Loading...
HomeMy WebLinkAboutSOLR-18-1022 '5c:03484022 - City of Arcadia, CA fr Development Services Department t )l�- i i k t Permrt Type•Solar 1 240 West Huntington Drive,Post Office Box 60021 i 4 s I h < S Arcadia,CA 91066-6021 Lt- Work c/asshcotion_ o`lars Res,den't laf, (626)574-5416 tt". r * + < 'Permit Status:{lssued., ARCADIA IssueDat o6/i5/zo18I Expiration: 12/12/2018 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 1906 S SIXTH AVE Arcadia,CA 5791019014 Contacts LANNY HALIM Owner ARTGREEN CONSTRUCTION General Contractor(B) 1906 SIXTH 18375 VENTURA BLVD 703,TARZANA,CA 91356 Description:ROOF MOUNTED SOLAR SYSTEM.18 PANELS Valuation: $0.00 Tenant Total sq Feet: 0.00 Plan Check n Plan Fees Amount Payments Amount Paid Building Plan Check Fee Residential $50.00 Total Fees $300.91 Electrical Permit Issuance Fee $44.35 Cash/Receipt N REC-001453-2018 $300.91 Fire Plan Check Fee Residential $50.00 Amount Due: $0.00 Inverters $77.78 Panels $77.78 Solid Waste Management Fee 2 $1.00 Total: $300.91 mil COMPLETED fain.! tcee_r,zsc CALLS FOR INSPECTIONS Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. �J�Ik/(_L IJ C. This permit/plan review expires by time limitation and becomes null and 1 (S r t' void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. • June 15, 2018 Issued By: Date lune 15,2018 Page 1 of 1 A: dvogy4:4. ki war yi PERMIT/PLAN REVIEW APPLICATION co 4)*' . Development Services Department,240 West Huntington Drive,Post Office Box 60021 0o• "' Arcadia, CA 91066-6021, (626) 574-5416,Fax (626)447-9173 City of Arcadia LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: Chapter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,and my license is in full force and effect. 7 ❑ I have and will maintain a certificate of consent to self-insure for workers' ( Signature of Contractor License Class License No.t�k '73q Exp. Date�'Zi,10 compensation, as provided for by Section 3700 of the Labor Code, for the /(A,/i_ performance of the work for which this permit is issued. �L�' OWNER-BUILDER DECLARATION ❑ I have and will maintain workers'compensation insurance,as required by Section ❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which his permit License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, Carrier demolish,or repair any structure,prior to its issuance,also required the applicant for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less) 7000)of Division 3 of the Business and Professions Code)or that he or she is exempt them from and the basis for the alleged exemption. Any violation of I certify that in the performance of the work for which this permit is issued,I shall Section 7031.5 by any applicant for a permit subjects the applicant to a civil of employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall ❑I, as owner of the forthwith comply with those provisions. property, or my employees with wages as their sole compensation,will do the work,and the structure is not intended or offered for ,l sale(Section 7044,Business and Professions Code:The Contractors License ( Date l�15�( p Signature �����'�c Law does not apply to an owner of property who builds or improves thereon, or who does such work himself or herself or through his or her own employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. ❑I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon, and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Date Signature Lender's Address IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for further information. (Name (Pt-'& tte., 00-ClCif (Title evt�- PRINT NAME certify that I have read this application and state that the above information is c rrect and that I am the owner or duly authorized agent of the owner. I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of Arcadia to enter upon the above-mentioned property for inspection purposes. C ///// �C' , ( Date( inature 1 9/17/2017 17@ i ~Ntr > J ArtWreen Construction. .- 18375 Ventura Blvd. #703 Tarzana, CA 91356 ARTGREEN Tel: 818.995.0552 o eMail: info@ArtGreenConstruction.Com I To Whom It May Concern: I Haim Vagas President of; ArtGreen Construction. 18375 Ventura Blvd. Tarzana, CA 91356 CSLB#897539 City Tax 000227374400015 Allow (l e-i (S(a re(0'5 and their officers or representatives the ability to obtain pull permits plans as representatives of"ArtGreen Construction"for any necessary permits related process. b • Respectfully, Haim Vaga \( a° ,1% .. .. b Sarjne tt2.20Cs-c,P,aftiffh,. 1/ - ` - . I tour rtt � .Sr, `o0.12. ' t . .. State of The ART GREEN Solutions B-Lic.f1897539 •ROOF ACCESS POINT SHALL BE LOCATED IN N AREAS THAT DO NOT REQUIRE THE PLACEMENT OF OF GROUND LADDERS OVER OPENINGS SUCH AS • e WINDOWS OR DOORS,AND LOCATED AT STRONG '`- POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFUCT s "y1' WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS,WIRES OR SIGNS. 5 n C'J A 8001 CANOGA AVE BB CANOGA PARK,CA 81304 PHONE:1(818)584-4820 REVISIONS DESCRIPTION (E)FENCE E WISTARIA AVE. DATE REV PROPERTY LINE —1851-3" _ r • W &PL eMN9 el KI 4 114" _ EXISTING *. tt _ _ DRIVEWAY PROJECT NAME&ADDRESS zeo 411 . I - 1..; M Ikt 7-STORY0 QCD 1 HOUSE 1-STORY Q ; Z \ --i ],-Z GARAGE CD = \r Z��n— (E)PENCE = U Q D ' 38 11 z m O Z 8 Q tli CC CC Zi ! J Q n to L )1 i — J AR TRA INFORMLTN PROPERTY LINE // —1851_311 3'-6" r E 125A MAIN SERVICE PANEL J CONTRACTORENCoNSORUCTON (&)GATE _ CA UC 00887539 ROOF ACCESS POINT 18375 VENTURA BLVD t703 ROOF#1 (18)PANASONIC TARLuW CA 91858 VBHN32ESA16 MODULES (8581 9956552 SHEET NAME PLOT PLAN& Swmml EvgimaingbalmrlewN We exlNng=mire vile tiCaSSIQVit ROOF PLAN 'adm lading toe ee In seed�ne<eo®to the nuts tombs The The Mips rift Eedmckngn•mm,mmnemimcam 7y. N. ("(r.4 . SHEET SIZE almisAnsart b bya�&wkv4 mfnaniegothm. /.4 "9. road allot non,o�Nna.we.•orme.lmignorenro.5os. ANSI B Project 8:U2432.0382..181 ;�*/ . 17.. t z .41 * 11"X 17" 1 PLOT PLAN WITH ROOF PLAN 99 civ t\s" SHEET NUMBER PV-1 SCALE:1/16"=1' �`A OF COI 6/15/2018 PV-1 J..-a Der COI,fir, thrpnrt'rrl, 'Crt.it,t5 f)f tt • This set or / �1, 'i&){1 ,pt'Partntt'n/ VSE Project Number:U2432-0382-181 • 0n the job all I' b/It'cifi(;I f� Thesbrrnrrt made Qv,1�t 6.1.an d nrr Ch1rm eSrntrst 1k'k pt June 15,2018 57: pip 'cthe oralt Sasha International of be p'tf�o permit 01.t he and vpet'r%iin`.1 riS' rrOr7.S 8001 Canoga Avenue,#B l rrrl''ions pl• t 'in'PPrpt .rtion shall rrh't'f(l.o (`ofthe tin!, rrryt Canoga Park,CA 91304 Ord. ,, atf r nr'state hm REFERENCE: Lanny Halim Residence: 1906 6th Avenue,Arcadia,CA 91006 Solar Array Installation To Whom It May Concern: Per your request, we have reviewed the existing structure at the above referenced site. The purpose of our review was to determine the adequacy of the existing structure to support the proposed installation of solar panels on the roof as shown on the panel layout plan. Based upon our review, we conclude that the existing structure is adequate to support the proposed solar panel installation. Design Parameters Code: California Building Code,2016 Edition(2015 IBC) Risk Category:II Design wind speed: 100 mph (3-sec gust)per ASCE 7-10 Wind exposure category:C Ground snow load: 0 psf Existing Roof Structure • Roof structure:2x8 rafters @ 16"O.C. Roofing material:concrete tile(round) Roof slope: 18° Connection to Roof Mounting connection: (1)5/16"lag screw w/min.2.5"embedment into framing at max.48"O.C.along rails Conclusions Based upon our review,we conclude that the existing structure is adequate to support the proposed solar panel installation. The weight of the solar array is 3 psf or less. In the area of the solar array, other live loads will not be present or will be greatly reduced(2016 CBC,Section 1607.12.5).The member forces in the area of the solar panels are not increased by more than 5%; thus, the stresses of the structural elements are not increased by more than 5%. Therefore, the requirements of Section 403.3 of the 2016 CEBC are met and the structure is permitted to remain unaltered. u r r VSE Project Number: U2432-0382-181 Lanny Halim Residence 6/15/2018 The solar array will be flush-mounted (no more than 6" above the roof surface) and parallel to the roof surface. Thus, we conclude that any additional wind loading on the structure related to the addition of the proposed solar array is negligible. The attached calculations verify the capacity of the connections of the solar array to the existing roof against wind (uplift), the governing load case. Regarding seismic loads, we conclude that any additional forces will be small. With an assumed roof dead load of 21 psf,solar array dead load of 3 psf, and affected roof area of 33%(maximum),the additional dead load (and consequential seismic load)will be 4.8%.This calculation conservatively neglects wall weight.Because the increase in lateral forces is less than 10%, this addition meets the requirements of the exception in Section 403.4 of the 2016 CEBC. Thus the existing structure is permitted to remain unaltered. Limitations Installation of the solar panels must be performed in accordance with manufacturer recommendations. All work performed must be in accordance with accepted industry-wide methods and applicable safety standards. The contractor shall notify Structural Engineering, should any damage, deterioration or discrepancies between the as-built condition of the structure and the condition described in this letter be found. Connections to existing roof framing must be staggered, except at array ends, so as not to overload any existing structural member. The use of solar panel support span tables provided by others is allowed only where the building type, site conditions, site-specific design parameters, and solar panel configuration match the description of the span tables. The design of the solar panel racking(mounts,rails, etc.), and electrical engineering is the responsibility of others. Waterproofing around the roof penetrations is the responsibility of others. Structural Engineering assumes no responsibility for improper installation of the solar array. 4-SICST17%." pPFS31� y- lb,'r' 1 17 o I *;1 �l1 t�y qT�o _ r.. 06/15/2018 Russell Emery,P.E. Project Engineer Enclosures RNE/kec JOB NO.: U2432-0382-181 SUBJECT: WIND PRESSURE PROJECT: Lanny Halim Residence Components and Cladding Wind Calculations Label: Solar Panel Array. Note: Calculations per ASCE 7-10 SITE-SPECIFIC WIND PARAMETERS: Basic Wind Speed [mph]: 100 Notes: Exposure Category: C Risk Category: II ADDITIONAL INPUT & CALCULATIONS: Height of Roof, h [ft]: 25 (Approximate) Comp/Cladding Location: Gable/Hip Roo s 7"0<27° Hip? f No Enclosure Classification: Enclosed Buildings • Zone 1 GCp: 0.9 Figure 30.4-2B (enter largest abs. value) Zone 2 GCp: 1.7 (enter largest abs. value) Zone 3 GCp: 2.6 (enter largest abs. value) a: 9.5 Table 26.9-1 z9 [ft]: 900 Table 26.9-1 IC: 0.95 Table 30.3-1 Kn: 1 Equation 26.8-1 IC: 0.85 Table 26.6-1 Velocity Pressure, qh [psf]: 20.6 Equation 30.3-1 GCp;: 0 Table 26.11-1 (largest abs. value) OUTPUT: p=q,,liGCP)—(GC,,)J Equation 30.9-1 Zone 1 Pressure, p [psf]: 18.5 psf(1.0 W, Interior Zones*) Zone 2 Pressure, p [psf]: 35.0 psf (1.0 W, End Zones*) Zone 3 Pressure, p [psf]: 53.5 psf(1.0 W, Corner Zones*within a) (a= 3 ft) r . JOB NO.: U2432-0382-181 SUBJECT: SEISMIC LOADS PROJECT: Lanny Halim Residence COMPARE WIND &SEISMIC LOADS FOR CONNECTION (1 Sq. Ft. Section) Wind Load, W: Wind pressure, p: 11.1 psf(Zone 1: 0.6 W from wind pressure calculation) Height, h: 1.0 ft Width, w: 1.0 ft FPep: 11.1 lb (Uplift) Wind Controls Connection Design Seismic Load, E: Risk category: II Fe: 1.0 Seismic Design Category: D Fv: 1.5 IP: 1.00 SMS: 1.992 Site Class: D SM1: 1.073 RP: 1.5 SDS: 1.328 S5: 1.992 SD1: _ 0.715 Si: 0.715 ap: 1 0.7 * Fp,min: 0.837 lb z: 1.0 ft 0.7 * Fp,max: 4.463 lb h: 1.0 ft 0.7 * Fp,vert: 0.558 lb z/h: 1.0 0.7 * Fp,long: 2.231 lb 0.7*Fp,perp: 1.2200 lb (uplift) CHECK INCREASE IN OVERALL SEISMIC LOADS SEISMIC: Estimated Roof Dead Load 21 psf Max. % of Roof w/ Panels 33 % Dead Load from Panels 3 psf Total Dead Load 21.7 psf (DL+% of roof w/ Panels*Panel DL) Increase in Dead Load 4.8% Conservatively neglecting the weight of existing wall materials, the installation of the solar panels represents an increase in the total weight (and resulting seismic load) of 4.8%. Because the increase is less than 10%, this addition meets the requirements of the exception in Section 403.4 of the 2016 CEBC. Thus the existing structure is permitted to remain unaltered. JOB NO.: U2432-0382-181 SUBJECT: CONNECTION PROJECT: Lanny Halim Residence Lag Screw Connection Capacity: Demand: Lag Screw Size [in]: 5/16. Cd: 1.6 NDS Table 2.3.2 Pressure Max Max. TZib. Max. Uplift (0.6 Wind) Tributary Area Embedment' [in]: 2.5 (psf) Width (ft) (ft) Force (lbs) Grade: SPF(G = 0.42) Zone Capacity [lbs/in]: 205 NDS Table 12.2A 1 11.1 4.0 11.0 122 Number of Screws: 1 2 21.0 4.0 11.0 231 Prying Coefficient: 1.4 3 32.1 4.0 11.0 353 Total Capacity [lbs]: 586 Demand< Capacity: CONNECTION OKAY 1. Embedment is measured from the top of the framing member to the beginning of the tapered tip of the lag screw. Embedment in sheathing or other material is not effective.The length of the tapered tip is not part of the embedment length. 2. 'Max.Trib Area'is the product of the'Max.Tributary Width'(along the rails)and 1/2 the panel width/height (perpendicular to the rails). JOB NO.: U2432-0382-181 SUBJECT: GRAVITY LOADS PROJECT: Lanny Halirim Residence CALCULATE ESTIMATED GRAVITY LOADS Increase due to Original ROOF DEAD LOAD (D) pitch loading Roof Pitch/12 3.9 Concrete Tile (Round) 12.6 1.05 12.0 psf 1/2" Plywood 1.1 1.05 1.0 psf Framing 3.0 psf Insulation 0.0 psf 1/2" Gypsum Clg. 0.0 psf M, E & Misc 0.0 psf DL 17 psf PV Array DL 3 psf ROOF LIVE LOAD (Lr) Existing Design Roof Live Load [psf] 20 ASCE 7-10,Table 4-1 Roof Live Load With PV Array [psf] 0 2016 CBC, Section 1607.12.5 w/Solar Panel SNOW LOAD (S): Existing Array Roof Slope [x:12]: 3,9 3.9 Roof Slope [01: 18 18 Snow Ground Load, p9 [psf]: 0 0 ASCE 7-10, Section 7.2 Terrain Category: C C ASCE 7-10, Table 7-2 Exposure of Roof: Fully Exposed Fully Exposed ASCE 7-10,Table 7-2 Exposure Factor, Ce: 0.9 0.9 ASCE 7-10,Table 7-2 Thermal Factor, Cr: 1 A 1.1 ASCE 7-10, Table 7-3 Risk Category: II II ASCE 7-10, Table 1.5-1 Importance Factor, Is: 1.0 1.0 ASCE 7-10,Table 1.5-2 Flat Roof Snow Load, pf[psf]: 0 0 ASCE 7-10, Equation 7.3-1 Minimum Roof Snow Load, pm [psf]: 0 0 ASCE 7-10, Section 7.3.4 Unobstructed Slippery Surface? No No ASCE 7-10, Section 7.4 Slope Factor Figure: Figure 7-2b Figure 7-2b ASCE 7-10, Section 7.4 Roof Slope Factor, Cs: 1.00 1.00 ASCE 7-10, Figure 7-2 Sloped Roof Snow Load, ps [psf]: 0 0 ASCE 7-10, Equation 7.4-1 Design Snow Load, S [psf]: 0 0 • JOB NO.: U2432-0382-181 SUBJECT: LOAD COMPARISON PROJECT: Lanny Halim Residence Summary of Loads Existing With PV Array D [psf] 17 20 Lr[psf] 20 0 S [psf] 0 0 Maximum Gravity Loads: Existing With PV Array D+ L,[psf] 37 20 ASCE 7-10,Section 2.4.1 D+S[psf] 17 20 ASCE 7-10,Section 2.4.1 Maximum Gravity Load [psf]: 37 20 Ratio Proposed Loading to Current Loading: 54% OK The gravity loads in the area of the solar array are decreased;thus,the stresses of the structural elements are decreased.Therefore,the requirements of Section 403.3 of the 2016 CEBC are met and the structure is permitted to remain unaltered. JOB NO.: U2432-0382-181 SUBJECT: SOLAR LAYOUT PROJECT: Lanny Halim Residence •, , N , v ` i 1/4(._ 1/4- .1_,;- ), V 'C--'C.Zj-- J - J : . ,,,<� , ::iiiN , 2-STORY =%. ' HOUSE ,.up, 3 6 —N ISERVICE PANEL /4