HomeMy WebLinkAboutFindings & Action Form• e HighlandsAssociation
Architectural Review Board
Findings and Action Report
File No.: 0-016-2020 Date: 81412020_
Project Address: 2020 Highland Oaks Dr.
Applicant: R. Ballesteros
Owner (if different) L. Montano
Project Description: Interior remodel and addition of second story
FINDINGS
I. SITE PLANNING - The proposed project IS consistent with the Site Planning Guidelines. The
enlargement of the existing structure is visually harmonious with the site and compatible with the
character and quality of the surroundings.
II. MASSING -The proposed project IS consistent with the Massing Guidelines. The proposed second
story addition locates the massing to the rear of the home to minimize the appearance of the second
story from the street.
III, FRONTAGE CONDITIONS - The proposed project IS consistent with the Frontage Condition
Guidelines. Homes should not have significantly greater height at the front of a property than that
of adjacent homes which this proposed project will not since the second story addition will only
be partially visible from the streetview.
IV. GARAGES & DRIVEWAYS - The proposed project IS consistent with the existing structure of
the garages and driveways. The garage and driveway will remain as they are currently built.
V. ARCHITECTURAL STYLE - The proposed project IS consistent with the Guidelines. The
proposed project would not change the existing architectural style of the home.
VI. HEIGHT, BULK & SCALE - The proposed project IS consistent with the Guidelines. The
proposed second floor plate height of 8.5 feet does consider existing second story plate heights
established within the immediate neighborhood.
VII. ROOFLINES - The proposed project IS consistent with the Roofline Guidelines based on the roof
plan and material (concrete tiles) being compatible with the Highlands requirements. The roof plan is
compatible with the proposed architectural style and design of the home. The pitch of the second story
addition has been lowered in order to create less height and mass within the view of neighboring
properties_
VIII. ENTRY - The proposed project IS consistent with the Entry Guidelines. The entry is not being
modified from the original architecturally style of the home.
VL WINDOWS & DOORS - The proposed project IS consistent with the Guidelines. The window
placement and window material on the second story have been designed to minimize direct views
into neighboring residences and actively -used outdoor spaces of neighboring properties_
X. ARTICULATION -The proposed project IS consistent with the Guidelines. The second story walls
provide articulation that creates some visual interest to the sides and rear of the second story
addition.
XI. FACADE DESIGN - The proposed project IS generally consistent with the Facade Design
Guidelines based on the home's overall design.
XII. COLORS & MATERL41S - The proposed project IS consistent with the Guidelines. The
colors used on the exterior of the home will mirror the existing color pallet.
XIII. ACCESSORY LIGHTING - The proposed project IS consistent with the Guidelines.
XIV. ADDITIONS & ALTERATIONS - The proposed project IS consistent with the Guidelines
for Additions and Alterations as it does exhibit a consistent architecture style throughout that is
carried forward from the original style of the home.
XV. - HILLSIDE PROPERTIES - The proposed project IS consistent with the Guidelines. The
home is located in a hillside area and as such the massing, scale and setbacks have been contained
to minimize potential view impacts on existing homes.
XVI. - FENCES, WALLS, GATES, & HEDGES - The proposed project IS consistent with the
Guidelines and most of the materials are existing.
XVII. LANDSCAPE & HARDSCAPE - The proposed project IS consistent with the Guidelines.
Additional landscaping will be added and existing landscaping will be grown to maintain the
privacy of the neighbor to the South of the subject.
XVIII. FENCES & WALLS - The proposed project IS consistent with the Guidelines for Fences
and Walls.
M. MINIMUM FLOOR AREA & SETBACKS - The proposed project IS consistent with the
Minimum Floor Area and existing setbacks.
XX. AFFECT ON ADJACENT PROPERTIES & NEIGHBORHOOD -- The General Plan Land Use
Policy LU -3.5 requires that, "new construction, additions, renovations, and infill developments be
sensitive to neighborhood context, building form, scale and colors." The proposed project is
consistent with the Single -Family Residential Design Guidelines. The proposed project does
integrate design that mitigates the massing and scale issues with respect to the streetscape as well
as adjoining properties.
ACTION
X Approved/ Conditionally Approved/ Denied
These Findings and Action were made by the following ARB Members of the Association at a
meeting held on August 4, 2020 via a conference call.
Members In Attendance -Vote:
Dean Obst, ARB Chair - Yes Signature:,4&
'
Lee Kuo - Yes
David Arvizu - Yes
Patrick Cronin - Yes
APPEALS
The ARB's decision may be appealed to the Planning Commission and the City Council, in
compliance with Section 9.08.07 of the City's Development Code.
Section 9108.07.020 of the City's Development Code states: Decisions of the ARB or ARB
Chairperson on all matters specified in Section 91.08.01.060 (Homeowners Association
Architectural Review Board) and 9108.01.070 (Homeowners Association Architectural Review
Board Chairperson) may be appealed to the Commission.
Section 9108.07.040 of the City's Development Code states: An appeal shall be submitted in
writing and shall specifically state the pertinent facts and the basis for the appeal.
1.Pertinent Facts and the Basis for the Appeal. The pertinent facts and the basis for the appeal
shall include, at a minimum, the specific grounds for the appeal, where there was an error or
abuse of discretion by the previous Review Authority (e.g., Commission, Director, ARB, ARB
Chairperson, or other City official) in the consideration and action on the matter being appealed,
and/or where the decision was not supported by the evidence on the record. Appeals filed by a
City official, a Commissioner, or a Councilmember shall be exempt from the requirements of this
Subparagraph.
2.Shall be Filed within 10 Days. The appeal shall be filed with the Department within io days
following the actual date the decision was rendered.
a.Appeals addressed to the Council shall be filed with Planning Services.
3.Accompanied by Filing Fee. The appeal shall be accompanied by the filing fee identified in the
Fee Schedule.
4.Suspension of Action. Once an appeal is filed, any action on the associated project is
suspended until the appeal is processed and a final decision is rendered by the applicable Review
Authority.