HomeMy WebLinkAboutItem 2f - Contract for Fiber Optics ProjectGALIFORntq��r'
August 5, 1903
STAFF REPORT
Public Works Services Department
DATE: December 16, 2014
TO: Honorable Mayor and City Council
FROM: Tom Tait, Public Works Services Director
By: Jan Balanay, Senior Engineer Assistant
SUBJECT: CONTRACT WITH FERREIRA CONSTRUCTION CO. INC., DBA
FERREIRA COASTAL CONSTRUCTION CO. FOR THE FIBER OPTICS
PROJECT IN THE AMOUNT OF $259,812
Recommendation: Approve
SUMMARY
The Fiscal Year 2013 -14 Capital Improvement Plan ( "CIP ") includes a project to extend
conduit and fiber optic cable from Live Oak Avenue at Sixth Avenue to the Public Works
Services Department ( "PWSD ") Service Center. The purpose of this project is to
replace outdated communication information infrastructure. To ensure that the City is
receiving the most competitive prices and quality service for this work, the PWSD
conducted a formal bid. Ferreira Construction Co. Inc., dba Ferreira Coastal
Construction Co. submitted the lowest responsive bid.
It is recommended that the City Council authorize and direct the City Manager to
execute a contract with Ferreira Construction Co. Inc., dba Ferreira Coastal
Construction Co. for the Fiber Optics Project in the amount of $259,812. A copy of the
proposed contract is attached as Attachment "B ".
BACKGROUND
In 2004, the City of Arcadia completed an Intelligent Transportation System ( "ITS ")
Master Plan to develop a short and long -range traffic management program. The ITS
Master Plan included installation of a fiber optic network which later included fiber optic
connections to various City facilities, such as the Library and Community Center that
improved the City's data and telecommunication system. At that time, funds were not
available to extend the fiber optic conduit to the PWSD Service Center.
Currently, the PWSD is linked to the City's computer network system through copper
wires known as T -1 lines. The transmission of data through T -1 lines is too slow to
accommodate modern communication needs and often results in system down -time,
Contract for Fiber Optics Project
December 16, 2014
Page 2 of 3
delays in transmitting information, and occasional dropped transmissions. As the City
works to improve and upgrade its digital capabilities and as data file size and the speed
required to send data has increased exponentially, the need to connect the PWSD
Service Center to the City's fiber optic network has become crucial. The Fiscal Year
2013 -14 CIP includes the extension of conduit and fiber optic cable from Live Oak
Avenue at Sixth Avenue to the PWSD Service Center, and will allow PWSD to install
and upgrade to the latest technology to improve communication efficiency and reliability.
In June 2013, the Fiber Optics Project was advertised and formally bid, with all bids
received being in excess of the approved budget. On July 1, 2014, the City Council
approved staff's recommendation to reject all bids received for the Fiber Optics Project
and directed staff to re- design and re -bid the project to allow the City to receive bids
within the approved budget amount. Staff redesigned the project by reducing the size of
the conduit and changing the original route of the conduit. The new alignment for the
conduit is through the Peck Road Water Conservation Park as shown on Attachment
"A ". Staff is in the process of formalizing a grant of easement to place the conduit in the
County easement and this project will not interfere with any planned or future projects in
the Peck Road Water Conservation Park. As a result, changing the alignment of the
conduit reduced the total length needed and simplified the installation of the conduit.
DISCUSSION
Notice Inviting Bids was published in the City's local adjudicated newspaper and bid
packages were distributed to contractors that perform this type of work. Staff also
contacted bidders who expressed interest in the previous project. On November 18,
2014, the City Clerk received two sealed bids with the following results:
RANK FIRM LOCATION TOTAL BID
1. Ferreira Construction Co, Inc. Chino, CA $259,812
2. HHS Communications, Inc. Ontario, CA $292,702
All bid documents were reviewed for content and the contractor's ability to best meet the
City's needs as specified in the bid specifications. Based on staff's review of the
contractors references, and evaluation of the bids received, Ferreira Construction Co.
Inc., dba Ferreira Coastal Construction Co. was determined to be the lowest responsive
bidder capable of performing the work required. They have completed similar projects
for several municipal agencies in Los Angeles County.
ENVIRONMENTAL ANALYSIS
This project is considered a Class 1 exemption as defined in Section 15301(b) of the
California Environmental Quality Act since the project consists of the negligible
expansion of an existing public facility providing public utility services.
Contract for Fiber Optics Project
December 16, 2014
Page 3 of 3
FISCAL IMPACT
Funds in the amount of $275,800 have been budgeted in the Fiscal Year 2013 -14
Capital Improvement Program for the Fiber Optics Project.
RECOMMENDATION
It is recommended that the City Council authorize and direct the City Manager to
execute a contract with Ferreira Construction Co. Inc., dba Ferreira Coastal
Construction Co. for the Fiber Optics Project in the amount of $259,812.
Approved
Dominic Lazzar
City Manager
Attachment "A" - Project Location Map
Attachment "B" — Proposed Contract
nn
FIBER OPTICS TO PUBLIC WORKS SERVICE CENTER
PROJECT NO.: 33820914
p,K A
P//j
,I
Q
Q,
NG �
Rp /
PROJECT LOCATION MAP
NOT TO SCALE
ATTACHMENT "A"
CITY OF ARCADIA
FIBER OPTICS TO PUBLIC WORKS SERVICE CENTER
PROJECT NO.: 33820914
CONTRACT
BETWEEN
CITY OF ARCADIA
AND
FERREIRA CONSTRUCTION COMPANY, INC. dba
FERREIRA COSTAL CONSTRUCTION COMPANY.
RVPUB \DRD \570015 GB - STATE & LOCAL (505/507/660) (7/24/00)
(PROJECT NO. 33820914)
CONTRACT FOR THE
CITY OF ARCADIA
Fiber Optics to Public Works Service Center Project
Project No. 33820914
PARTIES AND DATE.
This Contract is made and entered into this day of , 20_, by and between
the CITY OF ARCADIA (hereinafter called the "City ") and FERREIRA CONSTRUCTION COMPANY,
INC. dba FERREIRA COSTAL CONSTRUCTION COMPANY (hereinafter called the "Contractor ").
2. RECITALS.
2.1 The City is a charter City organized under the laws of the State of California, with
power to contract for services necessary to achieve its purpose;
2.2 Contractor, in response to a Notice Inviting Bids issued by City on November 20,
2014, has submitted a bid proposal for the Fiber Optics to Public Works Service Center Project
described in the Contract.
2.3 City has duly opened and considered the Contractor's bid proposal, and duly awarded
the bid to Contractor in accordance with the Notice Inviting Bids and the other Bid Documents, and
has given written notice to Contractor on [* *INSERT DATE * *].
2.4 Contractor has obtained, and delivers concurrently herewith, Performance and
Payment Bonds and evidences of insurance coverage as required by the Contract.
3. TERMS.
3.1 Incomoration of Documents.
This Contract includes and hereby incorporates in full by reference the following documents,
including all exhibits, drawings, specifications and documents therein, and attachments and addenda
thereto:
a. Notice Inviting Bids
b. Instructions to Bidders
C. Contract Bid Forms
d. Contract
e. Contract Appendix
Part "A" - General Conditions
Part "B" - Supplementary General Conditions
Part "C" - Special Provisions
Part "D" - Specifications
Part "E" - Drawings
RVPUB\DRD\570015 CONTRACT-1 GB - STATE & LOCAL (505/507/660) (7/24/00)
(PROJECT NO. 33820914)
Part "F" - Performance Bond
Part "G" - Payment Bond
ADDENDUM NO. 1 dated October 23, 2014.
ADDENDUM NO. 2 dated November 3, 2014.
The above documents, including the General Conditions, are an integral part of the Contract
Documents. In addition to signing this Contract, Contractor shall initial this paragraph immediately
below acknowledging that he or she has read, understood and agrees with all of the terms of the
Contract Documents, including, but not limited to, provisions of the General Conditions relating to
indemnification, insurance, standards of performance, termination, compensation and time of the
essence performance. Contractor shall not disclaim knowledge of the meaning and effect of any
term or provision of the Contract Documents, and agrees to strictly abide by their meaning and
intent. In the event that Contractor fails to initial below, the City shall have the right to declare
the Contract unexecuted and to award the Contract to another contractor in accordance with
state law.
Contractor, s Initials
3.2 Contractor's Basic Obligation.
Contractor promises and agrees, at its own cost and expense, to furnish to the City all labor,
materials, tools, equipment, services, and incidental and customary work for Bid Category numbers
1 through 14 necessary to fully and adequately complete Fiber Optics To Public Works Service
Center Project, including any alternates selected by the City, and all structures and facilities
described in the Contract (hereinafter the "Work "), for a total of Two Hundred Fifty -Nine Thousand,
Eight Hundred Twelve Dollars and No Cents, ($259,812.00), as specified in the Contract Bid
Forms submitted by the Contractor in response to the above referenced Notice Inviting Bids. Such
amount shall be subject to adjustment in accordance with the applicable terms of this Contract. All
Work shall be subject to, and performed in accordance with the above referenced documents.
3.3 Standard of Performance.
Contractor shall perform all Work under this Contract in a skillful and workmanlike manner,
and consistent with the standards generally recognized as being employed by professionals in the
same discipline in the State of California. Contractor represents and maintains that it is skilled in the
professional calling necessary to perform the Work. Contractor warrants that all employees and
subcontractors shall have sufficient skill and experience to perform the Work assigned to them.
Finally, Contractor further represents that it, its employees and subcontractors have all licenses,
permits, qualifications and approvals of whatever nature that are legally required to perform the
Work, and that such licenses and approvals shall be maintained throughout the term of this Contract.
3.4 Period of Performance.
RVPUB \DRD \570015 CONTRACT-2 GB - STATE & LOCAL (505/507/660) (7/24/00)
(PROJECT NO. 33820914)
Contractor shall perform and complete all Work under this Contract within forty -five (45)
Calendar Days, beginning ten (10) Calendar Days after the date on which the Notice to Proceed is
sent by the City to the Contractor. Moreover, Contractor shall perform its Work in strict accordance
with any completion schedule, construction schedule or project milestones developed pursuant to
provisions of the Contract, including but not limited to the Project Schedule located in the
Specifications.
Contractor agrees that if such Work is not completed within the aforementioned period and /or
pursuant to any such completion schedule, construction schedule or project milestones developed
pursuant to provisions of the Contract, including but not limited to the Project Schedule located in the
Specifications, it is understood, acknowledged and agreed that the City will suffer damage. Pursuant
to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated
damages the sum of Five Hundred Dollars ($500.00) PER DAY as provided by the applicable
provisions of the General Conditions, found in Part "B" of the Contract Appendix.
3.5 City's Basic Obligation.
City agrees to engage and does hereby engage Contractor as an independent contractor to
furnish all materials and to perform all Work according to the terms and conditions herein contained
for the sum set forth above. Except as otherwise provided in the Contract, the City shall pay to
Contractor, as full consideration for the satisfactory performance by the Contractor of the services
and obligations required by this Contract, the above referenced compensation in accordance with
compensation provisions set forth in the Contract.
3.6 Contractor's Labor Certification.
Contractor maintains that he is aware of the provisions of Section 3700 of the California
Labor Code which require every employer to be insured against liability for Worker's Compensation
or to undertake self- insurance in accordance with the provisions of that Code, and agrees to comply
with such provisions before commencing the performance of the Work. A certification form for this
purpose is attached hereto as Exhibit "A" and incorporated herein by reference, and shall be
executed simultaneously with this Contract.
3.7 Attorneys' Fees.
If either party commences an action against the other party, either legal, administrative or
otherwise, arising out of or in connection with this Contract, the prevailing party in such action shall
be entitled to have and recover from the losing party reasonable attorneys' fees and all other costs of
such action.
3.8 Successors.
The parties do for themselves, their heirs, executors, administrators, successors, and
assigns agree to the full performance of all of the provisions contained in this Contract. Contractor
may not either voluntarily or by action of law, assign any obligation assumed by Contractor hereunder
without the prior written consent of the City.
RVPUB \DRD \570015 CONTRACT-3 GB - STATE & LOCAL (505/507/660) (7/24/00)
(PROJECT NO. 33820914)
3.9 Notices.
All notices hereunder and communications regarding interpretation of the terms of the
Agreement or changes thereto shall be provided by the mailing thereof by registered or certified mail,
return receipt requested, postage prepaid and addressed as follows:
Contractor
Ferreira Construction Company, Inc. dba
Ferreira Coastal Construction Company
15188 Vista Del Rio Avenue
Chino, CA 91710
Attn: Brandon Pensick, Vice President
City
City of Arcadia
240 W. Huntington Drive
P.O. Box 60021
Arcadia, CA 91066 -6021
Attn: Jan Balanay, Senior Engineering Assistant
Any notice so given shall be considered received by the other party three (3) days after
deposit in the U.S. Mail, first class postage prepaid, addressed to the party at the above address.
Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the
method of service.
CITY OF ARCADIA
By:
Dominic Lazzaretto
City Manager
ATTEST:
By:
City Clerk
Approved as to Form:
By:
Stephen P. Deitsch
City Attorney
FERREIRA CONSTRUCTION CO., INC. dba
FERREIRA COASTAL CONSTRUCTION CO.
By:
Title
By:
Title
RVPUB\DRD\570015 CONTRACT-4 GB - STATE & LOCAL (505/507/660) (7/24/00)
(PROJECT NO. 33820914)
EXHIBIT "A"
CERTIFICATION
LABOR CODE - SECTION 1861
I, the undersigned Contractor, am aware of the provisions of Section 3700 et seg. of
the California Labor Code which require every employer to be insured against liability for
Worker's Compensation or to undertake self- insurance in accordance with the provisions
of the Code. I agree to and will comply with such provisions before commencing the Work
governed by this Contract.
CONTRACTOR:
Name of Contractor: FERREIRA CONSTRUCTION CO., INC. dba
FERREIRA COASTAL CONSTRUCTION CO.
:�
Signature
Name
Title
Date
RVPU13\DRD\570015 CONTRACT (EXHIBIT A) GB - STATE & LOCAL (505/507/660) (7/24/00)