Loading...
HomeMy WebLinkAboutItem 3d - Accept Work for St. Joseph Well 2V~ GP,,IF0$nl9Fjdf `� STAFF REPORT � -Unity of �o Public Works Services Department DATE: June 16, 2015 TO: Honorable Mayor and City Council FROM: Tom Tait, Public Works Services Director By: Tiffany Lee, Associate Civil Engineer SUBJECT: ACCEPT ALL WORK PERFORMED BY GENERAL PUMP COMPANY FOR THE INSPECTION AND REHABILITATION OF ST. JOSEPH WELL 2 Recommendation: Approve SUMMARY On November 4, 2014, the City Council approved a contract with General Pump Company in the amount of $144,280 for the inspection and rehabilitation of St. Joseph Well 2. The terms and conditions of this project have been complied with and the work has been performed to the satisfaction of the Project Engineer for a total project cost of $141,444. It is recommended that the City Council accept all work performed by General Pump Company for the inspection and rehabilitation of St. Joseph Well 2 as complete and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $7,072.20. BACKGROUND The City operates and maintains 14 groundwater wells, which produce an average of 16,500 acre -feet, or 5.4 billion gallons, of water to City of Arcadia customers each year. Regular inspection and maintenance of City wells is crucial to ensuring that the wells are operating at maximum production capacity and efficiency. Each year, one to two wells are selected for preventative maintenance based on the date of the last inspection, maintenance records, and the current well efficiency. Preventative maintenance performed on the City's water supply wells protects against higher emergency repair costs and avoids the need to supplement lost water supply with more expensive Metropolitan Water District water. Accept St. Joseph Well 2 Inspection and Rehabilitation June 16, 2015 Page 2 of 3 DISCUSSION On November 4, 2014, the City Council approved a contract with General Pump Company in the amount of $144,280 for the inspection and rehabilitation of the St. Joseph Well 2. The project began with removal and inspection of the well motor, shaft, and pump, and video inspection of the well casing. Based on this inspection, a scope of work consistent with the contract documents and bid schedule was prepared and agreed upon by the contractor and the Public Works Services Department ( "PWSD "). The work included cleaning of the well casing, replacing the existing worn column pipe, replacing worn or damaged line shaft sections, couplings, and line shaft retainers, rewinding of the electric motor, and replacing the worn pump bowl assembly. Following re- assembly and installation of the well equipment, the well was disinfected and water quality samples were taken, tested, and approved, in accordance with California Department of Public Health requirements. All terms and conditions of this contract have been complied with and the work has been performed to the satisfaction of the Project Engineer. General Pump Company completed construction of the work as defined in the project plans and specifications in an efficient and timely manner. ENVIRONMENTAL ANALYSIS This project is considered a Class 1 exemption as defined in Section 15301(b) of the California Environmental Quality Act since the project consists of the maintenance of existing public facility providing public utility services which does not expand the existing use of the facility. FISCAL IMPACT Funds in the amount of $200,000 have been budgeted in the Capital Improvement Water Fund for annual well inspection and rehabilitation work. The original contract estimate for all work was $144,280. Once the well was pulled, a more defined project cost was determined. The final construction cost of the project was $141,444, which is within the approved budget. Accept St. Joseph Well 2 Inspection and Rehabilitation June 16, 2015 Page 3 of 3 RECOMMENDATION It is recommended that the City Council accept all work performed by General Pump Company for the inspection and rehabilitation of St. Joseph Well 2 as complete, and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $7,072.20. Approved: Dominic Lazzarthd City Manager Attachment: Project Location Map Well Inspection and Rehabilitation of St. Joseph Well 2 Project Project No.: 728633615 CFK OP O O 'RAND VIEW NORTH ye o� 41 CITY OF ARCADIA "E RA RE BL , o ¢ yy zim W O ORANGE GROVE � > z S z 3 a � F OTHILL BL z m m svcaM av �- FOREST PARK COLORADO ST COLOR BL T SANTA P I ANRA �p�] PARK �I JII • a,1- a SANT AR ST ROJ441-1. N'`k — LOCATION { H TNG N R P N O ?P 02 > �9 }titii O ?� J e Z A O� C9 QP FA H�N SOP 3 0 J SAMA ANRA U m P R Y GOLF COURSE wo > ii HUNTINGTON ¢ CAMPUS DR Fn J F N A R C A D I A H S W_ > � 5 ¢ RD e > t z o a DUp,RTE ¢ o U z o ¢ > � ¢ m CAMINO REAL ¢ CAMINO REAL AV J ¢ a O z = a _ F 7 w F z LONGDEN AV Z w O J a m LIVE O AV LAS TUNAS DR ,NE OAK V 1 Q Ppe' Ur a D LOCATION MAP a NOT TO SCALE