Certificate of Occupancy
City of Arcadia
,( \\.,:..,
Development Services Department—Building Division /
a
This certificate issued pursuant to the requirements of the
l'---(California Building Code certifying that at the time of issuance this structure was in
compliance with the various ordinances of the City regulating building construction or use.
•
(\\K—,::;'
Permit No. 18-1955 •
Building Address: 2605 DERBY CT ARCADIA, CA 91007
, i
Permit Type: MF NEW Effective CBC: 2016 C.B.C. '
•
Occupancy Code: R-3/U
�,._ Zone Code: M�
Final nate: 9-16-2020 Type of Construction: TYPE VB SPRINKLERED
--- I
Owner: LENNAR HOMES OF CALIFORNIA
Kenne h Fields,B it ng 0 I
f
' k
Post in Conspicuous Place
r
. . 4.
;j .ption
ne
CONSULTING ENGINEERS
PAGE 1 OF 1
STRUCTURAL OBSERVATION REPORT
LENNAR HOMES, CA
THIS REPORT INCLUDES ALL CONSTRUCTION WORK THROUGH THE: February 13. 2020
PROJECT , "Essex"-SFD OPTION ONE J.N. 0918-2286
LOCATION . Arcadia,California BLDG.PERMIT NUMBER Mnew-18-1955
OWNER Lennar Homes LOCATION/DIVISION Coastal
ARCHITECT , Angeleno ARCHITECT J.N. 1704
STRUCT.OBS.OF RECORD . Ilia Sarad,P.E.,S.E.,S.E.C.B. LIC.OR REGISTRATION No. S-3855
STRUCTURAL OBSERVER . Erik Torres LIC.OR REGISTRATION No. .
OBSERVED STRUCTURAL ELEMENTS&THEIR CONNECTIONS: LOT(S)&PHASE OBSERVED:
Conventional Foundation System;i.e.,anchor bolts,holdown bolts&straps, Phase:18, Tract: 77121
post bases,Strong-Wall/Hardy Frame anchor bolts,slab size/reinforcement and HS#11,Plan 1AR
footing&pad size/reinforcement(NOTE:monolithic pour system). 2605 Derby Ct.,
Arcadia,California 91007
OBSERVED DEFICIENCIES: (ArrACH ADDITIONAL PAGES IF NECESSARY) _ _ _ Initial/Completion Date
The deficiencies noted during the observation visit have been corrected and/or installed
by a collaborated effort of the foreman and project superintendent. E.T. 02/13/20
Construction Stage: ❑HVAC ❑Electrical ❑Plumbing ❑Double Sided ❑ Plywood CI'g ❑ Deck Option ❑Guard
N/A Shear Walls Lid(a) Rails
Note:When box is checked,it indicates that construction stage is in progress,and it has not yet been completed at the time of observation was conducted
❑X STRUCTURAL SYSTEM WAS VISUALLY OBSERVED TO BE IN GENERAL CONFORMANCE WITH THE APPROVED PLANS
❑ STRUCTURAL DEFICIENCIES ARE OF A MINOR NATURE&MAY BE REVIEWED BY CITY BLDG INSPECTOR FOR COMPLIANCE
I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE AND BELIEF
1. IAM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE
STRUCTURAL OBSERVATION.
2. I,OR ANOTHER QUALIFIED-CHARGE OBSERVER WHO I HAVE DESIGNATED Q(:OFFS$J0
ABOVE AND IS UNDER MY RESPONSIBLE CHARGE,HAS PERFORMED THE �~c��P B• Sq.",oma
REQUIRED SITE VISITS AT EACH SIGNIFICANT CONSTRUCTION STAGE TO
VERIFY IF THE STRUCTURE IS IN GENERAL CONFORMANCE WITH THE rn
APPROVED PLANS AND SPECIFICATIONS. N0. S 3855 t53
3. ALL DEFICIENCIES,WHICH I DOCUMENTED,HAVE BEEN CORRECTED UNLESS
OTHERWISE INDICATED ABOVE. * Exp. 3/31/2020�,
4. ALL OBSERVED DEFICIENCIES SHALL BE CORRECTED AND APPROVED BY THE
OBSERVER PRIOR TO FINAL ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY �T' PRUCT t)RP
THE BUILDING DEPARTMENT. rF OF �F
MN(
5. THIS REPORT IS PROVIDED TO THE OWNER AS A PART OF THE OWNERS
OVERALL CONSTRUCTION QUALITY CONTROL PROGRAM. February 13,2020
6. OPTION ONE HAS PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE
WITH THE SEAOC RECO i NDED GUIDELINES FOR THE PRACTICE OF STAMP OF ENGINEER-OF-RECORD
STRUCTURAL ENGINEE' t' • ORN+.
SIGNED BY: Iff' ri"bII�I�. February 13,2020
Ilia Sara,, P. , S.E., ' .C.
STRUCTURAL OBSERVATI• DOES OT WAIVE THE REQUIREMENTS FOR INSPECTIONS BY CITY BUILDING
INSPECTORS. ALL WORK MUST ! ' . WITH THE APPROVED PLANS AND APPLICABLE STATE&LOCAL CODES.
2286508 Foundation H511 P1AR
Option One Tel 714.556.1916
Consulting Engineers 2755 Bristol Street. Suite 100. Costa Mesa.Ca. 92626 Fax 714 555 1452
` option
Ione
CONSULTING ENGINEERS
PAGE I OF 1
STRUCTURAL OBSERVATION REPORT
CITY of ARCADIA
THIS REPORT INCLUDES ALL CONSTRUCTION WORK THROUGH THE: April 1, 2020
PROJECT "Essex"-SFD OPTION ONE J.N. 0918-2286
LOCATION , Arcadia,California BLDG.PERMIT NUMBER Mnew-18-1955
OWNER , Lennar Homes LOCATION/DIVISION • Coastal
ARCHITECT Angeleno ARCHITECT J.N. 1704
STRUCT.OBS.OF RECORD . Ilia Sarad,P.E.,S.E.,S.E.C.B. LIC.OR REGISTRATION No. S-3855
STRUCTURAL OBSERVER Erik Torres,E.I.T. LIC.OR REGISTRATION No.
OBSERVED STRUCTURAL ELEMENTS&THEIR CONNECTIONS: LOT(S)&PHASE OBSERVED:
Interior and Exterior General Framing;i.e.,roof trusses,roof sheathing, Phase:1B, Tract:77121
shear elements,holdowns,floor sheathing,floor trusses,beams,headers,and HS#11,Plan 1AR
general hardware. 2605 Derby Court
Arcadia,California 91007
OBSERVED DEFICIENCIES: (ATFACH ADDITIONAL PAGES IF NECESSARY) Initial/Completion Date
The deficiencies noted during the observation visit have been corrected and/or installed
by a collaborated effort of the foreman and project superintendent. ET. 04/01/20
Construction Sta a Double Sided Plywood Cl' Guard
N/A S ❑HVAC ❑Electrical ❑Plumbing ❑Shear Walls Lid(s) g ❑ Deck Option ❑ Rails
Note:When box is checked,it indicates that construction stage is in progress,and it has not yet been completed at the time of observation was conducted
❑ STRUCTURAL SYSTEM WAS VISUALLY OBSERVED TO BE IN GENERAL CONFORMANCE WITH THE APPROVED PLANS
❑ STRUCTURAL DEFICIENCIES ARE OF A MINOR NATURE&MAY BE REVIEWED BY CITY BLDG INSPECTOR FOR COMPLIANCE
I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE AND BELIEF
I. I AM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE
STRUCTURAL OBSERVATION. QttOFESS/p�,�
2. 1,OR ANOTHER QUALIFIED-CHARGE OBSERVER WHO I HAVE DESIGNATED "'Ne
ABOVE AND IS UNDER MY RESPONSIBLE CHARGE,HAS PERFORMED THE
~���P S•4,Pg0 �
REQUIRED SITE VISITS AT EACH SIGNIFICANT CONSTRUCTION STAGE TO
VERIFY IF THE STRUCTURE IS N GENERAL CONFORMANCE WITH THE
rn
APPROVED PLANS AND SPECIFICATIONS. NO. S 3855 23
3. ALL DEFICIENCIES,WHICH I DOCUMENTED,HAVE BEEN CORRECTED UNLESS
OTHERWISE INDICATED ABOVE. * 6cp. 3/31/2022�,
4. ALL OBSERVED DEFICIENCIES SHALL BE CORRECTED AND APPROVED BY THE s+
OBSERVER PRIOR TO FINAL ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY qp RUC T URP
THE BUILDING DEPARTMENT. e OF CALF
5. THIS REPORT IS PROVIDED TO THE OWNER AS A PART OF THE OWNERS
OVERALL CONSTRUCTION QUALITY CONTROL PROGRAM. April 1,2020
6. OPTION ONE HAS PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE
WITH THE SEAOC RECO ENDED GUIDE INES FOR THE PRACTICE OF STAMP OF ENGINEER-OF-RECORD
STRUCTURAL ENGINEE'I !G Pi•'�I .
%j ff l
SIGNED BY: ������I1, A April I,2020
Ilia 5a a!;P.E., 5.E., 5.. .C.%
STRUCTURAL OBSERVATIO DOES OT WAIVE THE REQUIREMENTS FOR INSPECTIONS BY CITY BUILDING
INSPECTORS. ALL WORK MUST OMP WITH THE APPROVED PLANS AND APPLICABLE STATE&LOCAL CODES.
228650R_frmg_HS1121 AR
Option One Tel 714.556.1916
Consulting Engineers 2755 Bristol Street, Suite 100. Costa Mesa, Ca 92626 Fax 714 556.1952
�4 Of ARC
OFORk,44 r
C) `y
WPM
it ..AN1r 9)
�4A'`y°tom MEMORANDUM
Fire Department
DATE: August 7, 2020
TO: BUILDING DEPARTMENT
INSPECTOR Henry Kemich
FROM: FIRE DEPARTMENT
SUBJECT: FIELD INSPECTION
ADDRESS: 2601-2617 Derby Court
THE FOLLOWING ITEMS WERE CHECKED FOR CONFORMANCE WITH APPLICABLE FIRE
DEPARTMENT REQUIREMENTS:
TYPE OF INSPECTION DATE / INITIAL
FINAL INSPECTION
FIRE SPRINKLERS (PC# 20-846) 7-27-2020 Jill Perumean
FIRE ALARMS
HOOD & DUCT
KNOX BOX
OCCUPANCY 7-27-2020 Jill Perumean
COMMENTS:
Emailed Bldg. Dept. 7-27-2020 Rita