HomeMy WebLinkAboutItem 1k: Renovation of Snack Bar & Restrooms at Civic Center Athletic FieldSUMMARY
Page 1 of 3
STAFF REPORT
Public Works Services Department
DATE: September 21, 2010
TO: Mayor and City Council
FROM: Tom Tait, Public Works Services Director
Prepared by: Dave McVey, General Services Superintendent
SUBJECT: PROCEED WITH THE DESIGN AND DEVELOPMENT PLANS TO
RENOVATE THE SNACK BAR AND RESTROOMS AT THE CIVIC
CENTER ATHLETIC FIELD
Recommendation: Approve
The FY 2010 -11 Capital Improvement Plan (CIP) includes a project to replace the
existing natural turf with a new synthetic turf and underlayment at the Civic Center
Athletic Field. At the July 20, 2010 Study Session, the City Council directed staff to
proceed with the project.
As part of the overall upgrades to the Civic Center Athletic Field, staff recently identified
the need to renovate the existing snack bar and restrooms adjacent to the athletic field.
The building has been in existence for over 20 years and the restrooms are small.
Additionally, the entrance to the women's restroom is located on the south side of the
building; isolated and out of the sight from spectators and parents. With the installation
of new synthetic turf an increase in field use is expected, which would generate more
usage of the restrooms. As a result, the Public Works Services Department is
proposing to do the design and development of plans in -house to address the current
inadequate size of the restrooms and the safety concerns with the entrance of the
women's restroom. Attached is a sketch of the proposed renovation of the restrooms
and storage area.
Following the bid process, staff will come back to the City Council to get approval to
award a contract for construction. Therefore, staff is seeking City Council's approval to
proceed with the design and development of construction plans and to go out to bid for
the renovation of the existing snack bar and restrooms at the Civic Center Athletic Field.
Mayor and City Council
September 21, 2010
DISCUSSION
In 2007, the City Council approved the Parks and Recreation Master Plan. The Plan
evaluated the current condition and usage levels of City parks and fields and identified
the Civic Center Athletic Field as a priority field that needed renovation to increase
usage and availability. At the July 20 Study Session, the City Council directed staff to
proceed with replacing the field's existing natural turf with a new synthetic turf and
underlayment to increase usage and availability. The budget for this project has also
been approved by the City Council for FY 2010 -11.
As part of the overall upgrades to the project, staff recently looked into renovating the
existing snack bar and restroom areas of the building adjacent to the athletic field due to
several reasons. First, the building is over 20 years old with limited space for patrons to
use the restrooms. For instance, the restrooms can only accommodate one person at a
time while others wait in line outside the building. Second, although the existing
bathrooms comply with the American Disabilities Act (ADA) requirement, the clearance
in the bathrooms is minimal which makes it difficult in turning a wheel chair. Finally, the
maintenance of the new synthetic turf field requires a no -food policy; hence, the existing
snack bar in the building will need to be removed and in turn, the space will be utilized
to expand the restrooms and add a storage area.
Public Works Services staff re- evaluated the interior space of the building and has
designed a preliminary floor plan that would allow expansion to the existing restrooms.
Each existing restroom has only one commode, one sink, and one paper towel
dispenser. The proposed design would include three (3) commode or urinals with one
(1) ADA stall, two (2) sinks, and two (2) paper towel dispensers.
In addition, the existing women's restroom is located on the south side of the building,
which is isolated from the main building and could pose a safety issue. Therefore, to
address this concern, the proposed design would allow easy access to the entrance for
the restrooms, just off the playing field in clear view of parents and spectators.
Furthermore, additional interior space brought upon by the removal of the snack bar
area would be used as storage for the soccer club equipment and for the artificial turf
grooming equipment. The interior and exterior of the building would also be painted.
The estimated construction cost for this project is approximately $100,000. Should the
City Council approve the renovation work, the project would be separate from the
installation of the synthetic turf. However, it is anticipated that the renovation work
would be done at the same time as the field so that it can be ready for use. Additionally,
Public Works Services recently applied for a water conservation grant from the Upper
San Gabriel Valley Municipal Water District (MWD). The grant award is up to $100,000
dollars for the removal of natural turf and replacement with synthetic turf projects in
MWD's service area.
Following the bid process, staff will come back to the City Council to get approval to
award a contract for construction. Therefore, staff is seeking City Council's approval to
Page 2 of 3
Mayor and City Council
September 21, 2010
proceed with the design and development of construction plans and to go out to bid for
the renovation of the existing snack bar and restrooms at the Civic Center Athletic Field.
FISCAL IMPACT
The construction cost for the renovation of the restrooms at the Civic Center Athletic
Field is approximately $100,000.
Funds for this project are included in 2010 -11 CIP program for the replacement of the
natural turf field at the Civic Center Athletic Field. The funding consists of $750,000
from the Park Impact Fees Fund; $389,661 from Prop 40 Grants; and $360,339 from
the Capital Outlay Fund.
The synthetic field project was budgeted for $1.5 million. However, the cost for the
material is less than what was expected; therefore, the estimate for this project is
approximately $1.28. As a result, there are sufficient funds available in the budget to
renovate the snack bar and restrooms.
RECOMMENDATION
Approve to proceed with the design and development plans to renovate the snack
bar and restrooms at the Civic Center Athletic Field
Attachment
Approved by: Jr_ -rte
Donald Penman, City Manager
Page 3 of 3
'al0 � _ � . 'a10
Z ,8b X „OE 1 I I �) .817 X „0£ z
M L_-- — — - Iw
0 I '2110 '2110
,8b X „OE �R p Z ,8b X „0£
L_— —J s.. J_ —J
•
•
o
0
•
5
l
0 O
W
L_ 0
U
U Z
O O
Q w
U U
z
w O
< U