Loading...
HomeMy WebLinkAboutItem 2e - Accept Work for Longden Forebay Roof Replacement Project Accept Longden Forebay Roof Replacement Project May 16, 2017 Page 2 of 2 DATE: May 16, 2017 TO: Honorable Mayor and City Council FROM: Tom Tait, Public Works Services Director By: Eddie Chan, P.E., Principal Civil Engineer SUBJECT: ACCEPT ALL WORK PERFORMED BY VINCOR CONSTRUCTION, INC. FOR THE LONGDEN FOREBAY ROOF REPLACEMENT PROJECT AS COMPLETE Recommendation: Approve SUMMARY On December 6, 2016, the City Council approved a contract with Vincor Construction, Inc. in the amount of $37,578.64 for the Longden Forebay Roof Replacement Project. The terms and conditions of this project have been complied with and the work has been performed to the satisfaction of the Project Manager for a total project cost of $37,578.64. It is recommended that the City Council accept all work performed by Vincor Construction, Inc. for the Longden Forebay Roof Replacement Project as complete, and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $1,878.93. DISCUSSION The Longden water facility includes a 60-foot diameter concrete reservoir with a wood roof. The existing wooden roof cover was installed in 1960, and over the years has been patched several times. A recent inspection of the facility’s roof identified increased areas of deterioration. As a result, a project to replace the roof was included and adopted in the Fiscal Year 2016-17 Capital Improvement Program. On December 6, 2016, the City Council approved a contract with Vincor Construction, Inc. in the amount of $37,578.64 for the Longden Forebay Roof Replacement Project. The work performed included the removal of the existing built-up roofing material, spot repair of the deteriorated roof structure, and installation of a new wood roof with 4-ply sheet felt material and gravel built-up roofing system. Accept Longden Forebay Roof Replacement Project May 16, 2017 Page 2 of 2 The terms and conditions of this contract have been complied with and the work has been performed to the satisfaction of the Project Manager. Vincor Construction, Inc. has completed the work as defined by the City’s specifications in an efficient and timely manner. FISCAL IMPACT The cost of the project is $37,578.64, and funds in the amount of $54,300 have been budgeted in the Fiscal Year 2016-17 Capital Improvement Program for the Longden Forebay Roof Replacement Project. RECOMMENDATION It is recommended that the City Council accept all work performed by Vincor Construction, Inc. for the Longden Forebay Roof Replacement Project as complete, and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $1,878.93.