Loading...
HomeMy WebLinkAboutUntitled (4) 44 Development Services Department 1016 240 West Huntington Drive,Post Office Box 60021-* ` - PERMIT NO $QQ-052-370 �'��' Arcadia,CA 91066-6021 City of (626) 574-5416,Fax(626)447-9173 Arcadia Permit Type: Tenant Improve PROJECT TRACT NO. LOT NO. APPLICATION DATE ISSUED BY PRINT DATE PERMIT STATUS 12/17/2015 CM 16:37 8/16/2016 Issued ADDRESS NO. Dir.Prefix Street Name Street Suffix UNIT BLG ASSESSORS PARCEL NO. GEO CODE 400 S Baldwin Ave T-387 OWNER MAILING ADDRESS Westfield Corporation,Inc. 11601 Wilshire Blvd. 12th Floor PHONE NO. Inspector#: CHRS Los Angeles,CA 90025- EMAIL ADDRESS: g Plan Chk#: 15-764 APPLICANT MAILING ADDRESS Plan#: 31864 PHONE NO. Satoh Brothers International EMAIL ADDRESS: CONTRACTOR/PROFESSIONAL ' S r, ^� " (° Satoh Brothers International 8 �I� I j i : 1 tt#910 PHONE NO (310)768-2700 FAX NO © Gar e ena, CA 90 248 EMAIL ADDRESS: License No. 743636 Type: B Expires: 12/31/2017 12:01 TENANT MAILING ADDRESS PHONE NO. FAX NO. Jins Eyeware DESCRIPTION TI FOR JINS EYEWARE - -- Construction Type UOM #of Units Value Construction Type UOM N of Units Value Value Value 115,000.00 $115,000.00 r/,.<4.4 °f-/-/G . OCCUPANCY: Tenant Improve TOTAL VALUATION: $115,000.00 QTY UOM DESC AMT AMT PAID ACCT QTY UOM DESC AMT AMT PAID ACCT each Plan review 862.88 862.88 01-3103 PC Cal Green 86.29 86.29 01-3103 PC ADA 129.43 129.43 01-3103 1.00 Flat Bldg Issue Auto 44.35 44.35 01-3104 each Bldg permit 1,327.50 1,327.50 01-3104 Bldg Issue ADA 132.75 132.75 01-3104 1.00 each T.1.Fire Pkc 245.00 245.00 01-3109 SMIP Corn 32.20 32.20 14-2207 gm bldg std 5.00 5.00 714-2203 1.00 Flat SWMF Auto 6.25 6.25 88-3027 Total Fees: $2,871.65 Balance Due: $0.00 Paid Today: This permit/plan review expires by time limitation and becomes null and void if the work authorized by the Receipt#: permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. CALLS FOR INSPECTION INSPECTORS'OFFICE HOURS Requests for inspection should be made at least Monday-Thursday Friday one(1)business day in advance of the inspection 7:30 a.m.to 8:30 a.m. 7:30 a.m.to 8:30 a.m. by telephone at(626)574-5416 for onsite work. 4:00 p.m.to 5:30 p.m. 4:00 p.m.to 4:30 p.m. (Closed on alternate Frida)s) ." +. NOTES Building Inspections Date Insp. Plumbing Inspections Date u Z `5414,02 1)4Ye-J c - 100. Setbacks 210. Under flribld•.drain - , G_„" 101. Rough grade 211. Copper underslab 4-7 CE<G, •& al= 1 c&C 6-t`i"<CE ilk 102. Figs.&forms 212. Rough plumbing V-? /C i5* -(o_Z/‘ Rovefo ee.E c 7-g, c 6 Al 103. Pre-slab 213. Rough gas _ 104. Floor joists 214. Shower pan 57 (112( T C(ice rl o 105. Steel 215. Water heater .t4.(-ors P-ga4- d 106. Grout lift 216. Roof drains _ 107. Shear nailing 217. Building sewer 6-7-46, '/�y �" 7 L(../0-,,S Lk 108. Diaph nailing 218. Water service 4-2c-i' p/27vi ux.., At o tro 7 109. Roof nailing *71220.19. Final gas ` �443'1C Fixtures �`a Z'-.l4 'e- 7le�/REL-4-�,/O✓� Ae /110. Framing 111. Occ./Area Sept.Wall ,221. Final plumbing g-22,-/4 � " �� 3 R'a G�j• 112. Sound walls 222. Sewer cap/demo. 113. T-bar•rid De ttI� - is--7- .50-e----,="i 7 114. Insulation-Flr. _ _ Pool Inspections Date Insp. S--/"2„--7/6 Sop n�T g G �A- 115. Insulation-Wall 240. Excavation/steel �/ 116. Insulation-Ceil. 241. Rough plumbing 117. Drywall nailing 242. Light shell/bonding 118. Interior lath 243. Underground conduit 119. Exterior lath 244. P-trap 120. Finish grade %_�45. Gas line&test _ 121. Final building 5"l-a / E7�J 246. Fence,gates&signs 122. Final demo/lot clear 247. Pool heater 248. Final electric Electrical Inspections Date Insp. 249. Final plumbing 150. Power pole 250. Pool cover _ 151. Sales lot lighting 251. Pool final 152. Underground conduit 153. Underslab conduit Reroof Inspections I Date Insp. 154. UFER ground 270. Pre-reroof insp. 155. Water ground 71. Roof framing 156. Rough electrical (0 65;-(C 272. Sheathing nailing hir 157. Fixtures 273. Final reroof 158. G.F.C.I. 159. E•ft.bondin• Sign Inspections I Date Insp. 160. Service panel 7--ti- ��280. Setback/overhang 161. Final electric & Y f Ar . 281. Footing 282. Conduit/wiring Mechanical Inspections Date Insp. 283. Disconnect 180. Venting/flue 284. Final sign 181. Furnace/A.C. 182. Rouch HVAC 17-1`-/6,rat�rA Miscellaneous Insp. Date Insp. 183. Fire dampers 290. Fire alarm 184. Furnace compartment 291. Underground supply 185. Combustion air 292. Fire sprinklers 186. Smoke detectors 293. Monitor system 187. Metal F.P.rough 294. Hood dry chem. 188. Compressor setback 295. Final 189. Commercial hood •17 ,rsa; 190. Duct shaft Sewers&Offsite Insp. I Date I Insp. 191, Final mechanical :-2 / .41111' 300. Lateral(main to P/L) 301. Saddle/Y Block Wall Inspections Date Insp. 302. Cesspool filled 200. Footings 303. Sidewalk - 201. Steel/rebar 304. Driveway 202. Grout lift 305. Curb replacement 203. Final wall 306. Trash bin 1,. _ i I i , }Ltyi t i ' <7r �tf " f w , w , , i v . :� , ice z �r .,. cle'\ :. )R. ; i , , 1 c4 oox � � U A , 0 M � W � C [ C N V E^ C. C O I p-- P N.0 •y 57. C ^ U V ti g..1 q m . "A v) v 7 IN V O A w W N H W Nee V III CO a°' ria V e = . p ,. o 0 roti... t" •ni t �•w' Z r,4 . / ''.44 i 4 1%* • .4 il E ,F4 6 7%5 4 ii t � 4u,V lay r'' o w o >o 2 a g > > cu an a. c w e CS 4 a o vs 6. 0' R -' v. E.-■ It; 0 - 1 Ea :J 5 R o , - .. ° r q C , ,,, c m +. a L v1 +: a d 6 u e c„, �, 0 a O O F 1Q 4 ! i 1,04 I A Olt ),,n-+s, ,�J Il 1 11 ” /t 11 . ;;' It h if A I1 i l� 1 / c.,,,..... .. ;++j ��� - � „ .: i:,r� j"e Development Services Department .1 240 West Huntington Drive,Post Office Box 60021 PERMIT NO. BOO-053-320 ••.. Arcadia,CA 91066-6021 City of (626) 574-5416,Fax(626)447-9173 Permit Type: Mechanical Arcadia PROJECT TRACT NO. LOT NO. APPLICATION DATE ISSUED BY PRINT DATE PERMIT STATUS 4/14/2016 CM 7:43 4/14/2016 Issued ADDRESS NO Dir.Prefix Street Name Street Suffix UNIT BLG ASSESSORS PARCEL NO. GEO CODE 400 S Baldwin Ave T-387 OWNER ILIN Westfield Corporation, Inc. 161'° +l 1-ti/ Floor PHONE NO. OS l EMAIL ADDRESS: APPLICANT MAILING ADDRESS South Bay Heating&Air Condition PHONE NO. EMAIL ADDRESS: CONTRACTORIPROFESSIONAL MAILING ADDRESS South Bay Heating&Air Conditionin506 Sanford Ave PHONE NO. (310) 835-3300 FAX NO. Wilmington, CA 90744 EMAIL ADDRESS: License No. 439779 Type: C-20 Expires: 5/31/2017 12:00: TENANT MAILING ADDRESS PHONE NO. FAX NO. Jins Eyeware DESCRIPTION MECHANICAL.FOR.TIN'S EYE WARE Construction Type UOM #of Units Value Construction Type UOM #of Units Value S-2l-/ 7w,.. ... OCCUPANCY: TOTAL VALUATION: $0.00 QTY UOM DESC AMT AMT PAID ACCT QTY UOM DESC AMT AMT PAID ACCT I.00 Flat Mech Issue Auto 44.35 44.35 01-3105 2,00 each Furn<100,000btu 37.48 37.48 01-3105 2.00 each Comp 3-15hp 68.58 68.58 01-3105 1,00 each Vent-appliance 9.36 9.36 01-3105 I.00 each SWMF 2 Auto 1.00 1.00 88-3027 Total Fees: $160.77 Balance Due: $0.00 Paid Today: $160.77 This permit/plan review expires by time limitation and becomes null and void if the work authorized by the Receipt#: 112547 permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from 01-3105 159.77 the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit 88-3027 1.00 is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. CALLS FOR INSPECTION INSPECTORS'OFFICE HOURS Requests for inspection should be made at least Monday-Thursday Friday one(1)business day in advance of the inspection 7:30 a.m. to 8:30 a.m. 7:30 a.m.to 8:30 a.m. by telephone at(626)574-5416 for onsite work. 4:00 p.m.to 5:30 p.m. 4:00 p.m.to 4:30 p.m. (Closed on alternate Fridays) ..<, ,., Development Services Department x+ 240 West Huntington Drive, Post Office Box 60021 -i,ir� ' un PERMIT NO B00-053-075 Arcadia, CA 91066-6021 City of (626) 574-5416, Fax(626)447-9173 Arcadia Permit Type: Plumbing PROJECT TRACT NO. LOT NO. APPLICATION DATE ISSUED BY PRINT DATE PERMIT STATUS 3/16/2016 CM 10:38 3/16/2016 Issued ADDRESS NO. Dir.Prefix Street Name Street Suffix UNIT BLG ASSESSORS PARCEL NO. GEO CODE 400 S Baldwin Ave T-387 MAILING OWNER ADDRESS Westfield Corporation, Inc. 11601 Wilshire Blvd. 12th Floor PHONE NO. Los Angeles,CA 90025- EMAIL ADDRESS: APPLICANT MAILING ADDRESS C-Thirty-Six, Inc. PHONE NO. EMAIL ADDRESS: CONTRACTOR/PROFESSIONAL MAILING ADDRESS ' C-Thirty-Six, Inc. 24440 Goldpoint PI PHONE NO. (714)620-5670 FAX NO. Diamond Bar CA 91765 EMAIL ADDRESS: License No. 739644 Type B/ A 016 12:00: y . k. s TENANT Jins Eyeware PHONE NO. FAX NO. DESCRIPTION PLUMBING FOR J1NS EYEWARE Construction Type UOM #of Units Value Construction Type UOM #of Units Value k7"/A(-- a. ..22- !4. OCCUPANCY: Tenant Improve TOTAL VALUATION: $0.00 QTY EOM DESC AMT AMT PAID ACCT QTY UOM DESC AMT AMT PAID ACCT 1.00 Flat Plmbg Issue A 44.35 44.35 01-3105 1.00 each Lavatories 12.46 12.46 01-3105 2.00 each Kitchen sinks 24.92 24.92 01-3105 1.00 each Floor sink 12.46 12.46 01-3105 1.00 each Wtr htr/vent 15.55 15.55 01-3105 I.00 Fixtures Plmbg fixture 12.46 12.46 01-3105 1.00 each SWMF 2 Auto 1.00 1.00 88-3027 Total Fees: $123.20 Balance Due: $0.00 Paid Today: $123.20 This permit/plan review expires by time limitation and becomes null and void if the work authorized by the Receipt#: 112224 permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from 01-3105 122.20 the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit 88-3027 1.00 is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. CALLS FOR INSPECTION INSPECTORS'OFFICE HOURS Requests for inspection should be made at least Monday-Thursday Friday one(1)business day in advance of the inspection 7:30 a.m.to 8:30 a.m. 7:30 a.m.to 8:30 a.m. by telephone at(626)574-5416 for onsite work. 4:00 p.m.to 5:30 p.m. 4:00 p.m.to 4:30 p.m. (Closed on alternate Fridays) 4., Development Services Department 240 West Huntington Drive, Post Office Box 60021 PERMIT NO BOO-053-177 Arcadia,CA 91066-6021 City of (626) 574-5416,Fax(626)447-9173 Arcadia Type:Permit T e Electrical PROJECT TRACT NO. LOT NO. APPLICATION DATE ISSUED BY PRINT DATE PERMIT STATUS 3/30/2016 CM 10:35 3/30/2016 Issued ADDRESS NO. Dir.Prefix Street Name Street Suffix UNIT BLG ASSESSORS PARCEL NO. GEO CODE 400 S Baldwin Ave T-387 OWNER MAILING ADDRESS Westfield Corporation, Inc. 11601 Wilshire Blvd. 12th Floor PHONE NO. Inspector#: HNRY c ii 0025_ t EMAIL ADDRESS: SI ••• ' s APPLICANT >' A.J. Kirkwood PHONE NO. EMAIL ADDRESS: 5 CONTRACTORIPROFESSIONAL MAILING ADDRESS 714 NO. A J Kirkwood&Associates 2752 Walnut Avenue PHONE (714)505-1977 FAX NO. Tustin, CA 92780 EMAIL ADDRESS: License No. 724633 Type: C10 Expires: 7/31/2016 12:00: TENANT MAILING ADDRESS PHONE NO. FAX NO. DESCRIPTION ELECTRICAL FOR TI i '('[__,(_,Oyy__ Construction Type UOM #of Units Value Construction Type UOM #of Units Value A4./..........i.,:" ,44¢c. g —2.41—i G . OCCUPANCY: TOTAL VALUATION: $0.00 QTY UOM DESC AMT AMT PAID ACCT QTY UOM DESC AMT AMT PAID ACCT 1.00 flat Elec Issue Auto 44.35 44.35 01-3105 4.00 each Distrib panel 62.20 62.20 01-3105 60.00 each Outlets 68.00 68.00 01-3105 144.00 each Ltg fixtures 152.00 152.00 01-3105 1.00 each Misc elec 15.55 15.55 01-3105 1.00 each SWMF 2 Auto 1.00 1.00 88-3027 Total Fees: $343.10 Balance Due: $0.00 Paid Today: $343.10 This permit/plan review expires by time limitation and becomes null and void if the work authorized by the Receipt#: 112363 permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from 01-3105 342.10 the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit 88-3027 1.00 is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. CALLS FOR INSPECTION INSPECTORS'OFFICE HOURS Requests for inspection should be made at least Monday-Thursday Friday one(1)business day in advance of the inspection 7:30 a.m.to 8:30 a.m. 7:30 a.m.to 8:30 a.m. by telephone at(626)574-5416 for onsite work. 4:00 p.m.to 5:30 p.m. 4:00 p.m.to 4:30 p.m. C ,.....-"i (Closed on alternate Fridays) 4„�Ge Development Services Department i OW 240 West Huntington Drive,Post Office Box 60021 PERMIT NO. BOO-051-530 Arcadia,CA 91066-6021 City of (626) 574-5416,Fax(626)447-9173 Arcadia Permit Type: Comm Add/Alt PROJECT TRACT NO. LOT NO. APPLICATION DATE ISSUED BY PRINT DATE PERMIT STATUS 9/24/2015 JB 10:19 9/24/2015 Issued ADDRESS NO. Dir.Prefix Street Name Street Suffix UNIT BLG ASSESSORS PARCEL NO. GEO CODE 400 S Baldwin Ave T-387 OWNER MAILING ADDRESS Westfield Corporation, Inc. 11601 Wilshire Blvd. 12th Floor PHONE NO. Inspector#: CRIS Los Angeles, CA 90025- EMAIL ADDRESS: APPLICANT MAILING ADDRESS Westfield Corporation(Steven Char Ji ( rOMP[E1F PHONE NO. (310)261-3764 `Qg ` EMAIL ADDRESS: CONTRACTOR/PROFESSIONAL MAILING ADDRESS Owner PHONE NO. FAX NO. EMAIL ADDRESS: License No. Type: Expires: TENANT MAILING ADDRESS PHONE NO. FAX NO. (Future)Jins DESCRIPTION DEMOLISH INTERIOR IN PREPARATION FOR FUTURE TENANT IMPROVEMENT Construction Type UOM #of Units Value Construction Type UOM #of Units Value Value Value 25,000.00 $25,000.00 ;(44-c. !a -?-!5 OCCUPANCY: Tenant Improve OTAL VALUATION: $25,000.00 QTY UOM DESC AMT AMT PAID ACCT QTY UOM DESC AMT AMT PAID ACCT each Plan review 317.04 317.04 01-3103 each Energy p/c fee 107.31 107.31 01-3103 PC Cal Green 31.70 31.70 01-3103 PC ADA 47.56 47.56 01-3103 100 Flat Bldg Issue Auto 44.35 44.35 01-3104 each Bldg permit 487.75 487.75 01-3104 Bldg Issue ADA 48.78 48.78 01-3104 SMIP Corn 7.00 7.00 14-2207 gm bldg std 1.00 1.00 714-2203 1.00 each SWMF 2 Auto 1.00 1.00 88-3027 1.00 Flat SWMF Auto 6.25 6.25 88-3027 Total Fees: $1,099.74 Balance Due: $0.00 Paid Today: $1,099.74 This permit/plan review expires by time limitation and becomes null and void if the work authorized by the R«<.ipl/4. 110488 permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from 01-3103 503.61 the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit 714-2203 011-3104 580.88 is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of 7227 1.00 714- 1.00 Arcadia building inspector for a period of 180 consecutive days. 88-3027 7.25 CALLS FOR INSPECTION INSPECTORS'OFFICE HOURS Requests for inspection should be made at least Monday-Thursday Friday one(1)business day in advance of the inspection 7:30 a.m.to 8:30 a.m. 7:30 a.m.to 8:30 a.m. by telephone at(626)574-5416 for onsite work. 4:00 p.m.to 5:30 p.m. 4:00 p.m.to 4:30 p.m. (Closed on alternate Fridays) "', Development Services Department *. 240 West Huntington Drive, Post Office Box 60021 PERMIT NO BOO-053 117 Arcadia, CA 91066-6021 City of (626) 574-5416, Fax(626)447-9173 Arcadia Permit Type: Fire PROJECT TRACT NO. LOT NO. APPLICATION DATE ISSUED BY PRINT DATE PERMIT STATUS 3/22/2016 CM 10:13 4/8/2016 Issued ADDRESS NO. Dir.Prefix Street Name Street Suffix UNIT BLG ASSESSORS PARCEL NO. GEO CODE 400 S Baldwin Ave T-387 OWNER MAILING ADDRESS Westfield Corporation, Inc. 11601 Wilshire Blvd. 12th Floor PHONE NO. Plan Chk#: 16-123 Los Angeles,CA 90025- EMAIL ADDRESS: APPLICANT MAILING ADDRESS Allready Fire Sprinkler Co. PHONE NO. EMAIL ADDRESS: , CONTRACTOR/PROFESSIONAL MAILING ADDRESS Allready Fire Sprinkler Co. 818 N Grand Av PHONE NO. (626)913-6720 FAX NO. Covina,CA 91723 EMAIL ADDRESS: License No. 358795 Type: C16 Expires: 7/31/2016 12:00: TENANT MAILING ADDRESS Jins Eyeware PHONE NO. FAX NO. DESCRIPTION SPRINKS FOR JINS EYEWARI51 cor��irip1 in,A Construction Type UOM #of Units Value Construction Type UOM #of Units Value Value Value 7,500.00 $7,500.00 OCCUPANCY: Fire Sprink/AIm TOTAL VALUATION: $7,500.00 QTY (TOM DESC AMT AMT PAID ACCT QTY UOM DESC AMT AMT PAID ACCT 27.00 each sprinkler pck 637.50 637.50 01-3109 1.00 Flat Fire Issue Auto 44.35 44.35 01-3112 each Fire Permit 203.85 203.85 01-3112 1.00 each SWMF 2 Auto 1.00 1.00 88-3027 Total Fees: $886.70 Balance Due: $0.00 Paid Today: $249.20 This permit/plan review expires by time limitation and becomes null and void if the work authorized by the Receipt#: 112481 permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from 01-3112 248.20 the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit 88-3027 1.00 is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. CALLS FOR INSPECTION INSPECTORS'OFFICE HOURS Requests for inspection should be made at least Monday-Thursday Friday one(1)business day in advance of the inspection 7:30 a.m.to 8:30 a.m. 7:30 a.m.to 8:30 a.m. by telephone at(626)574-5416 for onsite work. 4:00 p.m.to 5:30 p.m. 4:00 p.m.to 4:30 p.m. (Closed on alternate Fridays) i'''1 Development Services Department 240 West Huntington Drive,Post Office Box 60021 PERMIT NO B0O-053_313 Arcadia,CA 91066-6021 City of (626) 574-5416,Fax (626)447-9173 Arcadia Type:Permit T e Fire PROJECT TRACT NO. LOT NO. APPLICATION DATE ISSUED BY PRINT DATE PERMIT STATUS 4/13/2016 CM 12:10 4/22/2016 Issued ADDRESS NO. Dir.Prefix Street Name Street Suffix UNIT BLG ASSESSORS PARCEL NO. GEO CODE 400 S Baldwin Ave T-387 OWNER MAILING ADDRESS Westfield Corporation, Inc. 11601 Wilshire Blvd. 12th Floor PHONE NO. Plan Chk#: 16-163 Los Angeles,CA 90025- EMAIL ADDRESS: APPLICANT MAILING ADDRE Building Electronic Controls Inc. . PHONE NO. °w� :3"' EMAIL ADDRESS: f CONTRACTOR/PROFESSIONAL MAILING ADDRESS Building Electronic Controls Inc. 2246 Lindsay Way PHONE NO. FAX NO. Glendora, CA 91740 EMAIL ADDRESS: License No. 729905 Type: C Expires: 11/30/2016 12:01 TENANT MAILING ADDRESS Jins Eyeware PHONE NO. FAX NO. DESCRIPTION FIRE ALARMS FOR JINS EYEWARE Construction Type UOM CO of Units Value Construction Type UOM #of Units Value Value Value 7,270.00 $7,270.00 OCCUPANCY: Fire Sprink/Alm TOTAL VALUATION: $7,270.00 QTY UOM DESC AMT AMT PAW ACCT QTY COM DESC AMT AMT PAID ACCT 700 each tire alarm pc 2 637.50 637,50 01-3109 100 Flat Fire Issue Auto 44.35 44.35 01-3112 each Fire Permit 203.85 203.85 01-3112 100 each SWMF 2 Auto 1.00 1.00 88-3027 Total Fees: $886.70 Balance Due: $0.00 Paid Today: $886.70 This permit/plan review expires by time limitation and becomes null and void if the work authorized by the Receipt#: 112660 permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from 01-3109 637.50 the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit 01-3112 248.20 is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of 88-3027 1.00 Arcadia building inspector for a period of 180 consecutive days. CALLS FOR INSPECTION INSPECTORS'OFFICE HOURS Requests for inspection should be made at least Monday-Thursday Friday one(1)business day in advance of the inspection 7:30 a.m.to 8:30 a.m. 7:30 a.m.to 8:30 a.m. by telephone at(626)574-5416 for onsite work. 4:00 p.m.to 5:30 p.m. 4:00 p.m.to 4:30 p.m. (Closed on alternate Fridays) Cj■ !LI116,1P14 iii �unityutl;d MEMORANDUM Fire Department DATE: September 1, 2016 TO: BUILDING DEPARTMENT INSPECTOR Henry Kemick FROM: FIRE DEPARTMENT SUBJECT: FIELD INSPECTION ADDRESS: 400 S. Baldwin Avenue #F1 (Jin's Eyewear) THE FOLLOWING ITEMS WERE CHECKED FOR CONFORMANCE WITH APPLICABLE FIRE DEPARTMENT REQUIREMENTS: TYPE OF INSPECTION DATE / INITIAL FINAL INSPECTION FIRE SPRINKLERS 8-31-2016 Jill Perumean FIRE ALARMS 8-24-2016 Jill Perumean TANKS HOOD & DUCT KNOX BOX OCCUPANCY 8-31-2016 Jill Perumean . COMMENTS: Emalled Bldg. Dept. 9-1-2016 jp r t ee c_>A k.. itZer/nee AIR-SOUND-HYDRONIC PROFESSIONALS RAC Test:and Balance Report PROJECT: Jin's Arcadia, CA CONTRACTOR: South Bay Heating & Air ARCHITECT: N/A ENGINEER: N/A REPORT CERTIFICATION NO: ot,0 AIR 94 36497 4 Conboy 11:1094510ec c(` 11433 ANSI REPORT CERTIFICATION DATE: AM* '' cn • EHp t2/3 y *�� August 25, 2016 REVIEWED AND APPROVED BY: Michael Conboy ICB / TABB Certified Contractor 457 E. Arrow Hwy, Ste. D, Azusa, CA 91702 TEL: 626-915-8117 FAX: 626-915-8112 E-1\L II..: associatedairbalance ngrnail.com _.---.—......—...... ,,. ,61•''',....„,N, .'. q1/4_ ifi 0. , C:24, 0,J = .•,,'" itg:irg1,4. 1 ( (.2 4)J I. at CI 4-) 0_, L ti.■ 71- :434 13 r) fp (I) 747 C_n 7) — 1 on ...,o 73 0 70.7•‘;',i,,,.,..,,,,..,,,,,,,,.;.4.14,:oactni:,.. H-711 7(( CD L •• rt) I, k..,,,_ 1,) C:).- to to 0.1 ..,.. b , _ 1---- (f) .---:_..-,-. -,-, ;(J s.{,, L i-I , CT --_-• .4._„. r rp .„, ' '' '011 '-' rl., 2 7- 7 () (f) (-) 0 , —, (4 • - i (D D S.T: 0 '7 C11 1, C ‘--3 - " 2 rs- - 0 D V.) D 1„i -- ,- 'D a, c: *---i. • 0, (—) a ":' ,., _Cl_ R a r 1--- •-f... GU n rii C-) 0 `-:- -.:C2, n PO a, J 0 . D 0 -S 0 ED 0 (T'' ., ') 7," ■, ,., CD 1(.3 13 G) -rj (1„) --, --•',').- 3‘:,;', (,-J ', CO — cr) !----J. . ....i. -,- -k -1 Ca .-- , ,--.7) ,z,...‘ e '--T1 ,,-..; 0 retwan$,„. 0 ';‹, _..i ■?... ,,_,) 7: 6 I; n■ --> 7/, ro - i4,•• ( ) n U iv D rr H—H cl) - •,, ,,,,,I.„ L" cm - c.- TO (1) •Ii... . ;1: (0 Cl) I — . sl,) ---)- -Alt'•..,, _ 0 Al •..-._., c) .. D (1) \ c,;(alg(Ii -):7.1) 0 t— ,1, AT.74ZeS.,o,r (D ----.-. , .--..--,...„..—.....—.—„„,..-...-.--......-----.-.---......„,„.------...-... ° ` . .14.:; t R.' RI a "4%, .4,. - ,.-, Ts k , ,t g, r-r, r.4,, , q E. a'cv :1', _, y csn ,, R I CD w fy 'ze ti CO `'� , it�if Wiry y' '&71' A 2 46' (Z11% a n ci c, a L.4 c'l ,—.. i 4 n .. 1111! ta/ ....1 -, c,,, t gi Pt o tD 0 N ro a R 0 , A n t, V w ^'�1 s1 $4. - to 1 1 ftlOra t 17 I 1 5' ....k ,..,.. I pa ce) .,._ et ,„. • P. .,,...„,_. 1 ' c'.• ,.., i tt R.. •4 (.. z..) ,521 .-.-i ,,,...........,,, Cu.") - . cra --1 lie:„..• 1 . .'`IP q 2 .....4 , 4„: t' .1', Pd'a• .41 0. II. to .4 e c-, ,..... L. co ).......1 1-4 4... . ...j.. i * ....... tt:::, . 1 I., ,.... l' h; a (.. .;)9. Irt r t R. . ! i t ;. ", RI 1 .., t , 4 A A I i ,,,. ■ it .0 , ,,, .1 Ni ;. .! A.i tyros% (J4 i Q ' • r tt'✓ ii J.:Ali 1 % ... ,., ..,.. . ..... 5 1 .. it ill l g .47 a WN 1.. R to C $al 1 g tc;. ,,..0 6,; t„, e il P fo ti ti w ar W o b� y 00 . • rt II CN IIP R cit:, rile tme,,, il ,._,,,(a '''''Cj ,...., ;zi o . . k5:1 Z , E # 1 o 1$71:1 0. (11.) �. C4 4 ' � � ) � '14t � ,' ; n }\�, ,iii ' 1 a ..-) t..% n ce F-, A ...,,,i.. o rr p * H a ` el O M ea (1111 CO -13 st ig r` -ogit , - /11t) ila II P i kti '. to illio'IF rim fl '. c UL4 Nffa3 'fir ellt)41) z = 1.4, COI tii Associated Air Balance 457 E. Arrow Hwy,Ste.D,Azusa, CA 91702 AIR SOUND HYDRONIC PROFESSINALS Tel: 626.915.8117 Fax: 626.915.8112 ABBREVIATIONS ACT - ACTUAL AK - FREE AREA FACTOR ATC - AUTOMATIC TEMPERATURE CONTROL BP - BYPASS(DAMPER,VALUE,ETC.) CAV - CONSTANT AIR VOLUME BOX CD - CEILING DIFFUSER CE - CEILING EXHAUST DIFFUSER CFM - CUBIC FEET/MINUTE CF - COEFFICIENT FACTOR CL - CENTER LINE CR - CEILING RETURN INLET DB - DRY BULB DD - DIRECT DRIVE DNL - DATA NOT LISTED EMS - ENERGY MANAGEMENT SYSTEM ENT - ENTERING ESP - EXTERNAL STATIC PRESSURE FH - FLOWHOOD(MEASURES CFM DIRECTLY,PPM AND AK FACTORS ARE NOT REQUIRED) FPM - FEET PER MINUTE FPVAV - FAN POWERED VARIABLE AIR VOLUME BOX GPM - GALLONS PER MINUTE HP - HORSEPOWER KW - KILOWATTS L/S - LITER PER SECOND LD - LINEAR DIFFUSER LVG - LEAVING(TEMP,PRESSURE IN INCHES,FPM,CFM) MIS - METER PER SECOND MB - MIXING BOX NA - NOT APPLICABLE/ACCESS NM - NOT MEASURED NVL - NO VALID LOCATION OSA - OUTSIDE AIR PD - PRESSURE DROP RA - RETURN AIR REQ - REQUIRED RPM - REVOLUTIONS PER MINUTE SA - SUPPLY AIR SF]) - SMOKE FIRE DAMPER SP - STATIC PRESSURE SWR - SIDE-WALL RETURN SWS - SIDE-WALL SUPPLY TDH - TOTAL DEAD HEAD TP - THERMALLY PROTECTED VAV - VARIABLE AIR VOLUME BOX W - WATTS WB - WET BULB WG - WATER GAUGE AP - DIFFERENTIAL PRESSURE AT - DIFFERENTIAL TEMPERATURE Jin's Store - Arcadia Table of Contents System Page Number AHU-1 1 AHU-2 2 AHU-1 SUBTOTALS 3 AHU-2 SUBTOTALS 4 EF-1 5 EF-1 SUBTOTALS 6 tkoglOGe: k.S4 gt5 -r•WAee Page 1 AIR-SOUND-HYDRONIC PROFESSIONALS Air Handling Unit Test Data Job Name: Jin's Store-Arcadia Date: 8/25/2016 System: AHU-1 UNIT INFORMATION I Unit Number AHU-1 Location CEILING Area Served SALES Manufacturer TRANE Model Number TEM4AOC48 Serial Number 15343RBJ2V AIR MEASUREMENTS I DESIGN I ACTUAL Total Fan CFM 1,800 1,704 Total Outlet CFM 1,800 1,704 Total Traverse CFM NVL - Total Retum Air CFM N/L 1,319 Total Outside Air CFM 400 385 External Unit Static Pressure .50" .49" Total Fan Static Pressure N/L - Total Suction Static Pressure N/L .33" Total Discharge Static Pressure N/L .16" Fan RPM 3 SPEED HIGH Diff. Press. Set Point N/L N/A MOTOR MEASUREMENTS I DESIGN I ACTUAL Motor HP 1/3 1/3 Motor Voltage-Legl/Leg2/Leg3 208 208 Motor Phase 1 1 Motor Amperage-Leg1/Leg2/Leg3 6.30 5.80 Motor Service Factor T.P. T.P. Motor RPM 3 SPEED HIGH VFD Hz. Setting N/L N/A Overload Protection N/L N/A PULLEY & BELT DATA I Motor Pulley DIRECT DRIVE Fan Pulley DIRECT DRIVE Belt-Quantity/Size DIRECT DRIVE Center Distance DIRECT DRIVE Sheave Adjusted Closed DIRECT DRIVE Remarks: teiho: 141beer,e42<S44 .. arff/AZGIK Page 2 AIR-SOUND-HYDRONIC PROFESSIONALS Air Handling Unit Test Data Job Name: Jin's Store-Arcadia Date: 8/25/2016 System: AHU-2 UNIT INFORMATION l Unit Number AHU-2 Location CEILING Area Served CUSTOMER COUNTER, STAFF ROOM, OFFICE Manufacturer TRANE Model Number TEM4AOC48 Serial Number 1519352T2V AIR MEASUREMENTS I DESIGN ACTUAL Total Fan CFM 1,600 1,595 Total Outlet CFM 1,600 1,595 Total Traverse CFM NVL - Total Return Air CFM N/L 1,189 Total Outside Air CFM 400 406 External Unit Static Pressure .50" .47" Total Fan Static Pressure N/L - Total Suction Static Pressure N/L .32" Total Discharge Static Pressure N/L .15" Fan RPM 3 SPEED HIGH Diff. Press. Set Point N/L N/A MOTOR MEASUREMENTS ( DESIGN ACTUAL Motor HP 3/4 3/4 Motor Voltage-Leg1/Leg2/Leg3 208 208 Motor Phase 1 1 Motor Amperage-Leg1/Leg2/Leg3 6.30 6.00 Motor Service Factor T.P. T.P. Motor RPM 3 SPEED HIGH VFD Hz. Setting N/L N/A Overload Protection N/L N/A PULLEY & BELT DATA Motor Pulley DIRECT DRIVE Fan Pulley DIRECT DRIVE Belt-Quantity/Size DIRECT DRIVE Center Distance DIRECT DRIVE % Sheave Adjusted Closed DIRECT DRIVE Remarks: Atoc-VAIG4tVe,ee2<S 4.4;7‘,Zee a4 Page 3 AIR-SOUND-HYDRONIC PROFESSIONALS Diffuser And Grille Test Data Job Name: Jin's Store-Arcadia Date: 8/25/2016 System: AHU-1 Room Number Size Type Design Actual I l I I Ak eFPM I CFM I FPM I CFM SALES 1 14"X8" SWS 1.00 200 194 SALES 2 14"X8" SWS 1.00 200 187 SALES 3 14"X8" SWS 1.00 200 206 SALES 4 14"X8" SWS 1.00 200 181 SALES 5 14"X8" SWS 1.00 200 185 SALES 6 14"X8" SWS 1.00 200 196 SALES 7 14"X8" SWS 1.00 200 184 SALES 8 14"X8" SWS 1.00 200 186 SALES 9 14"X8" SWS 1.00 200 185 (1,800) (1,704) RETURN R-1 24"X24" RG 1.00 N/L 1,319 OSA 400 385 Totals Remarks: Page 4 tricS‘Ikkier.A442/ 4 Ma,~24W AIR-SOUND-HYDRONIC PROFESSIONALS Diffuser And Grille Test Data Job Name: Jin's Store-Arcadia Date: 8/25/2016 System: AHU-2 Room I Number I Size Design Actual I Type 1 Ak FPM 1 CFM 1 FPM 1 CFM STAFF ROOM 1 24"X24" CD 1.00 350 340 OFFICE 2 24"X24" CD 1.00 350 336 CUSTOMER COUNTER 3 24"X24" CD 1.00 300 291 CUSTOMER COUNTER 4 24"X24" CD 1.00 300 317 CUSTOMER COUNTER 5 24"X24" CD 1.00 300 _ 311 (1,600) (1,595) RETURN STAFF ROOM R-1 24"X24" RG 1.00 N/L 326 CUSTOMER COUNTER R-2 24"X24" RG 1.00 N/L 863 (1,200) (1,189) OSA 400 406 Totals Remarks: FShiot -CS4 ‘ ;,‘,/24tW Page 5 AIR-SOUND-HYDRONIC PROFESSIONALS Exhaust Fan Test Data Job Name: Jin's Store-Arcadia Date: 8/25/2016 System: EF-1 UNIT INFORMATION I I Unit Number EF-1 Location ROOF Area Served HOOD Manufacturer CAPTIVE AIRE Model Number NCA 8FA Serial Number 2561200 AIR MEASUREMENTS I Design I Actual I I Design 1 Actual Total Fan CFM 880 Total Outlet CFM 880 Total Fan Static Pressure .50" .51" Suction Static Pressure N/L .33" Discharge Static Pressure N/L ATMOS Fan RPM N/L 1,340 MOTOR MEASUREMENTS I Design I Actual I I Design I Actual J Motor HP 1/3 1/3 Motor Voltage- Leg1/Leg2/Leg3 208 208 Motor Phase 1 1 Motor Amperage-Leg1/Leg2/Leg3 7.0 6.2 Motor Service Factor 1.35 1.35 Motor RPM 1,735 1,735 VFD Hz. Setting N/L N/A Overload Protection N/L N/A PULLEY & BELT DATA Motor Pulley 1VL40"X1/2" Fan Pulley AK46"X3/4" Belt-Quantity/Size AX19(1) Center Distance 4 1/2" % Sheave Adjusted Closed 50% Remarks: ekacatli00/4442<-C A&Z.WatV a4 Page 6 AIR-SOUND-HYDRONIC PROFESSIONALS Diffuser And Grille Test Data Job Name: Jin's Store-Arcadia Date: 8/25/2016 System: EF-1 Room Number Size Type Ak Design Actual I I I I I FPM I CFM I FPM I CFM EF-1 CUSTOMER COUNTER 1 10"X10" OPEN 0.69 1275 880 1243 858 HOOD (880) (858) Totals .■ 1■• Remarks: __...... ._ , '...' 5 -..b. 'q b,,, ',, =-• W2'1 —...1 E"I a... ., , Cr al.1 GO . 45 J 0 I . 1,100M00 TWA 0 m- , ... 7 . „. h _....4. 0 *Tr* 0 . CI .1- __ .m. .:., .1111111111111111111111111,Walli a ......ff . _i, ,.., t....o:.e,,..e.me,......,...,.. e ,,, ,.....,..,...... z ir InitiliallIttacfra.A. Lazirg .pii ....4a.- ...4 . *Imo k 11_ n 1,1 4111111111111111111411113113,111011rerV‘i:1 "4.41 0 ...s_71414.4 _,_ • N . i A. 40311110. t=lielir rPlilri CH.P1111Wit le i41 t q -A-2 r • au . ■ 3 .. 1 , ". Will' i, g ,,, F-.1 ;-- c.) 0.1.11,11.•Litiath4 ,..........w, -w i .4, : : •..: 0 Priiitizten.......,... 411Pilosinei I, ipa 4,4 U r gilP:Ajd•r1,27:71 pi, .or.r., v„,10„01,,,....v,,N A......,, . i .4,), ll .1 cli§ .1 111 14;46-14 4 4"' 0..... i 0 011111W11 f. tm...-....-...... .1. 4 ...,_:.__:._• ,,,..... ,..f. . ._:_.-: ...._ •_ , ir ; 0, -44 1 ...-„..............„.„,■,, 7•'-E:. -1E:111=7-gli-rirt= 't2..-.^.7i22.r....esa,*• • IR "..iismsr.zet. I : I 1 fl II _ 6 3__ - ' . - - f•' - --":“..':'__ ill ----4 - - !Alt Fill ......,....4 i r ., fito, 'flit . il f N.Ililli 71101;i4), 1.I TIMM 12 t ii • V.'t 1111li/11P et ty 'q.ksltA. 11914111bl II, i - Pitll OM. , `,.;7 • r '4.), i I ..! ,- el • Ir il "1k I • -.4 • 1 ..., „, ....... p , . , h- • 1.1 ir • , ., sa"i4,-fiTi3111111111 I ,•.J(1) 1,1 [I I •i It I 1 r. s I : 111 • 1 MIA p ;0 (1 ) [fit 0 1 a 011111 (D Anil 1:711 1 '' mtict 1 I 1111 ri.,,:lwt is .1 I ,Li, MAL 114 Az , I , Willi .. . . II I I i ,4.-1) . .1 '1 11 / / I ,., ,1 1 i 2 1 .1 I 1 • 1 1 .i r I 0 le 12 0, ..v..„.".. .....,„,g. /....' --;--.,: „7, .-7,-....., _ g-7=La gu.-AolikUctvg.v. 72,Z1---' ,0 0 . ,... ____/--- .....- . li- 4 C) n Q ......„ . ..... , , 0 , 2 0 7.-"' 0 • ....7•1 > r- ''''' ■ .7-, -• ,- n, 0 e n 0 03 , .., ,.., > ....., Co Ca X , 14T; ..4 ..- P4 44.; a.,....• . v., •,'"r1 0 c 77 c 1-. - r" ,p• 2. xi - .z c-) , 7- z, Ill • 0 'V Z >4' r— ..„ W I cli 8 -rt xi i --4 rn • '-', 9fn I "-- . '4 .4, 4 ca▪ , ; ..' -' ,411 Z _ — ... , CA • r--, = i MINIMINIM11••••■••■•■ .. H C o ! ' ''' ■ . 0 CI r.". •-1-, M — ,..i- , , . . _. :;... .. ._ . ., r I- 1 - , .1101111110•0■1100.1111111.11M )I .I ' 1 i 1 , ! z r■ _ . . I ....,. C-.1 i• 1 j 1 , • .• ..- , 'S.. • i , ■. ,It.rp I !' 15".. 1 • Cr:4:'44: ' ; ! 1 1 1 4—IT I 1 ! ; ' 4 I I.--- ', -,- -4 i . t' ;\ , ,SP . IA,C' ' 1 , 1 „ , , , , 1,:„..., 147 , „ ...,.\ (-11 - — I J u; ., I \ .7>• - ■ + • I 1 1 \ L. *,,l Z `P,-. Z 11 —1 X • • •• .-',, \ 1 1 I P".. 1 i 1 ''.10 . , 1 ,-.0. , .1 _. aS fi) ----H— -1-10'''> ' CD .7xj 1 I ! 1 ■ 1 \',.:7c,s,\, 1 1 - . C: ] i. i 1 1 1 : 1 ........1 1 1 . , , i 1 I ..25' z 1 '',.,r) ..2. (..Ii , 10. 1 .M11000m00114Poom. i- • 1 I I IL ',,•****4 tr.*:* ,,::,,,i:,•, ,C4*)) 1 ■ P 1 er. P I 1 0.101. —...... ---I oI' 12 rn rn 9 O¢'n=x s 7 7 1.t yi 'p • :9z2m ,� f0 N w• 12=a m y O 4 p q ,01. =00c N O A ID S)� m ya7C w m y N O~ ofyc el ;m y 0▪-C . 0OSH 0 m T` < 12 f• • _ _O m C S Z d m,D, .4 :m12i : _ m • E y 0 mA}, xxn . 0., S Q7 •D f." O x 10 S L K p in"m T 7 �m CO m tpCb y Y ,[im a or sot om 3 rn s�m0 4p<sm Z m2} to ZG ';1 In r imr 2 " N 2 °rTc Xo a r z==� a m N ma A m m s r m !;4 X°',,,5 1 S --e_ r:' Z V Cli f N u O :/O:/11 m N ' 0.a" _ �v ''.maT 2c O m v W 2 y N G«.. �., i1. I I P 0 Z .,50y�F, m IS m s rn Azsme,S ^ ill �. g, '-",,T,vv 0 • 021112 C n _ j 1 y ai n p =� t a s a., ry r. a m= T- a-.� i Z p X AK N2 as= X 7 a, , / Cie) I ...e■ormie• o o s >R C) s r v m t G M x 1 i w 0 12��� i 0 x m ammy a g% 0 S 1 •m N 4 1 ~ n .. .. k{• ,� 03" 0 , 4 �t r . � N r • y \ \ 1t a 1 • N \ \, , llfl a 'c"1:611:1 ft' --1 • • I o 1 i s3� $ _'" 3 z n S m 7 ,, G 2t - �, Y i — mO A° fff 1 : 1 ¶16j ti N m a• 1 k 400P A N Y p".. A MC S w = C _ n D n ' mm c N y pD Y O 4 D t r C em m 2 aom ; Cyr 5 p 8;1. K / ',/,,,/,/,/,/ c Q a :,/,,,` ff r�/ f N , ////,',/,/, , ,t a � v`" s • � r ,va pq _ ,/ -- .a v arm o o A � , / CA Q p / / , g rn r/r Nir "k‘tlt. .N • ',.'s,\‘‘\.\ ems\. xi \4%. k, \\\\ 'X-,.\," XI \ C g D r v 4 2 3N; h \\‘\1/4 \\\NN ''' ". , as ill Z II L • R , J c.) ...... , L:. § Vii c._.6 A .. Al. n -y ___L g Z g (Al m ai �/�J s REQUEST FOR CLARIFICATION- RFC RFC 16 JiNS Santa Anita TO: MBA Arch FROM: Sergio Zajdenberg PHONE: PHONE: FAX: FAX: ATTN: Sarika Handique BY: PROJECT# DATE: 4/18/2016 SUBJECT: SUB: SPEC. REF. TRADE: DWG.REF. JOB NO. PLEASE PROVIDE THE FOLLOWING INFORMATION/CLARIFICATION: Type question here: The building inspector has requested that all expansion joints be repaired by removing the existing foam and install new rated mineral wool and the appropriate expansion joints to separate the tenant below from JINS. We request that expansion joint details be provided for the floor and wall conditions. BY: Sergio Zajdenberg DUE DATE: ASAP RESPONSE: Install horizontal and vertical expansion joisaat existing locations per attached specifications. A fs%/ l r I BY MBH Architects _ ' 30/4_ / RESPONSE DATE: 05/06/16 ATTACHMENTS: List attachments here: DISTRIBUTION: Jins Design Manager Architect team Jins Pro'ect Manager General Contractor Engineer ❑ Yuko Hagiwara ❑ Michael Nieto ❑ pM ❑ Satoh Brothers ❑ HBK ❑ Sank • ci „L LL/91/8 -"A3?J ci O E v v”) co 01 n3 h rn o. co X CO coo 0 ` p as=$ o ct M _ II 011 , CD Cri F.- U .- a cit M (> d d o + Z E 0 ' M v 1- o_ ( ao —) 0 ,_ cow -a Hy« c CO co ° C7 O N c 0c 0 m O t• o civQ U U vo« > c '' U LLoN -c) (3 (t) c_ Cd Yco c a) ° f- Nfn a) co = oLiyA m - Q• � U °uZ E g, N 2+ X L , L- 0' N L W Q j �a\\e\\\\\\a\\\\ca%\\\\ua. fl O V A N md a■ Z c'',0 L = 0 U) v) E m O L .` c v a 2 cG)o � ooQ V U �' O 7 j „t 60/8 l/Z-7\321 c „ 0 E0 b L TN LL1 W Li a oy J goco Q•O• o LIJ et CL m0- 2VO vvuv co <g u) F- a: MI Zap cad � � T M QO 'II I— 2Zm �! y XN � Z co 3 U Om ZZJW Jpp vg Qt moo + c 0 Em -1 YI- 0 12O A O a � o0 lf, a II- JQ SF- Q a'r�. 'ri' a cC0 yT i Document Control No.BGS07 95 13 09/05/13 Section 07 95 13 EXPANSION AND SEISMIC JOINT COVER SPECIFICATIONS PART 1 — GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1 General Requirements, apply to the work of this section. 1.02 WORK INCLUDED A. Furnish and install complete Balco, Inc. Expansion Joint Cover Systems. 1. Interior Floor expansion joint covers. 2. Interior Wall expansion joint covers. 3. Interior Ceiling expansion joint covers. 4. Exterior Floor expansion joint covers. 5. Exterior Wall expansion joint covers. 6. Roof expansion joint covers. 7. Fire Rated Assemblies. 1.03 RELATED WORK A. Related work which is specified elsewhere. 1. Cast-In-Place Concrete: Section 03300. 2. Unit Masonry: Section 04200. 3. Structural Steel: Section 05120. 4. Lightgauge Metal Framing: Section 05400. 5. Cement Plaster: Section 09220. 6. Gypsum Wallboard: Section 09250. 1.04 REFERENCES A. Publications listed herein are part of this specification to the extent referenced. The criteria established in the specifications shall take precedence over the standards referenced herein. (An example of a reference standard is provided below.) 1. American Society for Testing and Materials (ASTM): a. ASTM B221, Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods,Wire, Shapes and Tubes. 1.05 DEFINITIONS A. Define industry and product terms as necessary. 1 Document Control No.BGS07 95 13 09/05/13 avoid project delay. If not adhered to, the Architect will designate the exact product to be used, and the contractor will have no recourse. 1. Submit manufacturer's specifications and technical data, including Material Safety Data Sheets, installation instructions, and, as required, catalog cuts and templates to explain construction and to provide for incorporation of the product into the project. 2. Submit certificates, copies of independent test reports, or research reports showing compliance with fire resistance rating and other specified performance requirements. 3. Submit shop drawings showing complete fabrication details for all joint covers, including required anchorage to surrounding construction, recesses, blocking, backing and connections between similar and dissimilar joint cover assemblies. 4. Submit three (3)6" samples of the specified system. 1.09 DELIVERY, STORAGE AND HANDLING A. Provide temporary protective cover on [anodized aluminum] [stainless steel] [bronze]finished surfaces. B. Deliver joint covers to jobsite in new, clean, unopened crates of sufficient size and strength to protect materials during transit. C. Store components in original containers in a clean, dry location. 1.10 SEQUENCING A. Submittals shall be completed and approved prior to award of subcontract for system components. B. Subcontract for the work of this section shall be planned to allow sufficient time for manufacturer's production and delivery scheduling. 1.11 WARRANTY A. Submit manufacturer's warranty that materials furnished will perform as specified for a period of not less than one (1) year when installed in accordance with manufacturer's recommendations. PART 2 - PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. Furnish and install as noted in specifications and as indicated on drawings, [Expansion Joint Cover Type(s) (type number(s))] [Seismic Joint Cover Type(s) (type number(s))] as manufactured by: Balco, Inc., PO Box 17249, 2626 S. Sheridan, Wichita, KS 67217; phone: 800-767-0082 or(316)945-9328; fax: (316)945-0789. B. Substitutions: Submit proposed substitutions in writing to Architect no less than 10 days before bids are due. Submit samples and product data to demonstrate acceptability of 3 Document Control No. BGS07 95 13 09/05/13 E. Fasteners, accessories and other materials required for complete installation in accordance with the manufacturer's installation instructions. 2.03 FABRICATION A. Fabricate [expansion] [seismic]joint cover assemblies as detailed. Provide centering bars, sealing washers, gaskets, splice covers, and closures as necessary for complete installation. 1. Fabricate special transitions and corner fittings as required. 2. Fabricate fire barrier and provide fire-resistant sealant as required for fire-resistant installations. 3. Miter and weld joint systems as applicable. 4. Provide necessary and related parts, devices, water barrier(if specified), anchors, form clips and other items required for water-resistant and fire-resistant installation. 5. Provide corners, tees, transitions, curb risers, etc. assembled with connection [mitered] [interlocking] and secured to ensure proper fit and alignment as applicable. 6. Special conditions shall be [shop] [field]fabricated. 7. Cover plates shall have a [smooth] [serrated] [v-grooved] [abrasive] [1/8 inch recessed] exposed surface. B. Shop assemble components and package with anchors and fittings. Provide components in single lengths where possible; minimize site splicing. 2.04 FINISHES (Select all applicable items in this section) A. Aluminum: 1. Floors, Roofs, and Exterior Walls— Mill finish. 2. Interior Walls and Ceilings—[Clear anodized, Class II, AA-M12 C22 A31; 204-R1] [Color anodized to match] [Other(specify)] [Prime painted]. 3. In contact with concrete—Prime painted. B. Steel shall be galvanized in accordance with ASTM A123. C. Bronze: Satin finish. [Provide lacquer coating for wall and ceiling joint covers.] D. Stainless Steel: [Matte finish, sanded] [Other(specify)]. E. Vinyl: Gray(standard). Optional white or black is available for some products. F. Santoprene: [Black] [White] [Gray] [Tan] [Select Color]. G. Silicone: [[Natural Stone] [Grey] [Bronze] [Black] [Select Color] G. Abrasive: [Black (standard)] [Select color(Optional colors available)]. H. Filler Strips: Gray(standard). 5 nimonsuemenok Z < Ziv 1.-. Z Q cc Q 4 in O co r 1 z O 1_ o O W p Z ~ wco o Q W O Ln co z 1 z Q IL c°n ° 2 wU Y V W >- co O 0w cc co O C9 O m ~ ZcEw w o >- z mw = � .� U X N U Q U)O > C i a L Q o m ?< °o Z 6 H W I- wwY0 N w w a_ D U 1 v~i m ( maw >k R z w w ° O � j O Ce V w Ce J D 4,____ (..9 Z J W / I•L) (:) C)C-01 0 0 H U-1 . -II c \\\ I Q \ O C 1 I N1 C O L C O Lid = J w M LJ c 13/ nr Q � ,u U u, C N 0000 V /1' V e o D f 0 \.,.- H B K CONSULTANTS, LTD. Mechanical & Electrical Design Services 171 Charring Cross Drive South Suite 1B Phone 614.882.1199 Westerville,Ohio 43081 Fax 614.882.1857 l r, August 1, 2016 Mr. Henry Kemick Building Inspector City of Arcadia t (6, a 4_, Re: J!NS store Westfield: Santa Anita 400 S. Baldwin Ave, Unit 203, ; G Arcadia, CA, 9100 Dear Sir: This letter is in regards to the Hood/Exhaust system being installed in the J!NS store at Westfield Santa Anita. My office did not realize that the updated plans with his hood had not been reviewed by the City of Arcadia. The plans that are being submitted with this letter are the current set of contract documents. The purpose of the hood is to remove odors from the lens grinding area. We have had several email communications with the owner, J!NS, on the type of hood required to determine if there was anything hazardous. Attached is a document provided to us by J!NS from the Lens Manufacturer giving information on the Flammability and the Chemicals emitted when grinding the lens and the manufacturer's recommendation for exhaust due to odors. Based on exhausting a product that is neither flammable nor toxic we have specified a Class II hood. See enclosed shop drawing of the hood being installed. The exhaust duct connecting the hood to the fan should be a Class I duct based on the above information. The exhaust system is operating at 0.5" negative pressure and the temperature of the air will be the space temperature, 75°F. Based on this information the duct can be constructed based on the current SMACNA HVAC Duct Standards. California Mechanical Code Section 506.2, exception (1). Enclosed is this section of the code. Please review and approve. If you have any questions or comments,please feel free to contact us. Regards, is,s5.09c0k, f William D. Best, P.E. 34.0 04 2tei 1 aOF CAI, :'.. f; -/ f1 Watching the world MRTT Series Safet y Information of MR TM resins R7 . V.YBS � N1 h ,thrNnIJ• w' tkMV(y4' R 174 k,,,4lq 41,0/.0 t4i Ik`grKVI L,AIi�uiifTemheL. L.LIF `t W`SyfT.—p:I IK#T4`q'Y Vtr�°'-8q.�i» Revised June 2011 (T116-033) Mitsui Chemicals, Inc. 1 Copyright©2011 Mitsui Chemicals, Inc. TI16-033 For your safety please refer to this brochure when handling MRTM lenses made from MRTM monomers. Please note the data concerning MRTM resins in this brochure is measured without coating made by the standard procedure of Mitsui Chemicals Inc. It is not warranted that our customers' lenses have the same result as in this brochure. (1) Safety data of the powder of MRTM resins occurred during grinding Mitsui Chemicals has taken the following safety data of the powder of ground MRTM resins. • Ames test MR-7TM MR-8TM MR-10TM MR-174TH resin resin resin resin Negative Negative Negative Negative Mitsui Chemicals also has the following results on MR-174TH resin. • MR-174TH resin •Chromosomal aberration test : Negative •Skin irritation test : no irritation property P.I.I.=0.0 •Skin sensitization test : no sensitizing property The above data were measured using MRTM resin powders without coating made by the standard procedure of Mitsui Chemicals Inc. It is not warranted that our customers' lenses have the same result in the case of different formulations, different amount or kind of additives, a different manufacturing process, or by using coated lenses. 2 Copyright©2011 Mitsui Chemicals, Inc. T116-033 (2) Flammability of MRTM resins by ISO method Mitsui Chemicals tested the flammability of MRTM resins according to ISO 146889:2003 to confirm the conformance to the clause 4-3-2 (flammability) of ISO 146889:2003. • Flammability of MRTM resins Result Judgment MR-7TM resin No combustion Pass MR-8TM resin No combustion Pass MR-10TM resin No combustion Pass MR-174TM resin No combustion Pass If you need a certificate of the conformance to ISO, please contact Mitsui Chemicals. (3) Gases emitted during edging Mitsui Chemicals has taken data on gases during edging. 10 Identification of Gas Components <Method > The gas emitted when using a wet-type edger (TOPCON, ALE-100EX) was collected and analyzed by means of GC-MS (gas chromatography-mass spectroscopy) and GC-FPD (gas chromatography-flame photometry) to identify its components. <Result> Mitsui Chemicals found the following gases were emitted during edging. Please note Mitsui Chemicals has no information on the other gases. Other gases may be emitted during edging. Resin Name of the gasses occurred MR-7 i M resin MR-8TM resin Hydrogen sulfide (H2S), Carbonyl sulfide (COS) and Ethyl TM mercaptane (C2H5SH) MR-10 resin Hydrogen sulfide, 1-Propene, Propylene sulfide, MR-174TM resin epithiopropane methyl ether, diallylsulfide, Carbonyl sulfide, Carbondisulfide,Acetic acid and Tribromomethane 3 Copyright©2011 Mitsui Chemicals, Inc. TI16-033 ©Analysis of the concentration of the gas emitted <Method > The gas was collected at a distance of 5 to 10 cm between the edging surface and the end of the detecting tubes (of Gas Tech Co.). In the case of MR-7TMresin, MR-8TH resin and MR-10TH resin, the concentrations of gases including HCN and CO in addition to the above three types (COS, H2S and C2H5SH)were determined. (Consequently, the gas concentration in this analysis is not always the same as in the working environment of lens producers.) In the case of MR-174TH resin, the concentrations of H2S, COS, CS2 and acetic acid which are measurable by the detectors, as well as of mercaptanes and SO2,were determined. <Results> • MR-7TH resin, MR-8TH resin and MR-10TH resin Detection Result(concentration ppm) limit(ppm) MR-7TH MR-8TH MR-10TM H2S 0.1 ND 0.15 0.18 COS 2 ND ND ND CS2 0.63 ND ND ND SO2 0.05 ND ND ND C2H5SH 0.1 ND ND ND HCN 0.2 ND ND ND CO ND ND ND ND; Not detected • MR-174TH resin Detection Result limit(ppm) (concentration ppm) H2S 0.1 0.2 COS 10 ND CS2 5 ND SO2 0.05 ND Acetic acid 0.5 ND Mercaptanes 0.1 ND ND; Not detected 4 Copyright©2011 Mitsui Chemicals, Inc. TI16-033 • Reference; The recommended allowable values Recommended allowable values(ppm) CAS NO. Japan Industrial ACGIH2O09 or 2010 Health Society - 2010 TWA STEL H2S 7783-06-4 5 1 5 COS 463-58-1 — — — CS2 75-15-0 10 1 — SO2 7446-09-5 Under study — 0.25 C2H5SH 75-08-1 — 0.5 — HCN 74-90-8 5 — Ceiling 4.7 CO 630-08-0 50 25 — Acetic acid 64-19-7 10 10 15 Methylmercaptane 74-93-1 — 0.5 — : Not allocated ACGIH :American Conference of Governmental Industrial Hygienists TWA(TLVs-TWA) : It is the time-weighted average concentration for a conventional 8-hour workday and a 40-hourworkweek, to which it is believed that nearly all workers may be repeatedly exposed, day after day, without adverse effect. STEL(TLVs-STEL) : It is the concentration to which it is believed that workers can be exposed continuously for 15-minutes not more than four times per day. TLVs-Ceiling shows the concentration that should not be exceeded during any part of the working exposure. As a result of analyzing the gas emitted during the edging of lenses, a trace amount of gas was detected. However, although the concentration of the gas emitted during edging is below the allowable concentration, it is necessary to take proper exposure prevention measures (adequate ventilation and wearing of protective devices, among others) to remove odor and ensure the working environment is satisfactory because the work conditions depend upon various factors e.g. kind of edger, shape and number of lenses, frequency of operation and ventilation conditions of the operation room. 5 Copyright©2011 Mitsui Chemicals, Inc. TI16-033 *The information contained herein is based on information, data, etc. available at the time of preparation thereof. No warranty, express or implied, is given for the data and evaluation results contained herein. *The contents contained herein may be changed without notice for the purpose of improvement and other purposes. *The information contained herein is valid as of June 2011. *The precautions described herein are based on the assumption that the materials will be handled in a normal manner. Therefore, if you handle the products in any special manner, you should take safety measures suitable for application or use. Contact: For further information, please contact the following: Vision Care Materials Department Health Care Materials Division Mitsui Chemicals, Inc. Shiodome City Center 1-5-2 Higashi-Shimbashi, Minato-ku, Tokyo, 105-7117, Japan TEL: +81-3-6253-3852 FAX: +81-3-6253-4235 http://www.mitsui-chem.co.jp http://www.mitsuichem.com/special/mr/index.htm 6 Copyright©2011 Mitsui Chemicals, Inc. TI16-033 g g o r o 4. v Z c rn t r c n Q� li I. 1 u g Z i s o- 0• ' v $ Q °° boo 0 co S'A -7 ' � S 1" A 7 G p` trV ` N Z A rl N O P vi y .r,c ij ', �n Z+� N r t b 1 ayO -4M.-. r A 4 h br �r2A� ni $ a $ mrMnIT_,Y a t II y Q N no c...1.) I�1 yy rr 7p ii -I-i 1 Ed 0--1 m V- A a xi id e `, y n A N N =2 n A� _ T m_ h 1111 CO o2N I NI m N N - . prim • N R-N i L ttl �l A Zi D �mm -..] S.. . m c,5-c El 41 '-'� � met' 70 < Nam IV D A Nri 1 tz *in • mac F -Am a° � P t') n . -6 4' P CO CO tt, •C N O I O O '1 - 6c _ !iii Y ig y y t g t':t%'it'' 5 t.rI t g y 5 t 7 r 7 r N N 4 C�y 1 -i;1 c_. _L— eiollisr i'AM 0 ! ________z; 4 K I p /3 e g f6l N x i SN }' i! I I!'k911 II asc F3 ie Iii i5;11 � a Q i • ar'° iii i- !iii 14i1111 0 i Pm . r. 1 4. n 77 ro/ 1., . .7,\„ i \.. 1,\,, / rl . 1! i N ' • 11 . .,, g ip .< 1 1 -1 , ..,, t., ,,„,,,. „, . .. .4. NfJOIA to • . c,, ,c O� d h a na . a • P LJ t1 `N n • epm A W tl0 `'C • d N II m T I O C 0 Exhaust Fan Wiring JOB 2561200 - Jins - Westfield arcadla DRAWING NUMBER EXH2561200-1 SHIP DATE 3/16/2016 MODEL NCABFA Installed Options 1 ��(( e o-H � � BK MT-01 GR L J S«1 Corioonent Identification 3 GR ---� Label Descrlotlorl Location 141-01 Fan Motor 720 4 SW-01 Rah disconnect switch 721 5 6 7 8 9 10 11 12 13 14 15 MOTOR [NFO 16 EXHAUST 0.333HP-115V-1P-7.0FLA 17 18 MO /Gi cRRMpv..8Il EI2MATION MO TORR/CTRL MP. 15A 19 20 • ---- DENOTES FIELD WIRING 21 DENOTES INTERNAL WIRING WIRE COLOR 22 BK - BLACK YW -YELLOW BL -BLUE GR - GREEN BR -BROWN GY - GRAY OR - ORANGE PR - PURPLE 23 RD - RED PK - PINK \ WH - WHITE ISLE 505.2 Nate: lett• urdrdiiiii,al dadttrrvrrata t' 1 uldirr9; .,t�araalua:l MMVEYING VELOCITIES at'tpritrrna.'nP.see Chapter-12. (iadif'rar-niea lftarl�draa,p�C (lilt FEET ROoucTB tYUMttJTE NU 506.0 Product-Conveying i)ucts. Any 506.1 Materials. Materials used in prtlduct-et+n eyui duct lint,and w systems shall be suitable for the intended use and shall e■rf 2000 ' metal. i Exceptions: +ta�tq �� f p .: (I i Asbestos-cement,concrete.cta) or ceramic materials shall bepermined to be used where it Is shown that these mate- - r ere ec�,t9� . p dais will be equivalent to metal ducts installed in :aeeur- , �a dance with this chapter. (2) Ducts serving a Class 5 system shall he ii r nittcd to he z k # , constructed of approved nonmetallic material ►%here the fit corrosive characteristics of the material helms corn e�cd �� # a y make a metal system unsuitable and ,A here the mixture being come); is nonflammable. proved nonmetallic material shall h either a listed 5 "4 pmt lasing a flame-spread index not exceeding�' and smoke-devclnpcd rating of 50 or le s on lu+th inside and without evidence of continued pritgrl'sso e or shall have a flame-spread index not 223 and shall be installed with an autotnatt pieu grit n system inside the duct. ° n I vacuum cleaning systems w idtin a Audi be constructed of materials in accor- '„ otandards r'efer'enced in Chapter ot boc- ling or roof-ceiling with the building code. its extending from i � + and dwelling unit to to be used. Tlylicsns Conveying ,yillor in Class 2,3, rf. shall net be conveyed q (it t. v •7.- ¢yam ,l}I v�«qF [an✓' �,9ji'tensu f .•y r rpyr� rjr ,e �'p� ' 'y}z�'' r ( r Ill) N�'ICew*+fr+V Yiv kv); "�F A t "t y �° `.r?" 4 x L1 t.. At.CODE REGISTERED SPECIAL/DEPUTY INSPECTION TRILLIUM ENTERPRISE 11331 E 183 St, #120,Cerritos,CA 90703 DAILYREPORT Tel:562 708 7758 Email:rafatrl(JaoLcom Building Department ,,- '',4 a A Date 0 7/3 071 2,=$ Permit No. 13 a cf."- oS Z — 3 7o Project Name .TINS £ye 4a LASS Project No. Project Address '/od .f 44t Ai AV's ` A.ecAD!_*4, ('A F/.J'7 (-C/N'7- Owner's Name Ae.Si f i zD , ,fA.t/T, /J!;�4- Phone No. Owner's Address 4'Oi) S S A L/J y d/A/ A 0/5 / A,ec4019/ CA (it c,Q3-- General ContractorStrt,1{ i s d e c i1.il',e4 o:,A. -T-(F,A 1 id Phone 310 768 Z Tao General Contractor's Address 87 q AI( / I.c.) , t f. , irt,o Fax Site Contact t1ie i/s/47 P,Q,c,,j c;, CT- H‘j2 Beeper/Cell -310 35T 58 C Structural Engineer/Architectural Engineer Phone Structural Engineer/ Architectural Engineer Firm Address kPFf Fax 4/6 77e 7.6'11 Name in Seal 7-1/4-401H7 47.11 E7S M,,¢T� F&j1Jr,.,) Contact 9 L (p 772 76_LA? Type of Inspection: J Reinforced Concrete Gunite/Shotcrete ❑Prestress O Framing NOT C Reber O Hi-Tension Bolts C Anchors O Structural Masonry 7 Welding . Other cer/I id/2P To the Building Official: Building Inspector: I hereby,certify that work at the above address which required Special/Deputy Inspection was inspected by me and complies with applicable provisions of the Building Codes and approved drawings. y V is 2r P 160 r N1.JG el F Ta+f e4r- f 7b i .SPCC 2) MI y P tl►c 1/54- '¢. i S.37-2A/5 /1,av P t3 cr..4/`i AAt0 I z -�C dam fa 0 - ! ' S' /7E/760 ( re o c�c� p.,2:'.u'c. >O /f/e cATE "1"; '. T 2 &J AC, ,4, H ee4- 2 v tz 414 i f .1-1 GL 3/► t • r Ata, ..dr ! . r . - 711(Ck,Veif ('f}c '' 3 n - ,r4 i (N, 2 ki-41 51''4 Y k"l/yam (LJ/2) Fj 6.-A Pik/ 214c-4.uD/ti/c, cm i5 7I2 e-ad'.2,J c44L41) VCJQC..� lJ t~.. 6-44 v/zzie7 Atli!i.AP 4e- CaL< i(Fif C (45ci7 f�a— 2 N/g.i, 3,/y,. r RAFAT REED (562)708-7758 ,+ Deputy Inspector(Print) !"AF/ �L��`�� License: .51584318 Type: a-C.C Deputy Inspector(Sign) Date 07 1...5 /2._,/ - Hours: Sat. Sun. Mon. Tues. Wed. 8 Thurs. 8 Fri. Client Representative/ Verified by(Print 8 Sign) V 1-y1-� <(r/f/�— REGISTERED SPECIAUDEPUTY INSPECTION TRILLIUM ENTERPRISE 11331 E 183 St, #120,Cerritos,CA 90703 DAILY REPORT Tel:562 708 7758 Email:rafatrl@aol.com Building Department C/17 o/ A CAL)//9 Date ,p V Permit No. O -- )s Z. _ 27-n Project Name ,.T/ S L yC CI L4'SS Project No. Project Address 4 0.0 `S` Ji.AL L)1.4//1/4,/ A✓G/ ,/11/ C4 C) /4 CA 9 t o o - (viv/; F) Owner's Name /i/CS% F/ 1,/) J'AA/7)4 A of t i/k- Phone No. Owner's Address "-fag> .S A4,,/)taiiAi AV6, /1,4 M nIA� CAr '\104)-4— General Contractor .SATs-)H 6/2,0 i 7+CM 1 G4 4 f a,U,tbPne 31 c) 7(�g z-7 v� General Contractor's Address i371 tq[ /9© - S}- 0.°/i o Fax Site Contact Beeper/Cell 95/ 2 0 3 C/7 9 Structural Engineer/Architectural Engineer Phone Structural Engineer/ Architectural Engineer Firm Address k P F' Fax q / (0 77Z 7 6 `1 9 Name in Seal T//'4 0 %H y cJ i9 H S "I A rH[r r.)s7 ) Contact 9/6 7 7 Z 7 6 8 8 Type of Inspection: 0 Reinforced Concrete ❑Gunite/Shotcrete 0 Prestress ❑Framing ❑NDT Rebar 0 Hi-Tension Bolts 0 Anchors O Structural Masonry Welding ❑Other To the Building Official: Building Inspector: I hereby, certify that work at the above address which required Special/Deputy Inspection was inspected by me and complies with applicable provisions of the Building Codes and approved drawings. - k/nd) M�4ACo An0'i 0>Jlo 1Nt Z p©o 03/ 06 / Z o/ 9) — pi//W G Cal ,20/3 Cc= — - ,A ws A 5- Z 0 C 7/ _ . 07'8 /=CA IV .rAisPe i eo ,A g S k - / S Ie - ff Z (/ ,/F'c:.O ,4/L----e //✓s i°.�c 2U/@G sP(=c. (`rhos Sc/BM':Tea 67 �i,/Qc:Si IZ)NE FA/3gieA ;-o, S 2' - y liy Ficki JINS EYEGLASS BHM '"°°`"° 1508 E ,S SK-1R 0:9161ureka Rd 7727688661 uite 290 Cpffil ARCADIA, CA 6/21/16 F:916.772.7699 „p mod www.kpff.com diant MBH by R . et 1600-135 —1 rMMMAP'/IIKIAIPrAIAITAMMMMMAIIP'/W/IFIIMMMIIIMIM//WMIP%PMIKVIrAIMI. p 0 Iilk 1;--- - 1 4, ii 1 - NU SK-2- 1 1 L. LL 1 x x d- v 2T 2T �� /1 W W w w _ . gyp Q�PME 40 to 0 W2 No. 0 _om o-r E�ip.12-31-2017 t INN_ UNISTRUT P5001 @ 24"OC OF CAIN MAX PER SK-2,TYP i 0 / O 0 iPmw.�ArJ (E) W 16x I LL I LL j x X 3625162-33 @ 12"OC \ TT PER SK-3,TYP W 111111kg\; 1 EMI. SK-3- (E) W16x 1 FRAMING PLAN SK-1 (NTS) project JINS EYEGLASS by BHM Meet no. 1508 Eureka Rd,Suite 290 SK-2R (I:if Rosevme,CA95661 l000Non ARCADIA, CA eats 6/21/16 0:916.772.7688 F:916.772.7699 Job no. www.kpff.com client MBH 1600-135 CANTILEVER 4 BACKSPAN VIF } , (E)METAL �; DECK,VIF - - (E)Wx PER PLAN,TYP UNISTRUT P5001 PER PLAN W/ 1 / .1,6;r1, P2786 BEAM CLAMP EA END OF 71 EA Wx,TYP EA UNISTRUT UNISTRUT P1000 { PER 1/SK-4 , P1000 KICKER @ 4'-0"OC MAX W/ P1546 W/1/2"QIMACHINE BOLT W/ , STD NUT&WASHER EA END,TYP P1000 LONGITUDINAL BRACE @ 1:1 W/1/2"0 MACHINE BOLT STD NUT&WASHER TO EA VERTICAL UNISTRUT,TYP FULL LENGTH OF STOREFRONT ® METAL STUD 4 1 FRAMING BY OTHERS �� UNISTRUT P1000 CONTINUOUS a .. ,9,,OfESS/04, u o S5770 IS z Z • d Exp.12-31- * * �. 43 srq OF CO��\� u • 1 STOREFRONT SECTION SK-, (NTS) lçpff JINS EYEGLASS BHM "'°°� lat 1508 Eureka Ra,Suite 290 ARCADIA, CA 6/21/16 SK-3 Roseville,CA 95661 location dab 0:916.772.7688 F:916.772.7699 Job no. www.____om client M B H 1600-135 /_(E)Wx TYP • (E)METAL DECK •I•I .• I I (E)362S162-33 I I I I @ 12"OC MAX, 11 11 VIF I I I I I I I I I (N)362S162-97 @ 12"OC W/(3) NOTE: I I I I #10 SMS EA CONTACT,TYP. CLIP FLANGES AS REQ'D. BOTH STUDS ARE TO ,_L _ _ _ _ ,_� BE SHEATHED W/ 1/2" — — — — m n GYP BOARD EA FACE I I W/#10 SMS 4" OC (N)362 3 I I I I TRACK PER MFR @12"OC,TYP� II II EDGE, 12" OC FIELD _______..,\ I I I I I I I I I I I I I I I I I I 7:-.6-FESS/04, � '- 1•S+�4 (1.Q Q'. I I I I I I I I I I I I I I I I I I I I I • 7(E)SLAB o X0 N z m ui Y A Ep.12-31 17 * I 11 IS> ° WOW-cil* TYP `i l_ -OF CO J 1 POCKET FRAMING SK-3 0 METAL STUDS (NTS) PER 1/- SUP TRACK SCHEDULE TRACK TO MATCH WALL HOGHT GAGE /2 MAK (2)110 SUS w/SID WASHERS AG w SI STUD GAGE&WIDTH 0 TO 9'-6' 18 TTP W/#10 SMS EA LEG 9'-s'TO 16'-0' 16 aw�w�'.w,�wr EA CONTACT,TYP 6'-0'TO 25'-0' 14 SLOTTED TRACK W/21/, °� NOTE, FLWGES 8/GAGE SEE NOTE PROVIDE 1404 SLOTTED TRACK 0 THICKNESS PER SCHEDULE 'SYM'CONDITION WALL STUD PER BECKON W/(2) #10 SMS TO TRACK (E)SL.AB� DECK PERP TO WALL (2)#10 SMS W/STD '/s MA, WASHERS 0 18'OC \� TYP `ll'L 1 +- 160A CONT R 8/(2)110 SMS 0 16'DC INTO EA LOW FLUTE g • 1r% SLOTTED TRACK 8/2Y2" WALL STUD PER FLANGES W/GAGE PLAN W/(2)#10 NOTE THICKNESS PER SCHEDULE SMS TO TRACK USE HILT1 X-U z 3/4"SHOT PIN 0 DECK PARALLEL TO VAALL 24"OC WHERE WALL HEIGHT 16'-0". USE HILT X-U x 3/4"SHOT PIN 0 CD 16"OC WHERE WALL HEIGHT> 16'-0°. TOP CONNECTION 2 BOTTOM CONNECTION (NTS) SK-3 (NTS) project JINS EYEGLASS by BHM sheet tiff RosevllleeCA 95661ite 290 location ARCADIA, CA ice 6/9/16 SK-4 Nat 0:916.772.7688 F:916.772.7699 �• www.kpff.com client MBH 1600-135 UNISTRUT P1000,TYP EA SIDE UNISTRUT UNISTRUT P5001 P1320,TYP PER PLAN TOP&BOTT ill 1/2"0MACHINE ill BOLT W/STD NUT &WASHER,TYP 1 STOREFRONT — UPPER CONNECTION SK-4 (NTS) glirr..43..!1/4 g..MES,if.; aN°' 70 (n z O m UNISTRUT * 4.12.31.2017 =.. P1000,TYP 44,RVCTUtZP a\Q.* OF CALIF UNISTRUT P1000 UNISTRUT P1026 W/1/2"0 PER SK-2 MACHINE BOLT W/CHANNEL III NUT&WASHER EA LEG,TYP IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PARTITION TRACK PER MFR 2 STOREFRONT — LOWER CONNECTION SK-4 (NTS) • project JINS EYEGLASS by BHM sheet no. 11(14:1ff 1508 Eureka Rd,Suite 290 S K-6 Roseville,CA 95661 location ARCADIA, CA • 6/21/16 0:916.772.7688 8:916.772.7699 �. www.kpff.com dle MBH 1600-135 REF. Pil# STEEL o o v VERIFICATION AND 32 REFERENCED INSPECTION o o STANDARD c (T) v) 1. MATERIAL VERIFICATION OF WELD FILLER ////�/ • ESS/0 MATERIALS: i C) �PM ES MqT a. IDENTIFICATION MARKINGS TO CONFORM TO AISC 360 AWS SPECIFICATIONS IN THE APPROVED A3.5 - + 2 CONSTRUCTION DOCUMENTS. b. MANUFACTURER'S CERTIFICATE OF . 5710 C m COMPLIANCE REQUIRED. - W Y 2 .V 2. INSPECTION OF WELDING: 11SECTION 12-31- 7 * a. STRUCTURAL STEEL AND COLD-FORMED / * /�lgsrRUCTV�p,�,.'p��Q. STEEL DECK: ��F CA��F 1) SINGLE-PASS FILLET WELDS <= 5/16". - X"' AWS D1.1 Wx PER SK-1 IZ- I-12 1/4\ < TYP L3x3x1/4x0'-4"TO ALIGN W/ UNISTRUT BELOW W/1/2"0 A MACHINE BOLT W/STD NUT& 2-12 �i/4 PLATE WASHER TO UNISTRUT,TYP V1/4 - HSS 4x4x1/4 CONT UNISTRUT P5001 PER SK-1,TYP 1 UNISTRUT FURRING SK-6 (NTS) • ANNEX N AWS D1.1/D1.1M:2010 WELDING PROCEDURE SPECIFICATION(WPS) Yes❑ PREQUALIFIED x QUALIFIED BY TESTING or PROCEDURE QUALIFICATION RECORDS(PQR) Yes❑ Identification# CN112 Revision Date By Company Name FIRESTONE FABRICATORS Authorized by EVA GUZMAN Date 7/12/16 Welding Process(es) FCAW _ Type—Manual Li Semiautomatic Supporting PQR No.(s) Mechanized❑ Automatic❑ JOINT DESIGN USED POSITION Type: Position of Groove: Fillet: ALL Single❑■ Double Weld❑ Vertical Progression: Up El Down❑ Backing: Yes❑ No Backing Material: NA ELECTRICAL CHARACTERISTICS Root Opening NA Root Face Dimension Groove Angle: NA Radius(J–U) Transfer Mode(GMAW) Short-Circuiting❑ Back Gouging: Yes❑ No❑ Method Globular(*I Spray[1 Current:AC❑ DCEP© DCEN❑ Pulsed El BASE METALS Power Source:CC❑ CV❑ Material Spec. A36,Asst,A572,A500 Other Type or Grade GR 36 Tungsten Electrode(GTAW) Thickness: Groove Fillet 1 1/2"to 2 1/2" Size: Diameter(Pipe) Type: FILLER METALS TECHNIQUE AWS Specification A520 Stringer or Weave Bead: STRINGER AWS Classification NR 232 Multi-pass or Single Pass(per side)Single/multiple Number of Electrodes E71-TA Lincoln Electric Innershield NR232 Electrode Spacing Longitudinal SHIELDING Lateral NA Flux INNERSHIELD Gas NA Angle NA Composition NA Contact Tube to Work Distance 1r2-to 1" Electrode-Flux(Class) Flow Rate NA Peening NA V_ Gas Cup Size NA Interpass Cleaning: WIRE BRUSH PREHEAT POSTWELD HEAT TREATMENT Preheat Temp.,Min. See note Temp. Interpass Temp.,Min. Max. 325 Time WELDING PROCEDURE Pass or Filler Metals Current Weld Type& Amps or Wire Travel Layer(s) Process Class Diam. Polarity Feed Speed Volts Speed Joint Details ALL FCAW E71-T 5/64 DC(-) 145 to 385 16 TO VARIE 3/16"-3/8" FILLET ° 28 +/- SUP WELD Reviewed,no notes _Revise and resubmit 10% TO XReviewed w/comments _Submit specific item 6 91PM Note thickness: (1) 1/8"-3/4"=-32F +1-10 roN 11A"_1 1/) _Rn1 This document has been reviewed for general conformance CONTRACTOR IS TO HAVE with the design concept and the Construction Documents. SPECIAL INSPECTOR ON SITE Corrections or comments made do not relieve the contractor PER SK-6. from compliance with the plans and specifications. The -250F contractor is responsible for confirming and correlating dimensions, means and methods of construction, and coordination of the work with that of other trades. KPFF Consulting Engineers Date:07/12/2016 By:BHM . ~ FLUX-CORED SELF-SHIELDED(FCAW-S)WIRE 2 „,i, 1 , - rs .. .r- 7 g ,!,„ - ' if :). ,-;:-.-- 0 , , -.-.2ioto$41,..,,i,i, ,,--0, -4-teeli.All Positkg-1 AWS ETITr8 . - -.71;:zr,--- --' -_-_. .. .'�� ���r�/�� ��///�ax�x/^ce� ------`------ -'----- -----` High deposition rat s for out-of-position AVV8A5.20/A5.2OPN' 2OO5 E71T-O-H16 welding A5.20/A5.20M: " ASME E71T-8-H10 ' Penetrating ABS: 3YSA � Fast freezing, UOyU� �8�iS1�[ 3YS h Meets waiver DNVG[8d8� III k� requirements �YH1�� BV Grade: SA3YMH CVV8/CSAVV48-08: E491T-8 H16 DB: EN758T423YN2 TUV: EN758T423YN2 N1|L'E-24403/1:° MIL-71T-8AS ,^���,: A/ip&e��m/)� FEN1A355 ---------- ---- AWS D1.8 * 3���UG��Ur�8�OO.|OC|UU�Og1hU8�8Uh��CttO ������"�m�x/w^wuw°.^~w=^�u"^o=,"�=,`.* seismic requirement General plate fabrication ' Hull plate and stiffener welding on ships and barges . Machinery parts,tanks, hoppers, racks and ' ���^u' �o�� �/��_ _ __ _ _ scaffolding All ^. THE LINCOLN FLFCTRIC COMPANY . . .., _ '.i.; Diameter 13.5 lb(6.1 kg)Coil 13.5 lb(6.1 kg)Coil 25 lb(11.3 kg) In (mm) 54 lb(24.5 kg)Master Carton 54 lb(24.5 kg)Hermetically Seated Pail Steel spoor . .. f.:.068 (1 7) ED012518 , ED030643 ;.:7'..! ,,1 8) 80012522 80030232 80030644 i 5;04 (20) EDO 12525 ED030647 111ameter 25 lb(11.3 kg)Plastic Spool 50 lb(22.7 kg)- in (mm) (Vacuum Sealed Foil Bag) Coil 068 (1 7) . 80012519 I -L72 :1 8; 80030949 80012523 (2.0i 80012576 . . _. Yield Strength m Tensile Strength Elongation Hardness Charpy V-Notch/Jftetbil.".'• MPa(ksi) MPa(ksi) % Rockwell B 0-29°C(-20°F) Requirements-A1NS E711-8 ' 400(58)min. 480-655(70-95) ! 22 min. 1 _ . 27(20)rim. ...__ . ■ typical Results'' -As-Welded 460-520(66-75) 575-615(83-89) 25-31 87-90 47-75 t35-!tir. %C %Mn %Si %S Requirements-AWE E711-8 0.30 max. ' 1 75 max 0.60 max. ; 0.03 max. ' 0.03 max. ■ Ty,pical Results:- 016-018 U.61 lc -,-`2 (1.26-0 33 ..0 Of ,-_0 01 Diameter, CTWEIP Wire Feed Speed Voltagem Approx.Current Melt Off Rate Deposition Rate' 'OrtelieY.:1 Polarity -,mm in . m/min (in/min) (volts) (amps) kg/hr (lb/hr) kg/hr (lb/hr) ( ) 2.8 (110) 18-19 ` 195 ' 2.3 (5,0) 1 1.8 (3.9) ' 78 I . 1 3.3 (130) 19-21 925 2.8 (6.2) 2.0 (4.6) 0.068 in(1.7 mm), 19-32 3.8 (150) 19-21 250 3.2 (7.)) 24 (58) -; 1 t DC- (3/4-1 1/4) 4.3 t170) 20-22 270 3 5 (7.8) 2.8 (6.1) 5.0 ((95) 23-24 100 4 3 (94) Li 2 (/0, 6i 320(1) 23-2,1 350 5-1 1 1.8) 45 95) 7 4 t3201 25-2; .100 6.9 ((5.2) 5 2 ;I 2.0 (85) 16 (8 130 1.8 14.0) 1 5 (3 3) 35 (140) 18-2 t 225 3.) (6.8) 2.5 15.51 0.072 in (1.8 mm), 19-32 3.9 (155) 19-22 240 3 3 (7.2) 2.7 (6.0f De (3:4-f 1,4) -1 3 (170) 20-23 235 A 11 (8.0) 2.0 t8 2.4 (750) ?"..'.'4-1 315 5 3 ((1 7) 43 (9 0) ' 7 4 ‘20) 3 3-2i7. 350 G 2 (13 6) 5 i..1 (11 01 f.5 (60) 16i7 145 1 7 (3.7) 1.2 (77 5/64 in(2.0 111111), (9-32 7 9 ;115) 19-25 260 3 2 (7.0) 2.5 (5.5) -.--._ DC- (3/4-1 1/4) 3.0 ((20) 19-20 270 3 3 (7 3) 2.6 (5 7) 33 (130, 70-21 285 3.5 (/8) 2.5 (6.2f 4.6 (180 '2:)-2.3 JO 5.0 (10.9) 3.9 (87, -. [,„ ;[,..1,-,H' 1-.' . --, (tie Lincoln Electric Company _lie L s:.Clair Avenue CERTIFICATE OF CONFORMANCE nn,, ilcvdand,Ohio J4117-I 199 (APPLIES ONLY TO U.S.PRODUCt'S) LINCOLN ' 1 o :; 'rodud• fnnerdnield•NM-232 THE WELDING EXPERTS' Classification: 6717-84116 E71T8-A2-CSS-H16 (1 Year) Specification: AWS A5,20:2005,ASME SPA5.28 AWS A5.38:2012,ASME SFA5.36 Date April 29,2015 This is to certify that the product named above and supplied on the referenced order number is of the same classification, manufacturing process, and material requirements as the mater.: which was used for the test that was mtduuded on the date shown, the results of which am shown below. All tests required by the specifications shown for classification were .'iat time end the material tested met all requirements. It was manufactured and supplied according to the Quality System Program of the Lincoln Electric Co which meets the requirements of IS09001, NCA3800, AWS A5.01, and other performed ASME.ABS,and VdTUV. spedfic2ition and Military requirements, as applicable. The Quality Company, n Ohio. U.S.a uatity System Program has been approves G Operating Settings E717-8-F118 - '_--' Requirements ` RESULTS 'Electrode Size f Polarity 0.068 inch 5164 inch Voltage.V DC- DC- re Feed Speed,mrVmin('m/min) 21 20 UJ� Current,A ( 483(190) 457(180) Average Heal Input,kJ/rnm(kJ/in) 315 340 • Contact Tip to Work Distance,mm(in) 7.5(39) 1.9(49) Pass&Layers 25(7) 25(1) Preheat Temperature C{•F) (60 min.) 18/7 1318 interpass Temperature °C('F) __-_._-. (275-d9Q.._.-. 20(72) i 20(72) Postweld)ieat Tratme_nt..____ _ (275-lded 765(325) 1135(325) Mechanical properties of weld deposits - .. -.. ..-- -ASYt}Id.Ptl __.. __._. q¢we1d� Tensile Strength,MPa(ksi) -- — (70 95) Yield Strength,0.2%Offset,MPa(ksi) 620(89) 670(89-)-- Fbn lio (58 min) 480(70) gan%. % 22 min 28 � 490(71) Average Impact Energy (20 min.) L 2� Joules -29 C ft-Ibs 20°F 58(43) — 0 29 L.--� F.1 t_ _ 56 58 59(41,43.1_4_1 I S7( 2) . - - x,57 60(40 42.44) average Hardness.HRB r Not Required L 91- — 1 Chemical composition of weld deposits twelaM%I i 0.30 max. � 0.19 ___,..__`. Mn 1.75 max. 0.61 0.17 Si 0.60 max. I 0.27 0.67 S 0.03 max. 0.27. P 0.03 max. 0.003 0012 Cr 0.010 ! 0.012 0.20 max. 004 Ni 0.50 max. 0.04 Mo 0.30 0.02 0.03 Cu 0.08 max. 0.02 0.01 At 0.35 max. 0.03 1 0.00 _-__....__.—._ t.a max. - 0.05 Page 1 or 4 Cent.No.22220 • Material Safety Data Sheets(MSDS)and Certificates of Conformance are available on our website at www,lincolnelectric.com TEST RESULTS Test results for mechanical properties,deposit or electrode composition and diffusible hydrogen levels were obtained from a weld prescribed standards,and shoWil not be assumed to be the expected results In a particular peeing,but not limited to,weld procedure,t be as plate Chemist Produced and tested according to testing,or other a P ry and temperature,weldment design application fabrication methods.Users are cauvtioned to confirm b appropriate means,the suitability of any welding consumable and procedure before use in the intended application depending on many factors. by qualiflcaticr. The Lincoln Electric Company is manufacturing CUSTOM E R ASSISTANCE POLICY The and Electric exceed they is ng and selling high quality welding equipment. customers os and the best expectations.On occasion,purchasers may ri consnmrmati and cutting however,are not in a of their ability based on information provided to them by the Customere and the knowledge they me wetly y ask Lincoln Electric for information or agdwcogebe9ou�p heeir usCe of ouriienge is to meet the needs or our howevt or guarantee not i ea positi liability the Information provided or to evaluate the engineering requirements for the products.Our In to any warranty ar our or assume a any with respect such that might i or advice.Moreover,the y may have concerning adrning the application.P Yand responr Y express or Implied w particular weldment.Accordingl ntn O�i ecmpfoyees, at rim any custr products..Any ex purpose 9 apse from the information or advice includdin h information y implied waadvice does not create,expand,a� ; rposa IS specifically disclaimed. g any implied warran Lincoln Electric is a responsive manufacturer, specific �'of merchantability Of any warranty responsibility u rme of the customer.Many variables beyond the control f L use of incoln sElectrc affect the results requirements. products sold by blame In ape Is setae e within the control io of, methods rods ns the sole suits obtained in applying these types of fabrication methods and service Subject to Change-This information is accurate to the best of our knowledge at the time of printing. Please refer to www.lincolnelectric.cam for any updated information. THE LINCOLN ELECTRIC COMPANY LINCOLN 22801 St.Clair Avenue•Cleveland,OH• s Lincoln Datn Global,Inc.All Flights Reserved. 44117-1199•U.S.A. ELEG" Issue Date 01/12 Phone:+1.216.481.8100•www.ljncolneleCtric.com � T THE WELDING EXPERTS' CERTIFIED WELDER , . eamiN MARCO ANTONi0 INEZ ..O" PA MANUAL PROCE.--.--3:: A EVtA13 TOW*. (1 INIMINE■ SPECIAL INSPECTION REPORT Al crtscrepancim shall be DISCREPANCY brought to the of the it work CONFORMANCE A,o'� Contractor a for correction. If corredons are not made in a oA be nohow Sub�ely report te& and oopres requirements.S this business day folkwing the to gelding Department and and copies b Contractor. of the � n.For the duration.submit a co:ro week. 5 days This SA • Progress Report Final Report . Report No.: `f 4 4,4‘0.-11,4/ A�40t� -"— ---- Page No. of ■ r i .ck--c CZ - z-i,vs•-, D Ns iffEA,e t iM - Typepeu;io,i: /4/44.-is 5�o 708 77f • Concrete • Res t'd Gypsum Concrete • Structural g Excavation and Fills Rtir€oreed Concrete • Insulating Concrete Fdl Hi gh S lre gth o aro,.Pler s and Caissons • Prestressed Concrete - aissons Bolts in Concrete/Masonry QSp ay-APpped Fire S mo ke Control• Structural Masonry • Other Time Date Arrived Departed ,D�e�pa�rted Description> Abon and Location of Work inspected i-Q "? ") c_^ " EA'La fir • --v`- - __ •Re ma rks: ._s e. ^ _ I HEREBY DECLARE THAT 1. 1 OI?MY COMPANY G� TO THE BEST OF MY KNOWLEDGE: 2 t FOR THE WORK CO D IN THE OWNER T is REPORT. THE�CyITECT/EfvGINEER OF RECORD TO PROVIDE SPECIAL 9. COVERED THIS INSPECTION DURING NE TIME PERIOD AS STATED ABOVE, . . S REPORT IS IN CONFORMANCE TO THE APPROVED THE CODE EXCEPT AS INDICATED 0 � •SPECIFICATIONS�p App .p s Palos-Spacer Inspection Report C►Page Veraion1 N1.0-12/2000i RAFAT REED (562)708-7758 +-Inc, •. . . .s =Y• SPECIAL INSPECTION REPORT DISCREPANCY An discrepancim shall be Contractor kr=reckon. I Of irght to the argil[ attention of the tf CONFORMANCE are not made in a timely report to Bait approved and requirements.Engineer/Architect Stmt this this report shall be used as a �9�eparhnent and Ella to Budding Department as and� -Submit of record O f Owner no the business F Ardto of recall and Owner. Contractor. ceec l t� t following ng the duration.submit a wort than 5 days This is a: • • ogress Repo Final Report ,�f� ep Report No.: 4740 e7 S /34i-Dj4 /✓i//4vi 4i Ck � • Page No. of O°-- 4;4-2 T 7 -tea/Engineer R Number Oi /Yd/!f G`.4j�f -r�To� __!. S5 /� - 19� _ Type of lnspec,ion' ��� 7a� . • Concrete 77.3- Concreced Concrete �6 Gypsum Concrete • Strums Warding• • High Excavation • bolts inrCprcrea 1 N Strength Bolting • Pd and Fats • S taete/Gurtite • Structural Masonry • Spray-Applied Fire proofing • Smoke Control Caissons Time Time Date A'TlVed Departed Description-�S� )won and Location of Work Inspected• 1 .c ?A. �y 4 • f •'• _A..." - - c..Remarks; `; .� /V '.„-_,,Ka_, _w SJi Q 1�1'DECLARE THAT i I CRAW COM THAT THE FOLLOWING IS TRUE TO THE BEST OF MY KNOyy EDGE: INSPEC AW FOR THE IS'RETAINED SY THE OYMIER OR THE ARCHITECT/ENGINEER OF Z. 1 HAVE p�� REQUIRED ���THIS REPORT. RECORD TO PROVIDE SPECIAL 3 T SECTION DURING THE TIME PERIOD AS STATED ABOVE_ 1MORtK COVERED IN THIS REPORT IS IN CONFORMANCE TO THE vWRKMANS �.- --, /� 5 OF THE Cope.E7CCEPT AS INDICATED APPROVED PLANS,SPECIFICATIONS � Tin OTHERVNSE AND AaLE � =� c� "l s" am' ,Y7/2,-(..) (6 t" Date s*Pftp.doc'Spx�Inspection Report tZ Page Version)(1/1.11$-'1212000) RAFAT REED (562)7084751M