HomeMy WebLinkAboutItem 09i - Accept Traffic Signalization
DATE: October 20, 2020
TO: Honorable Mayor and City Council
FROM: Jason Kruckeberg, Assistant City Manager/Development Services Director
Philip A. Wray, Deputy Director of Development Services/City Engineer
By: Kevin Merrill, Principal Civil Engineer
SUBJECT: ACCEPT ALL WORK PERFORMED BY BELCO ELECNOR GROUP FOR
TRAFFIC SIGNAL IMPROVEMENTS, INCLUDING TRAFFIC
SIGNALIZATION OF MID-BLOCK CROSSWALKS ON HUNTINGTON
DRIVE BETWEEN SANTA ANITA AVENUE AND SECOND AVENUE,
AND MISCELLANEOUS TRAFFIC SIGNAL IMPROVEMENTS AT
MULTIPLE LOCATIONS ON HUNTINGTON DRIVE FROM SANTA CLARA
STREET TO GATEWAY DRIVE, IN THE AMOUNT OF $704,918.41, AS
COMPLETE
Recommendation: Approve
SUMMARY
On February 5, 2019, the City Council awarded a contract to Belco Elecnor Group, in the
amount of $658,472, plus a 10% contingency. The work included traffic signal
improvements, including traffic signalization at mid-block crosswalks on Huntington Drive
between Santa Anita and First Avenues and between First and Second Avenues, various
traffic signal equipment upgrades, the addition of right-turn overlaps at Huntington Drive
and Santa Anita Avenue, and protected/permissive left-turn phasing to the traffic signals
at Huntington Drive and First Avenue and Huntington Drive and Gateway Drive. There
were three (3) change orders on the project totaling $46,446.41, or 7.05%. With the
adjustment for change orders and actual quantities, the final contract amount is
$704,918.41, which is within the total authorized budget amount.
The terms and conditions of this project have been complied with, and the required work
has been performed to the City’s satisfaction. It is recommended that the City Council
accept the project as complete and authorize the final payment in accordance with the
contract documents.
Accept Traffic Signalization
October 20, 2020
Page 2 of 3
BACKGROUND
This project proposed traffic signal improvements at multiple locations. The
improvements included the installation of two new pedestrian traffic signals at the mid-
block crosswalks in Huntington Drive between Santa Anita Avenue and First Avenue, and
between First Avenue and Second Avenue, and various traffic signal equipment
upgrades, the addition of right-turn overlaps at Huntington Drive and Santa Anita Avenue,
protected/permissive left turn phasing to the traffic signals at Huntington Drive and First
Avenue and Gateway Drive.
The plans and specifications were completed in December 2018, and the project was
advertised for bids in January 2019. On February 5, 2019, the City Council awarded a
contract to Belco Elecnor Group, in the amount of $658,472, plus a 10% contingency.
DISCUSSION
The construction began in September 2019 and was completed in September 2020. The
project was delayed several months due to a long equipment delivery time period,
including the manufacture and delivery of traffic signal poles. In addition, the onset of the
COVID-19 pandemic caused further delays in scheduling Belco’s workforce over the last
few months. The project is now complete to the City’s satisfaction.
There were three (3) change orders, totaling $46,446.41, or 7.05% of the original contract
amount. The first change order was for the addition of two video detection systems; one
at Huntington Drive and First Avenue and the other at Huntington Drive and Gateway
Drive. After the contract was awarded, it was determined that these two detection
systems should be upgraded to be consistent with the other Huntington Drive
intersections. The prices were determined from quotes directly from the manufacturer
and were comparable to previous purchases by the City.
The second and third change orders were for credits on striping and detector loop
restoration that were determined to be better suited for the Huntington Drive Pavement
Rehabilitation project anticipated to start later this month. That project will be paid for out
of the same budget. The traffic signal work was separated from the pavement
rehabilitation work because of the significantly different type of work and the need to move
the signal work ahead of the pavement rehabilitation. The change orders also included
final adjustments in quantities.
A summary of the change order costs is as follows:
Original Contract: $658,472.00
CO #1 $58,747.41
CO #2 ($2,698.00)
CO #3 ($9,603.00)
COs Sub Total: $46,446.41
Final Total Contract: $704,918.41
Accept Traffic Signalization
October 20, 2020
Page 3 of 3
The three change orders totaled $46,446.41, bringing the final construction total to
$704,918.41.
FISCAL IMPACT
The traffic signal improvements were budgeted as part of the Huntington Drive
Rehabilitation project in the 2017-18 Fiscal Year Capital Improvement Program. The total
budget for the project was $2,000,000, with $500,000 from Capital Outlay funds,
$800,000 from Proposition C funds, and $700,000 from Transportation Impact
funds. There are sufficient funds to cover the final cost of $704,918.41, with the majority
paid for by the Transportation Impact funds and a small amount from Proposition C funds.
RECOMMENDATION
It is recommended that the City Council accept all work performed by Belco Elecnor
Group for traffic signal improvements, including traffic signalization of mid-block
crosswalks on Huntington Drive between Santa Anita Avenue and Second Avenue, and
miscellaneous traffic signal improvements at multiple locations on Huntington Drive from
Santa Clara Street to Gateway Drive, in the amount of $704,918.41, as complete; and
authorize the final payment to be made in accordance with the contract documents.