HomeMy WebLinkAboutItem 10j - Accept Fire Station 105 Carpet Replacement ProjectAccept Fire Station 105 Carpet Replacement Project November 5, 2019 Page 1 of 2 DATE: November 5, 2019 TO: Honorable Mayor and City Council FROM: Tom Tait, Public Works Services Director By: Tyler Polidori, General Services Superintendent SUBJECT: ACCEPT ALL WORK BY MOHAWK COMMERCIAL, INC., FOR THE FIRE STATION 105 CARPET REPLACEMENT PROJECT AS COMPLETE Recommendation: Approve SUMMARY On April 2, 2019, the City Council approved a contract with Mohawk Commercial, Inc. in the amount of $43,492.83 for the Fire Station 105 Carpet Replacement Project. The terms and conditions of the project have been complied with and the work has been performed to the satisfaction of the Project Manager for a total project cost of $44,986.79. This amount reflects the original contract amount of $43,492.83, plus a contract change order totaling $1,493.96, or 3.43%, more than the original contract amount. It is recommended that the City Council accept all work performed by Mohawk Commercial, Inc. for the Fire Station 105 Carpet Replacement Project as complete, and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $2,174.64. DISCUSSION The Fiscal Year 2018-19 CIP budget provides for the replacement of the carpet on the second floor at Fire Station 105. The carpet tiles at Fire Station 105 were the original carpet tiles that were installed over 10 years ago during the building’s construction. Due to the station’s high-traffic activity, the carpet tiles were worn and stained beyond repair, and in need of replacement. In an effort to prevent premature wear and increase the lifespan of the newly installed flooring, a select combination of wear and stain resistant carpet tile and vinyl linoleum products were installed. The areas of initial entry received a highly durable “walk off” carpet tile that has a thicker pile than traditional carpeting, and increased stain resistance. The high-traffic hallways were covered in a plank vinyl linoleum product that will allow for simplified routine cleaning and maintenance. The carpet tiles in the dorm and office areas were replaced with a color Accept Fire Station 105 Carpet Replacement Project November 5, 2019 Page 2 of 2 and pattern that will hide dirt more effectively to preserve the appearance of the carpeting. All Mohawk Commercial, Inc. carpet tiles carry a limited lifetime warranty, while the vinyl linoleum product offers a 10-year limited warranty. The change order listed below was required to order a small quantity of additional carpet tile material to complete the project. It was determined after material was initially ordered that an area of flooring at the fire station was more suitable to be covered in carpet tile than in plank vinyl linoleum, which was originally specified in the contract. CCO# Description Amount 1. Additional carpet tile material required to complete project $1,493.96 Total: $1,493.96 The change order increased the overall contract amount by $1,493.96, or 3.43% more than the original contract amount. All other terms and conditions of this contract have been complied with and the work has been performed to the satisfaction of the Project Manager. Mohawk Industries, Inc. has completed the work as defined in the project plans and specifications in an efficient and timely manner. FISCAL IMPACT The total cost for flooring materials and installation services is $44,986.79. Funds in the amount of $45,000 have been budgeted in the Fiscal Year 2018-19 Capital Improvement Plan for the Fire Station 105 Carpet Replacement Project. RECOMMENDATION It is recommended that the City Council accept all work performed by Mohawk Commercial, Inc. for the Fire Station 105 Carpet Replacement Project as complete, and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $2,174.64.