HomeMy WebLinkAboutItem 2f - Miscellaneous Sewer Main Repair Project Complete Accept the Miscellaneous Sewer Main Repair Project July 18, 2017 Page 1 of 2 DATE: July 18, 2017 TO: Honorable Mayor and City Council FROM: Tom Tait, Public Works Services Director By: Eddie Chan, P.E., Principal Civil Engineer SUBJECT: ACCEPT ALL WORK PERFORMED BY VASILJ, INC. FOR THE MISCELLANEOUS SEWER MAIN REPAIR PROJECT AS COMPLETE Recommendation: Approve SUMMARY On March 21, 2017, the City Council approved a contract with Vasilj, Inc. in the amount of $44,650 for the Miscellaneous Sewer Main Repair Project. The terms and conditions of this project have been complied with and the work has been performed to the satisfaction of the Project Manager for a total project cost of $35,150. This amount reflects the original contract amount of $44,650 minus quantity changes totaling $9,500, or 21.28% less than the original contract amount. It is recommended that the City Council accept all work performed by Vasilj, Inc. for the Miscellaneous Sewer Main Repair Project as complete, and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $1,757.50. BACKGROUND In 2006, the State Water Resources Control Board (“SWRCB”) adopted the Waste Discharge Requirement Program for all public owned sanitary sewer collection systems in California with more than one mile of sewer pipeline. Under this program, the City is required to prepare and implement a Sewer System Management Plan (“SSMP”). The SSMP identifies routine and preventative operation and maintenance activities and preventative maintenance actions such as regular visual and CCTV inspections of manholes and sewer pipes. Results of these inspections are used to prioritize and prepare projects to repair damaged sewer pipe segments. Accept the Miscellaneous Sewer Main Repair Project July 18, 2017 Page 2 of 2 DISCUSSION On March 21, 2017, the City Council approved a contract with Vasilj, Inc. for the Miscellaneous Sewer Main Repair Project. The work performed included repairing the sewer main on Arcadia Avenue. In addition, four damaged manholes (one on Foothill Boulevard, one on Highland Oaks Drive, one on Huntington Drive, and one at Santa Anita Avenue) were repaired. During the course of the work, it was discovered that one section of the damaged sewer pipe on Arcadia Avenue was longer than what was identified in the contract specifications. The Contractor submitted a change order request for the additional work. The quote submitted by the contractor was beyond a reasonable cost. Staff evaluated the section that was not in the contract specifications and found that the pipe is cracked but still serviceable, and did not require immediate repair. The section of sewer pipe requiring additional work was removed from the contract and a credit of $9,500 was applied. This work will be included in a future miscellaneous sewer main repair project. The terms and conditions of this contract have been complied with and the work has been performed to the satisfaction of the Project Manager. Vasilj, Inc. completed the work as defined by the City’s specifications in an efficient and timely manner. FISCAL IMPACT Funds in the amount of $70,000 were budgeted in the Fiscal Year 2016-17 Capital Improvement Program for the Miscellaneous Sewer Main Repair Project. The total cost for this project is $35,150, which includes the original contract amount of $44,650 minus quantity changes totaling $9,500, or 21.28% less than the original contract amount. The remaining funds will go back to the Sewer Fund balance. RECOMMENDATION It is recommended that the City Council accept all work performed by Vasilj, Inc. for the Miscellaneous Sewer Main Repair Project as complete, and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $1,757.50.