1. PARTIES AND DATE.
This Contract is made and entered into this day of ebA t11-,y 2009, by and
between the CITY OF ARCADIA (hereinafter called the "Owner ") and S. J. GRIGOLLA
CONSTRUCTION (hereinafter called the "Contractor ").
2. RECITALS.
2.1 The Owner is a charter City organized under the laws of the State of California, with
power to contract for services necessary to achieve its purpose;
2.2 Contractor, in response to a Notice Inviting Bids issued by Owner August 2008, has
submitted a bid proposal for construction the CURB RAMP REPLACEMENT PROJECT described
in the Contract.
2.3 Owner has duly opened and considered the Contractor's bid proposal, and duly
awarded the bid to Contractor in accordance with the Notice Inviting Bids and the other Bid
Documents, and has given written notice to Contractor on February 4, 2009.
2.4 Contractor has obtained, and delivers concurrently herewith, Performance and
Payment Bonds and evidences of insurance coverage as required by the Contract.
3. TERMS.
3.1 Incorporation of Documents.
This Contract includes and hereby incorporates in full by reference the following documents,
including all exhibits, drawings, specifications and documents therein, and attachments and
addenda thereto:
a. Notice Inviting Bids
b. Instructions to Bidders
C. Contract Bid Forms
El. Contract
e. Contract Appendix
Part "A"
- General Conditions
Part "B"
- Federal Requirements
Part "C"
- Special Provisions
Part "D"
- Specifications
Part "E"
- Drawings
RMWEPRM570015 CONTRACT-1 GB - STATE & LOCAL (505 /507/660) (724/00)
(PROJECT NO. 43855509)
Part "F" Performance Bond
Part "G" Payment Bond
Part "H" Escrow Agreement (optional)
ADDENDUM NO. 1 dated January 13, 2009
The above documents, including the General Conditions, are an integral part of the Contract
Documents. In addition to signing this Contract, Contractor shall initial this paragraph immediately
below acknowledging that he or she has read, understood and agrees with all of the terms of the
Contract Documents, including, but not limited to, provisions of the General Conditions relating to
indemnification, insurance, standards of performance, termination, compensation and time of the
essence performance. Contractor shall not disclaim knowledge of the meaning and effect of any
term or provision of the Contract Documents, and agrees to strictly abide by their meaning and
intent. In the event that Contractor fails to initial below, the Owner shall have the right to
declare the Contract unexecuted and to award the Contract to another contractor in
accordance with state law.
,avJ.
Contractor, s Initials
3.2 Contractor's Basic Obligation.
Contractor promises and agrees, at its own cost and expense, to furnish to the Owner all
labor, materials, tools, equipment, services, and incidental and customary work forthe construction
of Project No. 49854208 necessary to fully and adequately complete the Curb Ramp Replacement
Project, Including any alternates selected by the Owner, and all structures and facilities described in
the Contract (hereinafter the "Work "), for a total of Twenty Five Thousand Four Hundred Dollars
and Zero Cents ($25,400), as specified in the Contract Bid Forms submitted by the Contractor in
response to the above referenced Notice Inviting Bids. Such amount shall be subject to adjustment
in accordance with the applicable terms of this Contract. All Work shall be subject to, and performed
in accordance with the above referenced documents.
3.3 Standard of Performance.
Contractor shall perform all Work under this Contract in a skillful and workmanlike manner,
and consistent with the standards generally recognized as being employed by professionals in the
same discipline in the State of California. Contractor represents and maintains that it is skilled in the
professional calling necessary to perform the Work. Contractor warrants that all employees and
subcontractors shall have sufficient skill and experience to perform the Work assigned to them.
Finally, Contractor further represents that it, its employees and subcontractors have all licenses,
permits, qualifications and approvals of whatever nature that are legally required to perform the
Work, and that such licenses and approvals shall be maintained throughout the term of this
Contract.
3.4 Period of Performance.
Contractor shall perform and complete all Work under this Contract within 14 calendar days,
beginning ten (10) calendar days after the date on which the Notice to Proceed is sent by the Owner
to the Contractor. Moreover, Contractor shall perform its Work in strict accordance with any
RVPUB \DRD \570015 CONTRACT-2 GB - STATE & LOCAL (505/507/660) (7/24/00)
(PROJECT NO. 43855509)
completion schedule, construction schedule or project milestones developed pursuant to provisions
of the Contract, including but not limited to the Project Schedule located in the Specifications.
Contractor agrees that if such Work is not completed within the aforementioned period
and/or pursuant to any such completion schedule, construction schedule or project milestones
developed pursuant to provisions of the Contract, including but not limited to the Project Schedule
located in the Specifications, it is understood, acknowledged and agreed thatthe Ownerwill suffer damage.
Pursuant to Government Code Section 53069.85, Contractor shall pay to the Owner as fixed and liquidated
damages the sum of Two Hundred Fifty Dollars and Zero Cents ($250.00) PER DAY as provided by
the applicable provisions of the General Conditions, found in Part "B" of the Contract App
3.5 Owner's Basic Oblioation.
Owner agrees to engage and does hereby engage Contractor as an independent contractor
to furnish all materials and to perform all Work according to the terms and conditions herein
contained for the sum set forth above. Except as otherwise provided in the Contract, the Owner
shall pay to Contractor, as full consideration forthe satisfactory performance by the Contractor of the
services and obligations required by this Contract, the above referenced compensation in
accordance with compensation provisions set forth in the Contract.
3.6 Contractor's Labor Certification.
Contractor maintains that he is aware of the provisions of Section 3700 of the California
Labor Code which require every employer to be insured against liability for Worker's Compensation
or to undertake self- insurance in accordance with the provisions of that Code, and agrees to comply
with such provisions before commencing the performance of the Work. A certification form for this
purpose is attached hereto as Exhibit "A" and incorporated herein by reference, and shall be
executed simultaneously with this Contract.
3.7 Attorneys' Fees.
If either party commences an action against the other party, either legal, administrative or
otherwise, arising out of or in connection with this Contract, the wailing fees) and a I other costs
be entitled to have and recover from the losing party
of such action.
3,8 Successors.
The parties do for themselves, their heirs, executors, administrators, successors, and
assigns agree to the full performance of all of the provisions contained in this Contract. Contractor
may not either voluntarily or by action of law, assign any obligation assumed by Contractor
hereunder without the prior written consent of the Owner.
GB - STATE & LOCAL (505/507/660) (724/00)
RVPUB�DRD\570015 CONTRACT-3
(PROJECT NO. 43855509)
3.9 Notices.
All notices hereunder and communications regarding interpretation of the terms of the
Agreement or changes thereto shall be provided by the mailing thereof by registered or certified
mail, return receipt requested, postage prepaid and addressed as follows:
Contractor
S. J. Grigolla Construction
2639 Sierra Way
La Verne CA 91750
Attn: Steven J. Grigolla
President
Owner
City of Arcadia
240 West Huntington Drive
Arcadia CA 91007
Attn: Philip A. Wray
City Engineer
Sure
Sines-N
't �nnP � r� Q 2'8tv7
Attn:
With Copies To:
Any notice so given shall be considered received by the other party three (3) days after
deposit in the U.S. Mail, first class postage prepaid, addressed to the party at the above address.
Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the
method of service.
CONTRAC
By: 6to'.jt.4 5, 6Y1.�u5 (A
Name
►CGS
Title
Tax I.D. Number
O-
Number
Contractor's License:
Class
Number 3 S6 - t94 B
RVPUB\DRD157W15 CON
CITY OF ARCADIA
By: , ""o
Donald Penman, City Manager
altefon
Date
Attest
By:
LCiity-Cerk t
Approved as to Form:
5 By:
Stephen P. Deitsch, City Attorney
TRACT -4 ca- STATE &LOCAL so5150116e0�w+24roo,
(PROJECT NO. 43855509)
EXHIBIT "A"
CERTIFICATION
LABOR CODE - SECTION 1861
I, the undersigned Contractor, am aware of the provisions of Section 3700 et sec. of
the California Labor Code which require every employer to be insured against liability for
Worker's Compensation or to undertake self- insurance in accordance with the provisions of
the Code. I agree to and will comply with such provisions before commencing the Work
governed by this Contract.
CONTRACTOR:
Name of Contractor: �j . tS- b nc �ju l �A L40avy ea .
WnlC
By:
Signature: eo�lek::�
Name: iS�JL -� (T( Gn�sa��9
Title: rh e $
Date:
RVPIIMMM570015 CONTRACT (EXHIBIT A)
GB -STATE &LOCAL (505/507/660) (724/00)