Loading...
HomeMy WebLinkAboutUntitled at City of Arcadia, CA - Permit NO.SOLR-19-2198 r.' Development Services Department --; - r5 Permit.Type:Solar 240 West Huntington Drive,Post Office Box 60021 { ) J�,.t f'' E i 11! i Work Classification:Solar-Residential • -Arcadia,CA 91066-6021 v '-.__: — "--, . (626)574-5416 - ' H' Permit Status;Estimate ARCADIA lssueDate: 10/29/20191 Expiration: 04/26/2020 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 207 E FLORAL AVE Arcadia,CA 91006-2502 5772018015 Contacts Venkata Donthineni Owner SUNPOWER CORPORATION SYSTEMS' Contractor- 207 Floral AVE 1414 Harbour WAY#1901,Richmond,CA (408)218-6811 890895 Description:ROOF MOUNT PV SYSTEM, 20 MODULES/MICRO Valuation: $ 0.00 Tenant INVERTERS, 100 AMP LOAD CENTER Total Sq Feet: 0.00 Plan Check# Plan# Fees Amount Payments Amount Paid Building Plan Check Fee Residential $50.00 Total Fees $324.72 Distribution Panel $16.48 Cash/Receipt#REC-02940-19 $324.72 Electrical Permit Issuance Fee $47.01 Amount Due: $0.00 Fire Plan Check Fee Residential $50.00 Inverters $77.78 - Panels $82.45 Solid Waste Management Fee 2 $1.00 Total: $324.72 F,.-.,,. rz•/`7 •fq �/ CALLS •• • .SPE' 11f5 Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. October 29, 2019 Issued By: Date October 29,2019 Page 1 of 1 AR 4- .1FORNG• ill 40 Cfr'g • 1_ PERMIT/PLAN REVIEW APPLICATION It ilt . rill zjp Development Services Department,240 West Huntington Drive, Post Office Box 60021 Arcadia, CA 91066-6021, (626) 574-5416,Fax(626) 447-9173 City of Arcadia iCENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ereby affirm under penalty of perjury that I am licensed under provisions of I,fte`by affirm under penalty of perjury one of the following: apter 9(commencing with Section 7000,of Division 3 of the Business and (j� ofessions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers' cense Class(. � C License No.!. till:14, - Exp. Date2fLB/GI compensation, as provided for by Section 3700 of the Labor Code, for the gnature of Contractor r ] I performance of the work for which this permit is issued. n )) OWNER-BUILDER DECLARATIONp61'Ilave and will maintain workers'compensation insurance,as required by Section IDI hereby affirm under penalty of perjury that I am exempt from the Contractors I 3700 of the Labor Code,for the performance of the work for which this permit License Law for the following reason(Section 7031.5,Business and Professions is issued.Myr onkefrs_'compensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, . Carrier:p_____d( _ v l a.HGY----- demolish,or repair any structure,prior to its issuance,also required the applicantCwt ) W'QoD L for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number _ provisions of the Contractors License Law(Chapter 9(commencing with Section 1\ (G°5 section need not be completed if the permit is for one hundred dollars or less) 7000)of Division 3 of the Business and Professions Code)or that he or she is 0 certify that in the performance of the work for which this permit is issued,I shall exempt them from and the basis for the alleged exemption. Any violation of , Section 7031.5 by any applicant for a permit subjects the applicant to a civil Inot employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): elompensation Laws of California,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall ❑I, as owner of the property, 'forhwith comply with those provisions. or my employees with wages as their sole rrJ compensation,will do the work,and the structure is not intended or offered for Date(O129/c 1 Signature sale(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property who builds or improves thereon, i. or who does such work himself or herself or through his or her own employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. ❑I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Date Signature Lender's Address IMPORTANT:APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909) 396-2000 for further information. N e -tcn Li Ari-s Title 4`t-'1"\--- PRINT ['ty1-`'\� PRAT NAME _ U !cefY t. rthat I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of It dia to enter upon the above-mentioned property for inspection purposes. I ]/� �( 'Sinature /I�.!�:1 Date "�/` t/ Fe -r . �,l LAGUNA 28202 Cabot Road, Suite 300 I i CONSULTING ENGINEERS Laguna Niguel, CA 92677 , • LPG, INC_. 949-371-5238 info@LagunaEngineers.com October 24,2019 QROFESS/ph 4 �p �ESKgNq�� To: Sunpower Corporation ��@gyp ,f ,G 1414 Harbour Way y > t South Richmond,CA.94804 ES a S 5847 z r, * EXP. 12/19 Subject: Certification Letter Donthineni Residence tP d> U07U' Q I 207 East Floral Ave Of CA y►% Arcadia,CA.91006 Digitally signed by Paymon �, Eskandanian Date:2019.10.25signed Paymon • To Whom It May Concern, A jobsite observation of the condition of the existing framing system was performed by an audit team of Sunpower Corporation ' as a request from Laguna Consulting Engineers.All review is based on these observations and the design criteria listed below and only deemed valid if provided information is true and accurate. On the above referenced project,the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof.The structural review only applies to the section of the roof that is directly supporting the solar PV system and its supporting elements.The observed roof framing is described below. If field conditions differ,contractor to notify engineer prior to starting construction. The roof structures of(Roof 1&2)consist of composition shingle roof,sloped at.19 degrees.The roofing material is supported by roof plywood and skip sheathing and by the roof framing below. • The existing roof framing systems of(Roof 1&2)are judged to be adequate to withstan4--tfj loading imposed by the installation of the solar panels.No reinforcement is necessary. ,� The spacing of the solar standoffs should be kept at 72"o.c.for landscape and;72"o:c.fg0�ortr o?ientation. kN#• 1Q;- `". The scope of this report is strictly limited to an evaluation of the fastener attani�a;,f?tande,Fdym�g;framingAnd supporting structure,only. All panels,racking and hardware shall be installed per relli`Vprer spe2ilica`tdn§and`'withirl specified design limitations.All waterproofing shall be provided by the m�areacturff`kaguda Con ting,�'nginegrtbSs4 mes no,responsibility for misuse or improper installation-of the solar PV anel ,6r racs" CC ' ": Design Criteria:' k O\I' \`}�•, ,:i `` f •�`\ ` • Applicable Codes=2016 CBC,ASCE-v-1b,a�y ' 'JDS;c1,2 -.:1N alt \ ,�..% .''- • Roof Dead Load.=9 psf(Roof 1&2) \\�S Sc•. t?S" P`��� '.S' - .` ,`, 1 Roof Live Load=20 psf `�\`��?�" �a \.s.,, '' `,a `,.1•�,' • Wind Speed=110 mph(Vult),Exposure C,Rlt ;te�ggb�II c,-*•'.•�,,� • • Attachments: 1-5/16"dia.lag screw with 2.5 iM2h min embPtd;lient`dgpth,at spacing shown above. \IS I 'N Please contact me with any further questions or concerns regarding this p-oject. Sincerely, Paymon Eskandanian,S.E. Principal Engineer n,...u.i..,...; o,..-I,4,...,.,. A.,..,rl:n r`A vlc.,. 1 1 ' , l,1 LAGUNA 28202 Cabot Road, Suite 300 •a1 CONSULTING ENGINEERS Laguna Niguel, CA 92677 '', LPG, INC. 949-371-5238 info@LagunaEngineers.com Address: 207 East Floral Ave,Arcadia,CA.91006 Exposure: C Wind Speed: 110 mph Risk Category: II Aerial Image ' ^ T7,�-.�:13-ir� 77 ,5 {. rlr t. ,,yt ' „y ! —r—q1.2 ;r tiiie .fit s • v Zi ta8'l Ti _' -' .3'=4,Y•x , . . i7 1 , f ,i- 1 , 4--- . 1 ��"' Y _(' .r- '. 1 7 r '� " + • ' .s a1 r y r:—,4.1 4.._\I:1\k : 't �`' '` ., . a # '-.�. 2-,Or7IEa. �FIoraI-Ave,° ffi. = 3 ' r. . `\ �a..1 ,,. ....a.,... , , _ _, . • , +tYF k+ � 4' if�L1N . "tjli ' � ~ t� ' ' - '•11�s (tom! amu,, • 3- 1i+. 'r l�aoa "w5 _ 1 s."� e. 1t ' �� I � .,.,� . 1 y �y1P9,M 1 i , , �,c �`�. G,r j h ,_ ll..sp. Ti9L.. Lai:' , ice T. i_ • S, a '1 _"T.I •• " - IA.- W. :R1 'ti` '—. 1. •1.• . \\ r - - , ..36solit -kciar ,-i..49e:-. ,. 4 r In nth intim; 17 etc irlcnro Arncrl in rA vlcrn 9 Ile LAGUNA 28202 Cabot Road, Suite 300 L CONSULTING ENGINEERS Laguna Niguel, CA 92677 949-371-5238 LPG, INC. info@LagunaEngineers.com Gravity Loading PV Dead Load=3 psf(Per Sunpower Corporation) DL Adjusted to 19 Degree Slope 3.17 psf PV-Sys—tern Weight - - Weight of PV System(Per Sunpower Corporation) 3.0 psf X Standoff Spacing= 6.00 ft Y Standoff Spacing= 2.75 ft Standoff Tributary Area= f 16.50 sft Point Loads of Standoffs 50 lb ) I ` Roof.Live Load=20.psf Note:Roof live load is removed in area's covered by PV array. Roof Dead bad(Roof 1&2) Composition Shingle I 4.00 Roof Plywood and Skip Sheathing + 3.50 Framing 0.73 Vaulted Ceiling 0.00 (Ceiling Not Vaulted) Miscellaneous 0.77 Total Roof DL(Roof 1&2) 9.0 psf DL Adjusted to 19 Degree Slope 9.5 psf 11 11 fl n4�,;nan Dacia. nn Arnorflc rA ,,Ic , z T • ' I,I LAGUNA 28202 Cabot Road, Suite 300 o •;� CONSULTING ENGINEERS. Laguna Niguel, CA 92677 • LPG, INC. , 949-371-5238 info@LagunaEngineers.com Wind Calculations Per ASCE 7-10 Components and Cladding k Input,Vanables .0 Wind Speed 110 mph Exposure Category C - • Roof Shape Gable/Hip Roof Slope 19 degrees • Mean Roof Height 20 ft Effective Wind Area 19.3 ft • ri;t:t1,:glicItgrAttigngniWini_ipiressurelCalculationeaSil Wind Pressure P=qh*G*Cn qh=0100256*Kz*Kzt*Kd*VA2 (Eq.30.3-1) Kz(Exposure Coefficient)=0.9 (Table 30.3-1) Kit(topographic factor)= 1 (Fig.26.8-1) Kd(Wind Directionality Factor)= 0.85 (Table 26.6-1) V(Design Wind Speed)_ 110 mph _(Fig.26:5-1A) Risk Category= II (Table 1.5-1) qh= 23.70 0.6*qh= 14.22 an.o", pi" acuaions-10 rai arargran - ' _ . Zone 1 Zone 2 Zone 3 Positive GCp= -0.84- -1.39 -2.23 0.36 ,(Fig.30.4-1) Uplift Pressure= -11.91 psf -19.76 psf _ -31.68 psf 10.0 psf (Minimum) X'Standoff Spacing= 6_00 6.00 4.00 Y Standoff Spacing= 2.75 2.75 2.75 Tributary Area= 16:50 16.50. 11:00 Footing Uplift= -197 lb 326 lb 348 lb • .. , .,.re e-M tstandoffOpTffCa cu aeons an'sca e Zone 1 Zone 2 Zone 3 Positive GCp -0.84 -1.39 "-2.23 038 ` •(Fig.30.4-1) Uplift Pressure= -11.91 psf -1.9.76 psf -_31.68 psf 10.0psf (Minimum) Y X Standoff Spacing= 6.00 6.00 4.00 Y Standoff Spacing= 1.75 ' 1.75 1.75 Tributary Area= 10.50 10.50 7.00 Footing Uplift= -125 lb -208 lb ,222lb' Maximum Design Uplift=-348 lb Standoff Uplift Capacity =450 lb 450 lb capacity>348 lb demand Therefore,OK as ener. apac_r-fy Check s • r• -j Fastener= 1-5/16"dia Lag Number-ofFasteners=1 Embedment Depth=2.5 Pullout Capacity Per Inch=250 lb Fastener Capacity=625 lb vi/F.S.of 1.5&DOL of1.6=66716 667.2lb capacity>348 Ib demand Therefore,OK r1nnlh nnni DnciAcnrc Arndd rA vlcm A ., 3 . r LAGUNA 28202 Cabot Road, Suite 300 CONSULTING ENGINEERS Laguna Niguel, CA 92677 LPG, INC. 949-371-5238 info@LagunaEngineers.com Vertical Check Per CEBC Section 402.3 Summary CU Loading: (E)Existing (N)with PV D(psf) 9.0 psf 12.0 psf PV DL=3 psf Lr(psf) 20.0 psf 0.0 psf (Under Panels Only) S(psf) 0.0 psf 0.0 psf Total Roof Gravity Load29.0 psf 12.0 psf %Change in Roof Gravity Load due to PV array addition %-DIFF=(N-E)/E =(12-29)129 %-DIFF= -58.62% (O.K.) Per the California Existing Building Code(CEBC)2016 Section 402:3,indicates that alterations to a , building that result in less than 5%increase in the gravity loads may be performed without a structural evaluation of the existing building.The member forces in the area of the propsed solar array will not increase by more than 5%.Therefore,the requirements of section 3403.3 have been met and the proposed addition of solar PV is allowed with no further remediation. i . e, LAGUNA 28202 Cabot Road, Suite 300 X11 CONSULTING ENGINEERS Laguna Niguel, CA 92677 LPG, INC. 949-371-5238 info@LagunaEngineers.com Lateral Check Per CEBC 2016 Chapter 34 Existing Weight of Effected Building Level Area Weight(psf) Weight(Ib) Roof 2550 sf 9.5 psf 24272 lb Ceiling 2550 sf 6.0 psf 15300 lb 7/8"Stucco _ - 100 ft 11.0 psf 4400 lb (8'-0"Wall Height) Int.Walls 100 ft 6.4 psf 2560 lb Existing Weight of Effected Building 46532 lb Proposed Weight of PV System Weight of PV System(Per Sunpower Corporation) _ 3.0 psf Approx.Area of Proposed PV System 365 sf I Approximate Total Weight of PV System 1155 lb I 10%Comparison 10%of Existing Building Weight(Allowed) 4653 lb Approximate Weight of PV System(Actual) 1155 lb Percent Increase 2.5% 4653.1b>1155 Ib,Therefore OK - I