FTIP#LAF3607 CFP#F3607
AMENDMENT NO. 1
LOA.P00F3607
U 1D0-2:10
AMENDMENT NO. 1 -
LETTER OF AGAGREEMENT \\v0 ‘AO
BETWEEN
CITY OF ARCADIA
AND
THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
This Amendment No. 1 to Letter of Agreement (this "Amendment"), is dated as of October
1, 2018, by and between the City of Arcadia ("Project Sponsor"), and the Los Angeles County
Metropolitan Transportation Authority ("LACMTA").
RECITALS:
A. Project Sponsor and LACMTA entered into that certain Letter of
Agreement No. LOA.P00F3607, dated November 12, 2015, (the "Existing LOA"), which
Existing LOA provides for the Arcadia Gold Line Station Pedestrian Linkage Project ("the
Project"); and
B. Whereas, LACMTA Board on July 26, 2018, desires to extend the
lapsing date of Funds programmed for Fiscal Year (FY) 2015-16 to June 30, 2019; and
C. Project Sponsor and LACMTA desire to amend the Existing LOA as
provided herein.
Rev: 10.15.18 1 LOA Amendment Lapsing Date Extension
FTIP#LAF3607 CFP#F3607
AMENDMENT NO. 1
LOA.P00F3607
AGREEMENT:
NOW, THEREFORE, for good and valuable consideration, the receipt and
adequacy of which are hereby acknowledged, the parties hereby agree as follows:
1. Part II, Paragraph 6.1(ii) of the Existing LOA is hereby amended by
deleting it in its entirety and replacing it with the following: "Funds programmed for FY
2015-16 are subject to lapse on June 30, 2019. Project Sponsor shall allocate or obligate
these Funds by the lapsing date."
2. Attachment A of the Existing LOA is hereby replaced by Attachment A-
1, attached.
3. Attachment B of the Existing LOA is hereby amended to delete the
Project Schedule and replace it will the following Project Schedule:
Original LOA Schedule in Revised Project Schedule
LOA Milestones Scope of Work
Start Date End Date Start Date End Date
Environmental Clearance Mar 2018 Dec 2018
Design Bid&Award May 2017 Oct 2017
Design June 2016 Jan 2017 Nov 2017 Dec 2018
Right-of-Way Acquisition NA NA
Obligation of Construction
Funds (Obtain E-76) Mar 2019 June 2019
Total Project Duration
(Months) 19 months 35 months (from design)
4. Part I, Paragraph 10 of Existing LOA is hereby amended to change
LACMTA's Project Manager to Courtney Aguirre, Mail Stop 99-22-6.
5. Except as expressly amended hereby, the Existing LOA remains in full
force and effect as originally executed. All rights and obligations of the parties under the
Existing LOA that are not expressly amended by this Amendment shall remain unchanged.
Rev: 10.15.18 2 LOA Amendment Lapsing Date Extension
.
FTIP#LAF3607 CFP#F3607
AMENDMENT NO. 1
LOA.P00F3607
IN WITNESS WHEREOF, the parties have caused this Amendment No. 1 to be duly
executed and delivered as of the above date.
LOS ANGELES COUNTY
METROPOLITAN TRANSPORTATION AUTHORITY
By: �M0
Date: �b
aoi
Plli A. Washington
Chief Executive Officer
APPROVED AS TO FORM:
MARY C. WICKHAM
County Counsel
By: "g'�,% -� Date: /2/1"10epu
CITY OF ARCADIA
By: Date: �� IS -25)11
Dominic Lazzaretto
City Manager
APPROVED AS TO FORM:
By: e.,, e Date: I/0 Jl q
Stephen P. Deitsch
City Attorney
Rev: 10.15.18 3 LOA Amendment Lapsing Date Extension
a 3 J
CD o 0 0 0
Li) 6 a 6 6
\ ) a co © co CO /
u {
\ /w k k ƒ g§ Ej CO-$ $ COƒ co
2 co co co co co
y ak
0 t
t
0.0
U
.� 0
u » \
\ Co
ft
= T <
& 0 I-
k / / ` w 0
cr
o _
/ CO 5 a < CD
i
q / / /
/ _ _ «
% 0 co t 2 zCe
Q c Q «
g r24 ® � G CO \ 0 f
W
k \ \ k / 5 \ Z /
/ / 2 ® � © >-
u_ _1 Cl) %
_ \ / / \ ƒ $ C)
F.1 » k ) 4 k
4 \ \ § \ 0
ƒ \ ° § ~ CZ
a.
k \
$ / / / § u.
/ 1-
w < 0
<
/ $ \
0 O -
(
/
\
CO § z /
ƒ z § ) /
zU \ / / /
k � 7 O
I / j
0 j 2 \ ./ 0 \
0 Ce G 00 \ y
o } 5 = ® k
\ \ \ OC
\ \ � \ u E—, et, \
D O R ƒ
\ § \
Los Angeles County One Gateway Plaza 213.922.2000 Tel
12) Metropolitan Transportation Authority Los Angeles,CA 90012-2952 metro.net
Metro
January 28, 2016
FEB - 1 2016 , � FEe D 1 ?016
City of Arcadia op
Development Services Depaihuent �.,••; .,, 17'7 , llit
240 W Huntington Drive i NpSER
Arcadia, CA 91007 PiCL'„$'
Attn: Linda Hui
RE: Letter of Agreement for F3607 Arcadia Gold Line Station Pedestrian Linkage Project,
LOA.P00F3607
Ms. Hui,
Enclosed is the original signed copy of Letter of Agreement for the Arcadia Gold Line Station
Pedestrian Linkage Project, LOA.P00F3607. Please keep it for your own record.
If you have any questions, please call me at (213) 922-3065 or email me at fanj@metro.net.
Sincerely,
Jingyi Fan
Transportation Planner
r
Los Angeles County One Gateway Plaza 213.922.2000 Tel
Metropolitan Transportation Authority Los Angeles,CA 9001 2-2 9 52 metro.net
Metro
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
November 12, 2015
City of Arcadia
240 W. Huntington Drive
Arcadia, CA 91066
Attn: Dominic Lazzaretto
RE: LETTER OF AGREEMENT FOR FEDERAL PROJECTS PROGRAMMED THROUGH
THE LACMTA CALL FOR PROJECTS
Dear Sir/Madam:
As part of the Los Angeles County Metropolitan Transportation Authority("LACMTA") 2009
Call for Projects,the LACMTA Board of Directors, at its meeting on September 24, 2009,
authorized the programming of(ands to City of Arcadia ("Project Sponsor") for Arcadia Gold
Line Station Pedestrian Linkage Project—LACMTA Call for Projects ID#F3607,
FTIP#LAF3607 (the "Project") subject to the terms and conditions contained in this Letter of
Agreement("LOA").
The terms and conditions of this LOA consist of the following and each is incorporated by
reference herein as if fully set forth herein: Specific Terms of the LOA, General Terms of the
LOA;Attachment A-the Project Funding, Attachment B -the Scope of Work-,Attachment C-
the Reporting Guidelines,Attachment D - Federal Transportation Improvement Program
(FTIP),Attachment E - Caltrans Document List, and any other attachments or documents
referenced therein.
Rev: 02.05.13 1 LOA Federal Agreement CMAQ RSTP
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
In the event of a conflict,the Special Conditions for the Project,if any, shall prevail over the
Specific Terms of the LOA and the Specific Terms of the LOA shall prevail over the General
Terms of the LOA.
Please acknowledge your acceptance and agreement to the terms and conditions of this LOA
by signing below.
Very truly yours,
f4hillip A.Was r: on
Chief Executive Officer
Project Sponsor has read and understands the terms and conditions of this LOA, induding all
the attachments, and by signing below Project Sponsor hereby accepts and agrees to the terms
of this LOA.
City of Arcadia
By:
Dominic Lazzaretto
City3Lager
Date: rr 2.3� /S
Rev: 02.05.13 2 LOA Federal Agreement CMAQ RSTP
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
CALL FOR PROJECTS
LETTER OF AGREEMENT
PART I
SPECIFIC TERMS OF THE LOA
1. Title of the Project (the "Project"): Arcadia Gold Line Station Pedestrian Linkage
Project- LACMTA Call for Projects ID#F3607, FTIP#LAF3607.
2. Amount of Funds Programmed (the "Funds"): LACMTA Board of Directors' action of
September 24, 2009, programmed $1,546,804 (the "Funds") to Project Sponsor for the
Project. The LACMTA funding plan reflects the programming of Funds over one year,
Fiscal Years (FY) 2015-16. LACMTA Board of Directors' action recertified the Funds for
FY 2015-16 only in the amount of$1,546,804.
3. The Funding Agency for this Project (the "Agency") is CALTRANS.
The Programming Agency for this Project is LACMTA.
4. The "Project Funding" documents all sources of funds programmed for the Project as
approved by LACMTA and is attached as Attachment A. The Project Funding includes
the total programmed budget for the Project, including the Funds programmed by
LACMTA and the Project Sponsor Funding Commitment(local match). The Project
Funding also includes the fiscal years in which all the funds for the Project are
programmed.
5. Project Sponsor shall complete the Project as described in the Scope of Work. The
"Scope of Work" for the Project is attached to this LOA as Attachment B. The Scope of
Work includes a general description of the Project and a detailed description of the
work to be completed. The Scope of Work also includes a set schedule including
Project milestones consistent with the lapsing policy described in Part II below. Work
shall be delivered in accordance with that schedule unless otherwise agreed to by the
parties in writing.
6. Attachment C -the Reporting Guidelines; Project Sponsor shall complete the
"Quarterly Progress Report." The Quarterly Progress Report is attached to this LOA as
Attachment Cl in accordance with Attachment C - Reporting Guidelines.
7. The "FTIP PROJECT SHEET (PDF)" is attached as Attachment D and is required to
ensure that the Project is programmed correctly in the most up-to-date FTIP document.
The FTIP PROJECT SHEET (PDF) can be found in ProgamMetro FTIP database under
the reports section at https://program.metro.net. All projects that receive funding
through the LACMTA Call for Projects must be programmed into the FTIP which
includes locally funded regionally significant projects for information and air quality
modeling purposes. Project Sponsor shall review the Project in ProgramMetro each
year and update or correct the Project as necessary during a scheduled FTIP
Rev: 02.05.13 3 LOA Federal Agreement CMAQ RSTP
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
amendment or adoption. Project Sponsor will be notified of amendments and
adoptions to the FTIP via e-mail. Changes to the FTIP through ProgramMetro should
be made as soon as possible after Project Sponsor is aware of any changes to the
Project,but no later than October 1 of the year the change or update is effective.
Should Project Sponsor fail to meet this date, it may affect Project Sponsor's ability to
access funding, delay the Project and may ultimately result in the Funds being lapsed.
8. Attachment F - Caltrans Document List, are attached to this LOA as Attachment E for
reference purposes only and however a more current listing may be found on
http://www.dot.ca.gov/hgJLocalPrograms/ or
http://www.dot.ca.govihq/LocalPrograms/public.htm
9. Prior to the obligation of the Funds, no material changes to the Project Funding or
the Scope of Work shall be funded or allowed without prior written approval of
LACMTA and Project Sponsor. Such prior approval shall be evidenced by an
amendment to this LOA, approved and-signed by the LACMTA Chief Executive
Officer or his designee and Project Sponsor. After the Funds have been obligated, no
material changes will be allowed.
10. LACMTA's Address:
Los Angeles County Metropolitan Transportation Authority
One Gateway Plaza
Los Angeles, CA 90012
Attention:Alice Tolar, Mail Stop 99-22-6
11. Project Sponsor's Address:
City of Arcadia, Linda Hui, 240 W. Huntington Drive Arcadia, CA 91066
(626)574-5435,lhui @ci.arcadia.ca.us
Rev: 02.05.13 4 LOA Federal Agreement CMAQ RSTP
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
PART II
GENERAL TERMS OF THE LOA
1. PAYMENT OF FUNDS: Project Sponsor understands and agrees that LACMTA
provides no Funds under this LOA and LACMTA shall have no responsibility or obligation to
provide any Funds for the Project. Project Sponsor shall receive the Funds directly from the
Agency pursuant to a separate agreement with the Agency. Project Sponsor shall submit to the
Agency the appropriate invoices in the form, manner, and schedule specified by the applicable
requirements of the Agency. Project Sponsor cannot be reimbursed for any cost incurred
without prior authorization from the Agency. Project Sponsor shall be subject to, and comply
with, all applicable requirements of the Agency and of LACMTA as required by LACMTA to
fulfill its responsibilities as the programming agency. The allowability of expenditures,the
cost reimbursement schedule, eligibility issues, resolution of disputes, and all other issues
relating to this LOA shall be subject to the rules, regulations, and requirements of the Agency
and LACMTA as the programming agency.
2. TERM:
2.1 The term of this LOA shall commence upon the date of this LOA, and
shall terminate upon completion of the Scope of Work and LACMTA's receipt of Caltrans'
final voucher paid for the Project.
2.2 Prior to the obligation of the Funds, should LACMTA determine there
are insufficient Funds available for the Project, LACMTA may terminate this LOA by giving
written notice to Project Sponsor at least thirty (30) days in advance of the effective date of such
termination.
3. USE OF FUNDS:
3.1 Project Sponsor shall utilize the Funds to complete the Project as
described in the Scope of Work and as approved by LACMTA and in accordance with the
applicable requirements of the Agency.
3.2 The Funds, as programmed under this LOA, can only be used towards
the completion of the Scope of Work originally adopted by LACMTA unless modified by an
amendment to this LOA. Project Sponsor shall also be subject to and comply with all
applicable requirements of the Agency administering this Project.
Rev: 02.05.13 5 LOA Federal Agreement CMAQ RSTP
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
4. REPORTING AND AUDIT REQUIREMENTS:
4.1 Project Sponsor shall be subject to and comply with all applicable
requirements of the Agency regarding Project reporting and audit requirements. Project
Sponsor shall use the Federal Transportation Improvement Program ("FTIP")No.,
Expenditure Authorization ("EA') No., and LACMTA Call for Projects Project ID#on all
correspondence.
4.2 Since the Project is funded exclusively with Federal funds and contains
no LACMTA local funding, LACMTA has no audit responsibilities for this Project. Project
Sponsor shall comply with all Agency compliance, pre-award and performance audit
requirements as deemed necessary to assure that funding expenditures conform to all
applicable Project funding guidelines,laws and regulations. LACMTA, as the programming
agency, shall have the right, at its sole discretion, to audit the Project for compliance with the
terms of this LOA and to assure that funding expenditures conform to the terms of this
LOA. LACMTA shall have the same audit rights as the Agency to audit the Project.
4.3 Project Sponsor shall submit the Quarterly Progress Report within 60
days after the close of each quarter on the last day of the months November, February, May
and August. Annually with the 4th quarter Progress Report, Project Sponsor also shall
submit photos of key components and milestones demonstrating Project progress or
completion.
5. EXPENDITURE AND DISPOSITION OF FUNDS:
5.1 The expenditure and disposition of the Funds by Project Sponsor shall
be subject to and in accordance with the terms and conditions of this LOA and the applicable
requirements of the Agency. Project Sponsor shall not utilize the Funds in any other way or
on any project other than that specified in this LOA and the applicable requirements of the
Agency.
5.2 Project Sponsor shall be responsible for any and all cost overruns for the
Project.
5.3 Project Sponsor shall be eligible for the Funds up to the programmed
amount specified in Part I, Section 2 of this LOA subject to the terms and conditions
contained herein and in all applicable requirements of the Agency.
5.4 Subject to the requirements and regulations of the Agency, and to the
extent allowed by the Agency, any underruns to the funds shown in Attachment A shall be
apportioned between LACMTA and Project Sponsor in the same proportion as the Sources
of Funds from each party to this LOA as specified in Attachment A to this LOA. Upon
completion of the Project described in the Scope of Work and subject to the requirements
and regulations of the Agency, and to the extent allowed by the Agency, any unused
obligation of the Funds shall revert back to LACMTA for future programming at LACMTA's
discretion.
Rev: 02.05.13 6 LOA Federal Agreement CMAQ RSTP
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
5.5 The programming of the Funds does not imply nor obligate any future
funding commitment on the part of LACMTA or the Agency.
6. TIMELY USE OF FUNDS / REPROGRAMMING OF FUNDS:
6.1 Project Sponsor must demonstrate timely use of the Funds by:
(i) executing this LOA within ninety(90) days of receiving formal
transmittal of the LOA from LACMTA, or by December 31 of the
first Fiscal Year in which the Funds are programmed,whichever
date is later; and
(ii) obligating the Funds programmed under this LOA for allowable
costs within 36 months from July 1 of the first Fiscal Year in
which the Funds are programmed. All Funds programmed for
FY 2015-16 are subject to lapse on June 30, 2018.
If Project Sponsor fails to meet any of the above conditions,the Project shall be considered
lapsed and will be submitted to the LACMTA Board of Directors for deobligation.
6.2 Project Sponsor must demonstrate evidence of timely use and obligation
of Funds programmed for the Project within the time period described in Part II, Section 6.1 of
this LOA. Evidence of timely obligation will be either an executed "Authorization To Proceed"
document(Caltrans Version E-76).
6.3 In the event this LOA is not executed and/or evidence of timely
obligation of Funds is not provided as described in Part II, Sections 6.1 and 6.2 of this LOA,the
Project will be reevaluated by LACMTA as part of the annual Call for Projects
Recertification/Deobligation process and the Funds may be deobligated and reprogrammed to
another project by the LACMTA Board of Directors. If Project Sponsor does not complete one
element of the Project, as described in the FTIP Sheet, due to all or a portion of the Funds
lapsing,the entire Project may be subject to deobligation at LACMTA's sole discretion. In the
event the Funds are reprogrammed,this LOA shall automatically terminate without further
action by either party.
7. SOURCES AND DISPOSITION OF FUNDS:
7.1 The obligation for LACMTA to program the Funds for the Project is
subject to sufficient Funds being made available for the Project by the LACMTA Board of
Directors, the United States Government or the State of California, as applicable. If such
Funds are not made available for the Project, this LOA shall be void and have no further force
and effect, and LACMTA shall have no obligation to program the Funds for the Project,unless
otherwise agreed to in writing by LACMTA.
7.2 Project Sponsor shall fully fund and contribute the Project Sponsor
Funding Commitment, as identified in the Project Funding(Attachment A), towards the cost of
the Project. If the Funds identified in Attachment A are insufficient to complete the Project,
Rev: 02.05.13 7 LOA Federal Agreement CMAQ RSTP
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
Project Sponsor agrees to secure and provide such additional non-LACMTA programmed funds
necessary to complete the Project.
8. COMMUNICATIONS:
8.1 Project Sponsor shall ensure that all Communication Materials contain
recognition of LACMTA's contribution to the Project as more particularly set forth in
"Funding Agreement Communications Materials Guidelines" available on line or from the
LACMTA Project Manager. Please check with the LACMTA Project Manager for the web
address. The Funding Agreement Communications Materials Guidelines may be changed
from time to time during the course of this Agreement. Project Sponsor shall be responsible
for complying with the latest Funding Agreement Communications Materials Guidelines
during the term of this Agreement,unless otherwise specifically authorized in writing by the
LACMTA Chief Communications Officer.
8.2 For purposes of this Agreement, "Communications Materials" include,
but are not limited to, press events, public and external newsletters, printed materials,
advertising,websites radio and public service announcements, electronic media, and
construction site signage. A more detailed definition of"Communications Materials" is
found in the Funding Agreement Communications Materials Guidelines.
8.3 The Metro logo is a trademarked item that shall be reproduced and
displayed in accordance with specific graphic guidelines. These guidelines and logo files
induding scalable vector files will be available through the LACMTA Project Manager.
8.4 Project Sponsor shall ensure that any subcontractor, including,but not
limited to, public relations, public affairs, and/or marketing firms hired to produce Project
Communications Materials for public and external purposes will comply with the
requirements contained in this Section.
8.5 The LACMTA Project Manager shall be responsible for monitoring
Project Sponsor compliance with the terms and conditions of this Section. Project Sponsor
failure to comply with the terms of this Section shall be deemed a default hereunder and
LACMTA shall have all rights and remedies set forth herein.
Rev: 02.05.13 8 LOA Federal Agreement CMAQ RSTP
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
9. OTHER TERMS AND CONDITIONS:
9.1 This LOA, along with the applicable requirements of the Agency,
constitutes the entire understanding between the parties, with respect to the subject matter
herein. The LOA shall not be amended, nor any provisions or breach hereof waived, except in
writing signed by the parties who agreed to the original LOA or the same level of authority.
9.2 In the event that there is any legal court(e.g. Superior Court of the State
of California, County of Los Angeles, or the U.S. District Court for the Central District of
California) proceeding between the parties to enforce or interpret this LOA, or the applicable
requirements of the Agency, to protect or establish any rights or remedies hereunder,the
prevailing party shall be entitled to its costs and expenses, including reasonable attorneys' fees.
9.3 Neither LACMTA nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything done or committed to
be done by Project Sponsor under or in connection with any work performed by and or service
provided by Project Sponsor, its officers, agents, employees, contractors and subcontractors
under this LOA. Project Sponsor shall fully indemnify, defend and hold LACMTA, and its
subsidiaries and their respective officers, agents and employees harmless from and against any
liability and expenses,induding without limitation, defense costs, any costs or liability on
account of bodily injury, death or personal injury of any person or for damage to or loss of risk
of property, any environmental obligation, any legal fees and any claims for damages of any
nature whatsoever arising out of the Project, induding, without limitation: (i) use of the Funds
by Project Sponsor, or its officers, agents, employees, contractors or subcontractors; (ii) breach
of Project Sponsor's obligations under this LOA; or (iii) any act or omission of Project Sponsor,
or its officers, agents, employees, contractors or subcontractors in the performance of the work
or the provision of the services in connection with the Project, induding,without limitation,
the Scope of Work, described in this LOA.
9.4 Neither party hereto shall be considered in default in the performance of
its obligations hereunder to the extent that the performance of any such obligation is prevented
or delayed by unforeseen causes induding acts of God, acts of a public enemy, and
government acts beyond the control and without fault or negligence of the affected party. Each
party hereto shall give notice promptly to the other of the nature and extent of any such
circumstances daimed to delay,hinder, or prevent performance of any obligations under this
LOA.
9.5 Project Sponsor shall comply with and insure that work performed
under this LOA is done in compliance with Federal Agency Regulations (FAR), Generally
Accepted Accounting Principles (GAAP), all applicable provisions of federal, state, and local
laws, statutes, ordinances, rules, regulations, and procedural requirements and the applicable
requirements and regulations of the Agency and LACMTA.
9.6 Project Sponsor shall not assign this LOA, or any part thereof,without
written consent and prior approval of the LACMTA Chief Executive Officer or his designee,
and any assignment without said consent shall be void and unenforceable.
Rev: 02.05.13 9 LOA Federal Agreement CMAQ RSTP
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
9.7 This LOA shall be governed by California law. If any provision of this
LOA is held by a court of competent jurisdiction to be invalid,void, or unenforceable,the
remaining provisions shall nevertheless continue in full force without being impaired or
invalidated in any way.
9.8 The terms of this LOA shall inure to the benefit of, and shall be binding
upon, each of the parties and their respective successors and assigns.
9.9 If any software/Intelligent Transportation Systems ("ITS") is developed
with the Funds and if Project Sponsor ceases to use the software/ITS for public purposes or
Project Sponsor sells, conveys, licenses or otherwise transfers the software/ITS, LACMTA
shall be entitled to a refund or credit, at LACMTA's sole option, equivalent to the amount of
the Funds spent developing the software/ITS. Such refund or credit shall not be required,
subject to LACMTA approval of the intended use, if Project Sponsor reinvests the proceeds
of such sale, conveyance, license or transfer into the Project to offset operating or systems
management costs.
9.10 If applicable, implementation of any ITS project shall be consistent
with the Regional ITS Architecture. ITS projects must comply with LACMTA's Countywide
ITS Policy and Procedures adopted by the LACMTA Board of Directors including the
submittal of a completed, signed self-certification form, in the form of Attachment F-1. (See
http://www.metro.riet/projects/call_projects/for a copy of LACMTA's Countywide ITS
Policy and Procedures.)
9.11 If any parking facilities are designed and/or constructed using the
Funds, Project Sponsor shall coordinate with LACMTA parking program staff in the
planning, design and management of the facility and shall ensure that its implementation is
consistent with LACMTA-adopted parking policy. (For LACMTA's Parking Policy and contact
information, see http://www.metro.net/projects/call._projects/ .)
9.12 Project Sponsor agrees that the disposal of property purchased with the
Funds shall be disposed of in accordance with the Agency's guidelines.
9.13 Notice will be given to the parties at the address specified in Part I,
unless otherwise notified in writing of change of address.
9.14 Project Sponsor in the performance of the work required by this LOA is
not a contractor nor an agent or employee of LACMTA. Project Sponsor attests to no
organizational or personal conflicts of interest and agrees to notify LACMTA immediately in
the event that a conflict, or the appearance thereof, arises. Project Sponsor shall not represent
itself as an agent or employee of LACMTA and shall have no powers to bind LACMTA in
contract or otherwise.
9.15 Project Sponsor shall notify LACMTA in advance of any key Project
staffing changes.
Rev: 02.05.13 10 LOA Federal Agreement CMAQ RSTP
LOA ATTACHMENT A-PROGRAMMED FUNDS
FTIP#:LAF3607 CFP#:F3607
PPNO: LOA.POOF 3607
FEDERAL GRANT AGREEMENT
CFP#: F3607 PROJECT TITLE: Arcadia Gold Line Station Pedestrian Linkage Project
LETTER OF AGREEMENT NO: LOA.P00F3607
($in Actual Dollars)
(LACMTA Programmed Funding and Sponsors Match Only)
- PROGRAMMED FUNDS - FY 2012-13 FY.2013-14 FY 2014-15 'FY 2015-16 FY 201647 FY 2017.18 BUDGET %
•
LACMTA PROGRAMMED FUNDING:
Federal
(RSTP)Regional Surface Transportation Program
(CMAQ)Congestion Mitigation and Air Quality Program 1,546,804 1,546,804 65.0%
Other:
-PA&ED
-PS&E
-R/W
-Construction
- LACMTA SUBTOTAL 1;546,804 65.0%
GRANTEE/SPONSOR MATCH:
Grantee Funding Commitment(specify type)
City General Fund
Prop C and Measure R Local Returns 832,895 832,895 35.0%
Block Grant
Other
-PA&ED
-PS&E
-R/W
-Construction
• PROJECT SPONSOR MATCH SUBTOTAL - 832,895 35.0%
TOTAL PROJECT FUNDING $2,379,699 $2,379,699 100.0%
2,379,699
Rev:08.20.13 LOA Attachment A-Federal
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
ATTACHMENT B
SCOPE OF WORK
PROJECT TITLE
Arcadia Gold Line Station Pedestrian Linkage Project
PROJECT LIMITS
The project area encompasses about I/ mile radius from the Gold Line Arcadia Station at the
intersection of First Avenue and Santa Clara Street. Improvements will be implemented on
the streets radiating from or approaching the Station, including Santa Clara Street, 1st
Avenue and Wheeler Avenue, a total of approximately 1.45 miles.
PROJECT BACKGROUND
The City of Arcadia is the first stop along the Metro Gold Line Foothill Extension alignment to
be open on March 5, 2016. The light rail extension will connect the existing Gold Line in
Pasadena to the City of Arcadia and many cities and communities eastward.The purpose of the
project is to provide improved pedestrian access and connectivity between the Gold Line
light rail transit facility and adjacent land uses. The project will improve pedestrian
connectivity for commuters and visitors alike by providing a pedestrian friendly environment
leading up to the Gold Line light rail station in the City of Arcadia. By doing so,the City is
providing the first-last-mile connectivity, and in turn promoting walking as a viable mode of
transportation.
PROJECT DESCRIPTIONS
The project includes the design and construction of pedestrian improvements around the
Gold Line Arcadia Station. These improvements will cover an approximately 1.45 mile area,
and include curb extensions, curb ramps, crosswalks, pedestrian signals, landscaping, street
furniture such as benches, trash receptacles, and 115 pedestrian scaled lightings,way-
finding, and signage along streets leading up to the Gold Line light rail station at First
Avenue and Santa Clara Street in the City of Arcadia.
PROJECT BUDGET AND FUNDING
Component City(35%) METRO (65%) Total Cost
Design $91,551 $170,023 $261,574
Construction $741,344 $1,376,781 $2,118,125
Total $832,895 $1,546,804 $2,379,699
Rev: 09.25.12 1 LOA CMAQ RSTP Attachment B
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
PROJECT SCHEDULE
Begin Complete
Design June 2016 January 2017
Ready to Advertise May 2017
Construction July 2017 December 2017
ESTIMATED PROJECT COSTS
Preliminary Design $ 110,000
Final Design/Bid Package $ 111,574
Right-of-way
Acquisition N/A
Utility relocation N/A
Clearance/demolition N/A
Total Design Cost $ 261,574
Construction
Earthwork 1 L.S. $ 92,000 $ 92,000
Drainage/Pavement 2,000 L.F. $ 58 $ 116,000
Sidewalk Improvements 24,000 S.F. $ 12 $ 288,000
Crosswalk Improvement 2,000 S.F. $ 40 $ 80,000
Traffic Items (Ped signals) 1 L.S. $ 13,000 $ 13,000
Pedestrian Lighting including conduit 115 Ea. $ 7,500 $ 862,500
Landscaping and Street Furniture 1 L.S. $ 170,000 $ 170,000
Signage/Way-finding 1 L.S. $ 73,000 $ 73,000
Structural Items
Bridge/Underpass/ramp N/A
Total Construction Costs $ 1,694,500
Contingency 15% $ 254,175
Construction Engineering/Management 10% $ 169,450
Total Project Cost $ 2,379,699
Rev: 09.25.12 2 LOA CMAQ RSTP Attachment B
FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
PROJECT AREA MAP
LOCATION MAP
G�
--E, �i ,
t,i ',i i h.ewcasee {.w ' . �' _:7 E ht rar n
{ti ; I 1 NI Park . € `— ,— G _r".``' ;. _ �, I)
–� r�radv Btv,� �E Colorado E .--_1 Ifi�d
r� -G y./Colora- n Blvd IE 1—_�
��J 'f,i `"J�'--`II ''���,`I i._j t,..----—I r— 1 L_.a_;; 01,_____.°'_._"
0' / L® Pale Ear, _ _ =I.} PROJECT :6 P";. fi r_. �-JJ 1-__-, e �1` �"°�'� =,,,---"1 IT
l nac� \ �.
C I —` L t j a N.{� � ` rt Zv �r :4 i ir
, v ____ �' ro L`- d S.., .., w ' ` E Sa C I! t°- "
,.-- \ '-,„-0,,, /C-7,` ,,..c: _I--(1::1------ - - *1 nt...,,y,,, i,.7.3; i \ 4,11 -.-:
' I , ,— .d 4 � f zetzr Awe k ti , .a — , �-- to a r [
4 Y�
53 a � a m 4 �,k *T- 4-4, -,-A53�ICN"t % .et s L4r n �o i t"C'xo
a�x_.�,v� a i' ^ A1►� � Y I v ���� ��-' _,.d;.�R , _ Yl�Hunk' {��
q yip. r— --' L_._. _.._..___ �..<..1 z .. ,� v,
'�� �: a o
"->r �*�� BorlSa litI
,t f { { « ° r er. ask,44,-�,x"a"O'e_v..d. _ +C liforr�ia St-----7,,'
�- __--_n
' .2 ' ' ri* ' 'mss -- _.,..._ N (.,}ami nfl.`S.t �..�,...
_ �1�!'11Uf16��'� _ p
`- ` , f+ q 'yam yam, —__. �� P�..:_ yl 5 __ 3y
+ '` fr ..+, 4 , T 1 ow',,E p 7.l!5� ..z..auv._._.____,,_,_____j 1«w ) d-a..—e,.r i -.--i 1..� m.....
El Dotal()
+° FBI i
G: : —f� 1 m
.itia C ou PS ,, t,< ,ci_.:-
7
1 .,.'yllYi
0 _
City of Arcadia
Dela_H.v-19,2015
Rev: 09.25.12 3 LOA CMAQ RSTP Attachment B
- FTIP#: LAF3607 CFP#F3607
LOA.P00F3607
PROJECT AREA MAP SCALE r=200'
.'}ria' t }. 1—• `3 � F'+- r !` - w Art s ; ,,,,. ,4_J .„-,i-
,, 1 S 'd 'k '-- , 4..
tS , T-.. e f lel 7y�a ,.«-a x ,Z,t kr� �y 'i.•- ,....7„,/,la:. c 1 tr t.;• ,
"" . !S`Ii �SEP) I X71 , ,,...P. .. „7, , Y'i 44.'44-w.ij 4�STr'. VSEgW;.V-1 ' ,,!irk ■ F t•. ,. -4
Niswttlet
1%
,
1.,._ y 4,(.4 ' >�. y °gy~"0 t h 4 . r` --t
x }f�
i a
1
}
',4 ier- A. . 2 t� `` . 1! V a :...mweg -.■
7 t ! p j 1.
- 5 i i Y ' m f ; '`' " g `y u 7 . 7,71 4f
} Mffnt, ST w ..,,,--,.--,,144 S'ANTTA1 6LARA
ST ,.. --4...-,4, 1
n
"� - i c * a� c. Rya .,- I. n.
, _' S"vN i11S ."fit 4 ,R -�,,,.a,%�iaf v S - ,
` ,•`,e ga. yam' -t Ib r. ✓�''*,*, .v : a i„,,
s.. A 9 t 9 n', r. 'Ql•!I- Y �,-t N }„,,,:ii.
te-'f 'r tt s 5.. t �".- .. I..
z irhWHtE! . SaT_.- :*. a.; , = Y . tW I ELERSfi _--„_o_-_-_._ .r ' ",-
-L_. rr
} ,.-k, yam,.. t'' 4, ,F.,. ..7. ,.$ .;, i '- '' - 'o/} 9 R i
7. y Jai ),. � A. f 4 �,-9 4i ♦>
` -,. } -*. 7 ,,,, ae_ . � :.,,_ __...2 =.,.. .k.,,-, -
y�C y .i
` i City of Arcadia
�`naiNP
Rev: 09.25.12 4 LOA CMAQ RSTP Attachment B
LOA ATTACHMENT C
REPORTING GUIDELINES FOR FEDERAL FUNDS
REPORTING PROCEDURES
• The Quarterly Progress Report (Attachment C1) is required for all projects. The Project
Sponsors shall be subject to and comply with all applicable requirements of the funding
agency regarding project-reporting requirements. In addition, Project Sponsor will
submit a quarterly report to the LACMTA PROJECT MANAGER. Please note that letters
or other forms of documentation may not be substituted for this form.
• The Quarterly Progress Report covers all activities related to the project and lists all costs
incurred. It is essential that Project Sponsors provide complete and adequate response to
all the questions. The expenses listed must be supported by appropriate documentation
with a clear explanation of the purpose and relevance of each expense to the project.
Expenses must reflect the proportionate share of local match, including in-kind, charged
to the grant.
• In cases where there are no activities to report, or problems causing delays, clear
explanation, including actions to remedy the situation, must be provided.
• Project Sponsors are required to track and report on the project schedule. LACMTA will
monitor the timely use of funds and delivery of projects. Project delay, if any, must be
reported each quarter. Projects not delivered in a timely manner will be reevaluated by
LACMTA as part of the annual Call for Projects Recertification process and the Funds
may be deobligated and reprogrammed by the LACMTA Board.
• The Quarterly Progress Report is due to the LACMTA as soon as possible after the close
of each quarter, but no later than the following dates for each fiscal year:
Quarter Report Due Date
July—September November 30
October- December February 28
January- March May 31
April- June August 31
Upon completion of the Project a Final Report that includes project's final evaluation must
be submitted.
Rev: 09.25.12 1 LOA Attachment C Reporting Guidelines
Project.Sponsor to Complete
LACMTA LOA ATTACHMENT Cl LOA#
QUARTERLY PROGRESS REPORT Quarterly Report#
Project Sponsors are requested to mail this report to the LACMTA PROJECT MANAGER.
Please submit Quarterly Progress Report with 60 days after the close of each quarter.
No later than November 30, February 28, May 31, and August 31.
SECTION 1: GENERAL INFORMATION
PROJECT TITLE:
LOA#:
QUARTERLY REPORT SUBMITTED FOR:
Fiscal Year: n2013-2014 n2014-2015 n2015-2016
n2016-2017 n2017-2018 n2018-2019
Quarter 1-7Q1: Jul -Sep n Q2: Oct-Dec
nQ3: Jan - Mar n Q4: Apr-Jun
(Attach photos of key components & milestones)
DATE SUBMITTED:
LACMTA MODAL CATEGORY:
n RSTI n Pedestrian nSignal Synchronization
nTDM nBicycle nGoods Movement
(Transit nTEA
Name:
Project Mgr:
LACMTA Project
Mgr. Mailing Address:
Phone Number:
e-mail:
Contact Name:
Job Title:
Project Sponsor Department:
Contact/ Project City/Agency:
Manager Mailing Address:
Phone Number:
e-mail:
Rev: 08.20.13 1 LOA Attachment Cl
SECTION 2: Quarterly PROGRESS REPORT
11: Project,to Date:Expenditure
%of Project Budget
Expended to Date
%of Project Completion
I2. DELIVERABLES&`MILESTONES', ,
DO NOT CHANGE THE ORIGINAL LOA MILESTONE START AND END DATES SHOWN IN THE 2ND AND 3RD
COLUMNS BELOW.
Project sponsors must make every effort to accurately portray milestone dates in the original LOA Scope of Work, since this
will provide the basis for calculating any project delay. If milestone start and/or end dates change from those stated in the
Original LOA Scope of Work, indicate the new dates under Actual Schedule below and re-calculate the project duration.
However,this does not change the original milestones in your LOA. PER YOUR LOA AGREEMENT,ANY CHANGES TO
THE PROJECT SCHEDULE MUST BE FORMALLY SUBMITTED UNDER SEPARATE COVER TO LACMTA FOR
Original LOA Schedule in Scope of Work Actual Schedule
LOA Milestones Start Date End Date Start Date End Date
Environmental Clearance
Design Bid &Award
Design
Right-of-Way Acquisition
Construction Bid&Award
Ground Breaking Event.
Construction
Ribbon Cutting Event
Total Project Duration
(Months)
PROJECTCOMPLETION :`' :r:. .,,,.
A. Based on the comparison of the original and actual project milestone schedules above, project is (select only
one) :
nOn schedule per original LOA schedule Less than 12 months behind original schedt
EBetween 12-24 months behind original schedule More than 24 months behind original schedi
B. Was the project design started within 6 months of the date originally stated in the LOA?
E Yes n No n Not Applicable
Rev: 08.20.13 2 LOA Attachment Cl
C. Was a construction contract or capital purchase executed within 9 months after completion of design/
specifications?
Yes ri No n Not Applicable
4. TASKS/ MILESTONES ACCOMPLISHED.
List tasks or milestones accomplished and progress made this quarter.
15. PROJECT:DELAY-
If project is delayed, describe reasons for delay (this quarter). Pay particular attention to schedule
delays. If delay is for the same reason as mentioned in previous quarters, please indicate by writing
"Same as Previous Quarter."
Rev: 08.20.13 3 LOA Attachment Cl
IA CTION`ITEMS TO RESOLVE DELAY-,':
If the project is delayed (as described in#4), include action items that have been, or will be, undertaken
to resolve the delay.
I certify that I am the responsible Project Manager or fiscal officer and representative of
and that to the best of my knowledge and belief the information
stated in this report is true and correct.
Signature Date
Name Title
Rev: 08.20.13 4 LOA Attachment Cl
FTIP#:LAF3607 LOA Attachment D FTIP SHEET CFP#:F3607
LOA.POOF3607
Los Angeles Metropolitan Transportation Authority
2017 Federal Transportation Improvement Program ($000)
TIP ID LAF3607 Irnplemen{Ing,Agetcy' Arcadia;City of ,
Project Description:Arcadia Gold Line Station Pedestrian Linkage Project.Design and construction of pedestrian improvements SCAG RIP Project 1NL04
Study:WA Is Model:l:NO Model#:
around the planned Gold Line Arcadia Station,connecting the communities with the regional rail system. PM:Linda Hui-(626)574-5435
Email:Ihui@cLarcadia.m.us
LS:N LS GROUP#:
Conformity Category.EXEMPT-93.126
System:Local Hwy Route: Postmile: Distance: Phase:Environmental Document/Pre-Design Phase(PAED) Completion Date 12/302016
Lane#Extd: Lane#Prop: Impry Desa: Air Basin:SCAB Envir Doc CATEGORICALLY EXEMPT-10/122015
Toll Rate: Toll Colc Loc: Toll Method: Hoy acs eg loc: Uza:Los Angeles-Long Sub-Area: Sub-Region:San Gabriel Valley
Beach-Santa Ma Area
CTIPS ID: EA#: PPNO:
Program Code:NCR25-BICYCLE 8 PEDESTRAIN FACILITIES-UPGRADE Stoo Loc:
PHASE PRIOR 16/17 17/18 18/19 1920 20/21 2122 BEYOND PROG TOTAL
RW
CON — — — • — -- ——
,SUBTOTAL
CD'Y-City -$0
RW $0 $0
•
GON $8.33 $833
_ SUBTOTAL $833' ;
CMAO-Congestion MitigationAir QimtiH - . .,PE _• $0.' - _ .— --
RW $0 $0
•
CON $1546 $'1546.
— — SUBTOTAL $1,546 -- $1,546;
cy1�71
TOTAL PE: $0 TOTAL RW: $0 TOTAL CON: 52.379
-General Comment:MTA required the City to apply for funding through 2015 State ATP.However,the City was not successful.Therefore,MTA reprogramed the Call funding in FY 16.Currently,the City is awaiting
LOA process.
-Meting Comment
-TCM Comment,
-Narrative:Project cost stays the same
Changed Project Completion Date:
-from"12/302015"to"12/302016"
Changed Current Implementation Status:
-from No ProjectActivity"to"Environmental Document/Pre-Design Phase(PAED)"
Revise Funds Between Fiscal Years
CMAO:
—Delete funds in 14/15 in CON for$1,546
•Add funds in 15/16 in CON for$1,546
CITY:
—Delete funds in 14/15 in CON for$633
•Add funds in 15/16 in CON for$833
Total'R'ed cost remains the same at$2 379
Last.Revised Adoption 17-00-Submitted Change reason:Carry Over,Carry over from 15-0 Total Cost $2,379
Page 1 Thursday,November 12,2015
FTIP#:LAF3607 CFP#F3607
LOA.P00F3607
ATTACHMENT E
LIST OF DOCUMENTS TO BE SUBMITTED TO CALTRANS
(FOR FEDERAL FUNDED PROJECTS)
NOTE: Refer to the Local Assistance Procedure Manual (LAPM) for the Exhibits.
Request for Authorization for Preliminary Engineering (PE)
1. Copy of approved FTIP sheet.
2. Copy of LOA with LACMTA (only if RSTP, CMAQ, or Federal STIP funds are involved).
3. Field Review Form—Exhibit 7-B.
4. Preliminary Environmental Study Form (PES) —Exhibit 6-A.
5. A field review should be conducted at this stage and then the remaining documents
could be submitted. During the field review all issues of the project such as
Environmental&Right-of-Way (R/W) should be identified and addressed.
6. Request for Authorization to Proceed with PE—Exhibit 3-A.
7. Request for Authorization—Data Sheets—Exhibit 3-G.
8. Local Programs Agreement- Exhibit 4-A (only if the agency plans to begin invoicing for
PE Phase prior to contract award).
NOTE: The portion of PE work done prior to authorization is ineligible for federal
participation. The Master Agreement (if needed), Supplemental Agreement and PR2 will be
initiated upon receiving Exhibit 4-A. Invoices will be accepted only after execution of all of
these agreements. Caltrans Encroachment permit must be obtained before the Request to
Proceed with Construction Phase if Caltrans R/W is involved.
Request for Authorization for Utility Relocation
1. Request for Authorization to Proceed with Utility Relocation—Exhibit 3-L.
2. Completed Project Prefix Checklist—Exhibit 3-E (if previously not submitted).
3. Finance Letter—Exhibit 3-F.
4. Request for Authorization— Data Sheets-Exhibit 3-G.
5. Local Programs Agreement Checklist—Exhibit 4-A (if not submitted previously).
6. Approved Environmental Document. (After the authorization, the following documents
should be submitted).
7. Request for Specific Authorization: See Exhibit 14-A. (Utility relocation work can
commence only after the approval of Specific Authorization).
8. Fully executed Utility Agreement.
Rev: 09.25.12 1 LOA Attachment E Caltrans Document List
FTIP#:LAF3607 CFP#F3607
LOA.P00F3607
Request for Authorization for R/W Phase
1. Request for Authorization to Proceed with R/W—Exhibit 3-B.
2. Completed Project Prefix Checklist—Exhibit 3-E (if previously not submitted).
3. Finance Letter—Exhibit 3-F.
4. Request for Authorization—Data Sheets—Exhibit 3-G.
5. Local Programs Agreement Checklist—Exhibit 4-A (if not submitted previously).
6. Approved Environmental Document (if not submitted previously.
Request for Authorization for Construction
1. Environmental Clearance Document.
2. R/W Certification—LAPM, Chapter 13.
3. PS&E Certification—Exhibit 12-C.
4. PS&E Checklist—Exhibit 12-D.
5. Request for Authorization to Proceed with Construction— Exhibit 3-C.
6. Project Prefix Checklist—Exhibit 3-E (if not previously submitted).
7. Preliminary Estimate.
8. Finance Letter—Exhibit 3-F.
9. Request for Authorization—Data Sheets—Exhibit 3-G.
10. Local Programs Agreement—Exhibit 4-A.
NOTE: The Local Agency shall not advertise the project until they receive the authorization
to proceed with construction. Every local agency must also have Quality Assurance Program
(QAP) —LAPM, Chapter 16.14,before advancing to Construction Phase. After a Program
Supplemental Agreement, Exhibit 4-A,which includes all the phases of the project,will be
mailed to the Local Agency.