HomeMy WebLinkAboutItem 09e - Accept Valve Replacement Project as Complete DATE: September 1, 2020 TO: Honorable Mayor and City Council FROM: Tom Tait, Public Works Services Director By: Tiffany Lee, P.E., Associate Civil Engineer SUBJECT: ACCEPT ALL WORK PERFORMED BY CEDRO CONSTRUCTION, INC. FOR THE VALVE REPLACEMENT PROJECT ON SANTA ANITA AVENUE AS COMPLETE Recommendation: Approve SUMMARY On February 18, 2020, the City Council approved a contract with Cedro Construction, Inc. in the amount of $192,105 for the Valve Replacement Project on Santa Anita Avenue. The terms and conditions of this project have been complied with and the work has been performed to the satisfaction of the Project Manager for a total project cost of $177,780. This amount reflects the original contract amount of $192,105 minus quantity changes totaling $14,325, or 7.5% less than the original contract amount. It is recommended that the City Council accept all work performed by Cedro Construction, Inc. for the Valve Replacement Project on Santa Anita Avenue as complete; and authorize the final payment to be made in accordance with the contract documents, subject to retention of $8,889. BACKGROUND As part of the valve exercising program, valves in the water distribution system are regularly inspected to verify the are functioning properly, and to identify valves that are broken or in need of repair. It was determined that the 30-inch gate valves on Santa Anita Avenue between Duarte Road and Orange Grove Avenue were not fully operational and needed to be replaced. The 30-inch transmission main on Santa Anita Avenue between Duarte Road and Orange Grove Avenue is a steel pipe that was constructed in 1936. The pipe has seven 30-inch gate valves along its length that allow water utility crews to isolate portions of the pipe in case of an emergency or a broken water main. Due to their age, the gate valves were not fully operational and needed to be replaced. Six of the seven 30-inch gate valves had already been removed and Accept Valve Replacement Project September 1, 2020 Page 2 of 3 replaced. The last 30-inch gate valve along Santa Anita Avenue, north of Foothill Boulevard needed to be removed and replaced. DISCUSSION On February 18, 2020, the City Council approved a contract with Cedro Construction, Inc. for the Valve Replacement Project on Santa Anita Avenue. The work performed included excavating in the street and right of way on Santa Anita Avenue, north of Foothill Boulevard, removing the damaged 30-inch gate valve, and installing a new 30- inch butterfly valve (shown on Exhibit “A”). In order to minimize the interruption of water services to residents and local business, two temporary shut off valves and a 24-inch bypass line were installed. This allowed the City’s contractor to isolate and remove from service the portion of the 30-inch transmission main where the valve was located without interrupting water service to businesses or residents. During the course of work, it was determined that several bid items could be removed from the scope of work. The City received credits for the removal of these bid items. Below is a description of the contract change orders. CCO Description Amount 1. Deleted – Remove and Replace 6” Curb and Gutter ($3,960) 2. Deleted – Remove and Replace Granite River Rock and landscape ($3,609) 3. Deduction on Asphalt Pavement Repair ($3,980) 4. Deduction on Installation of Steel Pipe ($2,776) Total: ($14,325) The terms and conditions of this contract have been complied with and the work has been performed to the satisfaction of the Project Manager. Cedro Construction, Inc. completed the work as defined in the project plans and specifications in an efficient and timely manner. FISCAL IMPACT Funds in the amount of $225,000 were budgeted in the Fiscal Year 2019-20 Capital Improvement Program for this project. The total cost for the Valve Replacement Project is $177,780. This amount reflects the original contract amount of $192,105 minus quantity changes totaling $14,325, or 7.5% less than the original contract amount. Accept Valve Replacement Project September 1, 2020 Page 3 of 3 RECOMMENDATION It is recommended that the City Council accept all work performed by Cedro Construction, Inc. for the Valve Replacement Project on Santa Anita Avenue as complete; and authorize the final payment to be made in accordance with the contract documents, subject to retention of $8,889. Attachment: Exhibit “A” – Photographs of Valves EXHIBIT “A” Valve Replacement Project - Valves Old 30-inch Gate Valve New 30-inch Butterfly Valve