HomeMy WebLinkAbout Findings and Action - Final ApprovalArcadia Highlands Homeowner's Association
Architectural Review Board
Findings and Action Report
File No.: 0-00272018 Date: 7/6/2018
Project Address: 1759 Oakwood Ave.
Applicant: _ Marvin Fung and Assoc. Inc.
Owner (if different) Nader and Viola 6ishara
Project Description: Complete remodel/redesign and addition of second story
FINDINGS
1. SITE PLANNING - The proposed project IS consistent with the Site Planning Guidelines.
II. ENTRY -The proposed project IS consistent with the Entry Guidelines.
III. MASSING - The proposed project IS consistent with the Massing Guidelines based on the set bark
of the second story addition to minimize the mass of the home.
1V. ROOFS - The proposed project IS consistent with the Roofing Guidelines based on the roof plan
and material (clay tiles) being compatible with the architectural style and design of the home.
V. FACADE DESIGN - The proposed project IS consistent with the Facade Design Guidelines based
on the home's overall design, use of color and traditional design elements.
VI. DETAILS - The proposed project IS consistent with the Guidelines for Architectural Details
The details are high quality and are consistent with the architectural style.
VII. MATERIALS & COLORS - The proposed project IS consistent with the Guidelines. The
project was approved on the condition that the dark wood used in the garage doors and exterior
features like the shutters will be changed to a medium stain color and the stucco color would be
changed to a warmer shade that is darker than the white that was proposed. The lighter wood color
and darker paint color will provide for less of an overall contrast on the exterior of the home and
therefore be more compatible and harmonious with the neighborhood.
VIII. LANDSCAPE & HARDSCAPE - The proposed project IS consistent with the Guidelines as
discussed in the Site Planning section.
IX_ FENCES & WALLS - The proposed project IS consistent with the Guidelines for Fences and
Walls.
X. ARCHITECTURAL STYLE - The proposed project IS consistent with the Guidelines as the
Spanish elements are still harmonious with the neighborhood.
Page 1 of 3
XI. ADDITIONS & ALTERATIONS - The proposed project IS consistent with the Guidelines for
Additions and Alterations as discussed in the above referenced Massing (Findings Section III).
XII. STREETSCAPE - The proposed project IS consistent with the Streetscape due the home
preserving the existing tree in the front yard and the second floor being set back from the first floor.
XIII. MINIMUM FLOOR AREA & SETBACKS - The proposed project IS consistent with the
Minimum Floor Area and Setback Guidelines.
XIV. GARAGES - The proposed project I5 consistent with the Guidelines for Garages
XV. EXTERIOR BUILDING MATERIALS & APPEARANCE - The proposed project is consistent
with the Guidelines for Exterior Building Materials and Appearance as referred to above in the
Facade Design comments (Finding Section V).
XVI. AFFECT ON ADJACENT PROPERTIES & NEIGHBORHOOD - Retaining the existing hedge
between the subject property and the property to the North takes into consideration the effect of
adjacent property privacy. Additionally, the project was gVTgpoved on the condition that the second
floor windows in the North bedroom, seating area and bathroom utilize some type of obscured glass
or glass treatment on the bottom portion of the windows.
The conditional approval is based on the changes being made that are referenced in
Findin s Section VII and XVI above.
Page 2 of 3
ACTION
Approved/ X Conditionally Approved/ Denied
These Findings and Action were made by the following ARB Members of the Association at a
meeting held on July 6, 2018 at 1759 Oakwood Ave., Arcadia, CA
Members In Attendance -Vote:
Dean Obst, ARS Chair - Yes
David Arvizu- Yes
Sunny Padival - Yes
Signature: le
Dean Obst
EXPIRATION - If for a period of one (i) year from the date of approval, any project for which plans have
been approved by the ARB, has not begun construction (as evidenced by clearing and grading
and/or/the installation of a new foundation and/or by installation of new materials on a structure that
is being remodeled) or has been unused, abandoned or discontinued, said approval shall become null
and void and of no effect. Such project may be resubmitted to the ARB for renewed approval; however,
the ARB shall review the project as if it had not been previously approved in accordance with the
current standards in effect.
APPEALS - Appeals from the ARB shall be made to the Planning Commission. Planning Commission
decisions on ARB cases may be appealed to the City Council. Said appeals shall be made in writing and
delivered to Planning Services within seven (7) calendar days of the ARB's decision and shall be
accompanied by an appeal fee in accordance with the applicable fee schedule adopted by resolution of
the City Council. Upon receipt of an appeal in proper form, such appeal shall be processed by Planning
Services in accordance with the same procedures applicable to appeals from the Modification Committee,
except that noticing shall be consistent with ARB noticing.