SUBJECT: REJECT ALL BIDS RECEIVED FOR THE SEWER MAIN REPLACEMENT
PROGRAM AND DIRECT STAFF TO RE-PROGRAM IN THE FISCAL
YEAR 2021-22 CAPITAL IMPROVEMENT PROGRAM BUDGET
Recommendation: Approve
SUMMARY
The City of Arcadia’s 2006 Sewer Master Plan study identified and prioritized sections of
sanitary sewer pipe that are flowing at or above design capacity. Based on the study, the
section of sewer pipe on Duarte Road between Baldwin Avenue and the connection point
to the Los Angeles County Sanitation District (“LACSD”) sewer trunk pipe at Holly Avenue
needs to be replaced in order to accommodate future sewer demands. A formal bid was
conducted and MNR Construction, Inc. submitted the lowest responsive bid. During the
bid evaluation process, MNR Construction, Inc. requested their bid to be withdrawn due
to a clerical error. All other bids received exceeded the estimated budget. It is
recommended that the City Council reject all bids received for the Sewer Main
Replacement Program and direct staff to re-bid the project.
BACKGROUND
The City of Arcadia’s 2006 Sewer Master Plan study identified sections of sanitary sewer
pipe on Duarte Road as inadequate in accommodating the current high demand flows
and at risk of experiencing sewer overflows. The existing 12-inch sewer pipe along Duarte
Road between Baldwin Avenue and the connection point to the LACSD sewer trunk pipe
needs to be replaced with a 16-inch sewer pipe to accommodate future sewer demands
and alleviate the potential of a sewer back up.
DISCUSSION
A Notice Inviting Bids was published in the City’s adjudicated newspaper, and bid
packages were provided to contractors that perform this type of work. On February 2,
2021, the City Clerk received six bids with the following results:
Reject Bids for the Sewer Main Replacement Program
March 2, 2021
Page 2 of 2
Bidder Location Bid Amount__ __
MNR Construction, Inc. La Verne, CA $ 768,500
GRFCO, Inc. Perris, CA $ 1,017,600
GRBCON, Inc. Baldwin Park, CA $ 1,028,418
Mike Prlich & Sons, Inc. Baldwin Park, CA $ 1,093,900
Aid Builders, Inc. Los Alamitos, CA $ 1,259,350
Mladen Buntich Construction Upland, CA $ 1,455,400
All bid documents were reviewed for content. During the bid evaluation process, the
lowest bidder, MNR Construction, Inc., requested their bid to be withdrawn due to a
clerical error. The price for one of their bid items should have been more than what they
indicated. All other bids received exceeded the estimated project budget of $900,000.
The Public Works Services Department (“PWSD”) reviewed all bids and found that bids
received were considerably higher than anticipated due to a less competitive bidding
environment and increased trucking costs, which may have resulted from the pandemic.
PWSD engineering staff will review the project scope and specifications to determine if
changes are needed. The project will be re-programed in Fiscal Year 2021-22 Capital
Improvement Program budget.
ENVIRONMENTAL ANALYSIS
This project is categorically exempt per the California Environmental Quality Act (“CEQA”)
as an existing facility, Section 15301 of the CEQA guidelines.
FISCAL IMPACT
Funds in the amount of $900,000 have been budgeted in the FY 2020-21 Capital
Improvement Program for this project. Staff will review the project scope and
specifications and re-program this project in the FY 2021-22 Capital Improvement
Program, making adjustments to the project scope and/or funding as needed.
RECOMMENDATION
It is recommended that the City Council reject all bids received for the Sewer Main
Replacement Program and direct staff to re-program in the Fiscal Year 2021-22 Capital
Improvement Program budget.