Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSOLR-20-0027 l
°'" 4 = 'i,, 4..-,,j''''''' �: Permrt'No SOLR 20 0027.
. City of Arcadia, CA
• ', Development Services Department ,u 1� J IFS'. PermitType Solar=
"= 240 West Huntington Drive,Post Office Box 60021
tf" r Sig s
Arcadia,CA 91066-6021 Work Clossrficdtion Solar'"Resldentral Over 10`KV_
sig (626)574-5416 'n �. `L ,t V „.P . -Permit Status Issued'
ARCADIA Issue Date 01)15/2020] Expiration: 07/05/2020
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
314 ARBOLADA DR Arcadia,CA 91006-2109 5770020007
e"..�ti:.. n "'d"WV'i:. ,..+ ''&`.us..:Yd:ai\.Ak.^.9a kv: ffi;.R'xkti %SY `t'. `u+A..'i ...'s:T: .<. a 'R:..r::" vi i m'.. 4 S eZw a'•... v....t'f".�S.,q7:44k'.w.s4 4 R
Contacts
CARMEN YANG Owner PACIFIC STONEGATE INC dba :SOLAR Contractor
314 ARBOLADA VAST
— 8727 LANYARD CT,RANCHO CUCAMONGA,CA 91730
(909)377-5477 965340
Description:ROOF MOUNTED SOLAR SYSTEM 73 MODULES 200 f Valuation: $ 0.00 Tenant
AMP LOAD CENTER
Total Sq Feet: 0.00 Plan Check# Plan#
C.,1 x.
fi9s4wf°V�+E'�'n98R..ea 4m..YYo,Ca=.n Jam.,i�.?..2ta.`..3K'k`�,a\.3 9=U.q x 'HW Y.•.A a, ,4 '
Fees Amount Payments Amount Paid
Building Plan Check Fee Residential $50.00 Total Fees $324.72
Distribution Panel $16.48 Cash/Receipt#REC-03588-20 $324.72
Electrical Permit Issuance Fee $47.01
Amount Due: $0.00
Fire Plan Check Fee Residential $50.00
Inverters $77.78
Panels $82.45
Solid Waste Management Fee 2 $1.00
Total: $324.72
CALLS FOR INSPECTIONS
Request for inspection by telephone at 626-574-5450. Leave a message
/� requesting the address,timeframe and what inspection item i needed.
Z_ 20 rc(P4g 74 eras. / (IC 5/ 4/S4c/fC r old/ /
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a period of 180 consecutive days.
;- 3,...-Z61'...--74. .-7 (_ 6.7
' ,Iliele -eek e --cep'71,:i'llity,7)1 0.7-4a
. r.
t;Ijik.'ill aim. i
°OF
January 15, 2020
Issued By: Date
January 15,2020 Page 1 of 1
U%Al OFFOR C.,
�' PERMIT/PLAN;REVIEW APPLICATION
0.N..,----/e, Development Services Department,240 West Huntington Drive,Post Office Box 60021
m,,„,,,a Arcadia, CA 91066-6021, (626) 574-5416,Fax (626) 447-9173
City of
Arcadia
LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION
in I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following:
Chapter 9(commencing with Section 7000,of Division 3 of the Business and
Professions Code,and my license is in full force and effect. y/ 0 I have and will maintain a certificate of consent to self-insure for workers'
License Class C-10 License N . 6S 3LLa Exp. Date U/Z 1(11 compensation, as provided for by Section 3700 of the Labor Code, for the
aSignature of Contractor c performance of the work for which this permit is issued.
OWNER-BUILDER DECLARATION ria I have and will maintain workers'compensation insurance,as required by Section
❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit
License Law for the following reason(Section 7031.5,Business and Professions is issued.M worLLkers'compensation insurance carrier and policy numbers are:
Code.Any city or county which requires a permit to construct,alter,improve, Carrier )g1111 ne
demolish,or repair any structure,prior to its issuance,also required the applicant S1'j�f 6-6)))03\-7
� 3�c-/
for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number Q
provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less)
7000)of Division 3 of the Business and Professions Code)or that he or she is
exempt there from and the basis for the alleged exemption. Any violation of 44R I certify that in the performance of the work for which this permit is issued,I shall
Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers'
penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the
workers'compensation provisions of Section 3700 of the Labor Code,I shall
❑I, as owner of the property, or my employees with wages as their sole forthwith comply with those provisions.
compensation,will do the work,and the structure is not intended or offered for 1 j S /Z(j-Z p // aG�1 �
sale(Section 7044,Business and Professions Code:The Contractors License DateSignature ✓v"j ��//"��
Law does not apply to an owner of property who builds or improves thereon,
or who does such work himself or herself or through his or her own
employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful,
sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one
completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation,
did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and
attorney's fees.
0 I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project(Section 7044,Business and Professions
Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY
who builds or improves thereon, and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency
contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097,
Civil Code).
❑ I am exempt under Section 7044,Business and Professions Code,for this reason:
Lender's Name
Date Signature Lender's Address_
IMPORTANT:APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND
RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING:
1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. .r I
2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings
and structures.
3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering
of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for
further information. j
Name Gil I 1"y�11w1�l�Ifv Title per-)--/-
PRINT NAME
I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner.
I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of
Arcadia to enter upon t e above-mentioned property for inspection purposes. AS— /22c
Signature Date 0?
•
:y
ARRAY INFORMATION
',7-----.--...... SOLAR PANEL INSTALLATION MODULE WEIGHT 45.5 LBS f VL-----
L� pL DR ISIONATE NO
CONNECTION DETAIL MODULE LENGTH 72.2 INCHES PL
MODULE WIDTH 40 INCHES FI' 01/14/2020a
MODULE DEPTH 1.8 INCHES
TOTAL MODULES 73 E.A
TOTAL MODULE WT. 3322 LBS
TOTAL RAIL WE. 365 LBS
IMI ''
q, Pa.
TOTAL INSTALLED WT. 3687 LBS -
I I I INSTALLATION AREA 1464.06 SQ.FT ¢"�°w�;
DISTRIBUTED LOAD 2.52 LBS/SQ.FF vim✓
I
I/OF CONNECT POINTS 146 E.A ..I ' .."
I I I POINT LOAD 25 LBS/POINT A.
p`I.,
I I 1 '6
n
NOTE: ./ a a
1:1 It I I ;�; •THE SOLAR SYSTEM HAS A DISTRIBUTED WEIGHTLESS .7 '�a
�,� I
S.THEUPPO
RT 3 ENTRATHAN 40 HS OR EACH VERTICAL a _
a a z
1 , T >- o
SUPPORT RAILS SOUR PANEL i-4
IS §IS Op
i N U
40X722' § Y i m O
0 2X6'ROOF (I D §Il §. CL. .®� Q
RAFTER AT 24'O.C. �saa�
Yid-Clomp PANEL CONNECTOR 0 40'0.C.
M7 ‘
X SOAR WAREHOUSE ATTACHMENT HARDWARE 0 19' m allP
8
O.C.YVL
IMM. 04 11 Ors
SUPPORT RAIL SOUR
MlNNECTOR - NWDOIbE +_.I ... CD Q o
PANEL CONNECTOR
SOLAR WAREHOUSE SOUR PANELR41T.r Ga. Y
ATTACHMENT HARDWARE 0 - •°NCRETE TRE ROOF lJ -�"' - �'
z_ _ •i'ai �_ �_-= moi— _r_ Ili O
.- --.- _ s ��� FpOFE6S/pM1, —� E ¢
II �I li �1 it CONCRETE TOE Roar r ieal`'1�q� �Q�_`G T/?(/q/F` 1 Q a
ROOF SHEATHING
ROOF SIffAIIWo ,' e ROOF ._. ,ZQ n+ L+y a ��- IIIM r� U ✓1
• (1)STNNIESS STEEL 9/16.OA•4 RRMfA 4•o.G C.No.C70784 P 1 1 —7 2.4
.25'LONG MIN 7.25 BIDED- 425.0)swans TM.A/le Dm. ¢I —7
RE-DOWN-UO BOLT.AT 48'O.L. �_DO,p AMN 325 T 0.G Na Exp.06/30/2021 * `� • /
WA 2XC ROOF RAFTER AT 24' r-1--I1 —
O.C.
IL I I o u7
'80F CALIF a �. t§i.�i-1-P. o .a
I 1-3 W / 0. NO
O
a 1 iA— LI \ a xo
a
§ FF
SOLAR PMRL l' BIS YIS F�
NH�I` axe ALARM o ��e—A L N o 0
`II av as car
a s» a rn
�II_ — @_ m a 0_o
J UU O U
I a�a a
I� °I4 aQ
.-1 Y Y 1
�� I� DI§ 0. y ate!rT �d
I �
NN
Date:
]x/7D/aD19
Scale:
a AS NOTED
' ' a ,'52
7 Drawn:
n it:
OSIDE VIEW IIIL sheet
SCALE:N.T.S O SCALER/32ITE CONDITION IPV-2
id 'Id 'Id - 'Id
U,, W REVISION
GENERAL NOTES: / DATE NO
I
� s .
D1,14,297D
l\11
DI
qq •v
u i
2 -
I.OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED,
2.ALL SPECIFIED WIRING IS BASED ON THE USE OF COPPER i 1^ R
W
3.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS AND SHALL L....:-...,
1.1'
COORDINATE ALL INSPECTION,COMMISSIONING AND ACCEPTANCE WITH 9 � �'
THE CLIENT,UTILITY CO.AND CITY INSPECTORS AS NEEDED. (E)SLOPE
(E)SLOPE (E)SLOPE (E)SLOPE !i.e.
_
4.DRAWINGS ARE DIAGRAMMATIC ONLY,ROUTING OF RACEWAYS SHALL 14• 14' �. (E)SLOPE f4' 14
BE AT THE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED ,.�oe
AND SHALL BE COORDINATED WITH OTHER TRADES. 14' 1 1 "°
S.IF DISTANCES OF CABLE RUNS ARE DIFFERENT THAN SHOWN,THE Si CONCRETE • ,
CONTRACTOR SHALL NOTIFY ELECTRICAL ENGINEER TO VALIDATE THE 0 TILE ROOF SUNPOWER AC MODULES I� TLE ROOF Lb41,4,
WIRE SIZE.FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS MIEN MEET ALL CURRENT I 1 1 �"''•
APPROPRIATE REQUIREMENTS FOR RAPID
6.WHENEVER A DISCREPANCY IN QUANTITY OF EQUIPMENT,ARISES ON ® de SHUTDOWN AS DEFINED IN I 'I (E)SLOPE In-
NEC 690.12 RAPID
THE DRAWINGS OR SPECIFICATIONS;THE CONTRACTOR SHALL BENssii 14'
RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND ® •
SHUTDOWN OF PV 1-1 h 3
SERVICES REQUIRED BY THE STRICTEST CONDIIIONS NOTED ON THE S ON BUILDINGS. U . �a P
(E)SLOPE
DRAWINGS OR IN THE SPECIFICATIONS TO ENDURE COMPLETE (E)SLOPE �.e1 a Q
Li
COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY 14 51-S1RIN t4' o G
THE ARCHITECT/ENGINEER. S2 _ -"` 2g E
7.ALL BROCHURES,OPERATION MANUALS,CATALOGS.SHOP DRAWINGS, S2� 0 r O.C.024' ,�J }�
ETC.SHALL BE HANDED OVER TO THE OWNER'S REPRESENTATIVE AT THE 0 _
COMPLETION OR WORK. 52 S7.STRING 7 -- (E)SLOPE O 3
8.ALL WIRING CONCEALED IN WALL AND CEILING SPACES SHALL BE IN (�SLOPE S2 (E)SLOPE - _ 1 --. -14• _ (/'�! u
METAL CONDUIT. 14' S3 O S3 (E)SLOPE 14' -- --0 i _ m O
52
9.TIRE SEISMIC BRACING AND ANCHORAGE OF ELECTRICAL CONDUITS S-� 53 S3 •- / _--Z� '
SHALL BE IN ACCORDANCE WITH THE'SMACNA'-GUIDLINES FOR SEISMIC st S2 / -- - --
RESTRAINS OF MECHANICAL SYSTEMS AND PLUMING PIPING SYSTEMS. S2 53 1•d 53 ]]] S4 RAL --4-
10.
� gill:I
10.ALL OF THE LISTED SYSTEMS REQUIRED THAT THE SEISMIC LATERAL Si s3 r 53 5
FORCE F INCLUDING CONSIDERATION OF a^P AND,^P BE DETERMINED AT ( 52
EACH LEVEL OF THE BUILDING SO THAT BRACE SPACING CAN BE SI SI 53/ � j -• ' Iiit r CD o 0
CALCULATED.THE DISTRICT STRUCTURAL ENGINEER CAN APPROVE THE S2 v �b----b� 1 } Q 0,
SEISMIC LATERAL FORCE DETERMINATION. ___/----
,.#5111,111;5 % --- - -- -- 7� .� G
I I.A COEOPY OFT SE CHOSEN
ALL EBBRACING
OATCI JOBS SITE PRIOR TO STARTING THE ... 52j�1� -r-r---- -• - 1- - 0 C
INSTALLING OF HANGERS AND/OR BRACES. �I • © '� • I [�!- CC el a
12.WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN (E)SLOPE 17 6 M ©� -- q. of=�'_�- w U s u
PINS IN EXISTING NON-PRESTRESSED REINFORCED CONCRETE.USE CARE (E)SLOPE I21E1=,_
AND CAUTION TO AVOID CUTTING OR DAMAGING THE REINFORCED BARS 14 57 ����..l III /� S5 11 14' ��_ I ��� I I I, I_ o
.WHEN INSTALLING THEM INTO EXISTING PRESTRESSED CONCRETE / 4 © 0 _-_ . III
r=____-__ , -��'��-
TENDONS BY USING A NON-DESTRUCTIVE METHOD PRIOR TO S7 !!1111.
INSTALLATIONMA INGTHET ONDE URIN CASTILN TO AVOID 57 � ,/� © ___ � I I 1��_ 0
CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION. >•
MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE 57 .�_ '®
REINFORCEMENT AND THE DRILLED-IN ANCHOR -$
1THE WORKING WELL
HE S NEW ELECTRICAL
TETEEXISTINGUIELECTRICAL BE :®� �� � , I�IIII TJ+1
EQUIPMENT IN WELL AS THENNEW ELECTRICAL EQUIPMENT WILL BE �s�'I (E)SLOPE I I Imo] r� I /E)SWPE '�
MAINTAINED ACCORDANCE WITH NEC 110.26. / �1 14' I I ' .4 G
14.SPACING MUST BE MAINTAINED BETWEEN ANY PLUMBING SEWER � 14' P.a
VENTS EXTENDING THROUGH THE ROOF AND THE UNDERSIDE OF THE "s ,�Jj ATTACHMENT - I I I F. O a
PHOTOVOLTAIC PANELS(6'MINIMUM RECOMMENDED). 1;,96,..
� ROINT EVERY 6' I 1 'I C ti15.SMOKE ALARMS AND CARBON MONOXIDE DETECTORS SHALL BE / �I !9 I l l l
LOCATED AS REQUIRED PER SECTIONS 8314&R315 WITHIN THE 56 Se 56 S5 55 55 �� / n I I I I 1 P} '
�T ww
CALIFORNIA RESIDENTIAL CODE(CRC). F,I-
PV MODULE LAYOUT r>O! a
16.SMOKE ALARMS SOLELY BATTERY OPERATED FOR THE 1 O FRAMING&ATTACHMENT a,
PHOTOVOLTAIC SYSTEM DOES NOT INVOLVE THE REMOVAL OF INTERIOR SCALE3 32"=1'-0" 2 S'In to 0 0
/ SCALE:3/32"=1'-0" o
WALL AND CEILING FINISHES INSIDE THE HOME. Q,
17.CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT - J,-,a .1 C
RESISTANT.(NEC 300.6 01,310.8D) SUNPOWER SPR-A410-G-AC PV SYSTEM: 73 X 410W =29.93 KW DC 27.21 KW AC =oQ 0 d
18.GROUNDING BUSHINGS ARE REQUIRED AROUND PRE•PUNCHED LEGEND ( )/(40"X72.2"X 1.57") ( ) `''".
CONCENTRIC KNOCKOUTS ON THE DC SIDE OF THE SYSTEM.(NEC 250.97) G
19.7'F{E GROUNDING ELECTRODE CONDUCTOR MUST BE PROTECTED FROM i♦ � RAPID SHUTDOWN SYSTEM MODEL: SUNPOWER SPR-A400-G-AC z rY -A 0
p0OFESSIp PV PANEL, SEE SHEET PV-6 N P,,,�'
PHYSICAL0.GROUNDING ELECTRODE CONI CTU R W ILL BE CO NTINUOUS,EXCEPT ti�Q��G TRS 1 I I C I LOAD CENTER p.N
` N
FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT.(NEC L K`- 2 R, RACKING: INVISIMOUNT PV-8 Date:
250,64 c) ¢ No.c70784 A AC DISCONNECT SOLAR WAREHOUSE 12/20/2019
21.RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE INSTALLATION PV-9 solo:
E■�orr3oRaz4 MAIN SERVICE ELEC. PANEL ASNOTED
BONDED AT EACH END.(CIC 250.64(E) ifDn
22.EQUIPMENT GROUNDING SHALL BE INSTALL AT EACH INDIVIDUAL •',. VDawn:y. R MONITOR RAFTER: 2x6 ® 24" O.C. J.N
MODULE AT TIRE MANUFACTURES RECOMMENDED POINT OF ..,-4s IL
ATTACHMENT USING A LISTED LUG SUITABLE FOR THAT PURPOSE.(WITH TF OF CAU*�� 72 FIRE SETBACK ROOF ACCESS Sheet
OR WITHOUT WEEB OR SHUCO CLIPS) o EXISTING VENT PV-3
23.ALL CONDUIT THAT IS EXPOSED MUST BE PAINTED THE SAME COLOR (E) EXISTING TO BE REMAIN