DATE: October 15, 2019
TO: Honorable Mayor and City Council
FROM: Tom Tait, Public Works Services Director
By: Eddie Chan, P.E., Principal Civil Engineer
SUBJECT: ACCEPT ALL WORK PERFORMED BY ROY ALLAN SLURRY SEAL, INC.
FOR THE FISCAL YEAR 2018-19 ANNUAL SLURRY SEAL PROJECT AS
COMPLETE
Recommendation: Approve
SUMMARY
On January 15, 2019, the City Council approved a contract with Roy Allan Slurry Seal,
Inc. in the amount of $539,475.50 for the Fiscal Year 2018-19 Annual Slurry Seal Project.
The terms and conditions of this project have been complied with and the work has been
performed to the satisfaction of the Project Manager for a total project cost of
$539,246.50. This amount reflects the original contract amount of $539,475.50 minus
quantity changes totaling $229, or 0.04% less than the original contract amount.
It is recommended that the City Council accept all work performed by Roy Allan Slurry
Seal, Inc. for the Fiscal Year 2018-19 Annual Slurry Seal Project as complete, and
authorize the final payment to be made in accordance with the contract documents,
subject to the retention of $26,962.33.
BACKGROUND
The Public Works Services Department (“PWSD”) is responsible for the maintenance and
repair of approximately 147 miles of roadway within the City. The 2017 Pavement
Management Program Update assessed the condition of all City streets and assigned a
numerical index between 0 and 100 which is used to indicate the general condition of the
pavement. The Annual Slurry Seal Maintenance Program assists in extending the life
expectancy of streets and improves the overall appearance and safety of City streets.
This program provides surface maintenance of all City streets and divides the City up into
eight zones, with one zone being addressed each year as part of an eight-year cycle.
Updates to the plan are conducted regularly to ensure that the program is effective and
to identify street segments with unusual wear and tear.
Accept Annual Slurry Seal Project
October 15, 2019
Page 2 of 3
DISCUSSION
On January 15, 2019, the City Council approved a contract with Roy Allan Slurry Seal,
Inc. for the Fiscal Year 2018-19 Annual Slurry Seal Project. The work performed
encompassed approximately 14.6 miles of residential and arterial streets and included
crack sealing, the application of an emulsified asphalt and sand coating commonly
referred to as slurry, and re-striping of street centerlines, stop bars, and other safety
striping. This process protects the asphalt pavement surface from weather, restores skid
resistance, and provides an aesthetic uplift to the street and neighborhood.
During the course of work, staff evaluated the quality and coverage of the slurry sealing
and made adjustments with the contractor to ensure the best possible finished
product. Furthermore, there was a reduction in the amount of type II slurry seal
application due to the removal of Fallen Leaf Road from Hampton Road to Glencoe Drive,
which was recently rehabilitated with the Fiscal Year 2018-19 Pavement Rehabilitation
Project. Additionally, Lyndon Avenue from Duarte Road to Magna Vista Avenue, Magna
Vista Avenue from West End to Ewell Lane, and Ewell Lane from Magna Vista Avenue to
Le Roy Avenue were also removed as they are scheduled to be rehabilitated with the
Fiscal Year 2019-20 Pavement Rehabilitation Project. The Arcadia Parking Lot north of
Huntington Drive between Santa Anita Avenue and First Avenue was also included as
part of this project. Below is the description of the contract change orders.
CCO# Description Amount
1. Savings from reduction of qualities: 130
Tons of Type II Slurry Seal ($26,070.20)
2.
Additional Work at Arcadia Parking Lot
North of Huntington Drive between Santa
Anita Avenue and First Avenue
$25,841.20
Total: ($229)
The terms and conditions of this contract have been complied with and the work has been
performed to the satisfaction of the Project Manager. Roy Allan Slurry Seal, Inc.
completed the work as defined in the project plans and specifications in an efficient and
timely manner.
FISCAL IMPACT
Funds in the amount of $805,000 have been budgeted in the Fiscal Year 2018-19 Capital
Improvement Program for the Annual Slurry Seal Program. The total cost for this project
is $539,246.50. This amount reflects the original contract amount of $539,475.50 minus
contract change orders totaling $229 or 0.04% less the original contract amount. The
Accept Annual Slurry Seal Project
October 15, 2019
Page 3 of 3
remaining funds from the slurry seal project have been budgeted for sidewalk, curb, and
gutter repair in this same area.
RECOMMENDATION
It is recommended that the City Council accept all work performed by Roy Allan Slurry
Seal, Inc. for the Fiscal Year 2018-19 Annual Slurry Seal Project as complete and
authorize the final payment to be made in accordance with the contract documents,
subject to the retention of $26,962.33.