HomeMy WebLinkAboutFindings and Action ReportFile No.: L-044-2017
•· Arcadia Highlands Homeowner's Association
Architectural Review Board
Findings and Action Report
Date: 11/29/2017
Project Address: 1829 Alta Oaks Dr.
Applicant: Alan Brookman/Hartman Baldwin Design Group
Owner (if different) Greg and Glenda Vanni
Project Description: Converting existing attic space to 591 sq. ft. oflivable space. The only changes to the
exterior of the home are the addition of two new windows on the North side to match the existing
windows.
FINDINGS
I. SITE PLANNING -The proposed project IS consistent with the Site Planning.
II. ENTRY -The proposed project IS consistent with the Entiy Guidelines.
III. MASSING -The proposed project IS consistent with the Massing Guidelines.
N. SCALE -The proposed project IS consistent with the Scale Guidelines
V. ROOFS -The proposed project IS consistent with the Roofing Guidelines.
VI. FACADE DESIGN -The proposed project IS consistent with the Facade Design Guidelines
VII. DETAILS -The proposed project IS consistent with the Guidelines for Architectural Details
VIII. MATERIALS & COLORS -The proposed project IS consistent with the Guidelines.
IX. LANDSCAPE & HARDSCAPE -The proposed project IS consistent with the Guidelines
X. FENCES & WALLS -The proposed project IS NOT consistent with the Guidelines for Fences
and Walls
XI. ARCHITECTURAL STYLE -The proposed project IS consistent with the Guidelines
XII. ADDITIONS & ALTERATIONS -The proposed project IS consistent with the Guidelines for
Additions and Alterations.
Page 1 of 3
XIII. STREETSCAPE -The proposed project IS consistent with the Streetscape
XIV. MINIMUM FLOOR AREA & SETBACKS -The proposed project IS consistent with the
Minimum Floor Area and Setback Guidelines.
XV. GARAGES -The proposed project IS consistent with the Guidelines for Garages.
XVI. EXTERIOR BUILDING MATERIALS &APPEARANCE -N/A
XVII. AFFECT ON ADJACENT PROPERTIES & NEIGHBORHOOD -No change
The only changes to the exterior of the home are the addition of two new windows on the North
side to match the existing windows and two new skylights on the back slope and not seen from the
street.
ACTION
_X_ Approved/ _ Conditionally Approved/ Denied
These Findings and Action were made by the following ARB Members of the Association at a
meeting held on Nov. 29. 2017 at 1829 Alta Oaks Dr. Arcadia
Members In Attendance-Vote:
Suzanne Ligon-Yes
David Arvizu-Yes
Lee Kuo-Yes
Signature: 4, .. t9/,"), 1//z.<-z/n
Suzanne Ligon, ARB Chair
EXPIRATION -If for a period of one (1) year from the date of approval, any project for which plans have
been approved by the ARB, has not begun construction (as evidenced by clearing and grading
and/or/the installation of a new foundation and/or by installation of new materials on a structure that
is being remodeled) or has been unused, abandoned or discontinued, said approval shall become null
and void and of no effect. Such project may be resubmitted to the ARB for renewed approval; however,
the ARB shall review the project as if it had not been previously approved in accordance with the
current standards in effect.
APPEALS -Appeals from the ARB shall be made to the Planning Commission. ~lanning Commission
decisions on ARB cases may be appealed to the City Council. Said appeals shall be made in writing and
delivered to Planning Services within seven (7) calendar days of the ARB's decision and shall be
accompanied by an appeal fee in accordance with the applicable fee schedule adopted by resolution of
the City Council. Upon receipt of an appeal in proper form, such appeal shall be processed by Planning
Services in accordance with the same procedures applicable to appeals from the Modification Committee,
except that noticing shall be consistent with ARB noticing.
Page 2 of 3