Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RALT-18-2309
k" - City of Arcadia, CA Permit NO RALT 18 2309' Development Services Department ' - '" }Pe m Type Residential Addition/Alteration= 240 West Huntington Drive,Post Office Box 60021 Q f L ('i r '' , t � , �WorkClassirnat on Res-.Addition/Alteration' Arcadia,CA 91066-6021 (626)574-5416 - 3 '-, Permit 5tatuv Issued ARCADIA 4 Issueoate 12/12/2018•. Expiration: 06/10/2019 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 230 Sharon RD Arcadia,CA 5785006014 Contacts TACAWY,AMIR Y AND SOUZANE H Owner 230 SHARON RD r (626)235-3574 , Description:INSTALL NEW WINDOW ON FRONT ELEVATION OF i Valuation: $ 15,550.00 i Tenant HOME,REPLACE SIDING AND BRICK FACADE WITH STACKED STONE/STUCCO PER APPROVED PLAN. NEW FRONT DOOR, E Total Sq Feet: 0.00 , Plan Check# Plan#IN FILE REPLACE ALL WINDOWS(RETRO-FIT) 4 ,_-...'"'.,,.`..".: -. .�.-_.._...W,...,,..�,.....�..- s..,. Fees Amount Payments Amount Paid Building Issuing Fee $44.35 Total Fees $796.02 Building Permit Fees $337.45 Cash/Receipt#REC-003121-2018 $796.02 Double Fee(Building) $337.45 Amount Due: $0.00 Energy Plan Review Fee $67.49 Green Building Standard $1.00 Solid Waste ManagementFee $6.25 COMPLETED StronggMotion Inst.Program Res $2.03 Total: $796.02 Y CALLS FOR INSPECTIONS Request for inspection by telephone at 626-574-5450. Leave a message r6,4L r;.:/,g_f 7 requesting the address,timeframe and what inspection item is needed. T�' This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. December 12,2018 Issued By: Date December 14,2018 Page 1 of 1 pv AR • o,,PwRY,� sis 1' PERMIT/PLAN REVIEW APPLICATION E�3*' Development Services Department, 240 West Huntington Drive,Post Office Box 60021 %„,..,Y r Arcadia, CA 91066-6021, (626) 574-5416,Fax (626) 447-9173 City of Arcadia LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: Chapter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers' License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Signature of Contractor OWNER-BUILDER DECLARATION ❑ I have and will maintain workers'compensation insurance,as required by Section ❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, Carrier demolish,or repair any structure,prior to its issuance,also required the applicant Policy Number for such permit to.file a signed statement that he or she is licensed pursuant to the provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less) 7000)of Division 3 of the Business and Professions Code)or that he or she is exempt there from and the basis for the alleged exemption. Any violation of ❑ I certify that in the performance of the work for which this permit is issued,I shall Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall I, as owner of the roe forthwith comply with those provisions, ❑ property,rty, or my employees with wages as their sole compensation,will do the work,and thestructure is not intended or offered for sale(Section 7044,Business and Professions Code:The Contractors License Date Signature Law does not apply to an owner of property who buildsvordloproyes thereon, -.. or who does such work himself or herself or tluough his krjhbr';own -. - employees,provided that such improvements are nOt antendel'bi':bffejed;for . '" WARNING: Failure to secure.Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold+iditl inline(1)yedr of " and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code„interest, and • attorney's fees. ❑I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY • who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury'that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Date Signature Lender's Address IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for further information. Name • Title PRINT NAME I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of Arcadia to enter upon the above-mentioned property for inspection purposes. Signature Date Gb 'ci. City of Arcadia, CA _ Permit No MEP=18. 2266 i lo Development Services Department Permit'Type:MEP r1 240 West Huntington Drive,Post Office Box 60021 __ I •' i+ , r ,` ' Arcadia,CA 91066-6021 r -' 4' - ' :Work.Classification:MEP-Residential (626)574-5416 , „,. . • • _ ,Perm/t Statits:.Issued ARCADIA Issue Date.12/06/2018`I Expiration: 06/04/2019 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 1230 Sharon RD Arcadia,CA 5785006014 Contacts TACAWY,AMIR Y AND SOUZANE H Owner 230 SHARON RD (626)235-3574 Description:REMODEL KITCHEN AND BATHROOMS.(EXISTING Valuation: $ 0.00 Tenant LAYOUT TO REMAIN) AMENDED 1-17-19 OUTLET FOR FRONT ABOVE GROUND Total Sq Feet: 0.00 Plan Check# Plan# WATER FOUNTAIN Fees Amount Payments Amount Paid Bathtubs/or Combo $24.92 Total Fees $500.44 Bidet $37.38 Cash/Receipt#REC-003076-2018 $500.44 Clothes Washer $12.46 Dishwasher $12.46 Amount Due: $0.00 Electrical Permit Issuance Fee $44.35 Garbage Disposal Fee $12.46 Hood Serviced by Mechanical Exhaust $14.11 Kitchen Sink $12.46 Laundry Trays y $12.46 al COMPLi Lavatories $62.30 Lawn Sprinkler Sstem on One Meter $18.74 INSPECTIONS Mechanical Permit Issuance Fee $44.35 Request for inspection by telephone at 626-574-5450. Leave a message Outlets-Receptacles&Switches $23.10 requesting the address,timeframe and what inspection item is needed. Plumbing Permit Issuance Fee $44.35 Shower $24.92 Solid Waste Management Fee 2 $1.00 This permit/plan review expires by time limitation and becomes null and Solid Waste Management Fee 2 $1.00 void if the work authorized by the permit is not commenced within 180 days Solid Waste Management Fee 2 $1.00 from the date of issuance or if the permit is not obtained within 180 days Ventilation Fan(Single Duct) $28.14 from the date of plan submittal.This permit expires and becomes null and Water Closet $37.38 void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Water Heater and/or vent $31.10 Arcadia building inspector for a period of 180 consecutive days. Total: $500.44 rt_.2.< /w -1' G9e December 06, 2018 Issued By: Date January 17,2019 Page 1 of 1 ,f AR "LLsort,,v.4.• k.� ; a 1: PERMIT/PLAN REVIEW APPLICATION 4a 4 , Development Services Department,240 West Huntington Drive,Post Office Box 60021 „ en" Arcadia, CA 91066-6021, (626) 574-5416, Fax (626) 447-9173 City of Arcadia LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: Chapter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,and my license is in full force and effect. 0 I have and will maintain a certificate of consent to self-insure for workers' License Class _License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the Signature of Contractor performance of the work for which this permit is issued. OWNER-BUILDER DECLARATION Q I have and will maintain workers'compensation insurance,as required by Section ❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, Carrier demolish,or repair any structure,prior to its issuance,also required the applicant Policy Number for such permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less) 7000)of Division 3 of the Business and Professions Code)or that he or she is exempt them from and the basis for the alleged exemption. Any violation of 0 I certify that in the performance of the work for which this permit is issued,I shall Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers' penalty of not mom than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall ❑I, as owner of the property, or my employees with wages as their sole forthwith comply w h those provisions. compensation,will do the work,and the structure is not intended or offered for sale(Section 7044,Business and Professions Code:The Contractors License Date Signature Law does not apply to an owner of property who builds or improves thereon, or who does such work himself or herself or through his or her own • employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is"'tinlavdul, sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines tip-to one completion,the owner-builder will have the burden of proving that,he or she '- hundred thousand dollars($100,000);in addition to the cost of compensation, did not build or improve for the purpose of sale): . damages as provided for in Section 3706 of the Labor Code, interest,;and • tri attomey's fees. IDI, as owner of the property, am exclusively`contracting with licensed - - - - contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Date Signature Lender's Address IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos. Please contact AQMD at(909) 396-2000 for further information. Name Title PRINT NAME I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of Arcadia to enter upon the above-mentioned property for inspection purposes. Signature Date City of Arcadia, CA ermit NO MEP 18 2266,= iTDevelopment Services Department4. �"` , �F-� '� 'Permit 7)'peyrMEP t 240 West Huntington Drive,Post Office Box 60021 , 5s-.< r �, F t.� t Work Classy canons MEP Residential Arcadia,CA 91066-6021 + __ (626)574-5416 - ' -PermitStatus:(issued' A2CADdA issueDaie.12/06/2018' Expiration: 06/04/2019 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 230 Sharon RD Arcadia,CA 5785006014 Contacts TACAWY,AMIR Y AND SOUZANE H Owner t 230 SHARON RD (626)235-3574 Description:REMODEL KITCHEN AND BATHROOMS.(EXISTING Valuation: $ 0.00 Tenant LAYOUT TO REMAIN) Total Sq Feet: 0.00 Plan Check B Plan N Fees Amount Payments Amount Paid Bathtubs/or Combo $24.92 Total Fees $500.44 Bidet $37.38 Cash/Receipt 8 REC-003076-2018 $500.44 Clothes Washer $12.46 Dishwasher $12.46 Amount Due: $0.00 Electrical Permit Issuance Fee $44.35 Garbage Disposal Fee $12.46 � Hood Serviced by Mechanical Exhaust $14.11 F`oL 349 -1? ` r/� Kitchen Sink $12.46 compiETED Laundry Trays $12.46 ✓ Lavatories $62.30 Lawn Sprinkler System on One Meter $18.74 CALLS FOR INSPECTIONS Mechanical Permit Issuance Fee $44.35 Request for inspection by telephone at 626-574-5450. Leave a message Outlets-Receptacles&Switches $23.10 requesting the address,timeframe and what inspection item is needed. Plumbing Permit Issuance Fee $44.35 Shower $24.92 Solid Waste Management Fee 2 $1.00 This permit/plan review expires by time limitation and becomes null and Solid Waste Management Fee 2 $1.00 void If the work authorized by the permit is not commenced within 180 days Solid Waste Management Fee 2 $1.00 from the date of issuance or if the permit is not obtained within 180 days Ventilation Fan(Single Duct) $28.14 from the date of plan submittal.This permit expires and becomes null and Water Closet $3738 void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Water Heater and/or vent $31.10 Arcadia building inspector for a period of 180 consecutive days. Total: $500.44 1, December 06,2018 Issued By: Date December 06,2018 Page 1 of 1 ,. ,,n 1 PERMIT/PLAN REVIEW APPLICATION • e; \4 r Development Services Department,240 West Huntington Drive,Post Office Box 60021 Arcadia, CA 91066-6021, (626) 574-5416,Fax (626) 447-9173 City of Arcadia LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: Chapter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,and my license is in full force and effect. 0 I have and will maintain a certificate of consent to self-insure for workers' License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Signature of Contractor OWNER-BUILDER DECLARATION ❑ I have and will maintain workers'compensation insurance,as required by Section I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, Carrier demolish,or repair any structure,prior to its issuance,also required the applicant Policy Number for such permit to filea signed statement that he or she is licensed pursuant to the provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less) 7000)of Division 3 of the Business and Professions Code) or that he or she is exempt there from and the basis for the alleged exemption. Any violation of I certify that in the performance of the work for which this permit is issued,I shall Section 7031.5 by any applicant for a permit subjects the applicant to a civil t employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall ❑I, as owner of the roe forthwith comply with those provisions. property,rty, or my employees with wages as their sole compensation,will do the work,and the structure is not intended or offered for j //26 l� g _ - sale(Section 7044,Business and Professions Code:The Contractors License 1 Date! fiSi nature 11111Law does not apply to an owner of property who builds or improves thereon, `\ or who does such work himself or herself or through his or her own employees,provided that such improvements are not intended or offered for WARNING:.Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(1)year and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving'that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. ❑I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). 0 I am exempt under Section 7044,Business and Professions Code,for this reason: /// r� Lender's Name 1 • Date 22- b 20 ($ignature - .—.....-_,„‘„,Lair ,. Lender's Address t IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909) 396-2000 for further information. Tame S©L1zf{-IV E CAC l�W \Title ©(,t9A a /— \\ PRINT NAME I certify that I have read this application and state that the above information is correct and that I.am the owner or duly authorized agent of the owner. I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of Arcadia to enter upon the above-mentioned property for inspection purposes. cJ Signature I i —..• a f Date )21‘ /2o,/ wv +i�r, tl- t-� • `�i • Z� ,: "tet/\ -... (`'\ \ 4 x k •`\•1\ �..' a •°....- . , , /` r 4r • t . r \ef......... y \ A5 .'f'CG. -� C ✓:. 2E r "� •1‘ `! 4; 1 .,• w 1 a - ( ( \ A�/V-/o ij. • • et kt 1t • / Y?. Via ' ( , . "N 3,i • i • \ti, - 1,` 1 [o - ,'i ( ' sSP •`c '' p . l r Q, 1,—,(4-- f.,i,,,t a . , . ela b- 4,1.; .. ': •i kr...—t\cas../('-i'c. -,‘--c.: ' 1, - , • «�- \ - . \` '‘,\*,`,,'c' .\ N �,.. \ a..7 • l- `'� a d �i ii ••a , I % l i' jt 6 di 4) CO it ; t e1 ;/� o 1 E 4= i=a ZZ. � • ly ll ...1 ,,i;".11:1::::;,.:—.211:htii7111 L s v.P?. let 1 '_-[t i t , w �rA' ♦J I { __{---_ �,' e _. - Je'1'T ry i• •. ' 1 O.ab 2 l .f , Z /go l.� 1.; ��; .eat y ` 0 66.• \__ 4= 1-7: "Pti- -,: as ms k .i {j b d• `R. ` 3 I»Fu.. 3 ! . crr t m c a ` 1:t L,1 .. t a. r S ¢ _El c �CI- Lu co .2� w m 5S s �c' X. '-or : " 4Ii� L " - a ,JI 1�ti F -- H 2e �``�?' Q �l ty �1. ar!!!!1„; ritili: ...1....Hr.,:tti.,.li.4.. L.1!1: til 4. Int • d a .�° pieil : • al , ., F s P ' V '. t.44 y _ 1"t ' t ^s'ba3`a�' City of Arcadia, CA Permit No Patio-l9-050f) \�,11/%• Development Services Department �}}}LL( _ Permit Type:'Patio .,�1 J,/ • 240 West Huntin9106 -6 Drive,Post Office Box 60021 `_J' (�I " ( I ' - Work Classii ication:'Patio Arcadia,CA 91066-6021 T (626)574-5416 - - - Permit Status:Issued ARCADIA ^`Issueoate:o3/ 2y2o191 Expiration: 09/08/2019 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 230 Sharon RD Arcadia,CA 5785006014 Contacts TACAWY,AMIR Y AND SOUZANE H Owner 230 SHARON RD (626)235-3574 Description:NEW 24'X 12'TRELLIS COVERED DETACHED PATIO Valuation: $ 1,600.00 Tenant (PRE-FAB) Total Sq Feet: 0.00 Plan Check 9 Plan 9 Fees Amount Payments Amount Paid Building Issuing Fee $47.01 Total Fees $198.07 •Building Permit Fees $86.85 Cash/Receipt 9 REC-00664-19 $198.07 Building Plan Review Fee $56.46 Green Building Standard $1.00 Amount Due: $0.00 Solid Waste Management Fee $6.25 Strong Motion Inst.Program Res $0.50 Total: $198.07 ., POC 34?-17 ? ? CALLS FOR 6-5 INSPECTIONS �--�' Request for inspection by telephone at I NSPECTI. Leave a message requesting the address,timeframe and what inspection item is needed. This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days 51 GOPWED� from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void ifany work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. March 12, 2019 Issued By: Date March 12,2019 Page 1 of 1 4 FR k , 1 PERMIT/PLAN REVIEW APPLICATION �\E@3b' Development Services Department,240 West Huntington Drive,Post Office Box 60021 Arcadia, CA 91066-6021, (626) 574-5416,Fax (626) 447-9173 City of Arcadia LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: Chapter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,and my license is in full force and effect. 0 I have and will maintain a certificate of consent to self-insure for workers' License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the Signature of Contractor performance of the work for which this permit is issued OWNER-BUILDER DECLARATION 0 I have and will maintain workers'compensation insurance,as required by Section ❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit License Law for the following reason(Section 70313,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, Carrier demolish,or repair any structure,prior to its issuance,also required the applicant Policy Number for such permit to file a signed statement that he or she is licensed pursuant to the (This section need not be completed if the permit is for one hundred dollars or less) provisions of the Contractors License Law(Chapter 9(commencing with Section 7000)of Division 3 of the Business and Professions Code)or that he or she is 0 I certify that in the performance of the work for which this permit is issued,I shall exempt there from and the basis for the alleged exemption. Any violation of Section 70313 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): compensation Laws of f alifomia,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall ❑I, as owner of the property, orthwith comply with those provisions. or my employees with wages as their sole compensation,will do the work,and the structure is not intended or offered for �{ sale(Section 7044,Business and Professions Code:The Contractors License r'ate ///2--/ir Signature Law does not apply to an owner of property who builds or improves thereon, or who does such work himself or herself or through his or her own employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. • ❑I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Signature ���. �� Lender's Address • 4fate_ab_44 ORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. er South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for further information. p arae S UZ-A-0 f/ c-A W Y Title .. PRINT NAME certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of readia to enter upon the above-mentioned property for inspection purposes. 7 3/1Z S nature �. 416 _ J\ Date /� 7 pxis7-7i116, /f©vA-'S t NI,-7,-..---ti.-„:---7, �1 / r X30 - t �„.. A4,-c-:•, _ 4. .f _ .fi6 r r' {t 112) i, tie Ara Y , � Cy Ri Loi -- - -- d&._144. &e =16,43$ sip - �1� 49 nebula , a,3f2 04 11 4,604 �R„ 24 5o SI. _ = d (�}q{-YW-+{J��` lt.o,o S� ' �-= yr Trz-U2s: 231 s 0� I'Si 3Sf r510 3510/6/435, .2/ 7. i.- y Ir i ® r, o Fe • z • Lr1 r � i� v „ : CR"1! ] ^j ' tn \" &VW� / PQ � /��/1rA ^ tib' 0 ' /2/ >k Gz' ROUTING ! Date .•.� if±rf2!Initial Gies Planning• •_ t2 Iq _.rt .. . . . . Building _I Fire -- � -- t-- PWS-Waiar WELD I —_-_. - Trees _.... • -- — . .— — New England -Wood Post Layout& Installation -=- ----.- Arbors /� Application by Design for In-Ground Application www.newenglandarbors.com This pergola can also be installed on a pre-existing wood or ( . • .-.. concrete surface using our bolt down bracket system with _ _ -- a4x4woodpost4sold.separate),-See page eight forme- ais. • Post location and placement is the most critical step in the overall installation process. Please double check for the possibility of any underground utilities such as sprinkler,gas Overhead View or telephone lines. - .. • _.135 1/2 in.- tri 1355 344.17 cmm. • STEP ONE �""°^ j i Measure and mark out the location of the pergola posts using f string line and temporary wood stakes. Diagonal distances must • be the same to ensure a square installation. Adjust stringlines 1351/2 in. tgl 5/g m nyci ev 1351/2 in q 344.1i7cm from corner otwooq post to wmerofwood post. 34417 cm accordingly.The inside corner of the string lines will be the post location. Please Note: i Should you decide to moderately modify the dimensions of your pergola from the standard kit size,a circular saw with a sharp 0 fine-tooth blade is all that you need to cut shorten or modify the vinyl components. • - STEP TWO , r1ol install Wood Supporting Posts Directly into the Ground 1 .• 1• 5 ; • 0 { i i After you have determined where the posts will be located, 3s excavate 10"diameter x 36"deep post holes. After holes are dug and cleaned,place the 4x4 wood post into a hole ensuring ifs level and square to string lines.The final post height should be no more than 84"out of the ground. If a post is higher because of obstructed excavation of footings,please cut down in height accordingly, © 84' Fill the vacant hole with pre-mixed concrete all the way to . within 3"of the top of the hole. After the concrete has set,backfill the 3"space with soil/sod. 4 Repeat for all six posts. 2 T T . Please Note: . I 3Some 4x4 pressure treated posts can be larger than 31/2x3 1/2 square due to twisting or cracking. We have allowed a tolerance I for this in the internal one way and two way 4x4 wood post guides (see page 8). However in extreme cases you may need to shave down the top of the 4x4 wood post slightly to get the vinyl post started over the wood post.Before installing your wood posts in the ground, please check to confirm this and correct at this stage if necessary. 12 X 24 Grande Hat Top Pergola • . OPTIONAL STEP . New England '�`.��� I aaeN, ip by Design Arbors Wood Post Layout& Installationww.newengiandarbors.<om Using Bolt Down Brackets for Concrete or Wood Surface . /It Note:for additional information on the bolt down bracket installation,refer to the bolt down bracket Instructions. ------_ All Measur neent are measured to this surface / Measure and mark out the location of the bolt down brackets using 1 .I string or chalk line. Diagonal distances must be the same to 282112 in ensure a square installation. Adjust string lines accordingly. I — 717.6 cm b — — The inside corner of the string lines will be the corner of the bottom D 3/8 in 134 3/8 in flange. ? 41.3 cm 341.3 cm Mark out the location of bolt down brackets accordingly using the base of the bracket accordingly. 134 3/8 i 190 in 134 3/8 in 190 In © 341.3 c1 482.7 cm 341.3 cm 482.7 cm Using a 3/16"mason ry drill bit drill 3"deep holes to allow installation of 2 3/4"concrete screws(Not included). , 4 "% -I 4 5/8 in (11,75 cm)Typical Proceed to install three 2 3/4"concrete screws into the botto:' ` i base of the bolt down bracket. Please Note: // �\ 3 ' 4 Concrete patios generally have sloped surface for water; n-off. I` � � �.> If this is the case,when you secure the bolt down braci/et to the /' l , concrete,the bracket may be at an angle. This can bp'/corrected :f 2 0 ' e I 0 for level using galvanized steel washers(not provi ed),acting a I e 4 as shims underneath the base to level-VERY IMPORTANT OR , o a o PERGOLA BEAMS AND RAFTERS WILL NOT(BE LEVEL. / \ ``^ -�sem' With the six post brackets installed pl mb,proceed to set the 4x4 x7'wood post in place, RerOeat for all 6 posts. 6 i Posts should be l34"in height. 6 7 5 f Pie se/Note: Some 4x4 pressure treatedPie posts can be larger than 3 1/2 x 3 1/2 square due to twin ng or cracking. We have allowed a Shims tolerance for this in the stbracketsandtheintemalonewayand two way 4x4 woodt guides. However in extreme cases,youfri /'' - �' may need to shave down the end of your 4x4 wood post slightly o / N to allow access. r- ; l-i-- Leve I S — :v . . 72 in Attach 8 post shims to each post,placing 4 shims starting at 6, \ • ____ i -- it on all sides,and 4shims ending at72;onall 4sides, `•_\ / T ` , 12 x 24 Grande Hai fop Pergola T a `. , *Ensure that holes at top of column are orientated correctly for future beam and rafter placement. Vinyl Column Assembly&Installation * Over Wood Posts 4 0 m Using the vinyl weld glue,insert the One Way 4"x4"Internal Wood Post Guide in the one end of the main column posts. This step is only applicable if your wood 4x4 post are embedded into the ground. If your pergola is going to be installed on1 wood or concrete surface,please dispose of these 6 pieces. Y ► lift,k Iii Using a step ladder,guide the bottom vinyl columns over the . ,¢_ wood 4x4 posts. Slide the base post trim over the vinyl post followed by the top vinyl columns over the wood 4x4 posts. You will need to use a step ladder. Please Note: I Ensure that holes at top of column are orientated correctly for future beam and rafter placement. See diagram at top ofnext page. 4 Connect the bottom and top vinyl column by using vinyl weld r and slidingether.Plea e together. s Note:Vinyl Weld Glue has about aI sixty second cure time and about a 20 minute dry time. 7j , sem__ � I : Slide the bottom post trim into position to cover the joint on 1 2 3 4 the column. 6 . = a` °'. Slide the top post trim into approximate position just below the bottom routed hole on the bottom of the top vinyl column assembly. ID 0 II II 1 ii If necessary,adjust post heights accordingly to ensure future level installation of beams and rafters as necessary. If slope Is -it- �� severe causing a height difference between the posts,you may - y x need to trim down the bottoms of your vinyl columns as necessary. 8 Secure the vinyl columns to the wood posts using 4-2 1/2" self-auguring stainless steel screws at 8"up from the base , of the posts,and 4-2 1/2"self-auguring stainless steel screws — just above the trim cap through the pre-drilled holes as I - illustrated.This will prevent possible uplift during high winds,etc. y Slope? n 5 6 7 8 • 12 x 24 Grande Flat Top Pergola ' . At this stage,the columns should be properly New England installed as per the following illustration, • - -- , --- -Arbors Leadership by Deign with the columns 134"in.(340.4 cm)apart. vnsw.neweng!ander bors.com • /so,notice that the holes at the top of each post should be facing the same direction.��:1 1.--- iL ;- . IL s (.7.) •5507 aI `:C qr t 4 S ' ; ,,_ a 340:4 m: 134 In. —.--1_._ 3404cm. ----_-3404 .'cm / STEP FOUR Rafter Assembly 0 Insert one 2x6x12 pressure treated wood into a rafter section followed by the joiner and another rafter section.Center the 2x6x1 2 pressure treated wood within the assembled rafter. El Screw the joiner to rafters and wood insert using I 1/2"screws. II Repeat steps 1 and 2 for the remainder of the rafters(total of 11 rafter assemblies) 1 r _ ` fair 2 IB so 1B X17 �m ;9 A, 12 x 24 Grande 1=1at Top Pergola d eV I/ 1 N N v New England Pergola Additional Materials List f DesignLea.da�aM1'pLyArbors r /Vww s newenglhdnrbors.com D Hardware(in plastic bags) A eft'f ' -- --t m Sri All Screws Included with this fat are Self-Auguring. ' V B//1 OL � 1 J O I O O A. Vinyl Weld Glue(6)-20000 u „B. 5/8"Self-Auguring Stainless Steel Screws(32)-20016(to secure rafters into rafter brackets) C. 1 1/2" Self-Auguring Stainless Steel Screws(92)-20005 Coiner screws&rafter bracket screws) 1 I D. 21/2"Self-Auguring Stainless Steel Screws(24)-20009-1 j I (to lock vinyl column and wood post together at bottom of each post) F. 2 1/2"Self-Auguring Stainless Steel Screws(24)-20009-1(to lock vinyl ' E __ column and wood post together at top of each post just above trim cap) 1 `/ F. 3"Self-Auguring Stainless Steel Screws(140)-20007(for shade slats). 1 G. 4"Self-Auguring Stainless Steel Screws(96)-20006(to lock the ihtersection of beams and first rafters with vinyl columns) as H. 1 1/2"Self-Auguring Stainless Steel Wood Screws(24)-20037(to lock the Wood Posts to the dolt down brackets) '+ I SP i 4110. If . Extra Materials You will Need I_ (Purchase separately from www.newenglandarbors.com or retailer of our products) If Mounting Pergola on Concrete or Wood Deck(not intended to be installed on concrete pavers,patio stones,or Interlocking bricks) H H. 4x4x7 Pressure-Treated Wood Posts(6)(purchase at ocal building center) If mounting pergola onto an existing concrete surface: • — •1/2"x 3 1/2"x 12"Wood Shims(48)-Can Be Cut From 1/2"Sheet of Plywood %- •1/4"x 2 3/4"Cement Screws-Countersunk Head(18) C •3/16"Concrete drill bit Minimum 3"long(1) r- • If mounting pergola onto a wooden/composite deck with , .v'f; AN ACCESSIBLE UNDERSIDE: 4- •1/2"x31/2"x12"Wood Shims(48)-Can BeCut From 1/2"Sheet ofPlywood •1/4"x?"Bolts and Nuts-Countersunk Head(18)(Length depends on blocking material) "` •1/4°Washers(18) •1/4"Wood drill bit.Minimum 3"long(1) ----it-MountingPergolain Ground I. 4x4x10 Pressure-Treated Wood Posts(6)(purchase at local building center) ...../.J. Concrete Ready Mix(6)(purchase at local budding center) Rafter/Beam Support(Required) ..�. K. 2x6x12 Pressure-Treated re-T, ed PostT(IS)(purchaseat7oi<aibuiidingcenter) ; j Tools You Will NeedTools You May Need • Level • Circular Saw with Fine Tooth Blade • Hammer • Framing Level • Tape Measure • Framing Square • String Line ivor to Scale , • Wood Stakes(6)(temporary support for string line) --'-Ala 4., • Step Ladders(1) 1 p r • Cordless Drill I j Purchase Purchase Purchase { Purchase Separately Separately Separately Separately 'pe I2 x 24 Grandc Mai lop Pergola Distance to first hole Support Beam 1 Main Su PPHoles on top Assembly t 1 314 1� N L ' Insert one 2x6x12 pressure treated wood into an outer beam "`'� section as illustrated. .J I I Critical Note: r • Note the location of the pre-drilled holes on the beam.As pictured aside;the further distanced holes need to be closest to the beam. _ — II This is critical to ensureeeeq'ualspacingofyourrads.—� --^ © I---^''.."`".`_—.._- Outer Beam Insert one inner beam section as shown.Position the 2x6x12 pressure treated wood so that it is flush with the open end of 2 Distance to first hole the inner beam. tt 3/q In Critical Note: l j Note the location'of the pre-drilled holes on the modified beam. As pictured aside,the further distanced holes need to be closets 1I to the joiner. This is critical to ensure equal spacing of your rafters. Screw the joiner to vinyl beams and wood insert using 1 1/2"screws. Note:Wood should not protrude out of the inner beam. _�- Inner Beam • 4 4 Install the rafter brackets to the main beams using 1 1/2" 3 f� pf screws. Only attach four brackets to the beam as shown. u a Follow the pre-drilled holes to identify locations. 1he ® etst ade othe I beam(2a st .vowe( Repeat steps 1 too fora total of4 main support beam assemblies. -- -- 5 • X4 Wood should be flush with the opening of the inner beam rents_ New England - . Arbors leadership by Design' ww w.newengl andarbo rs.com 12 x 24 Grande Hat Top Pergola New England STEP SIX . ° ° __._ _,_ _. _.Arbors . ... ...-..0 Leadership by Design wvwr.neweaglandarbors.com Main Support Beams & Rafter Placementinner Beam ends meet in the center Using a helper and two ladders proceed to complete the Si the middle post following steps: 0 Slide the main support beam with rafter brackets pre-installed through both holes of the vinyl column(overshooting),and then back through both holes of the opposite column. Repeat for all beams. tl Please Note: The two Inner Beams should meet in the center of the middle posts as shown.Main support beams should overhang 4 1/4 inches on all four corners. !t 11. 4 =0 11 Il_ h It jill JI pIII I Inner �� 11, Beam Overhang I 44- I'• il • Outer ' Beams Please Note: © The top of the vinyl columns may need to be tensioned in opposite directions to each other to allow the beams and rafters to be Slide the two outside and middle rafters through both holes of installed on a slight angle. The vinyl columns naturally allow the vinyl column and through both holes of the opposite some measure of flex. column. a I , '4..... I -kill iiii li Ju,1 1 .........stirbobi iiii !1. 11 I 12 x 24 Grande Flat Top Pergola • STEP SIX ? 3 til -day Main Support Beams &Rafter Placement k (Continued) 0 © - Final adjust the main support beams and rafters ensuring the overhang _ - - past the columns is equal to the eye. Using 4"screws lock the main.jupport14 beams and rafters into positign•inside the posts by driving Irscrewss from the outside and 88 screws m the inside of each column I/ 4 - • Place the rafters in the front and rear rafter brackets. la Complete a final adjustment of all beams and rafters. All spacing i-l�ll and overhangs past columns be equal to the eye. r ��i' L Using 5/8"self-auguring stainless steel screws attach the pergola -- Ai 1� I r' rafters to the rafter brackets. ��' ��III � rI ll I New England �w�,•� Leadership by Dori"Arbors —4 II www.neweng th nda rbors.<mn 4 ii i / isissave Ili II 6 graills. , 12 x 24 Grande Flat Top Pergola • STEP SEVEN New England - Arbors Leadership by Design Fastening End& Post Caps w:,wnewenglandarbors.eom 2 - N If Install decorative pergola end caps using vinyl weld. El --:\I the post caps. IIel _-- II- Install ® 'Ir Final position your post trims. t! 1--Itt, ii f / . r App- 0,, /Jy rl/�IP- a � ��- Ir II 01 j As. ---samaiti.: I `___, Pt11! P11 11� To glue pergola end in place: To position post trim in place: t.Apply a generous amount of vinyl glue to the pergola end as shown. 1.Slide the post trim down. 2.Slide the pergola end into the beam/rafter and allow a few minutes 2.Apply a generous amount of vinyl glue around the post for glue to cure. 3.Slide the post trim back up to the desired location and allow a few minutes for glue to cure. C% 12 x 24 Grande Flat Top Pcrgola • STEP EIGHT • Shade Slats Assembly Please note the two different lengths of shade slats included in your kit-75 7/8 in(Long Outer Shade Slat)and 69 7/8 in (Short Inner Shade Slat) 75 7/8 in 6g 7/8 in — — x28 x28 Assemble shade slats by first gluing the decorative end caps as shown, and then inserting the two slats(one long outer,one short inner)into one joiner.Push firmly until extrusion bottoms out inside joiner. No screws are necessary. 697/8"(Short inner Shade Slat) 75 7/8"(Long Outer Shade Slat) Elm isr,, Glue End Cap First • New England -- -Arbors LeadersMp by Design www.newenglandarbo rs.cons 12 x 24 Grande Flat Top Pergola is New England STEP NINE Arbors leederdiipby resign www.nevrenytand arbors.com 14 Shade Slats Installation Important! The 14 shade slats are designed to be installed with If installing an additional shade slat kit(purchase 8 11/16"spacing between each slat. separately),please follow the instructions included with Shade slats are designed to extend approximately 8 1/4"past the 72x24 Additional Shade Slat Kit. the last rafter. Measurement includes the pre-installed pergola ends. Your goal is to ensure that all the shade slats overhang Short Inner Shade Slats equally to the eye. r will butt up to each II in the center of the middle rafter Install first shade slat adjacent to the top of the vinyl columns. 1 ar- Install the rest of the shade slats he 811/16"spacing. eother � III Install one 3"screw at each intersection of rafter and shade slat. 2 IF 8 11/16 In I `if�l: i R=t/ I /AI r qr • —4‘711P\1441111%*7-- 1 1 III it. �ir %moi 'i �A r,ir. re:4-mtgeti► " tars `�=x� 11 a 11, Csa 11711:111111. 1111°"- 7i 12 x 24 Grande F1at Top Pergola [ ff • • 12 x 24 Grande Flat Top Pergola ii r ,".-.^-.�'� "..—..rte ,..r.,?...—' a[' ci 1'.' .13 1 _ 1' ASSEMBLY GUIDE . v. ---- s , U S • New England t. Leadership by Design Ver 1.1-090717 www.newenglandarbors.com NewEnglatnd LeadershiPby Design AIUOCS e::ep12x 24 Pergola Materials Breakdown' www.newenglandarbors.com Check Boxes (Total of 11) for These Contents e. -�� In the event of missing or defective parts please call our customer service �`�–��� dept.at 1 800 282 9346(Mon.to Fri.8:00 AM to 4:00 PM EST). ~:% t IL 1. Post Caps(6)-10699-1 2.Main Column Tops(6)- 10826 1 3. Post Trims(12)-10698-1 1� 4.Rafter&Main Support Beam Decorative End Caps(26)-10829 • t ••f _ 5. Main Support Beams w/pre-drilled holes-Short-Inner(4)-10917 11I I q I 6.Main Support Beams w/pre-drilled holes-Long-Outer(4)-11127 1J ` 7.Main Support Beam&Rafter Joiners(15)- 10820 Illi & Main Column Bottoms(6)-10816 9.Rafter Brackets(16)-10827 �i- 10. Shade Slats-Long-Outer- 10819(28) 11.Shade Slats-Short-Inner- 10718-1(28) %r " " ' } 12. Rafters(22)-10818 !J 13. Shade SlatJoiners(28)-10600-1 ���Os li- 14. One Way4"x4"Internal Wood Post Guide(6) 10696-1 1ifil 1111,,,1 . Li , a. 0 15. Shade Slat Decorative End Caps(28)-30030.1 If" 16. Post Base Trims(6)-10916 • 17. *Boit Down Brackets(6)-80054 • a_� � r II*Bolt Down Brackets are used only for installing the pergola — ' ` on an existing surface such as concrete or wood deck.The I l � �ij pergola is not to be installed on concrete pavers,patio stones, ___ _ _ _ _ ___ _ or interlocking brick. --- 10 ill Fr 12 • Not to Scale 12 x 24 Grande Flat Top Pergola • id 12 x 24 Pergola Materials Overview ED i 1 l l 11 1l-- suss siiiii � � 11lap• . , .II• i� is 1. �III� hl 8 ii ��1 ,1 -ill l 1 _ 4 0--- .. • 9 7 0 4sat 1144 [lb 1. Post Caps(6)-70699-1 2. Main Column Tops(6)- 10826 3. Post Trims(12)-10698-1 4. Rafter&Main Support Beam Decorative End Caps(26)- 10829 5. Main Support Beams-Inner(4)- 10917 6. Main Support Beams-Outer(4)- 11127 7. Main Support Beam&Rafter Joiners(15)-10820 8. Main Column Bottoms(6)- 10816 9. Rafter Brackets(16)- 10827 10. Shade Slats-Long Outer- 10819(28) 11. Shade Slats-Short Inner-10718-1(28) 12. Rafters(22)-10818 13. Shade Slat Joiners(28)- 10600-1 14. One Way 4"x4"Internal Wood Post Guide(6) 10696-1 15. Shade Slat Decorative End Caps(28)-30030-1 16. Post Base Trims(6)- 10916 17. Bolt Down Brackets(6)-80054 New England -- _-- -Arbors Leadership by Design www.newengla ndarbors.com E I2 x 24 Grande Fat 'lop Pergola Table of Contents 0 12 x 24 Grande Flat Top Pergola PAGE Introduction&Overview El Pergola Materials Overview 4 Pergola Materials Breakdown Pergola Additional Materials List 6 Wood Post Layout&Installation for In-Ground Application 0 Wood Post Layout&Installation using Bolt Down Post Brackets for Concrete or Wood Surface 8 Vinyl Column Assembly and Installation Over Wood Posts 9 Rafter Assembly 10 Main Support Beam Assembly III Main Support Beams& Rafter Placement IN Fastening End and Post Caps 14 Shade Slats Assembly...—.„...... .... Di Shade Slats Installation 16 I I I I I I JINNIilaffirl�iilS S SIL. _ Ifllim1•ilaiil - E Ia II�� I�r Wil_. co _IIS I•I�_I5 r I•�Ir _il_. co - • - IialI•I�i5 1�MNI•I \ ar. -1»I�lill�i�iomla=N_. . N, = ami;IIs;iIIIIInJIIIIIIaIImYllllll�_Sm,a I_i�i-1•_I_iM_. New England z �Ilmllll�am�illsilmiII�Ii . Jim...mgs...llllll s ENNMM - -Arbors in=Nim aim inilir__I�IMNMI Leadership by Design -11.1 ______1Ia� - e— -A �_— e.— www.newrb englandaors.cmm' - - II • 310 1/2 in [789 cm] �"g ' 41 Top View E I I I - v - Cr) U co 134 In [340 cm] 134 i [340 cm] 134�in [340 cm] <r rn a o r 1 �9 (n 353 cm] I 1139 In 53 cm] I (9 in [. 53 cm] .11 144 i [366 cm] \ 283. in [719 cm] ( Side View Frain View ri1 2 x 24 Grande Flat Top Pergola • r Introduction & Overview �1711 'ft►, Ir 71. r II r 4i;i 4v 4L=s 4 Getting Started Restriction of Use First Wallow us to say thank you for the investment you have made in one of our fine pergola kits.This kit is designed to be assembled and installed This product is not designed to carry additional ideally by two people with basic carpentry knowledge and tools. Do not weight loads such asswings,peop!e or other attempt alone,especially during the installation stage. Should you decide to objects. moderately modify the dimensions of your pergola from the standard kit size, a circular saw with a sharp fine-tooth blade is all that is needed to cut,shorten Please take the time to read this instruction or modify the vinyl components. When assembling components place on a guide thoroughly prior to the construction non-abrasive surface (ie:shipping box) to avoid scratching. We recom- of your pergola. If you have any questions, mend a 15'x 15'area for unobstructed assembling. You should not need to feel free to contact our technical dept by calling use excessive force when assembling any components. 1 800 282 9346(Mon to Fri 8:00 A.M to 4:00 Planning&Preparing P.M.EST). This Pergola is made to stand independent of your home and you can either locate it near your house or let it stand alone in the garden. By keeping it un- attached from your home you will not have to deal with moving existing gutters or matching eave heights. If you plan to build your pergola close to the house,please keep the outer extremities of the pergola a minimum of . flinches back from your eaves. What looks like the toughest part of this project is actually the easiest,the graceful,solid-looking columns.We've designed these columns to simply be slipped over treated 4x4 wood posts that are either embedded in concrete or directly mounted to a concrete or wood surface using our bolt down brackets. See pages 7,8 and 9 for more details. It is critical before you start that you consider the current slope of elevation where the pergola is planned-if there is any. Also utility or sprinkler line location is important to identify prior to excavating holes if necessary. 7�7 You should also check to verify local building codes,ordinances,neighbour- New ew England hood covenants,or height restrictions regarding this type of structure. - --- - -Arbors Leadership by Design w ww.newe ng landarb ors.com 1 2 x 24 Grande Flat Top Pergola I L,gii