`� STAFF REPORT
� -Unity of �o
Public Works Services Department
DATE: March 17, 2015
TO: Honorable Mayor and City Council
FROM: Tom Tait, Public Works Services Director
By: Heloise King, P.E., Associate Civil Engineer
SUBJECT: ACCEPT ALL WORK PERFORMED BY ROADWAY ENGINEERING AND
CONTRACTING INC. FOR THE CIVIC CENTER PARKING LOT
IMPROVEMENT PROJECT AS COMPLETE AND AUTHORIZE THE
FINAL PAYMENT TO BE MADE IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS, SUBJECT TO THE RETENTION OF
$20,135.40
Recommendation: Approve
SUMMARY
On July 15, 2014, the City Council approved a contract with Roadway Engineering and
Contracting Inc. in the amount of $395,978 for the Civic Center Parking Lot
Improvement Project. The terms and conditions of this project have been complied with
and the work has been performed to the satisfaction of the Project Engineer for a total
project cost of $402,708. This amount reflects the original contract amount of $395,978
plus contract change orders totaling $6,730 or 1.7% of the original contract amount.
It is recommended that the City Council accept all work performed by Roadway
Engineering and Contracting Inc. for the Civic Center Parking Lot Improvement Project
as complete and authorize the final payment to be made in accordance with the contract
documents, subject to the retention of $20,135.40.
BACKGROUND
The Civic Center and the Police Department public parking lots provide parking and
access to the Civic Center Campus, which includes City Hall, Council Chambers,
Athletic Field, and the Police Department. These parking lots had not been renovated
since the mid- 1950's when the original asphalt pavement was installed. As a result, the
pavement surface condition was distressed to the point that there was severe "alligator
cracking" (cracking into a pattern resembling the back of an alligator).
Accept Civic Center Parking Lot Improvement Project
March 17, 2015
Page 2 of 3
DISCUSSION
On July 15, 2014, the City Council approved a contract with Roadway Engineering and
Contracting Inc. in the amount of $395,978 for the Civic Center Parking Lot
Improvement Project. The work included replacement and repair of the original
pavement. In order to be consistent with the City's General Plan and overall emphasis
on sustainability, the Civic Center Parking Lot Improvement Project included a storm
water capture and infiltration system. The storm water capture and infiltration system
will infiltrate the first one inch of a rainstorm and the excess runoff will be diverted to the
City's storm drain system. There were no changes to the existing parking space design
or quantity of parking spaces.
During the project, design updates were made to improve ADA compliance and
increase aesthetics and functionality of the concrete work. These improvements added
work to the original scope of the project. Below is a breakdown of the contract change
orders:
The terms and conditions of this contract have been complied with and the work has
been performed to the satisfaction of the Project Engineer. Roadway Engineering and
Contracting Inc. completed construction of the work as defined in the project plans and
specifications in an efficient and timely manner.
FISCAL IMPACT
The Fiscal Year 2013 -14 Capital Improvement Program has a budget $435,000 for this
project. The total project cost for this project, including the change orders, is $402,708.
Description
Amount
Remove and replace curb, gutter, and thickened
1
edge at catch basin, construct additional sidewalk,
$2,350.00
construct additional landing to renovate accessible
curb ramp to meet ADA regulations.
Remobilization for third phase of construction,
2.
installation of detectable warning surface to meet
$4,380.00
ADA regulations.
Total Change Orders
$6,730.00
The terms and conditions of this contract have been complied with and the work has
been performed to the satisfaction of the Project Engineer. Roadway Engineering and
Contracting Inc. completed construction of the work as defined in the project plans and
specifications in an efficient and timely manner.
FISCAL IMPACT
The Fiscal Year 2013 -14 Capital Improvement Program has a budget $435,000 for this
project. The total project cost for this project, including the change orders, is $402,708.
Accept Civic Center Parking Lot Improvement Project
March 17, 2015
Page 3 of 3
RECOMMENDATION
It is recommended that the City Council accept all work performed by Roadway
Engineering and Contracting Inc. for the Civic Center Parking Lot Improvement Project
as complete and authorize the final payment to be made in accordance with the contract
documents, subject to the retention of $20,135.40.
Approved:
Dominic La77areW
City Manager
Attachment: Project Location Map
PROJECT LOCATION MAP
CIVIC CENTER PARKING LOT IMPROVEMENTS
PROJECT NO. 17820514
CITY HALL NORTH LOT
INCLUDING
ATHLETIC FIELD PORTION
ATHLETIC FIELD
J O
Q—
O
O
O �
� O J
Al • I TY
HA O
J�
� 0 �
e O
p POLICE
DEPT
ye
Al
O
J
ye e e
POLICE DEPARTMENT
VISITOR LOT
LOCATION MAP
NO SCALE