HomeMy WebLinkAboutFindings and Action FormaRCHrrECTuRAu. DESIGN REVIEW Boat
FINDINGS AND ACIiGN
A ASSOCIATION NAME: VAt,-.k��j'
B. PROJECT ADDRESS: �'�� \)CL0A*r.(6 � C. - PROPERTY OWNER:
ADDRESS (IF DI RENT):
D. FINDINGS (cWy check those that apply, and pt+avide a wriftn exp nation for each):
1. The Proposed corstructlan matieriaiS ARE00t'�ARE NOT 0 comp�ibie vM ftexisfing
materials, beu:ause
2. The pro(�osed ma�e�ls Will. ,WILL NOT ❑ sig adverse impact on
the overall appearance of the pnopeity. because NbA./Cb_Q
3. � proposed p ISM�1,SNOT Q st��ficantly le from fhe a�oinMg pu tic
Y �
4. TheJA p�njed IS . is NOT Q signifignfiy vis adjoin"loll
ng� prop�e�es
5. The eleme�s of the sbucture's design ARE �ARE NOT 0 c:onsistent with th8 ex3sting
bLMing's cyeslgn, because
6. The pnopoaed Pr0,1eCt �$ , IS NOT ❑ in pmportlon to otter tmprovemertts on the
s�jec# sf6e or fP iapProver!fents on other In Ute nel�bortrood, because
loceUon of the proposed project WILL Q, WILT. NOT�.debirnenfa! to the use
and enjopmwt# and.valtte fl# and neighbcrt-aod, beCBUSe
B. 1'h9proPo_ad Projects dcs DQ , DO NOTprovkle for adequate separation
n. o*1he same a*inh9 propertles, because
8. , OTHER FINDINGS:
(ov+er)
E. ACTION:.,
APPROVAL
0 CONDITIONAL APPROVAL., subject to the following 00nditl0n(S):
0 DENIAL
F. DATE OF ARCH -MC WR
to to
RWIEW BOMUS ACTION:
G. ARCHCTURAL REVIEW BOARD MEMBER(S) RENDERING THE ABOVE DECISION:
....................
�-
H. REPRESENTING THE k�7\��* 1`T 0' ASSOCIATION.
APPEALS.
Appeals thea ARB s- Jedsion shall be ffele to. the Planning Commission. Anyone
d"ringtoo make such an appal should com'24,11 Fftnnft Servk;es for the requISMAMMILIS,, 1W.I.
and pr�c Sam a'ppse W ff ant be ff ads In. %#dffrQ and &%ftred to flmnbV &Nvims at
IAL
24W W. Dr., Armdk% CA 91007, within se"n M calendar days of the ARS"s
decision. '
J. EXPIRATION OF APPROVAL
If fbr a period of one fl). year from Um *date of any project 1br which plans have
-2-
been approved by the ARB, tm not begun construcdon (as evidenced by Lmming and
gradkV and/or tion of a new foundation and/or -by k1St8l18t1Dn of rrew nr ials on a
s�n�cftm #W Is b&;ng or -hm been Wised, or dr"Om. Iftm, sawapproval 8IL ffmy be-mmAnOW tD the
W MUMim nuH and v-voidmW of no ef Wnt Such-I-MMULA
AM for rerowd approval: however, the AM Wmg review the project as if It had not been
Previously appmed In amomvlm-mm with the cimwd standards In effect.