Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutUntitled '`�„ <„d Permit=tvo SQL R 19 1670a
City of Arcadia, CA - 0 b r 4 -=,'"/ .t 't
Development Services Department 'A' r v � Permit Type Solar
- . 240 West Huntington Drive,Post Office Box 60021 • , ;t %.11 f ; , °' s
r`- .- Wm Classification Solar Residential Over 10 KVz
- �,�� -' "k Arcadia,CA 91066-6021
E'' f, ; (626)574-5416 ' 4 , �y g v , -,, , Permit.tgtus:Issue d,,
ARCADIA Issue Date- 0/12/2020 Expiration: 10/12/2021
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
1305 Rodeo RD Arcadia,CA 5770010001 5
-`bG9�xx.4....i... '�.:S9:S'..e�Y".YMSa?5.}6:tb`"T+-wLin�•.-¢'.L 8'S�'�'S S
Contacts
DAVIDIAN OUYANG Owner SUNPRO SOLAR INC* Contractor
1305 RODEO RD 34859 FREDRICK ST 101,WILDOMAR,CA 92595
(626)379-6365 • (951)970-6736 830451
Description:GROUND MOUNTED SOLAR SYSTEM 40 Valuation: $0.00 * Tenant 1
MODULES/MICRO INVERTER,SUBPANEL 225 AMP AND 125
AMP.HOA APPROVAL 20-13 Total Sq Feet: 0.00i Plan Check# Plan# t.
- \ s.• ,
Fees Amount Payments Amount Paid
Building Plan Check Fee Residential $100.00 Total Fees $374.72
Distribution Panel $16.48 Cash/Receipt#REC-05702-20 $374.72
Electrical Permit Issuance Fee $47.01
Fire Plan Check Fee Residential $50.00 Amount Due: $0.00
Inverters $77.78
Panels $82.45
Solid Waste Management Fee 2 $1.00
Total: $374.72
i
/a.-Z7'�f, &11461_ teC/r)— CALLS FOR INSPECTIONS
/ Y� Request for inspection by telephone at 626-574-5450. Leave a message
//i /te( cei7requesting the address,timeframe and what inspection item is needed.
F
r9
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a period of 180 consecutive days.
•
it
17,......] COMPLETED
October 12,2020
Issued By: Date
October 12,2020 Page 1 of 1
� ARe
V7FORlV4. 1)
! VV
, IinI PERMIT/PLAN'REVIEW APPLICATION
E Development Services Department,240 West Huntington Drive,Post Office Box 60021
m y% Arcadia, CA 91066-6021, (626)574-5416,Fax(626) 447-9173
City of
Arcadia
LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION
❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following:
Chapter 9(commencing with Section 7000,of Division 3 of the Business and
Professions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers'
License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the
Signature of Contractor performance of the work for which this permit is issued.
OWNER-BUILDER DECLARATION ❑ I have and will maintain workers'compensation insurance,as required by Section
❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit
License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are:
Code.Any city or county which requires a permit to construct,alter,improve, Carrier
demolish,or repair any structure,prior to its issuance,also required the applicant
for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number
provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less)
7000)of Division 3 of the Business and Professions Code)or that he or she is
exempt there from and the basis for the alleged exemption. Any violation of ❑II certify that in the performance of the work for which this permit is issued,I shall
Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers'
penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the
workers'compensation provisions of Section 3700 of the Labor Code,I shall
❑I, as owner of the property, or my employees with wages as their sole forthwith comply with those provisions.
compensation,will do the work,and the structure is not intended or offered for
sale(Section 7044,Business and Professions Code:The Contractors License Date Signature
Law does not apply to an owner of property who builds or improves thereon,
or who does such work himself or herself or through his or her own
employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful,
sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer,to criminal penalties and civil fines up to one
completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition'to the cost of compensation,
did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and
attorney's fees.
❑I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project(Section 7044,Business and Professions
Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY
who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency
contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097,
Civil Code).
❑ I am exempt under Section 7044,Business and Professions Code,for this reason:
Lender's Name
Date Signature Lender's Address
IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND
RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING:
1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel.
2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of ew buildings
and structures.
3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering
of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for
further information.
Name Title
PRINT NAME
I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner.
I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of
Arcadia to enter upon the above-mentioned property for inspection purposes.
Signature Date
�� Perrriit ivo SOLR 19 1670
..4,y i City of Arcadia, CA ,
Development Services Department !ITh/(2 +n 'v' :Permit Type Solari
t 240 West Huntington Drive,Post Office Box 60021 ' Li F ,n44,.%,° '` c-..1�W,�.,
Ail/. d Arcadia,CA 91066-6021 `rr: � ark C)as.41 66tioil Solar=ResidentialOver 10"KT
'` " (626)574-5416 a ,, .Permit Status Issued
ARCADIA r , .- Issue Date=10/12/2020.1 Expiration• 10/12/2021
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
1305 Rodeo RD Arcadia,CA 5770010001
Contacts
DAVIDIAN OUYANG Owner SUNPRO SOLAR INC* Contractor
1305 RODEO RD 34859 FREDRICK ST 101,WILDOMAR,CA 92595 a°
(626)379-6365 (951)970-6736 83045 71
1
. ,::.
Description:GROUND MOUNTED SOLAR SYSTEM 40 Valuation: $ 0.00 Tenant
MODULES/MICRO INVERTER,SUBPANEL 225 AMP AND 125
AMP.HOA APPROVAL 20-13 - Total Sq Feet: 0.00 Plan Check# Plan#
Fees Amount Payments Amount Paid
Building Plan Check Fee Residential $100.00 Total Fees
Distribution Panel $16.48
Electrical Permit Issuance Fee $47.01
Fire Plan Check Fee Residential $50.00 Amount Due:
Inverters $77.78
Panels $82.45
Solid Waste Management Fee 2 $1.00
Total: $374.72
•
CALLS FOR INSPECTIONS
Request for inspection by telephone at 626-574-5450. Leave a message
requesting the address,timeframe and what inspection item is needed.
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a period.of 180 consecutive days.
• .
October 12, 2020
Issued By: Date
• October 12,2020 Page 1 of 1
Of ARC
-I.orywoRktilb
PERMIT/PLAN'REVIEW APPLICATION
7 <ffiEB -,
Nt w, Development Services Department,240 West Huntington Drive,Post Office Box 60021
om\y% Arcadia, CA 91066-6021, (626)574-5416,Fax(626)447-9173
City of
Arcadia
LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION
❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following:
Chapter 9(commencing with Section 7000,of Division 3 of the Business and
Professions Code,and y tnse is in full force l land ffect. �q ElI have and will maintain a certificate of consent to self-insure for workers'
License Class!i 10 Cs ll
License No. i30 'L,
Signature of ContractorExp. Date' ""ia compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
OWNER-BUILDER DECLARATION ❑ I have and will maintain workers'compensation insurance,as required by Section
❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit
License Law for the following reason(Section 7031.5,Business and Professions is issued.Myaworkers'compensation insurance carrier and policy numbers are:
Code.Any city or county which requires a permit to construct,alter,improve, Carrier Si PCM �Q vV//rr'���((�O
demolish,or repair any structure,prior to its issuance,also required the applicant
Policy Number 11((�� U TJ
for such permit to file a signed statement that he or she is licensed pursuant to the
provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less)
7000)of Division 3 of the Business and Professions Code)or that he or she is
exempt there from and the basis for the alleged exemption. Any violation of I certify that in the performance of the work for which this permit is issued,I shall
Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers'
penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the
workers'compensation provisions of Section 3700 of the Labor Code,I shall
❑I, as owner of the property, or my employees with wages as their sole forthwith compy with those provisions.
compensation,will do the work,and the structure is not intended or offered for Date I I Signature (3 ��
sale(Section 7044,Business and Professions Code:The Contractors License
Law does not apply to an owner of property who builds or improves thereon,
or who does such work himself or herself or through his or her own
employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful,
sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one
completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of,compensation,
did not build or improve for the purpose of sale). damagesas provided for in Section 3706 of the Labor Code, interest, and
attorney's fees.
0 I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project(Section 7044,Business and Professions
Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY
who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency
contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097,
Civil Code).
0 I am exempt under Section 7044,Business and Professions Code,for this reason:
Lender's Name
Date Signature Lender's Address
IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND
RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING:
1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel.
2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings
and structures.
3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering
of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for
further information. SS 11��pp
Name I�+`,I``0 ikUv SU 1-1- �l r6 N Title t)(154)PRINT NAME
I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner.
I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of
Arcadia to enter upon the above-mentioned property for inspection purposes.
Signature O Date
ICS (11 /?6
CITY OF ARCADIA File#
HOA ARCHITECTURAL REVIEW BOARD
SHORT REVIEW APPLICATION
PLEASE COMPLETE THE FOLLOWING INFORMATION(REQUIRED):
PROJECT ADDRESS 1305RodeoRd ZIP 91006
APPLICANT(S)NAME Bob Kommann
MAILING ADDRESS 34859 Fredrick St.Suite 101
CITY Wildomar STATE CA ZIP 92595
E-MAIL ADDRESS bkommann@sunpro-solar.com
TELEPHONE NO. 951-813-5408
PROPERTY OWNER(S)NAME Davide and Susan Ouyang
MAILING ADDRESS 1305 Rodeo Rd
CITY Arcadia STATE CA ZIP 91006
E-MAIL ADDRESS ouyang5522@gmail.com
TELEPHONE NO. (626).379-6365
PROJECT TYPE(Check applicable):
❑ Single-Story Remodel and Addition 0 Landscaping and Hardscaping 0 Sport Court and Related Features
❑ Detached Accessory Structure(not 0 Pool and Spa Equipment 0 Fences and/or Walls
ADUs)
❑ Façade Improvement 0 Mechanical Equipment X Ground-Mounted Solar
❑ In-Ground Swimming Pools/Spa with 0 Above Ground Swimming 0 Fountains,Water Features,or
Water Features Pools and Spa Statues
GENERAL DESCRIPTION OF PROJECT: Ground mounted solar installation approximately
41'x 17'and less than 6'in height
DOES THE PROJECT REQUIRE DISCRETIONARY APPROVAL BY THE DEVELOPMENT SERVICES DIVISION(E.G.,
PROTECTED TREES,ADMINISTRATIVE MODIFICATIONS,ETC.)? X Yes 0 No
If Yes,submit copies of the requests to the ARB for concurrent consideration
THE APPLICANT AND PROPERTY OWNER HEREBY DECLARE UNDER PENALTY OF PERJURY THAT ALL THE INFORMATION
SUBMITTED FO' 1 IS APPLICATION IS TRUE AND CORRECT.
g606/* , 9/15/2020.
APPLICAN S SIGNATURE DATE
3/i 5P2020
DATE OE' O�IER S SIGN�TURF
ACTIONS AND FINDINGS
0 APPROVED ✓ CONDITIONALLY APPROVED 0 DENIED
CONDITIONS OR REASONS FOR DENIAL:Approved with the conditions(1)The arborists report satisfies the city that the affected oak tree will remain
unharmed 2)the screening hedge blocks view from neighboring properties and remains healthy.intact and available for city inspection in the future.
BY: - DATE: 9/23/2020 _ EXPIRATION: 9/24/2021
THERE ISA TEN(10)DAY APPEAL PERIOD FOR THIS APPLICATION. APPEALS MUST BE SUBMITTED IN WRITING TO THE COMMUNITY
DEVELOPMENT DMSION WITH A$600.00 APPEAL FEE BY -"WMPm.ON 10/05/2020
HOA Short Review -4- 11/19
1,11k
9111/2020
-.too
yoursolarptanscom
**v,/.► ENGINEERING SOLUTIONS FOR ALL YOUR SOLAR NEEDS
Structural Calculations for
SOLAR PANEL GROUNDMOUNT CONNECTIONS at:
1305 Rodeo Rd.
Arcadia, CA 91006
Ouyang,Davidian
Design Criteria
1 - Code:CBC 2019/ASCE 7-16
2 - Wind: 110 MPH,Exposure:C
3 - Steel Pipe: Strong Grade(A53 Grade B,Fy=35 ksi)
Notice:Use restrictions of these calculations.
The attached Calculations may be electronically stamped/signed as permitted by engineer of record.
Contractor/Client to verify existing dimensions/conditions prior to construction.
The use of these calculations is solely intended for the above mentioned project.
(1';:oFESS/soN9
m
No. C70784 '
-1EExp.0613012021
S•57-11 1\
97F OF CAS\ 1/
1-844-PV ELITE I info@yoursolarplans.com
3000 EAST BIRCH STREET, SUITE 201,BREA, CA 92821
Design Wind Load on Open Structures with Monoslope
CNw=-0.78 CNL=1.56
i"Is-14.84 psf 5 9.68 psf
_-1.18 ir CNw=1.14
Ari -22.45 psf41rAr 21.69 psf
Case � �. Case A�' �
y=0° CNw,=-1.70 CNL=0.48 I Cy=180°
-32.34 psf 9.13 psf v
2 it i CNL=0.00 6 CNN=1.72
AI**
0.00 psf 32.72 32.72 psf
Cas If' . Case� �
Clear Wind Flow
CNw=-1.06
-20.16 psf CNL=-1.14 '
3 141!..#14#
�� 7 21.69 psf
��4# CNL=-1.50 it CNw=0.16
� -28.53 psf . A� 3.04 psf
Case •Case f ��
y=0° CNN=-1.94 CNL=-0.3 Cy=180°
-36.90 psf -5.71 psf v
4 Cm._-0.68 8 CNw=1.04
'Pj14'
-12.94 psf "' � 19.78 psf
iat,
h 0.5L 0.5L
Case B Case B
/.
Obstructed Wind Flow
ASCE 7-16
p=ghGCN
qr.00256 K=Kg Kd V2 l
Roof Angle= 12.00
Mean Roof Height h= 3.27 Fr Exp=C
Exposure coefficient K== 0.85
Topography factor Kt= 1.00
Directionality factor Kd= 0.85
Wind Speed V= 110.00 MPH
Importance factor IW= 1.00
q== 22.38 PSF
Gust Effect factor G= 0.85
CN= Net pressure coefficient
p= 19.02 CN PSF
1.CNw and C Ni.denote net pressures(contributions from top and bottom surfaces)for windward and leeward half of
roof surfaces,respectively.
2.Clear wind flow denotes relatively unobstructed wind flow with blockage less than or equal to 50%.Obstructed wind
flow denotes objects below roof inhibiting wind flow(>50%blockage).
4.Plus and minus signs signify pressures acting towards and away from the top roof surface,respectively
Simple Span
L= 17.83 FT
Distance between supports:I= 10.46 FT Wind Loads Condition
RL= 276 lbs/ft 6.CIear Wind Flow,Dir=180 Deg,Case B
.„,," Rr.= -313 lbs/ft 4.Obstructed Wind Flow,Dir=0 Deg,Case B
'���� ,,,, ,, RR= 259 lbs/ft 5.Clear Wind Flow,Dir 180 Deg,Case A
I ' RR= -249 lbs/ft 3.Obstructed Wind Flaw,Dir=0 Deg,Case A
Total Horizontal Load Vw= 762 lbs 5.Clear Wind Flow,Dir 180 Deg,Case A
\ 2O2O ATC Hazards by Location
ATCHazards by Location
Search Information �__ —_ — ..,F__. _ VictoMtle
Address: 1305 Rodeo Rd,Arcadia, CA 91006, USA - _ • I_-____.-_I -_ tY o
- . 588 ft - __Hesperia
Coordinates: 34.1540257,-118.0380261 .__ _- : .:-:,,,-_,--,r-'-- Nati` Fo esti i
Elevation: 588 ft '-'---7--L•-___,.,01--2--7:j., _:2`–..,
_ Los-Angeles.=1San 63 inardlrtao r E
Timestamp: 2020-06-08T17:05:27.219Z ( - -- — r=, o ,; _ t&er Ide -N
It.�iV al
',4`r. U. ;} _
Hazard Type: Seismic • - ELI_�,�= Anhheim, ;r" li
Reference ASCE7-16 I OO le iLo Bea ho= —` 1 �'
l'• -- --9 - riMap data©2134/0 3r�map OfroGI
Document:
Risk Category: II
Site Class: D-default
Basic Parameters
Name Value Description
Ss 2.005 MCER ground motion(period=0.2s)
S1 0.749 MCER ground motion(period=1.0s)
SMS 2.406 Site-modified spectral acceleration value
SM1 *null Site-modified spectral acceleration value
SDS 1.604 Numeric seismic design value at 0.2s SA
SD1 *null Numeric seismic design value at 1.0s SA
*See Section 11.4.8
Additional Information
Name Value Description
SDC *null Seismic design category
Fa 1.2 Site amplification factor at 0.2s
Fv *null Site amplification factor at 1.0s
CRs 0.888 Coefficient of risk(0.2s)
CR1 0.891 Coefficient of risk(1.0s)
PGA 0.874 MCEG peak ground acceleration
FPGA 1.2 Site amplification factor at PGA
PGAM 1.049 Site modified peak ground acceleration
https://hazards.atcouncil.org/#/seismic?lat=34.1540257&Ing=-118.0380261&address=1305 Rodeo Rd%2C Arcadia%2C CA 91006%2C USA 1/2
6/8/2020 ATC Hazards by Location
TL 8 Long-period transition period(s)
SsRT 2.005 Probabilistic risk-targeted ground motion(0.2s)
SsUH 2.257 Factored uniform-hazard spectral acceleration(2%probability of
exceedance in 50 years)
SsD 2.297 Factored deterministic acceleration value(0.2s)
S1 RT 0.749 Probabilistic risk-targeted ground motion(1.0s)
S1 UH 0.84 Factored uniform-hazard spectral acceleration(2%probability of
exceedance in 50 years)
S1 D 0.752 Factored deterministic acceleration value(1.0s)
PGAd 0.94 Factored deterministic acceleration value(PGA)
*See Section 11.4.8
The results indicated here DO NOT reflect any state or local amendments to the values or any delineation lines made during the building
code adoption process. Users should confirm any output obtained from this tool with the local Authority Having Jurisdiction before
proceeding with design.
Disclaimer
Hazard loads are provided by the U.S.Geological Survey Seismic Design Web Services.
While the information presented on this website is believed to be correct,ATC and its sponsors and contributors assume no responsibility
or liability for its accuracy.The material presented in the report should not be used or relied upon for any specific application without
competent examination and verification of its accuracy,suitability and applicability by engineers or other licensed professionals.ATC does
not intend that the use of this information replace the sound judgment of such competent professionals, having experience and knowledge
in the field of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the results of the
report provided by this website. Users of the information from this website assume all liability arising from such use. Use of the output of
this website does not imply approval by the governing building code bodies responsible for building code approval and interpretation for the
building site described by latitude/longitude location in the report.
httpsi/hazards.atcouncil.org/#/seismic?Iat=34.1540257&Ing=-118.0380261&address=1305 Rodeo Rd%2C Arcadia%2C CA 91006%2C USA 2/2
\1I—j
Company JOB TITLE
Address
City,State JOB NO.^ _ _ SHEET NO.
Phone CALCULATED BY DATE W�
CHECKED BY DATE
Seismic Loads: IBC 2018 Strength Level Forces
Risk Category: I
Importance Factor(I): 1.00
Site Class: D-code default
Ss(0.2 sec)= 200.50%g
S1 (1.0 sec)= 74.90%g
Fa= 1.200 Sms= 2.406 SDS= 1.604 Design Category= D
Ft/= 1.700 Sm1 = 1.273 Spy= 0.849 Design Category= D
Seismic Design Category= D
ilk . .
Vertical Loads
Pipe Size 3"Sch 40
Width of Array B = 17.83 ft
E-W Span L = 8.00 ft
N-S Span W 10.46 ft
Tilt 9 = 12.0;"
Height of Bottom of Array hb = 1.92•ft
Mean Height Ground Mount hm = 3.27 ft
Snow Load Qs = 0.00,psf
Panel Dead load QO = 3.00 psf
Wind Speed V =. 110'mph
Wind Category _Exp. = _ C
Uplift Wind Linear Load o"p = -313 plf (See attached wind analysis)
Downward Load odn = 276 plf (See attached wind analysis)
Snow Uniform Load ws=Qs*B/2 = 0 plf
Uniform Dead Load Wd=Qo*B = 26.7 plf
Wind Uplift Point Load Pop=w.,*L = -2506 lbs
Wind Down Point Load Pdn=wdn*L = 2209 lbs
Snow Point Load P.=ws*L = 0 lbs
Panel Dead Point Load Pp„=wd*L = 214 lbs
Check Adequacy of U-Bolt Anchor for Tension(ASTM/AISI 304
Trib.Width of Solar Rail Lm. = 2.75 ft
No.of Bolts Per Track NB = 2.00 bolts
Uplift Force on U-Bolt TB=1-,811*o J,/NB = -431 lbs (Upwards)
Cross Sectional Area of Bolt AB = 0.196 in2 (1/2"ip)
Ultimate Tensile Strength F„ = 70 ksi
Tensile Capacity of Bolt T=0.6*0.75*F„*AB = 6185 lbs
Demand Capacity Ratio DCR=T I Ta = 0.07 <1 OK
Pipe Beam
Controlling Liner Load w=D+.6W = 192 plf
Moment M=w*L2/8 = 1540 lb-ft
Moment Capacity Mn = 3.85 k-ft AISC Table 3-15
Demand-Capacity Ratio DCR=M I Mn = 0.40 <1 OK D+.6W
Lateral Loads ASCE 7-16 15.4
Site Classification: D
Seismic Design Category: D
Ss =, 2.005;
S1 0.749
Sos =. 1.604
S01 =• 0.849;
Seismic Response Factor R = 1.25
Seismic Importance Factor le = _ 1.00
Weight IN = 428 lbs
SDS
Cs = = 1.283 CONTROLS
le
Cs,min=0.044S0510 = 0.071
Cs,min=0.8S.ils/R = 0.479
Lateral Seismic Load Vs=0.7Wp*Cs = 384 lbs
Lateral Wind Load 0.6V,, = 457 lbs
IP . .
Pipe Column Check
Soil Grade GR =I 0%1
Height of Front Leg h1 = 2.15 ft
Height of Rear Leg h2 = 4.38 ft
Relative Stiffness of Front Pipe R1 = 0.89 .
Relative Stiffness of Rear Pipe R2 = 0.11
Load to Front Leg V,=Wh*R1 = 409 lbs
Load to Rear Leg V2=Wh*R2 = 48 lbs
Moment Capacity Mn = 3.85 k-ft AISC Table 3-15
Modulus of Elasticity E = 29000 ksi
Yielding Stress Fy = 35 ksi
Front Pipe
Moment M1=V1*h1 = 879 lb-ft
Demand-Capacity Ratio DCR=M1/M„ = 0.23 <1 OK D+.6W
Axial Load P = 1540 lbs D+.6W
Length L = 6.28 ft
Radius of Gyration r = 1.17 in2
Effective Length k = 2.1
_ TOE
Euler Buckling Stress Fe kr)L z
( = 15.7 ksi
Fy/Fe = 2.24<2.25
F„,.= 0.877Fe = 13.7 ksi
r F
F„,. = (0.658Fe)Fy = n/a ksi
Area of Pipe Ag = 2.07 in2
Axial Capacity P=AgF,, = 28.42 kips
Demand-Capacity Ratio DCR=Pa/P 0.05 <1 OK D+.6W
Interaction Equation 0.255 <1 OK D+.6W
Rear Pipe
Moment M2=v2*h2 = 212 lb-ft
Demand-Capacity Ratio DCR=M2 M. = 0.05 <1 OK D+.6W
Axial Load Pa = 1540 lbs D+.6W
Length L = 4.38 ft
Radius of Gyration r = 1.17 in2
Effective Length k = 2.1
,R2E
Euler Buckling Stress Fe = kL z = 32.16 ksi
(r)
Fy/Fe = 1.09<2.25
F„,.= 0.877Fe = 28.2 ksi
Fl
F„,.=(0.658 )Fy = n/a ksi
Area of Pipe Ag = 2.07 in2
Axial Capacity P=AgFa = 58.38 kips
Demand-Capacity Ratio DCR=Pa/P = 0.03 <1 OK D+.6W
Interaction Equation 0.07 <1 OK D+.6W
III
Concrete Footing Check-Upward Load
Diameter of Footing B = 2 f
Depth of Footing D = 4.5 ft
Unit Weight of Concrete y = 150 pcf
Footing Weight Pconc=BZ/4*n*D*y = 2121 lbs
Vertical Load P„,=0.6*Cosa*W„P+0.69(Pp,.+P.n.) = -70 lbs
Soil Capacity a = 1500 psf CBC Table 1806.2
Skin Friction fs = 250 psf CBC 1810.3.3.1.4
Skin Friction Force Fs=B*lt*D*fs = 7069 lbs
Total Resisting Load F=Fs/0 = 7069 lbs
Demand Capacity Ratio DCR=Pup/F = 0.01 <1 OK
Downward Load
Design Down Pdn=.6(Cos0*Wd„)+Pi,,+P.n. = 3631 lbs
Demand Capacity Ratio DCR=Pda/F = 0.51 <1 OK
Front Pipe Pole Footing Analysis
Lateral Load P1=MAX[.6Wh,.7V] • = 409 lbs
Width of Footing b = 2.00 ft
Height of Column h1 = 2.15 ft
CBC 2016 Lateral pressure slat = 100 pcf
Load Pressure Increase a = 1.33 CBC 1806.1
Allowable Lateral Pressure 51 = 183 psf
2.34P
_
A S ib = 2.62ft
d=0.5A 1+ Ji+ A(4.36h)) = 4.11 ft
Minimum Depth of footing = 4.25 ft
Rear Pipe Pole Footing Analysis
Lateral Load P2=MAX[.6Wh,.7V] = 269 lbs
Width of Footing b = 2.00 ft
Height of Column h2 = 4.38 ft
CBC 2016 Lateral pressure slat = 100 pcf
Load Pressure Increase a = 1.33 CBC 1806.1
Allowable Lateral Pressure S1 = 176 psf
2.34P
_
A Sb = 1.79ft
Sib
(-A ))
4.36h
d=0.5A(1+ 1+ = 3.95ft
Minimum Depth of footing = 4.25 ft
\. .. ..
L
I
CITY OF ARCADIA TRE 2 ® 13
���� PROTECTED TREE PERMIT
ENCROACHMENT INTO O A PROTECTED ZONE
K
AI XDiA
PLEASE COMPLETE THE FOLLOWING INFORMATION (REQUIRED) :
PROJECT ADDRESS /3 0 5 Porleo lid.
APPLICANT(S) NAME KOC n M /I7\
MAILING ADDRESS 3 5 3 L/ �n,1 ct LA1 11 n,1 (i S 70 /
CITY Illurrt Oz, STATE (' ZIP. 9 &5 , 7
E-MAIL ADDRESS -,
TELEPHONE NO. •175 _ 'l.r -.54/0 ?
PROPERTY OWNER(S) NAME Da vi vl I.a i Ou van
MAILING ADDRESS 1303 > —le() Rd
CITY A re:Gi di.
c. STATE C 6 ZIP f l o0
E-MAIL ADDRESS 0 up 1)9 ,s-s,2? Q j/11(4ri, lUnrt
TELEPHONE NO. &JO 3.7q -- c3(6, S .
***PLEASE ANSWER THE THREE QUESTIONS ON PAGE 2***
THE APPLICANT AND PROPERTY OWNER HEREBY DECLARE UNDER PENALTY OF PERJURY THAT ALL
THE INFORMATION SUBMITTED FOR THIS APPLICATION IS TRUE AND CORRECT.
APPLICANTS S NATURE DATE
/20;)c.)
7//
7/1/2320
PROPERTY O ERAS SIGNATURE DATE I+
ACTION TAKEN
0 APPROVED R CONDITIONALLY APPROVED 0 DENIED
) CONDITIONS OR REASONS FOR DENIAL: 4 U'&1e-Cr" -gyp 'PFGrlp-imea 49,4-[1 bt.tS I.L A 216c,g,is m
ze-PoR-r. 2E7�i2-`- \.J4 S 13IP04.1c24 `7/z'/7.
CJI �...sr u 0 to•,/ 1,.ltu I2—mt,.,,6.
TV 4E1(Wet 07 I'7?'ti e71-1(re)TtE Fa e,E. PlArra 770•f t-tl.S LI S ' `/1 Zf-
BY: 1--L (S I- DATE: i/Z 0 EXPIRATION: • / a(4 t ?Z ( ST7L`A.ePL7.
THERE IS A TEN(1 0)DAY APPEAL PERIOD FOR THIS APPLICATION. APPEALS MUST BE SUBMITTED IN WRITING TO THE
COMMUNITY DEVELOPMENT DIVISION WITH A$600.00 APPEAL FEE BY S-?✓O
4 P.M.ON I b 15t/ZO
DATE FILED 1(11 Z ° RECEIPT NO. 7 s PAID t7 ECEIVED BY 6•1
•
TRE
2/17
PLEASE ANSWER THE FOLLOWING QUESTIONS(REQUIRED) :
A-separate sheet may be attached if necessary
Note: Section 9704.8.1 of the Arcadia Municipal Code requires that all of the following questions be answered in
detail to explain why the Protect tree(s)need to be encroached upon
1. Why is it necessary to encroach upon the tree(s)?
Thi propose.S Sor lvcc. h`�� s 4c_ ,5
r pro 0/4,ca;oi', (ask :•����, , £ C / c'��C
prou, A s ac ]c,. (ye 5I 7r1C f7oncsla�e Cl�reol !
Solar CS Cr
2. Why is encroachment upon the tree(s) more desirable than an alternative project.design?
1.7, SC/4< l ecl IOcccIio, i S 'r -c bQSf jc>s_42)
O rCLJJ I /AA(' c--i- jI"r; n FCierjj9
til � 1�, n �c ny vtSi L
/ t
3. What mitigation measures are included in the project to ensure that encroachment will
not eventually result in the loss of the protected tree(s)? l!
e A ft0r,5.61:fee- • s co", r/vi ed �� �G� �n�f!rr s ,Sa/c
prp 0.sc c/\ ivccY, c,n etre Cts 0-14 14 /0 frvi 11
r1C�7 I^'1pet
��
's
if
ij
ii
TRE -2- 2/17
.
©SERIES S U N P o W E R®
SunPower®E-Series: E20-327 I E19-320
. ii ) SunPower® Residential
. . . . . . . . .
. _ . . ._ = . . , . AC Module
. . . . . . . . . .
• . ,„ Built specifically for use with the SunPower EquinoxIm system,the only fully
" integrated solution designed,engineered,and warranted by one
manufacturer.
" Maximum Power. Minimalist Design.
Viii
ii Industry-leading efficiency means more power and savings
. per available space.With fewer modules required and
hidden microinverters,less is truly more.
2' Highest Lifetime Energy and Savings.
d Designed to deliver 60%more energy over 25 years in
real-world conditions like partial shade and high temperatures.'
150%
140%
Fundamentally Different. ii 13015
And Better. 2090
SunPowermX-Series Up to
�+ 110% 60%
p1w1% more
.�--_- l . 90 1 lifetime
sow 1 _. .. ..M. energy
m Conventional Module
1`\ \ cu 70%
O 5 10 15 20 25
The SunPower®Maxeon®Solar Cell
Years of operation
• Enables highest-efficiency
modules available.2 O Best Reliability. Best Warranty.
• Unmatched reliability3
• Patented solid metal foundation 1� With more than 25 million modules deployed around o aerrra
prevents breakage and corrosion the world,SunPower technology is proven to last.That's gip' 2sv1 ,
77 why we stand behind our module and microinverter SunPowerComplete z
s
fj, a with the industrys best 25-year Combined Power and Confidence
.-="sf` Product Warranty,including the highest Power Warranty
"'"'�' in solar.
------ 81
100%
Factory-integrated Microinverter oo- 96%
a
• Simpler,faster installation 3 94% -
C 9215
• Integrated wire management, E 9 SunPower"' 12%
rapid shutdown "CI 8615 E-Series and X-Series more
86% Conventional Module
• Engineered and calibrated by asow power
SunPower for SunPower modules n; 82% ; in year
8015 25
O 5 10 15 20 25
Years of operation
•
Datasheet
E-Series: E20-327 I E19-320 SunPower®Residential AC Module
AC Electrical Data
Inverter Model:Enphase IQ 7X5(IQ7XS-96-ACM-US) @240 VAC @208 VAC
Peak Output Power 320 VA 320 VA
Max.Continuous Output Power 315 VA 315 VA
Norr.(,..-L)Voltage/Range=(V) 240/211-264 208/183-229
Max.Continuous Output Current(A) 1.31 1.51
Max.Units per 20 A(LL)Branch Circuit' 12(single phase) 10(two pole)wye
CEC Weighted Efficiency 97.5% 97.0%
Now.Frequency 60 Hz
Extended Frequency Range 47-68 Hz
AC Short Circuit Fault Current Over 3 Cycles 5.8 A rms
Overvoltage Class AC Port III
AC Port Backfeed Current 18 mA
?ower Factor Setting 1.0
Power Factor(adjustable) 0.7 lead./ 0.7 lag.
No active phase balancing for three-phase installations
DC Power Data Warranties,Certifications,and Compliance
SPR-E20-327-E-AC SPR-E19-320-E-AC Warranties •25-year limited power warranty
Nom.Powerz(Pnom) 327 W 320 W •
25-year limited product warranty
•
Power Tol. +5/-0% +5/-0% UL 1703
•Module Efficiency20.4% 19.9% Certifications UL 1741/IEEE-1547
and •UL 1741 AC Module(Type 2 fire rated)
Temp.Coef.(Power) -0.35%/°C -0.35%/°C Compliance 'UL 62109-1/IEC 62109-2
•FCC Part 15 Class B
•Three bypass diodes •ICES-0003 Class B
Shade Tol. •Integrated module-level maximum •CAN/CSA-C22.2 NO.107.1-01
power point tracking •CA Rule 21(UL 1741 SA)`
- - - - - - (includes VoltNar and Reactive Power Priority)
Tested Operating Conditions •UL Listed PV Rapid Shutdown Equipment°
Operating Temp. -40°F to+185°F(-40°C to+85°C)
Enables installation in accordance with:
Max.Ambient Temp. 122°F(50°C) NEC 690.6(AC module)
Max.Load Wind:62 psf,3000 Pa,305 kg/m,front&back •NEC 690.12 Rapid Shutdown(inside and outside the array)
Snow:125 psf,6000 Pa,611 kg/m,front •NEC 690.15 AC Connectors,690.33(A)-(E)(1)
Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s)
When used with InvisiMount racking and InvisiMount accessories
Mechanical Data (UL2703):
- - - .Module grounding and bonding through InvisiMount
Solar Cells 96 Monocrystalline Maxeon Gen III
•Class A fire rated
Front Glass High-transmission terns ered glass 1. When used with AC module Q Cables and accessories(UL 6703 and
anti,reflective coating UL 2238)6:
Environmental Rating Outdoor rated •Rated for load break disconnect
Frame Class 1 black anodized(highest AAMA rating) PID Test Potential-induced degradation free
Weight 42.9 lbs(19.5 kg) • 1558mm(613 in.) 1
Recommended Max. 1.3 in.(33 mm) , -
Module Spacing I i
4
1 SunPower 360 W compared to a conventional module on same-sized arrays(260 W,16% 46 mm
•
efficient,approx.1.6 m21,4%more energy per watt(based on third-party module - ,` (1.13 In.)
characterization and PVSim),0.75%/yr slower degradation(Campeau,Z.et al."SunPower `
Module Degradation Rate,"SunPower white paper,2013).
2 Based on search of datasheet values from websites of top 10 manufacturers per IHS,as of ""'• 1046 mm (` '
January2017. ',., 0. . R, f.-.3omm....r
(412 in.) (12 in.)
3#1 rankin"Fraunhofer PV Durability Initiative forSolar Modules:Part 3."PVTech Power , I
Magazine,2015.Campeau,Z.etal."SunPowerModuleDegradationRate,"SunPowerwhite
paper,2013. j-
4Factory set to1547a-2014default settings.CARule 21 default settings profile set during 393mm r `
commissioning.See the Equinox Installation Guide#518101 for more information. (155in.)
5Standard Test Conditions(1000W/ Irradiance,AM1.5,25°C).NRELcalibration i
m'
standard:SOM5 current,LACCS FF and voltage.All DC voltage is fully contained within the I__._, . ,,,_____I
module. I q37 mm
6 This product is UL Listed as PVRSE and conforms with NEC 2014 and NEC 2017 690.12; -...i 37mm
and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors;
when installed according to manufacturer's instructions.
ID AC MCCUE
aaassltxrUnal
See www.sunpower.corn/facts for more reference information. nI
WO ry 1
®Sp
moreils,see ed aawwwjec oaiuttCOUNWINT
Specifications Included in this datasheet are subject to change without notice. LISTED A"3uJVNPOWEry
©2018 SunPower Corporation.All Rights Reserved.SUNPOWER,the nodule Fire Performance:Type 2
SUN POWER logo and MAXEON are registered trademarks of SunPower
Corporation in the U.S.and other countries as well.1-800-SUNPOWER. Please read the Safety and Installation Instructions for details. 531 948 RevA
sunpower.com
II p - ,- , ...., ,,,,--,-.,,,---4.,, r -rte 7.A(;::::.4„-,7-:-\
74,',„,,,,, Y
as .
S.S �
maVy.
E_1 r- 1-- - - _
. . $ SI, .
ar-,',.sa
ss-.
- ---
SunPower® Energy.LinkTM I Residential and Commercial PVS6
Improve Support,
Reduce Maintenance Costs SunPower EnergyLink—Plug-and-Play Installation
An intuitive monitoring website enables you to: This complete solution for residential and commercial monitoring and
• • See a visual map of customer sites control includes the SunPower®PV Supervisor 6(PVS6)which improves
• Remotely manage hundreds of sites the installation process,overall system reliability,and customer
• Receive elective system reports experience.
• Locate system issues and remotely diagnose • Compact footprint for improved aesthetics
• Diagnose issues online • Robust cloud connectivity and comprehensive local connectivity
• Drill down for the status of individual devices • Flexible configuration of devices during installation
•smot•,a E,,,,.�,aw,..� ,,,, _ Consumption metering
— — •— ,„„ • Revenue-grade production metering(pending)
• Web-based commissioning
1.•p_:• •���, ' ;�; Remote diagnostics of PVS6 and inverters
�.1111111IIII 11111IIIIiI i'.-:47°
�- .-r_'; • Durable UL Type 3R enclosure reduces maintenance costs
m_ ---- • Easy integration with SunPower eBOS
Add Value for Customers
With the SunPower Monitoring System Robust Cloud Connectivity
s H,1 F,JWER Multiple options to maintain optimal
customers can:
• See what their solar system produces each !, connectivity:
day,month,or year 3 -- • Hardwired Ethernet
• Optimize their solar investment and save on I • Wi-Fi
energy expenses • Cellular backup
• See their energy use and estimated bill savings
• See their solar system's performance using the
SunPower monitoring website or mobile app: , _—__. 7.:„.._ ._
. t--r -- 0 :."_:— , ". ., ,.
r ,.., ,...____I
0 .
Datasheet
--.. _ _.�.._._ - - - - - -__ — —- -- - r
ti-�� � _ - - - - b if ~'E �rr(' '`rte .
P,x,r
SunPower° EnergyLinkTM I Residential and Commercial PVS6
SunPower Monitoring Websites PVS6 - SunPower AC Modules
-- .,._._ - .,„4,®µ
11111111dC��IIJiJ III11 ;'.;.:7 ..� 1 ,
Y'•
'°._.
���111lIIIIIIIIIIII'u -:k- s Multiple communication options includeEthernet,Wi-Fi,and cellular. i
Site Re•Uirernents Oseratin: Conditions
Number of SunPower AC modules85 Temperature -22°F to+140°F(-30°C to+60°C)
supported per PVS6 Humidity(maximum) 9596,non-condensing
High-speed Internet access via accessible '
Internet access router or switch
• 100-240 VAC(L-N),50 or 60 Hz
Power
• 208 VAC(L-L in 3-phase),60 Hz
Communication
RS-485 Inverters and meters
• One channel of revenue-grade production metering
Mechanical Integrated Metering • Two channels of consumption metering
Weight 5.5 lbs(2.5 kg) Ethernet 1 LAN(or optional WAN)port
Dimensions 11.8 x 8.0 x 4.2 in.(30.5 x 20.5 x 10.8 cm) PLC PLC for SunPower AC modules
Enclosure rating UL50E Type 3R -
WI-FI 802.11 b/g/n 2.4 GHz and 5 GHz
Cellular LTE Cat-M1/3G UMTS
ZIgBee IEEE 802.15.4 MAC,2.4GHz ISM band
Web and Mobile Device Su.•ort
Data Storage 60 days
Customer site monitor.us.sunpower.com •
Upgrades Automatic firmware upgrades
Partner site pvsmgmt.us.sunpower.com
Browsers Firefox,Safari,and Chrome
Mobile devices iPhonea,iPada,and AndroidTm
Customer app 1.Create account online at:monitor.us,sunpower.com. Warranty and Certifications _
2.On a mobile device,download the SunPower Monitoring 10-year Limited Warranty
app from Apple App Stores'or Google Playrustore.
3.Sign in using account email and password. Certifications UL,cUL CE,UL 61010-1�'1aaanndd-2,FCC Part 15(Class B)
LISTED
FCC ID:YAW529027 E503346
530536 RevC
02619SunPower SmPo porarpoAll rights
onaendiPadaed ra-r RSUN POWERicsofApand lnc.A Yrc da dGooalePlaaor rev-ad made suNpowER.
tered
trademar1sofSunPower Corporation.iPhoneandi Padare�registered Era demaria ofApple Inr_AndroidandGoogie Playa re
000leInMothartradernarksare the propertyof their re pe eowners.Spetiricationsincludedinthisdatasheetaresubjettio
change withoutrw5ce.
Datasheet
/JL IRONRIDGE Ground Mount System
1 {
s`
/
/ '
,/,/
•
, / M
l ' li d
'
/ r
Mount on all terrains, in no time.
The IronRidge Ground Mount System combines our XR1000 rails with locally-sourced steel pipes or
mechanical tubing, to create a cost-effective structurecapable of handling any site or terrain challenge.
Installation is simple with only a few structural components and no drilling, welding, or heavy machinery
required. In addition, the system works with a variety of foundation options, including concrete piers and driven
piles.
Rugged Construction PE Certified
Engineered steel and aluminum ® Pre-stamped engineering letters
components ensure durability. available in most states.
UL 2703 Listed System Design Software
® Meets newest effective UL 2703 1111 Online tool generates engineering
standard. values and bill of materials.
O Flexible Architecture 25-Year Warranty
01
00 Multiple foundation and array Products guaranteed to be free
configuration options. of impairing defects.
• Datasheet
>.:- ..,ffiFr� 7 ^' ", 7Biu i -
� �-
c
_-- -, ,\ -
'#
.
i
If
� `am9.f
f
� (3, 360°Product Tour
'"wVisit ironridge.com
31 ,
- Substructure w'
Top Caps Bonded Rail Connectors Q Diagonal Braces Cross Pipe&Piers
, -,'-`, IQ '3/ elliall11111.11111111111
1)
•) j., 11 ,,:X j.''/'
_ �.
Connect vertical and cross Attach and bond Rail Optional Brace provides Steel pipes or mechanical
pipes. Assembly to cross pipes. additional support. tubing for substructure.
- Rail Assembly
XR1000 Rails UFOs 0 Stopper Sleeves Q CAMO 0
I
. �; r ..
11111111111.1'—
Curved rails increase Universal Fastening Objects Snap onto the UFO to turn Bond modules to rails while
spanning capabilities. bond modules to rails. into a bonded end clamp. staying completely hidden.
- Resources
----. '_-.--1 Design Assistant lo,, A 4 NABCEP Certified Training
-:
• Go from rough layout to fully "•4' lir Earn free continuing education credits,A I- while learning more about our systems.
engineered system. For free.
_ -• - _ _ i Go to ironridge.com/design `Sr Go to ironridge.com/training
©2018 IronRidge,Inc.All rights reserved.U.S.Patents:#8,695,290;#9,819,303;#9,865,938;Others Pending.Version 1.40 ®A�®
Cut Sheet
"AIL. IRON RIDGE XR1000 Rail
See Descri tion/Lengt•
s .71
.46
Rail Section Properties
Property Value
Total Cross-Sectional Area 0.807 int
Section Modulus (X-axis) 0.530 in3
Moment of Inertia (X-axis) 0.843 in4
Moment of Inertia (Y-axis) 0.182 in4
2.88 Torsional Constant 0.436 in3
3.00
2.53 Polar Moment of Inertia 0.330 in4
J
.58
1.57 —
Clear Part Black Part j
Number Number Description/Length Material Weight
XR-1000-132A XR-1000-132B XR1000,Rail 132" (11 Feet) 10.97 lbs.
6000 Series
XR-1000-168A XR-1000-1688 XR1000,Rail 168" (14 Feet) Aluminum 13.96 lbs.
I XR-1000-204A XR-1000-204B XR1000,Rail 204' (17 Feet) 16.95 lbs.
v1.0
F
•
GROUND MOUNT
\v-%Itillik\**11/4
\
'' I *, • *\ 1".*\,.
.4\ 1
I\ , .-11''- \ ' \'
INSTALLATION MANUAL 'AL IRON RIDGE -
CONTENTS
���
DISCLAIMER 1
RATINGS 2
MARKINGS 2
CHECKLIST 3
1,BUILD BASE 4
2,CONNECT SUBSTRUCTURE 4
3,PLACE RAILS 5
4,SECURE LUGS 5
5.SECURE MODULES 6
CAMO 7
ELECTRICAL DIAGRAM 8
DIAGONAL BRACES(OPTIONAL) 9
END CAPS 9
WIRE CLIPS 9
SPLICING CROSS PIPE 10
MICROINVERTER KITS 11
SYSTEMS USING ENPHASE MICROINVERTERS OR SUNPOWER.AC MODULES 11
SYSTEMS USING MICROSTORAGE PRODUCTS 12
FRAMELESS MODULE KITS 12
MODULE COMPATIBILITY 13
MODULE COMPATIBILITY 14
MODULE COMPATIBILITY 15
MODULE COMPATIBILITY 16
DISCLAIMER
This manual describes proper installation procedures and provides necessary standards required for product reliability.
Warranty details are available on website.All installers must thoroughly read this manual and have a clear understanding
of the installation procedures prior to installation. Failure to follow these guidelines may result in property damage, bodily
injury or even death.
IT IS THE INSTALLER'S RESPONSIBILITY TO:
• Ensure safe installation of all electrical aspects of the array.All electrical installation and procedures should be
conducted by a licensed and bonded electrician or solar contractor. Routine maintenance of a module or panel shall
not involve breaking or disturbing the bonding path of the system.All work must comply with national, state and local
installation procedures, product and safety standards.
• Comply with all applicable local or national building and fire codes, including any that may supersede this manual.
• Ensure all products are appropriate for the installation, environment, and array under the site's loading conditions.
• Use only IronRidge parts or parts recommended by IronRidge;substituting parts may void any applicable warranty.
• Review the Design Assistant and Certification Letters to confirm design specifications.
• Ensure provided information is accurate. Issues resulting from inaccurate information are the installer's responsibility.
• Validate foundation parameters prior to installation, as a local geotechnical report may be required to assess ground
conditions. We recommend consulting with a local engineer familiar with local regulations and build site requirements,
including soil conditions,terrain and load criteria.All parameters may impact foundation requirements.
• Ensure bare copper grounding wire does not contact aluminum and zinc-plated steel components,to prevent risk of
galvanic corrosion.
• If loose components or loose fasteners are found during periodic inspection, re-tighten immediately. If corrosion is
found, replace affected components immediately.
• Provide an appropriate method of direct-to-earth grounding according to the latest edition of the National Electrical
Code, including NEC 250:Grounding and Bonding, and NEC 690:Solar Photovoltaic Systems.
• Disconnect AC power before servicing or removing modules,AC modules, microinverters and power optimizers.
• Review module manufacturer's documentation for compatibility and compliance with warranty terms and conditions.
©2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-1
RATINGS
UL 2703 LISTED
ceus #5003225
Intertek
• Conforms to STD UL 2703 (2015)Standard for Safety First Edition: Mounting Systems, Mounting Devices, Clamping/
Retention Devices, and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels.
• Certified to CSA STD LTR AE-001-2012 Photovoltaic Module Racking Systems.
• Max Overcurrent Protective Device(OCPD) Rating:25A
• Max Module Size:24ft2
• Max Frameless Module Size for Canadian LTR-AE: 19.5 ft2
• CAMO Specific Allowable Design Load Rating:50 PSF downward, 50 PSF upward, 15 PSF lateral
• LTR AE Canadian Load Rating:2400 Pa
• System Level Allowable Design Load Rating:meets minimum requirements of the standard(10 PSF downward, 5
PSF upward, 5 PSF lateral).Actual system structural capacity is defined by PE stamped certification letters.
CLASS A SYSTEM FIRE RATING PER UL 2703
• Not Fire Rated
STRUCTURAL CERTIFICATION
• Designed and Certified for Compliance with the International Building Code&ASCE/SEI-7
MARKINGS
Product markings are located on the system's Rail
Connectors.
cM
®e�
Ug
©2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-2
PRE-INSTALLATION IRONRIDGE COMPONENTS
❑ Verify module compatibility. See Page 12 for info. -
❑ Purchase 2"or 3"ASTM A53 Grade B Schedule 40
Pipe, galvanized to a min of ASTM A653 G90 or ASTM
A123 G35, or 2.375"or 3.500"Allied Mechanical
Tubing with Gatorshield or FlowCoat Zinc coating
(ASTM A1057). 4 a,
XR100&XR1000 Rail Rail Connector
TOOLS REQUIRED
❑ Post Hole Digger or Powered Auger
❑ Socket Drive(7/16", 9/16", and 1/2"Sockets)
❑ Torque Wrenches(0-240 in-lbs and 10-40 ft-lbs) Ir114 0.1
❑ Transit, String Line, or Laser Level Top Cap UFO
❑ 3/16"Allen Head
TORQUE VALUES sal 6 P4
❑ Top Cap Set Screws(3/16"Allen Head)
❑ Schedule 40 Grade B Pipe:20 ft-lbs
Stopper Sleeve CAMO
❑ 2."Allied Mechanical Tubing: 11 ft-lbs
❑ 3"Allied Mechanical Tubing:16 ft-lbs ‹O. ®;
1141010 Top Cap U-Bolt Nuts(9/16"Socket): 15 ft-lbs -
Clirres
❑ Rail Connector Bracket Nuts(9/16"Socket):21 ft-lbs
❑ Rail Connector U-Bolt Nuts(9/16"Socket):60 in-lbs Grounding Lug Microinverter Kit
❑ Grounding Lug Nuts(7/16"Socket):80 in-lbs
O Grounding Lug Terminal Screws(7/16 Socket):20 in-lbs
❑ Universal Fastening Objects(7/16"Socket):80 in-lbs
❑ Diagonal Brace Set Screws(1/2"Socket): 15 ft-lbs r �°
U Diagonal Brace Bolts(1/2"Socket):40 ft-lbs Diagonal Brace End Cap Wire Clip
O Microinverter Kit Nuts(7/16"Socket):80 in-lbs
❑ Frameless Module Kit Nuts(7/16"Socket):80 in-lbs
4 If using previous version of:Integrated Grounding Mid Clamps,
Grounding Lug,End Clamps,and Expansion Joints please refer to
Alternate Components Addendum(Version 1.30).
If installing on a low slope roof please refer to Ground Mount for Frameless Module Kit Frameless End/Mid Clamp
Flat Roof Applications Addendum(Version 2.0).
0 2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-3
,
1. BUILD BASE ��
A.MARK LOCATIONS O
Establish pier locations.Once grid of pier locations has G7 G7 G7
been set,verify all angles are square. liamimir
2 Spacing varies with load conditions.Consult engineering specs.
II
EN TN TN
ICJ ICJ ICJ
B.POSITION PIERS O
Excavate the foundation holes. Insert vertical piers into TVertical Pier/
Level Tops
foundation holes, and pour in concrete mixture. Ensure (Schedule 40 Pipe)
vertical piers are plumb, level, square, and placed in
parallel rows. Level the tops so they are even. Level Ground
x'90.4 Brace piers until concrete foundation has cured.
I
-^T /
9 In some cases,cross bracing is required to provide extra support / /
for piers.If required,install Diagonal Braces at this time. / % Concrete // l /
Depth / /j
P
/ 1!d Depth /
/ v
fi
2. CONNECT SUBSTRUCTURE
A.MOUNT TOP CAPS O
Mount a Top Cap on each pier. Wait to tighten set screws.
9 If using Diagonal Braces,install them prior to Top Caps. o ._.. 6>
IthiTio
B.LAY CROSS PIPE 0
Set cross pipes or tubing in Top Cap grooves.Attach with
3/8"U-bolts,flange nuts,flat washers, and lock washers. air
Torque U-bolts to 15 ft-lbs and align assembly.
Torque Top Cap set screws to 20 ft-lbs for Schedule 40
Grade B Pipe, 11 ft-lbs for 2"Allied Mechanical Tubing,
-
Set
and 16 ft-lbs for 3"Allied Mechanical Tubing. schedule ao d Screws
Pipe:20 ft-lbs u-Bolt
2'Allied Tubing:11 ft-lbs 15 ft lbs
4 To join more than one section of cross pipe,see Page 10. s•Allied Tubing:16 ft-lbs
©2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-4
3. PLACE RAILS 'AI&
A.ATTACH HARDWARE O
On the ground, attach Rail Connector brackets to rail by
sliding 3/8"-16 bonding bolts into side slot.Space out to
match pier spacing.With brackets in place,finger tighten
flange nuts onto bolts.
9 Tape ends of rail,to keep bolts from sliding out while moving. 0
14
B.FASTEN CONNECTORS 0
Center rails on cross pipes, leaving equal distance on Bracket
ends.Secure with Rail Connector hardware:3/8"-16 21 nabs
U-bolts,flange nuts,flat washers, and lock washers. 60 in-clbs
Torque U-bolt nuts to 60 in-lbs and bracket to 21 ft-lbs. /iii -
9 Spacing between rails should align with module manufacturer 0 ,_
recommended clamping locations.
lir
IIIIIIIIMMI
4. SECURE LUGS
Terminal Screw
GROUNDING LUGS `� (20 in-lbs)
.J� -
Insert T bolt in top rail slot and torque hex nut to 80 in- `li
lbs. Install a minimum 10 AWG solid copper or stranded 0
1°I /
grounding wire.Torque terminal screw to 20 in-lbs.
9 Only one Grounding Lug required per continuous subarray, ..----------'""----...,,,„...\i
regardless of subarray size(Unless frameless modules are used,
see Page 10). Hex Nut
9 If using Enphase microinverters or Sunpower AC modules, ri (eo in-lbs)
....s.....'''.....s.'.............''.•...-J.. )-
Grounding Lugs may not be needed.See Page 11 for more info.
9 Grounding Lugs can be installed anywhere along the rail and in
either orientation shown.
9 Grounding Lugs are intended to for use with one solid or stranded
copper wire,conductor size 10-4AWG.
©2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-5
5. SECURE MODULES 'ilk
A.SECURE FIRST END 0
UFO
Place first module in position on rails, a minimum of 1" 80lnabs /,
from rail ends. Snap Stopper Sleeves onto UFO. Fasten 01.111,4;7,;;;;_i'rl!"1,
„module to rail using the UFO,ensuring that the UFO isiriihooked over the top of the module.Torque to 80 in-lbs. /' %'
9 Ensure rails are square before placing modules. -' .1111111
9 Hold Stopper Sleeves on end while torquing to prevent rotation. irf �• �9 If using CAMO instead of UFO+Stopper Sleeve,refer to Page 7 it
for CAMO installation procedure.
B.SECURE NEXT MODULES 0
Place UFO into each rail, placing them flush against first \�_ _-_� _____� ___ -\\ —\\_ 'I '.__
module.Slide second module against UFO.Torque to 80 i .1\.-..—��—� ��_-�uF --\\--s- �
in-lbs. Repeat for each following module. -\�--_\\._—��- �� BOIQ-lbs
\� \��- \\ ��,���-��
9 When reinstalling UFO,move modules a minimum of 1/16” so ��\-----\\___ -- ---
UFOs are in contact with a new section of module frame.
9 When UFOs are loosened and re-tightened,ensure UFO T bolt '
bottoms out in rail channel before re-torquing UFO to achieve full
::::::::r:::Il
rail ', �9. i�� r ``•�L% \�\� �.
C.SECURE LAST END 0
/ .% _ >� -
Placelast module in position on rails,a minimum of 1" _
from rail ends.Snap Stopper Sleeves onto UFO. Secure '_ Z/ _ - Z.? _ --.%?.
,_:_ -_Z;,,-_.- :._:,i ....,7 _,_
UFO Clamps on rails, ensuring they are hooked over top
of module.Torque to 80 in-lbs. w
9 Hold Stopper Sleeves on end while torquing to prevent rotation. ��4,,-.-1-,_,....:9 If using CAMO instead of UFO+Stopper Sleeve,refer to Page 7
for CAMO installation procedure.
D.REPEAT STEPS O
Secure remaining module rows, leaving a minimum 3/8" ailair
gap between rows.
9 If using End Caps,refer to Page 9. ft4ltf it**AilWiraiggir
it
/, sior ilipmilm,ilip
ik ViST
ar
2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-6
CRMO
���
A.SLIDE INTO RAIL 0
Ir
Slide CAMO into rail channel far enough to clear the /
module frame. CAMO requires 6"of clearance from end of °'
rail. `^,. ani
B.PLACE MODULE 0 -.,%.
-i ,y _ti
Place module on rails(module cells not shown for clarity). itis,".
i
When installing CAMO the module can overhang the rail %",i,;-l �
no more than 1/4". . -,...;-"-- ,,=;''''
:. -"-- '`' ,
-� i',
C.PULL TOWARDS END O
Pull CAMO towards rail ends,at 45 degree angle, so the .. ,--
bonding bolt contacts the module flange edge. �' � t
;r liSr
sy � e.
D.SECURE TO FRAME O
Rotate handle with an upwards motion until CAMO snaps ,,,
into rail channel. Ensure CAMO bonding pins are fully r' . '�
seated on top of module frame. ,..--;,- ---
„.-3,,,...7:„.„---- h ',; \�
FRAME COMPATIBILITY
1
CAMO has been tested or evaluated with all modules i Module Glass/Cells
listed in the Module Compatibility section having frames j !
within the referenced dimensions. Be sure the specific
module being used meets the dimension requirements.
Frame Compatibility:
4 For installations with Hanwha Q CELLS modules with 32 mm I X=1.2-2.2 mm
frame heights,the maximum ground snow is 45 PSF(33 PSF Y=15-40 mm
module pressure).
iiY .
Q CAMO is not compatible with Canadian Solar modules. i L___i i- -----” �x
—.
2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-7
ELECTRICAL DIAGRAM
lr
IIIII III III
O 000
1^I IAI I
1 1 1 1 1 I I UFO or
I I , � CAMO • Grounding Lug*
I I II I I I I I I I
1 1 1 I I I I I Fault Current I Min 10 AWG*
I I I 1I I I I I I Ground Path — Copper Wire
0000 s!1
I I 11 I I 1
I I 1 I I I Cross Pipe 1 I
1- -I 4- -I - - - 4- -I + -I - ,,
EI I I I I I I > '� 111
I I I I I I I
I I I I I I 1 I
I I 11 1 1
O 000
1 I 1 I 11 I
1 I 1 I I I I I }
1 I 1 1 1 1 II (V Optional Cross Brace
• :JIM4f
1 I I 1 I 1 N I I C✓ WI
I I I I 11 I
I I I I I I I I J- I c.k>
11 I I I I I
0 0 0110 0 Bonding Points F—Fault Current Ground Path
I II I 1 1 I Section View
I I 1 1 1 1 Cross Pipe I I *Grounding Lugs and wire are not required in systems using
_ L J 1J - _ _ 1 _1 - - - - - - 1 -1 - - certain Enphase microinverters or certain Sunpower modules.
I ' ' ' > Equipment grounding is achieved with the Engage cable for
- T 1 T 7 - - - T 1 T 1 - - Enphase or the AC module cable system for Sunpower via their
I I 1 I I I I I integrated EGC.
I I 1 1 11
O 000
1<,--...-1 1 1 14-----
I
1 I I 1 1
11 1 I I I I I
I I 1 I I I I I
I I 1 I I I 1 1
1 1 1 I I I I I
is'i( Ne1 i I
0000
`d 1 III II
Plan View
*Only one Grounding Lug required per continuous subarray.
©2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-8
DIAGONAL BRACES (OPTIONAL) ZA116.. •
Slide sleeve on north pier 2-3"above the ground (6"max).
Attach Diagonal Brace to sleeve with 1/2"hardware.
Slide second sleeve up on south pier 2-3"below top cap
(6"max). Raise Diagonal Brace to align holes in sleeve
and brace.Attach hardware and raise sleeve to full extent.
Torque Diagonal Brace bolts to 40 ft-lbs.Torque set
Set Screws
screws to 15 ft-lbs. 15 ft-lbs Diagonal Brace.Bolts
y ' L,,/' 40 ft-lbs
• Diagonal Brace
31' yl Sleeve
South Pier North Pier
END CAPS
End Caps add a completed look and keep debris and
pests from collecting inside rail. ( \
Firmly press End Cap onto rail end.
`rye
Q End Caps come insets of left and right Check that the proper (� (�,
amount of each has been provided. �/]_
4 For open-structure installations,you can use adhesive to secure kiQ,
the End Caps. : �VO\
1/4
WIRE CLIPS
Wire Clips offer a simple wire management solution. Press Clip Snap Clip
into Slot Closed
Firmly press Wire Clip into top rail slot. Open clip and
insert electrical wire accordingly. Close clip once complete. (���
IZZP-
1114
Run
re •`�
©2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-9
. ,
SPLICING CROSS PIPE
/AIL
The following instructions should be followed, when O
required,to join more than one section of cross pipe
together to ensure bonding is maintained throughout the
system.
Cross Pipe Infernal Spice Cross Pipe
A.ALLIED MECHANICAL TUBING SPLICES ----------` — r____--------------— —
tt-lbs tube splices shown in the table below shall be C' '
of equivalent Allied Flowcoat or Gatorshield zinc coating.
125
r - - ----- ----------- ----- ----- ----- — -- 3.50.
Mechanical Tube Size
of the Structure Splice Tube Size
12.0"
2.375"OD, 12 Gauge 2.000"OD, 9 Gauge, I
Minimum 12"Long
3.500"OD, 8 Gauge 3.000"OD, 12 Gauge, BO
Minimum 12"
Long
Insert splice tube 6"into first section of cross pipe and se- Cross Pipe
cure with 2 self-drilling screws(1/4"-14 x 34"),spacing them
approximately 1.25"from end of pipe and approximately
3.50"apart,tightening screws to 9 ft-lbs.
Slide second section of cross pipe over splice tube and •`•
secure with two more self-drilling screws.Tighten screws ,
to 9 ft-lbs. }� 1
oil 4
cif
43,
9 Pre-drill 5/32"pilot holes through cross pipe and splice tube for ,};;+' ;;: _ _
•
Viet
easier installation of self-drilling screws. ,—. 1
B.SCHEDULE 40 GRADE B PIPE SPLICES N Threaded Coupling
Use galvanized threaded pipe couplings that match the
pipe size used for the structure.Threaded Schedule 40
Grade B Pipe must be used when splicing cross pipe 0
together.
Maximum
'
Fully thread coupling onto both sections of pipe being aP of 1/2
spliced together. Cross Pipe Cross Pipe
9 To ensure structural integrity of cross pipes,mechanical tube or II I
coupling splices are not permitted In end spans or in middle 1/3 of
interior cross pipe spans. ' I
Weir
ii
C.CROSS PIPES CAN BE JOINED OVER AN INTERIOR iii iI
TOP CAP WITH A MAXIMUM GAP OF 1/2" Top Cap -10
9 To avoid potential problems from the effects of thermal
expansion,a maximum total continuous cross pipe length
of 100 ft is recommended.
Pier
©2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-10
MICROINVERTER KITS
Use IronRidge's Microinverter Kit to bond compatible
microinverters and power optimizers to the racking system. One Microinverter
Kit Required
Insert Microinverter Kit bolt into top rail slot. Place ((80 Inaba)
T
compatible microinverter or power optimizer into position
and tighten hex nut to 80 in-lbs.
Q If installing in areas with ground snow loads greater than 40 psf,
install MLPE devices directly next to module frame edge
COMPATIBLE PRODUCTS
Enphase
M250-72,250-60,M215-60,C250-72,S230,S280,IQ 6,IQ 6+,IQ
107,IQ 7A,IQ 7+,IQ 7X,Q Aggregator
Parton
MIG240,MIG300,G320,G640
Solar Edge
P300,P320,P340,P370,P400,P405,P485,P505,P600,P700,
P730,P800p,P800s,P850,P860 .-.
SMA
RoofCommKit-P2-US,TS4-R Module Retrofit Kits(TS4-R-S,
TS4-R-O,TS4-R-F)
Tigo
Tigo Access Point(TAP),TS4-R-X(where X can be 0,S,F,or
M), (whereS, M),TS4-A-F,TS4- On AP systems equipment
TS4-R-X-DUO X can be 0, orremove Grounding Washer
A-2F,TS4-A-0,TS4-A-O-DUO
AP Systems
QS1,YC600 '
4 Remove Grounding Washer on AP Systems QS1 and YC600
inverters before installing to XR rails. Twots MicReqroiuirenverterd
Id
4 Remove the Stainless Steel Clip on Tigo-"A"MLPE Devices o- (so in-lbs)
before attaching to XR rails.
4 Use the number of IronRidge Microinverter kits allowed
by the MLPE mounting flange.Some will require 1 kit and
others 2 kits.
SYSTEMS USING ENPHASE MICROINVERTERS OR SUNPOWER AC MODULES
IronRidge systems using approved Enphase products or SunPower modules eliminate the need for lay-in lugs and field
installed equipment grounding conductors(EGC).This solution meets the requirements of UL 2703 for bonding and
grounding and is included in this listing.
COMPATIBLE PRODUCTS
Modules with model identifier Ab-xxx-YY and InvisiMount(G5)46mm frame;where"A"is either E,or X;"b"can be 17,18,19,20,21,or 22;
and"YY"can be C-AC,D-AC,BLK-C-AC,or BLK-D-AC.
Enphase
Microinverters M250-72,M250-60,M215-60,C250-72,and Engage cables ETI0(-240,ET)0208,ETXX-277.
Q A minimum of two inverters mounted to the same rail and connected to the same Engage cable are required.
4 The microinverters or SunpowerAC modules must be used with a maximum 20 A branch rated overcurrent protection device(OCPD).
4 If an AC module is removed from a circuit for maintenance,you must first disconnect AC power and then install a temporary EGC to
bridge the gap by inserting an AC extension cable(or via other NEC-compliant means),in order to maintain effective ground continuity
to subsequent modules.
©2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-11
SYSTEMS USING MICROSTORAGE PRODUCTS
Use IronRidge's Microinverter Kit to bond compatible microstroage
devices to the racking system. Insert Microinverter Kit T-bolt into top
rail slot. Place compatible microstorage into position and tighten hex
nut to 80 in-lbs.
I
COMPATIBLE PRODUCTS
Microinvertew
ElIAZR (80 in4bs)
PHAZR Devices PHAZR-X,where X is 6-12.
is
•
4 Running a separate equipment grounding conductor to the PHAZRs is
not required. "
Q If installing in areas with ground snow loads greater than 40 psf and
underneath a module,Install PHAZR devices as close as possible to !<
module frame edge.
4 Use the number of Iron Ridge Microlnverter kits allowed by the
microstorage mounting flange.Some will require 1 kit and others 2 kits.
FRAMELESS MODULE KITS
Insert Frameless Kit T bolt in top rail slot. Place star
washer over T bolt, allowing it to rest on top of rail. Secure
module clamps with a hex nut and torque to 80 in-lbs. Place
Star Washer
COMPATIBLE PRODUCTS N
-----
Sunforson.
Sunforson sliver or black SFS-UTMC-200(B)mid and SFS-UTEC-
200(B)end clamps.
Sunpreme
Sunpreme silver or black mid and end clamps with part numbers
7500105X where"X"is 1,5,6 or 7.
lronridge Y�
IronRidge silver or black mid and end clamps with part numbers
FMLS-XC-001-Y where"X"is E or M and"Y"is B or blank.
Module Clamp
(80 in-lbs) Grounding Lugs
Required on Every Rail
4 Follow module manufacturer's installation Instructions to install
the module clamps.
9 Frameless modules require using a Grounding Lug on every —�—`
rail.
4 For Sunpreme Modules Only:If required to use slide prevention
hardware,see Module Slide Prevention Addendum(Version
1.10).
©2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-12
MODULE COMPATIBILITY
The Ground Mount System may be used to ground and/or mount a PV module complying with UL 2703 only when the
specific module has been evaluated for grounding and/or mounting in compliance with the included instructions. Unless
otherwise noted, "xxx"refers to the module power rating and both black and silver frames are included in the certification.
MAKE MODELS
Amerisolar modules with 35,40 and 50 mm frames AS-bYxxxZ Where"b"can be 5 or 6;"Y"can be M,
Amerisolar P, M27, P27, M30,or P30;"xxx"is the module power rating;and"Z"can be blank,W or WB
Aptos modules with 35 and 40 mm frames DNA-yy-zz23-xxx Where"yy"can be 120 or 144;"zz"can be
Aptos MF or BF;and""xxx"is the module power rating
Astronergy modules with 30,35,40 and 45 mm frames aaSMbbyyC/zz-xxx Where"aa"can be CH or
Astronergy Solar A;"bb"can be 60,66,or 72;"yJ'can be blank, 10 or 12;"C"can M, P, M(BL), M-HC, M(BL)-HC, P-HC,
M(DG),or M(DGT);"zz"can be blank, HV, F-B,or F-BH ;and xxx is the module power rating
Astronergy frameless modules CHSM6610P(DG)-xxx Where"xxx"is the module power rating
ASUN ASUN modules with 35 and 40 mm frames ASUN-xxx-YYZZ-aa Where"xxx"is the module power
rating;"YY"can be 60 or 72;"ZZ"can be M,or MH5;and"aa"can be blank or BB
Auxin modules with 40 mm frames AXN6y6zAxxx Where"y"can be M or P;"z"can be 08,09, 10, 11,or
Auxin 12;"A"can be F or T;and"xxx"is the module power rating
Axitec Modules with 35 and 40 mm frames AC-xxxY/aaZZb Where"xxx"is the module power rating;"Y"
Axitec can be M, P or MH;"aa"can be blank, 125-or 156-;"ZZ"can be 54,60,72, 120,or 144;"b"can be S or
SB
Boviet Boviet modules with 35 and 40mm frames BVM66aaYY xxxBB Where"aa"can be 9, 10 or 12;"YY"is M
or P;"xxx"is the module power rating;and"BB"can be blank or L
BYD BYD modules with 35 mm frames BYlloocAY ZZ Where"xxx"is the module power rating;"A"can be
M6, P6, MH or PH; "Y"can be C or K;and"ZZ"can be 30 or 36
Canadian.Solar modules with 30,35 and 40 mm frames CSbYxxxZ Where"b"can be 1,3 or 6;"Y"can
be H, K, P, U,V,W,or X;"xxx"refers to the module power rating;and"Z"can be M, P, MS, PX, M-SD,
Canadian Solar P-AG, P-SD,MB-AG, PB-AG, MS-AG,or MS-SD
Canadian Solar frameless modules CSbY xxx-Z Where"b"can be 3 or 6;"V"is K, P, U,or X;"xxx"is the
module power rating,and"Z"can be M-FG, MS-FG, P-FG, MB-FG,or PB-FG
CertainTeed CertainTeed modules with 35 and 40 frames CTxxxYZZ-AA Where"xxx"is the module power rating;"Y"
can be M, P or HC;"ZZ"can be 00,01, 10,or 11;and"AA"can be 01,02,03 or 04
CSUN Csun modules with 35 and 40 mm frames YYxxx-zzAbb Where"YY"is CSUN or SST;xxx is the module
power rating;"zz"is blank,60,or 72;and"A"is blank, P or M;"bb"is blank, BB, BW,or ROOF
Ecosolargy modules with 35,40 and 50 mm frames ECthoocYzzA-bbD Where"xxx"is the module power
Ecosolargy rating;"Y"can be A, H,S,or T;"zz"can be 125 or 156;"A"can be M or P;"bb"can be 60 or 72;and"D"
can be blank or B
2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-13
MODULE COMPATIBILITY
ET Solar modules with 35,40 and 50 mm frames ET-Y6ZZxxxAA Where"Y"can be P, L,or M;"ZZ'
ET Solar can be 60 or 72;"xxx"refers to the module power rating;and"AA"can be WB,WW, BB,WBG,WWG,
WBAC,WBCO,WWCO,WWBCO or BBAC
Flex modules with 35,40 and 50 mm frames and model identifier FXS-xxxYY ZZ;where"xxx"is the
Flex module power rating;"YY"can be BB or BC;and"ZZ"can be MAA1B, MAA1W, MAB1W,SAA1B,
SAA1W,SAC1B,SAC1W,SAD1W,SBA1B,SBA1W, SBC1B,or SBC1W
GCL GCL modules with 35 mm and 40 mm frames GCL-ab/YY xxx Where"a"can be M or P;"b"can be 3 or
6;"YY"can be 60,72,72H,or 72DH;and xxx is the module power rating
Gigawatt Solar Gigawatt modules with 40 mm frames GWxY
xxY Where"xxx refers to the module power rating;and
"YY"can be either PB or MB
Hansol Hansol modules with 35 and 40 frames HSxxxYYzz Where"xxx"is the module power rating;"YY"can
be PB, PD, PE,TB,TD, UB, UD,or UE;and"zz"can be AH2,AN1,AN3,AN4, HV1,or JH2
Hanwha SolarxxHanwha Solar modules with 40,45,and 50 mm frames HSLaaP6-YY 1-xxxZ Where"aa"can be either
60 or 72;"YY"can be PA or PB; x
refers to the module power rating;and"Z"can be blank or B
Hanwha Q CELLS Modules with 32,35,40,and 42mm frames and model identifier aaYY-ZZ-xxx
where"aa"can be Q.or B.;"YY"can be PLUS, PRO, PEAK, LINE PRO, LINE PLUS, PLUS DUO or
PEAK DUO;and"ZZ"can be G3,G3.1,G4,G4.1, L-G2, L-G2.3, L-G3, L-G3.1, L-G3y, L-G4, L-G4.2,
Hanwha Q CELLS L-G4y, LG4.2/TAA, BFR-G3, BLK-G3, BFR-G3.1, BLK-G3.1, BFR-G4, BFR-G4.1, BFR G4.3, BLK-G4.1,
G4/SC,G4.1/SC,G4.1/TAA,G4.1/MAX, BFR G4.1/TAA, BFR G4.1/MAX, BLK G4.1/TAA, BLK G4.1/
SC, EC-G4.4, G5, BLK-G5, L-G5, L-G5.1, L-G5.2, L-G5.2/H, L-G5.3, G6,G6+, BLK-G6, L-G6, L-G6.1,
L-G6.2, L-G6.3,G7, BLK-G6+, BLK-G7,G7.2,G8, BLK-G8,G8+, BLK-G8+L-G7, L-G7.1, L-G7.2,
L-G7.3, L-G8, L-G8.1, L-G8.2,or L-G8.3;and"xxx"is the module power rating
Heliene modules with 40 mm frames YYZZxxxA Where"YY"can be 36,60,72,or 96;"ZZ"can be M, P,
Heliene or MBLK;"xxx"is the module power rating;and"A"can be blank, HomePV,or Bifacial
HT-SME HT SAAE modules with 40 mm frames HT72-156Z-xxx Where"Z"can be M, P, M-C, P-C, M(S), M(VS),
M(V), P(V), M(V)-C, P(V)-C;and"xxx"is the module power rating
Hyundai modules with 33,35,40 and 50 mm frames HiY SxxxZZ Where"Y"can be A, D, M or S;"xxx"
Hyundai refers to the module power rating;and"ZZ"can be HG, HI, KI, MI, MF, MG, RI, RG, RG(BF), RG(BK),
SG,TI,or TG
Itek Itek Modules with 40 and 50 mm frames IT-xxx-YY Where"xxx"is the module power rating;and"YY"
can be blank, HE,or SE,or SE72
JA Solar modules with 30,35,40 and 45 mm frames JAyyzz-bbww-xxx/aa Where"yy"can be M, P, M6
or P6;"zz"can be blank, (K), (L), (R), (V), (BK), (FA), (TG), (FA)(R), (L)(BK), (L)(TG), (R)(BK), (R)(TG),
JA Solar (V)(BK), (BK)(TG),or(L)(BK)(TG);"bb"can be 48,60,or 72;"ww"can be D09,S01,S02,S03,S06,
S09,or S10;"xxx"is the module power rating;and"aa"can be BP, MP,SI,SC, PR,3BB,4BB,4BB/RE,
5BB
Jinko modules with 35 and 40 mm frames JKMYxxxZZ-aa Where"Y"can either be blank or S;"xxx"
is the module power rating;"ZZ"can be M, P,or PP;and"aa"can be blank, 60, 60B,60H,60L,60BL,
Jinko 6OHL,60HBL,60-J4,60B-J4, 60B-EP,60(Plus),60-V, 60-MX, 72,72-V,72H-V,72L-V,72HL-V,72-MX,
72H-BDVP,or 72HL-TV Jinko frameless modules JKkboocPP-DV Where"xxx"is the module power
rating
Kyocera Modules with 46mm frames KYxxxZZ-AA Where"Y"can be D or U;"xxx"is the module power
Kyocera rating;"ZZ"can be blank,GX,or SX;and"AA"can be LPU, LFU, UPU, LPS, LPB, LFB, LFBS, LFB2,
LPB2,3AC,3BC,3FC,4AC,4BC,4FC,4UC,5AC,5BC,5FC,5UC,6BC, 6FC,8BC,6MCA,or 6MPA
LG modules with 35,40,and 46 mm frames LG)oocYaZ-bb Where"xxx"is the module power rating;"Y"
LG can be A, E, N,Q,S;"a"can be 1 or 2;"Z"can be C, K,T,or W;and"bb"can be A3,A5, B3,G3,G4,J5,
K4,or V5
Longi modules with 30,35 and 40 mm frames LRa-YYZZ-xxxM Where"a"can be 4 or 6;"YY"can be
Longi blank, 60 or 72;"ZZ'can be blank, BK, BP, HV, PB, PE, PH, HBD, HPB,or HPH;"xxx"is the module
power rating
0-2019 IRONRIDGE,INC.VERSION 2.3 GROUND.MOUNT INSTALLATION MANUAL-14
MODULE COMPATIBILITY Znik
Mission Solar modules with 33 and 40 mm frames MSEbbxxxZZaa Where"bb"can be blank or
Mission Solar 60A;"xxx"is the module power rating;"ZZ"can be blank, MM,SE,SO,SQ,SR,or TS;and"aa"
can be blank, 1J,4J,4S,5K,5T, 60,6J, 6S, 6W,8K,8T,or 9S
Mitsubishi modules with 46 mm frames PV-MYYxxxZZ Where"YY"can be LE or JE;xxx is the
Mitsubishi module power rating;and"ZZ"can be either HD, HD2,or FB
Motech IM and XS series modules with 40,45 and 50 mm frames
Neo Solar Power modules with 35 mm frames D6YxxxZZaa Where"Y"can be M or P;xxx is the
Neo Solar Power module power rating;"ZZ"can be B3A, B4A, E3A, E4A, H3A, H4A;and"aa"can be blank, (TF),
ME orME(TF)
Panasonic modules with 35 and 40 mm frames VBHNxxxYYzzA Where"xxx"refers to the module
Panasonic power rating;"YY"can be either KA, RA, SA or ZA;"zz"can be either 01,02,03,04,06,06B, 11,
11B, 15, 15B, 16, 16B, 17,or 18;and"A"can be blank, E, G,or N
Peimar modules with 40 mm frames SbxxxYzz Where"b"can be G or P;"xxx"is the module power
Peimar rating;"Y"can be M or P;and"zz"can be blank, (BF),or(FB)
Phono Solar modules with 35,40, and 45 mm frames PSxxxY ZZ/A Where xxx refers to the module
Phono Solar power rating;"Y"can be M, Ml, MH,or M1 H or P; "ZZ"can be 20 or 24;and"A"can be F,T, U,or
TH
Prism Solar Prism Solar frameless modules BiYY xxxBSTC Where"YY"can be 48,60, 60S,72 or 72S;and
xxx' is the module power rating
REC modules with 30,38 and 45 mm frames RECxxxYYZZ Where"xxx"is the module power
REC Solar rating;"YY"can be AA, M, NP, PE, PE72,TP,TP2,TP2M,TP2SM,or TP2S;and"ZZ'can be blank,
Black, BLK, BLK2,SLV,or 72
ReneSola modules with 35,40 and 50 mm frames AAcocY ZZ Where"AA"can be SPM(SLP)or
Renesola JC;"xxx"refers to the module power rating;"Y"can be blank, F, M or S;and"ZZ"can be blank,Ab,
Ab-b,Abh,Abh-b,Abv,Abv-b, Bb, Bb-b, Bbh, Bbh-b, Bbv, Bbv-b, Db, Db-b,or 24/Bb
Renogy Modules with 40 and 50 mm frames RNG-xxxY Where"xxx"is the module power rating;
Renogy and"Y"can be D or P
Risen Modules with 35 and 40 mm frames RSMyy-6-xxxZZ Where"yy"can be 60,72, 120 or 144;
"xxx"is the module power rating;and"ZZ"can be M or P
Risen Frameless modules RSMyy-6-xxxZZ Where"yy"can be 60,72, 120 or 144;"xxx"is the module
power rating;and"ZZ"can be MDG or PDG
S-Energy modules with 40 frames SNmY ZZ Where"xxx"is the module power rating;"Y"can be
S-Energy M or P;and"ZZ"can be 10,or 15
Seraphim modules with 35 and 40 mm frames SEG-aYYxxxZZ Where"a"can be blank, 6 or B;
Seraphim Energy Group "YY"can be blank, MA, MB, PA,or PB;"koc"is the module power rating;and"ZZ"can be blank,
BB, BG, BW, HV, WB,WW, BMB, BMB-HV
Seraphim USA Seraphim modules with 40 and 50 mm frames SRP-xxx-6YY Where"xxx"is the module power
rating;and"YY"can be MA, MB, PA, PB,QA-XX-XX,and QB-XX-XX
Sharp Sharp modules with 35 and 40 mm frames NUYYxxx Where"YY"can be SA or SC;and"xxx"is the
module power rating
Silfab Silfab Modules with 38 mm frames SYY Z-xxxAb Where"YY"can be IL,SA, LA,SG or LG;"Z"
can be blank, M, P,or X;"A"can be blank, B, H, M,or N;and"b"can be A, L, G,or T
Solaria = Solaria modules with xx
h 40 mm frames PowerXT xY ZZ Where"xxx"is the module power rating;"Y"
can be R or C;and"ZZ"can be AC, BD, BX, BY, PD, PX, PZ,WX or WZ
Solarcity(Tesla) Solarcity modules with 40 mm frames SCxxxYY Where"xxx" Y"
is the module power rating;and"Y
can be blank, B1 or B2
SolarTech SolarTech modules with 42 mm frames STU-xxY
xY Where"xxx"is the module power rating;and
"YY"can be PERC or HJT
2019 IRONRIDGE,INC.VERSION 23 GROUND MOUNT INSTALLATION MANUAL-15
1
MODULE COMPATIBILITY
SolarWorld AG/ SolarWorld Sunmodule Plus, Protect, Bisun,XL, Bisun XL, may be followed by mono, poly,duo,
xx
Industries GmbH black, bk,or clear;modules with 31,33 or 46 mm frames SW-xxx Where"x "is the module power
rating
SolarWortd Americas Inc. SolarWorid Sunmodule Plus, Protect, Bisun,XL, Bisun XL, may be followed by mono, poly,duo,
black, bk,or clear;modules with 33 mm frames SWA-xxx Where"xxx"is the module power rating
Stion Thin film modules with 35 mm frames STO-xxx or STO-xxxA Thin film frameless modules
Stion STL-xxx or STL-xxxA Where"xxx"is the module power rating
SunEdison Modules with 35,40 and 50 mm frames SE-YxxxZABCDE Where"Y"can be B, F, H, P,
SunEdison R;or Z;"xxx"refers to the module power rating;"Z"can be 0 or 4;"A"can be B,C,D,E,H,I,J,K,L,M,
or N ;"B"can be B or W;"C"can be A or C;"D"can be 3,7,8,or 9;and"E"can be 0, 1 or 2
Suniva modules with 35,38,40,46 and 50 mm frames OPTxxx-AA-B-YYY Z MVXxxx-AA-B-YYY Z
Suniva Where"xxx"is the module power rating;"AA"is either 60 or 72;"B"is either 4 or 5;"YYY"is either
100,101,700,1B0,or 1B1;and"Z"is blank or B
Sunpower standard (G3 or G4)or InvisiMount(G5)40 and 46 mm frames SPR-Zb-xxx-YY Where
Sunpower "Z"is either A, E, P or X;"b"can be blank, 17, 18, 19,20,21,or 22;"xxx"is the module power
rating and"YY"can be blank, BLK, COM,C-AC, D-AC, E-AC, G-AC, BLK-C-AC,or BLK-D-AC
Sunpreme Sunpreme frameless modules GXB-xxxYY Where"xxx"is the module power rating;and"YY"can
be blank or SL
Sunspark Sunspark modules with 40 mm frames SYY xicxZ Where"YY"can be MX or ST;"xxx"is the module
power rating;and"Z"can be M, P or W
Suntech Vd,Vem,Wdb,Wde,and Wd series modules with 35,40 and 50 mm frames
Talesun modules with 35 and 40 frames TP6yZZaaxxx-b Where"yy"can be blank, F or H;"ZZ"can
Talesun be 60 or 72;"aa"can be M or P;and"b"can be blank, B,T,or(H)
Trina Modules with 30,35,40 and 46mm frames TSM-xxxYYZZ Where"xxx"is the module power
rating;"YY"can be DD05, DD06, DD14, DE14, DE15, DEG15, PA05, PC05, P005, PD06, PA14,
PC14, PD14, PE14, or PE15 ;and"ZZ"can be blank, .05, .08,.10, .18, .08D, .18D,0.82, .002,
Trina .00S,05S,08S,A,A.05,A.08,A.10,A.18,A(II),A.05(11),A.08(11),A.082(II),A.10(II),A.18(II), H, H(II),
H.05(11), H.08(11), HC.20(II), HC.20(II),or M
Frameless modules TSM-xxxYY Where"YY"can be either DEG5(II), DEG5.07(II), DEG5.40(II),
DEG5.47(II), DEG14(II),DEG14C(II), DEG14C.07(II), DEG14.40(II), PEG5, PEG5.07, PEG5.40,
PEG5.47, PEG14,or PEG14.40
URE modules with 35 mm frames DyZmocHaa Where"y"can be 6 or 7;"Z"can be K or M;"xxx"is
URE the module power rating;and"aa"can be H3A, H4A,or H8A
Vikram solar modules with 40 mm frames VSyy.ZZ.AAA.bb Where"yy"can be M, P, MBB, MH, MS,
Vikram MHBB,or PBB;"ZZ"can be 60 or 72;"AAA"is the module power rating;and"bb"can be 03.04 or
05
VSUN VSUN modules with 35 and 40 mm frames,VSUNxxx-YYz-aa,Where"YY"can be 60,72, 120,or
144;"z"can be M, P, MH, PH,or BMH;and"aa"can be blank, BB,or DG
Winaico modules with 35 and 40 mm frames Wsy-xxxZa Where"y"can be either P or T;"xxx"is the
Winaico module power rating;"Z"can be either M, P,or MX;and"a"can be blank or 6
Yingli Panda, YGE,YGE-U,and YLM series modules with 35,40,and 50 mm frames
2019 IRONRIDGE,INC.VERSION 2.3 GROUND MOUNT INSTALLATION MANUAL-16