DATE: November 21, 2017 TO: Honorable Mayor and City Council
FROM: Tom Tait, Public Works Services Director
By: Jacquelyn Mercado, Management Analyst
SUBJECT: SETTING CITY WATER AND SEWER RATES FOR CALENDAR YEAR
2018
RESOLUTION NO. 7187 SETTING CITY WATER RATES AND FINDING
THE RATES WILL NOT EXCEED THE ESTIMATED AMOUNT NECESSARY TO FUND THE OPERATION OF THE CITY WATER
SYSTEM FOR CALENDAR YEAR 2018
Recommendation: Adopt
RESOLUTION NO. 7188 SETTING CITY SEWER RATES AND FINDING THE RATES WILL NOT EXCEED THE ESTIMATED AMOUNT
NECESSARY TO FUND THE OPERATION OF THE CITY SEWER
SYSTEM FOR CALENDAR YEAR 2018
Recommendation: Adopt
SUMMARY
On January 19, 2016, the City Council adopted a tiered water rate structure and
approved a five-year water and sewer rate adjustment schedule for calendar years 2016
through 2020. The Public Works Services Department (“PWSD”) has reviewed water and sewer operating budgets, revenues, expenditures, and reserve fund balances, and
determined that it is necessary to adjust water and sewer rates for calendar year 2018
to recover increasing water and sewer system operations and maintenance costs, and
to continue to replace aging infrastructure. In addition, the PWSD has determined that a
3% sewer rate adjustment, instead of the approved maximum of 6%, will be appropriate for calendar year 2018. The water and sewer rate adjustments will ensure revenue
stability and encourage water use efficiency. The City of Arcadia’s water and sewer
rates are among the lowest in the area and will remain so, even with the proposed rate
adjustments.
It is recommended that the City Council adopt Resolution Nos. 7187 and 7188
authorizing the proposed rate adjustments for calendar year 2018.
Resolutions adopting City Water and Sewer Rates November 21, 2017
Page 2 of 8
BACKGROUND
The City provides and maintains water and sewer services to more than 55,000
residents. Utility rates fund the operations, maintenance, and capital improvements of
the water and sanitary sewer systems to provide quality services to Arcadia residents and businesses. In February 2014, the City Council awarded a Professional Services Agreement to an independent rate consultant for the preparation of a Water and Sewer
Rates Cost of Service Study (“Cost Study”) that determined how best to recover
projected cost increases over a five-year period. The PWSD and the City’s consultant
gathered and analyzed data on the City’s water and sanitary sewer operations, and established an appropriate rate structure that would meet the City’s primary objectives of providing revenue stability, and encouraging water use efficiency.
At the September 15, 2015, Study Session, the City Council directed the PWSD to
proceed with the implementation of a tiered water rate structure and sewer rate adjustments based on the completed 2015 Cost Study. The seasonal tiered water rate structure for single-family customers includes variable consumption allotments based on
the customers’ water meter size. This helps to account for the usage requirements of a
large property with more irrigable land area versus a smaller property with less irrigable
land area. On October 20, 2015, the City Council directed the PWSD to follow Proposition 218 balloting procedures to establish water and sewer rates. On January 19, 2016, the City Council conducted a public hearing and, finding no majority protest,
adopted the seasonal tiered water rate structure, and approved a five-year water and
sewer rate adjustment schedule for calendar years 2016 through 2020.
DISCUSSION
Water Rates
Water rates are determined by analyzing expenditures and revenues, and forecasting the water sales for calendar year 2018. The following goals were identified in the 2015 Cost Study:
• Generate sufficient revenue to fund continued operations and maintenance of the
City’s water supply and distribution system (“Water System”).
• Provide for equipment replacement and improvements to the Water System infrastructure through capital improvements.
• Enhance conservation measures and meet state mandates.
• Maintain reserve funds to make necessary repairs in the event of a catastrophic
event. Operations and maintenance expenditures comprise the majority of the expenses within
the Water budget with the single largest line item being water supply costs. The 2015
Cost Study Financial Model was used to forecast water sales and expenditures that
include looking at the cost of current and future water supplies, including the rising cost of replacement water, and system operation costs. Based on discussions and previous
Resolutions adopting City Water and Sewer Rates November 21, 2017
Page 3 of 8
direction from the City Council, the annual rate adjustments have been designed to use reserve funds to lessen the amount of annual water rate adjustments. Accordingly, the
City Council agreed to lower the water reserve fund balance from $20 million to $12
million over the five year period. As a result, the 2015 Cost Study recommended that
the City increase revenues by 15% in calendar years 2016 and 2017, and 7% for the following three calendar years in order to fund expected operations, maintenance, and Capital Improvement Program expenditures.
Following an analysis of forecasted water use, it is recommended that the maximum
rate adjustment of a 7% increase for water rates be applied for calendar year 2018. The reason for applying the maximum rate adjustment is primarily due to the increased cost for Replacement Water and a new water supply fee assessed by the Main San Gabriel
Basin Watermaster (“Watermaster”).
Although the Governor declared the state drought to be over, local regions continue to suffer from long-term drought impacts. In the Main San Gabriel Basin (“Main Basin”), where the City pumps most of its water from, basin levels have not recovered to
minimum operating levels. In response, the Watermaster established a plan to restore
the health of the Main Basin by purchasing and importing water from the State Water
Project. The cost for this large water purchase will be passed on to local water purveyors, including the City of Arcadia, through a new Water Resource Development Assessment (“RDA”) fee. The RDA fee will be assessed based on how much water the
City pumps from the Main Basin during a year (the City’s average annual water pumped
from the Main Basin is 10,000 acre feet). In addition to regular replacement water costs,
the RDA fee will increase annually and is anticipated to cost the City over $5 million dollars through Fiscal Year 2020-21.
Fiscal Year Watermaster RDA ($/AF) Expected City Demand (AF) Total Due
2017-18 $70 10,000 $ 700,000
2018-19 $105 10,000 $ 1,050,000
2019-20 $140 10,000 $ 1,400,000
2020-21 $175 10,000 $ 1,750,000
Rate Structure
The City has implemented a four-tier rate structure for single-family residential
customers with seasonal adjustments in allotments based on meter size. The four-tier inclining block structure varies seasonally to reflect outdoor water use during winter
(November - April) and summer months (May - October). Additionally, the single-family
tiered rate structure assists in managing customer demand for water by pricing
discretionary water uses, such as landscape irrigation, at a higher rate than water used
for drinking and sanitation purposes. This is to provide a price signal to customers to use water efficiently, and offers an incentive to reduce excess water use. As water
Resolutions adopting City Water and Sewer Rates November 21, 2017
Page 4 of 8
usage increases, so does the cost per unit of additional water; this methodology has proven effective in curtailing wasteful water practices.
The proposed water rates for calendar year 2018 are as shown in the tables below, and
will not exceed the estimated amount necessary to fund the operation of the City Water System for calendar year 2018:
(a) Fixed bimonthly meter charge for all customer classes.
Proposed Meter Charge ($/Meter Size)
Meter Size (in inches) Current Rate Proposed Rate 1/1/2018
5/8” $ 20.34 $ 24.21
3/4” $ 22.17 $ 26.10
1” $ 25.82 $ 29.87
1 1/2” $ 34.97 $ 39.29
2” $ 45.94 $ 50.60
3” $ 71.55 $ 76.99
4” $ 108.13 $ 114.69
6” $ 217.87 $ 227.78
8” $ 345.90 $ 359.73
10” $ 528.80 $ 548.21
(b) Commodity charges ($/Hundred Cubic Feet (HCF)) for single-family residential
customers based on the approved four-tier inclining block rate structure, and
variable consumption allotments based on the customers’ water meter size.
Bimonthly Tier Break Points (in HCF) for Winter Months’ Water Usage (November through April)
Meter Size (in inches)
5/8” 3/4” 1” 1 1/2” 2”
Tier 1 0-22 HCF 0-22 HCF 0-22 HCF 0-22 HCF 0-22 HCF
Tier 2 23-28 HCF 23-36 HCF 23-42 HCF 23-46 HCF 23-60 HCF
Tier 3 29-34 HCF 37-46 HCF 43-58 HCF 47-62 HCF 61-86 HCF
Tier 4 35+ HCF 47+ HCF 59+ HCF 63+ HCF 87+ HCF
Bimonthly Tier Break Points (in HCF) for Summer Months’ Water Usage (May through October)
Meter Size (in inches)
5/8” 3/4” 1” 1 1/2” 2”
Tier 1 0-22 HCF 0-22 HCF 0-22 HCF 0-22 HCF 0-22 HCF
Tier 2 23-34 HCF 23-48 HCF 23-62 HCF 23-66 HCF 23-94 HCF
Tier 3 35-44 HCF 49-66 HCF 63-92 HCF 67-96 HCF 95-140 HCF
Tier 4 45+ HCF 67+ HCF 93+ HCF 97+ HCF 141+ HCF
*HCF = Hundred Cubic Feet
Resolutions adopting City Water and Sewer Rates November 21, 2017
Page 5 of 8
Proposed Single-Family Bimonthly Rates for Commodity Charges ($/HCF)
Current Rate
(All Usage)
Proposed Rate
1/1/2018
Tier 1 $1.54 $1.62
Tier 2 $1.88 $1.98
Tier 3 $2.13 $2.26
Tier 4 $2.29 $2.42
(c) Commodity charges ($/HCF) for multi-family residential customers based on the
approved two-tier rate structure with water allocations based on the number of
dwelling units in each multi-family complex.
Bimonthly Tier Allotments (Per Dwelling Unit)
Tier (HCF) x Per Dwelling Unit
Tier 1 12
Tier 2 13 +
Proposed Multi-Family Bimonthly Rates for Commodity Charges ($/HCF)
Current Rate
(All Usage)
Proposed Rate
1/1/2018
Tier 1 $1.49 $1.53
Tier 2 $1.74 $1.78
(d) Specific uniform rates for Commercial, Government, and Institutional classes.
Proposed Rates for Commodity Charges ($/HCF)
Current Rate (All Usage) Proposed Rate 1/1/2018
Commercial $1.60 $1.64
Government & Institutional $1.88 $1.93
The net change to a customer’s water bill will be affected by the customer’s ability to
use water efficiently. The percent increase will vary among customers based on usage. Arcadia’s water rates are among the lowest in the area and will remain so, even with the
proposed increases. The table below provides a comparison of Arcadia’s rates along
with other neighboring jurisdictions.
Resolutions adopting City Water and Sewer Rates November 21, 2017
Page 6 of 8
* Proposed rates for 2018
Sewer Rates
The City’s sewer system includes 138 miles of pipe and is, on average, 75 years old. The Sewer Master Plan is a comprehensive report outlining a long-range program of
capital improvements and preventative maintenance measures to upgrade and maintain
the City’s sewer system. Annual sewer rate adjustments are necessary to fund the
operations and maintenance activities of the sewer system to ensure that the City’s
sewer system is in compliance with state regulations that mandate the elimination of sewer overflows.
The proposed revenue increases would allow the City to fund ongoing operations and
achieve a 75 year replacement cycle for the City’s sewer system. The results of the
2015 Cost Study determined that the current sewer rate structure equitably recovers costs from each customer class but that the City must increase sewer revenues
annually in order to fund Capital Improvement Projects and meet projected expenditure
increases. The PWSD has determined that only a 3% sewer rate adjustment, instead of
the approved maximum of 6%, for calendar year 2018 is necessary to recover
operations and maintenance costs for the City’s sewer system.
The proposed sewer rates for calendar year 2018 are shown in the tables below, and
will not exceed the estimated amount necessary to fund the operation of the City Sewer
System for calendar year 2018:
$456.59
$330.78 $319.01 $291.34
$184.23
$138.77 $129.26
$-
$100.00
$200.00
$300.00
$400.00
$500.00
LADWP SouthPasadena*Sierra Madre Pasadena Monrovia*ArcadiaProposed
(2018)
ArcadiaCurrent
Single-Family Bimonthly Water Cost for Neighboring Cities Total Bimonthly Charge for 1 inch Meter with Summer Usage of 59 HCF
Resolutions adopting City Water and Sewer Rates November 21, 2017
Page 7 of 8
(a) Single-Family Residential and Multi-Family Residential Dwellings
Proposed Bimonthly Rate
Current Rate Proposed Rate
1/1/2018
$15.53 $16.00
(b) Commercial Properties
Proposed Bimonthly Rate
Current Rate Proposed Rate
1/1/2018
$46.40 + $0.25 Variable
Per HCF Billed Water Usage
$47.79 + $0.26 Variable
Per HCF Billed Water Usage
The proposed sewer rates are increased proportionally in each year to generate the
necessary projected level of revenues provided in the 2015 Cost Study. Arcadia’s sewer
rates are also among the lowest in the area and will remain so through the year 2020,
even with the proposed increases, as shown in the table below.
* Proposed rates for 2018
Each year, as part of the budgeting process, water and sewer operating budgets will be
reviewed and analyzed. Should it be determined that revenue projections do not require
the full percent rate adjustment, the PWSD will recommend a lesser rate adjustment. In
addition, water and sewer rate adjustments will be brought to the City Council for
adoption each year.
$32.24
$26.03 $25.92
$19.50 $18.51 $18.02 $16.00
$-
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
$35.00
Sierra Madre South
Pasadena*
Pasadena San Gabriel Arcadia
Proposed(2020)
Monrovia Arcadia
Proposed(2018)
Residential Bimonthly Sewer Cost for Neighboring Cities
Resolutions adopting City Water and Sewer Rates November 21, 2017
Page 8 of 8
ENVIRONMENTAL ANALYSIS
The proposed action does not constitute a project under the California Environmental
Quality Act (“CEQA”), and it can be seen with certainty that it will have no impact on the
environment. Thus, this matter is exempt under CEQA. FISCAL IMPACT
Water and sewer rate increases are necessary to fund ongoing operations and
maintenance budgets and the Capital Improvement Program while maintaining an adequate Reserve Fund balance in case of a natural disaster or emergency. The lack of a rate adjustment would not allow the City to recover increasing water supply costs, and
operations and maintenance costs for the City’s water and sewer system. The 2015
Water and Sewer Costs of Service Study determined that the City will need to increase
water revenues by seven percent in calendar year 2018 to fund expected operations and capital improvement expenditures. Additionally, the PWSD has determined that a 3% sewer rate adjustment, instead of the approved maximum of 6%, for calendar year
2018 is necessary to fund expected operations and maintenance costs for the City’s
sewer system.
The City’s General Fund is charged for water usage by the City at various facilities. The rate increases have been anticipated in the adopted Budget.
RECOMMENDATION
It is recommended that the City Council adopt the following Resolutions:
a. Resolution No. 7187 setting City Water Rates and finding the rates will not
exceed the estimated amount necessary to fund the operation of the City Water
System for calendar year 2018; and b. Resolution No. 7188 setting City Sewer Rates and finding the rates will not
exceed the estimated amount necessary to fund the operation of the City Sewer
System for calendar year 2018.