DATE: June 23, 2015
TO: Honorable Chairman and Planning Commission
FROM: Phil Wray, Deputy Development Services Director/City Engineer
Lisa Flores, Planning Services Manager
SUBJECT: RESOLUTION NO. 1941 – APPROVING MODIFICATION NO. MP 15-02
WITH A CATEGORICAL EXEMPTION UNDER THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT (CEQA) FOR A PARKING
MODIFICATION PLAN FOR THE ENTIRE ARCADIA HUB SHOPPING
CENTER AT 1201 to 1325 S. BALDWIN AVENUE, and 733, 745 and 815
W. NAOMI AVENUE
Recommendation: Adopt Resolution No. 1941
SUMMARY
The applicant, Patsy Ma on behalf of Baldwin Arcadia Center, LP, is requesting
approval of a parking modification for the entire Arcadia Hub Shopping Center that
would replace a requirement for a parking demand study for every tenant change with a
parking plan that establishes an administrative process for determining additional
parking space needs for tenant changes for a term of five years or until the total number
of available spaces is reached, whichever comes first. The plan will not physically
expand or alter the existing parking facilities.
It is recommended that the Planning Commission approve MP 15-02 and adopt the
attached Resolution No. 1941 (Attachment No. 1) that incorporates a finding that this
project qualifies as a Categorical Exemption under the California Environmental Quality
Act (CEQA), and the requisite findings for approval of a Modification Permit, and the
conditions of approval as listed in this staff report.
BACKGROUND
The Arcadia Hub shopping center was originally constructed in 1957 and fronts Duarte
Road, Baldwin Avenue, and Naomi Avenue. The site is approximately 772,134 square
feet in area with surface parking and a single deck parking structure adjacent to the
Burlington Coat Factory. Major tenants include the Burlington Coat Factory/Baby Depot,
L.A. Fitness, Spring Bamboo restaurant, and Vons Pavilions - refer to Attachment No. 2
for an aerial photo and zoning information. The center has 1,138 parking spaces. The
Resolution No. 1941 – MP 15-02
Arcadia Hub Shopping Center
June 23, 2015 – Page 2 of 7
westerly portion of the center is zoned C-2, General Commercial, and the portion along
Baldwin Avenue is zoned C-2 & H4.
The parking for the site is deficient by the City’s Code, but there does not appear to be a
parking capacity problem. For a development of this size and type, the parking code
requirement is generally not realistic because the mix of uses creates a synergy where
different uses have different peaks, some uses are underachieved, and a patron may
visit more than one tenant using one parking space. All these factors contribute to an
overall more efficient use of the parking lot.
In the interest of allowing the owner to change out tenants, the City has allowed tenant
changes based on parking demand studies that evaluated the overall impact of each
proposed tenant on the parking situation. The studies have indicated that overall, there
is a sufficient parking supply to meet the increased demands. However, considering the
site layout, a significant share of the parking supply is undesirable and inconvenient to
the public, behind buildings and on the deck of the parking structure. Because there
have been several recent use changes approved, with one being a 15,000 square foot
restaurant at 1271 S. Baldwin Avenue, the property owner’s representative was asked
to wait on additional requests until all current changes are completed and to determine
a more comprehensive way to analyze the parking impact on new use changes.
PROPOSAL
The request is to replace a requirement for a parking demand study for every tenant
change with a parking plan that establishes an administrative process for determining
additional parking space needs for tenant changes for a term of five years of until the
total number of available spaces are reached, whichever comes first.
Arcadia Hub Shopping Center is the largest shopping center outside of Westfield Santa
Anita Mall and it is currently has 349,768 square feet of gross leasable area (GLA) and
1,138 parking spaces. The current land uses at this center include:
• 157,274 sf of GLA retail
• 45,084 sf GLA non-retail (schools, banks, day spa, dental)
• 42,020 sf of GLA restaurant
• 43,000 sf of GLA health/fitness center (L.A. Fitness)
• 62,390 sf of GLA supermarket (Pavilions)
The center is unique since it was designed for small retail businesses, it does not have
an allowance for non-retail uses built into the parking rate like Westfield Santa Anita
Mall does, each use is calculated as a single, standalone use, and the parking
requirement does not take into consideration the mix of uses and the different parking
demands. Because this center was designed for small retail businesses, it has a high
turnover since the tenants do not have the same lifespan as the large established
business and those spaces are usually filled with other uses such as real estate office,
Resolution No. 1941 – MP 15-02
Arcadia Hub Shopping Center
June 23, 2015 – Page 3 of 7
art school, and restaurants. Every parking study that was conducted for this center has
shown that the parking demand rates are very low as a whole, versus what the code
expects the demand to be, therefore the activity is much lower than an average center
of this size and this site does not generate a high level of parking demand.
The property owner has prepared a parking plan that establishes a baseline condition of
building occupancies and parking utilization, and proposes a method of evaluating
future use changes in a conservative and realistic manner. For the purpose of the
parking plan, the site parking was divided into eight zones with the number of spaces in
each zone, as shown below:
The parking data was gathered in October 2014, and it represents a snapshot of the
parking conditions after all the permitted use changes were in place and the restaurant
activity from the two newest restaurants had leveled out. The plan includes an inventory
of the total usable building space and any unoccupied space at the time the parking
data was gathered. The parking plan in the master parking study documented the
parking demand for weekday and weekend conditions, and the hour-by-hour results per
area for both are shown in Attachment No. 3. The weekend results were used as the
baseline condition because they reflect the higher usage of the two. The results
indicate that the parking demand for the entire site at the weekend 3:00 PM peak hour
is 627 spaces. Dividing this number into the total occupied building space of 339,248
square feet (10,520 square feet of space is currently vacant), results in an peak usage
of 1.85 spaces for 1,000 square feet. As a comparison, the City code requirement for a
regional shopping center is 4.75 spaces per 1,000 square feet. However, for a retail
center of this size, the code requires the parking for each use to be calculated
separately as a stand-alone need, and results in a total parking requirement of 1,946
spaces.
Resolution No. 1941 – MP 15-02
Arcadia Hub Shopping Center
June 23, 2015 – Page 4 of 7
Given this information, a conservative and realistic approach was developed to evaluate
the feasibility of allowing more parking-intensive use changes. Two factors were
proposed to achieve the goal; no additional available parking spaces in zones E-G shall
be considered in the plan, and when all other areas reach 90% capacity, the entire
parking lot will be considered full. Zones E-G are considered undesirable and
inconvenient, and the 90% capacity factor is commonly used in studies of large parking
lots.
As a result, the baseline data and parameters for the parking plan are as follows:
• Total number of parking spaces on site - 1,138
• Number of parking spaces in zones A-D and H - 836
• Number of parking spaces in zones E-G - 302
• Number of unoccupied spaces in zones E-G during peak weekend hour (3:00
PM) eliminated from further consideration - 207
• Number of spaces considered capacity of zones A-D and H (90%) - 752
• Number of occupied parking spaces in zones A-D and H during peak weekend
hour (3:00 PM) - 531
• Number of unoccupied parking spaces in zones A-D and H during peak weekend
hour (3:00 PM) - 305
• Number of unoccupied parking spaces in zones A-D and H during peak weekend
hour to reach capacity (90%) - 221
As a result of eliminating available parking in zones E-G from further consideration, and
limiting the capacity to remaining available spaces to 90% of the total, the conservative
net number of available spaces out of the 752 spaces is 221.
The parking plan then recommends a step-by-step process for evaluating future use
changes as follows:
• Determine credit for existing use - Use the site specific factor of 1.85 spaces per
1,000 SF
• Determine the new use type
• Use Arcadia Parking Code rates to determine the number of parking spaces
required
• Subtract the credit for the existing use from the new requirement
• The result is the number of net new parking spaces required
Resolution No. 1941 – MP 15-02
Arcadia Hub Shopping Center
June 23, 2015 – Page 5 of 7
• Deduct this amount from the available parking supply (starting with 221)
• Keep a running total of available parking supply after each new request. No use
changes shall be allowed for parking needs exceeding the 221 spaces.
The recommendation is to use the parking plan for a period of five years or until the 221
space supply is used up, whichever comes first. At that point, only like for like use
changes would be allowed, and the results of this parking plan would need to be
analyzed to determine if the parking demand is substantially different.
A traffic analysis was also analyzed of the four nearest intersections:
• Golden West Avenue and Duarte Road
• Baldwin Avenue and Duarte Road
• Baldwin Avenue and Naomi Avenue
• Baldwin Avenue and Camino Real Avenue
The study also took a conservative approach, assumed higher intensity than retail uses
for new tenants and the study demonstrated that the programmatic study for the entire
shopping center would not generate any significant traffic impacts.
FINDINGS
Section 9292.1.4 of the Arcadia Municipal Code states that the purpose of the
Modification procedures is for the following:
1. Secure an appropriate improvement of a lot;
2. Prevent an unreasonable hardship; or
3. Promote uniformity of development
As stated earlier, this center is the second largest shopping center outside of Westfield
Santa Anita Mall and the largest neighborhood shopping center in the City, but it is
unique in that each use is considered as a standalone use with its own parking rate and
based on the mix of uses the center has a very low demand rate as a whole versus
what the Code “expects” the demand to be. Therefore, approval of the parking
modification to the entire center would replace a requirement for a parking demand
study for every tenant change with a parking plan that establishes an administrative
process for determining additional parking space requirements on tenant changes for a
term of five years of until the total number of spaces are reached, whichever comes
first. The new program would be an appropriate improvement to the center since it
Resolution No. 1941 – MP 15-02
Arcadia Hub Shopping Center
June 23, 2015 – Page 6 of 7
would also allow the property owner to repurpose the buildings with the right mix of uses
for this center while still providing the now-required parking requirements for those units.
ENVIRONMENTAL ASSESSMENT
This project would not physically expand or alter the existing parking facilities, and
qualified as a Class 1 Categorical Exemption per the provisions of the California
Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Guidelines.
Refer to Attachment No. 4 for the Preliminary Exemption Assessment.
PUBLIC NOTICE/COMMENTS
Public hearing notices for this item were mailed to the property owners and tenants of
those properties that are located within 300 feet of the subject property. Staff did not
receive any comments during the notification period.
RECOMMENDATION
It is recommended that the Planning Commission conditionally approve the project and
find that the project is exempt per CEQA Section 15301, subject to the following
conditions of approval.
1. This Parking Plan is approved for evaluating use changes requiring up to an
additional 221 parking spaces, or for a five (5) year period, whichever comes first.
2. The management company should regularly post maps to remind their tenants that
their employees must be in the designated employee parking areas, as new
employees are hired may not be aware of this requirement.
3. The applicant shall defend, indemnify, and hold harmless the City of Arcadia and its
officials, officers, employees, and agents from and against any claim, action, or
proceeding against the City of Arcadia, its officials, officers, employees or agents to
attack, set aside, void, or annul any approval or conditional approval of the City of
Arcadia concerning this project and/or land use decision, including but not limited to
any approval or conditional approval of the City Council, Planning Commission,
Modification Committee, or City Staff, which action is brought within the time period
provided for in Government Code Section 66499.37 or other provision of law
applicable to this project or decision. The City shall promptly notify the applicant of
any claim, action, or proceeding concerning the project and/or land use decision and
the City shall cooperate fully in the defense of the matter. The City reserves the
right, at its own option, to choose its own attorney to represent the City, its officials,
officers, employees, and agents in the defense of the matter.
Attachment No. 1
Resolution No. 1941
1
RESOLUTION NO. 1941
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
ARCADIA APPROVING A MODIFICATION NO. MP 15-02 WITH A
CATEGORICAL EXEMPTION UNDER THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT (CEQA) FOR A PARKING
MODIFICATION PLAN FOR THE ENTIRE ARCADIA HUB SHOPPING
CENTER AT 1201 to 1325 S. BALDWIN AVENUE, and 733, 745 and 815
W. NAOMI AVENUE.
WHEREAS, in May 2015, Ms. Patsy Ma on behalf of Baldwin Arcadia Center, LP
requested approval of a parking modification for the entire Arcadia Hub Shopping
Center that would replace a requirement for a parking demand study for every tenant
change with a new current parking plan (“Plan”) that establishes an administrative
process for determining additional parking space requirements for tenant changes to
remain in effect for a period of five years or until all the parking spaces distributed in
parking zones A-D and H (752 spaces) have reached capacity based on the current
uses, whichever comes first at the Arcadia Hub Shopping Center at 1201 to 1325. S.
Baldwin Avenue, and 733, 745 and 815 W. Naomi Avenue, Development Services
Department Case No. MP 15-02 (this application is thereafter referred to as the
“Project”); and,
WHEREAS, on June 2, 2015, Planning Services completed an environmental
assessment for the Project in accordance with the California Environmental Quality Act
(CEQA), and recommended that the Planning Commission determine the Project is
exempt under CEQA per Section 15301 of the CEQA Guidelines because the Project
would not physically expand or alter the existing parking facilities; and,
2
WHEREAS, on June 23, 2015, a duly noticed public hearing was held before the
Planning Commission on the Project, at which time all interested persons were given full
opportunity to be heard and to present evidence.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF
ARCADIA HEREBY RESOLVES AS FOLLOWS:
SECTION 1. That the factual data submitted by the Community Development
Division in the staff report dated June 23, 2015 are true and correct.
SECTION 2. This Commission finds, based upon the entire record:
1. That the purpose of the Modification procedures is for the following:
a. Secure an appropriate improvement of a lot;
b. Prevent an unreasonable hardship; or
c. Promote uniformity of development
FACT: This center is the second largest shopping center outside of Westfield
Santa Anita Mall and the largest neighborhood shopping center in the City, but it is
unique in that each use is considered as a standalone use with its own parking rate and
based on the mix of uses the center has a very low demand rate as a whole versus
what the Code “expects” the demand to be. Therefore, approval of the parking
modification to the entire center would replace a requirement for a parking demand
study for every tenant change with a parking plan that establishes an administrative
process for determining additional parking space requirements on tenant changes for a
term of five years of until the total number of spaces are reached, whichever comes
first. The new program would be an appropriate improvement to the center since it
would also allow the property owner to repurpose the buildings with the right mix of uses
for this center while still providing the now-required parking requirements for those units.
3
SECTION 3. For the foregoing reasons the Planning Commission hereby
determines that the Project is Categorically Exempt per Section 15301 of the CEQA
Guidelines, and approves Modification No. MP 15-02 to allow a Parking Modification
Plan for the entire Arcadia Hub Shopping Center at 1201 to 1325 S. Baldwin and 733,
745, and 815 W. Naomi Avenue, subject to the conditions of approval attached hereto.
SECTION 4. The Secretary shall certify to the adoption of this Resolution.
(SIGNATURES ON NEXT PAGE)
5
Conditions of Approval
1. This Parking Plan is approved for evaluating use changes requiring up to an
additional 221 parking spaces, or for a five (5) year period, whichever comes first.
2. The management company should regularly post maps to remind their tenants that
their employees must be in the designated employee parking areas, as new
employees are hired may not be aware of this requirement.
3. The applicant shall defend, indemnify, and hold harmless the City of Arcadia and its
officials, officers, employees, and agents from and against any claim, action, or
proceeding against the City of Arcadia, its officials, officers, employees or agents to
attack, set aside, void, or annul any approval or conditional approval of the City of
Arcadia concerning this project and/or land use decision, including but not limited to
any approval or conditional approval of the City Council, Planning Commission,
Modification Committee, or City Staff, which action is brought within the time period
provided for in Government Code Section 66499.37 or other provision of law
applicable to this project or decision. The City shall promptly notify the applicant of
any claim, action, or proceeding concerning the project and/or land use decision and
the City shall cooperate fully in the defense of the matter. The City reserves the
right, at its own option, to choose its own attorney to represent the City, its officials,
officers, employees, and agents in the defense of the matter.
4. Approval of MP 15-02 shall not be of effect unless on or before 30 calendar days
after approval of this project, the property owner/applicant has executed and filed
with the Community Development Administrator or designee an Acceptance Form
available from the Development Services Department to indicate awareness and
acceptance of these conditions of approval.
Attachment No. 2
Aerial Photo with Zoning Information
Disclaimer: This map is a user generated static output from an Internet mapping site and is for reference only. Data
layers that appear on this map may or may not be accurate, current, or otherwise reliable.
THIS MAP IS NOT TO BE USED FOR NAVIGATION
0.1
© City of Arcadia
WGS_1984_Web_Mercator_Auxiliary_Sphere
0Miles0.1
3,577
0.06
Legend
1:
Arcadia Hub Shopping Center
Notes
Reported on 06/18/2015 04:01 PM
This map was automatically generated
using Geocortex Essentials.
City Boundary
Arcadia City Boundary
Sphere of Influence
Parcels
Cities and Communities
Attachment No. 3
Master Parking Study, dated April 3, 2015
and Traffic Impact Study, dated June 3, 2015
Master Parking Study Update
Arcadia Hub Commercial Center
April 3, 2015
Prepared For:
Baldwin Arcadia Center LP
650 West Duarte Road, Suite 1088
Arcadia, CA 91007
Prepared by:
1100 Corporate Center Drive, Suite 201
Monterey Park, California 91754
(323) 260-4703
JB41141
Master Parking Study Update, Arcadia Hub Commercial Center Page ii
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
Table of Contents
1. INTRODUCTION ..................................................................................................................................... 1
1.1 PROJECT LOCATION .................................................................................................................................................................1
1.2 STUDY DEFINITION ...................................................................................................................................................................1
2. EXISTING CONDITIONS ........................................................................................................................ 4
2.1 EXISTING PARKING UTILIZATION ............................................................................................................................................4
2.2 EXISTING PARKING AVAILABILITY ............................................................................................................................................8
3. PARKING DEMAND AND REQUIREMENTS ..................................................................................... 11
3.1 CITY PARKING CODE REQUIREMENTS ................................................................................................................................. 11
3.2 OTHER PARKING DEMAND RATE SOURCES ........................................................................................................................ 12
4. FUTURE POTENTIAL USES ................................................................................................................. 14
4.1 PARKING DEMAND OF NEAR-TERM PLANNED USES .......................................................................................................... 14
4.2 PARKING DEMAND OF LONG-TERM POTENTIAL RESTAURANT BUILDOUT ..................................................................... 17
4.3 FRAMEWORK FOR ANALYSIS OF FUTURE RESTAURANT USES ............................................................................................ 19
4.4 RECOMMENDED APPLICATION OF FRAMEWORK ................................................................................................................ 22
List of Figures
FIGURE 1– PROJECT SITE LOCATION 2
FIGURE 2 – EXISTING SITE PLAN 3
FIGURE 3 – AVERAGE WEEKDAY DAY PARKING DEMAND 6
FIGURE 4 – AVERAGE WEEKEND DAY PARKING DEMAND 7
List of Tables
TABLE 1 – AVERAGE WEEKDAY DAY PARKING OCCUPANCY 4
TABLE 2 – AVERAGE WEEKEND DAY PARKING OCCUPANCY 5
TABLE 3 – AVERAGE WEEKDAY DAY – AVAILABLE PARKING SPACES 8
TABLE 4 – AVERAGE WEEKEND DAY – AVAILABLE PARKING SPACES 9
TABLE 5 – HUB SHOPPING CENTER – EXISTING TENANTS 10
TABLE 6 – SHARED PARKING DEMAND ANALYSIS – NEAR-TERM PLANNED USES 16
TABLE 7 – SHARED PARKING DEMAND ANALYSIS – LONG-TERM RESTAURANT BUILDOUT 18
TABLE 8 – PARKING DEMAND REPLACEMENT RATES BY PARKING RATE SOURCE 20
Appendices
APPENDIX A – PARKING UTILIZATION COUNTS
Master Parking Study Update, Arcadia Hub Commercial Center Page 1
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
1. Introduction
This report is a Master Parking Study for the Arcadia Hub Shopping Center. The Center is located on
the southwest corner of Duarte Road and Baldwin Avenue in the City of Arcadia. The site has four
access driveways on Duarte Road and three access driveways on Naomi Avenue.
The project Master Parking Study has the following defined objectives:
Update existing parking demand data for the off-street parking supply at the Hub site.
Update tenant information in terms of existing and pending uses.
Provide a framework for the City to use, with the basis of both a real average parking demand
rate for all uses at the site and existing published rates for a limited number of specific uses, to
determine without further study the adequacy of parking for new tenants that would have a
higher intensity than retail.
KOA consulted with the City of Arcadia in the development of the scope of work for this study.
Parking demand data collection for the parking study was conducted across seven days. The adequacy
of on-site parking was evaluated under three tenant alternatives:
1. Existing Conditions
2. Future Planned Conditions – Existing with planned new near-term future tenants
3. Future Potential – Existing with potential new long-term future tenants
The parking study was based on City of Arcadia code parking standards and the ULI Shared Parking
methodology, which takes into account time-of-day fluctuations for certain land uses. Other sources
such as ITE Parking Generation were also evaluated to provide a comparison of demand for future
planned and potential uses at the site.
1.1 Project Location
The Hub commercial center is bounded by Duarte Road on the north, Baldwin Avenue on the east,
Naomi Avenue on the south, and the President Square Shopping Center and multi-family residential uses
on the west. The site addresses are 1201 to 1325 South Baldwin Avenue, and 733, 745 and 815 West
Naomi Avenue.
Figure 1 illustrates the project site location and the sub-areas used for the analysis of collected parking
data.
1.2 Study Definition
Future proposed tenants at The Hub site will be restaurant and medical-office uses that replace either
vacant spaces or existing retail uses. In order to assess the impact of these new tenants on the existing
parking supply over a multi-year timeframe, the City has requested that a master parking study be
completed. The near-term tenant changes are expected to happen within the current year of 2015.
Figure 2 provides the site plan, the parking layout, and the locations of the commercial spaces.
Project Site Location
Figure 1
N
Not to Scale
Master Parking Study Update -The Hub Shopping Commercial Center
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
1 2
3 4
Project Location
XXX
Study Intersection
IntersectionTurn Volume
X
LEGEND
Project Location
LEGEND
N
NottoScale
TrafficandParkingStudyforArcadiaHubShoppingCenter
ParkingSupplyFigure 2
DUARTERD.NAOMIAVE.
BALDWINAVE.
Pavilions
745W.NaomiAve.
1201
1205
12151225
(VACANT)122712291271
(YiXiangRestaurantexpectedtoopeninSummer2013)1309
1311A1311B
1311C1313
1317
(VACANT)
LAFitness1325
A
B
(VACANT)CE
F
(VACANT)GHI
J
KL
M
A
B
C
D
E
F
G
H
I
K
L
M
N
J
815W.NaomiAve.
733W.NaomiAve.
Recycling
(6ParkingSpacesRemoved)
PARKINGSTRUCTURETOPLEVEL
PARKINGSTRUCTUREGROUNDLEVELLegend(#)=subareaparkingsupplyinspaces
Surveysub-area
ShopingCartStorage
(64)
(36)
(181)(311)
(182)
(51)
(215)
(98)
24
22
22
22
24
12
14
28
28
14
1226
12
13
26
26
26
26
26
28
36
18108
1010
24
24
8
2
5
6
30
18
3
2
23
54 5454
28
9
5135
51
2222
14
7
2224241625242423
G
A
DCB
E
H
F
X
Master Parking Study Update, Arcadia Hub Commercial Center Page 4
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
2.Existing Conditions
This section documents the parking demand from the surveys conducted at the Hub site, the parking
availability by hour for average weekday and weekend conditions, the weekend/weekend peak hours of
parking utilization, and the occupancy of tenant spaces at the time of the parking surveys.
2.1 Existing Parking Utilization
Parking survey counts were conducted for this study, in order to document the overall parking
utilization of the site, by defined sub-areas, for an average weekday and weekend day. The data
collected included seven consecutive days of counts from Saturday, October 18th
through Friday,
October 24th
, 2014. The counts were conducted during the 6:00 a.m. to 11:00 p.m. timeframe on each
survey day.
Table 1 summarizes this data for an average weekday of data collection on an hourly basis. The demand
is broken down by the defined survey sub-areas within the shopping center site. Parking utilization
above 85 percent occupancy is shown in bold, red font.
As Table 1 illustrates, the highest parking demand was during the 6:00 p.m. hour, when 53 percent of
the spaces were occupied. During the weekday parking demand peak, nearly half of the off-street
parking spaces within the site remained unoccupied.
Table 1 – Average Weekday Day Parking Occupancy
Average Weekday ‐ Percent Occupied
AreaArea AArea BArea CArea DArea EArea F Top Level
(G)
Ground
Level (H)
Total
Occupancy
Supply983111816436512151821138
6:00 AM2%8%11%9%0%18%2%3%6%
7:00 AM4%15%22%19%0%22%3%6%11%
8:00 AM7%25%30%25%11%24%4%10%17%
9:00 AM33%37%44%42%19%37%5%29%30%
10:00 AM46%46%43%41%33%53%11%47%39%
11:00 AM55%50%39%41%39%45%16%57%42%
12:00 PM80%56%36%41%39%39%17%65%47%
1:00 PM87%54%33%34%39%33%18%71%47%
2:00 PM72%51%30%31%39%33%15%70%44%
3:00 PM59%53%41%34%36%33%19%68%45%
4:00 PM62%66%44%41%36%35%20%68%50%
5:00 PM78%68%53%38%39%31%17%64%52%
6:00 PM94%66%57%44%39%24%20%58%53%
7:00 PM98%64%56%45%31%18%19%57%52%
8:00 PM90%62%54%44%25%10%13%45%47%
9:00 PM64%46%43%36%19%6%9%29%34%
10:00 PM45%36%35%33%17%2%4%13%25%
11:00 PM14%22%19%14%8%0%0%4%12%
2. Existing Conditions
Master Parking Study Update, Arcadia Hub Commercial Center Page 5
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
Table 2 summarizes the parking occupancy for the average weekend day during the survey, on an hourly
basis. The demand is also broken down by the various parking areas within the shopping center.
Parking utilization above at 85 percent or higher is shown in bold, red font.
As Table 2 illustrates, the highest parking demand occurred during the 3:00 p.m. hour on an average
weekend day, when 55 percent of the spaces were occupied. Similar to the average weekday data,
approximately half of the parking spaces within the site are available during peak demand times.
Table 2 – Average Weekend Day Parking Occupancy
Average Weekend ‐ Percent Occupied
AreaArea AArea BArea CArea DArea EArea FTop Level
(G)
Ground
Level (H)
Total
Occupancy
Supply983111816436512151821138
7:00 AM2%10%14%9%6%8%2%3%7%
8:00 AM7%24%37%25%11%16%3%7%17%
9:00 AM27%32%42%36%11%27%3%17%25%
10:00 AM51%47%42%39%22%29%10%37%36%
11:00 AM58%52%40%36%28%37%16%56%42%
12:00 PM92%65%37%39%31%35%23%71%52%
1:00 PM94%64%40%38%33%33%24%81%54%
2:00 PM89%64%40%41%28%33%22%79%53%
3:00 PM80%60%44%38%25%33%33%89%55%
4:00 PM76%66%41%31%25%33%29%81%54%
5:00 PM83%56%48%41%25%24%23%76%51%
6:00 PM98%62%45%48%28%8%25%76%54%
7:00 PM99%64%51%41%25%10%22%75%54%
8:00 PM97%48%27%27%25%4%17%67%42%
9:00 PM56%35%14%8%19%2%12%36%26%
10:00 PM26%22%3%5%14%0%7%15%13%
11:00 PM13%16%2%2%3%0%2%6%7%
Figures 3 and 4 illustrate the daily parking demand trajectory by hour an average weekday and weekend
day. The parking count summary data is provided in Appendix A.
Average Weekday Day Parking DemandFigure 3N
Master Parking Study Update -The Hub Shopping Commercial CenterDUARTE RD.NAOMI AVE.
BALDWIN AVE.
Pavilions
745 W. Naomi Ave.
1201
1205
12151225
(VACANT)122712291271
(Yi Xiang Restaurant expectedto open in Summer 2013)1309
1311A1311B
1311C1313
1317
(VACANT)
LA Fitness1325
A
B
(VACANT)CE
F
(VACANT)GHI
J
KL
M
A
B
C
D
E
F
G
H
I
K
L
M
N
J
815 W. Naomi Ave.
733 W. Naomi Ave.
Recycling
(6 Parking Spaces Removed)
A(98)
B(311)C(311)
D(64)
E(36)
F(51)
24
22
22
22
24
12
14
28
28
14
1226
12
13
26
26
26
26
26
28
36
18108
1010
24
24
8
2
5
6
30
18
3
2
23
54 5454
28
9
5135
51
2222
14
7
2224241625242423
PARKING STRUCTURETOP LEVEL = G(215)
PARKING STRUCTUREGROUND LEVEL = H(182)LEGEND
A(#)
Area“A”withparking spaces#
Shoping Cart Storage
XX
Parking Supply per Segment0% to 29%
Parking Demand (Percentage)30% to 44%45% to 59%60% to 74%
75% to 84%85% to 94%95% to 100%
Average Weekend Day Parking DemandFigure 4N
Master Parking Study Update -The Hub Shopping Commercial CenterDUARTE RD.NAOMI AVE.
BALDWIN AVE.
Pavilions
745 W. Naomi Ave.
1201
1205
12151225
(VACANT)122712291271
(Yi Xiang Restaurant expectedto open in Summer 2013)1309
1311A1311B
1311C1313
1317
(VACANT)
LA Fitness1325
A
B
(VACANT)CE
F
(VACANT)GHI
J
KL
M
A
B
C
D
E
F
G
H
I
K
L
M
N
J
815 W. Naomi Ave.
733 W. Naomi Ave.
Recycling
(6 Parking Spaces Removed)
A(98)
B(311)C(311)
D(64)
E(36)
F(51)
24
22
22
22
24
12
14
28
28
14
1226
12
13
26
26
26
26
26
28
36
18108
1010
24
24
8
2
5
6
30
18
3
2
23
54 5454
28
9
5135
51
2222
14
7
2224241625242423
PARKING STRUCTURETOP LEVEL = G(215)
PARKING STRUCTUREGROUND LEVEL = H(182)LEGEND
A(#)
Area“A”withparking spaces#
Shoping Cart Storage
XX
Parking Supply per Segment0% to 29%
Parking Demand (Percentage)30% to 44%45% to 59%60% to 74%
75% to 84%85% to 94%95% to 100%
2. Existing Conditions
Master Parking Study Update, Arcadia Hub Commercial Center Page 8
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
2.2 Existing Parking Availability
Based on the existing shopping center parking demand, the number of available spaces per hour was
calculated. As illustrated by the data in Table 3, during an average weekday at 6:00 p.m., when the
shopping center experiences its maximum occupancy, there are approximately 534 available parking
spaces within the site.
Table 3 – Average Weekday Day – Available Parking Spaces
Arcadia Hub Shopping Center ‐ Average Weekday ‐ Available Spaces
AreaArea AArea BArea CArea DArea EArea FTop Level
(G)
Ground
Level (H)Total
Supply983111816436512151821138
6:00 AM962871615836422111771068
7:00 AM942651425236402081711008
8:00 AM91232127483239207163939
9:00 AM66197102372932204130797
10:00 AM5316710338242419197697
11:00 AM4415611138222818078657
12:00 PM2013611638223117964606
1:00 PM1314212142223417753604
2:00 PM2715112644223418254640
3:00 PM4014610742233417558625
4:00 PM3710510138233317258567
5:00 PM22988540223517865545
6:00 PM61057736223917376534
7:00 PM21117935254217478546
8:00 PM1011883362746186100606
9:00 PM35167104412948195129748
10:00 PM54198117433050206158856
11:00 PM842441465533512141751002
As illustrated by the data in Table 4, during an average weekend at 3:00 p.m., when the shopping center
experiences its maximum occupancy, there are approximately 511 available parking spaces within the
site.
2. Existing Conditions
Master Parking Study Update, Arcadia Hub Commercial Center Page 9
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
Table 4 – Average Weekend Day – Available Parking Spaces
Arcadia Hub Shopping Center ‐ Average Weekend ‐ Available Spaces
AreaArea AArea BArea CArea DArea EArea F Top Level
(G)
Ground
Level (H)Total
Supply983111816436512151821138
7:00 AM962811555834472111771059
8:00 AM91237114483243209170944
9:00 AM72210105413237208151856
10:00 AM48165105392836193114728
11:00 AM4114810941263218080657
12:00 PM810911439253316652546
1:00 PM611110940243416335522
2:00 PM1111310838263416738535
3:00 PM2012310240273414520511
4:00 PM2410510744273415334528
5:00 PM171379538273916543561
6:00 PM21179933264716143528
7:00 PM11128938274616745525
8:00 PM316313347274917860660
9:00 PM43203155592950190117846
10:00 PM73243175613151201154989
11:00 PM852621786335512101711055
Based on the existing parking demand counts, the Hub Shopping Center currently has enough parking
available to satisfy its peak parking demand periods on both average weekday and weekend days.
Table 5 lists the tenants that occupied the site when the parking surveys were conducted.
2. Existing Conditions
Master Parking Study Update, Arcadia Hub Commercial Center Page 10
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
Table 5 – Hub Shopping Center – Existing Tenants
AddressExisting Tenant
Square
FootageAddressExisting Tenant
Square
Footage
S. BALDWIN AVE.745 W. NAOMI AVE.
1201ABurlington Coat Factory100,491 Pavilions62,390
1201BBurlington Coat Factory26,000 815 W. NAOMI AVE.
1201Custom Apparel406 AYushoken [3]1,550
1205Daiso Japan15,000 BAmerican Continental Bank2,280
1207Yamaha3,535 C/DJenny Craig2,400
1215Ann Karen Spa12,500 EBeauty Supply1,550
1225Re-Max3,275 FShabu Shabu1,550
1227New Fusion Restaurant7,200 GAU791,550
1229Bank of America5,857 HHair & SkinCare1,550
1271Yi Xiang Restaurant [1]15,000 IGNC1,550
1309First Commercial Bank4,083 JTime Warner1,550
1311AOrchid Thai Cuisine2,800 KParkland Dental1,550
1311BYong Dong Tofu House2,000 LParkland Dental1,550
1311CVACANT760 MMission Renaissance Art1,550
1313Industrial Arts School4,814
1317VACANT4,000
1325L.A. Fitness43,000
733 W. NAOMI AVE.
AStarbucks Expansion600
BStarbucks950
CAT&T665
DSmoke Shop760
EBoutique No. 5564
FRancho Shoe & Vacuum Repair940
GSubway760
HRita's Italian Ice760
IReal Estate Agency760
JVivi Hair Salon760
KCorner Beauty750
LNovelty750
MJC Herbs740
NMorning Glory/FedEx741
Master Parking Study Update, Arcadia Hub Commercial Center Page 11
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
3. Parking Demand and Requirements
This section estimates parking demand of the current uses on the Hub site based on ITE Peak Generation
peak demand rates and ULI Shared Parking hourly demand breakdowns, for comparison purposes. A
singular Hub-specific commercial rate for new uses was also defined based on the surveyed site demand
rates and the total floor area of the center.
The parking demand rates for the Hub site, based on the conducted parking demand surveys, are as
follows. These are demand rates for an average unit of floor area, across all existing Arcadia Hub site
uses, including retail, restaurants, medical offices, the gym use, and the supermarket use.
Weekday: 1.78 spaces per 1,000 sq.ft.
Weekend: 1.85 spaces per 1,000 sq.ft.
The weekday peak rate is based on a demand of 604 parking vehicles within the 6:00 p.m. hour and the
weekend peak rate is based on a demand of 627 parking vehicles within the 3:00 p.m. hour. The
occupied/active floor area at the time of the surveys totaled 339,031 square feet.
As discussed within the later sub-sections, demand rates from other sources indicate that typical parking
demand for a shopping center range from approximately 3.6 to 4.0 spaces per 1,000 sq.ft. The Municipal
Code requires a parking supply of 4.75 spaces per 1,000 sq.ft. The disparity between these rates
indicates that the Arcadia Hub site as a whole does not generate the high level of parking demand
expected from the average neighborhood commercial center.
Typical activity is much lower per square foot of area than an average center. The Arcadia Hub
Shopping Center, therefore, has a potential to take on a higher percentage of restaurant uses than other
similarly-sized centers. Various sources of parking demand rates, applied later in this report to a
comparison of potential parking demand, are discussed in the next sub-section.
3.1 City Parking Code Requirements
The City of Arcadia Municipal Code defines the following rates for parking requirements, per 1,000
square feet of gross floor area, at specific uses that would apply to the Hub site.
General Office: 4 spaces required
Medical/Dental Office: 6 spaces required
Restaurant (1,500 sq-ft or more): 10 spaces required
Retail/Shopping Center Uses: 4.75 spaces required
Gym (3,000 sq-ft or less): 10 spaces required
Supermarket uses are required to provide parking based on the shopping center rate.
The Hub site currently provides an off-street parking supply of 1,138 spaces. Applying City Code rates
in their raw form, the site is underparked (a deficit results, based on expected demand). The site
currently has some vacancies, equating to approximately three percent of the total site floor area.
The site, despite the high floor area occupancy, does not generate a high level of parking demand. Based
on the site’s mix of uses that allow customers to visit multiple locations in one trip, and the general
4. Future Potential Uses
Master Parking Study Update, Arcadia Hub Commercial Center Page 12
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
intensity of individual uses within the site, overall demand is much lower than that anticipated by City
Code requirements.
Code requirements generally are defined for single, standalone uses and the mixture of uses provided
within a neighborhood shopping center such as the Arcadia Hub site can usually reduce overall parking
demand. Other sources of demand rates for parking are discussed within the next sub-section.
In the next area of this report, Section 4, the parking demand that is expected to be generated by new
planned tenants at the site is discussed, followed by the definition of a framework for future analysis by
the City of planned uses.
3.2 Other Parking Demand Rate Sources
ITE Parking Generation
The Institute of Transportation Engineers’ (ITE) Parking Generation 4th
Edition informational report
contains empirical data on parking demand rates for various land uses. Below are the parking rates for
the average peak period parking demand for the land uses that would most likely apply to future uses at
the Arcadia Hub site. The rates listed are for weekday demand:
General Office: 2.84 spaces per 1,000 square feet of floor area
Medical/Dental Office: 3.20 spaces per 1,000 square feet of floor area
Family/Sit-Down Restaurant: 10.6 spaces per 1,000 square feet of floor area
Fast-Food Restaurant: 8.2 spaces per 1,000 square feet of floor area
Retail/Shopping Center Uses: 3.96 spaces per 1,000 square feet of floor area
Gym (3,000 sq.ft. or less): 5.27 spaces per 1,000 square feet of floor area
As the list shows, most of the ITE parking rates show a lower demand per 1,000 square feet than the
Code-based rates, except for the family/sit-down restaurant use, which is higher.
ITE also provides weekend parking demand rates for some of these uses:
Family/Sit-Down Restaurant: 13.5 spaces per 1,000 square feet of floor area
Retail/Shopping Center Uses: 4.67 spaces per 1,000 square feet of floor area
Gym (3,000 sq.ft. or less): 2.89 spaces per 1,000 square feet of floor area
Similar to the weekday ITE parking demand rates, the weekend rates are consistently lower than the
Code-based rates, except for the family/sit-down restaurant use, which is higher.
Urban Land Institute – Shared Parking
Another source for parking demand data is the Urban Land Institute’s (ULI) Shared Parking (2nd
Edition)
methodology. The ULI parking demand rates come from a variety of sources, which include physical
surveys and publications.
Below are the weekday parking demand rates for the specific land uses that would likely apply to future
Hub site uses:
4. Future Potential Uses
Master Parking Study Update, Arcadia Hub Commercial Center Page 13
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
General Office: 3.8 spaces per 1,000 square feet of floor area
Medical/Dental Office: 4.5 spaces per 1,000 square feet of floor area
Family/Sit-Down Restaurant: 10.5 spaces per 1,000 square feet of floor area
Fast-Food Restaurant: 15 spaces per 1,000 square feet of floor area
Retail/Shopping Center Uses: 3.6 spaces per 1,000 square feet of floor area
Gym (3,000 sq-ft or less): 7 spaces per 1,000 square feet of floor area
Weekend rates for these land uses are as follows:
General Office: 0.38 spaces per 1,000 square feet of floor area
Medical/Dental Office: 4.5 spaces per 1,000 square feet of floor area
Family/Sit-Down Restaurant: 15 spaces per 1,000 square feet of floor area
Fast-Food Restaurant: 14 spaces per 1,000 square feet of floor area
Retail/Shopping Center Uses: 4 spaces per 1,000 square feet of floor area
Gym (3,000 sq-ft or less): 5.75 spaces per 1,000 square feet of floor area
As with the ITE parking demand rates, most of the rates show a lower demand per 1,000 square feet
than the Code-based rates, except for the family/sit-down restaurant use, which is higher.
The ULI Shared Parking methodology also documents the daily variation in parking demand for various
land uses. These time-of-day factors allow one to calculate the expected peak parking demand by hour
for a certain land use. These factors are derived from data provided by shopping center managers,
physical surveys, and other parking publications.
In using empirical parking demand rates and applying a time-of-day adjustment, the ULI methodology
provides more refined overall parking demand calculations.
Master Parking Study Update, Arcadia Hub Commercial Center Page 14
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
4. Future Potential Uses
This section estimates the future parking demand with new proposed and potential uses for the site. An
estimated near-term scenario is analyzed (planned/potential uses added), and a long-term scenario is also
analyzed (estimated potential buildout of site restaurant uses). This section also defines a framework for
future analysis by the City of future planned restaurant or medical-office uses, two uses very typical to
the center outside of the gym, supermarket, and general retail tenants.
Site management is planning for new uses within the site for 2015, which would be sit-down restaurant
uses and medical-office uses that would replace existing retail or would occupy currently vacant tenant
spaces. There is an additional 16,124 square feet of planned new uses, all more intense than retail, that
would occupy tenant spaces within both the eastern site building at 1201-1325 S. Baldwin Avenue and
the western site building at 815 W. Naomi Avenue.
The analysis incorporated City Municipal Code parking rates and ULI use rates. The ULI source is based
on the family restaurant rate and adjusted with time-of-day factors (expected proportion of demand per
hour).
4.1 Parking Demand of Near-Term Planned Uses
KOA conducted a shared parking analysis for the proposed uses based on the Urban Land Institute’s
(ULI) Shared Parking (2nd
Edition) methodology.
The Code-based parking requirements do not take into consideration that land uses have different peak
parking demands throughout the day and that the total demand for the site may in fact be
accommodated with less parking supply. In addition, parking demand also fluctuates by weekday versus
weekend. Thus, a reduction in parking demand due to fluctuations in parking demand by time of day and
weekday versus weekend was applied based on the Shared Parking methodology.
The planned near-term new site uses would consist of the following changes, within three separate
tenant spaces, totaling 16,124 square feet:
A 9,574 square-foot medical-office tenant
A 1,550 square-foot restaurant tenant
A 5,000 square-foot restaurant tenant
For this analysis, the expected new sit-down restaurant uses for currently vacant units were adjusted for
time-of-day fluctuations based on the ULI methodology. The expected new sit-down restaurant and
medical uses in existing retail and office spaces were also adjusted for time-of-day fluctuations.
Furthermore, an existing parking demand credit was taken for the uses that would be replaced (retail
and office) so that the new parking demand for the expected restaurant and medical uses is not over
estimated.
Future Potential Uses
For purpose of future parking availability, the parking supply within site sub-areas E to G was not
considered, and therefore the parking supply total was reduced to 836 spaces. The analysis assumes
that functional capacity would be reached when the parking occupancy is at 90 percent.
4. Future Potential Uses
Master Parking Study Update, Arcadia Hub Commercial Center Page 15
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
Table 6 indicates that after all the adjustments have been made, the peak total parking demand for the
entire site under the near-term scenario would be as follows:
666 parking spaces occupied (80% occupancy) on an average weekday at 6:00 p.m.
643 parking spaces occupied (77% occupancy) on an average weekend day at 12:00 p.m.
Throughout the day, there would be at least 170 parking spaces available on a weekday and 193 spaces
available on a weekend day.
4. Future Potential Uses
Master Parking Study Update, Arcadia Hub Commercial Center
Page 16
Prepared for Baldwin Arcadia Center, LP
JB41141
April 3, 2015
Table 6 – Shared Parking Demand Analysis – Near-Term Planned Uses
ExistingParking
TOTALParkingWEEKDAY
Demand
SHAREDSurplus/PARKING ACCUMULATION PERCENTAGES [1]
TimeOctober
PARKING(Deficit)TimeFamilyOfficeMedical
of Day2014
DEMAND836 spacesof DayRetailRestaurant 6:00AM701300 4 0 87
749 6:00AM1%25%0%0%
7:00 130250(2)8 0 161
675 7:00 5%50%1%0%
8:00 1993026(5)10 26 286
550 8:00 15%60%20%90%
9:00 3413826(11)12 26 432
404 9:00 35%75%60%90%
10:00 4414329(20)14 29 536
30010:00 65%85%100%100%
11:00 4814529(26)14 29 572
26411:00 85%90%45%100%
Noon532509(29)16 9 587
249Noon95%100%15%30%
1:00PM5344526(30)14 26 615
221 1:00PM100%90%45%90%
2:00 4982529(29)8 29 560
276 2:00 95%50%100%100%
3:00 5132329(27)7 29 574
262 3:00 90%45%45%100%
4:00 5712326(27)7 26 626
210 4:00 90%45%15%90%
5:00 5933823(29)12 23 660
176 5:00 95%75%10%80% 6:00 6044019(29)13 19 666*170
6:00 95%80%5%67%
7:00 592409(29)13 9 634
202 7:00 95%80%2%30%
8:00 532404(24)13 4 569
267 8:00 80%80%1%15%
9:00 390300(15)10 0 415
421 9:00 50%60%0%0%
10:00 282280(9)9 0 310
52610:00 30%55%0%0%
11:00 136250
(3)8 0 166
67011:00 10%50%0%0%
ExistingParking
TOTALParkingWEEKEND
Demand
SHAREDSurplus/PARKING ACCUMULATION PERCENTAGES [1]
TimeOctober
PARKING(Deficit)TimeFamilyOfficeMedical
of Day2014
DEMAND836 spacesof DayRetailRestaurant 7:00 79130(2)4 0 94
742 7:00 5%25%20%0%
8:00 1942326(3)7 26 247
589 8:00 10%45%60%90%
9:00 2823526(9)11 26 345
491 9:00 30%70%80%90%
10:00 4104529(15)14 29 483
35310:00 50%90%90%100%
11:00 4814529(20)14 29 549
28711:00 65%90%100%100%Noon592509(24)16 9 643 193
Noon80%100%90%30%
1:00PM616430(27)14 0 646
*
190 1:00PM90%85%80%0%
2:00 603330(30)10 0 616
220 2:00 100%65%60%0%
3:00 627200(30)6 0 623
213 3:00 100%40%40%0%
4:00 610230(29)7 0 611
225 4:00 95%45%20%0%
5:00 577300(27)10 0 590 246 5:00 90%60%10%0% 6:00 610350(24)11 0 632 204 6:00 80%70%5%0% 7:00 613350(23)11 0 636 200 7:00 75%70%0%0% 8:00 478330(20)10 0 501 335 8:00 65%65%0%0% 9:00 292150(15)5 0 297 539 9:00 50%30%0%0%10:00 149130(11)4 0 155
68110:00 35%25%0%0%
11:00 8380
(5)2 0
88
74811:00 15%15%0%0%
[1] Source: Tables 2-5 and 2-6 from Urban Land Institute Shared Parking, 2nd Edition, 2005.
* Hour with maximum parking demand.
Medical Tenants Changes
Retail
Tenants ChangesRetail
Tenants Changes
Vacant
Tenants to Restaurant
Restaurant Tenants Changes
Restaurant Tenants Changes
Vacant
Tenants to Medical
WEEKEND SITE PARKING ACCUMULATIONWEEKDAY SITE PARKING ACCUMULATION
Vacant
Tenants to Restaurant
Vacant
Tenants to Medical
Medical Tenants Changes
4. Future Potential Uses
Master Parking Study Update, Arcadia Hub Commercial Center Page 17
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
4.2 Parking Demand of Long-Term Potential Restaurant Buildout
This report sub-section analyzes a potential future site scenario with restaurant uses added to the site
to a point where total site parking demand is at its operational maximum for the entire Hub site. This
maximum was defined as approximately 90% occupancy of all on-site parking. Some areas of the site
would experience 100 percent occupancy, while parking would likely remain available at the periphery of
the site.
It is assumed for this scenario that these restaurant tenants would occupy either existing retail or vacant
spaces. The existing gym, supermarket, medical office, and restaurant spaces would remain.
Restaurants experience consistently higher parking demand than do retail uses.
In order to avoid the parking demand increase exceeding a 90% site occupancy rate, an additional 17,450
square feet of existing retail uses can be converted to sit-down restaurant use. The total restaurant
development potential is 24,000 square feet of floor area (6,550 square feet in the near-term and 17,450
square feet in the long-term).
In transitioning to a restaurant use from lower-intensity land uses, there is only a limited amount of
square feet that can be converted before parking demand is higher than the site supply. If exceeding the
supply, demand would create a spillover and on-street parking or parking within adjacent commercial
properties would be utilized for supply, creating significant impacts beyond the site.
Table 7 indicates that after all the adjustments have been made, the peak total parking demand for the
entire site would as follows:
727 occupied parking spaces (87% occupancy) on a weekday at 6:00 p.m.
751 occupied parking spaces (90% occupancy) on a weekend at 12:00 p.m.
Throughout the day, there would be at least 109 parking spaces available on a weekday and 85 spaces
available on a weekend day.
4. Future Potential Uses
Master Parking Study Update, Arcadia Hub Commercial Center
Page 18
Prepared for Baldwin Arcadia Center, LP
JB41141
April 3, 2015
Table 7 – Shared Parking Demand Analysis – Long-Term Restaurant Buildout
ExistingParking
TOTALParkingWEEKDAY
Demand
SHAREDSurplus/PARKING ACCUMULATION PERCENTAGES [1]
TimeOctober
PARKING(Deficit)TimeFamilyOfficeMedical
of Day2014
DEMAND836 spacesof DayRetailRestaurant 6:00AM70130(1)48 0 130
706 6:00AM1%25%0%0%
7:00 130250(6)95 0 244
592 7:00 5%50%1%0%
8:00 1993026(17)114 26 378
458 8:00 15%60%20%90%
9:00 3413826(40)143 26 534
302 9:00 35%75%60%90%
10:00 4414329(73)162 29 631
20510:00 65%85%100%100%
11:00 4814529(96)171 29 659
17711:00 85%90%45%100%
Noon532509(107)190 9 683
153Noon95%100%15%30%
1:00PM5344526(113)171 26 689
147 1:00PM100%90%45%90%
2:00 4982529(107)95 29 569
267 2:00 95%50%100%100%
3:00 5132329(102)86 29 578
258 3:00 90%45%45%100%
4:00 5712326(102)86 26 630
206 4:00 90%45%15%90%
5:00 5933823(107)143 23 713
123 5:00 95%75%10%80% 6:00 6044019(107)152 19 727*109
6:00 95%80%5%67%
7:00 592409(107)152 9 695
141 7:00 95%80%2%30%
8:00 532404(90)152 4 642
194 8:00 80%80%1%15%
9:00 390300(57)114 0 477
359 9:00 50%60%0%0%
10:00 282280(34)105 0 381
45510:00 30%55%0%0%
11:00 136250
(11)95 0 245
59111:00 10%50%0%0%
ExistingParking
TOTALParkingWEEKEND
Demand
SHAREDSurplus/PARKING ACCUMULATION PERCENTAGES [1]
TimeOctober
PARKING(Deficit)TimeFamilyOfficeMedical
of Day2014
DEMAND836 spacesof DayRetailRestaurant 7:00 79130(6)48 0 134
702 7:00 5%25%20%0%
8:00 1942326(11)86 26 318
518 8:00 10%45%60%90%
9:00 2823526(34)133 26 442
394 9:00 30%70%80%90%
10:00 4104529(57)171 29 598
23810:00 50%90%90%100%
11:00 4814529(73)171 29 653
18311:00 65%90%100%100%Noon592509(90)190 9 751*85
Noon80%100%90%30%
1:00PM616430(102)162 0 719
117 1:00PM90%85%80%0%
2:00 603330(113)124 0 647
189 2:00 100%65%60%0%
3:00 627200(113)76 0 610
226 3:00 100%40%40%0%
4:00 610230(107)86 0 612
224 4:00 95%45%20%0% 5:00 577300(102)114 0 619 217 5:00 90%60%10%0% 6:00 610350(90)133 0 688 148 6:00 80%70%5%0% 7:00 613350(85)133 0 696 140 7:00 75%70%0%0% 8:00 478330(73)124 0 562 274 8:00 65%65%0%0% 9:00 292150(57)57 0 307 529 9:00 50%30%0%0%10:00 149130(40)48 0 170
66610:00 35%25%0%0%
11:00 8380
(17)29 0 103
73311:00 15%15%0%0%
[1] Source: Tables 2-5 and 2-6 from Urban Land Institute Shared Parking, 2nd Edition, 2005.
* Hour with maximum parking demand.
Medical Tenants Changes
Retail
Tenants ChangesRetail
Tenants Changes
Vacant
Tenants to Restaurant
Restaurant Tenants Changes
Restaurant Tenants Changes
Vacant
Tenants to Medical
WEEKEND SITE PARKING ACCUMULATIONWEEKDAY SITE PARKING ACCUMULATION
Vacant
Tenants to Restaurant
Vacant
Tenants to Medical
Medical Tenants Changes
4. Future Potential Uses
Master Parking Study Update, Arcadia Hub Commercial Center Page 19
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
4.3 Framework for Analysis of Future Restaurant Uses
The parking demand rates for the Hub site, based on the conducted parking demand surveys, are as
follows:
Weekday: 1.78 spaces per 1,000 sq.ft.
Weekend: 1.85 spaces per 1,000 sq.ft.
The weekday peak rate is based on a demand of 604 parking vehicles within the 6:00 p.m. hour and the
weekend peak rate is based on a demand of 627 parking vehicles within the 3:00 p.m. hour, and the
occupied/active floor area (at the time of the surveys) of 339,031 square feet.
The parking rates for three proposed land uses (sit-down restaurant, fast-food restaurant, and medical-
office) were reviewed to assess the impact their addition to the Hub site would have on parking
utilization.
In order to verify that off-street parking would be available for the new land uses, parking rates applied
to the analysis need to be adjusted to correctly factor existing parking demand from the retail uses they
would be replacing. This was done for the respective parking rates of the three potential new land uses
(sit-down restaurant, fast-food restaurant, and medical office). The Replacement Rate or Additional
Parking Spaces Rate would account for not only the additional parking demand from the new land use,
but would also provide a credit for the existing parking demand of the replaced retail land use; this will
result in a more refined parking demand estimate that would not necessitate an overparking of the site.
Three following tables provide the rates for each of the land uses for each parking rate source. Note
that if one of these proposed land uses are to be occupied in a vacant space, the land use’s parking rate
would be used to calculate parking demand, not the replacement rate. The rates are per 1,000 square
feet of gross floor area:
Table 8 – Application of City Code Rates – The “Rate’ column provides the City Code rate per
1,000 square feet for each indicated use, the “Retail Rate’ column provides the City Code rate
for retail uses, and the “Replacement Rate” column provide the difference in rates (applying to
the replacement of existing retail uses by these more intense uses).
Table 9 – Application of ITE Rates – Columns are provided for weekday and weekend periods.
The “ITE Rate’ column provides the ITE Code rate per 1,000 square feet for each indicated use,
the “Retail Rate’ column provides the related rate for retail uses, and the “Replacement Rate”
column provide the difference in rates.
Table 9 – Application of ULI Rates – Columns are provided for weekday and weekend periods.
The “ULI Rate’ column provides the ITE Code rate per 1,000 square feet for each indicated use,
the “Retail ULI Rate’ column provides the related rate for retail uses, and the “Replacement
Rate” column provide the difference in rates.
City Code rates relate to the peak parking demand for either weekday or weekend periods. The City
Code does not differentiate between sit-down and fast-food restaurants, but the other applied sources
do. Application of fast-food rates should be considered for high-volume chain coffee shops, sandwich
shops, and some fast-casual tenants such as newer chain pizza establishments.
4. Future Potential Uses
Master Parking Study Update, Arcadia Hub Commercial Center
Page 20
Prepared for Baldwin Arcadia Center, LP
JB41141
April 3, 2015
Table 8 – Parking Demand Rates Menu – City Code
Sit-Down/Family Restaurants104.755.25Fast-Food Restaurants104.755.25Medical-Office Uses64.751.25Retail Rate
RateReplacement Rate
City Code Rates
Land Use
Table 9 – Parking Demand Rates Menu – ITE
Sit-Down/Family Restaurants10.62.947.6613.52.8710.63Fast-Food Restaurants8.22.945.2613.52.8710.63Medical-Office Uses3.22.940.263.22.870.33ITE Parking Generation Rates
Land Use
Replacement Rate
ITE RateRetail ITE RateITE RateRetail ITE RateWeekdayWeekend
Replacement Rate
Rates taken from Parking Generation (3
rd
edition), published by the Institute
of Transportation Engineers (ITE).
4. Future Potential Uses
Master Parking Study Update, Arcadia Hub Commercial Center
Page 21
Prepared for Baldwin Arcadia Center, LP
JB41141
April 3, 2015
Table 10 – Parking Demand Rates Menu – ULI
Sit-Down/Family Restaurants10.53.66.915411Fast-Food Restaurants153.611.414410Medical-Office Uses4.53.60.94.540.5ULI Parking Rates
Land Use
Replacement Rate
Retail ULI Rate
ULI Rate
Replacement Rate
Retail ULI Rate
ULI Rate
WeekdayWeekend
Rates taken from Shared Parking (2
ne
edition), published by the Ur
ban Land Institute (ULI).
4. Future Potential Uses
Master Parking Study Update, Arcadia Hub Commercial Center Page 22
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
4.4 Recommended Application of Framework
It is recommended that the rate options provided here, and the ranges of potential demand provided by
the City Code, ITE, and ULI sources be reviewed by the City of Arcadia for future proposed restaurant
tenants. The following steps should be taken as part of this City review:
Determine credit for existing use, and multiply the applicable lease area by 1.85 spaces per 1,000
SF
Determine the new use type
Multiply by the Arcadia Municipal Code parking rate
Subtract the credit for the existing use (net new parking requirement)
Subtract this amount from the available parking supply in number of spaces (752 spaces,
calculated from a base supply of 836 spaces within parking survey sections A-D and H, as
defined for this report, multiplied by a 90 percent occupancy factor)
Keep a running total of available parking credits
Some conditions that could be considered by the City, as new uses are evaluated, are as follows:
If a sector reaches or exceeds the available supply, consider conditioning the applicant with
improved directional signage for that sector of the site to direct drivers to other areas of
available spaces within the site and/or the upper level of the parking structure.
Also consider, based on the severity of the change in available supply, encouragement of
employees to use parking at rear of commercial buildings at north and west ends of the site,
parking along the periphery of the southern site frontage, and the upper level of the parking
structure.
Master Parking Study Update, Arcadia Hub Commercial Center Appendices
Prepared for Baldwin Arcadia Center, LP JB41141
April 3, 2015
Appendix A
Parking Survey – Demand Data Summaries
Monday Parking UtilizationDate:10/20/14
AreaArea AArea BArea CArea DArea EArea F Top Level
(G)
Ground
Level (H)
Supply98311181643651215182
6:00 AM1231760536
7:00 AM338331008713
8:00 AM7914314410925
9:00 AM2810975299171552
10:00 AM49136873112262479
11:00 AM48136612412202895
12:00 PM641576025131830109
1:00 PM881695720141834122
2:00 PM701665419151729121
3:00 PM781189121101948140
4:00 PM702078723111740132
5:00 PM7920411320111530125
6:00 PM9122011828101331116
7:00 PM8819496278337100
8:00 PM621798025732159
9:00 PM571317622721846
10:00 PM551247222721531
11:00 PM188932163048
Tuesday Parking UtilizationDate:10/21/14
AreaArea AArea BArea CArea DArea EArea F Top Level
(G)
Ground
Level (H)
Supply98311181643651215182
6:00 AM2362780435
7:00 AM5523313010512
8:00 AM7595416213817
9:00 AM36947629315858
10:00 AM4713065267332182
11:00 AM491497226102233111
12:00 PM641385727102131117
1:00 PM911545024112240133
2:00 PM66147532191733123
3:00 PM431635519101835124
4:00 PM522005929122232126
5:00 PM632198025141539103
6:00 PM91177982614104788
7:00 PM9819510930101238101
8:00 PM9220111034872193
9:00 PM611548527651653
10:00 PM491156425621021
11:00 PM155037134109
Wednesday Parking UtilizationDate:10/22/14
AreaArea AArea BArea CArea DArea EArea F Top Level
(G)
Ground
Level (H)
Supply98311181643651215182
6:00 AM22217601365
7:00 AM4434216012912
8:00 AM106050142141120
9:00 AM2811088258201661
10:00 AM38147762614252576
11:00 AM54146632415233798
12:00 PM811756627151838115
1:00 PM721706823141244124
2:00 PM661525522171434121
3:00 PM521676928151437126
4:00 PM551897928141348115
5:00 PM771919329141543112
6:00 PM982041023413940104
7:00 PM962001053613104391
8:00 PM9820110933913974
9:00 PM591386420611938
10:00 PM2997622060615
11:00 PM9432585013
J:\2014\JB41141 Arcad HubShopCtr PkgUpdate\Documents\Tables\Parking Demand ‐ Demand01/20/15
Thursday Parking UtilizationDate:10/23/14
AreaArea AArea BArea CArea DArea EArea F Top Level
(G)
Ground
Level (H)
Supply98311181643651215182
6:00 AM4221660947
7:00 AM74142130111014
8:00 AM7997221710819
9:00 AM291227127722943
10:00 AM49139832312232794
11:00 AM691718129162140112
12:00 PM911917826132246133
1:00 PM831675825151635139
2:00 PM681645522131731155
3:00 PM43152712215174192
4:00 PM611948527141949111
5:00 PM76219942316194399
6:00 PM872089929151645104
7:00 PM9820611234121042109
8:00 PM9018210326763174
9:00 PM561349028412241
10:00 PM20110651941614
11:00 PM6574171004
Friday Parking UtilizationDate:10/24/14
AreaArea AArea BArea CArea DArea EArea F Top Level
(G)
Ground
Level (H)
Supply98311181643651215182
6:00 AM21822501432
7:00 AM15444901446
8:00 AM5855014312312
9:00 AM381368527920946
10:00 AM42168802615282593
11:00 AM491757227172739106
12:00 PM922126223192337117
1:00 PM891856520181539129
2:00 PM851725918181939121
3:00 PM722268621131839139
4:00 PM692398922141846137
5:00 PM842349823161632148
6:00 PM9322310423161146116
7:00 PM98207872011844120
8:00 PM98201862014635110
9:00 PM8416371181142687
10:00 PM66120561882738
11:00 PM219439340212
Saturday Parking UtilizationDate:10/18/14
AreaArea AArea BArea CArea DArea EArea F Top Level
(G)
Ground
Level (H)
Supply98311181643651215182
7:00 AM4322672353
8:00 AM11797118611816
9:00 AM3912480266211139
10:00 AM64175863010232975
11:00 AM651908128132737110
12:00 PM932227327162548141
1:00 PM932207724182350160
2:00 PM822178023122548155
3:00 PM80191782492073175
4:00 PM822227516102566158
5:00 PM7916810030111657156
6:00 PM97195843512351167
7:00 PM9520189249356171
8:00 PM96138551210245154
9:00 PM51108396803170
10:00 PM206664601522
11:00 PM11513220710
J:\2014\JB41141 Arcad HubShopCtr PkgUpdate\Documents\Tables\Parking Demand ‐ Demand01/20/15
Sunday Parking UtilizationDate:10/19/14
AreaArea AArea BArea CArea DArea EArea F Top Level
(G)
Ground
Level (H)
Supply98311181643651215182
7:00 AM0272641427
8:00 AM26963132537
9:00 AM1377721926322
10:00 AM351166520671460
11:00 AM4813663176103394
12:00 PM87182612361150119
1:00 PM91179662361153133
2:00 PM9217866288947132
3:00 PM76184802381367149
4:00 PM6618973237858138
5:00 PM8218071226842122
6:00 PM9419380268457111
7:00 PM9819795278639103
8:00 PM931584121722889
9:00 PM58108123511959
10:00 PM297062401334
11:00 PM15463000211
J:\2014\JB41141 Arcad HubShopCtr PkgUpdate\Documents\Tables\Parking Demand ‐ Demand01/20/15
Traffic Impact Study
Arcadia Hub Shopping Center –
Near-Term Tenant Changes
June 3, 2015
Prepared For:
Baldwin Arcadia Center LP
650 West Duarte Road, Suite #1088
Arcadia, CA 91007
(626) 821-3448
Prepared by:
1100 Corporate Center Drive, Suite 201
Monterey Park, California 91754
(323) 260-4703
JB41141
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page ii
Table of Contents
1. INTRODUCTION ..................................................................................................................................... 1
1.1 PROJECT LOCATION .................................................................................................................................................................1
1.2 PROJECT DESCRIPTION .............................................................................................................................................................1
1.3 PROJECT STUDY AREA ..............................................................................................................................................................4
1.4 ANALYSIS METHODOLOGY ......................................................................................................................................................4
2. EXISTING CONDITIONS ....................................................................................................................... 8
2.1 EXISTING ROADWAY SYSTEM ..................................................................................................................................................8
2.2 EXISTING TRANSIT SERVICE ................................................................................................................................................... 10
2.3 EXISTING INTERSECTION LEVELS OF SERVICE ....................................................................................................................... 10
3. CUMULATIVE WITHOUT-PROJECT CONDITIONS ....................................................................... 13
3.1 AMBIENT GROWTH ................................................................................................................................................................ 13
3.2 AREA/CUMULATIVE PROJECTS ............................................................................................................................................... 13
3.3 PLANNED ROADWAY IMPROVEMENTS .................................................................. ERROR! BOOKMARK NOT DEFINED.
3.4 CUMULATIVE WITHOUT-PROJECT INTERSECTION OPERATIONS ....................................................................................... 16
4. CUMULATIVE WITH-PROJECT CONDITIONS ............................................................................... 18
4.1 PROJECT TRIP GENERATION ................................................................................................................................................. 18
4.2 PROJECT TRIP DISTRIBUTION AND ASSIGNMENT ................................................................................................................ 18
5. PROJECT TRAFFIC IMPACTS AND MITIGATION MEASURES ..................................................... 22
5.1 METHODOLOGY FOR STUDY INTERSECTION IMPACTS ....................................................................................................... 22
5.2 DETERMINATION OF SIGNIFICANT IMPACTS ........................................................................................................................ 22
6. SUMMARY AND RECOMMENDATIONS .......................................................................................... 23
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page iii
List of Figures
FIGURE 1 – PROJECT SITE LOCATION 2
FIGURE 2 – EXISTING SITE PLAN 3
FIGURE 3 – STUDY INTERSECTION LOCATIONS 5
FIGURE 4 – EXISTING INTERSECTION GEOMETRY 9
FIGURE 5 – AREA TRANSIT LINES 11
FIGURE 6 – EXISTING TRAFFIC VOLUMES 12
FIGURE 7 – AREA PROJECT LOCATIONS 15
FIGURE 8 – CUMULATIVE WITHOUT-PROJECT TRAFFIC VOLUMES 17
FIGURE 9 – PROJECT TRIP ASSIGNMENT 19
FIGURE 10 – CUMULATIVE WITH-PROJECT TRAFFIC VOLUMES 21
List of Tables
TABLE 1 – LEVEL OF SERVICE DEFINITIONS 7
TABLE 2 – DESCRIPTION OF STUDY AREA ROADWAYS 8
TABLE 3 – SUMMARY OF AREA TRANSIT LINES 10
TABLE 4 – INTERSECTION PERFORMANCE – EXISTING CONDITIONS 10
TABLE 5 – AREA PROJECTS TRIP GENERATION5N 13
TABLE 6 – STUDY INTERSECTION OPERATIONS – CUMULATIVE WITHOUT-PROJECT CONDITIONS 16
TABLE 7 – PROPOSED PROJECT TRIP GENERATION 18
TABLE 8 – INTERSECTION PERFORMANCE – CUMULATIVE WITH-PROJECT CONDITIONS 20
TABLE 9 – DETERMINATION OF CUMULATIVE WITH-PROJECT IMPACTS 22
Appendices
APPENDIX A – TRAFFIC COUNTS
APPENDIX B – INTERSECTION LEVEL OF SERVICE WORKSHEETS
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 1
1. Introduction
This report summarizes a traffic impact analysis prepared by KOA for the Arcadia Hub Shopping
Center. The site is located on the southwest corner of Duarte Road and Baldwin Avenue in the City of
Arcadia, California.
The traffic analysis evaluates any potential impacts that may occur at the surrounding intersections
because of the planned near-term change in some existing tenant spaces at the Hub site from retail or
vacant to restaurant and medical-office uses. The related change in site uses results in the project
generating more than 50 net new p.m. peak hour trips. Therefore, the project near-term trip generation
was documented for the a.m. and p.m. periods, and the impact analysis focused on the p.m. peak hour.
Key tasks undertaken for the updated traffic analysis included: 1) trip generation forecasts of the
proposed project, 2) assignment of project-generated trips to the study area roadway system, and 3)
evaluation of the level of service with the inclusion of cumulative and project traffic at the study
locations. KOA coordinated with engineering staff at the City of Arcadia before finalizing the scope of
work for this study.
A separate project parking analysis, for the same near-term tenant changes, was completed by KOA on
April 3, 2015.
1.1 Project Location
The Arcadia Hub Shopping Center is bounded by Duarte Road on the north, Baldwin Avenue on the
east, Naomi Avenue on the south, and the President Square Shopping Center and multi-family
residential uses on the west. The site addresses are 1313 & 1317 S. Baldwin Avenue, 1205A S. Baldwin
Avenue, and 815 W. Naomi Avenue. Figure 1 illustrates the project site location.
1.2 Project Description
The proposed project involves the following planned tenant changes:
5,000 square feet of new restaurant (karaoke bar, 1205A S. Baldwin Avenue);
An additional 1,550 square feet of new restaurant within a separate tenant space (815
West Naomi Avenue); and
9.574 square feet of new medical office use (1313 & 1317 S. Baldwin Avenue).
Within these areas, a total of 6,364 square feet is occupied by existing active retail tenants. This active
use was included in the trip generation credit totals, to properly analyze the incremental impact of the
overall change from the existing use or vacant use to the proposed use.
The project is anticipated to be open within the current year of 2015.
Figure 2 provides the existing project site plan. The shopping center site provides vehicular access via
four driveways on Duarte Road and three driveways on Naomi Avenue.
Project Site Location
Figure 1
N
Not to Scale
Arcadia Hub Shopping Center - Near-TermTenant Changes
1 2
3
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE4
Project Location
XXX
Study Intersection
IntersectionTurn Volume
X
LEGEND
Project Location
LEGEND
N
Not to Scale
Arcadia Hub Shopping Center - Near-TermTenant ChangesDUARTE RD.NAOMI AVE.
Pavilions
745 W. Naomi Ave.
1205
1317
LA Fitness1325
A
(VACANT)
B
C
D
E
F
G
H
I
K
L
M
N
J
733 W. Naomi Ave.
Recycling
(6 Parking Spaces Removed)
(VACANT)1227122912711309
1311A1311B
Existing Site PlanFigure 2
BALDWIN AVE.
1201 121512251311C1313
ABCEF
GHI
J
KL
M
815 W. Naomi Ave.
1. Introduction
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 4
1.3 Project Study Area
This traffic study update analyzed conditions with the project at four study roadway intersections. All of
the intersections are controlled by traffic signals. The intersections are listed below and illustrated on
Figure 3.
1. Golden West Avenue and Duarte Road
2. Baldwin Avenue and Duarte Road
3. Baldwin Avenue and Naomi Avenue
4. Baldwin Avenue and Camino Real Avenue
1.4 Analysis Methodology
Study Scenarios
Weekday AM and PM peak hour traffic operations were evaluated at the study intersections for the
following traffic scenarios:
Existing
Cumulative without-Project
Cumulative with-Project
Existing Conditions
The City provided recent counts for the two Duarte Road study intersections, which were conducted
on December 10, 2014 and December 11, 2014.
KOA supplemented that count source with two new counts at the Baldwin Avenue/Naomi Avenue and
Baldwin Avenue/Camino Real Avenue intersections, which were conducted on May 6, 2015. The traffic
count summaries are provided in in Appendix A of this report.
Fieldwork within the project study area was undertaken by KOA to verify the existing conditions of
study roadways such as traffic control characteristics, approach lane configurations at each study
intersection, on-street parking restrictions, and locations of transit stops.
The existing level of service (LOS) at each of the study intersections is discussed in Section 2 of this
report.
N
Not to Scale
Arcadia Hub Shopping Center - Near-TermTenant Changes
1 2
3
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE4
Project Location
XXX
Study Intersection
IntersectionTurn Volume
X
LEGEND
1 2
3
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE
4
Project Location
Study IntersectionX
LEGEND
Study Intersection Locations
Figure 3
1. Introduction
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 6
Cumulative without-Project Conditions
Typically, an ambient/background traffic growth rate that takes into account regional traffic growth in
the study area is applied to the existing traffic volumes to determine base traffic volume conditions.
However, the proposed near-term tenant changes are anticipated to be completed within 2015, which is
the current year. An ambient traffic growth rate therefore was not added to analyze existing plus-
project conditions.
Traffic from cumulative/area projects (approved or pending approval) within the City of Arcadia,
however, was included in the analysis. Daily and peak hour trips that would be generated from each of
the area projects were computed based on trip rates from the Trip Generation (9th Edition). The
cumulative project traffic volumes were added to the existing traffic volumes. Operations at the study
intersections under this scenario are discussed in Section 3 of this report.
Project Trip Generation and Distribution
The project trip generation was calculated using trip rates based on the Institute of Transportation
Engineers (ITE) Trip Generation (9th
Edition). The trip distribution is based on development trends in the
area, local and sub-regional traffic routes, regional traffic flows, and the focused study area.
The methodology utilized for the project trip generation and distribution calculations is discussed in
Section 4 of this report.
Cumulative with-Project Conditions
Based on the traffic from the proposed project, volumes for the without-Project and with-Project
conditions scenarios were analyzed. Operations at the study intersections are discussed in Section 4 of
this report.
Level of Service Methodology
For analysis of level of service at signalized intersections, the Intersection Capacity Utilization (ICU)
methodology was utilized. The concept of roadway level of service under the ICU methodology is
calculated as the volume of vehicles that pass through the facility divided by the capacity of that facility.
A facility is “at capacity” (volume-to-capacity of 1.00 or greater) when extreme congestion occurs. This
volume-to-capacity (v/c) ratio value is based upon volumes by lane and approach lane configuration. For
this analysis, a lane capacity of 1,550 vehicles per hour per lane for all through lanes and single turn lanes
and a total loss time of 10% were used.
Level of service values range from LOS A to LOS F. LOS A indicates excellent operating conditions
with little delay to motorists, whereas LOS F represents congested conditions with excessive vehicle
delay. LOS E is typically defined as the operating “capacity” of a roadway. Table 1 defines the level of
service criteria.
1. Introduction
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 7
Table 1 – Level of Service Definitions
SignalizedStop-Controlled Intersection
IntersectionAverage Stop Delay
Volume/CapacityPer Vehicle (Sec/Veh)
Ratio (ICU)(HCM)
A
Excellent operation. All approaches to the intersection
appear quite open, turning movements are easily made,
and nearly all drivers find freedom of operation.
0.000 - 0.600≤10
B
Very good operation. Many drivers begin to feel
somewhat restricted within platoons of vehicles. This
represents stable flow. An approach to an intersection
may occasionally be fully utilized and traffic queues start
to form.
0.601 - 0.700>10 - 15
C
Good operation. Occasionally backups may develop
behind turning vehicles. Most drivers feel somewhat
restricted.
0.701 - 0.800>15 - 25
D
Fair operation. There are no long-standing traffic
queues. This level is typically associated with design
practice for peak periods.
0.801 - 0.900>25 - 35
E Poor operation. Some long standing vehicular queues
develop on critical approaches.0.901 - 1.000>35 - 50
F
Forced flow. Represents jammed conditions. Backups
from locations downstream or on the cross street may
restrict or prevent movements of vehicles out of the
intersection approach lanes; therefore, volumes carried
are not predictable. Potential for stop and go type
traffic flow.
Greater than 1.000>50
Source:Highway Capacity Manual, Special Report 209, Transportation Research Board, Washington D.C., 2000 and Interim
Materials on Highway Capacity, NCHRP Circular 212, 1982
LOSDefinition
Level of Service Analysis
The City of Arcadia traffic impact standards include the following thresholds for significant impacts,
based on computed volume-to-capacity (V/C) ratios and level of service (LOS) values:
When traffic generated by the project causes a signalized or unsignalized intersection to move
to LOS E or F from LOS D or better, or
When an intersection already at LOS E or F is worsened by 0.02 or greater change in
volume/capacity ratio due to traffic added by the project.
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 8
2. Existing Conditions
This section documents the existing traffic conditions in the study area. The discussion presented here
is limited to specific roadways in the project’s vicinity.
2.1 Existing Roadway System
A description of the roadways that are approaches to the study intersections are summarized in Table 2.
Table 2 – Description of Study Area Roadways
North Side /South Side /
East SideWest Side
North of Duarte Road3022StripedNP - Red CurbNP - Red CurbCommercial
Betw. Duarte Road and Naomi Ave3022Striped1 Hr 8a.m. to 6p.m.1 Hr 8a.m. to 6p.m.Commercial
South of Naomi Ave3022Striped1 Hr 9a.m. to 6p.m.1 Hr 9a.m. to 6p.m.Commercial
West of Golden West Ave3522StripedNo RestrictionsNo RestrictionsResidential
Betw. Golden West Ave and Baldwin
Ave 3522Striped NP - Red Curb / No
Restrictions
NP - Red Curb / No
Restrictions Commercial / Residential
East of Baldwin Ave3522StripedNP - Red CurbNP - Red Curb Commercial / Medical Office /
Residential
North of Duarte Road3011StripedNo RestrictionsNo RestrictionsResidential
Betw. Duarte Road and Naomi Ave3011StripedNo RestrictionsNo RestrictionsRetail / Residential
South of Naomi Ave3011StripedNo RestrictionsNo RestrictionsResidential
West of Golden West Ave2511StripedNo RestrictionsNo RestrictionsResidential
Betw. Golden West Ave and Baldwin
Ave 2511StripedNo RestrictionsNo RestrictionsRetail / Residential
East of Baldwin Ave2511Not StripedNo RestrictionsNo Restrictions Commercial / Medical Office /
Residential
West of Golden West Ave2511StripedNo RestrictionsNo RestrictionsResidential
Betw. Golden West Ave and Baldwin
Ave 2511StripedNo RestrictionsNo RestrictionsRetail / Residential
East of Baldwin Ave2511StripedNo RestrictionsNo RestrictionsRetail / Residential
NP - No Parking
NAOMI AVENUE - Local Road
DUARTE ROAD - Secondary Arterial
BALDWIN AVENUE - Primary Arterial
# LanesMedian
Type
GOLDEN WEST AVENUE - Collector
CAMINO REAL AVENUE - Local Road
General Parking Restrictions
General Land UseNB/
EB
SB/
WB
Roadway
Posted
Speed Limit
(mph)
Figure 4 illustrates the existing approach lane configurations and traffic controls at the study
intersections.
Existing Intersection Geometry
Figure 4
N
Not to Scale
Arcadia Hub Shopping Center - Near-TermTenant Changes
1 2
3
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE4
Project Location
XXX
Study Intersection
IntersectionTurn Volume
X
LEGEND
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE
Project Location
LEGEND
Signalized Intersection
Lane Configuration
2. Existing Conditions
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 10
2.2 Existing Transit Service
The project study area is served by two bus transit lines operated by Metro. Table 3 summarizes the
transit lines in the vicinity of the project site.
Table 3 – Summary of Area Transit Lines
7:00 AM - 9:00 4:00 PM - 6:00 PM
264AltadenaCity of Duarte Baldwin Avenue/
Duarte Road 60 Minutes60 Minutes
268City of El MonteAltadenaBaldwin Avenue30 Minutes30 Minutes
Source: Metro Transit website
Metro Transit Lines
Frequency (Approximate)
LineFrom / ToTo / FromVia Weekday
Figure 5 illustrates the routes of the public transportation services in the vicinity of the project site.
2.3 Existing Intersection Levels of Service
The existing weekday AM and PM peak hour turn movement volumes at the study roadway
intersections are provided on Figure 6. Based on the existing traffic volumes, a volume-to-capacity (v/c)
ratio for the signalized intersections and the corresponding levels of service were determined. The
traffic analysis worksheets are provided in Appendix B of this report.
Table 4 provides a summary of the v/c ratios and level of service values for existing conditions. All of
the study roadway intersections are operating at LOS D or better during both peak hour periods.
Table 4 – Intersection Performance –
Existing Conditions
ICULOSICULOS
1Golden West Avenue & Duarte Road0.483A0.675B
2Baldwin Avenue & Duarte Road0.829D0.561A
3Baldwin Avenue & Naomi Avenue0.569A0.740C
4Baldwin Avenue & Camino Real Avenue0.609B0.569A
PM Peak AM Peak Study Intersections
AreaTransit Lines
Figure 5
N
Not to Scale
Arcadia Hub Shopping Center - Near-TermTenant Changes
1 2
3
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE4
Project Location
XXX
Study Intersection
IntersectionTurn Volume
X
LEGEND
1 2
3
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE
4
Project Location
LEGEND
Signalized Intersection
Metro 264
Metro 268
X
METRO 264
METRO 268
X
ExistingTraffic Volumes
Figure 6
N
Not to Scale
Arcadia Hub Shopping Center - Near-TermTenant Changes
1 2
3
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE4
Project Location
XXX
Study Intersection
IntersectionTurn Volume
X
LEGEND
AM PEAK HOURPM PEAK HOUR
1
61
109
33
19
665
75
47
82
80
20
540
84
2
87
875
56
104
661
168
168
535
82
147
470
31
3
204
1001
70
36
70
35
4055
34
47
92
4
93
1189
39
93
51
92
2615
14
33
51
720816
1
109
136
62
69
572
87
69
167
58
34
922
111
2
37
851
29
21
131
46
54
1012
37
57
300
47
3
187
839
47
73
120
35
34
921
171
106
94
210
4
28
992
44
72
38
45
52
1069
30
41
92
45
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 13
3. Cumulative without-Project Conditions
This section provides an analysis of traffic conditions in the study area with cumulative/area projects
added but without the proposed Project. The current year 2015 was selected for analysis based on the
anticipated completion date of the project, late within the current year.
3.1 Ambient Growth
Typically, an ambient/background traffic growth rate that takes into account regional traffic growth in
the study area is applied to the existing traffic volumes to determine base traffic volume conditions.
Since the proposed project is anticipated to be completed within the current year, an ambient traffic
growth rate is not applicable for this analysis.
3.2 Area/Cumulative Projects
Traffic from other developments (area/cumulative projects) within the study area that are approved or
pending approval was added to the existing traffic volumes for this analysis scenario. Based on
information provided from the City’s development database, 33 area projects were included in the
analysis.
A list of the projects and the trip generation of each of the area projects are summarized in Table 5.
The project locations are illustrated on Figure 7.
The area projects traffic was added to the surrounding street system using the same distribution and
assignment methodology applied for project trips, with some adjustments for projects near the edge of
the study area.
Table 5 – Area Projects Trip Generation
ITE
In Out Total In Out Total Code
Restaurant (New)4,500SF572272249261844932
Retail (New)10,710SF4576410192140820
Retail (Removed)(6,930)SF(296)(4)(3)(7)(12)(14)(26)820
Total733292352332558
2 Westfield Center Expansion
Project Restaurant (New)20,000SF2,5431199721611879197932
321-29 Alta StCondominium11DU64145426230
4168 W. Las Tunas AveRetail9,148SF391639161834820
Restaurant30,000SF3,815178146324178118296932
(Retail)(30,000)SF(1281)(18)(11)(29)(53)(58)(111)820
Total2,53416013529512560185
6845 W. Huntington DrCondominium10DU58134325230
7715 S. Old Ranch RdCondominium11DU64145426230
8180 Campus Dr Performing Arts
Center 1,200SeatsN/A000121224441
9289 W. Huntington Dr Medical Office
Building 72,000SF2,6011363617272185257720
Unit No.Project Title or Address
Weekday
Daily
1Baldwin Plaza Expansion Project
5400 S. Baldwin Ave
AM Peak HourPM Peak HourDescriptionSize
3. Cumulative without-Without Project Conditions
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 14
Table 5 – Area Projects Trip Generation (continued)
ITE
In Out Total In Out Total Code
Medical Office64,255SF2,3221223215464165229720
Restaurant4,600SF585282250271845932
Total2,9071505420491183274
11650 W. Huntington DrCondominium34DU1983121512618230
12948-950 Arcadia AveCondominium18DU105178639230
13630 W. Live Oak AveChurch23,461SF21485136713560
Starbucks Expansion600SF511333265121224936
Restaurant 7,200SF915000432871932
Dental Expansion1,550SF56314246720
Total1,4823633695744101
15 Gold Line Foothill Extension -
Phase 2A
Light Rail Transit
Station with Parking 300Spaces7532576432121615637293
16743-753 W Huntington DrCondominium10DU58134325230
17713 S Old Ranch RdCondominium11DU64145426230
18
101-111, 121-159 N Santa Anita
Ave, 21 Morlan Pl, 55 W
Huntington Dr
Automobile Sales103,000SF3,32714949198108162270841
19919, 921 & 923 Fairview AveCondominium12DU70145426230
20736-738 Camino Real AveCondominium18DU105178639230
21130 West Huntington DrHotel212rooms1,73266461126562127310
Medical Office12,489SF45124630133245720
Retail3,126SF1332136612820
Total58426733193857
23907-915 Arcadia AvenueCondominium13DU76156527230
24132-142 Las Tunas Dr.Condominium17DU99167639230
251222 Temple City Blvd.Condominium10DU58134325230
26501 N. Santa AnitaCondominium20DU1162797310230
27550 S. Second AvenueCondominium20DU1162797310230
Restaurants3,000SF381181432181230932
Retail9,864SF421639181937820
Total802241741363167
2912321 Lower Azusa Rd.Warehousing1,688,000SF6,009400106506135405540150
30 325 N. Santa Anita, 400, 414,
and 420 Rolyn Place.Private School300students74414895243222951536
Office380SF4101011710
Condominium5DU29022213230
Total33123224
Medical Office5,420SF1961031351419720
Retail1,806SF77112347820
Total2731141581826
33621 FairviewCondominium12DU70145426230
Notes:
Unit
Arcadia Hub Shopping Center14
10 161 Colorado Pl / 125 W.
Huntington Dr
No.Project Title or Address
Weekday
Daily AM Peak HourPM Peak HourDescriptionSize
The description of the related projects is based on the cumulative projects list from the Focused Traffic Impact Study for YiXiang Seafood Restaurant at 1271 S. Baldwin
Avenue, Arcadia, August 8, 2012, prepared by K2 Traffic Engineering, Inc. and on the City's related projects database from February 12, 2013.
The trip generation is based on ITE "Trip Generation, 9th Edition."
323-325 N. First Avenue32
205 North Santa Anita Ave22
1108-1130 S. Baldwin Avenue28
405 S. Santa Anita31
^
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
§¨¦605
§¨¦210
1
2
3
4
5
6 7
8
9
10
11
12
13
14
15
1617
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Arcadia Hub Shopping Center - Near-Term Tenant Changes
Figure 7 Area Project Locations
LEGEND
^Project Site
!(Area Project
I0 10.5
Miles
Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase,IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, ©OpenStreetMap contributors, and the GIS User Community
3. Cumulative without-Without Project Conditions
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 16
3.4 Cumulative without-Project Intersection Operations
The without-Project traffic volumes are provided on Figure 8. Table 6 summarizes the v/c and
corresponding levels of service at the study intersections.
All of the study roadway intersections are projected to operate at LOS D or better during the weekday
AM and PM peak hour periods, except for the intersection of Baldwin Avenue and Duarte Road, which
is projected to operate at LOS E during the AM peak hour period.
Table 6 – Study Intersection Operations –
Cumulative without-Project Conditions
ICULOSICULOS
1Golden West Avenue & Duarte Road0.499A0.696B
2Baldwin Avenue & Duarte Road0.960E0.665B
3Baldwin Avenue & Naomi Avenue0.681B0.848D
4Baldwin Avenue & Camino Real Avenue0.714C0.660B
Study Intersections AM Peak PM Peak
The traffic analysis worksheets for this scenario are provided in Appendix B.
Cumulative Without-ProjectTraffic Volumes
Figure 8
N
Not to Scale
Arcadia Hub Shopping Center - Near-TermTenant Changes
1 2
3
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE4
Project Location
XXX
Study Intersection
IntersectionTurn Volume
X
LEGEND
AM PEAK HOURPM PEAK HOUR
1
63
109
33
19
711
76
52
82
80
20
593
84
2
89
1203
67
109
680
168
168
710
114
182
489
37
3
214
1328
70
36
70
35
40
899
63
47
47
107
4
93
1527
39
93
51
92
26
1009
15
14
33
51
1
111
136
62
69
614
92
71
167
58
34
985
111
2
44
1103
42
28
161
46
54
1289
62
91
324
52
3
207
1096
47
73
120
35
34
1198
183
122
94
224
4
28
1269
44
72
38
45
52
1360
30
41
92
45
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 18
4. Cumulative with-Project Conditions
This section documents with-Project traffic conditions at the study intersections with the addition of
project-generated traffic. Traffic that would be generated by the proposed project is defined in a three-
step process including trip generation, trip distribution and trip assignment.
4.1 Project Trip Generation
Trip generation for the proposed project was calculated by utilizing rates published in the Institute of
Transportation Engineers Trip Generation (9th
Edition). The trip rates and the trip generation totals are
provided in Table 7.
Table 7 – Proposed Project Trip Generation
TotalIn OutTotalInOut
High-Turnover Restaurant 1 932--127.1510.8155%45%9.8560%40%
Medical Office720--36.132.3979%21%3.5728%72%
Shopping Center820--42.700.9662%38%3.7148%52%
High-Turnover Restaurant 1 9325.000k.s.f636000492920
High-Turnover Restaurant 9321.550k.s.f19717981596
Medical Office7209.574k.s.f3452318534925
1,178402713984751
Former Use Trip Credit
Shopping Center8206.364k.s.f-272-6-4-2-23-11-12
-272-6-4-2-23-11-12
906342311753639
1. Proposed use is kareoke bar, use assumed to not be open during a.m. peak period.
PM PeakLand UseIntensityUnits Daily
Total
AM PeakITE
Code
Proposed Project Subtotal
Proposed Project Trip Generation Estimates
Trip Generation Rates
Former Use Trip Credit
Total
Trip generation rates based on ITE Trip Generation Manual, 9th Edition, Institute of Transportation Engineers, 2012, unless otherwise noted.
The proposed conversion of existing retail or vacant space into a new restaurant and medical office
space (the Hub site near-term planned improvements) would generate 906 daily trips, including 34 a.m.
peak-hour trips and 75 p.m. peak-hour trips.
The trip generation takes into account trip credits from the former retail use, but does not take into
account trip-reducing factors such as internal capture and pass-by trips. Therefore, application of these
rates results in a conservative estimate of trip generation totals.
4.2 Project Trip Distribution and Assignment
The trip distribution applied to this project is illustrated on Figure 9.
ProjectTripAssignment
Figure 9
N
Not to Scale
Arcadia Hub Shopping Center - Near-TermTenant Changes
1 2
3
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE4
Project Location
XXX
Study Intersection
IntersectionTurn Volume
X
LEGEND
AM PEAK HOURPM PEAK HOUR
1
1
0
0
0
2
0
0
0
0
0
6
0
2
0
1
1
0
6
0
0
2
3
2
2
0
3
6
0
0
0
0
0
0
0
2
2
0
3
4
0
6
0
0
0
0
0
3
0
0
0
0
1
2
0
0
0
8
0
0
0
0
0
9
0
2
0
4
4
0
9
0
0
4
5
6
6
0
3
9
0
0
0
0
0
0
0
4
8
0
10
4
0
9
0
0
0
0
0
10
0
0
0
0
4. Cumulative with-Project Conditions
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 20
The proposed Project traffic volumes were added to the without-Project traffic volumes to determine
conditions with the project. The traffic volumes for this scenario are provided on Figure 10.
Table 8 summarizes the v/c and corresponding levels of service values at the study intersections.
Table 8 – Intersection Performance –
Cumulative with-Project Conditions
ICULOSICULOS
1Golden West Avenue & Duarte Road0.500A0.700B
2Baldwin Avenue & Duarte Road0.963E0.668B
3Baldwin Avenue & Naomi Avenue0.683B0.860D
4Baldwin Avenue & Camino Real Avenue0.716C0.663B
Study Intersections AM Peak PM Peak
All of the study intersections are projected to operate at LOS D or better during the weekday AM and
PM peak hour periods, except for the intersection of Baldwin Avenue and Duarte Road, which is
projected to continue to operate at LOS E during the AM peak hour period.
The traffic analysis worksheets for this scenario are provided in Appendix B.
Cumulative With-ProjectTraffic Volumes
Figure 10
N
Not to Scale
Arcadia Hub Shopping Center - Near-TermTenant Changes
1 2
3
DUARTE RD
NAOMIAVE
GOLDEN WEST
AVE
BALDWIN
AVE
CAMINO REALAVE4
Project Location
XXX
Study Intersection
IntersectionTurn Volume
X
LEGEND
AM PEAK HOURPM PEAK HOUR
1
64
109
33
19
713
76
52
82
80
20
598
84
2
89
1204
68
109
686
168
168
712
117
183
491
37
3
220
1328
70
36
70
35
40
899
65
50
47
110
4
93
1532
39
93
51
92
26
1012
15
14
33
51
1
113
136
62
69
621
92
71
167
58
34
994
111
2
44
1107
46
28
170
46
54
1293
67
97
330
52
3
216
1096
47
73
120
35
34
1198
187
130
94
234
4
28
1278
44
72
38
45
52
1370
30
41
92
45
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 22
5. Project Traffic Impacts Evaluation
This section evaluates the significance of the identified incremental impacts of the proposed near-term
tenant changes at the Hub Shopping Center site.
5.1 Methodology for Study Intersection Impacts
Per City of Arcadia traffic impact standards, the following thresholds define significant impact standards,
based on computed volume-to-capacity (V/C) ratios and level of service (LOS) values:
When traffic generated by the project causes a signalized or unsignalized intersection to move
to LOS E or F from LOS D or better, or
When an intersection already at LOS E or F is worsened by 0.02 or greater change in
volume/capacity ratio due to traffic added by the project.
5.2 Determination of Significant Impacts
Table 9 provides a comparison of the a.m. and p.m. peak hour conditions under existing and cumulative
with-Project scenarios. Traffic impacts created by the Project were calculated by subtracting the values
in the “Cumulative (2015) Without Project” column from the values in the “Cumulative (2015) With
Project” column. The determinations of significant impacts for the study intersections are provided
within the two columns at the right side of the table.
The proposed Project would not cause significant traffic impacts at the study intersections during both
a.m. and p.m. peak hours. Mitigation measures are therefore not recommended for the proposed
Project.
Table 9 – Determination of Cumulative with-Project Impacts
Peak
HourICULOSICULOSICULOS
1Golden West Avenue & Duarte RoadAM0.483A0.499A0.500A0.001No
PM0.675B0.696B0.700B0.004No
2Baldwin Avenue & Duarte RoadAM0.829D0.960E0.963E0.003No
PM0.561A0.665B0.668B0.003No
3Baldwin Avenue & Naomi AvenueAM0.569A0.681B0.683B0.002No
PM0.740C0.848D0.860D0.012No
4Baldwin Avenue & Camino Real AvenueAM0.609B0.714C0.716C0.002No
PM0.569A0.660B0.663B0.003No
Sig
Impact?
Change
in ICU
Existing (2015)
Conditions
Cumulative
(2015) With
Project
Study Intersections
Cumulative
(2015) Without
Project
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Page 23
6. Summary and Recommendations
The following is a summary of the findings and recommendations of the project traffic impact analysis.
The proposed project is the conversion of an existing 6,364 square feet of retail space into a
new 5,000 square foot karaoke bar at 1205A S. Baldwin Avenue, 1,550 square foot restaurant
space at 815 West Naomi Avenue, and 9,574 square foot medical office space at 1313 & 1317 S.
Baldwin Avenue. The project is anticipated to be open with the current year of 2015.
Based on ITE Trip Generation (9th
Edition), the proposed conversion of an existing retail use to a
restaurant and medical office use would generate approximately 906 daily trips, 34 AM peak
hour trips (23 inbound and 11 outbound), and 75 PM peak hour trips (36 inbound and 39
outbound).
For the cumulative impact analysis, a total of 33 planned/pending area projects were included in
the analysis, based on information provided from the City development database.
The planned tenant changes at the Arcadia Hub Shopping Center site would not cause
significant traffic impacts at the study intersections during either the weekday a.m. or p.m. peak
hours. Therefore, mitigation measures are not recommended for the proposed project.
A separate project parking analysis, for the same neat-term tenant changes, was completed by
KOA on April 3, 2015.
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Appendices
APPENDIX A
Traffic Counts
Location ID:29
North/South:Golden West AvenueDate:
East/West:Duarte RoadCity:Arcadia, CA
123456789101112
Lanes:RTLRTLRTLRTL
7:0011231011112745413200
7:151212651531715128672300
7:30201810121460826811956360
7:452418131315251428151612110429
8:0023311728183382518211314492
8:151919820186663815241663510
8:301414914144551813231223384
8:4520219101607141714171253417
Total Volume:143135751121235286417499125868343092
Approach %41%38%21%8%90%2%19%52%29%12%85%3%
Peak Hr Begin:7:45
PHV8082477566519331096184540201815
PHF0.890
123456789101112
Lanes:RTLRTLRTLRTL
16:009242116136982623251964497
16:151537192314611132324242205560
16:301234261613418725322421813559
16:451739233412810193629292257596
17:0016351328140152033252022412581
17:151746191116418122724322429621
17:301446182513617143529382175594
17:451140192313219164131212398600
Total Volume:10026113915398498932051861921542554008
Approach %19%53%28%12%79%8%19%43%38%10%87%3%
Peak Hr Begin:17:00
PHV5816769875726962136109111922342396
PHF0.9650.8960.9430.872
Northbound
0.943
Eastbound
Totals:
SouthboundWestbound
Totals:
12/11/2014
SouthboundWestboundNorthboundEastbound
0.7360.8870.8600.834
Location ID:30
North/South:Baldwin AvenueDate:
East/West:Duarte RoadCity:Arcadia, CA
123456789101112
Lanes:RTLRTLRTLRTL
7:00156514191091211150413316449
7:15138612251491571861036221589
7:301698243313316192041947725668
7:45191284736133231525514414232848
8:001615446491773210220271710937894
8:1529143324817325182222878733845
8:30181104335178241317818313245797
8:4530124312715124172061238943757
Total Volume:15690824927212031711101621132427312525847
Approach %12%69%19%17%73%10%6%87%7%4%71%25%
Peak Hr Begin:7:45
PHV825351681686611045687587314701473384
PHF0.946
123456789101112
Lanes:RTLRTLRTLRTL
16:00724713426591831275410577
16:15920618122357200988510592
16:301022911224771681410565543
16:45723716928752205117116632
17:0010245161324561937106111601
17:157264713383222811158715690
17:3012273218358142186136712687
17:458230101234572121398519644
Total Volume:6217019271198405014106474481794322
Approach %3%92%5%23%64%13%3%92%4%11%76%13%
Peak Hr Begin:17:00
PHV371012544613121298513747300572622
PHF0.9500.9010.9170.951
Northbound
0.863
Eastbound
Totals:
SouthboundWestbound
Totals:
12/10/2014
SouthboundWestboundNorthboundEastbound
0.9090.9040.8960.900
Intersection Turning Movement
Prepared by:
National Data & Surveying Services
Day:
Date:
NLNTNRSLSTSRELETERWLWTWRTOTAL
LANES:120121110110
7:00 AM131781048777518586348
7:15 AM30187519454513584361
7:30 AM3024189131872016266484
7:45 AM49263201118515791861410607
8:00 AM49260159230582031132910679
8:15 AM70250168157191072010145586
8:30 AM362281912148169112371310532
8:45 AM282102110135221323237158515
NLNTNRSLSTSRELETERWLWTWRTOTAL
TOTAL VOLUMES:3051817114641167976510016255107594112
APPROACH %'s:13.64%81.26%5.10%4.82%87.88%7.30%19.88%30.58%49.54%24.89%48.42%26.70%
nb anb dsb asb deb aeb dwb anb d
PEAK HR START TIME:745AMTOTAL
PEAK HR VOL:20410017040720553447923670352404
PEAK HR FACTOR:0.885
CONTROL:
5/6/2015
0.949
NS/EW Streets:
SOUTHBOUND
Baldwin AveBaldwin Ave
AM
Naomi Ave
Signalized
Naomi Ave
0.678
WESTBOUND
0.8350.733
WednesdayProject ID:
City:
15-5269-002
Arcadia
EASTBOUND NORTHBOUND
Intersection Turning Movement
Prepared by:
National Data & Surveying Services
Day:
Date:
NLNTNRSLSTSRELETERWLWTWRTOTAL
LANES:120121110110
4:00 PM29163101019930232551272212601
4:15 PM4517010719027202137262710590
4:30 PM332158921634162447142413653
4:45 PM4519111122032317205015308625
5:00 PM49203121021927322554233118703
5:15 PM532121352365324304818284724
5:30 PM372089102274529155919368702
5:45 PM482161392394621244913255708
NLNTNRSLSTSRELETERWLWTWRTOTAL
TOTAL VOLUMES:339157886721729285182184395155223785306
APPROACH %'s:16.92%78.78%4.29%3.45%82.89%13.66%23.92%24.18%51.91%33.99%48.90%17.11%
nb anb dsb asb deb aeb dwb anb d
PEAK HR START TIME:500PMTOTAL
PEAK HR VOL:18783947349211711069421073120352837
PEAK HR FACTOR:0.980
CONTROL:
Project ID:15-5269-002
City:Arcadia5/6/2015
Wednesday
Signalized
Naomi AveNS/EW Streets:Naomi Ave
PM
Baldwin AveBaldwin Ave
0.9230.9650.792
WESTBOUND NORTHBOUND SOUTHBOUND EASTBOUND
0.957
Intersection Turning Movement
Prepared by:
National Data & Surveying Services
Day:
Date:
NLNTNRSLSTSRELETERWLWTWRTOTAL
LANES:120120010010
7:00 AM1620014963434111312367
7:15 AM82257398502436254408
7:30 AM162711811563381017917529
7:45 AM253212252176489171416664
8:00 AM322838824137921371741707
8:15 AM2231964171521212181026607
8:30 AM1426639187114921109534
8:45 AM9262561697571112179519
NLNTNRSLSTSRELETERWLWTWRTOTAL
TOTAL VOLUMES:142214770401335332675791391151344335
APPROACH %'s:6.02%91.01%2.97%2.84%94.82%2.34%14.44%41.67%43.89%35.82%29.64%34.54%
nb anb dsb asb deb aeb dwb anb d
PEAK HR START TIME:745AMTOTAL
PEAK HR VOL:9311893926816151433519351922512
PEAK HR FACTOR:0.888
CONTROL:
5/6/2015
0.897
NS/EW Streets:
SOUTHBOUND
Baldwin AveBaldwin Ave
AM
Camino Real Ave
Signalized
Camino Real Ave
0.621
WESTBOUND
0.8500.662
WednesdayProject ID:
City:
15-5269-001
Arcadia
EASTBOUND NORTHBOUND
Intersection Turning Movement
Prepared by:
National Data & Surveying Services
Day:
Date:
NLNTNRSLSTSRELETERWLWTWRTOTAL
LANES:120120010010
4:00 PM31895112436111256911511
4:15 PM72257202410711810612554
4:30 PM142464162427561214615587
4:45 PM10237419232568151579567
5:00 PM62251116249911231020816604
5:15 PM12277111327286201113816667
5:30 PM322398272513251615124605
5:45 PM7267131527681124824109672
NLNTNRSLSTSRELETERWLWTWRTOTAL
TOTAL VOLUMES:62188964118202748701298511766924767
APPROACH %'s:3.08%93.75%3.18%5.38%92.43%2.19%24.65%45.42%29.93%42.55%24.00%33.45%
nb anb dsb asb deb aeb dwb anb d
PEAK HR START TIME:500PMTOTAL
PEAK HR VOL:2899244521069304192457238452548
PEAK HR FACTOR:0.948
CONTROL:
Project ID:15-5269-001
City:Arcadia5/6/2015
Wednesday
Signalized
Camino Real AveNS/EW Streets:Camino Real Ave
PM
Baldwin AveBaldwin Ave
0.8240.8870.881
WESTBOUND NORTHBOUND SOUTHBOUND EASTBOUND
0.962
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Appendices
APPENDIX B
Intersection Level of Service Worksheets
B-1: Existing Conditions
B-2: Cumulative without-Project Conditions
B-3: Cumulative with-Project Conditions
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Appendices
APPENDIX B – 1
EXISTING CONDITIONS
Existing AM Thu May 14, 2015 09:49:35 Page 4-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Existing Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #1 Golden West Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.483 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 32 Level Of Service: A ******************************************************************************** Street Name: Golden West Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 0 1 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 61 109 33 47 82 80 20 540 84 19 665 75 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 61 109 33 47 82 80 20 540 84 19 665 75 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 61 109 33 47 82 80 20 540 84 19 665 75 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 61 109 33 47 82 80 20 540 84 19 665 75 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 61 109 33 47 82 80 20 540 84 19 665 75 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 0.77 0.23 1.00 0.51 0.49 1.00 1.73 0.27 1.00 1.80 0.20 Final Sat.: 1600 1228 372 1600 810 790 1600 2769 431 1600 2876 324 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.04 0.09 0.09 0.03 0.10 0.10 0.01 0.19 0.20 0.01 0.23 0.23 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Existing AM Thu May 14, 2015 09:49:35 Page 5-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Existing Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #2 Baldwin Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.829 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 74 Level Of Service: D ******************************************************************************** Street Name: Baldwin Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 87 875 56 168 535 82 147 470 31 104 661 168 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 87 875 56 168 535 82 147 470 31 104 661 168 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 87 875 56 168 535 82 147 470 31 104 661 168 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 87 875 56 168 535 82 147 470 31 104 661 168 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 87 875 56 168 535 82 147 470 31 104 661 168 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.88 0.12 1.00 1.59 0.41 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 3002 198 1600 2552 648 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.05 0.27 0.04 0.11 0.17 0.05 0.09 0.16 0.16 0.07 0.26 0.26 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Existing AM Thu May 14, 2015 09:49:35 Page 6-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Existing Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #3 Baldwin Ave & Naomi Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.569 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 38 Level Of Service: A ******************************************************************************** Street Name: Baldwin Ave Naomi Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 2 0 1 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 204 1001 70 40 720 55 34 47 92 36 70 35 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 204 1001 70 40 720 55 34 47 92 36 70 35 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 204 1001 70 40 720 55 34 47 92 36 70 35 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 204 1001 70 40 720 55 34 47 92 36 70 35 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 204 1001 70 40 720 55 34 47 92 36 70 35 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.87 0.13 1.00 2.00 1.00 1.00 0.34 0.66 1.00 0.67 0.33 Final Sat.: 1600 2991 209 1600 3200 1600 1600 541 1059 1600 1067 533 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.13 0.33 0.33 0.03 0.23 0.03 0.02 0.09 0.09 0.02 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Existing AM Thu May 14, 2015 09:49:35 Page 7-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Existing Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #4 Baldwin Ave & Camino Real Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.609 Loss Time (sec): 0 Average Delay (sec/veh): xxxxxx Optimal Cycle: 48 Level Of Service: B ******************************************************************************** Street Name: Baldwin Ave Camino Real Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 93 1189 39 26 816 15 14 33 51 93 51 92 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 93 1189 39 26 816 15 14 33 51 93 51 92 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 93 1189 39 26 816 15 14 33 51 93 51 92 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 93 1189 39 26 816 15 14 33 51 93 51 92 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 93 1189 39 26 816 15 14 33 51 93 51 92 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.94 0.06 1.00 1.96 0.04 0.14 0.34 0.52 0.39 0.22 0.39 Final Sat.: 1600 3098 102 1600 3142 58 229 539 833 631 346 624 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.06 0.38 0.38 0.02 0.26 0.26 0.06 0.06 0.06 0.15 0.15 0.15 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Existing PM Thu May 14, 2015 09:49:41 Page 4-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Existing Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #1 Golden West Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.675 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 47 Level Of Service: B ******************************************************************************** Street Name: Golden West Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 0 1 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 109 136 62 69 167 58 34 922 111 69 572 87 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 109 136 62 69 167 58 34 922 111 69 572 87 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 109 136 62 69 167 58 34 922 111 69 572 87 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 109 136 62 69 167 58 34 922 111 69 572 87 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 109 136 62 69 167 58 34 922 111 69 572 87 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 0.69 0.31 1.00 0.74 0.26 1.00 1.79 0.21 1.00 1.74 0.26 Final Sat.: 1600 1099 501 1600 1188 412 1600 2856 344 1600 2778 422 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.07 0.12 0.12 0.04 0.14 0.14 0.02 0.32 0.32 0.04 0.21 0.21 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Existing PM Thu May 14, 2015 09:49:41 Page 5-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Existing Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #2 Baldwin Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.561 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 37 Level Of Service: A ******************************************************************************** Street Name: Baldwin Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 37 851 29 54 1012 37 57 300 47 21 131 46 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 37 851 29 54 1012 37 57 300 47 21 131 46 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 37 851 29 54 1012 37 57 300 47 21 131 46 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 37 851 29 54 1012 37 57 300 47 21 131 46 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 37 851 29 54 1012 37 57 300 47 21 131 46 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.73 0.27 1.00 1.48 0.52 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 2767 433 1600 2368 832 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.27 0.02 0.03 0.32 0.02 0.04 0.11 0.11 0.01 0.06 0.06 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Existing PM Thu May 14, 2015 09:49:41 Page 6-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Existing Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #3 Baldwin Ave & Naomi Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.740 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 56 Level Of Service: C ******************************************************************************** Street Name: Baldwin Ave Naomi Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 2 0 1 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 187 839 47 34 921 171 106 94 210 73 120 35 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 187 839 47 34 921 171 106 94 210 73 120 35 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 187 839 47 34 921 171 106 94 210 73 120 35 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 187 839 47 34 921 171 106 94 210 73 120 35 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 187 839 47 34 921 171 106 94 210 73 120 35 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.89 0.11 1.00 2.00 1.00 1.00 0.31 0.69 1.00 0.77 0.23 Final Sat.: 1600 3030 170 1600 3200 1600 1600 495 1105 1600 1239 361 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.12 0.28 0.28 0.02 0.29 0.11 0.07 0.19 0.19 0.05 0.10 0.10 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Existing PM Thu May 14, 2015 09:49:41 Page 7-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Existing Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #4 Baldwin Ave & Camino Real Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.569 Loss Time (sec): 0 Average Delay (sec/veh): xxxxxx Optimal Cycle: 43 Level Of Service: A ******************************************************************************** Street Name: Baldwin Ave Camino Real Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 28 992 44 52 1069 30 41 92 45 72 38 45 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 28 992 44 52 1069 30 41 92 45 72 38 45 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 28 992 44 52 1069 30 41 92 45 72 38 45 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 28 992 44 52 1069 30 41 92 45 72 38 45 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 28 992 44 52 1069 30 41 92 45 72 38 45 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.92 0.08 1.00 1.95 0.05 0.23 0.52 0.25 0.46 0.25 0.29 Final Sat.: 1600 3064 136 1600 3113 87 369 827 404 743 392 465 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.32 0.32 0.03 0.34 0.34 0.11 0.11 0.11 0.10 0.10 0.10 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Appendices
APPENDIX B – 2
CUMULATIVE WITHOUT-PROJECT CONDITIONS
Fut Area Proj AM Tue Jun 2, 2015 10:55:25 Page 6-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative Without Project Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #1 Golden West Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.499 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 33 Level Of Service: A ******************************************************************************** Street Name: Golden West Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 0 1 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 61 109 33 47 82 80 20 540 84 19 665 75 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 61 109 33 47 82 80 20 540 84 19 665 75 Added Vol: 2 0 0 5 0 0 0 53 0 0 46 1 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 63 109 33 52 82 80 20 593 84 19 711 76 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 63 109 33 52 82 80 20 593 84 19 711 76 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 63 109 33 52 82 80 20 593 84 19 711 76 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 63 109 33 52 82 80 20 593 84 19 711 76 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 0.77 0.23 1.00 0.51 0.49 1.00 1.75 0.25 1.00 1.81 0.19 Final Sat.: 1600 1228 372 1600 810 790 1600 2803 397 1600 2891 309 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.04 0.09 0.09 0.03 0.10 0.10 0.01 0.21 0.21 0.01 0.25 0.25 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut Area Proj AM Tue Jun 2, 2015 10:55:25 Page 7-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative Without Project Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #2 Baldwin Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.960 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 143 Level Of Service: E ******************************************************************************** Street Name: Baldwin Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 87 875 56 168 535 82 147 470 31 104 661 168 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 87 875 56 168 535 82 147 470 31 104 661 168 Added Vol: 2 328 11 0 175 32 35 19 6 5 19 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 89 1203 67 168 710 114 182 489 37 109 680 168 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 89 1203 67 168 710 114 182 489 37 109 680 168 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 89 1203 67 168 710 114 182 489 37 109 680 168 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 89 1203 67 168 710 114 182 489 37 109 680 168 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.86 0.14 1.00 1.60 0.40 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 2975 225 1600 2566 634 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.06 0.38 0.04 0.11 0.22 0.07 0.11 0.16 0.16 0.07 0.26 0.27 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut Area Proj AM Tue Jun 2, 2015 10:55:25 Page 8-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative Without Project Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #3 Baldwin Ave & Naomi Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.681 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 48 Level Of Service: B ******************************************************************************** Street Name: Baldwin Ave Naomi Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 2 0 1 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 204 1001 70 40 720 55 34 47 92 36 70 35 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 204 1001 70 40 720 55 34 47 92 36 70 35 Added Vol: 10 327 0 0 179 8 13 0 15 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 214 1328 70 40 899 63 47 47 107 36 70 35 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 214 1328 70 40 899 63 47 47 107 36 70 35 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 214 1328 70 40 899 63 47 47 107 36 70 35 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 214 1328 70 40 899 63 47 47 107 36 70 35 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.90 0.10 1.00 2.00 1.00 1.00 0.31 0.69 1.00 0.67 0.33 Final Sat.: 1600 3040 160 1600 3200 1600 1600 488 1112 1600 1067 533 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.13 0.44 0.44 0.03 0.28 0.04 0.03 0.10 0.10 0.02 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut Area Proj AM Tue Jun 2, 2015 10:55:25 Page 9-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative Without Project Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #4 Baldwin Ave & Camino Real Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.714 Loss Time (sec): 0 Average Delay (sec/veh): xxxxxx Optimal Cycle: 65 Level Of Service: C ******************************************************************************** Street Name: Baldwin Ave Camino Real Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 93 1189 39 26 816 15 14 33 51 93 51 92 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 93 1189 39 26 816 15 14 33 51 93 51 92 Added Vol: 0 338 0 0 193 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 93 1527 39 26 1009 15 14 33 51 93 51 92 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 93 1527 39 26 1009 15 14 33 51 93 51 92 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 93 1527 39 26 1009 15 14 33 51 93 51 92 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 93 1527 39 26 1009 15 14 33 51 93 51 92 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.95 0.05 1.00 1.97 0.03 0.14 0.34 0.52 0.39 0.22 0.39 Final Sat.: 1600 3120 80 1600 3153 47 229 539 833 631 346 624 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.06 0.49 0.49 0.02 0.32 0.32 0.06 0.06 0.06 0.15 0.15 0.15 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut Area Proj PM Tue Jun 2, 2015 10:55:34 Page 6-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative Without Projectt Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #1 Golden West Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.696 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 49 Level Of Service: B ******************************************************************************** Street Name: Golden West Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 0 1 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 109 136 62 69 167 58 34 922 111 69 572 87 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 109 136 62 69 167 58 34 922 111 69 572 87 Added Vol: 2 0 0 2 0 0 0 63 0 0 42 5 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 111 136 62 71 167 58 34 985 111 69 614 92 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 111 136 62 71 167 58 34 985 111 69 614 92 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 111 136 62 71 167 58 34 985 111 69 614 92 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 111 136 62 71 167 58 34 985 111 69 614 92 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 0.69 0.31 1.00 0.74 0.26 1.00 1.80 0.20 1.00 1.74 0.26 Final Sat.: 1600 1099 501 1600 1188 412 1600 2876 324 1600 2783 417 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.07 0.12 0.12 0.04 0.14 0.14 0.02 0.34 0.34 0.04 0.22 0.22 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut Area Proj PM Tue Jun 2, 2015 10:55:34 Page 7-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative Without Projectt Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #2 Baldwin Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.665 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 46 Level Of Service: B ******************************************************************************** Street Name: Baldwin Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 37 851 29 54 1012 37 57 300 47 21 131 46 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 37 851 29 54 1012 37 57 300 47 21 131 46 Added Vol: 7 252 13 0 277 25 34 24 5 7 30 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 44 1103 42 54 1289 62 91 324 52 28 161 46 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 44 1103 42 54 1289 62 91 324 52 28 161 46 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 44 1103 42 54 1289 62 91 324 52 28 161 46 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 44 1103 42 54 1289 62 91 324 52 28 161 46 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.72 0.28 1.00 1.56 0.44 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 2757 443 1600 2489 711 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.34 0.03 0.03 0.40 0.04 0.06 0.12 0.12 0.02 0.06 0.06 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut Area Proj PM Tue Jun 2, 2015 10:55:34 Page 8-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative Without Projectt Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #3 Baldwin Ave & Naomi Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.848 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 79 Level Of Service: D ******************************************************************************** Street Name: Baldwin Ave Naomi Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 2 0 1 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 187 839 47 34 921 171 106 94 210 73 120 35 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 187 839 47 34 921 171 106 94 210 73 120 35 Added Vol: 20 257 0 0 277 12 16 0 14 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 207 1096 47 34 1198 183 122 94 224 73 120 35 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 207 1096 47 34 1198 183 122 94 224 73 120 35 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 207 1096 47 34 1198 183 122 94 224 73 120 35 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 207 1096 47 34 1198 183 122 94 224 73 120 35 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.92 0.08 1.00 2.00 1.00 1.00 0.30 0.70 1.00 0.77 0.23 Final Sat.: 1600 3068 132 1600 3200 1600 1600 473 1127 1600 1239 361 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.13 0.36 0.36 0.02 0.37 0.11 0.08 0.20 0.20 0.05 0.10 0.10 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut Area Proj PM Tue Jun 2, 2015 10:55:34 Page 9-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative Without Projectt Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #4 Baldwin Ave & Camino Real Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.660 Loss Time (sec): 0 Average Delay (sec/veh): xxxxxx Optimal Cycle: 55 Level Of Service: B ******************************************************************************** Street Name: Baldwin Ave Camino Real Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 28 992 44 52 1069 30 41 92 45 72 38 45 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 28 992 44 52 1069 30 41 92 45 72 38 45 Added Vol: 0 277 0 0 291 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 28 1269 44 52 1360 30 41 92 45 72 38 45 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 28 1269 44 52 1360 30 41 92 45 72 38 45 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 28 1269 44 52 1360 30 41 92 45 72 38 45 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 28 1269 44 52 1360 30 41 92 45 72 38 45 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.93 0.07 1.00 1.96 0.04 0.23 0.52 0.25 0.46 0.25 0.29 Final Sat.: 1600 3093 107 1600 3131 69 369 827 404 743 392 465 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.41 0.41 0.03 0.43 0.43 0.11 0.11 0.11 0.10 0.10 0.10 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Prepared for Baldwin Arcadia Center, LP
Traffic Impact Study - Hub Shopping Center, Arcadia
June 3, 2015 – Appendices
APPENDIX B – 3
CUMULATIVE WITH-PROJECT CONDITIONS
Fut wProj AM Tue Jun 2, 2015 10:55:39 Page 7-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative with Project Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #1 Golden West Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.500 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 33 Level Of Service: A ******************************************************************************** Street Name: Golden West Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 0 1 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 61 109 33 47 82 80 20 540 84 19 665 75 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 61 109 33 47 82 80 20 540 84 19 665 75 Added Vol: 3 0 0 5 0 0 0 58 0 0 48 1 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 64 109 33 52 82 80 20 598 84 19 713 76 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 64 109 33 52 82 80 20 598 84 19 713 76 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 64 109 33 52 82 80 20 598 84 19 713 76 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 64 109 33 52 82 80 20 598 84 19 713 76 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 0.77 0.23 1.00 0.51 0.49 1.00 1.75 0.25 1.00 1.81 0.19 Final Sat.: 1600 1228 372 1600 810 790 1600 2806 394 1600 2892 308 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.04 0.09 0.09 0.03 0.10 0.10 0.01 0.21 0.21 0.01 0.25 0.25 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut wProj AM Tue Jun 2, 2015 10:55:39 Page 8-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative with Project Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #2 Baldwin Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.963 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 145 Level Of Service: E ******************************************************************************** Street Name: Baldwin Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 87 875 56 168 535 82 147 470 31 104 661 168 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 87 875 56 168 535 82 147 470 31 104 661 168 Added Vol: 2 329 12 0 177 35 36 21 6 5 25 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 89 1204 68 168 712 117 183 491 37 109 686 168 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 89 1204 68 168 712 117 183 491 37 109 686 168 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 89 1204 68 168 712 117 183 491 37 109 686 168 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 89 1204 68 168 712 117 183 491 37 109 686 168 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.86 0.14 1.00 1.61 0.39 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 2976 224 1600 2570 630 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.06 0.38 0.04 0.11 0.22 0.07 0.11 0.16 0.17 0.07 0.27 0.27 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut wProj AM Tue Jun 2, 2015 10:55:39 Page 9-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative with Project Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #3 Baldwin Ave & Naomi Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.683 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 48 Level Of Service: B ******************************************************************************** Street Name: Baldwin Ave Naomi Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 2 0 1 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 204 1001 70 40 720 55 34 47 92 36 70 35 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 204 1001 70 40 720 55 34 47 92 36 70 35 Added Vol: 16 327 0 0 179 10 16 0 18 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 220 1328 70 40 899 65 50 47 110 36 70 35 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 220 1328 70 40 899 65 50 47 110 36 70 35 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 220 1328 70 40 899 65 50 47 110 36 70 35 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 220 1328 70 40 899 65 50 47 110 36 70 35 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.90 0.10 1.00 2.00 1.00 1.00 0.30 0.70 1.00 0.67 0.33 Final Sat.: 1600 3040 160 1600 3200 1600 1600 479 1121 1600 1067 533 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.14 0.44 0.44 0.03 0.28 0.04 0.03 0.10 0.10 0.02 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut wProj AM Tue Jun 2, 2015 10:55:39 Page 10-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative with Project Conditions AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #4 Baldwin Ave & Camino Real Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.716 Loss Time (sec): 0 Average Delay (sec/veh): xxxxxx Optimal Cycle: 65 Level Of Service: C ******************************************************************************** Street Name: Baldwin Ave Camino Real Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 93 1189 39 26 816 15 14 33 51 93 51 92 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 93 1189 39 26 816 15 14 33 51 93 51 92 Added Vol: 0 343 0 0 196 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 93 1532 39 26 1012 15 14 33 51 93 51 92 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 93 1532 39 26 1012 15 14 33 51 93 51 92 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 93 1532 39 26 1012 15 14 33 51 93 51 92 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 93 1532 39 26 1012 15 14 33 51 93 51 92 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.95 0.05 1.00 1.97 0.03 0.14 0.34 0.52 0.39 0.22 0.39 Final Sat.: 1600 3121 79 1600 3153 47 229 539 833 631 346 624 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.06 0.49 0.49 0.02 0.32 0.32 0.06 0.06 0.06 0.15 0.15 0.15 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut wProj PM Tue Jun 2, 2015 10:55:43 Page 7-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative with Project Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #1 Golden West Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.700 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 50 Level Of Service: B ******************************************************************************** Street Name: Golden West Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 0 1 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 109 136 62 69 167 58 34 922 111 69 572 87 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 109 136 62 69 167 58 34 922 111 69 572 87 Added Vol: 4 0 0 2 0 0 0 72 0 0 49 5 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 113 136 62 71 167 58 34 994 111 69 621 92 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 113 136 62 71 167 58 34 994 111 69 621 92 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 113 136 62 71 167 58 34 994 111 69 621 92 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 113 136 62 71 167 58 34 994 111 69 621 92 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 0.69 0.31 1.00 0.74 0.26 1.00 1.80 0.20 1.00 1.74 0.26 Final Sat.: 1600 1099 501 1600 1188 412 1600 2879 321 1600 2787 413 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.07 0.12 0.12 0.04 0.14 0.14 0.02 0.35 0.35 0.04 0.22 0.22 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut wProj PM Tue Jun 2, 2015 10:55:43 Page 8-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative with Project Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #2 Baldwin Ave & Duarte Rd ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.668 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 46 Level Of Service: B ******************************************************************************** Street Name: Baldwin Ave Duarte Rd Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 37 851 29 54 1012 37 57 300 47 21 131 46 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 37 851 29 54 1012 37 57 300 47 21 131 46 Added Vol: 7 256 17 0 281 30 40 30 5 7 39 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 44 1107 46 54 1293 67 97 330 52 28 170 46 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 44 1107 46 54 1293 67 97 330 52 28 170 46 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 44 1107 46 54 1293 67 97 330 52 28 170 46 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 44 1107 46 54 1293 67 97 330 52 28 170 46 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.73 0.27 1.00 1.57 0.43 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 2764 436 1600 2519 681 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.35 0.03 0.03 0.40 0.04 0.06 0.12 0.12 0.02 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut wProj PM Tue Jun 2, 2015 10:55:43 Page 9-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative with Project Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #3 Baldwin Ave & Naomi Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.860 Loss Time (sec): 10 Average Delay (sec/veh): xxxxxx Optimal Cycle: 83 Level Of Service: D ******************************************************************************** Street Name: Baldwin Ave Naomi Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 2 0 1 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 187 839 47 34 921 171 106 94 210 73 120 35 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 187 839 47 34 921 171 106 94 210 73 120 35 Added Vol: 29 257 0 0 277 16 24 0 24 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 216 1096 47 34 1198 187 130 94 234 73 120 35 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 216 1096 47 34 1198 187 130 94 234 73 120 35 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 216 1096 47 34 1198 187 130 94 234 73 120 35 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 216 1096 47 34 1198 187 130 94 234 73 120 35 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.92 0.08 1.00 2.00 1.00 1.00 0.29 0.71 1.00 0.77 0.23 Final Sat.: 1600 3068 132 1600 3200 1600 1600 459 1141 1600 1239 361 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.14 0.36 0.36 0.02 0.37 0.12 0.08 0.20 0.21 0.05 0.10 0.10 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Fut wProj PM Tue Jun 2, 2015 10:55:43 Page 10-1 -------------------------------------------------------------------------------- Arcadia Hub Shopping Center Traffic and Parking Update Cumulative with Project Conditions PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #4 Baldwin Ave & Camino Real Ave ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.663 Loss Time (sec): 0 Average Delay (sec/veh): xxxxxx Optimal Cycle: 55 Level Of Service: B ******************************************************************************** Street Name: Baldwin Ave Camino Real Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 28 992 44 52 1069 30 41 92 45 72 38 45 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 28 992 44 52 1069 30 41 92 45 72 38 45 Added Vol: 0 286 0 0 301 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 28 1278 44 52 1370 30 41 92 45 72 38 45 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 28 1278 44 52 1370 30 41 92 45 72 38 45 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 28 1278 44 52 1370 30 41 92 45 72 38 45 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 28 1278 44 52 1370 30 41 92 45 72 38 45 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.93 0.07 1.00 1.96 0.04 0.23 0.52 0.25 0.46 0.25 0.29 Final Sat.: 1600 3093 107 1600 3131 69 369 827 404 743 392 465 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.41 0.41 0.03 0.44 0.44 0.11 0.11 0.11 0.10 0.10 0.10 Crit Moves: **** **** **** **** ******************************************************************************** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to KOA CORP, MONTEREY PK
Attachment No. 4
Preliminary Environmental Assessment
Preliminary Exemption Assessment FORM “A”
PRELIMINARY EXEMPTION ASSESSMENT
(Certificate of Determination
When Attached to Notice of Exemption)
1. Name or description of project: Modification Permit No. MP 15-02
2. Project Location – Identify street
address and cross streets or attach
a map showing project site
(preferably a USGS 15’ or 7 1/2’
topographical map identified by
quadrangle name):
Arcadia Hub Shopping Center – 1201 to 1325 S. Baldwin
Avenue, and 733, 745 and 815 W. Naomi Avenue. The Project
site fronts Duarte Road, Baldwin Avenue, and Naomi Avenue in
the City of Arcadia, CA.
3. Entity or person undertaking
project:
A. Patsy Ma on behalf of Baldwin Arcadia Center, LP
B. Other (Private)
(1) Name Patsy Ma
(2) Address 430 S. Garfield Avenue #338
Alhambra, CA 91801
4. Staff Determination:
The Lead Agency’s Staff, having undertaken and completed a preliminary review of this project in
accordance with the Lead Agency's "Local Guidelines for Implementing the California Environmental
Quality Act (CEQA)" has concluded that this project does not require further environmental assessment
because:
a. The proposed action does not constitute a project under CEQA.
b. The project is a Ministerial Project.
c. The project is an Emergency Project.
d. The project constitutes a feasibility or planning study.
e. The project is categorically exempt.
Applicable Exemption Class: Section 15301, Class 1
f. The project is statutorily exempt.
Applicable Exemption:
g. The project is otherwise exempt
on the following basis:
h. The project involves another public agency which constitutes the Lead Agency.
Name of Lead Agency:
Date: June 2, 2015 Staff: Lisa Flores, Planning Services Manager