Loading...
HomeMy WebLinkAboutC-1579o9is- 90 ORIGINAL CITY OF ARCADIA CALIFORNIA SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CONSTRUCTION OF 8" PRESSURE REGULATION STATION AND 12" WATERLINE REPLACEMENT ON FOOTHILL BOULEVARD FROM OAKWOOD AVENUE TO FIRST AVENUE WORK ORDER 606 TOTAL BID AMOUNT: $55,240.00 CITY COUNCIL ROBERT C. HARBICHT, MAYOR DR. SHENG CHANG GARY A. KOVACIC WILLIAM R. KELLY CITY MANAGER BARBARA D. KUHN MARY B. YOUNG PAT MALLOY MAINTENANCE SERVICES DIRECTOR �C q t "ilt'",(A 2 FRCP 4 -30 -o / ` �a.2D9D3 �F OF C P,0, �f AGREEMENT I_\ 61, I IC CONTRACT DOCUMENTS AGREEMENT THIS AGREEMENT, made and executed this 26th day of MARCH 19 98 , between the City of Arcadia, whose address is 240 W. Huntington Drive, Arcadia, California 91007 (hereinafter referred to as "CITY ") and W.A. RASIC CONSTRUCTION CO., INd. whose address is 511 S. FIRST AVE, STE. 3 , ARCADI hereinafter referred to as "CONTRACTOR ". RECITALS A. City has invited bids relative to the Construction of 8" Pressure Regulation Station and 12" Waterline Replacement on Foothill Boulevard from Oakwood Avenue to First Avenue. B. Contractor has submitted a bid for the performance of the work above described and warranted to the City that it is possessed of the skills requisite in order to complete the said project. C. City has accepted the bid submitted by the Contractor and authorized the award of the contract to the Contractor. NOW, THEREFORE, in consideration of performance by the parties of the covenants and conditions herein provided, City and Contractor agrees as follows: 1. For and in consideration of the payments and covenants hereinafter specified to be made and performed by City, Contractor shall perform and complete the following: CONSTRUCTION OF 8" PRESSURE REGULATION STATION AND 12" WATERLINE REPLACEMENT ON FOOTHILL BOULEVARD FROM OAKWOOD AVENUE TO FIRST AVENUE WORK ORDER 606 and to perform and complete the same in a good and workmanlike manner all the work pertaining thereto shown on the Plans and Specifications therefor; to furnish at his own cost and expense all tools, equipment, labor, services, and materials necessary therefor (except such materials, if any, as in the said specifications are stipulated to be furnished by the City), and to do everything required by this contract, special provisions, technical specifications, construction plans, drawings and details, and all addenda issued by City to the foregoing prior to the opening of bids. 2. For furnishing all said materials and labor, services, tools, and equipment, and doing all work specified herein, also arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work, for all expenses incurred by or in consequence of the suspension or discontinuance of work, except such as in said specifications are expressly stipulated to be borne by the City and for well and faithfully completing the work in the manner specified in said Plans and Specifications, the City will pay and the Contractor shall receive in full compensation therefor on the unit price basis, the total price for the several items furnished pursuant to the specifications, as set forth in Contractor's bid heretofore filed by him and accepted by City, at the times and manner specified in the Contract Documents. NN 3. Contractor agrees to perform the work according to the terms of this Contract for prices) named in the bid, and City agrees to pay the same at the time, in the manner, and upon the conditions stipulated in the said contract documents. 4. Subject to the provisions of this Contract, all terms, covenants, conditions, and provisions hereof shall inure to and shall bind each of the parties hereto and each of their respective heirs, executors, administrators, successors, and assigns. 5. The Notice Inviting Bids, Information Required of Bidders, Contractor's Bid, Special Provisions, Technical Specifications, Construction Plans, Drawings and Details, and all addenda issued by City to the foregoing prior to the opening of bids, are hereby incorporated in and made part of this contract by reference and are collectively referred to therein and herein as "Contract Documents." 6. Contractor shall be responsible for compliance with the Apprenticeable Occupations Regulations of Labor Code, Section 1777.5, including compliance by all subcontractors. 7. Contractor represents and affirms that it is not affected by any labor dispute, work stoppage or strike; that the labor contracts of its subcontractors are not scheduled to expire for the term of this Contract, and that these Contracts contain "no strike" provisions. Contractor agrees that should any labor dispute, work stoppage or strike affect it or its subcontractors or any employees of same, Contractor shall continue to perform according to the work schedule and shall not be executed from non - performance and that the Contractor is subject to the Liquidated Damage provisions of this Contract for such non - performance. IN WITNESS WHEREOF, the parties hereto have caused this contract to be executed the day and year first above written. CITY OF ARCADIA By Mayor (SEAL) ATTEST: y Clerk APPROVED AS TO )7) e 4"/ City Attorney I N;.". FORM: y 7 21 CONTRACTOR - W.A. RASIC CONSTRUCTION CO., INC By WALTER A. RASIC PRESIDENT Title ,■. RECORDING REQUESTED BY CITY OF ARCADIA AND WHEN RECORDED MAIL TO: NAME JUNE D. ALFORD, CITY CLERK STREET CITY OF ARCADIA ADDRESS 240 W. HUNTINGTON DRIVE CITY, STATE & P.O. BOX 60021 ZIP CODE ARCADIA, CA 91066 -6021 , 98 1687985 RECORDED /FILED IN OFFICIAL RECORDS RECORDER'S OFFICE LOS ANGELES COUNTY CALIFORNIA 8:04 AM SEP 18 1998 SPACE ABOVE E NOTICE OF COMPLETION I FREE Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. (See reverse side for Complete requirements.) Notice is hereby given that: 1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described 2. The full name of the owner is THE CITY OF ARCADIA 3. The full address of the owner is 240 WEST HUNTINGTON DRIVE_ ARCADIA, CALIFORNIA 91007 4. The nature of the interest or estate of the owner is: In fee (IF OTHER THAN FEE, STRIKE "IN FEE" AND INSERT, FOR EXAMPLE, "PURCHASER UNDER CONTRACT OF PURCHASE," OR "LESSEE ") 5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are: NAMES ADDRESSES 6. The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the commencement of the work or improvements herein referred to: NAMES ADDRESSES 7. A work of improvement on the property hereinafter described was completed on AUGUST 4, 1998 The work done was: CONST. OF 8" PRESSURE REGULATION STATION & 12" WATERLINE REPLCMNT ON FOOTHILL BLVD. OAKWOOD TO 1ST S. The name of the contractor, if any, for such work of improvement was AVE. WORK ORDER 606 W.A. RASIC CONSTRUCTION COMPANY MARCH 26, 1998 IIF NO CONTRACTOR FOR WORK OF IMPROVEMENT AS A WHOLE, INSERT "NONE ") (DATE OF CONTRACT) 9. The property on which said work of improvement was completed is in the City of ARCADIA County of LOS ANGELES Stateof CA ,and is described asfollows: FOOTHILL BLVD. FROM OAKWOOD AVENUE TO FIRST AVENUE WITHIN THE CITY OF ARCADIA 10. The street address of said property is VARIOUS ADDRESSED UNDER PROJECT NO. 606 AS NOTED ABOVE II STREE AD ESS HAS BEEN OFFICIALLY ASSIGNED, INSERT "NONE ".) Dated: AUGUST 5, 1998 (SIGNATURE OF R OR CORPORATE OFFICER OF OWNER NAMED IN PARAGRAPH 2 OR HIS AGENT) WILLIAM R. KELLY, CITY MANAGER VERIFICATION I, the undersigned, say: I am the CITY CLERK OF THE CITY OF ARCADIA the declarant of the foregoing notice of completion; ( "PRESIDENT OF ", "MANAGER OF ", "PARTNER OF ", "OWNER OF ", ETC.) I have read said notice of completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct. Executed on AJJGUST 5 1998 at ARCADIA CA (CITY) (STATE) PERSONAL SIGNATURE OF THE JtTNE D. ALFORD,� WOLCOTTS FORM 1114 - Rev. R -94 (price class 3A NOTICE OF COMPLETION 01994 WOLCOTTS FORMS, INC. ,L WHO S SWEARING THAT THE CONTENTS OF THE NOTICE OF COMPLETION ARE TRUE.) CLE K (See reverse side for additional Information) I�67775 39114 I�I , S DO NOT RECORD REQUIREMENTS AS TO NOTICE OF COMPLETION Notice of completion must be filed for record WITHIN 10 DAYS after the completion of the work of improvement (to be computed exclusive of the day of completion) as provided in Civil Code Section 3093. The "owner" who must file for record a notice of completion of a building or other work of improvement means the owner (or his successor in- interest at the date the notice is filed) on whose behalf the work was done, though his ownership is less than the fee title. For example, if A is the owner in fee, and B, lessee under a lease, causes a building to be constructed, then B, or whoever has succeeded to his interest at the date the notice is filed, must file the notice. If the ownership is in two or more persons as joint tenants or tenants in common, the notice may be signed by any one of the co- owners (in fact, the foregoing form is designed for giving of the notice by only .one cotenant), but the names and addresses of the other co- owners must be stated in paragraph 5 of the form. Note that any Notice of Completion signed by a successor in interest shall recite the names and addresses of his transferor or transferors. In paragraphs 3, 5 and 6, the full address called for should include street number, city, county and state. As to paragraphs 7 and 8, this form should be used only where the notice of completion covers the work of improvement as a whole. If the notice is to be given only of completion of a particular contract, where the work of improvement is made pursuant to two or more original contracts, then this form must be modified as follows: (1) Strike the words "A work of improvement" from paragraph 7 and insert a general statement of the kind of work done or materials furnished pursuant to such contract (e.g., "The foundation for the improvements "); (2) Insert the name of the contractor under the particular contract in paragraph 8. In paragraph 8 of the notice, insert the name of the contractor for the work of improvement as a whole. No contractor's name need be given if there is no general contractor, e.g. on so- called "owner- builder jobs." In paragraph 9, insert the full, legal description, not merely a street address or tax description. Refer to deed or policy of title insurance. If the space provided for description is not sufficient, a rider may be attached. In paragraph 10, show the street address, if any, assigned to the property by any competent public or governmental authority. Before you use this form, fill in all blanks, and make whatever changes are appropriate and necessary to your particular transaction. Consult a lawyer if you doubt the form's fitness for your purpose and wse. Wolcotts makes no representation or sarranty, express or implied, with respect to the merchantability or fitness of this form for an intended use or purpose.