Loading...
HomeMy WebLinkAboutUntitled 4 City& Arcadia, CA _~ Permit No RALE,18-2286 Development Services Department 240 West Huntington Drive,Post Office Box 60021 �) 1�j'b' Perm1/t Type Residential Addlttan/Alteration j[,.� - I •e r,t 1 Arcadia,CA 91066-6021 � "' ri 1i Work'Classrfieot7on:Res-Addition/Alteration (626)574-5416 " - e Permrt'-Status:Issued ARCADIA issueioete:'08/28/2019', Expiration: Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 2035 Highland Oaks DR Arcadia,CA 5765009006 Contacts ..w. MR&MRS KEN LIN Owner EDWARD LI Applicant 2035 HIGHLAND OAKS DR 1107 FAIR OAKS AVE,SOUTH PASADENA,CA 91130 (323)229-9400 EGLCIVILENGINEERS@YAHOO.COM HHKC DEVELOPMENT INC Contractor 1306 5 NEW AVE,SAN GABRIEL,CA 91776 1045968 Description:REMOVE EXISTING TRELLIS.ADDITION FOR ; Valuation: $ 76,362.90 Tenant DINNING ROOM AND BATHROOM.NEW COVERED PATIO. I Total Sq Feet: 282.00 Plan Check#18-2286 Plan k 116 REMODEL KITCHEN,LAUNDRY AND REPLACE ALL WINDOWS. MEP INCLUDED --" • `--- ". ,- " Fees Amount Payments Amount Paid Bathtubs/or Combo $12.46 Total Fees $3,339.58 Building Issuing Fee $47.01 Cash/Receipt#REC-003084-2018 51,224.24 Building Permit Fees $1,031.95 Cash/Receipt N REC-02293-19 $2,115.34 Building Plan Review Fee $670.77 Cal Green Plan Check $67.08 Amount Due: $0.00 Dishwasher $12.46 (��' q Electrical Permit Issuance Fee $47.01 •�I t.)k.L 12 •t\ •1 1 Energy Plan Review Fee $206.39 Garbage Disposal Fee $12.46 Green Building Standard $4.00 Kitchen Sink $12.46 CALLS FOR INSPECTIONS Lavatories $12.46 Request for inspection by telephone at 626-574-5450. Leave a message Light Fixtures $9.24 requesting the address,timeframe and what inspection item is needed. Outlets-Receptacles&Switches $20.02 Parks&Recreation Fee(SFR) $803.70 Plumbing Permit Issuance Fee $47.01 This permit/plan review expires by time limitation and becomes null and Shower $12.46 void if the work authorized by the permit is not commenced within 180 days Single Family Fire Plan Check $280.00 from the date of issuance or if the permit is not obtained within 180 days Solid Waste Management Fee $6.25 from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 Solid Waste Management Fee 2 $1.00 consecutiveia days) tc r fo• -s ' - as verified by a City of Solid Waste Management Fee 2 $1.00 Arcadia building iRs_pgetc r fo, :=,'?%'I+ cutive days. Total: $3,339.58 August 28,2019 Issued By: Date August 28,2019 Page 1 of 1 •F.1FA0 • . 8YF,.. :; ;,...111L-4PERMIT/PLAN REVIEW APPLICATION 0" �i. Development Services Department,240 West Huntington Drive,Post Office Box 60021 -,..„,,.0%* Arcadia, CA 91066-6021, (626) 574-5416,Fax(626) 447-9173 City of Arcadia . caCENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ,-reby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: apter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,a y license is i, full force and ��cyy�"" o I have and will maintain a certificate of consent to self-insure for workers' License Class License 'o. I, 4 Sif/Efrp. Date /Z /l compensation, as provided for by Section 3700 of the Labor Code, for the Signature of Contractor I performance of the work for which this permit is issued. t OWNER-BUILDER DECLARA 0\ I have and will maintain workers'compensation insurance,as required by Section a I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of e work for which this permit License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers' ora ensatiogyinsuranc arier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, Carrier c<0.1 e- r' (A. • demolish,or repair any structure,prior to its issuance,also required the applicant for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number ( e" provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if th ertnit is for one hundred dollars or less) 7000)of Division 3 of the Business and Professions Code)or that he or she is I certify that in the performance of the work for which this permit is issued,I shall exempt there from and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): compensation Laws of ralifomia,and agree that if I should become subject to the workers'copensation provisions of Section 700 o eLabor Code,I shall ❑I, as owner of the property, forthwi o¢tply t� se provisions. woa and employees withwages as theirs for 11 / /� compensation,will do the work, the structure is not intended or offered for 1(, sale(Section 7044,Business and Professions Code:The Contractors License ate Signature Law does not apply to an owner of property who builds or improves thereon, V or who does such work himself or herself or through his or her own - employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(1)year of and shallsubject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. ❑I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors license Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon, and who contacts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Date Signature Lender's Address IMPORTANT:APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for further information. /// --- - i c (( Title irkAv`°jld. PRINT'NAME II I edify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. I agree to comply with all Ci ordinances • d tate Laws relating to building construction. I hereby authorize representatives of the City of Arcadia to enter upon the above entio'•$ ' $perty for inspection purposes.'gnaturer/. Q"Date V (24 (( 67 o c /> OML NOTES Building Inspections Date Insp. Plumbing Inspections Date Insp. / 2-20161 100. Setbacks _ 210. Under ft/bldg.drain 101. Rough grade 211. Copper underslab 102. Figs.&forms CqJ?,•rt)•/S 212. Rough plumbing I o •3°-/? 'et.% 103. Pre-slab 7•/x./9 213. Rough gas 104. Floor joists 214. Shower pan II•lf•19 105. Steel 215. Water heater 106. Grout lift 216. Roof drains 107. Shear nailing 217. Building sewer 108. Diaph nailing 218. Watersenice 109. Roof nailing f O S.t9 219. Final gas 110. Framing Io-28.19 4-- 220. Fixtures 111. OccfArea Sept.Wall 221. Final plumbing 12-11.19" 112. Sound walls 222. Sewer cap/demo. 113. T-bar'rid 114. Insulation-Flt Pool Inspections Date Insp. 115. Insulation-Wall (o-3o.ii _ 240. Excavation/steel 116. Insulation-Ceil. fo•30•I/'c- 241. Rough plumbing 117. Drywall nailing (1.4.1 i cf- 242. Light shell/bonding 118. Interior lath (l•419 - 243. Underground conduit 119. Exterior lath 244. P-trap 120. Finish grade 245. Gas line&test 121. Final building 12./1•/, 4-- 246. Fence,gates&signs 122. Final demo/lot clear 247. Pool heater 248. Final electric Electrical Inspections Date Insp. 249. Final•lumbint 150. Power pole 250. Pool cover 151. Sales lot lighting 251. Pool final 152. Underground conduit 153. Underslab conduit Date Insp. 154. LIFER ground 270. Pre-reroof insp. 155. Water ground 271. Roof framing 156. Rough electrical [o•23.19 #V--- 272. Sheathing nailing 157. Fixtures 273. Final reroof 158. G.F.C.I. 159. E••1.bondins Sign Inspections Date Insp. 160. Service panel r 280. Setback/overhang 161. Final electric 1241-11 "C.-- 281. Footing 282. Conduithvidn, Mechanical Inspections Date Insp. 283. Disconnect 180. Venting/flue 284. Anal sign 181. Fumace/A.C. 182. Routh HVAC Miscellaneous Insp. Date Insp. 183. Fire dampers 290. Fire alarm 184. Furnace compartment 291. Underground supply 185. Combustion air 292. Are sprinklers 186. Smoke detectors 293. Monitor system 187. Metal F.P.rough 294. Hood dry chem. 188. Compressor setback 295. Final 189. Commercial hood 190. Duct shaft o•jB• ' Sewers&Offsite Insp. Date Insp. 191. Final mechanical 12•111' 300. Lateral(main to Pt) 301. Saddle/V Block Wall Inspections Date Insp. 302. Cess•••I filled 200. Footings 303. Sidewalk 201. SteeVrebar 304. Driveway 202. Grout lift 305. Curb replacement 203. Final wall 306. Trash bin r County of Los Angeles 'r^�' — DEPARTMENT OF PUBLIC WORKS BUILDING & SAFETY DIVISION PUBLIC WORKS AV Los Angeles Regional Uniform Code Program STRUCTURAL OBSERVATION REPORT FORM STRUCTURAL OBSERVATION means the visual observation of the structural system, for general conformance to the approved plans and specifications, at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspections required by Section 108, 1704 or other sections of the Los Angeles County Building Code. (Sections 106.4.5, 1709) Report No. This report includes all construction work through 214.tday of&,$heir 20 /6:, Page No. / of Project Address: Structural Observer of Record (SOR): OR Phone No.: 2- 3r f//G'HG.Ana a s /)r. GDtow-D L / 313J239-740o Building Permit No.: Structural Observationw"p/1 ObserrvrPrrofessionnal Lic./Reg. No.: bserver Phone No.: performedby:tpeaa ca)6 .4 P3h27-7460 OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS FOUNDATION WALL FRAMES FLOOR ELEMENTS/CONNECTION OBSERVATION LOCATION ❑Footing, Stem Walls ❑ Concrete ❑ Steel Moment Frame ❑ Concrete ❑Mat Foundation ❑ Masonry ❑ Steel Braced Frame ❑ Steel Deck ❑Caisson, Piles, kWood ❑ Concrete Moment 0 Wood Grade Beams Frame ❑Retaining Foundation ❑ Others: ❑ Masonry Wall ❑ Others: , Hillside Special Anchors Frame ❑Others: Others:WAD . • NOTED DEFICIENCIES with the proposed corresponding corrective actions with respect to general conformance with the approved plans or in the load path: (A final report by the structural observer which states that Allobservedl!deficiencies have been resolved is required before/Jacce tance of the workrby the building officials.) /vn ch f CnIVCy l e/ . / 2-0J7 a— /MCfie.n �. I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE: 1. I AM THE ENGINEER OR ARCHITECT RETAINED BY THE OWNER TO BE IN RESPONSIBLE CHARGE FOR THE STRUCTURAL OBSERVATION IN ACCORDANCE WITH THE -. ., . REQUIREMENTS OF THE COUNTY OF LOS ANGELES. �Q�O`ESJ/Q 2. I, OR ANOTHER ENGINEER OR ARCHITECT WHO I HAVE DESIGNATED ABOVE AND IS . h(/ �,P) g1J0✓G(�,,, UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT .(‘) C� �� Gi EACH SIGNIFICANT CONSTRUCTION STAGE TO VERITY IF THE STRUCTURE IS IN I WNo.C56?06 C l GENERAL CONFORMANCE WITH APPROVED PLANS AND SPECIFICATIONS;. i 1Z I T1I 3. ALL NOTED DEFICIENCIES WHICH REMAIN TO BE CORRECTED HAVE BEEN INDICATED * Bp' I 31/2 /f ABOVE; / 4. I RECOMMEND THAT ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE COUNTY . _CAUe OF LOS ANG LES BE WITHHELD UNTIL ALL OBSERVED DEFICIENCIES ARE ...... CORRECTED /y,/,,„,7 (STAMP OF STRUCTURAL OBSERVER) SIGNATURE OF STRUCTURAL OBSERVER AT Version 1.0(2008 LACBC) Jan.10 2008 SPECIAL INSPECTION REPORT K-SPECIAL INSPECTION, INC. Tel: (213) 382-8100 9746 Woodleaf Dr. e-- -Fits Email: ksi8100aa@gmai1.com - Alta Loma, CA 91701 www.kspecialinspection.com lk SI INSPECTION City*CIWA- Permit #: Project Name: Address Address:62,63c 4i/424W) eV(' PR ContractorraCeSeCr_ Off Site Fabricator: --ON ney4/ 1 Type of Inspection: Continuous Continuous 4/ Periodic o Type of Sample: Q'ty: Required fc: Slump: Temperature: Mix Design #: In accordance with Section 1702 of the International Building Code, special inspection has been provided for the followings; g, I/A4 t5 JA awe er, nIS ar• - - 4-05-41. ti _earl a' dir_at . _ ) I / -40 - A=.141 _64/19___Cdra) ctcn 41i 114:e 4 , • am- ' 17-Aar *. 7 17 —istr YAM. .41214PCMOO r a Note: Based upon inspections performed and our(my)substantiating reports, it is our(my)professional judgement that, to the best of our(my)Knowledge, the inspected work was performed in accordance with the approved plans, specifications and applicable workmanship pro •:•ig s of . e Intematio_,_ ilding Cod- .--• California Building Code .--.•••••••••11m" _ Inspector's Signature Date: 4.2....0,y ‘11/ Print Full Name: eW,1675%1/afi(ft7certificate Number: /AeC,e-- -. ) ratrCounty of Los Angeles DEPARTMENT OF PUBLIC WORKS BUILDING & SAFETY DIVISION PUBLIC WORKS wyLos Angeles Regional Uniform Code Program STRUCTURAL OBSERVATION REPORT FORM STRUCTURAL OBSERVATION means the visual observation of the structural system, for general conformance to the approved plans and specifications, at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspections required by Section 108, 1704 or other sections of the Los Angeles County Building Code. (Sections 106.4.5, 1709) Re ort No. / This report includes all construction work through / day of�L)D h 8.20 /9 Page No. I of Project Address: Structural Observer of Record (SOR): S R Phone No.: zo 3s- w A4 I Oa,k% Pr. tPw/t2D LI P3)339-9400 Building Permit No.: Structural Observation Observr P/rofessio al Lic./Reg. No.: server Phone No.: performed by:E4*1D Z./ C -� >O (3)3)2'1—g¢oo OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS FOUNDATION WALL FRAMES FLOOR ELEMENTS/CONNECTION OBSERVATION LOCATION Footing, Stem Walls 0 Concrete 0 Steel Moment Frame ❑ Concrete ❑ Mat Foundation ❑ Masonry 0 Steel Braced Frame 0 Steel Deck ❑ Caisson, Piles, ❑ Wood ❑ Concrete Moment ❑ Wood Grade Beams Frame 0 Retaining Foundation 0 Others: 0 Masonry Wall 0 Others: Hillside Special Anchors Frame ❑Others: ❑ Others: NOTED DEFICIENCIES with the proposed corresponding corrective actions with respect to general conformance with the approved plans or in the load path: (A final report by the structural observer which states that all observed deficiencies have been resolved is required before a ceptance of the ork by the building officials.) NO Jel,�c;e ��y . q i- ,79,c_2-1 I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE: 1. I AM THE ENGINEER OR ARCHITECT RETAINED BY THE OWNER TO BE IN RESPONSIBLE CHARGE FOR THE STRUCTURAL OBSERVATION IN ACCORDANCE WITH THE r�C REQUIREMENTS OF THE COUNTY OF LOS ANGELES. Q��11 �Q 2. I, OR ANOTHER ENGINEER OR ARCHITECT WHO I HAVE DESIGNATED ABOVE AND IS ?O CUD✓ UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT C� LQ l� �2 EACH SIGNIFICANT CONSTRUCTION STAGE TO VERITY IF THE STRUCTURE IS IN W No.C56706 ^'j GENERAL CONFORMANCE WITH APPROVED PLANS AND SPECIFICATIONS; CC i1 3. ALL NOTED DEFICIENCIES WHICH REMAIN TO BE CORRECTED HAVE BEEN INDICATED OM 21 * ABOVE; t C1V14 •�Q,• 4. I RECOMMEND THAT ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE COUNTY IF OF CALW `:; OF LOS ANGELES BE WITHHELD UNTIL ALL OBSERVED DEFICIENCIES ARE •-� _ CORRECTED. G (((��� I/1 4/ 7 (STAMP OF STRUCTURAL OBSERVER) SIGNATURE OF ST URAL OBSERVER DATE Version 1.0(2008 LACBC) Jan.102008 n ___._— — Y Qualit Tel: (562)634-2131 a a r Cell: (213) 445-9093 -2,z0 411144% Experience 9160 Sonrisa St.# 1 And Bellflower,CA 90706 • ' ,• lik Dedication www.DeputyInspectionServices.com 1:•' 1 7 1 C Oscar@DeputyInspectionServices.com SPECIAL DEPUTY INSPECTORS TIME SHEET & REPORT Building PermitNo:g. > -- -i L J G Dept.of Bldg.& Safety,City of Av`G iii vt . Job ID &Address: „Aci cif '- :Irl S , L', . -7 a j c, i i 61 in I c 'GI 34c, Dr - General Contractor HV(, /7 at-, ( ti.,,,,.(„,-;,, 1 , no . J Sub-Contractor: dJ /Ar / ' Engineer: f (2 (. S. r;l^5r. J'le:(au, t ;u 1 f v'.1 rtnr.1/ S . . .J J - Type of Work: ❑ Reinforced Concrete ❑ Masonry -S Drilled in Anchors ❑ Shotcrete ❑ Wood/Shear Walls ❑ Pull Test ❑Welding CONCRETE SUPPLIER MIX DESIGN It SPECIFIED PSI SAMPLES TAKEN N i f't P/4 WELDER CERTIFICATION# WELDER `CERTIFICATION# VISUAL INSPECTION REPORT_or CERTIFICATE'OF COMPLIANCE 1C DATE: (1 / 1 E)/ if 0 Vc,(,dtl.PGA (if,-1attfl rr(t7,,) 41S )I-PL$ rdu tA—t/ fi t_ 1 Li • / w -, e i � 11 � .><,r.)P 4( (C;:) ,2 Li 'i Ci, C C . t -T' � ��. ,,-",- ( .,1.��r ,( 5 //G) /p el c, -' 7 ;) - { p lei C': ' PY;�. 47n1A3 PIS (1/, ) 7--,-IS .-cii q - vt^, f/� -E�s2''Y'}/i! "`r :\ (r-i,'I,'iv ' /4 c w•Gii s . C�. 4fG- P V4 • N. ' •-- S ',,,t10 .CR)In yr • — (41-) f.onXv fit S ':f'r/'( (. S '7cClS ) dir) ` t ;.tfif Sc' T4ic.-56v,,..", ( I / f iv(rifavt C . t ..i/ atannln,.P//' f ,( / A ,�c /„' �(/rtfrrl.5 _ r ` , r / , DAILY HOURS WORKED Monday Tuesday Wednesday Thursday Friday Saturday .Sunday StraightTime Li In it, • Time& Double Time All inspections are based on a minimum of 4 hours.Over 4 ours is an 8 hour minimum.After hours is by the hour.All lab work necessary to complete inspections will be paid by owner,enggineer orcontractor. Invoices notpaidwithin 3gdayswill be subjectto 18%A.P:R.finance charge and other related collection fees.TERMS AND CONDITIONS IN BACK ALSO APPLY. ATTORNEYS FEES'If any action at law orequity is brought hto enforce orinterprettheterms of thiscontract,theprevailing party shall beentitleto reasonable attorneys fees,costs and necessary disbursement,in addition to any other relief to which party may be entitled. A rVERIFYTIMEONLY • e� t ` Print ktsllectonNane: A I { i U V`0 I d l-]U v C r (71 License No •`; b 5 ) 11‘ - r l _ ' l i Registered Deputy�� Building`Inspector's Certificate Signed by w, - Approvedby7K •"r/- •:=r-- .-i- • Company-- 4 ,�--i1``,�(/moC /-f-tn ( Oh S4 r Terms and Conditions- • 1. Fee for Services 1. The minimum fee for observations servicesty Deputy inspection Services, Inc. (D1S)will be based upon a fee for a minimum of four(4) hours. 2. If the number of hours of observation services exceeds four(4)hours, but is less than eight(B)hours, the fee will be based upon eight(8)hours. II. Owner's Duties 1. Permits and Approvals: The Owner and/or his representative(i.e.,the Contractor)are responsible for all necessary building permits and local municipal and/or state approval unless otherwise specified in writing. 2. Code Violations: D1S is not responsible for any existing building code violations and/or other municipal and/or government codes,ordinances,and/or regulations. Corrections of Agreement, should they exist, are the responsibility of the Owner, unless specifically provided in the Agreement,and DIS is not responsible to determine or advise the Owner of such violations. 3. Notice of Sale Obligations: If the Owner sells any part or all of the Job site and/or the construction project, the full amount remaining unpaid under this Observation Agreement to DM will become due and payable. The Owner will provide DIS a written notice of sale within twenty-four(24)hours upon entering into an agreement for sale of the job site and/or construction project 'IL Disputes • 1. Arbitration: In the event that any disputes arise between the Owner and DIS,related to this Observation Agreement.and not resolved by mutual agreement,the dispute shall be submitted to binding arbitration in accordance with the rules of commercial arbitration,the JAMS or ENDISPUTE 2. Cost&Fees: In the event that a dispute arises between the parties related to in this Observation Agreement the prevailing party shall be entitled to recover from the non-prevailing party all cost incurred in the connection with resolving said dispute, including reasonable attomey's fees. 3. Written Notice: Any notice required or permitted under this Agreement shall be by certified mail to the addresses contained in this Agreement If either party changes his or her address,that party shall•provide written notice to the other of the new address. 4. Location of Venue: In the event that a dispute arises between the Parties related to this Agreement,the proper • place of venue shall be 5. Governing Law: The Agreement shall be constructed,interpreted and enforced according to the laws of the State of California. IV. misplranpras 1.. Agreement: This Agreement embodies the entire agreement of the parties. No understanding or agreement, verbal or otherwise, exists between the parties,except as expressly set forth in this Agreement 2. Validation: In the even that any provision of this agreement is held to be invalid,that shall not affect in any respect whatsoever the validity of the remainder of this Agreement 3. Payment The Owner will make all payments upon receipt of ihvoice,and will not withhold any payment after arrival at the job site. 4. Cancellation by Owner. This Observation Agreement involves personal the services of employees of DIS. As such,this Observation Agreement cannot be cancelled by the Owner for any reason, once DIS employees arrives at the job site. 5. Breach: If Owner breaches any provisions of this Observation Agreement related to payment of observations services in addition to all other remedies available,DlS has the right to a mechanic's lien. If at any time, payment owed to DIS by the Owner is in default for a period of five(5)days or more,the Owner shall pay interest to D1S at the rate of 1.5%of the unpaid amount owed for each month such amount remains unpaid. 6. Non-Assignability: DIS or the Owner may not assign this Observation Agreement,either voluntarily or by operations of law. My attempted assignment shall be null and void. 7. Consequential Damages: DIS shall not be liable for any consequential damages, incidental or otherwise. DIS's liability to the Owner,connected with this Observation Agreement,including,without limitation, for breach of this agreement, shall in no event exceed the aggregate amount of all payment received by D1S from the Owner, minus cost incurred by DIS. 8. Modification: No modifications, variations and/or changes to this.Agreement shall be binding upon DIS or the Owner unless mutually agreed to in writing. - - . it -_ 203 M6-14 D yak PR _ y 9 - . (N...._ -.,.€:“....v.-1,-.t..:44 [...met— /` lirr ``t z xe,L„c;_ty ',I • V � 4 -Un I'CSgdsc..„5:,,,,,,;;;;,\:‘...:! � �{ at t .,, Z6�<ggF: i t f = i !„31-'7'7'1 %� i ' ? --'6,1Lii • • l: • 1(I,r I „ - ,: t i .1: 11: • i 11 f It rtv d -i1 Jt_1__ II i I \/31 -; -11 ,d • . \i ' . > 1 `�_ - 7 _ .y..,�-' - ,