HomeMy WebLinkAboutItem 11g - Reject and Re-bid Duarte Road Sewer Capacity Improvement ProjectDuarte Road Sewer Capacity Improvement Project
June 4, 2019
Page 1 of 3
DATE: June 4, 2019
TO: Honorable Mayor and City Council
FROM: Tom Tait, Public Works Services Director
By: Eddie Chan, P.E., Principal Civil Engineer
SUBJECT: REJECT ALL BIDS RECEIVED FOR THE DUARTE ROAD SEWER
CAPACITY IMPROVEMENT PROJECT AND DIRECT STAFF TO RE-BID
THE PROJECT
Recommendation: Approve
SUMMARY
The City of Arcadia’s 2006 Sewer Master Plan study identified and prioritized sections
of sanitary sewer pipe that are flowing at or above design capacity. Based on the study,
the section of sewer pipe on Duarte Road between Baldwin Avenue and the connection
point to the Los Angeles County Sanitation District (“LACSD”) sewer trunk pipe at Holly
Avenue needs to be replaced in order to accommodate peak sewer flows. The Fiscal
Year 2018-19 Capital Improvement Program budget allocates funding to replace the
existing 12-inch sewer pipe with a 16-inch sewer pipe. To ensure that the City is
receiving the most competitive prices and quality service for this work, a fo rmal bid was
conducted and Vasilj, Inc. submitted the lowest responsive bid. During the bid
evaluation process, Vasilj, Inc. requested their bid to be withdrawn due to a clerical
error. All other bids received exceeded the estimated budget. It is recommended that
the City Council reject all bids received for the Duarte Road Sewer Capacity
Improvement Project and direct staff to re-bid the project.
BACKGROUND
In 2006, the State Water Resources Control Board adopted the Waste Discharge
Requirement Program for all publicly-owned sanitary sewer collection systems in
California with more than one mile of sewer pipeline. Under this program, the City was
required to prepare and implement a Sewer Syst em Management Plan (“SSMP”). The
SSMP identifies routine preventative operation and maintenance activities that assist
the City in achieving a goal of zero sewer system overflows. This is accomplished
through annual inspections, routine cleaning of the se wer pipes, repair of broken pipes,
and replacement of pipes flowing above their design capacity.
Duarte Road Sewer Capacity Improvement Project
June 4, 2019
Page 2 of 3
The City of Arcadia’s 2006 Sewer Master Plan study identified section s of sanitary
sewer pipe on Duarte Road as inadequate in accommodating the current high demand
flows and is at risk of experiencing sewer overflows. The existing 12-inch sewer pipe
along Duarte Road between Baldwin Avenue and the connection point to the LACSD
sewer trunk pipe needs to be replaced with a 16-inch sewer pipe to alleviate the
potential of a sewer back up and overflow.
DISCUSSION
A Notice Inviting Bids was published in the City’s adjudicated newspaper, and bid
packages were provided to contractors that perform this type of work. On May 14, 2019,
the City Clerk received five bids with the following results:
Bidder Location Bid Amount
Vasilj, Inc. Irwindale, CA $ 724,350
GRBCON, Inc. Baldwin Park, CA $ 798,478
Mike Prlich & Sons, Inc. Baldwin Park, CA $ 849,600
GRFCO, Inc. Brea, CA $ 993,000
MNR Construction, Inc. La Verne, CA $ 1,143,700
All bid documents were reviewed for content and the contractor’s background was
investigated. During the bid evaluation process, the lowest bidder, Vasilj, Inc. requested
their bid to be withdrawn due to a clerical error. The price for one of their bid items
should have been more than what they indicated. All other bids received exceeded the
estimated budget for this project of $750,000. The Public Works Services Department
(“PWSD”) reviewed all bids and found that the cost of Polyethylene pipe material
increased significantly due to high global demand for this pipe material. PWSD
engineering staff will work on revising the scope of work to bring the project within
budget, and rebid the project.
ENVIRONMENTAL ANALYSIS
This project is categorically exempt per the California Environmental Quality Act
(“CEQA”) as an existing facility, Section 15301 of the CEQA guidelines.
FISCAL IMPACT
Funds in the amount of $750,000 have been budgeted in the FY 2018-19 Capital
Improvement Program for this project.
Duarte Road Sewer Capacity Improvement Project
June 4, 2019
Page 3 of 3
RECOMMENDATION
It is recommended that the City Council reject all bids received for the Duarte Road
Sewer Capacity Improvement Project and direct staff to re -bid the Project.