Loading...
HomeMy WebLinkAboutSOLR-18-1634 (2) i - _ 3 r Permitto SOLR 181634" li 2Dev lop ent ServicesDrveaPost Office Box 60021 �s-- re a ix, - r Cityof Arcadia, CA ' ' 4 + P1' +` 4 `' 'l ` _129-6.(817-12-. erml[T efTSalar' w. � WorkClpsslhconon '.solar Residential+, I (626)Arcad574-54161066-6021 (626) i',. t G f ' .r `;- _ a Permit Status:Issued ARCADIA ' issueuate `o9/lojol8 Expiration: 03/09/2019 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 1126 N SECOND AVE Arcadia,CA 5771028017 Contacts DIANA SADAMITSU Owner TESLA ENERGY Solar Contractor(C-46) 1126 N 2nd AVE,Arcadia,CA 3055 Clearview Way,San Mateo,CA 94402 s (323)240-3174 Description:REVISED 9/27/18 ROOF MOUNTED SOLAR SYSTEM Valuation: S 0.00 Tenant 21 PANELS,�211NVEkTERS,y125 AMP t-T OP;D.,T;ENT,ER �t "'t n---' «"" '�"'�'t Total Sq Feet: 0.00 Plan Check# Plan# Fees Amount payments Amount Paid Building Plan Check Fee Residential $50.00 Total Fees $394.24 Distribution Panel $15.55 Cash/Receipt#REC-002250-2018 $300.91 Double Fee(Building) $77.78 Cash/Receipt it REC-002428-2018 $93.33 Electrical Permit Issuance Fee $44.35 Amount Due: $0.00 Fire Plan Check Fee Residential $50.00 Inverters $77.78 Panels $77.78 Solid Waste Management Fee 2 $1.00 Total: $394.24 CALLS FOR INSPECTIONS r. Request for inspection by telephone at 626-574-5450. Leave a message ria NM-- j p• I • IS v requesting the address,timeframe and what inspection item is needed. This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days ���ED from the date of lanissuance if tpermit ms not i obtained within 180 days C��Q from the date of plan submittal.This permit expires and becomes null and O ` void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. September 10,2018 ssued By: Date September 27,2018 Page 1 of 1 wan im,,„0„,,,„4 PERMIT/PLAN REVIEW APPLICATION 141;: Development Services Department,240 West Huntington Drive,Post Office Box 60021 Arcadia, CA 91066-6021, (626) 574-5416,Fax (626)447-9173 City of Arcadia ...,rceLICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: ro Chapter 9(commencing with Section 7000,of Division 3 of the Business and fessions Codej.and my license is in fully{orccee d effect. ❑ I have and will maintain a certificate of consent to self-insure for workers' License Class �D Lice No.aCN/f/ . Date woecompensation, as provided for by Section 3700 of the Labor Code, for the Signature of Contractor performance of the work for which this permit is issued. OWNER-BUILDER DECLARATION have and will maintain workers'compensation insurance,as required by Section 0 I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit License Law for the following reason(Section 7031.5,Business and Professions is issued.My workersc/ 'comp/ensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, Carrier fit">Cv! 4frne Ica demolish,or repair any structure,prior to its issuance,also required the applicant for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number `INS GG/ � provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less) 7000)of Division 3 of the Business and Professions Code)or that he or she is exempt there from and the basis for the alleged exemption. Any violation of ❑ I certify that in the performance of the work for which this permit is issued,I shall Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall ❑I, as owner of the property, forthwith comply with those provisions. or my employees with wages as their sole compensation,will do the work,and the structure is not intended or offered for Date?,L r7 /g sale(Section 7044,Business and Professions Code:The Contractors License Signature Law does not apply to an owner of property who builds or improves thereon, or who does such work himself or herself or through his or her own employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(I)year of and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. 0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044, Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Date Signature Lender's Address . IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for further information. //� N me ��Oc7 �G P-e et Title PRINT NAME /certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of Arcadia to enter upon� the above-mentioned property for inspection purposes. J nature ..J�1>� ''') /r Date 7• 2 / - 5' • PITCH:20 ARRAY PITCH:20 ALL ELECTRICAL EQUIPMENT TO BE MP1 AZIMUTH:268 ARRAY AZIMUTH:268 MOUNTED ON WALL MATERIAL:Comp Shingle STORY:1 Story PITCH:20 ARRAY PITCH:20 1 MP2 AZIMUTH:88 ARRAY AZIMUTH:88 I MATERIAL:Comp Shingle STORY:1 Story PITCH:20 ARRAY PITCH:20 MP3 AZIMUTH:178 ARRAY AZIMUTH:178 MATERIAL:Camp Shingle STORY:1 Story PITCH:20 ARRAY PITCH:20 MP4 AZIMUTH:178 ARRAY AZIMUTH:178 MATERIAL:Comp Shingle STORY:1 Story ler ill; ii i. LEGEND ... n (E)WIRY METER&WARNING LABEL INVERTER W/INTEGRATED DC DISCO &WARNING LABELS �,� n� n DC DISCONNECT&WARNING LABELS lJ Front Of House P1. AC DISCONNECT&WARNING LABELS n.. I I DC JUNC710N/COMBINER BOX&LABELS = n DISTRIBUTION PANEL & LABELS Ilk QQ LOAD CENTER&WARNING LABELS O DEDICATED PV SYSTEM METER Li RAPID SHUTDOWN Q STANDOFF LNS a 3, ', MP4 CONDUIT RUN ON OCATOEXTERIOR " , CONDUIT RUN ON INTERIOR (E1 oMrveuAv E!ifl � Q Q 1 P HEATGATEPENCE zl.up 0 HEAT PRODUCING VENTS ARE RED • AC L_L INTERIOR EQUIPMENT IS DASHED •© i SITE PLAN N Scale:3/32"=1' is E O. 10' 21' COM lDE�' n WIEN �'"°"R JB-9102735 00 BE LISED FOR IfDIANA SADAMITSU 6.72 KW PV ARRAY a'ANYttE RAFT 1E AA INC,.KP ROMMM SYSMA Abubakr Mohamed T 5 L n Melt MNL n BE MMan.�El"alee m w ZS Comp V4 w Flashing-Insert 1126 N 2ND AVE Pun MI 10 OROS ME nE PECFSNro ARCADIA, CA 91006 QaWRA01.yam w CpP6CMN xM MOILER 1HE sax NOME OF TME IMVECsK (21) SolarCity Standard 9SC320B1 Pte, SEE Wet Ile TESL*EQUIPMENT.ImIM 11E WefleN mat PwrsswalESA INC Multiple Inverters I SITE PLAN 3 C 9/25/2018 i PHOTOVOLTAIC ARRAY (14)Sunpower 345W Modules(SPR-X21-345) ROOF PLAN , (1)SMA Sunny Boy 5.0KW Invader 585.0-1 SP-US-40(240) Nem sr:Nada& UNIT INDEX Gate MSP (E)200A Main Service Panel \ INV (M Sunny Boy S.OKW Inverter ACD (N)30A Fused AC Disconnect RSC (N)Rapid Shutdown Controller RSB (N)Rapid Shutdown Box I. JIB (N)Name 3R Junction Box OSolar Module • EMT type conduit 0 O .. rw m > ❑ m \ / I a "CONTRACTOR ca �!� �' ° True Power Solar //11 r� Address: W Pomona,Ave Pomona,CA 91787 - /j/ 43'fug Berns,'.,,; ❑ Solar Am 1 Pone Number: 16 Maga Oa 6 Sunpower345W ❑ b lxfy9 EU \-ijJ-\s -. Pitch:24 Deg Lied 970591orientation:90 De. pA /t d P�weR SOLAR CI ❑ a ❑ ❑ c a ❑ C C b \ RSB I I Solar Array �n�� (3I&%7 3 Sunpowe Pilch:24 Deg Orientation:180 De: MI ME QM 121E Solar Array 3 5 Sunpower 345W Gate Pitch:24 Deg N Orientation:180 Deg / o' e, / \ a VT ac udaLI 2330 El Capp itan Ave. s Armdia,CA91006 rao' _ SCALE 18914.1m• FROM JUNCTION BOX TO ROOF EAVE EMT TYPE CONDUIT WLL RUN OVER I I I I .:Nmarzo THE ROOF AT 31)?HEIGHT.THEN UNDER THE EAVE TO PV EQUIPMENT. 01 5 10ft Po n3" • (70c1;- 7c32 avno