HomeMy WebLinkAboutItem 1e - Accept Orange Grove Disinfection Project€J�r STAFF REPORT Public Works Services Department DATE: March 3, 2015 TO: Honorable Mayor and City Council FROM: Tom Tait, Public Works Services Director By: Ken Herman, P.E. Principal Civil Engineer SUBJECT: ACCEPT ALL WORK PERFORMED BY MLADEN BUNTICH CONSTRUCTION COMPANY, INC. FOR THE ORANGE GROVE WATER PLANT DISINFECTION AND REHABILITATION PROJECT AS COMPLETE AND AUTHORIZE THE FINAL PAYMENT TO BE MADE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, SUBJECT TO THE RETENTION OF $6,677.72 Recommendation: Approve SUMMARY On June 3, 2014, the City Council approved a contract with Mladen Buntich Construction Company, Inc. in the amount of $125,500 for the Orange Grove Water Plant Disinfection and Rehabilitation Project. The terms and conditions of this project have been complied with and the work has been performed to the satisfaction of the Project Engineer for a total project cost of $133,554.49. This amount reflects the original contract amount of $125,500 plus contract change orders totaling $8,054.49, or 6.4% of the original contract amount. It is recommended that the City Council accept all work performed by Mladen Buntich Construction Company, Inc. for the Orange Grove Water Plant Disinfection and Rehabilitation Project as complete and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $6,677.72. BACKGROUND The Orange Grove Water Plant is a vital component of the City's water supply and distribution system. It is the City's only source of supply from the Santa Anita Subarea of the Raymond Groundwater Basin. Water pumped from two wells at the Orange Grove Water Plant (Well No.1A and Well No.5) is close to the Maximum Contaminant Level for nitrates and Volatile Organic Compounds ( "VOC's "). VOC's have been used extensively in the United States since the 1940's. VOC's are common components or additives in gasoline and diesel fuel and are used in the dry cleaning of clothing, in Accept Orange Grove Disinfection Rehabilitation Project March 3, 2015 Page 2 of 3 refrigeration units, and other petroleum -based products. The California Department of Public Health ( "CDPH ") approved the City's Blend Plan that blends water from these two wells with other City wells to ensure that the City's drinking water meets all state and federal drinking water standards before it leaves the Orange Grove Water Plant. To ensure that concentration levels are below the allowable limits, the CDPH added a condition of approval for the City's Blend Plan that requires the City to ensure that Wells 1A and 5 have a positive connection to their blending source. The only way to accomplish this in a way acceptable to the CDPH was to modify the piping from the wells to the reservoirs where blending occurs. DISCUSSION On June 3, 2014, the City Council approved a contract with Mladen Buntich Construction Company, Inc. in the amount of $125,500 for the Orange Grove Water Plant Disinfection and Rehabilitation Project. The work included modifying existing piping, installing chemical analyzers that monitor water quality, and installing new valves. During the rehabilitation of the project, Mladen Buntich Construction Company, Inc. encountered an obstruction within the reservoir. The contractor also discovered that the existing 12" pipe at the reservoir was ductile iron and not steel as shown on the drawings. The unforeseen conditions required additional work to the scope of the project. Below is a breakdown of the contract change orders: Description Am Additional labor and tools to drill through the 1 support beam found during construction and $6,705.74 welding of an additional support structure on the external portion of the reservoir for reinforcement. 2 Additional fittings needed to make the connections $1,348.75 with the ductile iron pipe. Total Change Orders $8,054.49 The terms and conditions of this contract have been complied with and the work has been performed to the satisfaction of the Project Engineer. Mladen Buntich Construction Company, Inc. completed construction of the work as defined in the project plans and specifications in an efficient and timely manner. Accept Orange Grove Disinfection Rehabilitation Project March 3, 2015 Page 3 of 3 FISCAL IMPACT The Fiscal Year 2013 -14 Capital Improvement Program has a budget of $200,000 for this project. The total cost for this project, including the change orders, is $133,554.49. RECOMMENDATION It is recommended that the City Council accept all work performed by Mladen Buntich Construction Company, Inc. for the Orange Grove Water Plant Disinfection and Rehabilitation Project as complete and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $6,677.72. Approved. Dominic Lazza City Manager Attachment: Project Location Map Orange Grove Disinfection System Upgrade Project Project No.: 72863114