Loading...
HomeMy WebLinkAboutUntitled 1'':4 ; i,„ a Permit NO.SOLR-18 0435 City of Arcadia, CA , Development Services Department { Y5� . ( i Permit Type:Solar 240 West Huntington Drive,Post Office Box 60021 ( i ` w r ( ' ) ¢ � I: II ice,'.L',!',work C'lassiflcation:.Residential Solar (".®a , Arcadia,CA 91066-6021 1_ ), L= t .. (626)574-5416 - Permit Status:Issued ARCADIA ,. Issue Date*03/28/2018 Expiration: 09/24/2018 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number s 2110 Canyon RD Arcadia,CA 5765010017 Contacts JOHN PRESKILL Owner Wade Webb Electrical Contractor 2110 CANYON RD (C-10) 324 E Foothill BLVD#201,Arcadia,CA 91006 (888)786-9322 Description:ROOF MOUNT SOLAR FOR SFR, 1/26 . Valuation: $0.00 Tenant W Total Sq Feet: 0.00 Plan Check# Plan# i x-54 Fees Amount payments Amount Paid Building Plan Check Fee Residential $50.00 Total Fees $300.91 Electrical Permit Issuance Fee $44.35 Cash/Receipt#REC-000684-2018 $300.91 Fire Plan Check Fee Residential $50.00 Inverters $77.78 Amount Due: $0.00 Panels $77.78 ‘ 4( CompliTED Solid Waste Management Fee 2 $1.00 Total: $300.91 4 .2s-1e CALLS FOR INSPECTIONS Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. f tiLIA L ' ' 1 This permit/plan review expires by time limitation and becomes null and 111 void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. March 28,2018 ssued By: Date March 28,2018 Page 1 of 1 of AR 4 csoFok.,9, � , Cj ,11 117 Al PERMIT/PLAN REVIEW APPLICATION ,. <IYAtiii `_ of 1� Development Services Department,240 West Huntington Drive,Post Office Box 60021 ....ty ec N, Arcadia, CA 91066-6021, (626) 574-5416,Fax (626) 447-9173 City of Arcadia LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION VI hereby affirm under penalty of perjury that I am licensed under provisions ofI hereby affirm under penalty of perjury one of the following: Chapter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,and my li ense is in full force.and effect. //e5 I have and will maintain a certificate of consent to self insure for workers' License ClassC�icens No. (O (¢vExp. Date compensation, as provided for by Section 3700 of the Labor Code, for the Signature of Contractor / performance of the work for which this permit is issued. OWNER-BUILDER DECLARATION ■ have and will maintain workers'compensation insurance,as required by Section I hereby affirm under penalty of perjury that I am exempt from the Contractors 700 of the Labor Code,for the performance of the work for which this permit License Law for the following reason(Section 7031.5,Business and Professions s issued.My workers'compensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, arrier demolish,or repair any structure,prior to its issuance,also required the applicant for such permit to file a signed statement that he or she is licensed pursuant to the olicy Number provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less) 7000) of Division 3 of the Business and Professions Code)or that he or she is exempt there from and the basis for the alleged exemption. Any violation of I certify that in the performance of the work for which this permit is issued,I shall Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): ompensation Laws of California,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall 0 I, as owner of the property, or my employees with wages as their sole forthwith comply wi those provisions. compensation,will do the work,and the structure is not intended or offered for p'W `j _ Signatureji�A _�'L sale(Section 7044,Business and Professions Code:The Contractors License Dat / Law does not apply to an owner of property who builds or improves thereon, or who does such work himself or herself or through his or her own employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. 0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). 0 I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Date Signature Lender's Address IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancyof new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for further information. on.N.,,e L f'L' filli/ab Title PRINT NAME B c•rtify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. II .gree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of Ar .dia to enter upon the above-mentioned property for inspection purposes. C lature i � .�/i 111 Date r,y , .. o i 1 7(0 oul)(/'o,4 a .. ,. CAUTION THIS PROPERTY SUPPLIED BYA SOLAR ELECTRIC SYSTEM. DISCONNECTING MEANS LOCATED AS SHOWN: Main Service Panel 0 PV Inverter _'_PV AC Disconnect Nil rimill IN 11- __ _I• PV Modules -- == -- -- =MI =MI -- -- iijr ..*.,,,„ nwp iS S�soy+%yJl . , _�i y AFFIDAVIT SELF-CERTIFICATION FOR Cie>`:!PUANCE.OF'SMOKE ALARMS AND CARBON M .NOXIDE AL ' `MS Sick Proert 'Address: 4"-D �a"��or� cQ . (acctI ( (o0 Permit.Number;. C nt\brief Job Description: ScA S.AA k°C h` Number of smoke alarms installed: . rl-Number of carbon monoxide alarms installed: a— When alterations, repairs or additions requiring a permit occur, or sleeping rooms are created, Smoke alarms shall be installed in each sleeping room, and outside each separate sleeping area in the immediate vicinity of the bedrooms, and on each additional story of the - dwelling, including basements and habitable attics as required by Section R314 of the 2016 California Residential Code (CRC) and California.Health and Safety Code Section .13113.7. For dwellings or sleeping units containing fuel burning appliances or having attached garages, carbon monoxide alarms .shall be installed outside each `separate sleeping area in the immediatevicinity of the bedrooms, and on each additional story of the dwelling, including basements as required by Section R315of the of the 2016 California Residential Code (CRC).. Multi-purpose alarms (combination carbon monoxide and smoke alarms) may be used. All alarms shall comply with requirements for listing and approval by the Office of the State Fire Marshal. http://osfm.fire.ca:qov/licensindlistinc1s/licenselistinq bml searchcotest.Dhp. As owner of the above referenced property, I hereby certify that the smoke alarms and carbon monoxide alarms have been installedin accordance with the manufacturer's instructions and in compliance with the code sections referenced above. declare under penalty of perjury that the foreg in is true and correct, and that this. .:. declarationwas executed ®�,Gate➢ . IkrijZ " Zo fig. at Arcadia, California. bR � des (. Owner's Name (printe•, t�,1.ed): . . o �- i Signature of •>wre o A A ' 4 :CA 1 Thisaffidavit must be returned to the City of Arcadia inspector prior to final inspection SMOKE ALARM AND CARBON MONOXIDE ,\LARM L. A IONS b Guest Room FA Baihroc� 6 Storage o Family Room Garage FIRST FLOG PLAN 0- SMOKE AL 'M I r- CAR:ON MONOXIDE ALARM cj 1 Mstr. L Bath _ P---� Master Bedroom Dining Room Kitchen Bath 0 Hall Closet 1 closet Closet i°antlly=Roof Bedroom Bedroom SEC.ND FLSOR:P 0=SMOKE ALAR I I cP\t r:,ON MONOXIDE A,,\r'M VINCI & ASSOCIATES sfruciurai Cnyineers STRUCTURAL CALCULATIONS FOR • PHOTOVOL.,T, ,.a ii%NtC.N'AVII:A.k/.4.611‘ellt :.:;i3.;.::-•' . ....;:i.* ••••-•:(.4...:t •' . C ,t,,,'4.5NW6 iilk -:.:::•*,."-t•...;1* ' >01..• ..k 1 V 1„ sN tAtel AlAtO N .. ARR ...y.., .... %)4- - , ti--, et ok ell 10\ '00'` \iNv4N •(yd s- ,IA k.‘ li s\N.- .c•catx • .104. t. s'• •(A)4' .,0:4:-0. 1' ‘(001° 1,1/41 N'ON S. iit .'ilt\ ,\\.0.4- \.0•,\Ili ' - ..a\(A t" v,),N1 :7:- ..- ii) A \-4e•' 6(c, ' ,x0:0 sote -:-.•7. John and Roberti P .:„ .;-,c d \ i....;0) . ' k\to V`' stA.0‘7, 2110 Canydn 6(‘ Arcadia • i I t 6 ------ I / --- ..,. Ammiofill*,\ 9 4CHAR:r vr 1ff No. * * ' "1,••\•• V :4 , T ._ _. • ---.._„, CLIENT: Renewables JOB NO: 09-3457 175 E. WILBUR ROAD, STE 103 •THOUSAND OAKS, CA 91360 p 805.496.2100 • e solar@VinciSE.com DATE: 3/23/2018 VINCI & ASSOCIATES SHEET: PROJECT: John and Roberta Preskill cSlruclural 6ngineers JOB NO.: 18-3457 2110 Canyon Rd 175 E.WILBUR ROAD,STE 103 •THOUSAND OAKS,CA 91360 ENGR.: JRV Arcadia, CA 91006 p 805.496.2100 • e solar@VinciSE.com CLIENT: Silverfox Renewables DESIGN DATA: ROOF DESIGN LOAD: ROOFING ( Composition Shingle ) = 5 psf SHEATHING = 2 ROOF RAFTERS/TRUSS = 2 MISCELLANEOUS = 1 ROOF RAFTER/TRUSS DESIGN DEAD LOAD = 10.0 psf CEILING & INSULATION = 3.25 MISCELLANEOUS = 1.25 DESIGN DEAD LOAD = 14.5 psf DESIGN LIVE LOAD = 20 psf DESIGN SNOW LOAD = 0 psf WIND DESIGN CRITERIA: BASIC WIND SPEED = 110 mph WIND EXPOSURE = C NUMBER OF STORIES = 1 SOLAR MODULE Solar Module Width: = 40.31 in Solar Module Length: = 79.69 in Solar Module Area = 22.31 ft2 Solar Module Dead Load = 2.41 psf Number of PV Modules = 26 Number of PV Mounts to Roof = 48 Maximum Spacing of Mounts = 4 ft o.c. Tributary Area to Mounts 22.31 ft2 x ( 26 / 48 ) = 12.08 ft2 (Average) ( 4 ft oc x 79.69 in / 12"/ft) /2 = 13.28 ft2 (Worst Case) . Solar Module Vertical Support Point Load: 13.28 ft2 x 2.41 psf = 32.0 lbs TOTAL AREA OF ADDED SOLAR PANELS ( 3.36 ft x 6.64 ft ) X ( 26 Modules ) = 580.0. ft2 DATE: 3/23/2018 VINCI & ASSOCIATES SHEET: 2 PROJECT: John and Roberta Preskill cSfrucfural Cngineers JOB NO.: 18-3457 2110 Canyon Rd 175 E.WILBUR ROAD,STE 103 •THOUSAND OAKS,CA 91360 ENGR.: JRV Arcadia, CA 91006 p 805.496.2100 • e solar@VinciSE.com CLIENT: Silverfox Renewables DESIGN CONNECTION TO ROOF TO RESIST WIND UPLIFT REFER TO NEXT SHEET FOR - SWH Standoff Detail UPLIFT FORCE CALCULATIONS Scale:3"= 1' Module ZONE Q UPLIFT a SMIO -.6(2.41 psf) PV Rail Design Force = ( Uplift x(0.6) ) -.6(2.41 psf) '- - Net Uplift = 11.8 psf L-Foot 1.85 Connections per Module (MIN) 26 Modules, 48 Connections Roof Penetration sealed with Max Trib Area = 13.28 ft2 a high performance roofStandoff UPLIFT/ CONN. = 13.3 ft` x 11.8 psf ) 1;ti sealant such as GE 30-year silicone sealant = 156.6 lbs/conn PER 2015 NDS (TABLE 12.2A) Sheathing FALLOW = 258 lbs/in x CD x Ct 5/16 x 3.5" Lag for (1) 5/16" lag bolt Framing Member min. 2.5"embed into Framing Member WITH 2.00" PENETRATION INTO JOIST FALLOW = 2.00 " x 413 lb/in = 825.6 lbs > 157 lbs Therefore O.K. FACTOR OF SAFETY: F.O.S. = 5.27 > 1.5 Therefore O.K. ZONE P FT a [ - 0.6 (2.41 psf) ZONE! UPLIFT a Wait] ( -.6(2.41 psf) J Design Force = ( Uplift x(0.6) ) - 0.6 (2.41 psf) Design Force= ( Uplift x(0.6) ) -.6(2.41 psf) Net Uplift = 28.0 psf Net Uplift = 17.2 psf 1.85 Connections per Module (MIN) 1.85 Connections per Module (MIN) 26 Modules, 48 Connections 26 Modules, 48 Connections Max Trib Area = 13.28 ft2 Max Trib Area = 13.28 ft2 UPLIFT/CONN. = 13.3 ft2 x 28.0 psf UPLIFT/CONN. = 13.3 ft2 x 17.2 psf = 371.9 lbs/conn = 228.4 lbs/conn PER 2015 NDS (TABLE 12.2A) PER 2015 NDS (TABLE 12.2A) FALLOW = 258 lbs/in x CD x Ct FALLOW = 258 lbs/in x CD x Ct for (1) 5/16" lag bolt for (1) 5/16" lag bolt WITH 2.00" PENETRATION INTO JOIST WITH 2.00" PENETRATION INTO JOIST FALLOW = 2.00 " x 412.8 lb/in FALLOW = 2.00 " x 413 lb/in = 825.6 lbs > 372 lbs = 825.6 lbs > 228 lbs Therefore O.K. Therefore O.K. FACTOR OF SAFETY: FACTOR OF SAFETY: F.O.S. = 2.22 > 1.5 F.O.S. = 3.62 > 1.5 Therefore O.K. Therefore O.K. NA% 13"-- PROJECTL : John11and yRobertaRd,Preskillcada PAGE: CLIENT: 2110 Canyon Rd,Arcadia,CA 91006 DESIGN BY: JRV JOB NO.: 15-3457 1- DATE: 103/23/18 REVIEW BY: -- Wind Analysis for Low-rise Building,Based on ASCE 7-2010 2016 CBC I INPUT DATA t r�. I Exposure category(B,C or D,ASCE 7-10 26.7.3) Le. 4 - Importance factor(ASCE 7-10 Table 1.5-2) IN,= 1.00 for all Category Basic wind speed(ASCE 7-1026.5.1 or 2012 IBC) V = 110 mph ~ Topographic factor(ASCE 7-10 26.9&Table 26.6-1) Ku = 1 Flat . Building height to eave he = 10 ft Building height to ridge hr = 21 ft , , . l Building length L = 54.68922 ft I B 1 Building width B = 68.75216 ft 1 I Effective area of components(or Solar Panel area) A =,579.9993 ft2 -I DESIGN SUMMARY Max horizontal force normal to building length,L,face = 18.38 kips,SD level(LRFD level),Typ. Max horizontal force normal to building length,B,face = 17.49 kips Max total horizontal torsional load = 167.24 ft-kips Max total upward force = 68.98 kips ANALYSIS _) Velocity pressure qh=0.00256 Kh Ke Kd V2 = 22.51 psf where: qh=velocity pressure at mean roof height,h.(Eq.28.3-1 page 298&Eq.30.3-1 page 316) _I Kh=velocity pressure exposure coefficient evaluated at height,h,(Tab.28.3-1,pg 299) = 0.86 Kd=wind directionality factor.(Tab.26.6-1,for building,page 250) = L 0.85 --1 h=mean roof height = 15.50 ft i <60 ft,[Satisfactory] (ASCE 7-10 26.2.1) 1 <Min(L,B),[Satisfactory] (ASCE 7-10 26.2.2) Design pressures for MWFRS p=qh((G CO)-(G Ca1)] where: p=pressure in appropriate zone.(Eq.28.4-1,page 298). penin= 16 psf(ASCE 7-10 28.4.4) ..J G Cp f=product of gust effect factor and external pressure coefficient,see table below.(Fig.28.4-1,page 300&301) G CPI=product of gust effect factor and internal pressure coefficient.(Tab.26.11-1,Enclosed Building,page 258) 1 = 17-01:11-1 or ra-5-0.] • a=width of edge strips,Fig 28.4-1,note 9,page 301, MAX[MIN(0.1 B,0.1L,0.4h),MIN(0.04B,0.04L),3] = 5.47 ft Net Pressures(psf),Basic Load Cases Net Pressures(psf),Torsional Load Cases --- Roof angle 6 = 17.74 Roof angle 0 = 0.00 Roof angle 0 = 17.74 Surface Net Pressure with Net Pressure with Surface Net Pressure with GCpt (+GCPI) (-GCpI) GCp1 (+GCPI) (-GCPI) GCpf (+GCPI) (-GCPI) J 1 0.51 7.44 15.54 -0.45 -14.18 -6.08 1T 0.51 1.86 3.89 2 -0.69 -19.59 -11.48 -0.69 -19.59 -11.48 2T -0.69 -4.90 -2.87 3 -0.46 -14.49 -6.38 -0.37 -12.38 -4.28 3T -0.46 -3.62 -1.60 4 -0.41 -13.26 -5.15 -0.45 -14.18 -6.08 4T -0.41 -3.31 -1.29 L___, 0.40 4.95 13.06 Roof angle 9 = 0.00 6 -0.29 -10.58 -2.48 Surface Net Pressure with 1E 0.77 13.31 21.42 -0.48 -14.86 -6.75 G Cp t (+GCpI) (-GCpI) 2E -1.07 -28.14 -20.04 -1.07 -28.14 -20.04 5T 0.40 1.24 3.26 3E -0.67 -19.04 -10.94 -0.53 -15.98 -7.88 6T -0.29 -2.65 -0.62 4E -0.61 -17.75 -9.64 -0.48 -14.86 -6.75 5E 0.61 9.68 17.78 6E -0.43 -13.73 -5.63 3E 3 2 `-' 2E 3E 3E 3 7 21 3E 4\_ 8 _- 4 4�_4T 2E 2 e s yT �4 ' 1 cam► ''tAllii 6E--..... Er�I/-'�� 4E 4€�► '•n1%) ,.._... -::f REQ�'- -�'",.r4E �� 1E /r E III �j/r•" 1E•••••••, ..4711-110,56' E REFERENCE CORNER / 1E REFERENCE CORNER 41 REFERENCE CORNER REFERENCE CORNER,I • WIND DIRECTION 25 WIND DIRECTION °�WR,D OQtEC1iON 2° b WIND DIRECTION 11 Load Case A(Transverse) Load Case B(Longitudinal) Load Case A(Transverse) Load Case B (Longitudinal) Basic Load Cases Torsional Load Cases it Basic Load Case A(Transverse Direction) Basic Load Case B Longitudinal Direction) Area Pressure(k)with Area Pressure(k)with Surface Surface (ft2) (+GCp i) (-GCp i) (ft2) (+GCp I) (-GCp I) 1 438 3.25 6.80 2 1579 -30.93 -18.13 2 1579 -30.93 -18.13 3 1579 -19.55 -6.75 3 1579 -22.87 -10.08 5 947 4.69 12.36 4 438 -5.80 -2.25 6 947 -10.02 -2.34 1 E 109 1.46 2.34 2E 395 -11.11 -7.91 2E 395 -11.11 -7.91 3E 395 -6.31 -3.11 3E 395 -7.52 -4.32 5E 119 1.15 2.12 4E 109 -1.94 -1.05 6E 119 -1.63 -0.67 Horiz. 8.90 8.90 Horiz. 17.49 17.49 Vert. -68.98 -38.51 Vert. -48.54 -22.32 Min.wind Horiz. 18.38 18.38 Min.wind Horiz. 17.05 17.05 28.4.4 Vert. -60.16 -60.16 28.4.4 Vert. -60.16 -60.16 1 Torsional Load Case A(Transverse Direction) _ Torsional Load Case B(Longitudinal Direction) Area Pressure(k)with Torsion(ft-k) Area I Pressure(k)with I Torsion(ft-k) Surface ftz - Surface l ft - GC I ( ) (+GC pi) (GC PI) (+GC PI) ("GC Pi) (2) (+GC pl) (-GCp (+GC PI) (-GCp 1 164 1.22 2.55 13 28 2 1579 -30.93 -18.13 -26 -15 2 592 -11.60 -6.80 -39. -23 3 1579 -19.55 -6.75 16 6 3 592 -8.58 -3.78 29 13 5 414 2.05 5.40 27 71 i 4 164 -2.18 -0.85 24 9 6 414 -4.38 -1.02 57 13 J 1E 109 1.46 2.34 32 51 2E 395 -11.11 -7.91 83 59 2E 395 -11.11 -7.91 -74 -53 3E 395 -6.31 -3.11 -47 -23 3E 395 -7.52 -4.32 50 29 5E 119 1.15 2.12 36 67 4E 109 -1.94 -1.05 42 23 6E 119 -1.63 -0.67 52 1 21 1T 273 0.51 1.06 -7 -15 5T 533 0.66 1.74 -10 -26 2T 987 -4.83 -2.83 20 12 6T 533 -1.41 -0.33 -21 -5 - 3T 987 -3.57 -1.57 -15 -7 Total Horiz.Torsional Load,MT , 167.2 167.2 4T 273 -0.91 -0.35 -12 -5 I Total Horiz.Torsional Load,MT 63 63 -J Design pressures for components and cladding 3' 2 2 t a 2I1-2-11A1241 --� p-4hL(G CP)-(G Co)] 5-i ze� where: p=pressure on component.(Eq.30.4-1,pg 318) t'°s 1 s 0 2 - 2 2I- - 2 p,,n= 16.00 psf(ASCE 7-10 30.2.2) `'�0 a �§�§ a G Cp=external pressure coefficient. Walls '31- --F-!1- 5 233 s S see table below.(ASCE 7-10 30.4.2) Roof ss°• Roof o>°• Effective Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Area(52) GCp -GCp GCp -GCp GCp -GCp GCp -GCp GCp -GC!, - Comp. 579.9993 0.30 -0.80 0.30 -1.20 0.30 -2.00 0.70 -0.80 0.70 -0.80 Comp.&Cladding Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Pressure Positive .Negative Positive Negative Positive Negative Positive Negative Positive Negative -_, (psf) 16.00 -22.06 16.00 -31.07 16.00 -49.08 19.81 -22.06 19.81 -22.06 Note: If the effective area is roof Solar Panel area,the only zone 1,2,or 3 apply. i I , DATE: 3/23/2018 VINCI $ ASSOCIATES SHEET: 5 PROJECT: John and Roberta Preskill Sfrucfuraf Engineers JOB NO.: 18-3457 2110 Canyon Rd 175 E.WILBUR ROAD,STE 103 •THOUSAND OAKS,CA 91360 ENGR.:. JRV Arcadia, CA 91006 p 805.496.2100 • e solar@VinciSE.com CLIENT: Silverfox Renewables LATERAL FORCES: (Base Shear Calculations - 2016 CBC) SEISMIC: Site Class: D (Use D if unknown) S1= 1.029 (USGS Software) Ss= 2.84 (USGS Software) F„= 1.5 (Table 1613.3.3(2)) Fa= 1.0 (Table 1613.3.3 (1)) I = 1.0 (Table 11.5-1 ASCE 7-10) R = 6.5 (Table 12.2-1 ASCE 7-10) SMs = Fa* Ss = 2.841 (Eq. 16-37) SDs = 2/3* Sims = 1.89 (Eq. 16-39) SMI= F„* Si= 1.544 (Eq. 16-38) SD1 = 2/3* SMI = ' 1.03 (Eq. 16-40) TL= 8 s (Figure 22-12 ASCE 7-10) T= Ct* (ha)" = 0.112 s (Eq. 12.8-7) Ct= 0.02 (Table 12.8-2 ASCE 7-10) ha = 10.0 ft x = 0.75 (Table 12.8-2 ASCE 7-10) **GOVERNS** VMIN = ( SDs)/( R/I ) = 0.29 W (Eq. 12.8-2 ASCE 7-10) NEED NOT EXCEED: IF <_TL USE: V = ( SDI)/T*( R/I ) = 1.41 W (Eq. 12.8-3 ASCE 7-10) IF T>TL USE: V = (SD1)*(TL)/T2*( R/I ) = 100.12 W (Eq. 12.8-4 ASCE 7-10)_ SHALL NOT BE LESS THAN: V = 0.01 ' W (Eq. 12.8-5 ASCE 7-10) _.I 3/23/2018 Design Maps Summary Report .m usGs Design Maps Summary Report �J User—Specified Input Building Code Reference Document 2012/2015 International Building Code (which utilizes USGS hazard data available in 201)0) Site Coordinates 34.17239°N, 118.02678°W Site Soil Classification Site Class D-"Stiff Soil" I Risk Category I/II/III i__ -- ,,�/ -.''''16°` ,,.,' •1,�' *,t .. 7' i ,.....- : 2",./4-„,, ', „pi, q satanada... ,y�: y.« .z -�9', 3' t 'Ilnvld°,4 , t r,a +► y ,A. A r\ ,.-_: Altiidety1 4* rt..' a' 1, ,f r `.. ,.• f 40110 bank r 0"" , •- • : f } ! i Ap r ii,I y4. e r'."''' ',"''''4E,'-'''_,� e 'pit iI ',w. -Sierra:nadre , -} 1f-- A It T. f '-iii 31.,,,r rte,e t u r dk" e w _ x- •Ad 4 Pasacana 4Ar<9,110• li `j •,.-A2usa,Glend•ora.t 1 b x.1 - t 11+R' � .2,, - ff ',,,c-,:,:,;i,,,, SogUlFas snapp ...kit-. ' enM1 Ti• !! r, � r i' �'- -::. ,, i°; »r :TempleCity.- :""t,"---'71:- -,- I ---i� -,,,i,---4----.-• .. Dias . Alhambra, Snn6abnel — ''� vgk _ i_Cavina1 La ern rt od r, R I ,„..,,F-Rosemeild riceitttt°e[e evil ac r = til ch r Fid rq ' .Js.. *.-',t ,1 , iii „1 ,sr.+...: ...—.r•ttldwinF'ar, 1. di . 'i � __ __J USGS—Provided Output Ss= 2.841 g Sms= 2.841 g S°s= 1.894 g Sr= 1.029 g Si,„= 1.544 g Sol= 1.029 g For information on how the 5S and S1 values above have been calculated from probabilistic(risk-targeted)and. -- . deterministic ground motions in the direction of maximum horizontal response,please return to the application and select the"2009 NEHRP"building code reference document. RICER Response Spectrum Design Response Spectrum 1290 170 ! :.61 1.71 2.12 I3_` aV 131 -__1 a134 I a 1.14 , a 1d5 1 a 1195 1.14 11.76 1 nM n,ST 111.S4 030' I 021 0.11 Mu _ 00) ln)' 0S 010 001 OM1.0) 1.17 1.10 I f[. 111 1f.i 0lU, 0.17 040 0/0 010) I/O 1.11 1.10 14) 1A) 21.) —J - Faiod1 T fseel Period,T(sec) . Although this information is a product of the U.S.Geological Survey,we provide no warranty,expressed or implied,as to the accuracy of the data contained therein.This tool is not a substitute for technical subject-matter knowledge. —J - htts://earth uake.us s. ov/cn1/desi nma s/us/summarY•Ph ?tem late=minimal8latitude=34.172389741320498r1on nude=-118.02678416742212&sit... 1/1 DATE: 3/23/2018 VINCI & ASSOCIATES SHEET: 7 PROJECT: John and Roberta Preskill S/ruc/ural Cngineers JOB NO.: 18-3457 2110 Canyon Rd 175 E.WILBUR ROAD,STE 103 •THOUSAND OAKS,CA 91360 ENGR.: JRV Arcadia, CA 91006 p 805.496.2100 • e solar@VinciSE.com CLIENT: Silverfox Renewables LATERAL FORCES 2016 CBC: (BASE SHEAR - Conservative) F1 PROOF= 5.0 ft SEISMIC BASE SHEAR: V= 0.29 W (SEE PREVIOUS) / h1 = 10.0 ft F1 ROOF = 15 PSF WALLS = 7 21.5 x 0.291 6.26 PSF WIND LOADS: Governs Ps= A kkt Iw PS30 (Eq. 6-1) A = 1.21 Ps30A= 19.20 psf PsA 23.27 psf Iw.= 1.00 Ps3oB= -10.00 psf PSB -12.12 psf kzt= 1.00 Ps3oc= 12.70 psf Psc 15.39 psf PS30D= -5.90 psf PSD -7.15 psf _J F1 uLT: _ ( 5 ft + 10 ft/2 )x (23.2704 psf+12.12 psf) = 354 lb/ft F1ASD: = 353.90 lb/ft x 0.6 = 212 lb/ft DATE: 3/23/2018 VINCI & ASSOCIATES SHEET: 8 PROJECT: John and Roberta Preskill cSlruclural Cngineers JOB NO.: 18-3457 2110 Canyon Rd 175 E.WILBUR ROAD,STE 103 •THOUSAND OAKS,CA 91360 ENGR.: JRV Arcadia, CA 91006 p 805.496.2100 • e solar@VinciSE.com CLIENT: Silverfox Renewables CHECK IMPACT OF NEW SOLAR PANELS ON SEISMIC LOAD l o (N)PV AC Disconnect `, I( Conduit In Attic 18"below Roof I (E) 1 Story SFD • • —////) (N) PV Array (E) Pool • 111 - 1 TOTAL ROOF AREA: ( 54.7ft x 68.8ft ) + ( 31.3ft x 26.6ft ) + ( 31.3 ft x 29.7 ft ) + ( 0.Oft x 0.Oft ) = 5517.9243 ft2 EXISTING ESTIMATED SEISMIC LOAD (BASE SHEAR) 5517.92 ft2 x 6.26 psf = 34568.5 Ibs AREA OF ADDED SOLAR PANELS ( 6.64 ft x 3.36 ft ) X ( 26 PANELS ) = 580.0 ft2 WEIGHT OF PANELS: 2.41 psf ADDED SEISMIC LOAD: 2.41 psf x 580.0 ft2 x 0.29 = 407.3 lbs % INCREASE = 407.3 = 1.2% < 10% 34568.52257 Therefore O.K. -1 fl WoodWorks® - �ORI FARE FOR WOOD DESIGN Check Existing Rafter Mar.23,2018 15:12 • Design Check Calculation Sheet WoodWorks Sizer 11.1 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End Roof DL Dead Full Area No 10.00(24.0") psf Roof LL Roof constr. Full Area Yes 20.00(24.0") psf PV1 Dead Point No 2.00 32 lbs PV2 Dead Point No 7.00 32 lbs PV3 Dead Point No 8.50 32 lbs PV4 Dead Point No 13.50 32 lbs Maximum Reactions (lbs)and Bearing Lengths (in) : 19.627' • 1.5' 11.5' 19' Unfactored: Dead 162 307 49 Roof Live 238 440 137 Factored: Total 401 747 186 Bearing: Length 0.50* 0.64 0.50* Min req'd 0.50* 0.64** 0.50* *Minimum bearing length setting used:1/2"for end supports and VT for interior supports **Minimum bearing length governed by the required width of the supporting member. Maximum reaction on at least one support is from a different load combination than the critical one for bearing design,shown here,due to Kd factor. See Analysis results for reaction from critical load combination. Lumber-soft, D.Fir-L, No.2, 2x6 (1-1/2"x5-1/2") Supports:All-Timber-soft Beam,D.Fir-L No.2 Roof joist spaced at 24.0"c/c;Total length:19.63';Clear span:1.518',10.214',7.649';volume=1.1 cu.ft.;Slope:13.0 deg Lateral support:top=full,bottom=at all supports;Repetitive factor:applied where permitted(refer to online help); Analysis vs. Allowable Stress and Deflection using NDS 2015: , I Criterion Analysis Value Design Value Unit Analysis/Design Shear fv = 68 Fv' = 225 psi fv/Fv' = 0.30 Bending(+) fb = 942 Fb = 1682 psi fb/Fb' = 0.56 Bending(-) fb = 1107 Fb' = 1272 psi fb/Fb' = 0.87 Deflection: • Interior Live 0.19 - L/654 0.68 = L/180 in 0.28 • Total 0.35 = L/349 1.03 = L/120 in 0.34 Cantil. Live -0.10 = L/189 0.21 = L/90 in 0.48 Total -0.18 = L/102 0.31 = L/60 in 0.59