Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutUntitled PermrtNo.SOLR 18 0886
City of Arcadia, CA
6 Development Services Department Permit Type Solar
240 West Huntington Drive,Post Office Box 60021 Work Classification Residential Solar
L o.. . "' Arcadia,CA 91066-6021
akm, (626)574-5416 r Permit Status:issued
ARCADIA Issue Date:05/30/2018;1 Expiration: 11/26/2018
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
1046 Paloma DR Arcadia,CA 5776009010
Assrezenv saanil
Contacts
WANG,DANNY AND EMILY Owner La Solar Group* Contractor
1046 PALOMA 16238 Raymer ST 13,Van Nuys,CA 91406
(818)373-0077
Description:ROOF MOUNT SOLAR SYSTEM SFR, 22/22 MICRO, Valuation: S 0.00 '; Tenant
NEW SUB PANEL 100 AMP as
Total Sq Feet: 0.00 Plan Check# Plan#
Fees Amount Payments Amount Paid
Building Plan Check Fee Residential $50.00 Total Fees $316.46
Distribution Panel $15.55 Cash/Receipt#REC-001291-2018 $316.46
Electrical Permit Issuance Fee $44.35
Amount Due: $0.00
Fire Plan Check Fee Residential $50.00
Inverters $77.78
Panels $77.78
Solid Waste Management Fee 2 $1.00
Total: $316.46
//�
JAG, /1"e�4� � CALLS FOR INSPECTIONS
a Request for inspection by telephone at 626-574-5450. Leave a message
/, requesting the address,timeframe and what inspection item is needed.
474.0/ € k 5ea-C-2(71/1/ I'cif4v1
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
4,f- COMPLETED
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a period of 180 consecutive days.
N.
Yr
C••' -
May 30,2018
Issued By: Date
May 30,2018 Page 1 of 1
4 OFARc
F RAO.A
I. PERMIT/PLAN REVIEW APPLICATION
(13\._
j• Development Services Department,240 West Huntington Drive,Post Office Box 60021
'YO1ty Cr" Arcadia, CA 91066-6021, (626) 574-5416,Fax (626) 447-9173
City of •
Arcadia
LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION
❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following:
Chapter 9(commencing with Section 7000,of Division 3 of the Business and
Professions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers'
Ciocrt(O �t`7"-ttt� co.Su'�
License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the
pe rmance of the work for which this permit is issued.
Signature of Contractor
OWNER-BUILDER DECLARATION I have and will maintain workers'compensation insurance,as required by Section
❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit
License Law for the following reason(Section 7031.5,Business and Professions is issued.My orkers'compensation carrier and policy numbers are:
Code.Any city or county which requires a permit to construct,alter,improve, Carrier
demolish,or repair any structure,prior to its issuance,also required the applicant 1"4- 1-2--
for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number
provisions of the Contractors License Law(Chapter 9(commencing with Section
(This section need not be completed if the permit is for one hundred dollars or less)
7000)of Division 3 of the Business and Professions Code)or that he or she is
❑ I certify that in the performance of the work for which this permit is issued,I shall
exempt there from and the basis for the alleged exemption. Any violation of
Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers'
penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the
workers'compensation provisions of Section 3700 of the Labor Code,I shall
❑I, as owner of the property, or my employees with wages as their sole forthwith comply with those provisions.
compensation,will do the work,and the structure is not intended or offered for • 1 . t
sale(Section 7044,Business and Professions Code:The Contractors License Date Signature
Law does not apply to an owner of property who builds or improves thereon,
or who does such work himself or herself or through his or her own
employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful,
sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one
completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation,
did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and
attorney's fees.
❑I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project(Section 7044, Business and Professions
Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY
who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency
contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097,
Civil Code).
❑ I am exempt under Section 7044,Business and Professions Code,for this reason:
Lender's Name
Date Signature Lender's Address
IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND
RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING:
1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel.
2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings
and structures.
3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripp'P:g,or altering
of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for
further information.
Name A 1d'(=:) % Title
PRINT NAME
I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner.
I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of
Arcadia to enter upon the above-mentioned pro erty for inspection purposes. , 'Q
•
Signature Date
F y
AFFIDAVIT SELF-CERTIFICATION FOR COMPLIANCE OF
SMOKE DETECTORS AND CARBON MONOXIDE ALARMS
When the valuation of additions, alterations, or repairs to dwelling units exceeds $1,000.00 smoke
detectors shall be installed in each sleeping room, and outside each separate sleeping area in the
immediate vicinity of the bedrooms, and on each additional story of the dwelling, including
basements and habitable attics as required by Section R314, of the 2013 California Residential
Code (CRC).
For dwellings or sleeping units containing fuel burning appliances or having attached garages,
carbon monoxide detectors shall be installed outside each separate sleeping area in the immediate
vicinity of the bedrooms, and on each additional story of the dwelling, including basements as
required by Section R315 of the 2013 CRC.
All alarms shall comply with requirements for listing and approval by the Office of the State Fire
Marshal. ,7 ,+
Property Address: /096 PA6A/ /&1'1 Gr t nra X14, elf f/' 7
Building Permit Number: BLD20 -
Total#of Bedrooms:
Total#of Floors: / (Including Habitable Basements and Attic Spaces)
TOTAL Number of Smoke Alarms in Dwelling Unit: P
TOTAL Number of Carbon Monoxide Alarms in Dwelling Unit: 6
As owner of the above-referenced property, I hereby certify that I have installed the smoke
detectors and carbon monoxide detectors in accordance with the manufacturer's instructions and in
compliance with the above sections of the California Residential Code, California Building
Code and California Health and Safety Code.
I declare under penalty of perjury that the fpregoing is true and correct, and that this
declaration was executed on (Date) 77/©//I
Owner's Name (printed/typed): te / 1.7/19 (iO4,17
Signature of Owner:
10
BSD-111 Form—Afidavit Self-Certification for Compliance of Smoke and Carbon Monoxide Detectors
Updated:06/26/14 tgar
\
\ CONTRACTOR:
/ \ \ Pa�Dmd O, LA Solar Group
` 16238 B Raymer St.•
\ Van Nuys•CA 91406
/
s \ Phone:(818)373.0077
C
O _� - \ U00 W4116
U\ %
�1 . g
- i ,.._
c•,e, LASOLAR•
1" Ib.
• �Q / Ara Petrosyan
/ o D •
,/I
I a . 4:!0"
/
op dI
15 -3"I o DN
IT-5" ° o A•
1 ' ') /'
. P. 1
I AC .a-
I ECB . d. IQ • •I
60'_4„ ? Q • / N.. n.+.aN..,a mw
I /
Drawn By:
1 GARAGE,PP
Ara Petrosyan
LEGEND �\ I
MSP Main Service Panel \ P Nam
4
\� Danny Wang
AC AC Disconnect \ I PROPERTY LINE 1046 Paloma Dr,
\ MSP ♦ / Arcadia,CA 91007
PV PV Sub Panel - \ X -1:'-
--.., s�
\ U• "°i4 W SYSTEM
SSP Service Sub Panel .;a,v — KV 1A2018 2
\ `O _, — a.aAS INDICATED
f I
4 _
5/14/2018
eftik
„,tivo
yourso1arp1anscom
otot ENGINEERING SOLUTIONS FOR ALL YOUR SOLAR NEEDS
Structural Calculations for
SOLAR POWER SYSTEM CONNECTION CHECK AT:
1046 Paloma Dr.
Arcadia, CA 91007
Job: Wang,Danny
Prepared For:
LA Solar Group
16238 B Raymer Street
Van Nuys, CA 91406
(818)373-0077
Design Criteria
1- Code: CALIFORNIA BLDG CODE 2016/ASCE 7-10
2- Wind: 110 MPH, Exposure: C
3 -Wood Species:Douglas Fir Larch(G=0.5)
Notice:Use restrictions of these calculations.
The attached Calculations are valid only when bearing original signature hereon,photocopy is void.
Contractor/Client to verify existing dimensions/conditions prior to construction.
The use of these calculations is solely intended for the above mentioned project.
� S/p��am
•
c.D. Ivu. C707u4 `m
EXP. 06/30/2019
Av
1-844-PV ELITE! info@yoursolarplans.com
3000 E.Birch Street Suite 201 I Brea CA 92821
WIND LOADING ANALYSIS - Roof Components and Cladding
Per ASCE 7-10 Code for Bldgs. of Any Height with Gable Roof 0 <=45°or Monoslope Roof 0<= 3°
Using Part 1 & 3: Analytical Procedure(Section 30.4 & 30.6)
Job Name: Wang, Danny Subject:
Job Number: Originator: Checker:
Input Data: A
Wind Speed, V= 11..0 mph (Wind Map, Figure 26.5-1A-C)
3Idg. Classification = II (Table 1-1 Occupancy Category)
Exposure Category = C (Sect. 26.7) B
Ridge Height, hr= 17.10 ft. (hr>= he)
Eave Height, he= 8.00 ft. (he <= hr)
Building Width = 50.00 ft. (Normal to Building Ridge)
Building Length = 55.00' ft. (Parallel to Building Ridge) I L
Roof Type= Gable (Gable or Monoslope) K >I
Topo. Factor, Kzt= 1:00 (Sect. 26.8 & Figure 26.8-1) Plan
Direct. Factor, Kd = 0.85 (Table 26.6)
Enclosed? (YIN) Y (Sect. 28.6-1 & Figure 26.11-1)
Hurricane Region? N.. 0
Component Name = Fastener (Purlin, Joist, Decking, or Fastener) hr A
Effective Area, Ae= 409 ft.^2 (Area Tributary to C&C) he
Overhangs? (YIN) N (if used, overhangs on all sides)
1.1 L
Resulting Parameters and Coefficients: Elevation
Roof Angle, 0= 20.00 deg.
Mean Roof Ht., h = 15.00 ft. (h = (hr+he)/2, for roof angle>10 deg.)
Roof External Pressure Coefficients, GCp:
3Cp Zone 1-3 Pos. = 0.30 (Fig. 30.4-2A, 30.4-28, and 30.4-2C)
GCp Zone 1 Neg. _ _ _-0.80 (Fig. 30.4-2A, 30.4-2B, and 30.4-2C)
GCp Zone 2 Neg. = 1.20 (Fig. 30.4-2A, 30.4-2B, and 30.4-2C)
GCp Zone 3 Neg. = -2.00 (Fig. 30.4-2A, 30.4-2B, and 30.4-2C)
Positive & Negative Internal Pressure Coefficients, GCpi (Figure 26.11-1):
+GCpi Coef. = 0.18 (positive internal pressure)
-GCpi Coef. = -0.18 (negative internal pressure)
If z <= 15 then: Kz=2.01*(15/zg)^(2/a) , If z > 15 then: Kz =2.01*(z/zg)^(2/a) (Table 30.3-1)
a= 9.50 (Table 26.9-1)
zg = 900 (Table 26.9-1)
Kh = 0.85 (Kh= Kz evaluated at z= h)
Velocity Pressure: qz= 0.00256*Kz*Kzt*Kd*V^2 (Sect. 30.3.2, Eq. 30.3-1)
qh = 22.35 psf qh = 0.00256*Kh*Kzt*Kd*VA2 (qz evaluated at z= h)
Design Net External Wind Pressures(Sect. 30.4&30.6):
For h <=60 ft.: p= qh*((GCp) -(+/-GCpi)) (psf)
For h > 60 ft.: p = q*(GCp) -qi*(+/-GCpi) (psf)
where: q = qh for roof
qi =qh for roof(conservatively assumed per Sect. 30.6)
` 1 i
Wind Load Tabulation for Roof Components& Cladding
Component z Kh qh p = Net Design Pressures (psf)
(ft.) (psf) one 1,2,3 (+ Zone 1 (-) Zone 2 (-) Zone 3 (-)
Fastener 0 0.85 22.35 10.73 -21.90 -30.84 -48.72
15.00 0.85 22.35 10.73 -21.90 -30.84 -48.72
For z = hr: 17.10 0.85 22.35 10.73 -21.90 -30.84 -48.72
•
For z= he: 8.00 0.85 22.35 10.73 -21.90 -30.84 -48.72
For z = h: 15.00 0.85 22.35 10.73 -21.90 -30.84 -48.72
Notes: 1. (+)and (-) signs signify wind pressures acting toward &away from respective surfaces.
2. Width of Zone 2 (edge), 'a' = 5.00 ft.
3. Width of Zone 3 (corner), 'a' = 5.00 ft.
4. For monoslope roofs with 0 <= 3 degrees, use Fig. 30.4-2A for'GCp'values with 'qh'.
5. For buildings with h > 60' and 0 > 10 degrees, use Fig. 30.6-1 for'GCpi'values with 'qh'.
6. For all buildings with overhangs, use Fig. 30.4-2B for'GCp' values per Sect. 30.10.
7. If a parapet>= 3' in height is provided around perimeter of roof with 0 <= 10 degrees,
Zone 3 shall be treated as Zone 2.
8. Per Code Section 30.2.2, the minimum wind load for C&C shall not be less than 16 psf.
9. Reference: a. ASCE 7-10, "Minimum Design Loads for Buildings and Other Structures".
b. "Guide to the Use of the Wind Load Provisions of ASCE 7-10"
by: Kishor C. Mehta and James M. Delahay (2004).
4
Roof Components and Cladding: '
_. . __,1... ---i
-
h
_ z _
1�I o
t
_....A- a. a u; _.11_1!...c
�(� I �...
_t_ ) , of ?,: '4.) _J en1 ` .i (3 (J)__ t
I I 1 I
i I I I
I I + 1
. ( I I i
i:.- fl I CV: C.0 .r;41t ti) {i) 'I ® ill'/nisi .i) IT,
1� I
1
i
1 t I i
t 1 I 1 i
1
i l 2' ,2 .#, 71 Ci}; :21 M®� c '.(3) -L i
A I-- t e ;3 (11
7(,.3 r ? 55
8 <= 7 deg. 7 deg. < 0 <= 27 deg. 27 deg. < 0 <=45 deg.
n��s 7�......Lam..n..ad:.....� :L6 I i— LSA LI
Iruul LuIIVZ. IRA ®41RUIR.IZ. V.VILII II -,— Vu IL.
(for Gable Roofs <=45° and Monoslope Roofs <= 3°)
2a , 2a.1
4......�., ®i
i
11 I.
1 a 1
1
I t
I 1
1 i
1 i ��I
"1 r 1 Ni
2 i CZ, l3,
ROOF PLAN
Roof Zones for Buildings with h > 60 ft.
(for Gable Roofs <= 10°and Monoslope Roofs <= 3°)
Gravity Load Data
Panel Data
Panel: 'Panasonic 330 Watt
Number of Modules: 22
Racking System: UNIRAC
Weight of PV Module 40.8 lbs
PV Module Dimensions L= 64.5 in
W= 41.5 in
Roof Data
Roof Material: Tile_
Roof Dead Load Qa= • 17 psf
PV System Dead Load Qpv= 3 psf
Framing Spacing s,.°,= 24 in
Linear Dead Load WD=(QD+Qpv)*Sroor= 40 plf
Lag Screw Check Lumber: DF-L No.1
Uplift Demand
Design Wind Pressure p= -30.8 psf(Zone 2)
Trib. Depth for Each Rail dp„=U2= 2.69 ft
Trib. Depth for Each Rail bp„=W/2= 1.73 ft
Screw Anchor Spacing spy= 6 ft(max.)
Uplift Force on Each Screw, Portrait UL=(p+Qp„) dp,*sp„= -449 lbs(Upwards)
Uplift Force on Each Screw,Landscape Uw=(p+Qp„)*bp,*spv= -289 lbs(Upwards)
Design Uplift Force P„p;ih=0.6*[Max(UL, Uw)1= -269 lbs(Upwards)
Uplift Capacity
NDS 2015 Adjustment Factors
CD= 1.6 CM= 1 Ct= 1 SG= 0.50 Ce, Ceg, C9, Cd;, Ct„are not appicable
Speicfic Gravity of Lumber SG = 0.50 NDS Supplement Table 4a
Diameter of Lag Screw D= .. 5/16 in
Withdraw Design/in 1800*SG4i2*D414= 266 lbs/in NDS 2015 12.1-1
Depth of Embeddment Ip= 2.50 in
Total Nominal Withdrawal Value W=W*ip= 665 lbs
Withdrawal Design VaulE W=W*C D*CM*Ct= 1064 lbs NDS 2015 Table 11.3.1
Demand-Capacity Ratio Puplift/W= 0.25 < 1 [OKAY]
Beam/Top Chord Check Lumber:DF-L No. 1
Moment Demand
Span 1 2 3 Orientation j li(ft) pi(lbs)
Lenght(ft): 8 8 8 1 3.8 -449
Portrait
2 7.6 -449
3 9.1 -449
Linear Dead Load wd= 40 plf Portraii 4 13.0 -449
Wind Load, Portrait UL= -449 lbs 5 14.5 -449
Portrait
Wind I oad, I andscape U,A,_ -289 lbs 6 18.4 -449
#of Attachment per Rafter NA= 8 Portrait
tivdxz 7 19.9 -449
8 23.7 -449
M(x)=Ri(x—Li)—Pi(x—/j)-
1000
1)-1000
500
0 .. ,.::.. .
E d' -500 00 5.0 10.0 1` 0 20.0 25.0 30.0
0
r) -1000 i •
-1500 - -
Length x(ft)
Ma,Moment
Dead 387 lb-ft
Dead+Wind 955 lb-ft
Dead+Snow 387 lb-ft
Moment Capacity Framing Member Size 2x4 Lumber Grade: DF-L No. 1
CM= 1 Ct= 1 Cr 1.15 CF= 1.5 fb= 1000 psi Cf„and C;are not applicable
Breadth b= 1:50 in
DCpll l U- 3.50,in
Section Modulus S, =bd2/6= 3.063 in3
Bending Stress Capacity F,,= CM*C,*Cr*CF*f,,= 1725 psi Table 4.3.1 NDS 2015
CD Fb=Co*Ft Ma*S, ASD Load Design Bending DCR
Dead 0.9 1553 psi 1515 psi D 1515 psi 0.98 OKAY-
Dead+Wind 1.6 2760 psi 3741 psi .6W+.6D 2245 psi 0.81 OKAY
Dead+Snow 1.15 1984 psi 1515 psi D+S 1515 psi 0.76 OKAY
Deflection Limit E= 1700 ksi I = 5.36-in4
Transient Deflection 0.317 in
Transient Deflection Allowed 303 > 180 [OKAY]
Total Deflection 0.754 in
Total Deflection Allowed 127 > 120 [OKAY]
I r
SEISMIC WEIGH I COMPARISON/ANALYSIS -(PER CBC 2016 Part 10 Chapter 4 Section 402
PV System Weight
•
Module Model Panasonic 330 Watt
Panel Weight Wp e1= 40.81 lbs
Number of Panels Npv= 22
Total PV System Weight WpV=Wpanel * Npv= 897.82 lbs
Existing Roof Weight
Roof Weight QD= 17.0 psf
Building Length Lbuild = 55 ft
Building Width Wbuild = 50 ft
Roof Area Abuild= 2750 IL
Building Perimeter Pbuild= 210 ft
Wall Height ht= 8 ft
Wall weight Qwall= 15 psf
Interior wall weight Qint= 10 psf
Floor Load Wfloor=Abuild * QD= 46750 lbs
Wall Load Nwaii= ht/2 * -wall* Pbuild +Abuild* Qint/2 = 26350 lbs
Total Story Weight Wbuild =Wfloor+Wwall= 73100 lbs
Percentage Weight Increa Wpv/Wbuild= 1.23% < 10% OKAY