 m•m n. m — C= n m _+ -- Ca c a u, ? OD cn c, :, c FD. ° 2 c�' CD o co v ='3 v c Cn -°O < m17 3 0 -D Or a _ a, n _ Qa � A; :m o Cr 6.' -S1 = am CD 3 = 'A p = D. N ? O j a 3 ton 0' 0 _ ° n aD 0 .p _ gyp co N = co w V••71 Cn C) � `< CID) _ Cn = Na O 3 a (� 8 8O _ ycn m _ m ■UU ! ! m ° �' N D a.C��D CD _ n "(p 7 7 a Cep C ° m a w K ? NN Q., 0 0= ,- "l /1 -1 0 m v a co � < n O o -.. co 0 v CS y O ♦/o �-° 3 C 6 CD aN CD O Z O C oi Cn (DQa(n CD m (Dnco O m C. ° o < •oc o O Z z4- A o 3 ton O a c CD CD O o co = a d 7 A (2.,' 7' a CDD CD tan (en"to 0.° O V O•. ni Cr CD �. , s O CD _ N w a o d N '" v (�D n d Q CD CD= c CD X w-0 Cn CD N al a ? _ C 3< c c a < q, a (a) � Q o co Z D o aaco ao D cad ° (D Ul na) 8 mc0 m m (.° 8 m sa -1 77 m .9 O 3 n cco co n o rn 5- 3 a.D ? co o c' a) co 0 CO p� c C� 2. °_' N = o o O CD _. O .-. D1n-r ca a O Cn N a ,< N 'o = o N N O O ° 0 7 j O C7 m CD a3 (0 co v ao m = ° CD CI P. cn v 3 '< chi v v � = CD CD Z V1 pn CC_) a7 pn < <.� co D n F 1 o v c -0 Z 5. 13 o o .. o O 0 T o OWN n _ _' T 5 co co z CS 0 > (D O SO 7O T g 73 Z o = Cl) n 7 n ro 0 —I a m CD (D � � V a o o c Z n � c co O CD c Qcoy � < O ni ? o v ° C'' co o m am �0 � o co c(0o n s c D o ? o o O O-' ` v c w3 3 tn ° m co 74: D ao < 0 moon o 7 n N N CD N CD 1] n = C n K mo < m7.� C. ccn � cu < < 0 CD t° h m3 -..-0c° cn mn - c O O cn a p Cu c un od ( m ° c -„< m d co o• o co = _ c. 0ro r. o v .� �; _ ro m N - m O o p v 3 - c c g a g Z. 6. 9_a a 7 '3 O O ca a G) c -0 n> n u) v n. CD a 0 a 5 CD O 5 co 3.c° -1 co a 010 z=. 0 � -o• <., _0 0 - 00 0a) ma) n • ymo70D - m� � -.-0a 3io (2.� � ° c am cn o ° m �m � 0 v 3 ac o _�' � � m D cu a a. °. 0 .- co O 3 Q ca 0 N 3 m a f, -• at 0.-, 10 "O O CD N v '� N a. 3 O Iv H N (Q 11 CD D 6 0 o r. st 6 Ca cp p a m .c1) v o c) cQ v * �' v 0 o C 0 m u+ v m 3 O m 2 7 a _ N m y •O < O a < -,• 0 O N O f ° D o, o' m cD p c m ° � �'. � ? o va 5-mm � o �c° � cp � oiO o � 3 C 13.X m � N � o � cn � ocn N O � � c a 0m � a � -t d g f) =" m w - v y m ca p (n • 2, S m ip — co O `z m o CD- co N O O C7 m O S 4) �. X C) O ° CO N � � m a3 = _,, �, � c = 5cyno co 000 a � nc, D (1) +n CO N ° � = Z � * � 2 „ -tea.- < 0 (aNm" = e ox o. cocno00 � D cin _, � ° - — a, ? � (,i „,-•=. a � _' 0 y o � m 3 a) 0 o4 - Sao 0 O 0 C cD mmo � o > >• � mm `° � N � o � � � m rmo � co � a oZ 0 C m a0C m - = , m y � v . m• O -0 .0 0 oco o a CD "'I C m N O- a- ° > > = m N rD m O7 O 0 m p, K a ,..r C k, Ccn aay ma if P- Qa'7- <. ao c ° 0- =. (� cua C 13 _' oo = < � a re 0. 8 ?^ � ocn bc' ammo CD _Z C1 cr, m ~ •- m o _ C) 7- °CDo c vo - c_ '< 3 - n off - "'I /7�1 0 = 0 — O C7SS° (D , m , m O' St N d a0.rt O CI (Jl O m co -„ `G In a = fn In (p CD 0 a O - m /v 0 n 0 m C) ° (/) n 0 a� 0 `�• coo <. 0. am < `< K' � D Ri ° S WV CD O m a, a > > S. p, co m o = "0 Z _n O cn Q O O to .: -h O co 5 ?. CD 0 N O "s O C 11 cia �co n - - 73 n cr ° co of 0 O •° p 0 Z �D m COm o o -I O a o .Q . m C 0 n a v v • 0 0 s ( 13 XI (n O 0 at a - C -.4 Y) m a C ° (DEC N w v D O 7 ° -S-o N D� n _n - � � - � ° Imo °;cQ 3 C)co m - CD - 0,, 3 6- o D CD C m a 8n zo � oo y-0c �. o . - CD W < S 7 '< N O < ° 0 "4i i n o = a a $ o a N y O co D _ * O 10 -. co co �. c N D N 3 o 0 c3D -^ C n � � to a = --=h - n 0 coc 0o0 , mom � a P a x3 c v, 3 c -° � w cu CD O O rD �. m O — m m O rn .M. v ct) v - v - . N ....... CD Q. ry =� 0 3 � 3 O 0 a ' o..2 Z _° v 0 CO - ° a v c v , 0 3 a a = N cro co c 0 O c° b LOZ `8 L tien-gad aleudadde s! uoge6!l!w an!;ewal!e Jeq eq n Jo/pue peJ!nbaa s!loafad 941 01 uo!leog!pow I! awwJalap uayl!pm'sa!oue6e alq!suodsa paloa4e Aue yl!nn uogounfuoo isuodsei paloa}}e Aue wio;u! uagi !pm Al!O ay; pue 'pewJo;u! Alale!paww! u! ���!� ow_ •sa!oua6e all, ai i ua i sa�nseaw uoge6!l!w ay; eq !legs Ai eqi 'palueweldw! AIln;ssaoons eq louueo u!aJaq p ,}.l P. Aue 'uo!leluawaldw!loafo.Jd;o esinoo eqi 6uunp;I •;oaayl uogeu gwoo e Jo 'JoloeJluo3 `lueogddy peu6!sse uaaq aneg uogelua.ualdw! sa!l!1!glsuodsal ay; `pJe6eJ s!yl uI •eeie loafad a uawa dw! eq II!^^saseaw uoge6!l!InI •sa!1!ngoe ay;lnoy6nayl luawdo!anap}o sa6els luaaa}}!p le P m � I a do a samseaw e uo poda pue .ol!uow II!m Apo au 'loafad pesodoid eqi Jo; p l P uo!le6!l!w II 6u!Jnsua 10;alq!suodsai Si e!peoJV;o�l!� aqi 'Aoua6y peal ay;sy uoge6!l!w ay) !pm aoue!Idwoo Iln; S311I1I8ISNOdS321 aNH JNI21O1INOIN NOW/91111N Z17 •ueld o!;!Dads og!oed l!nos!geas ay;Jo;uo!WJeloaO ange6eN pale6g!IN/1cPn1S pp! ayl u! pagguap! uoge6g!w sepnlou! weJ6ad 6u!1JOdaa pue 6uuolluovl uoge6g!ini s!yl •weJ6ad ay;ow! pa;eJodaoou! pue pedolanap we�6ad q II!M spJooaa pue sanpaoad eoue!Idwoo 6uuol!uow mau `spew ale se6uegows sawn aooJd eqi Jo; alq!suodsa asoyl Aq suogepuawwooal uodn paseq au6!eaa uaaq seq sain a oid (£ aoue!Idwoo o}sabueyo 'sassai6ad 6uuol!uow sy Iq. g q P p inn aoue!dwoo uaynn .pagoda eq p, I pue w of pue `uaynn pue uaMel eq II!M uogoe legm 'uogoe a)Iel II!^^oqm saleu6!sap anpeooid ties siyl . essaoau uogoe yoea Jo; pau!Ilno uaaq seq uogeo!;uan pue aoue!idwoo sanseaw Poge6q!w (Z !planes ;o uo!leluewaidw! A}!Jan o; pasn eq Aew uo!loe auo 'saouelsu! awos ul •eoue!Idwoo ainsue of kesseoeu ainpaoad pue uo!loe eqi yl!M pepJooaJ ale seJnseaw uo!le6!l!w ayl ( :sluawala 6u!Molio;aqi su!eluoo wel6oJd 6upol!uow ayl •uogeluawaldw! loafad au6!sa a e s wei6oid 6uuol!uow Jo 6ul iodei ayl eqi salels me! 6uunp aoue!Idwoo ansua of p P q In ) uawua!nue ayl uo sloa};a esJanpe pone JO ele6!l!w ayl •(9•�gp�Z uo!loaS apo� ao�nosa� o!lq d) 3 of loafad e uo peoeld seinseaw esoyl Jo; wel6o`d 6uuol!UOW JO 6ue!podeJ e a ild op sae6!bw (y030) PV Al!lenp leluawuonnu3 e!wo;!Ie0 ay�eJ6lod 6u!lJOda� pue l 6uuol!uol�I ulo!le6!l!►nI s!yl 6uguewaldw! u! asn io; paiedeJd uaaq seq d NOIlaflaO2IlNI 'I. W`dHDO2Id ON1111Od3?! aNY ONI1:JO1INOW NOIlVOIlIIN viav021v AO A110 — NV1d 0If103dS VOIIlOYd litlOSi8V3S O d c 4- U v O O Q U Z E o ~ r c 0 E ca V (1) � a 7 N a) a) D c D v- C U O O •- •c . O c- O N n 2 U co CD L. C -C C ' a) `) N .@ ] > N a �_ m E Q O a ° CI C "O 2 Q • - ° o a)co @ V L AL Q '4 o U En N O Q � • - c _ E O U /V >a' ` o J. O a .� O a co , Y. c U U O ,^ 0 a) U Z = o c a 9 Z W 2u- cL Q 0 ° a J 0' a) CL. w 0) �, U N L L O c C C - LL 0 o o ._ .v u) o � = c Z cn LU Q a) n w > a Ce OcO Q Z O a) — C 0 Q) a, > • M ›....0 N a oa) 3i- w3 •° = oac u) - -5i o �� ° o mCc3 c V O � a N� N5d r Ncu N .3E L E 0 o ay IL a) a) N O U C 7 C m C a) N c C ° >., �+ Q m °) U y w N ,� O N C ° N L `O L ° 7 N y O C Z ooa� E y `n w UmE y > o a _) "- c my r E av .n S r rn < 0 p o c yU• a) ccoo T.-; a� =N y ~ a),c°) � 2 � o °o 0 y cdi E c o c° a To� o f6 o m 3p ° N ° v Z tq N N _ C� o .�- � � °c E o.- n aa)) U c E SS 5 2 Q ° ° co rn ° N o E To . c p 0 Z C W O ° O •° c ? — N O 22 ° H cl N .0 N U -C m a u) a) d O) N V F.. a) N � m � a� cowa m co jai � 6� � � a`0i oa " n) 007 gC . o0 L N Q a < 0 �`' > > f0 >. o 0 00 o C7 mo ? a) � O ` ° o w 8 c aa� .rn ct 03 CD ca W y j m L 4,-;,-, c o C m e 'O c 0 C CO V U c a- N a) 8 W = N a) co a) CO v) °It= co c � •• a as > o > c m rn v) c TZ N E N = c d m@ c y U m i� E O d 'p O c c co m m W c00 O- N + = C = 41 Q d m vN- (/) O 7 -O •— . C w c >:-, a m T N aS C a) U LL. V! O a) W y y .N-� C d d 7 r N O Q) y 3 W m c0 O p N io N v N 0 0 Q. ce t7 •ti ._ 0 aa, ° ct c i.•o y � r � � m a)o1 a 0)m .@r E a�`'- .0 - o yr •- 17 = -0 a) .T+ a . .= 0 a) E Co N N N co U a) c a) cO Co a) N E m C U C L 41 N 2 5 C7m •3 E -c U �45 _cm U CC -° E > ° D E W 0U No 0 .E � £ E � 3 °)a) c L O W w U u) c C , ,_ O 0 a U Z E c0 c O • U cn m m C. f6 !-• > c .r- C O O O fa U s a) C 2a) > Q w- _ O O O arras Q C U ce LJL E_ L Li O > O ce n. rn >, 1— ,,^^ = c C) V ` 0) Z o3 C a I H o Z Ce 2u_ d W . a) U " .N .i LL 0 o• o ._ W Q 0 2 cc a 0 a Z _ � � _ Ec a) a) 0) . cn C O y N N O •- a) L L = O CO C Cl) E C U - V Ce LL E -O V) CD ID V) m O "�-�° L � ._ 'C 3 cpi OL . a w > g o > w ao .3 o a) vi-0 a p)0w V Z @ E m � .� a) U oU � °' a m m o c CO d @ �) E c°)m� m ao 30 � m o m y 'a� n� o o H a = a = Y. 3ww co o w co a•o °) m o v Z O = 'o a) 0- ,_ c ° � -o mu, 3m aia) a) u) c �♦ 0 z c f6 m e L O I) .8 c W a) L fi a) E c=a g) O -O N a) = a)•V 0) .0 m = w -o C C 'p C .0 o .§ o L.. L .= E -0 (CO ] o o H = V) h N I- L .J C C Q) O . t0 L p "E f0 W _V N Q .2)-C) O U O O O m p `o- m = a) V .o O ° h o N �' a0i m.E o c`0 . a'= o uoi o U y 3c c E A ain � .c v) a) ` a) °'`mow y o m Q H, vv py ;-..52 Lto Eo � c °) _ � � 2 cmo ` V1 c N c 8 3 P — 0)_ y V d F. J a) , C U C 3 o m � TL � co o co 6-, 3 � 3 � o,,a 3 >I is ....%) � = w e u) Q) d u) v) N - M U TC C T'.> a o fn N �i d— � - 3•cow Ern ' — E E c) .. a) O) p o) ca o — o = p o N •� .� Q Y C — w — O N Q) N a) O N > CO m co U ° °) a) CO (d O � m C. aa)) E N� c3 c >� co LO co yf0o `° � � y � a) o a) mo .� yp p oho 3 Din win . U v v c) 0 3 `5 U N H a L cp O U c N 0 m ` U co a) � �U p ° a. co 0,C O .EUE .�L a czi U do co� sOd N a) — y_ - •O CD 0 C d C a) U U v• UE0 O O o Q :' 3 C T°m 0 0 CpU U `F- O a c d 'L or > a) - - _a E O m a. co O >. U y J L O) Q o -8 =o8 .3 m o 4- _ Q O .°- ° �� o `o2U U c CO o :° cC)m N LL 0- ,C C 'U O Q 8 E N . (vi S a) C u , O� ~ > dVN .. coin g V ,_• c a) V • C) Z o z � _ = cr a Z re nLL. o• 0 < 0 C. W CD U te •N •� 0) L LL 0 p 0 0 c 17 Z O m 7 Cr) ��Z// 6 C O a) O L a) C V C O M C L_ .T, a) _co y 17 u7 en -o N o f9 N >+ IL C 0 C F- o co c4 0 .N m U - E E 3 > O +•' J L - C co co _ C co T U 0 rU a V °- cd E E 3 @ 'o- :0 � r > m 'o' a0i Q C o 2 ��m Q'> � ss LL H d � � ° r o E o `a ° aai @ c ow w c �� ccoo co °cc u) V ° co E � � Q o aa) H E L" 8 F- h ° T.._ o o E � .� Z � � - o u) oo � -cE Q a) N Q o , Lv 2@a) o < 0 cocoEo � T@ c -0 . m � c� -o �>a � >.,yZE ° @co ° CI- M o > m aco - U c ° � � c_°' c co y E � y � a� o �- _ c `� a ° ° a`�i �y °) me co ° m =O w o a) f° � a) o m E r• Z O v 'O > C U m T C fa T E 0 ° N h C N a Q Z C �LZ_ c � � ao -° y � � ma Y c o o y oga E u, at �' CD (.� m •- co H 3 � o '> 0 c o vi .°). c � ° a) y c � N � - ° .co < ' E •f6 0-1- '1' N U) Q = i � m d o a) °° c°' m ° oL2 o . � cn S ° m ° ° � ° a) CO /A N a y N (��pp @ a (D O U a1 'O T C ~ @ O C .a) co C Q a) U - U y O C o w _V 0) U U •O y a a) T C U_ p - O O a- C O D. E U 00 Q 2 .� U 0 CD c0 O C U O o O >, ` C .a O N .a) L N a .0 O O U' - a 4? y vo) ° c`a O L LU — _ c6 O U U a) t/) f� 'O c0 a) o E n ° w � aa-) a) o ° f° � C o ° L O D ,`o r E PM O= 0 O La) O CD _ ° N a) E ID co 1a a.0 c Ui a) a ,_ 0 C o U 0 O. c4 E ion 3 o � ° 2 t � •@ t � r a) .o o " , m ° 0 o° 3 a a° C -o -t ac) C as O U -5 U a) p ca a) C y > a 3 U O` a) D V U c S , co a co a) o c N • Q o > aoi > O o o CC a) o cco a o O o c Z 3 C o C C y E C y a 2 E. m92 ) U)) 2aaac) Eacco H 1- m ° � U) acao dwcivO) -D 5 S .0 ° a ° aa- � ._`-) .E m o) O C c c .� 0 c5 O O a .° o 0 U Z t ' L E c 0 L N to V a � a °) ra F- a) 0 c N a O. J L O O O aa u) O p O a> 3 c > a) al > m N N L ici o 0 0 z a V)a .n o c a)aa) L.77-.a' -, rx 7 `= � � m E 2 m a a> a> > 0 2 > C J a) > (p 2 0 Us � v) Urccooa � Q _ p oo E Q oa> U � c�a aa) - oa) m ce Q _ _ - C C . :a. c Q �/ _ L O y N cp O O a cr) >, co o co V Z ° 3 f _ f 0. C S a o L I ,_. o 0 0 c ° Z emu. Ova) 0af)) < O a) C V Z Q c wo> fn O � LIJ T. >.-.ii) V/ Z C C ) .L.+ O C (0 a) L L _o m L a) " 0 a> m L f6 a) L.. C c U . L a) N c0• Ti Ft O ma 3 0 - y 3 �a c@ m .- C . af°i �° c a> cmo E O c m • E50 -50E `n >i a) a)L w Q ° n LL 1�" of a`) >a CU `nU) � � v, o Dina o E � a> �' N � m � °' Z E ° E a_ To -cncn >> Ya -° Who mo � a3 � y�-_ Ca.NC a � � � ca ° c J ° C7�� o m o E o� L CJ CO cn �a) c) N c m Ecm - E CO ui < 0 o 0 0 C. M c22 = o c aZZ ED Zm g mLm m 3 a�.0 a0 `° �uoi N �o 0U o (� mo m m o 'E c o . E E Cr) o oa coi rn0 . 0 c a) .°. c o) 3 v CO Z O 3Q a c°i?�_ " N 'o ola n = p o @ co ? 0.. ca3 E coo - O Z c p� C .V Q O O f0 T'° �' c�U N O L O . U r C O O 'Q a) O V 1... o n Z 0 C o m c _w'o .U ~ o c > o a '0 a- 0 v '° . ai (/) Q v ° o o moQ> ow $ �nyca 0 oDmmoD Ica o c c " co m (7 moo —7.3 zz a». 000 m � > > � o m Q ca L Q .� w- � a� c EL ■a) od aC0 O C� na c = c o m Ea 3 a> c m >• > CD a a> o 0 U as a c g- o 7) mu) $4- 1=- 5 c 0 `� 3 o 0 � a> o Ea3 o o00U � 0L °? o o _ 0 c c y o 3 W w 7) a y O L U w C L a) c 0 O y C 0 ? o N 3 to LL c c > `n U J 6Q N c 0 g � a>> 05. 0 m 0 0 3 > o o a c —° m Cl) 0occo da> Qov @ ° D0 cYoa> aacc°', aao ° moot' .. ' cCc CZ 0 O E 0 o o '- L .0 U 0@ ° E .0 N O o 2 >a a) a) :r a L a> L U co z Q •° O 0 > N f0 ()i C O (1) d a N w a O) } > N C a> > 1C U c C m y E p a a> CD z;= C .- c m o 8 8 2 wm°O- U m - 0 m0 3 Ew x -va co u) coo a) co co � . L o a) `- 0 U) C C = .- 0 Q. 0 Z E U C O ca V 1 N «% ca 'i N .4 7, > 0 C .4-. C O O O U , L 2 as > Q C w_ c O 'O Q O a c,,, CC Q _ U Q r ' L LL 0 F-- > • re • U o 0 U Z= • Cr Z re nu_ -J a a W _0 01 L U..▪ Cl o o U Z vii o W Q 2 N Z d -0 >, � in E 5 Ch a) a) c o a) — N � O c .—' L N Q) o a) O a) a) >, Q t coo > ° Nof0 j� � rm ° Vc`a CD N � =° E � o .b - � ' (� oc � � E .E o :noa) •o .c DON0T (1) od 0 - •o o as •c T ° c c -0 .E c °' o E � cn c N E m Un. o as0 LL N' � •= y d 2 co 0_ = O a ccv as cu •F. as o � ? o .c c > N w c `° 0 $ ° o `o 2 a) a.° 0." c `5 o `m Q oL m� g °- o rnE Ti oin co a�i aEi � ° � o a ° af0i @ a�i Ns c co5. 0. C C O- V U O N to c f0 L to N O L y V O a) ` N c c f0 O ~ C E 8 j c (6 cp O_ fn v .E C , o 0 o o � _c � 3E o ascN ° ccc c -0 0.- C /� Z Z• C c • cam o o nco 0 0 o_0 CO E 09 co_o 3 � io .n a) a�i .o c .NL a, c Y 2 .o �t ♦„/ 0 a) 0 • N N U N N ' _ .O 0 w N co C as N o N v)= a a) d 8 L E .0 c o aLc Cn Q E a) a) c a7 _ a) N N y N . O U N C O 0 0 00 N yniCC m C � o a) a) > N 3 ° To— d ca .N 3 t m • _ ° o c 0 CO Q — m 0 -0 L w Oa) n t co o) a) = N N N coo N N 2 'O N f0 - L c y N a) 3 0 CO a) a� _ Q H 2 .c w ° wF ° 3 v`Oi L � 5 c @ _m E a9 .2 N `o .a > °o 3 E Noce Q_ 'oL 2 W } �c >, ° co a) Lco o co o 'o _m ° E 0_ ° 0 m(p -0 CO n. •E o_ m a n.-• _ � 80 .n3 .Ea°ias3N o N N N .oy o U cE aoc L a o ° O a) m ` f`0 0 N a) a) c o "0 N (n ° N E d E .2 C vN) > ° LL X) m C° d a •0 0 'p m .a .- .0 @ NO C m.0 °) - co • CO E (6 N N F-:'o N 0 C CL co w a) CO o -0 .0) o TO > 8 0_ o .c L 7, . C Y C N a d 3 'a a) C N a) O N ib- N N O N CL 0 Q a) N d d O E Q m N > a0i a0) C - N c 0_ L c C Q 0 H 'c>o -o :€5 as . 2V) 2 -8 ) . co.. . a) V 0cn . cnd? . m0 . �. pO . E . -5 ca o a) v- 0 N C N E C c ._ a O p Q -° a) N U Z E L 75 c :o C 0 L c0 fQ U 0 TS __ N CD a) CU N-' — ._ L7 f4 •• a) D C O fa a) a) ao-C i 0 0 0> a 0 as s v a) > 2U ac) a_. .au) O E b o-J d Q CI 4- c E 0 0 ° L Q 2 V rn i U ai a o c m IX _ • V _ ` " o a .N a ) O O a 0) a Z C1 o 7 7 L 9a C cr a) .c Z 5u- O N Q 0 -. o_ 0 W c co V c ._0 ac)C LL Q o O " 2 5 E V Z Q "' c ac .- m cn O > a)3 n Q 5 C 7 a) d (.9 O wao N Z "O C u) u) a) C a) co •a w•a d u C c9 C 'O d a) L C O L Q1 Q O C • C a) L Q N L.. ■`° f- 0 m c9 N a) L a) CL6 a O N a) CD "0 o c c) E 3 o cn V O c. w ai mz o a- 0 E Ea 3 � o ° °' a ao E m a a) > LL co ca) u) uNi ) -c . y ao w '> ?,c d a) E � E c a� h d V Z E c E`o � c o a� o � _� mtn � m o � � .g CO m m °) ami c E c ° a>i• < 0 .. o • a co c a) •C O c3 N C — O U V L `) (xd U a N O E > L CL 2 . 0 Q� a) 8 >, >21"',:u "' a) as .0 n7 m ° ELO 7 0 Qy a.� co 2 mac -V .0 �_ Zr, CD 0 0, ,n -0 aw a m E_ a v c y •v_ c o a) c .a u, >c s, 0d. c E co E - m o H Z ° C C a E O O C > ° > L C O .L-- 7 0 C u) >+ N C C L N D O Z c o ga oM m - v, .�� > _cm m a) N V cn E E co i) 'O O U 0_ d E C a a C O .0 •d o .N 7 fag vi >.N rn 0 ''Q^^ N Q a ° � a� o � ° o° � m v�°i �c �yo2 o E 1.^. E n �m w = � .c • y o ° co W V @ d a) co O ,, ••@ cr n 0_ co fn u) O j (6 L V) c .c C Ere in L @ Q O LLJ I- n °) " aow � mc>aon a = ECoQQ " a)c m -• c y u) a) CO 5 C C f,9 O c o c .D O 2 - N .o w a) F- a) °U a ai c '3 p) N N O N 9-- d Ll VI ` O m a' D .0 n 0 C .c f4 •C CO N a N E c) f6 O) O 8 L fti ° c N E@ d •X C ° � o� � �acNc c� � @ > o oc° of p u, E 3 c000 �� o o o c�EaUc' c o c @8 � ° c a) '= Q c a) m U a.) m a•° o >. a) co a a) o m a) a) a) - M 2 a) -- c� E U FL- n -8 w cS E c mOm 2 "u)2 ° mw : ° ° a:9 u) m , n o a) 4- C.) In c = C •2 O o Q co 0• Z = O f4 U V) m N a) CD D c > — 4- C O 0 13 c O 0 _ 2 a) > a O v- C a 0 '° U CS) c13 ix Q C _ LL7 E L L (.9 ~ > 0 L re >- IL a) >, H - C V Z o 4=0 ' • Zr I I . 0 m Z CC nu- 0 J CL W .n 0 o a .N 'L U_ 0 o o U Z a cn E. a rz Q Z � 3 00 --° a. 2 = o ° o) = u' �= 3 C Ce oo -o _ o . co c a) m o co 0 0 3 N m j c E d '0 o = co C N -a V aio oa) m � � r co �' c c � '� mac e' c o c a) o E co LL Z coo ,.- y QZ` ° o � ca V c > ° co d O :L-'. o o > N a) cam u) a) a a Q .E. 26 '� 20ct) � a E - 3 E w c is m 0 c N _ co o a) o '0 f0 •c o Y_ a) N f6 U Q U m a) m T N as 0 Z Z C �' p ° t Y 7 ° a O N U c 0 Q 3 T13 a) c`oo � c m V O o c aac : � 3 a y u m co .. �j a � co c 3 @ o ti L c� r - U > o 0 0 P. 3 co c a t v) a c 0 m y a > .a o N d c = U) 00 N Q c E .0 c4 E a m c m rn o w CO U) Q c4 °s 06iV wc � o 'E � 03 c E m � v 'c c U c co LLI H :- 'o Q o c � m E@ c`mo , o 0 0 � � CD c ••-_, u) a`) E co L) o o D • a' .n C _ U a) C c c N .a 3 y N y O u C c w c Par)N uT io ca E m (n a.ci Li o m 30 7t„ tJC ` � 0 8 co c Y a) = 3 c c ay N �, E yoo ' ci) Non -c-° m a) om 2 0c o0 o m � c . m a) � p Lod o _ ou, aa�ci � 2v 2 E = sc w � •� o)E c 2, a � ccv) c o tw U .s o U F, iac O g a)) O o .s a) i o Q i E U c co .� d n - • a c • Co c.) • m £ a • 0 m CO cn a) a c Z . o • 7 E • • co • E in • V • mm L a) C C 0 U" O c E12 7 O p Q -a o v w Z E L U L "E 2 C o CO U � dn_ O a) R `a) 0 c U o v) w C Z ,s O O 0 > c 'a va u) a) O U > c 12 o -• a c0 us 2 °) m me U• -cv a) Q QC O 0 ° < O C vi 0) S2 al V 0) co C_ U ° C C C) a Q Li -- i .0 y Co .- N N CD O O re = U L ,w CD L V Z C O 0 L a U L Z OC 5 a) F- a)CD Q O J (3., a) G- W cs) m C) re c' o ti. C oQ 2 c co 0 Z a 'N ✓ Q 0 0 • o. 0 Uo C TL N T N C 0 C U fo C ui CO O C C N C co (La- a) 6- - ° (C0 a Q c , o a) y o ,N � c E .yw co co � m _Zw a) 'v T a3 'Do ° � U 0 p N O iU U) a co N N N u) CO a) O C U a m > LL H' acs .9. _..12- a -o co Z N o a) c y 'TA -0 ° E • � o � cc occCca ° -0O -cc -° O •N - a) cam `gym ° ° � 1E 9- m aS d o a m UL c m = : Q• • Z E c � � o � °vd "E' O c •D � mL c .3 3 0 E c o Q • m � a)pa c2 v3caa) � cv_)Yc ° � o - co °) uu)) To CL 2 _ E o ? ° > c a) m o � .N E 0 o a) c m .� m a) a@ > a a) x o o Z m ,.- U -c co . > E - i) m d• ui aC dy w a) cC0 N U Z 0) ° co , 30 8 O 2 co v�) ~ O O m ao v -CZ 170 a> ca') no ° Z w a) E ° ax) aEE emu°) ° d oN Z C o ff uci U > y c c c c D a.r Q ° L o Q vi V H CD a � Eo° af0 � v � cQcp ° E °'a a c°iaa�'F- w ° ° � � Ewai m N Q N Q O m m =O O a aTi-°y o •-• y C a) U C o m Z co L a 3 j 0 U 1 -v C CO O @ N CO ca ° ° Y d 0 c = m c •- ui Q w c) -o o 'v a) L ° , u> c .a o c Q v) m mo m o 'c3 a) °- c -0 c O . ° a) u) co - c ao •'o u) x E - ° 0w �' Y m p c @ E L � co c o • ai c �W/) ° t co m E a 47. -0 ° cTa a) tC O C C o LL W a) V o 3 oa � .c as' acs $ °) o m m ' m c a) g @ . N o c E d a) o _ vm E a) act co ,c-�� ° �sa. �C m Z o as m -0 °c'° 0 c)w a� a _ U E . m _ as a) o E E °c) m o o � m o ° � dm E °a a E -y ° aa) o •c m a � c .c u) U -c 4 > � c c 'c a) co c d•S E ` 2 a) C o 0 C o co a O OL U uU) ate`) o — . a`) aa)) o o - C a ~ ° E o F- F- a. 3 —Ja._ :o .ocom .oac_ c . c X Za.0 0 3 . 80oE o0 L O d c = C .T. m U O O Q.. -o c UZ E � '= Fez- c 0 L E L U m co —0 � a � O � N d w F L - co r Q v ti-- U f0 a) N a) rn L a) O O O ` O 8 en -0 'V (3 a•( •�- c to C O O ° ' -0 •- a) 3 ,cu) yL m O ` U) .Q ° aa)) N N 2 c n3 c en Q CUaoo .6 O > c CI v- c c Q O _ E co � / Q LL. U C _Q CD ~ a) n a. n N ) .n a N o a O ® ce if co O O � L � N a Z o L.L.� °C cr A oa) oa Q O J d W cu c 0) E'm C.) c C ° O C C LL 0 0 0 m •= c o •5 c Z Q o ri my ET_ 00 N Q a) w > >'� > W Q 6 cco6 U ccoO N Z O a) 'O a) C a) a) O C O a) - N 4) N p co O O) o Y a) in Z a) > O fo Q to fo .a) > O y .c o N 0 0 .c .� @ y a �- y o •E p w N O w "- L Vliii 2 .1) 11-2c > 0 Ul O U C ^ U w f9 L O a)f0 O L L ° d w LL0 co d N .LO C L ° C) L N y a E' 4) E ' - 'E 0 H _ d c w � g �) CM c >' m o o � L a) : o f >,'5 a) 3 O a) Z a (t Da) (� Z .0 t3 .0 E ° L @8 as ° ° °) '°) � °' o ,vo c '5cZN , ;2 aaa)) Q 0 to S 7 0 w U C O C a) w C E Cp fl.L o co « L„ y i U C S N C ` co fo ..• O Z O (p N C L.. f0 .0 O .f O U O 7 ° -0 w O E C CL N O L lii CCj N .:. O ° E w (0 f0li O O .T.� L f0 L O ui O ••= U O 7 E n N Z v _ V '0 C O O - L C L C L .� C U fp•~ O O p� • c ° �_ c o — � N c c .o c 3 m co 'r.-7 ° m ° cp O E a) . c ao .E p U U O O U N• y v' t ` N p p N a fo c L d Q ccoo co o U w 4- a) N Y wp N i ,Q^ .) c cca) wwow yo3a) coU O , d° y6 � � � L � o) _ 8 � E � o _ _ co ao COV Q ° - -0 L O a) p � co -C w c ■c T,N •cNi_) .y N rn cg ` N O m O U C C fo a w U c co m Q to O O -0 L . 7 C - C 7 > CO a) U cNC >'= c — E � aC a) a) 2 a) a) — o >,° co ' u) o•avi y co o v) y — a) - 024) -0E o ° -,-,J � w cv EQ °a - -c v°)i �, g3 �a £ E o 3 >-- uo 22 p m t . a o .w o o ' 0 01) -- _ w o °- � o g a) c'cw en o)Q -c o 3 E O a) ° N c0 E U O O a) u) O a w > o 'O U .2 .c -"Ei N 'E O O a CO O ` d•E r- eo y N E to O - ` c L >. O fo O Y a C ' O w O O O a a) �- a) La� a) a >,E' ° N0 � ° - -°o ° a) Ocn ODUA aLLE a a) > EP>: . N Q w 1- .5 co v) c E ' c co > E d > o y E E c N U c y eh > — > c c > ai c Q o 7 L O a) O ' `di - • ' a) @ co O ) L 2 m • a) C) c cav • 8 E a) a0L • -° io £ 0 a) (4 Z c m E � z � v 3 (n o () v ' a L a) 0 a) c 4- 0 N C c - a) '� 00 >, a) .c >., m U Z p a .o p O - co a.. _ '= c 0 r a E a) m s o E s E U c6 n U 3ia o (1) oa Oa a a) a) i fa W `a) O c -o V C 4. C a) > ' a) •a N C 7 O o s'� r a) E � � 0 � a • > C co•a > ado =- U - ° c -1:3 0 o ° o c y o 0- c toi y a.) ,c o c■ E _ Uoc • n = Q c a) 0.12 Q U > co ._ .o O .E L co U m a .S .E CI 4- c c Q • o (d V o al U c O L .- N CL 14, E U _ 4- p co 0") C a... C a 0 CO C co c a_ U 0) u) C C N a) o ° -aEu) cn Q o E °a L 0` C 6- se, E a ` U) m Lek O > a .� o a. a) �a 0_ .(22 o a fa. .u) a aaa =• U c0 in u) "5 co C. o o aa) a a) � 3 a) (,� Z ., c cpma) a) o •LL c o. a) •-' a C C Q) a) r o d .0 P2 o U U 1 C@ Z 2 u- � � .c .c � Oa < 0 a a) O. w s o 0 1 °)g) 0 d c LL 0 o 0 o rna � -°- c rna°'i _ c () — Z U)) O LL m a m LL p) Q . ..'7) �� > Ill 0 W 0 -8 O co o U0 N Z .E C C C L C N C a) .c N t _v°) N Y U O O f0 w C as 0 U ° O Vn� o) a) DH C 8 ,0) c m co aE`� D 'o Lo a0 y � @U u) u) E U) C o) a ON E = 4) 0) = `. a) p y U LL I— U U co > > CO o ° =o.. -° •- T a � N w a Y co" ° f0 00 .N 'a N 0 3 c m o >, a - > > 0 m CD E v°i ° m a) � ° rnU c -p m oY asp c c aa� o o c u' CD 9) U) < 0 U ate - C cv C. E f0 o a) � c a0Y E ` .0 ° do u) ° a'9 - ° .o j c C O. 5 - Li- Q > N O T- C C Cl)E O V N ` O N y f0 a) o ',3 .O.N r- o a 0 u)) O _ Y_ p.0 LL Q) C L a3 p p ,., a a) _ ° o N ° m a) E - co c0 -0 a) f0 p w < .0 C <T o w w C a) _ '•' `= CO -a N C D .— (:) .... 1 .= N O . E - 'C O o 0 Z C O ,- a) C 'C a) N N a) E a) .L- - E 0 d _a a) H@ p N - p u) p ° L a N (� a) ,o Z a) y .5 yam ° me a) c m o 0 o ° 0 > v � _ m V) C o = .n o � m E �/. y_ r+ ) = L u) N = U 7 O C U) f' (0 a) a.0 a) •C L0 '@ ° O'aL L a p CO? L p0 Q CO C CO A N o Q N Q Z Q 7 = N O = .c O C a) a) C C u) a)- 8 a O` u) c ._.- u) a u- O ' 0 C a CO 0 a, E- 0, acE corn° .cs -o ' opYa) p_ a) m •'" c a) ° (0 Q a) CC u) C _N 7 u) _ = U U a c0 Z p 0 o f0 V U co a)_U 7 Q o . 0 O ° a3 L- O O u, O >, 0 a7 a) 'p O co ap' > U LT_W c c °) tali o u, 3 ° c>0%.,° cm 5 � oc � � Q o me ° CO c m pL~iL a) a Li V) 0 a) .e Z o = a) aa) c a> 3a) .S aioom - °' Q -- yc . Li (0 co '= m cN •s O d a) ° w a) d co > p U v `) a) > U C "-0 C vi ,.- a) >, , p a ` ° o f'� T a) C ,- - C a) E O y U a) C O N ._. a) N ° C ._0 ° C O E C M O a) O - a U Q ° F- Q °-,4) u' c� > ° as ° m .� Q .� V o = ,-°_ a a.m t a) C 0 ° ago u, rn . - a X X ° fa 0>< E � ° L ° 1_- o ac) 10 - c .3 � co U _0 m .E_ LL 1• a) _o 2w o 42 c." m m O a) a) O c a) c c c ._as >, m >, °— O c -0 c v c U Z E ° a o .. ti c L L L a'= (4 ° L U ,_ L E L U E C/3 V � Oa � a 50a . c .- > ol) C c > N w e `° N o 17 L 0 0 ° Uca >, - in m ` '-� 0O > c c O a) 0 E oo v `o5Ena :t: a) a3 l @:° ww c � � C � a � � >� � 0 a) C L c `m c •_ t L a.� > rn rn o .0 m` > >-. > pp Q U Cl) V •U a) L U .c 0 V .L.., Q c >, _ Q C ° 'O c O U f 0 U re Q� co a a L o V 0 / U ° U V ° ° U °)0 U C O O Q I.i E L co c 0 .0 co . ( 5 _ O a co L a) O c 0 7 O O o LL O ~ > a .N cco aaL. a_ .Nn o a. .� o ad • re ▪ CL >, a) V Z o Z a 0 C E s ._ -o •-- � � O c v of v v°' Z re 2 u- o — Fa F3 -c < 0 CL ��W// - cm V I.I. -C_- d V �•p u) C L 0 c ` •- a) a) c co o c L-L 1=1 Q. 0 'c mfr) -75 u) ccov) 0 U Q us o w o a) > Y 0 a c U U 0 Lii _ a _ > a CL (D C U cco c 0 O Uma_ cn0 < ono y -Too3oaC) > ac >,c4- .o. c .� V covCa) way) c ELF O - U w , w O � J c E4.- y U DO uoi O U) 2 N ifs in w D a 0 >, w v U .O U.. I— a L w > a CO` a) Y co L 0 O' 0 N d t/) w > >'Y a c N C 0 L (n o - a) � a 3 c o U a) . m . 0 Z •0 N ra c > c m o c '. 0) a) g > ca EL N °) ° � � y Q ° � � a .mCB 5 ° c g m cot g3 .L°. -0 a) c ° 3U � � vo ° `o d coo � oar c E o o cco o) o cLn �_ v°)iL _c E o3 H ` a) 0 y c c Q.E U � f6 C `�) U) O Q c y 0 w a y U 1] n 0 Z c w E 2 O 65 > ° � w o N 8 ;E co E c� o O a) - a) 3 � co ac. U d O c N E g L C y U 0 a o "0.c/J . y J y > .X a) O N y +T. m Cl) Q U ° L j L f0 M > .- a) > N 0 d 2 aa)) N N N 0 c -0 o a) c a_ a) 1J- a) U .a a0 CO N Q y E U cn Q_ 5 c c > > a) cn C V O ns • c ` ` d U W U 0 c E-�— 0 0 N h w c a) N w a) w w a Q a, a� y .y � ' w w W :� ay• o ° aL 8' ° Z 0 o y �U •� o o • o m 5 .> N u) o o (a 2 m E L a N o ac) >,ac) a_) c 'o_ L °) m 3 � -c a1i Q .`o - ? a w co Z � o � 'c O Q ° 5- °' � �c ° a) co CO c a)' y a) . L C c a cn a) cp C Li. Ca a c) aL � ,_ cmmac) a`) W aQVcomac) � 2C aC) 0c)oE oac) `ma) Q 7 d 0 U G •a, O O ._ c c J r y > c f9 a) Y .� O N ~ a) f` .�o- L co 0 .0 coo U > a 0 < E .c >, >O . a a, J w a) O .O a) a `° (.73 a H ca °)c 0 Cr). a a)a o v .E L.. H o -0 a_ o a cis .E w > m •a) •2 o a m .E cn a = , a m U o E w o O W v- U O • O _ C -° c aD UZ ° p '= L7E c U O Y U a) co Oa ) O m a) co - .«. _ . c fd y a) Q c a) 4- c ( Cl) @ Cl) o O E T E '� 0 Ts as U .; L , Co > L .., O a) L 4-21.(n) '0 �_ c ° c 2 15 . o U �▪ " S U -vw O Q c Q Cr) 05''' c c "" O c Q o ° U d O c O O 0 E .2 ocm ° � oca" ° E L 138- 43 p2BE2 Q F- > a Y2 o a 0 a N O a•� 0 O a 0) c l'''' — c c L..o o � � V Z C s co a) UN I 2 l9 I.- � ° co 3r Z It 5u" � -c ~ a Q 0 J Q. a) u) a w c C) f 1 L U V c o a) a) :6-0E o ._ 2OU) E LL Z CI Q c = u) -c a_ „.u)5 c V UJ Cr-Q U� � U �i0 N Z c c a) '0I, a) 2 w m 8 c «. 4 .� o f mom - S c E "- o � �'n dYmYmo'Zo acoate) ac) ° ac) c (� 0 ° E'er � � c a) U >,Y n'o E c E 0 ILL. = @ SW To c 0) wc3 as --0 o aw < G OO L O ° a�O m o u) U Q 0 uc) N O V CL c �U To E " Q c a� o� o c S�0 0 Z Z c o o- o a)) CO �a ° o ° a°) � y ° aZi E o0 N 0 a� a� V O_ a� > � v� � 3 - Y� ° 0 = c - -mow CO Q c N c a) N L U Cpp ° 7 O O c N - c6 N Q O a) 7 0) 7 Cl") o 8 u) U w C N a) O D m C7 t) a) !2- D ¢ a w. 2y . o E U E ,. a� Q r c o E. N0 - y 0 C in 0 0 -5 > a U C ll cn co w O aa) cL cEoac) a cE co N y E fa.. .- .c - a)a) ° u) a� , o co -a w S >,•S a 5 ..r_.-, Q J•O `., Qw 1- .� c) cc °a. H L@OLyo o'Ip (] E c •r• N 0 cn c0 7 u) O N u) U U Attachment No . 7 Specific Plan Document (On CD) Attachment No. 7