Loading...
HomeMy WebLinkAboutApproved PlansPROJECT ADDRESS:OWNER:PHONE:DRAFTSPERSON: HEIDI LIEMAIL:heidi.wy.li@gmail.comProject numberDateDrawn byChecked byA101PROJECT INFO ANDSITE PLAN00032Residence additionHEIDI LI-No.DescriptionDate1225 HOLLY AVE. ARCADIA CA 91007NEW ADU1225 HOLLY AVE. ARCADIA CA 91007NEW ADUBENNY CHEN6267829243SITEVINCITY MAPN.T.S.ALLOWABLE FAR4500SF + (9941 X 40%) = 8,476 SFFAR3,817 SF( PERMITTED MAIN HOUSE+ DETECHED GARAGE)420 SF (ADDITION TO PERMITTED DETACHED GARAGE)4,237 SF/ 19,941 SF = 21%LOT COVERAGE4151 SF (EXISTING STRUCTURE)840 SF (ADU)4,971 SF. (TOTAL) / 19,941 SF. = 25%PARKING:2 PARKING SPACES IN ATTACHED GARAGE IN MAIN HOUSE2 UNCOVERED PARKING IN FRONT OF ADU (SEE SITE PLAN)SCOPE OF WORK:NEW DETACHED ADU WITH 2 BEDROOMS, 1 BATHROOMKITCHEN AND LIVING ROOM CODE REFERENCE:2019 California Building Code, 2019 California Mechanical Code,2019 California Plumbing Code, 2019 California Fire Code, 2019 California Electrical Code, 2019 California Residential Code,2016 California Green Building Standards Code, 2019 California Energy Code. PROJECT SUMMARYADDRESS:1225 HOLLY AVE. ARCADIA CA 91007PROPERTY OWNER:BENNY CHEN 626-782-9243APN#5784-008-023PROPERTY BOUNDARYTRACT NO 6548 LOT COM AT NW COR OF LOT 16 TH S 89¢59'20" E TO W LINE OF HOLLY AVE TH S THEREON107.398 FT TH W ON N LINE OF S 100 FT OF LOT 1 ZONE:R-1STORY:2-STORY (EXISTING MAIN HOUSE)1-STORY (NEW ADU)LOT SIZE:19,941S.F.MAIN HOUSE (NO SCOPE) 3,817 S.F. (4 BEDROOMS)NEW ADU:840 S.F. (ADDITIONAL LIVING SPACE)- 440 SF (PERMITTED STRUCTURE, EXISTING GARAGE)- 400 SF ADDITION20' - 11"18' - 1"Conditionally Approved August 4, 2020 PROJECT ADDRESS:OWNER:PHONE:DRAFTSPERSON: HEIDI LIEMAIL:heidi.wy.li@gmail.comProject numberDateDrawn byChecked byA101PROJECT INFO ANDSITE PLAN00032Residence additionHEIDI LI-No.DescriptionDate1225 HOLLY AVE. ARCADIA CA 91007A102GENERAL NOTES AND EXISTING PLANSNEW ADUBENNY CHEN6267829243GENERAL NOTES1. All work shall comply with the California Building Code, 2019 Edition, and all otherlocal or state agencies having jurisdiction over this project.2. All drawings and specifications are considered to be a part of the ContractDocuments. The Contractor shall be responsible for the review and coordination ofall drawings and specifications prior to the start of construction. Any discrepanciesthat occur shall be brought to the attention of the Architect prior to the start ofconstruction so that a clarification can be issued. Any work performed in conflict withthe Contract Documents or any code requirements shall be corrected by theContractor at his own expense and at no expense to the Owner or designer.3. All symbols and abbreviations used on the drawings are considered to beconstruction standards. If clarification is required, the Contractor shall notify thedesigner prior to proceeding with the work.4. All dimensions and the site conditions shall be verified by the Contractor at the jobsite prior to bid submittal, start of shop drawings, start of construction, and/orfabrication of materials. If discrepancies are encountered, or conditions develop notcovered by the Contract Documents, owner shall be notified for clarification.5. Contractor shall provide and be responsible for the protection and repair ofadjacent existing surfaces and areas which may be damaged as a result of newwork.6. Do not scale drawings. Printed dimensions have precedence over scaled drawingsand large scale over small.7. Typical details shall apply in general construction unless specifically detailed.Where no details are given, construction shall be as shown for similar work.8. The Contract Documents and Specifications represent the finished structure. Theydo not indicate the method of construction. The Contractor shall provide all measuresnecessary to protect the structure and safety of workmen during construction. Suchmeasures shall include but not be limited to, bracing, shoring for loads due toconstruction equipment, etc. Observations visits to the site by the Architect orStructural Engineer shall not include inspection of the above items and does not inany way relieve the Contractor of his responsibilities for the above.9. For trenches or excavations (5) five feet or more in depth into which a person isrequired to descend, the Contractor is to obtain the necessary permit from the Stateof California, Division of Industrial Safety, prior to the issuance of a building permit.10. No holes, notches, blockouts, etc. are allowed in structural elements unlessdetailed on the structural drawings or approved by the Structural Engineer.12. All information show on the drawings relative to existing conditions is given asthe best represent knowledge form data supplied by the Owner, but withoutguarantee of accuracy. Where actual conditions conflict with the drawings, they shallbe reported to owner or designer so that proper clarification may be made.Modification of details of construction shall not be made without written approval ofthe owner or designer.EXISTING MAIN HOUSE FIRST FLOOR PLAN SCALE = N.T.S.EXISTING MAIN HOUSE SECOND FLOOR PLAN SCALE = N.T.S.Conditionally Approved August 4, 2020 PROJECT ADDRESS:OWNER:PHONE:DRAFTSPERSON: HEIDI LIEMAIL:heidi.wy.li@gmail.comProject numberDateDrawn byChecked byA101PROJECT INFO ANDSITE PLAN00032Residence additionHEIDI LI-No.DescriptionDate1225 HOLLY AVE. ARCADIA CA 91007A103FLOOR PLAN, RCP, FOUNDATIONPLAN AND ROOF FRAMING PLANNEW ADUBENNY CHEN6267829243Conditionally Approved August 4, 2020 PROJECT ADDRESS:OWNER:PHONE:DRAFTSPERSON: HEIDI LIEMAIL:heidi.wy.li@gmail.comProject numberDateDrawn byChecked byA101PROJECT INFO ANDSITE PLAN00032Residence additionHEIDI LI-No.DescriptionDate1225 HOLLY AVE. ARCADIA CA 91007A104DETAILS AND ELEVATIONSNEW ADU2ROOF EAVESCALE: N.T.S.4BENNY CHEN6267829243Conditionally Approved August 4, 2020